Loading...
HomeMy WebLinkAboutWQ0029233_Monitoring - 10-2016_20161202 (2)Page FdRM: NDAR-1 08-11 NON -DISCHARGE APPLICATION REPORT (NDAR-1) I of Permit No.: W00029233 Facility Name: Bear Lake Reserve County: Jackson Month: October Year: 2016 Did irrigoccur � Field Name: A Field Name: B Field Name: C Field Name: D Area (acres): 0.67 Area (acres): 0.84 Area (acres): ' 0.82 Area (acres): 1.26 at this faci( It [� /V. Cover Crop: p: Mature Forest Cover Crop: p: Mature Forest Cover Crop: p: Mature Forest Cover Crop: p: Mature Forest DYES ❑�c �� Hourly Rate (in): 0.05 Hourly Rate (in): 0.05 Hourly Rate (in): 0.05 Hourly Rate (in): 0.05 12016 Annual Rate (in): 70.5 / 7.0 Annual Rate (in): 85.7/8.6 Annual Rate (in): 72.5/7.2 Annual Rate (in): 69.6/7.0 Weath Q4l l oard Field Irrigated? ❑YES Dlyo Field Irrigated? ❑YES ONO Field Irrigated? DYES QN0 Field Irrigated? DYES ONO ❑ c V _ r d E E I— rS, ° m a ml :: ago h ❑� o 'V „ �, O. ` rA m a a L" d� Em �a O a �Q m� E`° i= � I TE ma ❑ �. J. E rn oc E3•a x0R = p J 0)V Ed �a O C. iQJ' o d;: E� rn H •- rn >,c ,�'v m ❑ E cmmy �c E�`o Xo�o x p Em ?A O 'q V m_m Em a� I- •- CME �,c m ❑. 0 E m ' �c Ea'o o� p.. ,� J m o E°1 �o oa %Q Ern i=� _ ` o� M o ❑o J Trn E�m x0o t0 2 J OF in ft ft gal min in in gal min in in gal min in in gal min in in 1 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0:00 0 0 0.00 0.00 2 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0,00 0 0 0.00 0.00 3 C 65 0 9 10 0 :. 0 0.00 :0.00 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 4 C 63 0 9 10 0 0 0.00 L1.00 0 0 0.00 0.00 0' 0 0.00 0.00 0 0 0.00 0.00 5 C 59 0 9 10 0: 0 0.00 0:00 0 0 0.00 0.00 0, 0 0.00 0.00 0 0 0.00 0.00 6 1 C 66 0 9 10 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 7 C 67 0 9 10 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 8 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 9 0 0 0.00 0.00 0 O 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 10 C 65 0 9 10 0 0 0.00 1 0.00 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 1 0.00 11 C 45 0 9 10 0 0 0.00 0.00 0 0 0.00 0.00 0. 0 0.00 0,00 0 0 0.00 1 0.00 12 C 39 0 9 10 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 13 C 43 0 9 9 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 14 C 50 0 9 9 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0:00 0 0 0.00 0.00 15 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 16 0 0 0.00 0.00 0 0 0.00 0.00 0. 0 0.00 1 0.00 0 0 0.00 0.00 171 C 51 0 9 9 0 0 0.00 0.00 0 0 0.00 0.00 0:. 0 0.00 0.00 0 0 0.00 0.00 18 PC 50 0 9 9 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 . 0.00 0 0 0.00 0.00 19 PC 52 0 9 9 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0,00 0.00 0 0 0.00 0.00 20 PC 70 0 9 9 0 0 0.00 0.00 0 0 0.00 0.00 0: 0 0.00 0.00 0 0 0.00 0.00 21 PC 40 0.1 9 8 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 22 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 231 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 241 C 42 0 9 8 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 251 C 44 0 9 1 8 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0:00 0 0 0.00 0.00 261 C 1 46 0 9 8 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 271 C 1 47 0 9 8 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 281 C 1 64 0 9 7 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 29 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 30 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 31 C 43 0 9 7 0 0 0.00 0.00 0 0 1 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 Monthly Loading: 0 0.00 2.57 jjjjjjffjM=jMMM 0 1 0.00 2.54 0 0.00 2.49 0 ss_ 0.00 2.39 12 Month Floating Total (in): FORM: NDAR-1 08-11 NON -DISCHARGE APPLICATION REPORT (NDAR-1) Page f of 6s . , Did the application rates exceed the limits in Attachment B of your permit? Were adequate measures taken to prevent effluent ponding in or runoff from the sites? Was a suitable vegetative cover maintained on all sites as specified in your permit? Were all setbacks listed in your permit maintained for every application to each permitted site? Were all freeboards maintained in accordance with the specified freeboard heights in your permit? Compliant []Non-compliant OCompliant ❑Non -Compliant Compliant ❑Non -Compliant [ZCompliant ❑Non -Compliant OCompliant ❑Non -Compliant If the facility is non-compliant, please explain in the space below the reason(s) the facility was not in compliance. Provide in your explanation the date(s) of the non-compliance and describe the corrective action(s) taken. Attach additional sheets if necessary. Operator in Responsible Charge (ORC) Certification Permittee Certification ORC: Michael Beek Permittee: Bear Lake Reserve Certification No.: SI -991669 WWIV-7930 Signing Official: Robert Barr Grade: SI WWIV Phone Number: (828) 251-1900 Signing Official's Title: Signatory Has the ORC changed since the previous NDAR-1? ❑yes 21No Phone Number: (828) 251-1900 Permit Exp.: 9/30/14 M^V Aj� I 2'` I- / /2_qj Signature Date Signature Date By this signature, I certify that this report is accurrate and complete to the best of my knowledge. I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that all qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations. Mail Original and Two Copies to: Division of Water Quality Information Processing Unit 1617 Mail Service Center Raleigh, North Carolina 27699-1617 FORM: NDAR-1 08-11 NON -DISCHARGE APPLICATION REPORT (NDAR-1) Page 2- of 6:1 Permit No.: WQ0029233 Facility Name: Bear Lake Reserve County: Jackson Month: October Year: 2016 Did irrigation occur at this facility? Field Name: E Field Name: F Field Name: G Field Name: H Area (acres): 0.74 Area (acres): 0.95 Area (acres): 0.71 Area (acres): 0.53 Cover Crop:Mature Forest Cover Crop: Mature Forest P' Cover Cro Mature Forest P� Cover Cro Mature Forest P' DYES ONO Hourly Rate (in): 0.05 Hourly Rate (in): 0.05 Hourly Rate (in): 0.05 Hourly Rate (in): 0.05 Annual Rate (in): 70.2/7.0 Annual Rate (in): 73.9/7.4 Annual Rate.(n): 63.516.3 Annual Rate (in): 77.3/7.7 Weather Freeboard Field Irrigated? DYES ENO Field Irrigated? DYES ENO Field Irrigated? DYES ENO Field Irrigated? ❑YES ❑✓ NO p v ° U ° w ami l+''0 ° E ° i0 '= a y a.LO m 0 r m m °i N M �,a w CL p d m E_ Q o a `?Q.„ V 41 a� E as rn i= •- rn a. C o p �a ° J E 0 3 ,� C E 3-a to mT ° :9 m y E d °= ° o a iQ v a) °: E ° rn � •r- 0 T C ° p m ° J E tM ` C E °'v �S o rL J 0 o �.:..af �= Q -o a '!4 a as '.r E eo m 1= - o� >.. c M p o J E or b .0 C E 3`v` M� O _ J a) v E N °= a o a %Q v a) w; E rn H° rn m `o ° p o J E rn C E v 0 �2 ° 2 J OF in ft ft gal min in it gal min in in gal min inz in ` gal min in in 1 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0:00 0 0 0.00 0.00 2 0 ':` 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 U0 0 0 0.00 0.00 3 C 65 0 9 10 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00,._; - 0.00. 0 0 0.00 0.00 4 C 63 0 9 10 0 0 0.00 0.00'` " 0 0 0.00 0.00 1 0 1 0 0.00` '` 0.00"' 0 0 0.00 0.00 5 C 59 0 9 10 0 0 0:00 0.00 0 0 0.00 0.00 0 0 0.00' 0.00 0 0 0.00 0.00 6 C 66 0 9 10 0 0 0.00 0,00 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 7 C 67 0 9 10 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 8 0 0 0.00 0.00 0 0 0.00 0.00 0 0 o.ob 0.00 0 0 0.00 0.00 9 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 10 C 65 0 9 10 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 11 C 45 0 9 10 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 12 C 39 0 9 10 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00, 0.00 0 0 0.00 0.00 13 C 43 0 9 9 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 14 C 50 0 9 9 0 0 0.00 0,00 0 0 0.00 0.00 0 0 0.00 fl.00.>. 0 0 0.00 0.00 15 0 :: 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00' 1 0 0 0.00 0.00 16 0 0 0.00 0.00 0 0 0.00 0.00 :0 0 0.00 0.00 0 0 0.00 0.00 17 C 51 0 9 9 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 18 PC 50 0 9 9 0 0 0,00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 19 PC 52 0 9 9 0 -- 0 0.00 U0 0 0 0.00 0.00 0 0 0.00 0.00: 0 0 0.00 0.00 20 PC 70 0 9 9 0 0 0:00 0.00 0 0 0.00 . 0.00 0 0 0.00 0.00 0 '01 - -- ; 0.00 0:00 21 PC 40 0.1 9 8 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 22 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 23 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 24 C 42 0 9 8 0 0 0.00 0,00 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 25 C 44 0 9 8 0 0 1 0:00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 261 C 46 0 9 8 0 0 0;.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 27 C 47 0 9 8 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 1 0 0 0.00 0.00 28 C 64 0 9 7 0 0 0.00 0,00 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 29 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 30 0 0 0.00 1 0.00 1 0 0 0.00 0.00 0 0 0.00' 0.00 0 0 0.00 0.00 31 C 43 0 1 9 1 7 0 1 0 1 0,00 1 0.00 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 �_12 Monthly Loading: Month Floating Total (in), 0 0.00 0 OM 0.00 2.53 0 0.00 2.51 0 No= - 0.00 2.44 FORM: NDAR-1 08-11 NON -DISCHARGE APPLICATION REPORT (NDAR-1) Page Z— of 6 Did the application rates exceed the limits in Attachment B of your permit? Were adequate measures taken to prevent effluent ponding in or runoff from the sites? Was a suitable vegetative cover maintained on all sites as specified in your permit? Were all setbacks listed in your permit maintained for every application to each permitted site? Were all freeboards maintained in accordance with the specified freeboard heights in your permit? ❑� Compliant ❑Non -Compliant ❑� Compliant ❑Non -Compliant ❑� Compliant ❑Non -Compliant ❑� Compliant ❑Non -Compliant ❑✓ Compliant ❑Non -Compliant If the facility is non-compliant, please explain in the space below the reason(s) the facility was not in compliance. Provide in your explanation the date(s) of the non-compliance and describe the corrective action(s) taken. Attach additional sheets if necessary. Operator in Responsible Charge (ORC) Certification Permittee Certification ORC: Michael Beck Permittee: Bear Lake Reserve Certification No.: SI -991669 WWIV-7930 Signing Official: Robert Barr Grade: SI WWIV Phone Number: (828) 251-1900 Signing Official's Title: Signatory Has the ORC changed since the previous NDAR-1? ❑Yes ONO Phone Number: (828) 251-1900 Permit Exp.: 9/30/14 Signature Date Signature Date By this signature, I certify that this report is accurrale and complete to the best of my knowledge. I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that all qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations. Mail Original and Two Copies to: Division of Water Quality Information Processing Unit 1617 Mail Service Center Raleigh, North Carolina 27699-1617 • FORM: NDAR-1 08-11 NON -DISCHARGE APPLICATION REPORT (NDAR-1) Page of 1v ' Permit No.: WQ0029233 Facility Name: Bear Lake Reserve county: Jackson Month: October Year: 2016 Field Name: I Field Name: K Field Name: M Field Name: N Did irrigation occur at this facility? Area (acres): 0.85 Area (acres): 0.99 Area (acres): 0.52 Area (acres): 0.58 Cover Crop:Mature Forest Cover Crop: Mature Forest P: Cover Crop: Mature Forest P� Cover Crop: Mature Forest P� ❑YES RIND Hourly Rate (in): 0.05 Hourly Rate (in): 0.05 Hourly Rate (in): 0,05 Hourly Rate (in): 0.05 Annual Rate (in): 80.0/8.0 Annual Rate (in): 71.0/7.1 Annual Rate (in). 66.816.7 Annual Rate (in): 60.2/6.0 Weather Freeboard Field Irrigated? ❑YES OND Field Irrigated? ❑YES OND Field Irrigated? ❑YES [AND Field Irrigated? ❑YES NO >` 0 v 0 y Y m r L° C E m c ° ° Q d a) w N '- am 07 w = U N p� d v Em p CL ?4 V dm F afl �c p M _j E 0 z�c x o m J a) o Em o a !4 a d;; H O1 = rn �,c p c J E rn � c x o =J 0 •o Em o a 74 o aia' p� rn a. O m _j 8 rn �_,5 % o _j y Em o a �4 a m;' = rn �,c 0 J E of � c K o 0 =J OF I in ft ft gal min in in gal min in in gal min in in gal min in in 1 0 0 0:00 0.00 0 0 0.00 0.00 0 0 0.00 0.00. 0 0 0.00 0.00 2 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0,00- 0 0 0.00 0.00 3 C 65 0 9 10 0 0 0:00 0.00 0 0 0.00 0.00 0 0 0.00. 0,00. 0 0 0.00 0.00 4 C 63 0 9 10 0 ' 0 0.00 0.00 0 0 0.00 0.00 0, 0 0.00 '0,00 0 0 0.00 0.00 5 C 59 0 9 10 0 0 0.00 0.00 0 0 0.00 0.00 ' 0 '' 0 0.00 0.00 ' ` 0 0 0.00 0.00 6 C 66 0 9 10 0 0 0,00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 7 C 67 0 9 10 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00... 0 0 0.00 0.00 8 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0:70 0.00 0 0 0.00 0.00 9 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 10 C 65 0 9 10 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 11 C 45 0 9 10 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 12 C 39 0 9 10 0 0 400 0.00 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 131 C 43 0 9 9 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 ` 0.00 0 0 0.00 0.00 141 C 50 0 9 9 0 0 0.00 0.00 0 0 0.00 0.00 10. 0 0,00 0.0,0 0 0 0.00 0.00 15 0 0 0,00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 16 0 0 0.00 `0.00 1 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 17 C 51 0 9 9 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0,00 0 0 0.00 0.00 18 PC 50 0 9 9 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 19 PC 52 0 9 9 0 0 0.00 0.00 0 0 0.00 0.00 0 1 0 0.00 0.00 0 0 0.00 0.00 20 PC 70 0 9 9 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 0 0, 0.00. ; -0.00 21 PC 40 0.1 9 8 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 22 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 23 0 0 0:00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 24 C 42 0 9 8 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 25 C 44 0 9 8 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 26 C 46 0 9 8 0 0 0,00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 27 C 47 0 9 8 0 0 0.00 0.00 0 1 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 28 C 64 0 9 7 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 29 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 30 0 0 0.00 0,00 0 0 0.00 0.00 D 0 0.00 0.00 0 0 0.00 0.00 311 C 43 0 9 1 7 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0 __ 0.00 0.00 0 00 = Monthly Loading: 12 Month Floating Total (in): 0 Q 00 2.53 0 0.00 ` 0 0.00 FORM: NDAR-1 08-11 NON -DISCHARGE APPLICATION REPORT (NDAR-1) Page __'� of - Did the application rates exceed the limits in Attachment B of your permit? Were adequate measures taken to prevent effluent ponding in or runoff from the sites? Was a suitable vegetative cover maintained on all sites as specified in your permit? Were all setbacks listed in your permit maintained for every application to each permitted site? Were all freeboards maintained in accordance with the specified freeboard heights in your permit? ❑✓ Compliant ❑Non -Compliant OCompliant ❑Non -Compliant RCompliant ❑Non -Compliant ❑� Compliant [—]Non-compliant (]Compliant ❑Non -Compliant If the facility is non-compliant, please explain in the space below the reason(s) the facility was not in compliance. Provide in your explanation the date(s) of the non-compliance and describe the corrective action(s) taken. Attach additional sheets if necessary. Operator in Responsible Charge (ORC) Certification Permittee Certification ORC: Michael Beck Permittee: Bear Lake Reserve Certification No.: SI -991669 WWIV-7930 Signing Official: Robert Barr Grade: SI WWIV Phone Number: (828) 251-1900 Signing Official's Title: Signatory Has the ORC changed since the previous NDAR-1? ❑Yes ONo Phone Number: (828) 251-1900 Permit Exp.: 9/30/14 n I / /Z 5// (, Signature Date Signature Date By this signature, I certify that this report is accurrate and complete to the best of my knowledge. I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that all qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations. Mail Original and Two Copies to: Division of Water Quality Information Processing Unit 1617 Mail Service Center Raleigh, North Carolina 27699-1617 FORM: NDAR-1 08-11 NON -DISCHARGE APPLICATION REPORT (NDAR-1) Page -4- of Permit No.: WQ0029233 Facility Name: Bear Lake Reserve County: Jackson Month: October Year: 2016 Field Name: 0 Field Name: P Field Name: Q Field Name: R Did irrigation occur Area (acres): 0.5 Area (acres): 1.1 Area (acres): 0.43 Area (acres): 0.7 at this facility? Cover Crop:Mature Forest Cover Crop: P� Mature Forest Cover Cro P� Mature Forest Cover Cro p� Mature Forest ❑YES ONO Hourly Rate (in): 0.05 Hourly Rate (in): 0.05 Hourly Rate (in): 0.05 Hourly Rate (in): 0.05 Annual Rate (in): 78.617.9 Annual Rate (in): 80.7/8.1 Annual Rate (in): 87.3/8.7 Annual Rate (in): 77.6/7.8 Weather Freeboard Field Irrigated? DYES RING Field Irrigated? []YES ONO Field Irrigated? DYES pNO Field Irrigated? DYES ❑� NO T 0 O v t � y E ° a t7 a d O) m 2 "_ m °' (n .0 a m �� O. o m Ln °° E d 3� ]Q 'a 07 2 E� ~ A C �� �J E rn 7` C Ewa Mx 0 m y E d °a i0 CLQ ° m a; E� ~ rn T C �� �J E m M` C E�''o =J 0 v E Of �Q `!Q a O. w Em ~,� rn T C '�v �J E rn 7 L G K'om 1970 m o E Ol moo. ,Q 0 CL~ v d :: Em '�- - m >, mm ❑J E Xom c0=J OF: in ft ft gal min in in gal min in in gal min in in gal min in in 1 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 2 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 3 C 65 0 9 10 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 4 C 63 0 9 10 0 0 0.00 0.00 0 0 0.00 0.00 1 0 0 0.00 0.00 0 0 0.00 0.00 5 C 59 0 9 10 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 6 C 66 0 9 10 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 7 C 67 0 9 10 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 8 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 9 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 10 C 65 0 9 10 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 11 C 45 0 9 10 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0,00 0 1 0 0.00 0.00 12 C 39 0 9 10 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 13 C 43 0 9 9 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 14 C 50 0 9 9 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0100 0 0 0.00 0.00 15 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 16 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 17 C 51 0 9 9 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 18 PC 50 0 9 9 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0,00 0 1 0 0.00 0.00 19 PC 52 0 9 9 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 20 PC 70 0 9 9 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 0 0 ; 0.00 0.00 21 PC 40 0.1 9 8 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 22 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 23 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 24 C 42 0 9 8 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 0 1 0 0.00 0.00 251 C 44 0 9 8 0 1 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 261 C 46 0 9 8 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 271 C 47 0 9 8 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 28 C 64 0 9 7 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 29 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 30 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 31 C 43 0 9 7 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 Monthly Loading: 0 0.00 2.57 0 ,� 0.00 2.35 0 0.00 2.63 0 z= _ = = _ = 0.00 2.43 __ , 12 Month Floating Total (in): FORM: NDAR-1 08-11 NON -DISCHARGE APPLICATION REPORT (NDAR-1) Page 4—of (i Did the application rates exceed the limits in Attachment B of your permit? Were adequate measures taken to prevent effluent ponding in or runoff from the sites? Was a suitable vegetative cover maintained on all sites as specified in your permit? Were all setbacks listed in your permit maintained for every application to each permitted site? Were all freeboards maintained in accordance with the specified freeboard heights in your permit? ❑� Compliant ❑Non -Compliant ECompliant [-]Non-compliant ❑✓ Compliant ❑Non -Compliant ECompliant ❑Non -Compliant (]Compliant ❑Non -Compliant If the facility is non-compliant, please explain in the space below the reason(s) the facility was not in compliance. Provide in your explanation the date(s) of the non-compliance and describe the corrective action(s) taken. Attach additional sheets if necessary. Operator in Responsible Charge (ORC) Certification Permittee Certification ORC: Michael Beck Permittee: Bear Lake Reserve Certification No.: SI -991669 WWIV-7930 Signing Official: Robert Barr Grade: SI WWIV Phone Number: (828) 251-1900 Signing Official's Title: Signatory Has the ORC changed since the previous NDAR-1? ❑Yes ENO Phone Number: (828) 251-1900 Permit Exp.: 9/30/14 Balk J( -C -1-,G //2?// 6 Signature Date Signature Date By this signature, I certify that this report is accurrate and complete to the best of my knowledge. I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that all qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations. Mail Original and Two Copies to: Division of Water Quality Information Processing Unit 1617 Mail Service Center Raleigh, North Carolina 27699-1617 FORM: NDAR-1 08-11 NON -DISCHARGE APPLICATION REPORT (NDAR-1) Page S' of� Permit No.: WQ0029233 Facility Name: Bear Lake Reserve County: Jackson Month: October Year: 2016 Field Name: S Field Name: T Field Name: U Field Name: Did irrigation occur Area (acres): 0.92 Area (acres): 0.61 Area (acres): 0.58 Area (acres): at this facility? Cover Crop:Mature Forest Cover Crop: P� Mature Forest Cover Crop: P: Mature Forest Cover Crop: P: ❑YES ONO Hourly Rate (in): 0.05 Hourly Rate (in): 0.05 Hourly Rate (in): 0.05 Hourly Rate (in): Annual Rate (in): 67,416.7 Annual Rate (in): 73.5/7.3 Annual Rate (in): 95.4/9.5 Annual Rate (in): Weather Freeboard Field Irrigated? ❑YES ENO Field Irrigated? OYES ENO Field Irrigated? OYES, QNo Field Irrigated? OYES ONO M ❑ O c� ` d d a+ y E c a+ o v a M O w •- N d a m ❑� �, O o Lo : E N E. �a C a as d m E R rn H '� = _h �� m ❑ p O E `a o tv m= p E 0 N d E._ m �a E o� O O. 1- >a = a C v M ❑ O O T C E �o x 0 C is = O E O E._ �c D Q >a G! d E R i- ,_ = �'. C 'm s ❑ O �. .3 C E a 0 0 = O O D 07 3'- E a m O G >a = m v E v co K o m ❑ O M= O OF in ft ft gal min in = in gal min in in gal min In, in gal min in in 1 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00, 0.00 2 0 0 0.00 0.00 " 0 0 0.00 0.00 0 0 '0.00 0:00 3 C 65 0 9 10 0 0 0:00 0.00; 0 0 0.00 0.00 0 0 0.001, .. 0.00 4 C 63 0 9 10 0 0 0.01) 0.00 0 0 0.00 0.00 0 0 w0.00 0.00 5 C 59 0 9 10 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.60", °` 0,00 6 C 66 0 9 10 0 0 0.00 ,' 0.00 0 0 0.00 0.00 0 0 0.00. 0,00 71 C 67 0 9 10 0' 0 0.00 0.00 ; 0 0 0.00 0.00 0- 0 0.00 0.00 8 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 9 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00' 10 C 65 0 9 10 0 0 0.00 0,00 0 1 0 0.00 1 0.00 0 0 0.00 , 0,00 11 C 45 0 9 10 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 12 C 39 0 9 10 0 0 0.00 0,00 0 0 0.00 0.00 0 0 0.00 0.00 13 C 43 0 9 9 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 14 C 50 0 9 9 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 15 0 0 AAO 0.00 0 0 0.00 0.00 0 0 0:00 0,00 16 0 0 0.00 0100 0 1 0 0.00 1 0.00 0 0 0.00, 0.00 17 C 51 0 9 9 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00, 0.00 18 PC 50 0 9 9 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 191 PC 52 0 9 9 0 0 0.00 0,00 0 0 0.00 0.00 0 0 0;00 0.00 20 PC 70 0 9 9 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 21 PC 40 0.1 9 8 0 0 .0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 22 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 23 0 0 0.00 0.00 0 0 0.00 0.00 0. 0 0.00 `0,00 24 C 42 0 9 8 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 25 C 44 0 9 8 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 261 C 46 0 9 8 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 27 C 47 0 9 8 0 0 0,00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 28 C 64 0 9 7 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 29 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 30 0 0 0.00 1 0.00 0 0 0.00 0.00 0 1 0 0.00 1 0.00 31 C 43 0 9 1 7 0 1 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 Monthly Loading: 12 Month Floating Total (in): 0 0.00 2.53 0 0.00 2.51 0 0.00 2.37 0 0.00 FORM: NDAR-1 08-11 NON -DISCHARGE APPLICATION REPORT (NDAR-1) Page of -6, % Did the application rates exceed the limits in Attachment B of your permit? Were adequate measures taken to prevent effluent ponding in or runoff from the sites? Was a suitable vegetative cover maintained on all sites as specified in your permit? Were all setbacks listed in your permit maintained for every application to each permitted site? Were all freeboards maintained in accordance with the specified freeboard heights in your permit? ECompliant ❑Non -Compliant RICompliant ❑Non -Compliant (]Compliant ❑Non -Compliant [2]Compliant []Non-compliant [ZCompliant ❑Non -Compliant If the facility is non-compliant, please explain in the space below the reason(s) the facility was not in compliance. Provide in your explanation the date(s) of the non-compliance and describe the corrective action(s) taken. Attach additional sheets if necessary. Operator in Responsible Charge (ORC) Certification Permittee Certification ORC: Michael Beck ._ Permittee: Bear Lake Reserve Certification No.: SI -991669 WWIV-7930 Signing Official: Robert Barr Grade: SI WWIV Phone Number: (828) 251-1900 Signing Official's Title: Signatory Has the ORC changed since the previous NDAR-1? ❑Yes ONo Phone Number: (828) 251-1900 Permit Exp.: 9/30/14 ) 1)2 Signature Date Signature Date By this signature, I certify that this report is accurrate and complete to the best of my knowledge. I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that all qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations. Mail Original and Two Copies to: Division of Water Quality Information Processing Unit 1617 Mail Service Center Raleigh, North Carolina 27699-1617