Loading...
HomeMy WebLinkAbout20140727 Ver 3_Modifications_20161122Burdette, Jennifer a From: Bob Zarzecki <bzarzecki@sandec.com> Sent: Tuesday, November 29, 2016 1:43 PM To: Alexander, Tasha L SAW; Burdette, Jennifer a Cc: MaryAnn.Bradshaw@LehighHanson.com; Cara Conder (cconder@res.us); Williams, Kelly Subject: RE: Hanson Crabtree Quarry Expansion Project SAW -2014-001246 (DWR#14-0727 _Cert. No.4048)_Phase 2 Mitigation Modification Request Attachments: Neu -Con SOA Hanson Quarry Expansion Phase II 112116.pdf Importance: High Tasha & Jennifer: Just following up on this. Any idea when we might get the modified permits/conditions back? Hanson is eager to resolve this outstanding mitigation payment as soon as possible. Thanks! Bob Zarzecki Wetlands Department Manager Soil & Environmental Consultants, PA -----Original Message ----- From: Bob Zarzecki Sent: Tuesday, November 22, 2016 9:21 AM To: 'Alexander, Tasha L SAW'; 'Jennifer. Burdette@ncdenr.gov' Cc: MaryAnn.Bradshaw@ LehighHanson.com; Patrick Smith; Williams, Kelly (kelly.williams@ncdenr.gov) Subject: RE: Hanson Crabtree Quarry Expansion Project SAW -2014-001246 (DWR#14-0727_Cert. No.4048)_Phase 2 Mitigation Modification Request Importance: High Tasha & Jennifer: Attached is an acceptance letter from RES to provide the remaining stream credits permitted for the Hanson Crabtree Quarry expansion project and needed for the Phase 2 stream relocation work. This mitigation was initially conditioned in the permit and certification to be provided via payment into DMS as RES did not have the stream credits available at that time. RES now has these stream credits available. Hanson requests the mitigation conditions be modified to allow the purchase of these required stream credits from RES. Please let us know if you have any questions or require additional information. 1 PS ... The construction of the stream relocation is not anticipated to occur at this time. Hanson understands that compliance with other permit conditions beyond just this final mitigation payment is required. Hanson will submit any other required information and notify the agencies prior to commencing construction of the stream relocation. Regards. Bob Zarzecki Wetlands Department Manager Soil & Environmental Consultants, PA -----Original Message ----- From: Alexander, Tasha L SAW [mailto:Tasha.L.Alexander@usace.army.mil] Sent: Friday, June 24, 2016 2:52 PM To: Bob Zarzecki; Gibby, Jean B SAW Cc: Jack H (Morrisville) USA Garvey, MaryAnn.Bradshaw@ LehighHanson.com, Lee, Toby (Morrisville) USA (Toby. Lee@hanson.biz), Burnette, Alan C (Atlanta) USA (Alan.Burnette@ heidelbergcement.com), Patrick Smith Subject: RE: Hanson Crabtree Quarry Expansion Project SAW -2014-001246 (DWR#14-0727_Cert. No.4048)_Start of Construction Notification I appreciate the coordination. Thank you, Tasha Alexander Regulatory Specialist Raleigh Regulatory Field Office U.S. Army Corps of Engineers -Wilmington District 3331 Heritage Trade Drive, Suite 105 Wake Forest, North Carolina 27587 Phone: 919-554-4884, extension 35 email: tasha.l.alexander@usace.army.mil The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so, please complete the Customer Satisfaction Survey located at our website at http://www.saw.usace.army.mil/missions/RegulatoryPermitProgram.aspx to complete the survey online. -----Original Message ----- From: Bob Zarzecki [mailto:bzarzecki@sandec.com] Sent: Friday, June 24, 2016 9:31 AM To: Gibby, Jean B SAW <Jean.B.Gibby@usace.army.mil>, Alexander, Tasha L SAW <Tasha.L.Alexander@usace.army.mil> Cc: Jack H (Morrisville) USA Garvey <Jack.Garvey@hanson.biz>, MaryAnn.Bradshaw@ LehighHanson.com, Lee, Toby (Morrisville) USA (Toby. Lee@hanson.biz) <Toby.Lee@hanson.biz>, Burnette, Alan C (Atlanta) USA (Alan.Burnette@ heidelbergcement.com) <Alan.Burnette@ heidelbergcement.com>; Patrick Smith <psmith@sandec.com> Subject: [EXTERNAL] RE: Hanson Crabtree Quarry Expansion Project SAW -2014-001246 (DWR#14-0727_Cert. No.4048)_Start of Construction Notification Jean & Tasha: I've removed both Dave and Jennifer for the email chain, as they both said they won't be at this meeting. I can't be there either, but you all will be fine without me. You're in good hands with Mary Ann, Jack and others. Also, Patrick Smith may be able to attend to represent S&EC. Please plan to meet them at the quarry office at 10 am on July 5th. 5001 Duraleigh Road You'll need to go through site specific safety training which will take a few minutes or so. Bob Zarzecki Wetlands Department Manager Soil & Environmental Consultants, PA -----Original Message ----- From: Bob Zarzecki Sent: Tuesday, June 21, 2016 10:27 AM To: 'Gibby, Jean B SAW', Shaeffer, David L SAW, 'Jennifer. Burdette@ncdenr.gov', Alexander, Tasha L SAW Cc: Jack H (Morrisville) USA Garvey, MaryAnn.Bradshaw@ LehighHanson.com, Lee, Toby (Morrisville) USA (Toby. Lee@hanson.biz), Burnette, Alan C (Atlanta) USA (Alan.Burnette@ heidelbergcement.com) Subject: RE: Hanson Crabtree Quarry Expansion Project SAW -2014-001246 (DWR#14-0727_Cert. No.4048)_Start of Construction Notification Jean & Tasha: I can't make a site meeting on the 5th, as I'm on vacation that entire week. But, you should be fine meeting with the Hanson folks without me. They're just making sure that they'll have the necessary people there. We'll be in touch soon to confirm this date. 3 Thanks! Bob Zarzecki Wetlands Department Manager Soil & Environmental Consultants, PA -----Original Message - From: Gibby, Jean B SAW [mailto:Jean.B.Gibby@usace.army.mil <mailto:Jean.B.Gibby@usace.army.mil> ] Sent: Monday, June 20, 2016 5:05 PM To: Bob Zarzecki, Shaeffer, David L SAW, 'Jennifer. Burdette@ncdenr.gov', Alexander, Tasha L SAW Cc: Jack H (Morrisville) USA Garvey, MaryAnn.Bradshaw@ Lehigh Hanson.com <mailto:MaryAnn.Bradshaw@ Lehigh Hanson.com>, Lee, Toby (Morrisville) USA (Toby. Lee@hanson.biz <mailto:Toby.Lee@hanson.biz> ), Burnette, Alan C (Atlanta) USA (Alan.Burnette@ heidelbergcement.com <mailto:Alan.Burnette@heidelbergcement.com> ) Subject: RE: Hanson Crabtree Quarry Expansion Project SAW -2014-001246 (DWR#14-0727_Cert. No.4048)_Start of Construction Notification :•• Since they plan to start construction on the 5th, would it be acceptable if we met with them around 830 to have the pre -construction conference on the 5th and that would allow Tasha to see the site, along with me and get the scoop, hoping to kill two birds with one stone (yep, there was a pun intended in there). Jean Jean B. Gibby Chief, Raleigh Field Office 4 U.S. Army Corps of Engineers Regulatory Division 3331 Heritage Trade Drive, Suite 105 Wake Forest, NC 27587 (919) 554-4884, Ext. 24 The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so, please complete the Customer Satisfaction Survey located at Blockedhttp://corpsmapu.usace.army.mil/cm_apex/f?p=136:4:0 <Blockedhttp://corpsmapu.usace.army.mil/cm_apex/f?p=136:4:0> -----Original Message ----- From: Bob Zarzecki [mailto:bzarzecki@sandec.com <mailto:bzarzecki@sandec.com> ] Sent: Friday, June 17, 2016 2:24 PM To: Gibby, Jean B SAW <Jean.B.Gibby@usace.army.mil <mailto:Jean.B.Gibby@usace.army.mil> >, Shaeffer, David L SAW<David.L.Shaeffer@usace.army.mil <maiIto: David. L.Shaeffer@usace.army.miI> >, 'Jennifer. Burdette@ncdenr.gov' <Jennifer.Burdette@ncdenr.gov <mailto:Jennifer.Burdette@ncdenr.gov> > Cc: Jack H (Morrisville) USA Garvey <Jack.Garvey@hanson.biz <mailto:Jack.Garvey@hanson.biz> >, MaryAnn.Bradshaw@ Lehigh Hanson.com <mailto:MaryAnn.Bradshaw@ Lehigh Hanson.com>, Lee, Toby (Morrisville) USA (Toby. Lee@hanson.biz <mailto:Toby.Lee@hanson.biz> ) <Toby.Lee@hanson.biz <mailto:Toby.Lee@hanson.biz> >, Burnette, Alan C (Atlanta) USA (Alan.Burnette@ heidelbergcement.com <mailto:Alan.Burnette@heidelbergcement.com> ) <Alan.Burnette@ heidelbergcement.com <mailto:Alan.Burnette@heidelbergcement.com> > Subject: [EXTERNAL] Hanson Crabtree Quarry Expansion Project SAW -2014-001246 (DWR#14-0727_Cert. No.4048)_Start of Construction Notification Importance: High Jean, David & Jennifer: As required under special condition "f)" of permit SAW -2014-001246, work is scheduled to commence on July 5, 2016 at the Hanson Crabtree Quarry Expansion project. Please confirm receipt of this notification and contact us if you desire a pre -construction meeting. Sincerely, Bob Zarzecki Wetlands Department Manager Soil & Environmental Consultants, PA North Quarter Office Park 8412 Falls of Neuse Road, Suite 104 Raleigh, NC 27615 (919) 846-5900 Office Phone (919) 256-4517 Direct Line (919) 846-9467 Fax (919) 270-2068 Mobile bzarzecki@sandec.com <mailto:bzarzecki@sandec.com> <mailto:bzarzecki@sandec.com <mailto:bzarzecki@sandec.com> > Visit us at SandEC.com<BlockedBlockedhttp://www.SandEC.com> ! This electronic communication, including all attachments, is intended only for the named addressee (s) and may contain confidential information. This electronic communication may not have passed through our standard review/quality control process. Design data and recommendations included herein are provided as a matter of convenience and should not be used for final design. Rely only on final, hardcopy materials bearing the consultant's original signature and seal. If you are not the named addressee (s), any use, dissemination, distribution or copying of this communication is prohibited. If you have received this electronic communication in error, please notify the sender by return e-mail and delete the original communication from your system. Thank you. From: Garvey, Jack H (Morrisville) USA [mailto:Jack.Garvey@hanson.biz <mailto:Jack.Garvey@hanson.biz> ] Sent: Friday, June 17, 2016 2:09 PM To: Bob Zarzecki Subject: FW: correction :•• All of the credits have been purchased for Phase 1 of the Crabtree Expansion, and the supporting documents are attached. The contractors are scheduled to start the project on July 5, 2016. This email correspondence is intended to serve as Start of Construction Notification for Action ID: SAW -2014-01246. Jack Garvey Environmental Manager Hanson Aggregates Southeast, LLC 2101 Gateway Centre Blvd, Suite 100 Morrisville, NC 27560 Tel: 919 380 2746 Cell: 336 669 7565 Fax: 919 380 2756 Jack.Garvey@hanson.com <mailto:Jack.Garvey@hanson.com> <mailto:Jack.Garvey@hanson.com <mailto:Jack.Garvey@hanson.com> > Blocked Blockedwww.hanson.com<BlockedBlocked http:Hwww.hanson.com> EBX Stream and Wetland Banks Statement of Availability November 21, 2016 NC Division of Water Resources Ms. Jennifer Burdette 512 N. Salisbury St. 9' floor Raleigh, NC 27604 Re Project: Hanson Crabtree Quarry Expansion Phase II U.S. Army Corps of Engineers Mr. David Shaeffer Raleigh Regulatory Field Office 3331 Heritage Trade Center, Suite 105 Wake Forest, NC 27587 This document confirms that Hanson Aeereeates Southeast, LLC (Applicant) for the Hanson Crabtree Quarry Expansion Phase II (Project) has expressed an interest to utilize 510 Stream Mitigation Credits from the EBX-Neuse I sponsored Neu -Con Wetland & Stream Umbrella Mitigation Bank, specifically the Selma Mill Site in Neuse HUC 03020201. As the official Bank Sponsor, EBX-Neuse I, attests to the fact that mitigation is available for reservation at this time. These mitigation credits are not considered secured, and consequently are eligible to be used for alternate purposes by the Bank Sponsor, until payment in full is received from the Applicant resulting in the issuance of a Mitigation Credit Transfer Certificate by the bank acknowledging that the Applicant has fully secured credits from the bank and the Bank Sponsor has accepted full responsibility for the mitigation obligation requiring the credits/units. The Bank Sponsor will issue the Mitigation Credit Transfer Certificate within three (3) days of receipt of the purchase price. Bank Sponsor shall provide to Applicant a copy of the Mitigation Credit Transfer Certificate and a documented copy of the debit of credits from the Bank Official Credit Ledger(s), indicating the permit number and the resource type secured by the Applicant. A copy of the Mitigation Credit Transfer Certificate, with an updated Official Credit Ledger will also be sent to regulatory agencies showing the proper documentation. If any questions need to be answered, please contact me at 919-209-1052. Best Regards, Ca� Cara S. Conder Resource Environmental Solutions, LLC 302 Jefferson Street, Suite 110 Raleigh, NC 27605