Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
20161183 Ver 1_CULVERT PHASING_20161129
SF-670018 17BP.7.R.93 ORANGE COUNTY 2@8'X8' STA. 13+49.5 -L- EAST BACK CREEK TRIBUTARY CULVERT PHASING NOTE: USE SANDBAGS FOR ALL IMPERVIOUS DYKES. l.) INSTALL ALL SEDIMENT CONTROL DEVICES NECESSARY FOR CULVERT CONSTRUCTION. PHASE 1 2.) REMOVE EXISTING BRIDGE. INSTALL TEMPORARY 36" CSP WITH TEMPORARY HEADWALLS AND IMPERVIOUS DIKES. PUMP ALL EFFLUENT INTO DIRT BAG. PHASE 2 3.) CONSTRUCT 2@8' X 8' RCBC PER PLANS AND SPECIFICATIONS. 4.) CONSTRUCT NEW ROADWAY. REMOVE IMPERVIOUS DIKES AND TEMPORARY 36" CSP. 5.) UPON STABILIZATION OF ALL DISTURBED AREAS, REMOVE ALL TEMPORARY SEDIMENT CONTROL DEVICES. IMPERVIOUS DIKE BM- � .-_ � cn V / �, � � SIGN c� �� � / � / �� � — i , �IIOODS REMOVE STRU CTU RE - �-, � `' i � '= - - "- � � � �. G U Y �j� �'� � IMPERVIOUS DIKE � �� \� � � ��.T][��]E�$� I[�]H[���I�T� �� ,- — � _ �-Y �� '� � ��--r��_ —_ ____ � � � � � � � � � � � � � � �� PROJECT:I7BP.�.R.93 (SF-670018: BRG �18 OVER � � � � � � � � � � � � � � � �q PROJECT:I7BP.�.R.93 (SF-670018: aD BRG �18 OVER