Loading...
HomeMy WebLinkAbout20050235 Ver 1_Staff Comments_20080410,xVQ Nm. 0 56 Z 3 DWQ Project No.: 05'0?- 3 5 ,Applicant: Alaor Irv 5 Project Name: 52 / (v Zy (a A- I &2S Date of Issuance of 401 Water Quality Certification: 02 ? it 10S Certificate of Completion Upon completion of all work approved within the 401 Water Quality Certification or pplicable Buffer Rules, and any subsequent modifications, the applicant is required to return this certific/to e 401/Wetlands Unit, North Carolina Division of Water Quality, 1621 Mail Service Center, Raleigh, NC1621. This form may be returned to DWQ by the applicant, the applicant's authorized agent, or the pngineer. It is not necessary to send certificates from all of these. Applicant's Certification I, , hereby state that, to a best of my abilities, due care and diligence was used in the observation of the construction such that the const ction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification an uffer Rules, the approved plans and specifications, and other supporting materials. Signature: Agent's Certification I, was used in the observation of the construction compliance and intent of the 401 Water Qualit specifications, and other supporting materials Signature: Engineer's Certification Partial _ I, Carolina, having been Permittee hereby state construction such that Water Quality Certific Date: as a duly registered Professional Engineer in the State of North 7r' ed to observe (periodically, weekly, full time) the construction of the project, for the o the e best of my abilities, due care and diligence was used in the observation of the )nstruction was observed to be built within substantial compliance and intent of the 401 and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature Registration No. _ Date v?? ?? ?G?A 1v\?V1 County: ??•? C Nance b a rre4 Date: lreby state that, to the best of my abilities, due care and diligence h that the construction was observed to be built within substantial rtification and Buffer Rules, the approved plans and