STORMWATER MANAGEMENT PLAN _ -
(Version 2.06; Released June 2016) FOR NCDOT PROJECTS
WBS Element: 17BP.7.R.97 TIP No.: SF-670137 County(ies): Orange Page 1 of 1
General Project Information
WBS Element: 176P.7.R.97 TIP Number: SF-670137 Project Type: Bridge Replacement Date: 8/16/2016
NCDOT Contact: Matthew Lauffer, PE Contractor / Desi ner: Fuh, David, PE
Address: NCDOT Hydraulics Unit Address: ICA Engineering, Inc.
1590 Mail Services Unit 5121 Kingdom Way, Suite 100
Ralei h, NC 27560 Ralei h, NC 27607
Phone: 919 707-6703 Phone: 919 900-1612
Email: mslauffer ncdot. ov Email: david.fuh hdrinc.com
City/Town: Hillsborou h Count ies : Oran e
River Basin(s): Neuse CAMA County? No
Wetlands within Project Limits? Yes
Pro'ect Description
Project Len th (lin. miles or feet): 0.066 miles Surrounding Land Use: Wooded, Agricultural, Scattered Residential
Proposed Pro'ect Existin Site
Project Built-Upon Area (ac. 0.2 ac. 0.2 ac.
Typical Cross Section Description: Edmund Latta Road (SR 1550): 2 paved lanes (total 20' wide), 4' shoulder on each side Edmund Latta Road (SR 1550): open shoulder section, 2 paved lane (total 20' wide)
(7' with guardrail).
Annual Avg Daily Traffic (veh/hr/day): Desi n/Future: 260 Year: 2025 Existin : 130 Year: 2000
General Project Narrative: The North Carolina Department of Transportation (NCDOT) has proposed to replace Orange County Bridge #670137 on Edmund Latta Road (SR 1550) over Forrest Creek. The
(Description of Minimization of Water existing structure is a single span bridge (1 @20'6”) and is timber deck on I-Beams supported by timber caps, timber piles, concrete encased, and timber bulkheads. The
Quality Impacts) proposed structure is a Single Span 21" Cored Slab with 2.5' Deep Caps, 1@40'. This structure has been designed to have as little environmental and surface water impacts as
possible. Geotextile and rip-rap were utilized for bank stabilization in an attempt to reduce stream bank erosion along the banks of the channel underneath the bridge. Forrest
Creek mitigation bank conservation site is located in the project area. The conservation easements are shown in the permit drawings.
To avoid direct discharge of bridge storm water into the receiving water, deck drains are not required for the proposed bridge. Storm water impacts to the stream have been
minimized by utilizing grated inlets and pipes to collect bridge storm water and use rip rap outlet protection at 14+53 RT to dissipate energy to provide a diffuse flow (non-erosive
sheet flow) before entering the buffer. This diffuse flow will run for a distance of 60'+/- in a wooded area before entering the stream. At the same (SE) quadrant, an existing
roadside ditch has outlet at 14+85 RT and becomes diffuse flow for a distance of 30'+/- before entering the buffer. This ditch will be retained and lined with toe protection along
the fill slope. At NE quadrant, an existing roadside ditch has outlet at 14+35 LT within buffer zone 2 with diffuse flow and runs for 15'+/- before entering buffer zone 1. This ditch
will be retained and lined with toe protection along the fill slope. At the NW quadrant an existing roadside ditch has outlet at 12+80 LT at a soil road with diffuse flow and runs for
a distance of 20+/- before entering the buffer. This ditch will be retained. In the SW quadrant there is an existing roadside ditch that has outlet to the stream. This ditch will be
retained and lined with toe protection along the fill slope. At all four quadrants, there are no proposed roadside ditches with concentrated flows or proposed stormwater
conveyances through the buffers. Due to the nature of low impact bridge replacement, the increases in stormwater discharges (post vs pre condition) are insignificant and the
existing ditches do not need to be modified. Therefore, additional stormwater measures are not required.
Waterbod Information
Surface Water Body 1: Forrest Creek NCDWR Stream Index No.: 27-2-21-2-2
NCDWR Surface Water Classification for Water Body Primary Classification: Water Suppl II WS-II
Supplemental Classification: Hi h Qualit Waters HQW NSW
Other Stream Classification: None
Impairments: None
Aquatic T&E S ecies? No Comments:
NRTR Stream ID: Buffer Rules in Effect: Neuse
Project Includes Brid e Spannin Water Bod ? Yes Deck Drains Discharge Over Buffer? No Dissipator Pads Provided in Buffer? No
Deck Drains Dischar e Over Water Body? (If yes, provide justification in the General Project Narrative) (If yes, describe in the General Project Narrative; if no, justify in the
(If yes, provide justification in the General Project Narrative) General Project Narrative)
V
Z
�
z
�
w
z
�Z
O y�
�Q
� U
�
�
*DESIGN EXCEPTION:
SAG VERTICAL CURVE K
VERTICAL SSD
I�
0
N
Z
a�o
�
Z
TO
PHELPS ROAD
DESIGN DATA
ADT 2000 = 130
ADT 2025 = 260
V = 55 MPH
SUB REGIONAL TIER
LOCAL
� " I ' •� " I � I : (�> I � \ (�) I'� " I ' I-I � � . �� I'� (�) I . I \ •�
II�I�'I�I(�)\ (�>I� I-II��I-f\��'.���'�
o��GE cou�TY
LOCATION: BRIDGE NO. 137 OVER FORREST CREEK ON SR 1550 (EDMUND LATTA ROAD)
TYPE OF WORK: GRADING, PAVING, DRAINAGE AND STRUCTURE
WETLAND AND SURFACE WATER IMPACTS PERMIT
��1 ��
� � �
� , i� i
�. / � i
PROJECT LENGTH
LENGTH ROADWAY TIP PROJECT = 0.058 MILES
LENGTH STRUCTURE TIP PROIECT = 0.008 MILES
TOTAL LENGTH TIP PROJECT = 0.066 MILES
Prepared ln tie Offlce of Hatch Molt MacDorm/d for
DIVISI011i 7
NORTN CAROLLNA DEPARTMENT OF TRANSPORTATION
2012 STANDARD SPECIPlCATlONS
TIM JORDAN PE
LETTING DATE: pROJECT ENCINEER
DAVID FUH PE
HYDRAULICS F,NGINEF.A
NCDOT CONTACT: TIM POWERS. PE
DIVIS[ON BRlOGE
PROGRAM MAh'AGEA
.
� I I.� I., I� .,�� - :,0-
���
G�`
0
/
ROADWAY DESIGN ENGINEER
P.E.
/GN.9TURE:
HYDRAULICS ENGIIVEER
GLI
PERMIT DRAWING
SHEET 1 OF 6
I�7�`OMPLFIPE PII,A�T�
DO NOT II8�' PoR R/W A(A[R9ITION
PLANS PREPARED BY:
� Hatch Mott
�` MacDonald
PO Box 700
Fuquay-Varina, NC 27526
(919)552-2253
(9191552-2254 (Faxl
WWW.hatchmott.com
LICENSE NO. F-0669
'� 512t [Cingdoin Way,
swte ioo
Raleigh, NC D607
NC I,irznse Vo� N-a. �3
Engineering
'DESIGN E%CEPTION:
SAG VERTICAL CURVE K
VERTICAL SSD
630
620
610
600
590
Vw
Z v�
� � 580
z�
w
� a
w
w �
Z_
� � O
0 w 'o
2
PVy
WETLAND AND SURFACE WATER IMPACTS PERMIT
1�kTp�,�. ua�� $`ic.�
�1I� S,CnA,TTE,nRE,D TREES
x L:Y LJ' EXISTIN{�i,�jDll
� AND BECCIMES
� —
15' RCP� ��'►� �aT3 �iEC"�
TO SR 1551 18' BSTJ-
IPHELPS RDJ SR isso EoMuNo LATTA RD.
__�_7 _ _ ------ —
�IS'RCP —►' ' —►—
%1 ����35 ELE�
� �
�oI T�
I � J si
�` C\ E;
M� pa��,w FA�. �soNs
10 11
BANK STABILIZATION
SEE DETAIL B
EST. 15 TONS RIP RAP
EST.16 SY GEOTE%TILE —,
EST. 11 CY E%CAVATION
(REMOVE EXISTING MUD SILLS)
BANK STABILIZATION
SEE DETAIL B
EST.18 TONS RIP RAP
EST.19 SY GEOTEXTILE —
EST.13 CY EXCAVATION
(REMOVE E%ISTING MUD SIL
BANK STABILIZATION�
L=46'
� �
DS HERE � �� I
iE FLOW I v�i I;
o�� � �'
� �
� �A7E r� �c'
20TEC ION �r P �
TAIL e `
TON RIP RAP
i SY EOTEXTILE � (
\
EXISTI G DITCH OUTLET
VELO ITY TO THE STREAM
Q10 = 9 cfs
V10- 9 fps jNON-EROSIVE)
CLA55 II RIP RAP
UP TO SHOULDER ELEV. (NP.)
�STRUCTURE PAY REM)
SEE ENLARGED
AREA ON
NEXT SHEET
V� /\�B
� i��
Q�uy / /
f/�oQ / � � �
y/ � /
/
/� / �
,• ✓/ �� � c��
' � /, �
� / /
/ .
� � /
� /
��
' VIOODS TOE PRO CTION
I'ENO� SEE DETAI A
SBG � EST.40 T NS RIP RAP
y�� 39 � ti EST. 105 GEOTEXTII
_ �iy � EXISTING DITCH ENI
� \AND BE OMES DIFFI
� _�
�
���� ����
���� �.
SBG
� DAhi` FARMS, ��
/%� �J }�'��i PROIECT REFERENCE SHEET NO.
`�' n IN � III J� � �� ROA�NGIN�ROG NGE 137 HENGINEERS
�LJ/ �L �7
� a %
�� �
/ h /U r U/ �
�l/ R �
/` �/ o/ \��\ .�
. % � .SOj< \�
� / ¢ \�\ \ N
��� � � � Q
_ /5
�� �j � ��I\-.� �GUY �W
/ �� / L/ �� °cur Z
� ��
I�T��IPL]E E PLA�V�
DO NOT Vp6 FOA W AC`OVIg114oN
HATCH MOTf MACDONALD 18 E, LLC
LICENSE NO. F-0669
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
Prepore t
Offi e oE � Hatch Mott po eax �oo
� `r�� , MacDonald www'narcnmo�'++com�szs
ND PROJECT l7BP.7.R.97 ��� /��,� �i��i
L— POC Sta.15t50A0 f/ �,/ I i '�� ,
j �SCATTERED TREES � / / � �
� `' � /,' '� � � DETAIL A Engineering ��
� / /� / I TOE PROTECTION VERTICAL SCALE HORIZONTAL SCALE
� � / / / � No� io scaie�
1� "� // �, p $, �P, 2�, p 2�, SP,
HERE / / / / �� Fiu �� ��
FLOW Nn au R� S�E� swre
�,s�x� � /if � �� �R��^� a `� PERMIT DRAWING
—� ��j o/<� i i d= , F� �EorExr��E SHEET 2 OF b GLI
_ �� ���/ / - i I I
--� � I Type of liner= Ct B Rip-Rap
�/ FROM STA.13+00 TO SiA.13+35 RT
FROM STA.14+70 TO STA.15+25 RT
�� r— �//� ,t)y ,����� FROM STA.14+20 TO SiA.15+30 Li
4S tLEC�2b'�'�
SCATTERED TREES DETAIL B
EN HERE BANK STABIUZATION
IFFU F�ow —L— PCC SYa. /6+/627 �"°"° s<°'`�
ESCAVnTION �ttP)
/� r �rvr�
\��� —L— PC S7a. /5+3227 151 SLOPE (TVP� S
��
m TOE PROTECTION GEOTE%TILE �TYP)
� $EE DETAIL A Type of Liner- C1A55 11 RIP RAP
\ E5T.20 TONS RIP RAP
��� EST. 55 SY GEOTEXTILE -L- STA. 13+60 -L- STA. 13+75 LEGEND
� � µL p�A�' u� �5� EST 18 TONS CL II RIP RAP EST 15 TONS CL II RIP RAP
� EST 79 SY GEOTEXTILE EST 16 SY GEOTEXTILE � DENOTES PERMANENT
� ' EST 13 CY EXCAVATION EST 11 CY EXCAVATION IMPACTS IN SURFACE WATER
�S�. CLA55 B RIP RAP
\ Esr. z roNs
�FF E5T.7 SY GEOTE%TILE
�
\
\
\
���
BEGIN PROJECT END PROJECT
BEGIN GRADE END GRADE
STA. 12 + 0.00 STA. 15 + 50.00
EL = 609.40' EL = 604.48'
PI = 12+95.00 PI = 14+85.00
EL = 602.68' EL = bO1J3'
VC = 130' VC = 130'
� K = 20 K =27
� i�-��BRIDGE�C� STA.13-67 -L-
I .27".PC S,W25'.DEEB CAPS
\ 1 @ 4 '; SKEWI 90 �
� � I GP ELE .�692.32
REMOVE
EXISTING
� �h BRIDGE � I I �
i
�CLASS IIRIP RAP /
SLOPE 1.5:1 (2.FT.THICK�J
�NORMAL TO CAP) �Np.)
'� �:��STRUCIURE PAY iTEMj,
i —
IREMOVE EXISTING MUq SILLS
AN� PROVIDE BANK 57ABILIZATION
' W/CL II RIP RAP
�SLOPC 1.5�7� ON 60TH SIDES
12 13
NORMAL WS
ELEV. = 596.0
DATE- 3-2-2016
�EXCAVATION = 90 CY
(STRUCTURE PAY ITEM�
14 15 16
17
IL]
100 0
50 100
SCALEe I"= 100' HORIZo
BR/DGE HYDRAUUC DATA
DES/GN DISCHAR6E _ 1100 CFS
DES/Gly FREQUENGI' = 25 YRS
DES/GN MN ELEyAT/ON = 602A Fi
BASE D/SCHARGE _ 1500 �FS
BASE FREQUEN�1' _ l00 YRS
BASE l�lW ELEVATI�N = �� �
OVERTOPP/NG D/S�HARGE _ 1100 �FS
OVERTOPP/NG FREQUEN�1' = 2a` YRS
OVERTOPP/NG ELEVATION = �� �
DATE OF SUftVEY = 3-2-20/6
►NS.ELEVATION = 596A FT
AT DATE OF SURVEY
630
620
610
600
590
580
/ /- / �' 1 ' . .
'DESIGN E%CEPTION: � / / � � �� �
SAG VERTICAL CURVE K � � / �
VERTICAL SSD � _ / ,� � ' %� � WETLAN D AN D
' i�' / / — _ � � /
�/�`9� �/�/i i i-- /� �\ � �� / // , / i� -� � � �' �
�i ���� i i i � � l � //�i i�� /i����, � I
� �'� g����� i I � � / l �l�lr ��i���� � �
��� �9'i i _ / / � / / �� I ��\�� r �� � �
�� ' ' '�� '' ' � � i I � � � ��ii � �s � .\ � � /
��i� �� �� l I � I I I � I �\�\\ ��o �\ � ��\ 1 //
�' / �� � i i � i i I� I, `�\� \��� �� 5 N�ESrqa�LqlLlznTioH '� I�
� I � I � I � ���� ��$r. isrTd WS a+.P ai+r 1 /
' � � / / � � I +L �y \ � � \ ESf,�6 �Y G� OTEXTILE �
�/ � \\ � � � I�Tp11...i1•��A�� 1 ���ST 1 Cr E%CA�ATIQN�
' i�� � � � I m '��" I 1 �lrz�,o�E E istiNG uo `�i��s�
� � i N � � i � � � i i� i � �^� ���
/ '�/ I � � 1 j � � l � j 1 I I I I � � / � � � �
� I � i � � � / � � � i i �NK StA ILyZAf19N ��//
/ / / / � � i / / � � / / /EyEr D�TdriS pIP/w.p� � � /
/ / � � / / / / � � / / / 5T.� SY �EbT�£XTILE� I
� � / / / / / � � / / / �Ao�3�CY E�CAVAYIO�JI
� �� � �� i i BEGII� Pl?OJ CT�nl7�P7%R97���3�nnpv�4x�nN��Muoi saL
� i �� i � � 6 � i —L� o. l � � � � � �
I � � / / � �� � � � � I l / I I / // �/ � AN ST BILIdAT10N
/
� �5Z9� ,� f�,, I � � � ��\� � � I l l l I � 1 / �/ -4 / � �� I
/� -L- POT .SfO. lU'fIXl� � �\ �,I� i � �SCA�'�TER��TI�F�S�� '� � �� �' I I� � il � i I
� � PROIECT REFERENCE SHEET NO.
/ � / / � 176P.7.R.97 - ORANGE 137 4
SURFACE WATER IMPACTS PERMIT � � �, � � � � � � �
i ROADWAY �ESIGN HYDRAULICS
i �°� � ENGINEER ENGINEER
� I � � i , � � I i I I � . . � � � � i � � � l � � ` ` `
J I � I I I � a/ d I� \ �
/ � � 1 I � I I I � � m I i � � � � � ` � � � ��' I � l � � � �
i � f—.._6a0----------._ I � m I I� � I� � � � � � � �� � h �d� 1 � ��
' , , rridB�G/ ' i i' i' i , ; i i � , � ' i ' i � ' Soi� ' 2/ 'i� � � \�
� � �� � ,� i �� ,� i i i � � � i i � � � � i � i � � � ��3 ^! � � � � \ � \ I�T��IPL]E E PLA�V�
� � n i� � �� � ce ��`B� � �/ i � i i i� � I i i � I � ��/ �� f i�� I � DO NOT VB� FOA w wCnvnyrrcoar
� i � �1 4 � ����--y--�—�m i i � !� i i � m � i � � / i �—i s0j<�� � '— __
i i �� � �. / / / A i i i (,(� � l,T� I�s�tis � � �' /� , _ � � � o
i � i �� ���` e� / i�� i i i i� i P � i i i i � � � w
/ % � ` � e �/ / / / � � � � I � I � \ � X �/l 1 �� \ nnrrn mom m�cooHn�o i a e, uc
� � ��� //� / / / � � � � � 1 I —___ '� �� �� �� � 0 � �
LICENSE NO. F-0669
/ � � � �/ `\ i � !/�/ /�� j/� � / � � � l / / � l � � � / I/ � �,�/�3y� � � � — —' DOCUMENT NOT CONSIDERED FINAL
i m � � i � � / � � � i i l � � � � � I � � d � �--y� ��cuv ��, �� \ UNLESS ALL SIGNATURES COMPLETED
/ �' �i � : � /��'. � � / / / / � l 1 ,.,�, / l/ � \
n �I �� i � ✓� q r�i �� i i!�/ � �—L /'/� 5�0. (%�f
�I ��� \ i � / i�/-i �, l i i i i� I i
/� � k' � i��. � � � � � I i I � I � � � �� ��
s W � � / * � � � � r y � �i � ` � � � m �E D � P� �EC7 � BPA.R.9y`
,�' i � �,
i � * ` � �� � � � � � rG �POC �St�.15t50 �
// / � - �� I g 1 \ \ \ � u � 1 � I � SCATiERED TREES
/ dze � � i I 1�� � � \ � � A � � � �� ---�
I � /' �'OOD�S TOE �PR (.TICpN \ \ \ \ � � I � � - -
I I /� �'OODS \ � /SEE pETAI `A � � � � �
� 'EN� EST 40 T NS'`RIP R P� � �\ 0 �
� — 59 / �Eo�x�� \ � � � \ � � � , — � .
� � I � I � �� � \ `W'I �_y/��ISTIt��i,�DITEH�E DS�HBRE � L � . e�� ! ���.39 ¢.y EST 105/ 1 \ �\ � t\ /
/ � � \ I � AND BFCQMFb DSFF SE FLQW� � �P� .0 � i�y „E7IISTING DIXCH EN �-IERE �\ � /
/ � � � � � � � � � � � I I � T� '� � � �AND �BE O�nES DIFF E AI�Vk \ � � � / �
_ � � i � � �� i i i i � � � i ��� T , � " � . _ � � , � . �ts �E ��i _- �� �j
` �/ I \ I I E%IST G R \ � X��I�T//// � � � �� � � � `
s` �� � — — � ' '�a�ej��-��"�� � � `
� — _ _ _ N��� \� �To s� isei � � ia s��TTT��� SITE 1
' _ - � \ � \ �(PHEL � RDJ SR/I550 �OMT LA TA�_y_�_�� T ___
� _ `_ \ \ \ \ \ �-7._/-7-i � � TY ,/
� � \ \ � \ \ \ l � � `�-&CFC �'\E�' E �-4'�-''--►� E , C j _
� � �,� frEM _ �. _
------� \� �� �� � �\ �V \ 1 1 ����i � i�3� jE � I � � ��i�GAYE c'
' _ _ _ _ _ ' \ \ � � � � \ � �� \ � \ \ \ i 5 � I � � ��; ; / � � �� � � � TOE� PRO EC IbN I � r y � /
\ \ � �� ��"� � � / ( SEE qETA� 1 I �e
�y_--"`�\\' �� �� \� � � `� � `� �.CC�\���� e\� ` c\ �esT.,�ror� �PaAP ,
�0 � � � � � \ � ���� \�� \ \ � ` � � i$T. 3 � SY I e�rekri�e I — �
_ � � � � � �n \ � � � \ 1 � I � � �\ I � � � I I I � I �U
' , _ _ � , . \ `�\ �� �\ �i �i � �\ �\ � i �\ `\ '� i1 i � �i �i �i i � i i i �Qx7o�' � v °9`THQ sTa`�n�,
, � � � � \ � � \\\ �\ \\ I\ i i \\ �\ �� \\ � � \\ � II i II �1 11 �1 I II �I � W10� 9�fps (NOI�-EROSIHE) m 1
�--_ �� �f�c^9 \\\ � � \ �� �\ \ N\I 111 I I 1 1 1 1 II � I I ICLP�SS IIRIPIRAPI I
- � � \\ \\ � I 1 I �� I I � I I � I I
� \ I � I � UP TO SHC�ULD�R ELEV.��NP.)
�\\ \\ \\\\ �\\ � I I � � I � I � I � I � I � � I I(ST�1Cl�URE I PAY� REM) I I
--__ � \ \ � � \ 1 I �� � I � I � I � I I � � I � I I I
,, .\ , �� � , � � � � , , ' � , �Tp��,ti,,�,�n_,� � ', � � S�E, EN,LAf��GE��
— �� \� `� � \` ` `�\` \ \ `� ' ' ' ' � Y","'F�•� � ' � r %4��p`' YN ' i
\�� �� �� � � I � I � I I I m I �
� '� �'�. '�� `� `,�� � `��� , ', � ', � � � � ; � � � ' � �� � � EXT� SHE�T '
> .\ \���`� \�� 1 � i i � i i i i � i i i i � i i� i� i � i i i
.�'�'�. �� ����\ ���` � N � � i�i � �� i� �� i i i � i i�i i i i i i � �
,' �� s��� ��� �� �Q � � i � i i � i i i i � i i i i i i i i i
�� i��� ��� �� � � i������ � i i i i � i i� i i i i i i i
, �� i i ����� �� �� � � � i � i � i i � i i i i � i i� i � i i i i m
� �� i 11 �i i i��� i� i � i i ��'� i � i � i � i i j i i i i�� �i i �i i �
� 1 I I I I I � I � I �/ � I � / ����� I � I � I I � �� I � I I I �� 1 I� I
, I I I I I I� I � I � I � I / / ��� I� I � I � I � I � I � I I I � 1 � I
' � / l� i i i i i i � i ; i % i � ; % ,' �l i � i �' ; ' i ' I i i ' li ' i � �i ' �i ' I�
, , � i �,, i�, � i, ! � i , i �� � i �,� �� � i �� � i � � � � � � �
630
�
3 620
E
v
S
� 610
0
�
3 600
0
0
0
�
� 590
O
. C
Vw
Z v�
� � 580
z�
w
� a
w
w �
Z_
� � O
0 w 'o
2
PVy
m
11
BEGIN PROJECT
BEGIN GRADE
STA. 12 + 0.00
EL = 609.40'
� `
12
� l � '
c T _
�\
82 \ �' 00 � ' ` �' \ eZ 7 \ � �
'� {y�' � , � 10=0.3 fs
YYP> �VTb=0.2 �s (
�� � �
� ; � —',
,
I \ `
I \ \ _
�E � — �,
I
I � �
I �� ��3 p� \ �
, � .
' � � �- � `�
� �-----� I
� ' �
i �
� i i
� i
� �
� �
� '� �
- -�� �' i
1L`i1Ls���l V' JL11A D'V'j�
I ���� � �i
� �, i
���
PI = 12+95.00
EL = 602.68'
VC = 130'
K = 20
REMOVE
EXISTINC
BRIDGE
�CLASS IIRIP RAP /
SLOPE 1.5:1 (2.FT.THICK�J
�NORMAL TO CAP) �Np.)
'� �:��STRUCIURE PAY iTEMj,
i —
IREMOVE EXISTING MUq SILLS
AN� PROVIDE BANK 57ABILIZATION
' W/CL II RIP RAP
�SLOPC 1.5�7� ON 60TH SIDES
13
PI = 14+85.00
EL = bO1J3'
VC = 130'
K =27
i�—�BRIDGE�C� STA.13-67 -L-
I.27".PC S,W25'.DEEB CAPS
1 @ 4 '; SKEWI 90 �
� I GP ELE .�692.32
I
NORMAL WS
ELEV. = 596.0
DATE- 3-2-2016
�_._ �� � �
i o_
' � 1��''� � ;
- I �
�� _ � �
_� y__`� _�s� ; _ �
-`-f-- �_ - -
.y.— ..•. . IC � �..F11 AA
� //1 /j( ( / I � � �B� � \ Prepore t e
i - � / I PGpY � Q Offi e of: �,
/ ,� i � Hatch Mott po eax �oo
/ � �// \ i � I � — — � � FUQuaY'Va�Rw.1�C 21526
� MacDonald www.nar�n�r+.�am
- i/� � ��i� j j � �----��
y` �i � �/i��� I I �� � 1��
�i
i � �/i�� `� � DETAIL A Engineering� ' Y � '
� % � � � � TOE PROTECTION
� il / i/ / �� INo�m s�oiel - VERTICAL SCALE HORIZONTAL SCALE
/ ��� m / � � �' , P �, �P, 2�, p 2�, SP,
�_ / / o F Fiu r""�� ""'��
// // � � ��<� GROUNO F��� SLOaE
PERMIT DRAWING
/ / � d
��r� � � i i �EorExr��E SHEET 2 OF b GLI
;� � `� y_ a= ,F� �
_ � � � —
� Type of liner= Ct B Rip-Rap
\ � \ \ � � � �� �� ` FROM STA. 13+00 TO SiA. 13+35 RT - � �
--- - - >� � � FROM STA. 14+70 TO STA. 15+25 RT � � \ � �
T —� FROM STA. 14+20 TO SiA. 15+30 Li / _ _ _ _ _ _ \ \
�,fiZ
w � j � - o «�r � � � � � � � A �
TB6 , \ �`� \� \ \ \ 1` ,\ { �, `�TT�ED TREES � \ DETAIL B � � - � � \ � \ \ 6'j
ITING pl E�Y ryERft � � 1 � � �_ 0� � � � BANK STABIUZATION �� �� �� � S
BEC0f�1E IFF�1 �F�ow� � � � � � ` � i �a„a s<a��i � � � �
� � � � � -L� PC�C S7a. l +/62I`� � _ . � � �
\ � \ \ \ � ESCAVnTION �ttP) � ' _ � � \ � \ \
toSrvEi, J� �\ � �\`� �� � ��\ � `� �� �� �� � r�rvr� i �\ �\ \ � \
\ � \\� \� \ � \ � \ V V \ • /iJT � � � � 1.5�.1 SLOPE (TVPI Q � / .6t0—� � � \\ \\
� - �
\ \ \ • \ \ � GEOTE%TILE ITYP) \ \ � \ \ \
� \ m � � Tnz E P�tO E6TION �� � \� \ � \ 1 // � \ � � �
� � \ � � $tt DE�`AIL A\ � � � \ �\ � � � Type of Liner- C1A55 11 RIP RAP / � \ � \ \
\ EST�20 1`ONS MP \
�� `� ` esr.3s sv��eor�xri� � � � � � � � LEGEND
\ \ 9 � � \ � � \ � \ Tpy LA 5� -L- STA. 13+60 -L- STA. 13+75
�� 0� \ \ � �' p'(�p�' F� �'(" EST 18 TONS CL II RIP RAP EST 15 TONS CL II RIP RAP
� \ � \ � � \ � � � � EST 79 SY GEOTEXTILE EST 16 SY GEOTEXTILE � DENOTES PERMANENT
fff��� ��// 1 �' � \ \ � \\ � � � e 1� \ EST 13 CY EXCAVATION EST 11 CY EXCAVATION IMPACTS IN SURFACE WATER
\ �.P�. CLA551 B �P �P \ \ � \ � � � � \ /
E�T.2 T� 5 � � � � �
� �F E�T.715Y O�OTE�'TILE � � �� \ \ � �� �� \\ � � i /
\� �� I � � \ \ � \ � � \ \ \ � �� ��_--� � 6�0
', , , �� � `, � � �� , `� . , �� , \ ,� ,
\I \ \ \ \ \ \\ \ \ `\ \ \ \ \- - / //
� i � � � � � � � � � � � � --- � �
i � ` ` � ` � ` . ' ��� 0
i � � � � � � � � . �
� \\ es \ \ ` 610_-__�� �
i � �\ � � � . � � , �
� �, '�, �e � , � � � � . � ' ' 50 100
1 � � � � � � \ � � �
�/ � � � � � \
\� � � � � � � � � � i
� \ \ \ \. . \ . , _ \\_ . `.` / /
_ ` � ` � � �� � �� � — — �� SCALEe I"= 100' HORIZo
� � � � � � � � — �
� � � � � �� �
� �
END PROJECT
END GRADE
STA. 15 + 50.00
EL = 604.48'
���
�EXCAVATION = 90 CY
(STRUCTURE PAY ITEM�
14 15 16
17
IL]
BR/DGE HYDRAUUC DATA
DES/GN DISCHAR6E _ 1100
DES/Gly FREQUENGI' = 25
DES/GN MN ELEyAT/ON = 602A
BASE D/SCHARGE _ 1500
BASE FREQUEN�1' _ l00
BASE l�lW ELEVATI�N = ��
OVERTOPP/NG D/S�HARGE _ 1100
OVERTOPP/NG FREQUEN�1' = 2a`
OVERTOPP/NG ELEVATION = ��
DATE OF SUftVEY
►NS.ELEyATION
AT DATE OF SURVEY
= 3-2-20/6
� 630
� 620
610
CFS
YRS
Fi
�Fs 600
YRS
fT
�FS
YRs 590
fT
580
= 596A FT
WETLAND AND SURFACE WATER IMPACTS PERMIT
j�'� ,/'Q PROJECT REFERENCE SHEET NO.
�� � II ��� 1 V ,ROADNGNDRO NNGE 137 HENGINE RS
���� .JS J� �Y �J
�' � � '� �� �'VOODS , , ,�� ,, �
� � i i � � � � �� � � I�7G��1�IY�L E PL?��T
EXI 1°I G C�ITCH � � � , � ��BAI�JK S7� iLt��TI�N--- ''� � ''� , � �����a W ��o�
EN HERE� �ND� � � ' ' '
, 1 1L , ,
� � � � 4� /!. /1' / // \ I HATCN MO ENMACDO F 0669& E, LLC
BECOMES bI��J�� , �� T� , � � , , �
F LOW I \ � / � � � DOCUMENT NOT CONSIDERED FINAL
� O I \ � \� ^ �_� ' �// � � � , EX I N Gi �'b ITC H UNLESS ALl SIGNATURES COMPLETED
' ; � ' � `, \� � �, V ', � ,' ' ' �' , E N �I� RE AN D � Offce of � �Hatch Mott Fo ao, ,aa
i � � �� ` ` � � / � � � e%E!� QuaY'V�Ina. NC 2i526
' �i B G� ES D I F F U� �� MacDonald www.na+onmax.00m
� i � \� � \ � �� / i� i � i ' ' �
, , � � � , , . , , , T � ,� � ,� L B F�w� �� IC� �
i i � w I, , � - �\ . , , � , ,
/ I i I i • 1� � \� _ --\� � �� 1--� I i� � - �� � �% i� Engineering
i � i i i � �'� � � ' PERMIT DRAWING
�i I i I i � �� � �� �� �� � � i i ' �' SHEET 5 OF b GLI
i � �
E�rsTiN ' RiW � � '� \�� SITE 1 � �'� �'� ,'',�'� �'� '' '' EXIS�I�IG RiW
, , , , , , , , , , , � ,, --_____
, � , , , \ , , , , __ � ,,______ __
� � _ � � � � i i � � � � ,' �� ,,-� ------_ �►
/ � i —i—__ � � �� i i i �L, , , � �� � __ '�
�
�,�/ , � i �—� ��� � � � i �� � �� --- `-------- --- O
,' / i � i � � , ,, � i � ,-- __---- - o --- N
� _
� � i � -_ i
i� / �� i i �_, , � - - ---------
i i __ '�� :,i � i r , - ' -------
, -___ � i ` �ri ----- _ _ -- -- Q
� � i - - �------- --
� i i ---_ -- ii � -- __
� � �� � _ ------- �
� � �� � �i� ��� � i�i'�iii - ------ Q�
'�, ��, ��� � �;� ; �, �,�� ,,�-TB���GI 15" RCP—IV Q
, , � �,� �� -
, , ,� ,,, �,�;, --_______ z
, , ,,,,,, � �,� -_
�� �� � � � � ��'�'�, � ' �� -- �-B 2 __ I__
, , _- �� i i ii i
� --
,� ,,- ___- � i�i ` \�i----- - ----------- ----
� '- --__ - - -- -- - --- --------
2 �'� / _ __ _� J � �I ��� —`�___________ ��_____ _ ______________________
�/ �--�----------- --- — I � � � 1 �� � ---�
i
/ i= -�i / I I \� \
— — s — — _ _ _ i T---- — �
_ \ I 1 \ � � � � — — — — — — — — _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
—�— — � --�� � 1 \ � � � ��\ ___ -- � -----------
� I TI�IG R-/W � � ''' �' , , � � --\ _ ___ ,
' �' � ` ' � EXISTING ;/�V
,
_ � , , , , , . ,
, � � � �, _______ ,� �
,,'' M T ,' ', � , ,� ,'' ', �, \'�', � - \ - _ �-�— - - - — - - -
�� G A T E � �� ; � �' , � ,� ` ,\ ' , ,�� 4S -C '�, e EXISTING DITCH
� � , I 2 ENDS HERE AND
' ; ' ,' � �,�/� T � ` '�, BECOMES DIFFUSE
� ��� - -
� � � , , . , �'��_--- --,, � FLOW
� � —� � ,, , �, � , � ' T E �\ , _
i A 'i �� , ' � � . � � � ���-'�_
� %\ � � ' ` � ` \� \ � `��-
� � � � ' ` ` � � ` --_
� , , , �_ Z -
i i � � � --,_
EXISTI�IG DITCH � C� T , � ��� � �`�� O O � ��, � , � � �'�, �� , Ql ' .3 cfs
VEL0ICITY TO TH� T �� � , , ��
� , � � � � � , '� �� 10 = 0 �� fps (NON—EROSIVE)
Q10 T 2.9 cfs , � � �—�, J �� W .', � ' �� _
V10T1.9 fps (NOhJ—ER V �, ° , , � , '` -��
, -�,
, , , , T Y P ) , , , � �-------------
� e� ��� � �
: � \ �UY � � �;�.. �\��„'��\� � -- �-
��, � , _ ��_
20 0
10 20
SCALEa I"= 20' HORIZo
��������
���� ����
���� �
LEGEND
�DENOTES PERMANENT
IMPACTS IN SURFACE WATER
WETLAND PERMIT IMPACT SUMMARY
WETLAND IMPACTS SURFACE WATER IMPACTS
Hand Existing Existing
Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural
Site Station Structure Fillln Fillln in Clearing in SW SW Impacts Impacts Stream
No. (From/To) Size / Type Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp. Design
(ac) (ac) (ac) (ac) (ac) (ac) (ac) (ft) (ft) (ft)
1 FROM -L- 13+55 TO -L- 13+80 BANK STABILIZATION 0.01 0.00 46 0
TOTALS*: 0.01 0.00 46 0 0
*Rounded totals are sum of actual impacts
NOTES:
2013 10 24
V
Z
�
z
�
w
z
�Z
O y�
�Q
� U
�
�
*DESIGN EXCEPTION:
SAG VERTICAL CURVE K
VERTICAL SSD
I�
0
N
Z
a�o
�
Z
TO
PHELPS ROAD
DESIGN DATA
ADT 2000 = 130
ADT 2025 = 260
V = 55 MPH
SUB REGIONAL TIER
LOCAL
� " I ' •� " I � I : (�> I � \ (�) I'� " I ' I-I � � . �� I'� (�) I . I \ •�
II�I�'I�I(�)\ (�>I� I-II��I-f\��'.���'�
o��GE cou�TY
LOCATION: BRIDGE NO. 137 OVER FORREST CREEK ON SR 1550 (EDMUND LATTA ROAD)
TYPE OF WORK: GRADING, PAVING, DRAINAGE AND STRUCTURE
BUFFER IMPACTS PERMIT
��1 ��
� � �
� , i� i
�. / � i
PROJECT LENGTH
LENGTH ROADWAY TIP PROJECT = 0.058 MILES
LENGTH STRUCTURE TIP PROIECT = 0.008 MILES
TOTAL LENGTH TIP PROJECT = 0.066 MILES
Prepared ln tie Offlce of Hatch Molt MacDorm/d for
DIVISI011i 7
NORTN CAROLLNA DEPARTMENT OF TRANSPORTATION
2012 STANDARD SPECIPlCATlONS
TIM JORDAN PE
LETTING DATE: pROJECT ENCINEER
DAVID FUH PE
HYDRAULICS F,NGINEF.A
NCDOT CONTACT: TIM POWERS. PE
DIVIS[ON BRlOGE
PROGRAM MAh'AGEA
.
� I I.� I., I� .,�� - :,0-
���
G�`
0
/
ROADWAY DESIGN ENGINEER
P.E.
/GN.9TURE:
HYDRAULICS ENGIIVEER
GLI
PERMIT DRAWING
SHEET 1 OF 6
I�7�`OMPLFIPE PII,A�T�
DO NOT II8�' PoR R/W A(A[R9ITION
PLANS PREPARED BY:
� Hatch Mott
�` MacDonald
PO Box 700
Fuquay-Varina, NC 27526
(919)552-2253
(9191552-2254 (Faxl
WWW.hatchmott.com
LICENSE NO. F-0669
'� 512t [Cingdoin Way,
swte ioo
Raleigh, NC D607
NC I,irznse Vo� N-a. �3
Engineering
'DESIGN E%CEPTION:
SAG VERTICAL CURVE K
VERTICAL SSD
DETAIL A
TOE PROTECTION
�Noi�a scalo�
o�
'L��'CIEA sioPe
�Ro��o d e
d= 1 Ft, �Eor[nne
Type of Liner= CL B Rip-Rop
FROM STA. 13 +00 TO STA. 13 r 35 RT
FROM STA.14+70 TO STA.15+25 RT
FROM STA.14+20 TO STA.15+30 LT
DETAIL B
BANK STABILIZATION
�No�fo Scale�
EXCAVATION �TYP)
2' (TYP�
1.5�.1 SIOPE (T�PI Nw5
4
GEOiEXTIIE �TVP)
Type of L�ner= CL45S II RIP RAP
-L- STA. 13-60 -�- STA. 13+75
EST 18 TONS CL II RIP RAP EST 15 TONS CL II RIP RAP
EST 19 SY GEOTEXTILE EST 16 SY GEOTEXTILE
EST 73 CY EXCAVATION E5T 71 CY EXCAVATION
630
620
610
600
590
Vw
Z v�
� � 580
z�
w
� a
w
w �
Z_
� � O
0 w 'o
2
PVy
(,kTp�,A. FA , A e� soys
urMs Nc.
�1I� S,CnA,TTE,nRE,D TREES
x L:Y LJ' EXISTIN{�i,�jDll
� AND BECCIMES
� —
BUFFER IMPACTS PERMIT
BANK STABILIZATION
SEE DETAIL B
EST. 15 TONS RIP RAP
EST.16 SY GEOTE%TILE —,
EST. 11 CY E%CAVATION
(REMOVE EXISTING MUD SILLS)
BANK STABILIZATION
SEE DETAIL B
EST.18 TONS RIP RAP
EST.19 SY GEOTEXTILE —
EST.13 CY EXCAVATION
(REMOVE E%ISTING MUD SIL
HERE
FLOW
15' RCP� �—�'� " �t� t.[EC"�-
— .�_-----__
TO SR 1551 18' B5T
IPHELPS RDJ SR isso EoMuNo LATTA RD.
—_�'7: _ _ _ ------ —
�IS'RCP '� �
REn
%1 ����35 ELE �
� �
�I N �� SOE �P
� \ EST. 15
` � EST.3
M� o°,�v� F�. �soNs
10 11
� �A7E r� mc' -
ROTEC ION �r p �
ETAIL e \
TON RIP RAP
5 SY EOTEXTILE (
\
EXISTI G DITCH OUTLET
VELO ITY TO THE STREAM
Q10 = 9 cfs
V10- 9 fps jNON-EROSIVE)
CLA55 II RIP RAP
UP TO SHOULDER ELEV. (NP.)
�STRUCTURE PAY REM)
SEE ENLARGED
AREA ON
NEXT SHEET
V� /\�B
� i��
Q�uy / /
�oQ / � � �
y/ � /
/
/� / �
,• ✓/ �� � c��
' � /, �
� / /
/ .
� � /
��
��
' VIOODS TOE PRO CTION
I'ENO� SEE DETAI A
SBG ��EST.40 T NS RIP RAP
y�� 39 � ti EST. 105 GEOTEXTII
�iy � EXISTING DITCH ENI
— � i � \AND BE OMES DIFFI
-� �
�
��d J1i V V � �� w�
���� �.
SBG
/%� �J }�'��i PROIECT REFERENCE SHEET NO.
`�' n IN � III J� � �� ROA�NGIN�ROG NGE 137 HENGINEERS
�LJ/ �L �7
� a %
�� �
/ h /U r U/ �
A/ R �
/` �/ o/ \��\
/ �e- p�,� ~ S��< � �
� DAhI` FARIAS. �� / � � \ � �
y/: Q \
� f� j_/�
� / / /I -.(� �GUY
-L- PT S�o. (1+85.00 � �,r
/ °cur
� �o�
ID PROJECT l7BP.7R.97 � / �/i � 'i`\i
- POC Sta.15t50A0 /
j �SCATTERED TREES �,E� / // / � �
� z�// /' '�
� �i
{� fl / ,/�/ i i�
�� A' ,// /,
�.ERE t� / / /
FLOW � / / /
�15�X� / �� � / /
_ � �// g �<� � / /
_ �� I I
__- //� I �
_/
— I�/
VE) /��
\ ��
� � -L- PC S7a. /5
m
TOE PROTECTION
�i SEE DETAIL A
\ E5T.20 TONS RIP RAP
EST.55 SY GEOTEXTILE
� \�
Tgp
�S�. CLA55 6 RIP RAP
\ Esr. z roNs
�FF EST. � SY GE�TEXT��E
�
\
\
\
���
BEGIN PROJECT END PROJECT
BEGIN GRADE END GRADE
STA. 12 + 0.00 STA. 15 + 50.00
EL = 609.40' EL = 604.48'
��
12
PI = 12+95.00 PI = 14+85.00
EL = 602.68' EL = bO1J3'
VC = 130' VC = 130'
K = 20 K =27
i�-�BRIDGE�C� STA.13-67 -L-
I.27".PC S,W25'.DEEB CAPS
1 @ 4 '; SKEWI 90 �
. � I GP ELE .�692.32
REMOVE
EXISTING� I
�_ BRIDGE
�CLASS IIRIP RAP /
SLOPE 1.5:1 (2.FT.THICK�J
�NORMAL TO CAP) �Np.)
'� �:��STRUCIURE PAY iTEMj,
i —
IREMOVE EXISTING MUq SILLS
AN� PROVIDE BANK 57ABILIZATION
' W/CL II RIP RAP
�SLOPC 1.5�7� ON 60TH SIDES
13
NORMAL WS
ELEV. = 596.0
DATE- 3-2-2016
���
SCATTERED TREES
_ GM f+F.r /L
�EXCAVATION = 90 CY
(STRUCTURE PAY ITEM�
14 15 16 17
(�YLDAiRYFA,_,�A A 50�
avna, MC.
IL]
I�T��IPL]E E PLA�V�
DO NOT Vp6 FOA W AC`OVIg114oN
Q HATCH MOTf MACDONALD 18 E, LLC
LICENSE NO. F-0669
DOCUMENT NOT CONSIDERED FINAL
�° UNLESS ALL SIGNATURES COMPLETED
� Prepore t e
Q orr� e or: �
Z �- Hatch Mott po eax �oo
�"��t MacDonald www'narcnmo�'++com�szs
1�� .
Engineering
VERTICAL SCALE HORIZONTAL SCALE
�' , P �, �P, 2�, p 2�, SP,
'�� '�'�"�'��
PERMIT DRAWING
SHEET 2 OF b �C�i�
LEGEND
_BZ �_ RIPARIAN BUFFER
ZONE 1 (30')
—gZ 2— RIPARIAN BUFFER
ZONE 2 (20')
ALLOWABLE IMPACTS ZONE 1
(BRIDGE)
� ALLOWABLE IMPACTS ZONE 1
(ROAD CROSSING)
� ALLOWABLE IMPACTS ZONE 2
(ROAD CROSSING)
lo0 0
50 100
SCALEe I"= 100' HORIZo
BR/DGE HYDRAUUC DATA
DES/GN DISCHAR6E _ 1100 CFS
DES/Gly FREQUENGI' = 25 YRS
DES/GN MN ELEyAT/ON = 602A Fi
BASE D/SCHARGE _ 1500 �FS
BASE FREQUEN�1' _ l00 YRS
BASE l�lW ELEVATI�N = �� �
OVERTOPP/NG D/S�HARGE _ 1100 �FS
OVERTOPP/NG FREQUEN�1' = 2a` YRS
OVERTOPP/NG ELEVATION = �� �
DATE OF SUftVEY = 3-2-20/6
►NS.ELEVATION = 596A FT
AT DATE OF SURVEY
630
620
610
600
590
580
� /- / � ' ' ' � � , . � �� � 0 I I I I � � - �- / / � PROIECT REFERENCE SHEET NO.
'DESIGN E%CEPTION: � / / � I � � � / I � ; � . � �� . e'9\ � � I I I I � � / � � i � � �
SAG VERTICAL CURVE K � / / � ti0 � / � � � �� ' � � I � ! � � / � � 176P.7.R.97 - ORANGE 137 4
VERTICALSSD ��/ ,� � � ; � �,- -;;-; �� BUFFER IMPACTS PERMIT � ` ' � �� � � � �' �`' �' ' ,' � � � � � � ROADWAY �ESIGN HYDRAULICS
i
� i� � �/ � � _ l � �� �� ��i ,� I I � � � �� I � 'y� ENGINEER ENGINEER
� _ _- i i� �
� �� � � I I I
� ��°'�'�' i�'/ i i ,' � � �� / � � � ���'����' � � , � i � � � 1 I I I � � I � I ' I � � � � � l � I ` � \�
�i� � i��� i i i i � l � / � �/ /�/ ��i�� ��� � � � � � � � � I I I � � � � � � �� �a�l ld I \ �� �
� � �� � i i i � � l / l l�i i� i��� I / �� � � I I I I� � �� I ��� I Y�" �c/ i I � \ �
' . ti0 i i � l ��� �/ � � � / // �--600---------- 1 I m I I I � � � � I �,A I v^, , ld � �fl� �
i / � / / � � / l � � � � � � � � � � ( ! i / i � � ,��lg � � 7 / / / 1 N � � � � � � � / � � � �F�. LJ' \
� � �i� �� � � � 1 � � � � �ioll ��e � \� � � � i r�� / �� / i / � � / � � � � � I � � � 50�� �2��1� i:Y� \ ��
'� m� `� i i i i i i � I�T �1-IPL]E E PLA�V
, �. � i i I i � � i I�� �� �� � � ,, li A �. ''� ,� m i i i i i i ���3 � � � � � r� �
� � / /� e � � � � � I � �
�/� i� I 1 � I I I l ��� � �� � � i A � e�� �' / / / I� I � I � � � I�� I \ ^ DO NOT VB� FOA w wCnmgrr[orr
' � I � � � � � �N� �Sra�iznrioN � � � i � 1 4 �� �.� - - '� - -�-'i` m� i i � � / i i i m � \ � � i S0j< � � - -
� i i se[.PE qIL I � / '/ ��\� �uy / �/ / / / � �T��T,A � \ � � � ' � �� � 0
� � I I � I I II \\\\ � � � � � / � / � \ � \ � QQ // / / / ��rreraAs �� ��l � � � /\ � N
, �� � � �\ � r. is.Tdys a�y ai,r � i i � i � � Q /�y� /� � � i � i i i P a � � � i (
/ � � +L . .` �� E�,�6 �Y `}^�� OT`EXTILE � / � l / ` �\ � I � / I � / � I � I � � _ _ I/ � / /I � �L� � Q HATCH MOTf MACDONALD 18 E, LLC
// i \\ � I�T�iLA,,.LM1,I�I A� � \ \ �jT 1 Cr tACAVATIQN� / ' �� / /' \ /� / / � / � � � / � \ LICENSENO.F-0669
' � � � � - - l \ � � � m �'f" F^'"""a^" � 1 1(rz�,o��e E�iStiNG �i.4fl `�i��5� � �� �� � � � � �, �� ��// �� i �� / / / � � � I � � � � � � � �//`� � ,� � �\ o � � _ , - DOCUMENT NOT CONSIDERED FINAL
� \ � N � / � I � � I/ m � / // l I I I �
/ �' � � 1 � � � / 1 1 1 � I I I l� l � � �� � � ��� ��. / %/� � / �� ////� �� � � II / ��/ � I'{� \ G�Y � W \
r G UNLESS ALL SIGNATURES COMPLETED
� �' I � � � J I � 1/ l� a / ��� �l I / p� �µ �/,r
/ / � NK StA$IL ZAfI N � / ✓ � � / / I � I -L- / II JIO. /I �To
/ / � / / / / / � / / � y 9 � l / �� / / � / / / i
/ / / SEbDFiTAIi a / / �� � \ i � � i / , i l i �
i � i � i i i � i i ieyr i� rdri5 piP/w.p �/� /I � �� l e � i i i I � � � i y�
/ / � � / / / / � � / / / �5T.6b9 SY �EOT�fXTILE/ I W l� � k � .�/ /��. � I I I � I I I � I � I � 1 / i
� � / / / / / � � / / / 57p�'13�CY E;�CAVAYior � / 1 � � ! � � � t I I m I I � I I
� � � � i i BEGI I� Pl?OJ CT�nl7�P7%R97 �(3Ennpve 4x�snti�� nnuo saLs� �� �� y /�� ��� m E D PRO EL�% BP.7.R.9�`�
� / � / � l I I � \ � /I • 1
� i �� i �� 6� i-L� o.l � ���� � � i * ` � � � rG �POCISt.l5t50 ---
� / � � / / � � � � � � � I l / I � � / / � / � � � 1 1 � � / � � � - � ( � � 0 1 \ \\ � \ u \ 11 � I \ \ SCATiERED TREES
9� , � I � � �\ � � I l l l I � 1 i I l 1 � � / Nes � i I 1�� \ \\ .
� �5Z � f,, � - � � � � � � i / � � � � r �40003 TOE �PR (.ri4N \ � \� \� I �, � � � - -�
-L- PQ% .SYO. lU'fIXl� � I � �SCA�'TER��TI�F�S/� I I11�- / y� I � I I I / ,EN /SEE pETAI `A � \ � \ \ \ � e �
// / � �� + � � � � � / � \ � �'OODS \ � 5 � EST 40 T NS'�RIP RqP � \ � �
/ I \ � � � � �Qi �''',_/� � i i i I� I I � 9 esThos �eo�xrr� \ � � � p`•'� ` "� �
� � � � y�ISTIt��i,�j DITEH E DS �HBRE � ' e�� ! ��r39 ¢ ry / 1 � � Y � � 1�
/ � � \ I � AND BFCQMFb DSFF SE FLQW� � �P � .0 01.� � �y „ E 7 IISTI NG DI XCH EN �- IERE �\ � �__ �//f
� l I I� � l l///� // I 1� I I I I , T '_�'� .� ���AND BE O�nES DIFF E AI�Vk \\� X " �
_-_ / � i � � �� IX � \ I i i i i � ��� � cu II I -� � �x ��E ��=_�-��r i
' I \ I � ezisr c% I �� // / l d - -� ��/'� �� L o_ /
s` �� F— —> ' '€"�e����s�`'�� � � � — __-- __ �—_ _=' ���—r'r ii '�
` ' - _ N�\� \\ �TO 5 1551 � '� 18' S��TT���-r \ $ITE 1 ' �TB� GI 15" RCP-IV \ I J�� � I
' - - � \ � � \(PHEL�� RDJ SR/I550 �OMT LA TA�_��—�=�-- --_ - _ - - - _ � --� � - =��j� � ' -0`
` ` �� \\ \� \ \ � � l �`�-&�7�-E\��E-��� w R'EM E 'C / -_ ` -_= -___ /E�
,,� �� � ,, �a, � Prepore � , e
i �-- ��/� ��// I P��Y � Q ' Offi e of: �� Hateh Mott po eaz �oo
/A� `/� so� I � � , MacDonald www'narcnmom++com�szs
'r /� �j� ' `\J �
/���/ 1 ��
� //// � j j � \� �-----
� ��i� ���� � �� -- _ ..._ _,.
r � i i � I I � ,�.
;'� /%' � `� �n ` �� ---- Engineering
�
j�/�� K�/ � / Y�� � \� _. VERTICAL SCALE HORIZONTAL SCALE
/ , i � m / � � � � � � - �' , P �' �P' 25' , P z�, SP,
uL _ / / � � �� ��
/��� `, ^y ` `� ,—' PERMIT DRAWING
� � � � SHEET 2 OF b
`� ` �� " � �� "� GLI
;� � �� )—� � � ,_—' ��
� �� P' � � `, _-,� ��
�\\ �\``/ I \1 \\\ / /6`5i
� � � � � � % 9 �.�- > \ \ 4 LE� ���� I \\ \\� s \ �- //'' �
- - - - - '- � \ \ � \ \ \ � � � � � ���� � � � 1 � ���GAYE � 7 qS � .. z ' Dg TB6 , \ � \� \ \ \ 1 1 I SCAT'fE�ED TREES � \ � / i � L E G E N D
� � �/ � I � � �. � � / � � �� / 1 � .-� / � , T _ ISTING L01 E�Y ERft � 1 � \ 610� � \ i
DETAIL A � � � � o � Ir��%=___ / �/ / � ro[�PRo ec ibN I �r p � T ,� � � � � 1 �-� � � \ \� �' RIPARIAN BUFFER
I '� 1 \\ ��,,� � f SEE qETA� 1 I .e B � ' \ . ` \ BZ � � BECOf�1E IFF�1 LOY�J � \ � � � -L PC�C SYQ. I 'fIE� � � — BZ 1— ZONE 1 (3O�)
TOE PROTECTION �
� noi�o s�alol � � � \ \���\ � �� ��'ei ` ( � EST 1 TOf� IP I�AP � 2 ���, \ ' � � 10=0.3 cfs � \ \ � 1 \ � \ � � \ \ � � � / �
� � � � � �� ���;�\ �\\� .�` _ �_ '�sr.a�3 srl e�rekri�e I � � � �yP> �via=os �s� RosrvH, J � � � � � � � � � � �
`��` s�oPE �, \ � � � �` / / � I � I I � i 6uv �� � � � �\.� � � � � � � � � � � � � � � � —BZ 2— RIPARIAN BUFFER
Ha �,� F�p m � � � � \ 1 � i � I � � � I � / � � �xisi c� oiTcH duneT Y i ; � --, � ���\ � � � � ��� .��t ` \ � � � i ZONE 2 (20')
�Ro��o , � � � � � � � � i i � i i i i � i i eoc� �Tw fo� THQ sTReo.r \ i i � � � � � � ` � � ` � � � � i �
a= , F� �Eo,�.��E i � � � � �� � � � i i i � i i i i � � �s� m ` �� � � � � � � �� , .
� I io# e rP (Nor4-eaosiHe� m � � � � � � r E rkorE�nor� 1 � � ALLOWABLE IMPACTS ZONE 1
� � s oeiwi� a� \ � � i (BRIDGE)
� � � \ � � � � � � � � � � � � � `' � \ � esr so roNs �ur� � �
\ \ m 1 I 1 1 I I I . � � � � \ \ � �
Type of Liner= CL e Rip-Rop \ \ N I I � I � I CLP�55 II RIP IRAP I I E � - � � � � EST. �55 5Y� GEOT�XTII� � \ � \ � � -� �
� I I � � ip I I� I � I � 1 � I I �UPTO SHC�ULD�RELEV.��NP.) I �� \\ 9\ � \ ��\�� �� \ �� // /
FROM STA.13+00 TO STA.13 r35 RT � � I � I � I � � I I � I I(ST�1Cl�URE PAY�REM) I pg � \� e\ � \ �L.T �LI��A 5�
FROM STA.M+70 TO STA.15+25 RT I � � I I � � � I � � I I I ��o3p� � � � � � \ \ �� \ \ � D�R F MC. 1 i i � ALLOWABLE IMPACTS ZONE 1
Faonn sra. ia+zo ro srn. is+ao �r � � � � I I I I I � I IC � I I � � x � qp r� �. � � � � �� � e � � � i (ROAD CROSSING)
\ � � � I ��LT�,IµF�1T��1 � I � N E, EN,LAf�GE� � � �,, , �,,, ��,S�B�P�,P �� � � � � , , � � � � � ,�
�
� ' f���A QN E T� To s � �� � .
DETAIL B � \\� \, II I I� II I� r^," II � � I � m � II � I � � I � � - - - - -� � I � �FF� E�T. 715Y O�OTE�rae �\ � �� \ � �\ �� �� �� � \ � � \ _ _ � � � mi ALLOWABLE IMPACTS ZONE 2
BANK STABILIZATION � I � � � I I I � I I i � I \ � � �\ � � � � � �__ i 6� � ROAD CROSSING
��o„os<o�e� � � � � � , � � � , � , � � � , � �NEXT� SHE�T � � , � � � , � . � � � � , , , , e �
� � � � � i � � � i i i � i i � � � i � �i � i � i i � � ,� � \i � � � `� � � � � �� � � `� � ' �'
ze'YP'anoH Inrl �\ N \ � I�� � � � �� I I � I i I � I � I I I � I � i � � I 11 � � \\ � �\\ �\� �\ � �\ �� � ��__ _ // i�
is�.is�ore rvr� Nws \ � � � 1 1� � I � I � I � � I � I � I I I � I I I � I � � � � � � � \� � \� \ � \� � � \� \� \� \�� i/
� 4 ` 1 \ � 1 � � I I � � � � I I I � _ _' � I 1 � \ � \ \� � \ is � � � � � � � ��Q 0
ceorexnie ��ve� � 1� � I � � � I � I � I � I � I I � I � I I 1 � I � m / / \ � � � � \ � BS � � � � 610� ._ -�� , �
Tviceore�e,= eussuniranr � � l 1 1 ��' � 1 � I � I � I I � � � � I II II �� 11 � �I � 1� 6 \� �\��\� \�\��\�� \�\ _ �� / �/
i � ]E�,I���T �%][IIE+��V �� ��� �' . ,
� � � � � � �� n, � � � � � � � � � I � � � � I � � � � I i � � �1 � �\ � �\ �\ � ��\ �� �� �� -�--- i
-L- STA. 13-60 -�- STA. 13+75 � � � � / � � � � I I � � � � � I I � I 1 1 � � I �� � � � � � \ � \ � � / � O I o 0
EST 18 TONS CL II RIP RAP ESESTSI6OSY5 EOTEXTILEAP I � I / / l / � I I I � I � I � I � I � I � I m I � I � I I ���� � / - \ � \ \ � �� � \� \ \ ��� �' �� II- /
EST195YGEOTEXTILE � � � / � � � � � % � I I I I I � I � I I I I � � -_ \\� � � � � � \� � � SCALEe I - IOO HORIZo
EST 73 CY EXCAVATION E5T 71 CY EXCAVATION / l � / � / � � � / � , � r � i I I � i I i � i � i � 1 � i � � \ � . � . �. � . . \ � , , \ � _ . . /
630
v
� 620
E
v
S
� 610
M
O
�
3 600
0
0
0
�
� 590
O
. C
Vw
Z v�
� � 580
z�
w
� a
w
w �
Z_
� � O
0 w 'o
2
PVy
10 11
BEGIN PROJECT
BEGIN GRADE
STA. 12 + 0.00
EL = 609.40'
� `
12
���
PI = 12+95.00
EL = 602.68'
VC = 130'
K = 20
REMOVE
EXISTINC
BRIDGE
�CLASS IIRIP RAP /
SLOPE 1.5:1 (2.FT.THICK�J
�NORMAL TO CAP) �Np.)
'� �:��STRUCIURE PAY iTEMj,
i —
IREMOVE EXISTING MUq SILLS
AN� PROVIDE BANK 57ABILIZATION
' W/CL II RIP RAP
�SLOPC 1.5�7� ON 60TH SIDES
13
PI = 14+85.00
EL = bO1J3'
VC = 130'
K =27
i�-�BRIDGE�C� STA.13-67 -L-
I.27".PC S,W25'.DEEB CAPS
1 @ 4 '; SKEWI 90 �
. � I GP ELE .�692.32
I
NORMAL WS
ELEV. = 596.0
DATE- 3-2-2016
END PROJECT
END GRADE
STA. 15 + 50.00
EL = 604.48'
���
�EXCAVATION = 90 CY
(STRUCTURE PAY ITEM�
14 15 16
17
IL]
BR/DGE HYDRAUUC DATA
DES/GN DISCHAR6E _ 1100
DES/Gly FREQUENGI' = 25
DES/GN MN ELEyAT/ON = 602A
BASE D/SCHARGE _ 1500
BASE FREQUEN�1' _ l00
BASE l�lW ELEVATI�N = ��
OVERTOPP/NG D/S�HARGE _ 1100
OVERTOPP/NG FREQUEN�1' = 2a`
OVERTOPP/NG ELEVATION = ��
DATE OF SUftVEY
►NS.ELEyATION
AT DATE OF SURVEY
= 3-2-20/6
� 630
� 620
610
CFS
YRS
Fi
�Fs 600
YRS
fT
�FS
YRs 590
fT
580
= 596A FT
�i
�
BUFFER IMPACTS PERMIT
j�'� ,/'Q PROJECT REFERENCE SHEET NO.
�� � II ��� 1 V ,ROADNGNDRO NNGE 137 HENGINE RS
���� .JS J� �Y �J
20 0
10 20
SCALEa I"= 20' HORIZo
��lls���YJLs�
��s��el V' ��s �'V'
����s �
BZ 1
— BZ 2 —
uo No1` II9a xoa
HATCN MOtT MACDONALD I B E, LLC I
LI<ENSE NO.F-0669
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALl SIGNATURES COMPLETED
repar n 1 e
o"'Ce °` I,� Hatch Mott ,o ao, ,aa
�` MacDonald wwwn$iomm�a+°room'szs
1�� ,,
Engineering
PERMIT DRAWING
SHEET 5 OF b i�$
EXISTING DITCH
ENDS HERE AND
BECOMES DIFFUSE
FLOW
LEGEND
RIPARIAN BUFFER ���� ALLOWABLE IMPACTS ZONE 1
ZONE 1 (30') � � � (ROAD CROSSING)
RI AOR EN2 B(�F�F,ER �
�� � ALLOWABLE IMPACTS ZONE 2
(ROAD CROSSING)
� ALLOWABLE IMPACTS ZONE 1
(BRIDGE) ETF — EXISTING TRANSPORTATION FACILITY
� � � � � ^ � � PROJECT REFERENCE SHEET NO.
BUFFER IMPACTS PERMIT o ����\�� 17BPENGWEERORANGE�37 ENGINEER
�_`� ROADWAY DESIGN HYDRAULICS
EXI I D,YCH , � , ' , �, , WOODS
i � � i , I
I � �� � ' ' �
EN ERE;AND � � � , � � ________---____ ' � i ING��'IYDL E pL.��v�
I I � I ` \ \ \ _ � / / � DO NO'C SI�E FOA W A(%1iII�1TiON
BEC ES QI��.JS � ' ` � ' ' �
, � � , � � �
FLOW I I- I I \ \ 1 \ � � �/ / / \ /� HATCN MOtT MACDONALD IB E LLC
\ \ LI<ENSE NO.F-0669
I � � � � � � � / � � / � / \I// � �^ / DOCUMENT NOT CONSIDERED FINAL
� � I �I \ � � � ��� � � W i � (\J �/ UNLESSALISIGNATURESCOMPLETED
� � O � �\ � � � � ' � / / 7` . V / repare i 1 e
I I � I � \ \ . � \ A� \ ' � / / , � � i � offke of., HdtCh MOtt ca eo. �oa
� c� \ / / Fuquay-V�Ina, NC 2i526
� \ � V � � � / � � � � � MacDonald www.na+onma�r.00m
; ; � �� ; �, `, �,\ , /,,�,, T � ,� ,, , � ,�� EXIS�NG� DITCH ,�� ,
; � � � ' `I/ � �� \\ - _ -\' " ,' ,' G ,Q T ,'� �� - �'� � L g EI-dDS HER AND ,' ' g�er�
� � � . , , � � �,��.
� i � � � � ' 13C1.O��S IFFU�E PERMIT DRAWING
�� j i I i � �S �� � �� � ��� i� � � � '� u' SHEET 5 OF b C7L�
� i � � � i \ � � � � ,i � /�< �
E�rSTIN R/W � � � �, `, �, � � � ,� ,� � EXIS�I�NG R/W
� � ; � � , � �,� � � � � ��,� ��,� ,, ,, ��j � ��� � ,�- ---______
; ,� ' _ � � � � � �� ��� �,� � , � �,, � T�- ,_---��------------_ ^
� � � ��,�� �� � ��,� �� � � � GJ � , � � - � -- ---
, �-�- o — — — ` o
���' �� ; '� � � � � � , � �
, ---------- ---
, ,– _ --
------- N
/ � `� i i _ ,__ ''��� ��;i � i ��; – ----- J ---------------------
� � / I ---_ IIII � 1 IU� — —
– — Q
` � _ — — — _ — — _ _ — _ _
/ \ / I — _ — — — — �
� � I ` ` � � � (
� _—_-----
I _____
�
'�� \'�, \'��, ' �;�'�����', ''�'�',' ,�-TB���GI -- 15" RCP-IV o
, � � �,,,��
,, ,, , ,,, �, , ; ���,; ,,
, , � ,,, „ , � ,,,� --_______ z
,, ,, � , ;;,,,�,,, , ; ;���,� �� -- �-6 2 __ I__
, , � „� ��, , � �
� ,� --- �� i i ii � i --
' '� �I � ` � � ����I i----- — ----- ----
� �� ___ _ ------- ----
� � __ — __ __ -------------
�� � � — -- � � � � � ���� —� _ ------
-- ---
------ �
2 , - _- , �-- ----
, - - ---
, - � - - , ,, , , ,,,, --, ,,-
, ,�- ' , -� ,,�� ,,, � ,� --=_-=------ ____________________-
—�--- -- - —` , i � � �-, , _ ------
�---, - ��-i �\ \ \ \ � i � ,�` ` ',,\ -- � --------_--
� I TI�IG R-%W '� ������ � �;iii %>- �� ��,\`�, y�� ��_t_,�i � ������� EXISTING �;��V
,� � � � ' , �� � � `� �� `� __--- --� �� _ _ ( - - — - - _
�
,� , � ,� � , '�, � _ _ -C-�- - - e EXISTING DITCH
�� G A T E � �� ; � � _,� � , �; , �. I ENDS HERE AND
� \ � � ; ,�� �' �,�/� T L S ITE 1 ��, � BECOMES DIFFUSE
Q � / �
� FLOW
� � � � � , � � ' TE �� � �-
�� � � , , ,� . , --�-
� ; � T � � � �' ' � � ' � ��-��--_-
, , ,, , ,
� EXISTIN'G DITC U� T ; � � , �� \' '�� �- �� e� ���--�--
�° VELOCITY TO THE � � ' �� � �� �, �� �' '� �
� � � � . , . � ��, �, (�1 'Q.3 cfs
� Q10 = �i.9 cfs � `, \�, \�� � ���, � ��� �10 = 0.2, fps (NON-EROSIVE)
� V10 = � .9 fps (NON�E � C'� �= J � � ; , � � �� � � _
� � � � ,
� , , , � , � � � �� --------��
Q , , � , , ��, . �, -----
� � ; ` T�A.B ZATI�JN �� �, � ;�� \�; ��� \-=-
o � , � UY � � ; A � ,
, „ � ,
�
` LEGEND
E
0
w RIPARIAN BUFFER ���� ALLOWABLE IMPACTS ZONE 1
�
�������� —BZ 1— ZONE 1 (30') � � � (ROAD CROSSING)
=� 20 O RIPARIAN BUFFER
z� ��'�� ���� —BZ 2 ZONE 2(20') \�� � ALLOWABLE IMPACTS ZONE 2
� " 10 20 �][�][�]E+s ]L (ROAD CROSSING)
z X ALLOWABLE IMPACTS ZONE 1
Nw-� SCALEa I��= 2O' HORIZo (BRIDGE) ETF - EXISTING TRANSPORTATION FACILITY
� S
�Q/
r��Y
BUFFER IMPACTS SUMMARY
IMPACT BUFFER
TYPE ALLOWABLE MITIGABLE REPLACEMENT
ROAD PARALLEL ZONE 1 ZONE 2 TOTAL ZONE 1 ZONE 2 TOTAL ZONE 1 ZONE 2
SITE NO. STRUCTURE SIZE / TYPE STATION (FROM/TO) CROSSING BRIDGE IMPACT (ft2) (ft2) (ft2) (ft2) (ft2) (ft2) (ft2) (ft2)
SINGLE SPAN 21" CORED
SLAB W/ 2.5' DEEP CAPS,
1 1 40' -L- 13+02 to 14+55 X 809 630 1439
-L- 13+47 to 13+87 X 458 458
TOTAL: 1267 630 1897 0 0 0
�
om
H �
< �
H Z
7o��p
r�TI�Cn
�z-I=D
=�DDm
� Z
2 N O �
z,���-n
• �OH
�DDD
��
U' o
z�
m
Z
� �
m�
� _
_
� �
m � D
� z
= O p
o �7 D
�
� � �
r
'-' � D
� �
�"� Z
Z �
� �
O
�
�SEEIPBANS A �� �CLEARING LIMITS � \ S�
�E '� =�E � R�W ^��� CLEARING LIMITS
E� � �E l�� � �E E E
� � - � R/W C � � - - - - � - - - - � � SLOPE STAKE LIN� rE.O.P. R/W � � �
R/W �
l�✓
SLOPE STAKE LINE F Iy B � E.O.P. �-� D
- - -
----� � �-� �-� � � � � _F ��`�`` /��------
�
�) E ���� E R/W �
-
� E E �O \ R�W �� E E-'J/ E, ` CLEARING LIMITS i ��
�j �. � � �- �•;: _
.���� CLEARING LIMITS , ^ ,
A �j�, :;:'
CLEARING LIMITS ' .• � �•
. ��''' �: �.
B .. • . D
GENERAL NOTES: C �
1. REMOVE TREES OUTSIDE THE CLEARING LIMIT WHEN, IN THE OPINION OF THE ENGINEER,
THE UTILITY OF A TREE WILL BE DESTROYED BY THE CONSTRUCTION OR THE CLEARING
OPERATION.
2. CLEAR IN ACCORDANCE WITH THIS STANDARD EXCEPT WHERE ADDITIONAL CLEARING
IS REQUIRED FOR SAFETY AS SHOWN ON THE PLANS.
3. FOR SECTIONS WITH WIDE MEDIANS WHERE TREES ARE TO REMAIN, CLEAR THE MEDIAN
SIDE IN THE SAME MANNER AS ON THE OUTSIDE.
CLEAR TO SLOPE STAKE LINE OR CONSTRUCTION LIMITS
. �
i •� ^ ` �
:�' •• '..
: :l:••' �. . .
SLOPE STAKE POINT
-
C� ROAD
� SLOPE STAKE POINT J �
PART SECTION D-D
CONST. LIMIT
LATERAL DITCH, CHECK DAM,
SILT BASIN, SILT DITCH, -
. TEMPORARY DIVERSION
- CONST. LIMIT
� � '-�
� . `• ��.�. •i
� SLOPE STAKE POINT �
PART SECTION C-C ,;�
:+
:'
�� �: . . ...• .
FENCE �
i
�
ISLOPE STAKE POINT�
PART SECTION B-B CONST. LIMIT
RISER BASIN �
z
o�
H �
H
aQ
HOCC='�C�
LLJ�Hz
oo�=
wQz�-x
QU��H
�
F— 2 Z W
c!)H�OJ
O�CAQ
Z H �
1 � ��
0�
�
O
L.L �
Z Z
H ~
�.
Qa�
o W �
J
o v '
�
o LL O
z � _
�
� � �
_ _
� �
� W
J �C.'3
Z
W
1EET 1 OF 1 S�OPE STAKE POINT —� `} SHEET 1 OF 1
200 ■ 02 SECTION A-/4 CONST. LIMIT ^O� ■ o^
L L