Loading...
HomeMy WebLinkAbout20071686 Ver 1_More Info Received_20080211illU ?; STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION MICHAEL F. EASLEY DIVISION OF HIGHWAYS GOVERNOR February 11, 2008 WBS No.: 33276.3.1 Contract No.: C201787 TIP No.: B-3824 FA No.: BRZ-1525(6) County: Chatham Description: Bridge over Ferrell's Creek and approaches on SR-1525. Subject: Preconstruction Conference Mr. Richard D. Kirkman, PE Kirkman Construction, Inc. PO Box 3026 Huntersville, NC 28070 Dear Mr. Kirkman: LYNDO TIPPETT SECRETARY This letter serves to confirm that the Preconstruction Conference for the referenced project will be held on Friday, February 22, 2008 at 10:00 a.m. at the Division of Highways Office in Aberdeen located at 902 N. Sandhills Blvd. A proposed Progress Schedule should be submitted to the Department for review and approval at your earliest convenience. In addition, the following information should be submitted to the Department at the Preconstruction Conference: • Detailed Construction Schedule • List of key Project Personnel with emergency call back numbers • List of Subcontractors with Subcontract Agreements • List of Company Officials authorized to sign supplemental agreements It is requested that you invite any proposed subcontractors deemed necessary. By copy of this letter, I am inviting various Department representatives having involvement and/or interest in this project We look forward to seeing you then. P. O. Box 1067, Aberdeen, N% 28315 Phone (910) 944-2344 Fax (910) 944-5623 February 11, 2008 Page 2 cc: E. C. Powell, Jr., PE M. C. Tillman R. E. Blakley, PE Bradley D. Bass Art King Barry Harrington Phillip Johnson, PLS, PE D. R. Scott, PE Richard K. Spencer - USACOE File Sincerely, Tim Johnson, PE Division Engineer Y: John . G. Olinger, PE Division Construction Engineer A. B. Reid Richard White - ATU/Bell South Alan Dasen - Progress Energy Rob Stone, PE Felix Davila, PE.- FHWA Greg Myrick, PE Kathy Lindsey B. G. Comer Brian Wrenn - NCDWQ -