Loading...
HomeMy WebLinkAboutWQ0005555_Monitoring - 10-2016_20161129 (2)FORM: NDAR-1 08-11 NON -DISCHARGE APPLICATION REPORT (NDAR-11 Page —L—.f Permit No.: WQ0005555 Facility Name: Weyerhaeuser - Elkin, NC County: Surry Month: October Did irrigation Field Name: 1 • �• Area (acres). Area (acres): at this facility? DYES EINO .. .. .. .. RN m MMS FORM: NDAR-1 08-11 NnN-fIISCHAR(.F APPLICATION REPORT (NDAR-1) Pape a Of Permit No.: •111 - October 1 •irrigationoccur at this facility? Area (acres): 1 1: Cover Crop: Cover Crop. Hourly Rate (in): Hourly Rate (in): Hourly Rate (in): 1 1 1 1 •.. • • 0 • Field 0 • Monthly Loading: Month12 Ij//�// 'FORM: NDAR-1 08-11 NON -DISCHARGE APPLICATION REPORT (NDAR-1) Page 3 of-/ Permit No.: WQ0006555 FacilityName: Weyerhaeuser- Elkin, NC County- Surry iMonth: October • irrigation at this facilit -]YES p • .. .. .. .. Hourly Rate (in): —Hopwrly Rate (in): Hou Annual Rate (in): Annual Rate (in): • ■ p • ■ p • ■ p • ■ p • IBM== MM =1�11=11=11M 0=11=11=11M IMMO=MME �M11=11MME ®MM0 ®= -_-- ---- ---_ ---- m MM0 ® -_-- �M_-- -ME=M- ® MMM ®M -_-ME --_O ---- -=N-ME m ��0 ®M 1M=NMMI1M NMI1MI1MI1M -11MMEME �MMENIMME MM �MMEMEME =1=0=M0 M1�11MMEME �MMENIMME m MM0 ® -_---®- ---- ---_ M ®M WMI1MI1MI1M WMINEMMINM 0=11=11MME a11MMEME m ®M —IIMIIM 0=11MM® �MIIMIIM ®®®— ®M®o ® =1�11MMENIM ®SME® =1�11=11MME ®®®— m MMM ®M IMMIMM NM -- 0=11=11M ®I1MI1MI1M m MMo ® 0=11=11MME 0=11=11MME WMI1MI1MI1M =1�11=11=11M El ==o ®M M1=0MMI1M WMINM■MINM =1=0MMINM ....viii/// .,, V//////// VOM" ,„ iiiiiioiiiia •„ ///iiia//// ,•- FORM: NDAR-1 08-11 NON -DISCHARGE APPLICATION REPORT (NDAR-1) Did the application rates exceed the limits in Attachment B of your permit? Page 'I/of / ❑� Compliant ❑Non -Compliant Were adequate measures taken to prevent effluent ponding in or runoff from the sites? ❑� Compliant ❑Non -Compliant Was a suitable vegetative cover maintained on all sites as specified in your permit? Elcompliant ❑Non -Compliant Were all setbacks listed in your permit maintained for every application to each permitted site? [2]Compliant ❑Non -Compliant Were all freeboards maintained in accordance with the specified freeboard heights in your permit? Eicompliant ❑Non -Compliant If the facility is non-compliant, please explain in the space below the reason(s) the facility was not in compliance. Provide in your explanation the date(s) of the non-compliance and describe the corrective action(s) taken. Attach additional sheets if necessary. are out of service, applying amendments, and re -seeding. Operator in Responsible Charge (ORC) Certification Permittee Certification ORC: Dennis R. Atkinson Permittee: Weyerhaeuser Company Certification No.: 15574 Signing Official: Debbie Tadlock Grade: SI Phone Number: 336-526-6437 Signing Official's Title: Mill Manager Has the ORC changed since the previous NDAR-1? ❑Yes [ANo Phone Number: 336-526-6498 Permit Exp.: 4/30/19 Signature Date Signature Date By this signature, I certify that this report is accurrate and complete to the best of my knowledge. I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that all qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations. Mail Original and Two Copies to: Division of Water Quality Information Processing Unit 1617 Mail Service Center Raleigh, North Carolina 27699-1617