Loading...
HomeMy WebLinkAbout20070971 Ver 1_Certification of Completion_2016110907/18/2007 07:41 252754118:; DAVID!EVANS PAGE 04 Certification of Completion DWQ Project No.: o,7 -0q71 County: Applicant: —A . Syd 2S Co v1S+r v c41 o vl , In C . Project Name: Me,116✓1 T)ovj✓1S Date of Issuance of Wetland Permit: Bu4c r Tmvxr.� 44�\or i2q�,tp Certificate of Completion R� LS Nt)VU9D 016 � Q-WgTE R P M� S z107 Upon completion of all work approved within the 401 Water Quality Certification and Buffer Rules, and any subsequent modifications, the applicant is required to return this certificate to the 401 Oversight/Express Permitting Unit, North Carolina Division of Water Quality, 1650 Mail Service Center, Raleigh, NC, 27699-1650. This form may be returned to DWQ by the applicant, the applicant's authorized agent, or the project engineer. It is not necessary to send certificates from all of these. Applicant's Certification 1, hereby state that, to the best of my abilities, due care and diligence was used in the observation of, the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rales, the approved plans and specifications, and other supporting materials. Signature: _ Date: Agent's Certification 1, hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Date: If this project was designed by a Certified Professional I, Tonq}Iiqn 1_ . MC'Dgy11gl as a duly registered Professional t:n Meir, i.e. (' Engineer, Landsckpe Architect, Surveyor, etc.) in the State of North Carolina, having been authorizetd o observe (periodically, weekly, full time) the construction of the project, for the Permittee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approvigl plans and specifications, and other supporting materials. ►,, Signature: �• V Regi N P� Na.3792$ — Date ��� 0--' ...$8Ad %4-1 Registration o., `fd 37928