Loading...
HomeMy WebLinkAbout20160952 Ver 1_RE Next bridge Anson SR1459 (17BP 10 R 60)_20161129Carpenter,Kristi From: Sent: To: Cc: Subject: Attachments: Follow Up Flag: Flag Status: Donna, Thompson, Larry B Tuesday, November 29, 2016 9:55 AM Hood, Donna Howard, Joel M; 'Crystal Amschler (crystal.c.amschler@usace.army.mil)' (crystal.c.amschler@usace.army.mil); Haywood, Luther G; Nikki.Honeycutt@stvinc.com; Carpenter,Kristi RE: Next bridge Anson SR1459 (17BP.10.R.60) NWP14 application R60 11-29-16.pdf Follow up Completed We have revised the PCN for 17BP.10.R.60 to reflect the addition of flood plain benches. The impacts were increased from 52 linear feet to 80 linear feet as a result. I also have a request into the NCEEP for mitigation coverage. Please let me know if you need anything additional from me. Thank you! La rry Larry Thompson, PWS, LSS Division Environmental Officer NC Department of Transportation Highway Division 10 704-983-4437 office 704-301-4881 mobile Ifhompson@ncdot.gov 716 West Main Street Albemarle, North Carolina 28001 'p�����''�����j'��`�i �� � �,�� Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. Facebook Twitter YouTube From: Hood, Donna Sent: Tuesday, November 22, 2016 9:30 AM To: Thompson, Larry B; Haywood, Luther G Cc: Howard, Joel M; 'Crystal Amschler (crystaLc.amschler@usace.army.mil)' (crystaLc.amschler@usace.army.mil); Haywood, Luther G; Nikki.Honeycutt@stvinc.com Subject: RE: Next bridge Anson SR1459 (17BP.10.R.60) La rry, On page 6 of the submittal (page 7 of the pdf) under the stormwater management plan it describes low flow/high flow barrel. If there are no low/high barrels, then the benches will be needed to keep the stream from being severely over widened. As far as the scoping, Polly has been gone for 4 years and if someone has scoping comments they can present them, but as it stands right now I am going to issue a hold letter. I appreciate the quick response. Thanks, Donna From: Thompson, Larry B Sent: Tuesday, November 22, 2016 9:20 AM To: Hood, Donna <donna.hood@ncdenr.�ov> Cc: Howard, Joel M<jhoward@ncdot.�ov>; 'Crystal Amschler (crystal.c.amschler@usace.army.mil)' (crystal.c.amschler@usace.army.mil) <crystal.c.amschler@usace.army.mil>; Haywood, Luther G <ghaywood@ncdot.gov>; Nikki.Honevcutt@stvinc.com Subject: RE: Next bridge Anson SR1459 (17BP.10.R.60) Donna, Not sure what to say about this one. It was designed without a low flow channel — both barrels to remain unobstructed. This would have been discussed in the field review with Polly when it was originally scoped. Did Polly leave any of her scoping notes for the 17BP projects? I am cc'ing Garland in on this as well. We may have agency comments from the scoping meetings, if not, STV should have them if we don't. La rry Larry Thompson, PWS, LSS Division Environmental Officer NC Department of Transportation Highway Division 10 704-983-4437 office 704-301-4881 mobile Ithompson(a�ncdot.qov 716 West Main Street Albemarle, North Carolina 28001 •���'�^i���;���� '�,.,'�`L���,i�,�-�.�, Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. Facebook Twitter YouTube From: Hood, Donna Sent: Tuesday, November 22, 2016 9:09 AM To: Thompson, Larry B Cc: Howard, Joel M; 'Crystal Amschler (crvstal.c.amschler@usace.army.mil)' (crvstal.c.amschler@usace.army.mil) Subject: Next bridge Anson SR1459 La rry, I am glad—I have bad news about this one-- There are no benches on this one (maybe I missed it?), no permanent impacts on this one for benches (all impacts outside of the culvert are marked as temp)---- It is designed with a low flow channel, so there need to be benches and perm. Impacts. How fast can they submit changes? Thanks, Donna From: Thompson, Larry B Sent: Tuesday, November 22, 2016 8:49 AM To: Hood, Donna <donna.hood@ncdenr.�ov> Cc: Howard, Joel M <jhoward@ncdot.gov> Subject: RE: SR2156 bridge 152 Thanks Donna! Garland will be ecstatic! La rry Larry Thompson, PWS, LSS Division Environmental Officer NC Department of Transportation Highway Division 10 704-983-4437 office 704-301-4881 mobile Ithompson(c�ncdot.qov 716 West Main Street Albemarle, North Carolina 28001 ��y�''���.��C'��'��"�I �:� �T� Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. Facebook Twitter YouTube From: Hood, Donna Sent: Tuesday, November 22, 2016 5:09 AM To: Thompson, Larry B Cc: Howard, Joel M Subject: RE: SR2156 bridge 152 Hi Larry, This is how I will issue it. Thanks for the follow up. There may be a few questions on the other permits, I will be looking to get those out today and tomorrow. Thanks, Donna From: Thompson, Larry B Sent: Monday, November 21, 2016 8:31 AM To: Hood, Donna <donna.hood@ncdenr.�ov> Cc: Howard, Joel M <Ihoward@ncdot.gov> Subject: RE: SR2156 bridge 152 Good Morning Donna, After checking the file for 17BP.10.R.66 (Bridge 152), I can tell you that this was the intent: 48 LF of impacts for the culvert 74 LF of impacts for the floodplain benches 131 LF of dewatering (dewatering entire length of the site) So, the total length of impacts is 131 LF. 122 LF are permanent and 9 LF is temporary. La rry Larry Thompson, PWS, LSS Division Environmental Officer NC Department of Transportation Highway Division 10 704-983-4437 office 704-301-4881 mobile Ithompson�ncdot.qov 716 West Main Street Albemarle, North Carolina 28001 •���������� ��'�i ���,.�-� Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. Facebook Twitter YouTube From: Hood, Donna Sent: Saturday, November 19, 2016 9:06 AM To: Thompson, Larry B Cc: Howard, Joel M Subject: SR2156 bridge 152 La rry, On the impact table there are 122 feet of permanent impacts listed and 131 feet of temporary impacts listed. Are the temporary impacts outside the footprint of the permanent impacts? From the binging of the impacts-253 feet of total impact? Thank You, Donna Donna Hood - Donna.Hood@ncdenr.gov North Carolina Dept. of Environmental Quality Division of Water Resources Transportation Permitting Branch 610 E. Center Ave. Mooresville, NC 28115 Ph:704.663.1699 Ce11:704.682.2839 Fax: 704.663.6040 � ;��� �� ��..� Email correspondence to and from this address is subject to the North Carolina Public Records law and may be disclosed to third parties unless the content is exempt by statute or other regulation Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties.