HomeMy WebLinkAbout20161175 Ver 1_Chatham Park Way_PCN 11-22-2016 (reduced)_20161122En�iton�nental �vnsultarr�t�, To: US Army Corps of Engineers Raleigh Regulatory Field Office Attn: Andy Williams 3331 Heritage Trade Drive, Suite 105 Wake Forest, NC 27587 From: Bob Zarzecki Soil & Environmental Consultants, P.A. Re: Chatham Park Way Pittsboro, Chatham County, NC �fv'?�[�la * 1��tc3xxc: (t)L�3j �S-4Ci_�t}{jl'1 • ti:t��i�ic.� c,t�� November 22, 2016 S&EC Project # 9948.W28 N.C. Division of Water Resources 401 & Buffer Permitting Unit Atin: Karen Higgins Archdale Building — 9t" Floor 5l2 North Salisbury Street, Raleigh, NC 27604 On behalf of the applicant, Chatham Park Investors LLC, please find attached a complete application (Preconstruction Notification), including supplemental information requesting written concurrence from the U.S. Army Corps of Engineers (USACE) and the N.C. Division of Water Resources (DWR) that the activities proposed below may proceed under Nationwide Permit 14 and General Water Quality Certification 3886. Please contact me at (919) 846-5900 if you have any questions or require additional information. PROJECT SUMMARY Project Name CHATHAM PARK WAY, Phase l Project Type Linear Transportation Project / Road Owner Chatham Park Investors LLC Applicant Chatham Park Investors LLC County Chatham Nearest Town Pittsboro Waterbody Name UT to Robeson Creek Index Number 16-38-(3) Class WS-IV;NSW USGS Cataloging Unit 03030002 IMPACT SUMMARY Stream Iinpact (acres): 0 Wetland Impact (acres): 0.13 Perm. 0.07 Temp. Open Watcr Impact (acres): 0 Total Impact to Waters of the U.S. (acres) 0.13 Perm. 0.07 Temp. Total Stream Impact (linear feet): 0 Attachments: Complete PCN Application & Supplemental Information DWR Permit Application Fee $240.00 Office Use Only: Corps action ID no. DWQ project no. Form Version 1.4 January 2009 Pre-Construction Notification (PCN) Form A. Applicant Information 1. Processing 1 a. Type(s) of approval sought from the Corps: � Section 404 Permit ❑ Section 10 Permit 1 b. Specify Nationwide Permit (NWP) number: 14 or General Permit (GP) number: N/A 1c. Has the NWP or GP number been verified by the Corps? � Yes ❑ No 1 d. Type(s) of approval sought from the DWQ (check all that apply): � 401 Water Quality Certification — Regular ❑ Non-404 Jurisdictional General Permit ❑ 401 Water Quality Certification — Express ❑ Riparian Buffer Authorization 1 e. Is this notification solely for the record For the record only for DWQ 401 For the record only for Corps Permit: because written approval is not required? Certification: ❑ Yes � No ❑ Yes � No 1f. Is payment into a mitigation bank or in-lieu fee program proposed for mitigation � Yes ❑ No of impacts? If so, attach the acceptance letter from mitigation bank or in-lieu fee program. 1g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1h ❑ Yes � No below. 1 h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ❑ Yes � No 2. Project Information CHATHAM PARK WAY, Phase 1 2a. Name of project: (Chatham Park Way is the applicant's proposed name for the NCDOT/Town of Pittsboro New North-South Connector.) 2b. County: Chatham 2c. Nearest municipality / town: Pittsboro 2d. Subdivision name: n/a 2e. NCDOT only, T.I.P. or state See Attachment 1(Project Description) project no: 3. Owner Information 3a. Name(s) on Recorded Deed: Chatham Park Investors LLC 3b. Deed Book and Page No. 81403/P0965 (multiple others) 3c. Responsible Party (for LLC if Timothy R. Smith applicable): 3d. Street address: 100 Weston Estates Way 3e. City, state, zip: Cary, NC 27513 3f. Telephone no.: (919) 481-3000 3g. Fax no.: n/a 3h. Email address: tim(c�prestondev.com Page 1 of 10 PCN Form — Version 1.4 January 2009 4. Applicant Information (if different from owner) 4a. Applicant is: ❑ Agent ❑ Other, specify: 4b. Name: 4c. Business name (if applicable): 4d. Street address: 4e. City, state, zip: 4f. Telephone no.: 4g. Fax no.: 4h. Email address: 5. Agent/Consultant Information (if applicable) 5a. Name: Bob Zarzecki (see attached agent authorization form) 5b. Business name Soil & Environmental Consultants, PA (if applicable): 5c. Street address: 8412 Falls of Neuse Road, Ste. 104 5d. City, state, zip: Raleigh, NC 27615 5e. Telephone no.: 919-846-5900 5f. Fax no.: 919-846-9467 5g. Email address: bzarzeckiCa�sandec.com Page 2 of 10 PCN Form — Version 1.4 January 2009 B. Project Information and Prior Project History 1. Property Identification 1a. Property identification no. (tax PIN or parcel ID): Parcel ID: 9752-61-3174 (multiple others) 1 b. Site coordinates (in decimal degrees): Latitude: 35.72147 Longitude: *-079.14806 1 c. Property size: ± 32.56 acres 2. Surface Waters 2a. Name of nearest body of water (stream, river, etc.) to Two unnamed tributaries to Robeson Creek (16-38-(3)) proposed project: 2b. Water Quality Classification of nearest receiving water: WS-IV,• NSW 2c. River basin: Haw River, Jordan Lake, Cape Fear 03030002 3. Project Description 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: The ROW is currently vacant and wooded land. The surrounding land use is primarly vacant, wooded properties. A retirement community (Pittsboro Christian Village) is located just east of the southern terminus of the project at US-64 Business. 3b. List the total estimated acreage of all existing wetlands on the property: +/- 0.3 acres 3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: +/- 500 If 3d. Explain the purpose of the proposed project: See Attachment 1(Project Description) 3e. Describe the overall project in detail, including the type of equipment to be used: See Attachment 1(Project Description) 4. Jurisdictional Determinations 4a. Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / project (including all prior phases) in the past? � Yes ❑ No ❑ Unknown Comments: 4b. If the Corps made the jurisdictional determination, what type of determination was made? � Preliminary ❑ Final Comments: 4c. If yes, who delineated the jurisdictional areas? Agency/Consultant Company: Name (if known): Dave Shaeffer/David Gainey USACE/S&EC Other: 4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. On July 16, 2015, Andy Williams (USACE) field verified the streams and wetlands as shown on the attached impact exhibits (Attachment 1.10). These were previously verified under Approved Jurisdictional Determination SAW-2010- 000140 (Attachment 1.12). The southern stream (UT1) was verified as `perennial" and the northern stream (UT2) as `intermittenY: 5. Project History 5a. Have permits or certifications been requested or obtained � Yes � No ❑ Unknown for this project (including all prior phases) in the past? 5b. If yes, explain in detail according to "help file" instructions. 6. Future Project Plans 6a. Is this a phased project? � Yes ❑ No 6b. If yes, explain. The New North-South Connector (Chatham Park Way) is a boulevard that will continue both north and south of Town to US-15-501. Additional stream crossings are anticipated in the future. However, the exact alignment and impacts are not known at this time. Other private or public entities might build other sections. Page 3 of 10 PCN Form — Version 1.4 January 2009 C. Proposed Impacts Inventory 1. Impacts Summary 1 a. Which sections were completed below for your project (check all that apply): � Wetlands ❑ Streams - tributaries � Buffers ❑ Open Waters ❑ Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. 2b. 2c. 2d. 2e. 2f. Wetland impact Type of jurisdiction number — Type of impact Type of wetland Forested (Corps - 404, 10 Area of impact Permanent (P) or (if known) DWQ — non-404, other) (acres) Tem ora T Bottomland Hardwood � Yes � Corps W1 �P❑T Fill 0.12 Forest ❑ No ❑ DWQ W2 ❑ P� T Construction Bottomland Hardwood � Yes � Corps 0.06 Access Forest ❑ No ❑ DWQ Headwater � Yes � Corps W3 � P❑ T Fill Forest ❑ No ❑ DWQ 0.01 W4 ❑ P� T Construction Headwater � Yes � Corps 0.01 Access Forest ❑ No ❑ DWQ 2g. Total wetland impacts 0.20 2h. Comments: W1 & W2 are located at the southern, perennial stream crossing (UT1). W3 & W4 are located adjacent to the northern, intermittent stream crossing (UT2). 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. 3b. 3c. 3d. 3e. 3f. �g. Stream impact Type of impact Stream name Perennial Type of jurisdiction Average Impact number - (PER) or (Corps - 404, 10 stream length Permanent (P) or intermittent DWQ — non-404, width (linear Temporary (T) (INT)? other) (feet) feet) S1 ❑P❑T 3h. Total stream and tributary impacts 0 3i. Comments: Bridges are proposed at both stream crossings to avoid impacts to the streams. Rock protection is proposed under the bridges to control erosion, but will not extend beyond the OHWM into the streams. Plan and cross section drawings of the bridges are attached. Page 4 of 10 PCN Form — Version 1.4 January 2009 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then individuall list all o en water im acts below. 4a. 4b. 4c. 4d. 4e. Open water Name of impact number - waterbody Type of impact Waterbody type Area of impact (acres) Permanent (P) or (if applicable) Tem ora T 01 ❑P�T 4f. Total open water impacts 0 4g. Comments: 5. Pond or Lake Construction If ond or lake construction ro osed, then com lete the chart below. 5a. 5b. 5c. 5d. 5e. Wetland Impacts (acres) Stream Impacts (feet) Upland Pond ID Proposed use or purpose (acres) number of pond Flooded Filled Excavated Flooded Filled Excavated Flooded P1 P2 5f. Total 5g. Comments: 5h. Is a dam high hazard permit required? ❑ Yes ❑ No If yes, permit ID no: 5i. Expected pond surface area (acres): 5j. Size of pond watershed (acres): 5k. Method of construction: 6. Buffer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts below. If an impacts require miti ation, then ou MUST fill out Section D of this form. 6a. ❑ Neuse ❑ Tar-Pamlico � Other: Jordan Project is in which protected basin? Lake (Cape Fear) ❑ Catawba ❑ Randleman 6b. 6c. 6d. 6e. 6f. 6g. Buffer impact number - Reason for impact Buffer Zone 1 impact Zone 2 impact Permanent (P) or Stream name mitigation (square feet) (square feet) Tem ora T re uired? B1 � P❑ T Road UT1 to Ro6eson Creek � Nos 13,303.0 9,425.4 62 � P❑ T Road UT2 to Robeson Creek � Nos 9,400.6 7,861.1 6h. Total bufFer impacts 22,703.6 17,286.5 6i. Comments: 81 is located adjacent to the southern, perennial stream crossing (UT1 to Robeson Creek). 82 is located adjacent to the northern, intermittent stream crossing (UT2 to Robeson Creek). In addition to these, there are additional Town of Pittsboro, Chatham Park PDD Zone 3 impacts of 22,537.2 sf at the location of 81. Page 5 of 10 PCN Form - Version 1.4 January 2009 D. Impact Justification and Mitigation 1. Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. See Project Description (Attachment 1). 1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. See Project Description (Attachment 1). 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for � Yes ❑ No impacts to Waters of the U.S. or Waters of the State? 2b. If yes, mitigation is required by (check all that apply): � DWQ � Corps � Mitigation bank 2c. If yes, which mitigation option will be used for this project? ❑ Payment to in-lieu fee program ❑ Permittee Responsible Mitigation 3. Complete if Using a Mitigation Bank 3a. Name of Mitigation Bank: Chatham Umbrella Mitigation Bank — Stinking Creek Mitigation Site Type: Riparian Wetland Quantity: 0.36 acres 3b. Credits Purchased (attach receipt and letter) Type: stream Quantity: 0 linear feet 3c. Comments: Wetlands = 0.18 x 2:1 = 0.36 acres In addition to purchased credits, the project will include constructed wetlands as described in E.1 and E.2 below. The constructed wetlands are not required to satisfy mitigation requirements. See Attachment 1.11. 4. Complete if Making a Payment to In-lieu Fee Program 4a. Approval letter from in-lieu fee program is attached. ❑ Yes 4b. Stream mitigation requested: linear feet 4c. If using stream mitigation, stream temperature: ❑ warm ❑ cool ❑cold 4d. Buffer mitigation requested (DWQ only): square feet 4e. Riparian wetland mitigation requested: 0 acres 4f. Non-riparian wetland mitigation requested: 0 acres 4g. Coastal (tidal) wetland mitigation requested: 0 acres 4h. Comments: 5. Complete if Using a Permittee Responsible Mitigation Plan 5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan. Page 6 of 10 PCN Form — Version 1.4 January 2009 6. Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ 6a. Will the project result in an impact within a protected riparian buffer that requires ❑ Yes � No buffer mitigation? 6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the amount of mitigation required. 6c. 6d. 6e. Zone Reason for impact Total impact Multiplier Required mitigation (square feet) (square feet) Zone 1 Road Crossing 0 3(2 for Catawba) 0 Zone 2 Road Crossing 0 1.5 0 6f. Total buffer mitigation required: 0 6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in-lieu fee fund). Mitigation for riparian buffer impacts will be determined by the Town of Pittsboro pursuant to the Town of Pittsboro Riparian Buffer Protection Ordinance (2/14/2011) and authority delegated to the Town by the North Carolina Environmental Management Commission. However, road crossings using bridges should not require buffer mitigation. 6h. Comments: Page 7 of 10 PCN Form — Version 1.4 January 2009 E. Stormwater Management and DifFuse Flow Plan (required by DWQ) 1. Diffuse Flow Plan 1a. Does the project include or is it adjacent to protected riparian buffers identified � Yes ❑ No within one of the NC Riparian Buffer Protection Rules? 1 b. If yes, then is a diffuse flow plan included? If no, explain why. Comments: The project includes a stormwater management plan with constructed � Yes � No wetlands and bio-filtration devices that remove nutrients from the stormwater runoff prior to entering the buffer or streams. 2. Stormwater Mana ement Plan 2a. What is the overall percent imperviousness of this project? < 25% (see below) 2b. Does this project require a Stormwater Management Plan? � Yes ❑ No 2c. If this project DOES NOT require a Stormwater Management Plan, explain why: 2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan: The Stormwater Management Plan ("SMP') for this linear road project (Attachment 1.9) meets or exceeds the requirements of Condition 12 of DWR's (formerly, DWQ) Water Quality Certification No. 3886. The percent impervious within the roadway is greater than 24%; however, the drainage area to each of the BMPs is significantly less than 25% impervious. This SMP includes constructed wetlands and bio-filtration devices. ❑ Certified Local Government 2e. Who will be responsible for the review of the Stormwater Management Plan? ❑ DWQ Stormwater Program � DWQ 401 Unit 3. Certified Local Government Stormwater Review 3a. In which local government's jurisdiction is this project? ❑ Phase II 3b. Which of the following locally-implemented stormwater management programs ❑ NSW apply (check all that apply): ❑ USMP ❑ Water Supply Watershed ❑ Other: 3c. Has the approved Stormwater Management Plan with proof of approval been attached? ❑ Yes � No 4. DWQ Stormwater Pro ram Review ❑ Coastal counties ❑ HQW 4a. Which of the following state-implemented stormwater management programs apply � ORW (check all that apply): ❑ Session Law 2006-246 ❑ Other: 4b. Has the approved Stormwater Management Plan with proof of approval been attached? � Yes ❑ No 5. DWQ 401 Unit Stormwater Review 5a. Does the Stormwater Management Plan meet the appropriate requirements? � Yes ❑ No 5b. Have all of the 401 Unit submittal requirements been met? � Yes ❑ No Page 8 of 14 PCN Form — Version 1.4 January 2009 F. Supplementary Information 1. Environmental Documentation (DWQ Requirement) 1a. Does the project involve an expenditure of public (federal/state/local) funds or the � Yes � No use of public (federal/state) land? 1 b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State ❑ Yes ❑ No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1 c. If you answered "yes" to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval letter.) ❑ Yes ❑ No Comments: 2. Violations (DWQ Requirement) 2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards, ❑ Yes � No or Riparian Buffer Rules (15A NCAC 26 .0200)? 2b. Is this an after-the-fact permit application? ❑ Yes � No 2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s): 3. Cumulative Impacts (DWQ Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in � Yes � No additional development, which could impact nearby downstream water quality? 3b. If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy. If you answered "no," provide a short narrative description. The proposed project is an NCDOT/Town of Pittsboro linear transportation project based on NCDOT modeling and projections of transportation needs. Development projects likely will be constructed with or without the proposed project. This project will not result in additional development but timely construction of the proposed project will result in better coordination of anticipated future development projects with the NCDOT/Town of Pittsboro highway planning, thereby enhancing environmental sustainability. Properties within the Chatham Park PDD are subject to additional stormwater management regulations and stream buffers and other additional protections. See Attachment 1(Project Description). 4. Sewage Disposal (DWQ Requirement) 4a. Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. The project is a linear transportation project that does not invo/ve the generation of wastewater requiring disposal or treatment. Page 9 of 14 PCN Form — Version 1.4 January 2009 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or � Yes � No habitat? 5b. Have you checked with the USFWS concerning Endangered Species Act � Yes � No impacts? ❑ Raleigh 5c. If yes, indicate the USFWS Field Office you have contacted. ❑ Asheville 5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? NHP & FWS databases. The project is not anticipated to have an impact on any Federally listed endangered or threatened species or critical habitat. 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as essential fish habitat? ❑ Yes � No 6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat? The NOAA Habitat Conservation/Habitat Protection: National Marine Fish Service; Essential Fish Habitat Mapper website was referenced. 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation � Yes � No status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)? 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? The NC State Historic Preservation Office (SHPO) HPOWEB GIS Service interactive map. Map attached (see Attachment 1.8) no historic listings or study list entries or determined eligible listings were identified within the property boundaries. While not listed on the National Register, there are two SHPO surveyed properties north and south of the project, but located outside of the project boundaries. 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA-designated 100-year floodplain? � Yes ❑ No 8b. If yes, explain how project meets FEMA requirements: Per the project engineer. The southern, perennial stream is located within the FEMA designated floodplain. Map attached as Attachment 1.7. The project will obtain all necessary flood studies or map revisions prior to construction. 8c. What source(s) did you use to make the floodplain determination? Project Engineer, NC Flood webside & FEMA DFIRM Digitally signed by Bob Zarzecki Soil & En vironmental 6 o b Z a rz e c k i DN: cn=Bob Zarzecki, o=5&EC, PA, ou=Wetlands Department email=bzarzecki@sandeccom, r—US Date: 2016.71.22 07:3735 -OS'00' Consultants, PA November Bob Zarzecki (see attached agent authorization form) 22, 2016 ApplicanUAgenYs Signature ApplicanUAgent's Printed Name (AgenYs signature is valid only if an authorization letter from the applicant Date is provided.) Page 10 of 10 PCN Form — Version 1.4 January 2009 Sai� S� �nviror�menta� Corzs ult�nts, P'A 'i-41_' I�.illt ��� `;�•�ist li�r;i�{, 4uiic I�i.}.li:�fcir���. �St '_�f�l„ Phn»c: {''71`F) �i-GG-i')i]{V+ h':3s. r.,ll'1j �{-}fr.']-1t�7 �anilrc:.�:nm PROPERTY �Wl'y1ER ! AGEI`kiT AilTH�RI�.ATI�I`+1 Prc�jaet 1�am�fDescripticrs�: CHATHAM PAI2K W�Y Qate: 2�J 1 fi The Q�partmcnt of the �rmy U.S. �rmy Corps of 6ngir�ters. fi9 Darli�gt�r� Avenue V4'el»1in�oa�, NC ?$403 Wilmington C3istrict A�tn: Andy Wilfiam� Fi�ld ��fice: Ralei�h Regulat�ry Field [}ftic� 5�c�,� Project # ��348.W�8 �, the undersigried, current pr�perty owner, subject ta tf�e ftmitations stated in the NDTICE below, �cr authori�e rep�-es�ntat€ves of the Wilmingtar� Di�t�ict, U.S. A�•my Corps af En�ine�rs (Car�s) and Soil & Envir�ar�rnental Cr�nsultants, PA (S&EC] staff, as my agent, tfl enter upar� the property h�r�in d�s�ribed for the purpase taf �antiucting on�site investigat€or�5 �nd issuing � determinatign associaked w6th Wat�rs �� the U.S. sub}ect to Federal juri�dic�ion �nder Section 40�� of the Clean Water Act and/or Section 1� of the Rivers anci Harbor5 Act v� 1$9�. This dvcurrEent aFs� �ut#�orize� S&EC, as my agent, to act an my t��half and taCce all actian5 n�ec�ss�ry far th� prc�cessing, is5u�nee �nd a�ceptance nf a permit or certificati+an, incluc��n� any and a1l assnciated star�dard and special conditi�ns. Ti�is authvrization by the applicant supersedes any pre�iaus authari�aC:on of an agent f�r this pr�jecf. NOTICE: This authc�rizati�n, f�r 9iability and �rafes�ional cour#esy reasc�ns, is va�id 4nly for government officials to enter the property when accampanied by S&EC stafF. Yau should ca9l 5&EC to arrange a site meeting prior to uisit'rng the site. Fi(]ADWAY & PARCE-I_. IN�(]RMATf�N: Parcef Index l�fe�rnb�r(s] ��'IN}: line�r trgnsU(�rt�.l:ic�n pro�ect; r�ultipie �arceis Nfew Ali�;nrnea�t: Ch�tham Park Way from b4-Bus. ezarth #o existii�g bridge at 64-Bypass LatlLt�ng: 35.7� 1461-U79.1479�i 'VVat�rshed: Rabeson Creelc, lb-3$-f3), "WS-IV;NSW" I�:i�] C� �l[i�'Lll�►I�I�lCi1�i�C��:7•ul:�llC��i iV�me: Chatham 1'ark Investors LLC Mai�in� Address: 1 Lltl VVestcrn Cstates Way, Cary, 3VC 27513-2'?59 TeEepljan� N�mber: (919} 481-3�41(l Emaii: tirn�r.r��p�estondev.corn Ti�n Smitl�, ;'� �,, �,wrat_ r Praperty Owner (please prsnt) � �: )-, cz q � � Date � � � e�� I G �- , We hereby c�rtify the abo�� inf�rmaiion submitted in t�is application is true and accurate ta the best �f a�rr EcnQwledga S(�IL 8 ENVIRONMENTAL CQt�iSULTAN�S, PA ETAl2 FALLS OF NEUS� STE iO4 RAI.€IGM, M4RTN CARflLa�IA 27615 f"H.(9 191 846-59U0 flU( (919) 845-94b7 �`'m,� ,'�iaut.� �an�k �.gic_ a, xC zmssus iwQ Hundred �oFty and noN00 � P,�� � �1i�v�s T� THE ORDER �� DIYIS#fMl 0� W�'A�R RE�OIiRCES � �F 512 N SAl�ISBURY STR�ET FtAL�IGM NC 276�d �.�_. . r � � DY'VR �— - �� ��• �' SOIL J� ENVIRONM�NiA�. CONS�LTANiS, PA Q117E nM0�lr�ff � � 2s7a2 32aa.00 26742 AATE � IHVOICE NO C(5MIv1[NT AM(3UNT NETAMDi1NT 11/21/Z016 11212016 f)948.1N28 reuised perr�it fee Chatham Park Way 2�4Q.�0 � � . � � C3ATE 11/21116 1/�NL]f0� MG pivi�IQn of WaGer Resaurce& TOTAL 2�Q.(30 nappucT sSi,Mr�s u5F w1rH sr59•� Frdvt�ovt �i�lr[o w u s t w • ATTACH M ENT 1: PROJECT DESCRI PTI ON 1. Overview The applicant proposes two single and complete crossings of two separate unnamed streams related to the construction of a linear road project — a section of a North Carolina Department of Transportation ("NCDOT") proposed major boulevard in Chatham County, North Carolina — identified by NCDOT as the New North-South Connector and referred to in this PCN as New North-South Connector or Chatham Park Way. The purpose of the boulevard is to get people, goods, and services from a point of origin to a terminal point. The need for the boulevard, and thus the two crossings, is established by NCDOT and the Town of Pittsboro Comprehensive Transportation Plan ("Pittsboro CTP" or "CTP"). A traffic study (conducted to answer questions from the USACOE Raleigh Field Office) demonstrated the New North-South Connector is needed, with or without development of 7100+ acres of land that have been zoned by the Town of Pittsboro ("Town") as Chatham Park Planned Development District ("Chatham Park PDD" or the "PDD"). The applicant proposes to construct the project now (instead of waiting until government funding becomes available for later construction by NCDOT) so that the project will serve as a sustainability-forcing mechanism to guide future development projects on land located in the Chatham Park PDD, as discussed below. The impacts of the project will be minimal and will be less than the impact limits authorized by NWP 14. 2. Applicant Environmental sustainability is a Chatham Park Investors LLC ("CPI") core value. CPI anticipates that the land within the PDD will contain a number of independently viable, commercial, institutional, and residential development projects that are constructed in a manner that is environmentally sustainable and flexible �nough to be responsive to the market. The timing, design, footprint, and other details of individual projects will be determined by the market at various times, probably over a period of decades. CPI's steps in achieving sustainability indude the following, some of which havealready been completed: 1) Ownership. As an initial matter, establish common ownership of 7,100+ acres (without condemnation authority) in order to facilitate the establishment of comprehensive standards for development of land in the Chatham Park PDD. NOTE: At the time of submission of this PCN, CPI and related entities own all but one parc�l in Chatham Park PDD. 2) Expert Resource Assessment. Retain experts in multiple disciplines, including for example, the fields of land development, environment, urban planning, highway planning, and infrastructure to assess the environmental, aesthetic, cultural, historical, and infrastructure resources of the property and adjacent areas and identify constraints and opportunities for sustainability. 3) Coordination with Government Actors. Share information with Town of Pittsboro, NCDOT, Chatham County, NCDEQ, Corps of Engineers, etc. to coordinate anticipated development projects within Chatham Park PDD with existing government requirements and plans that need to be accommodated and incorporated to ensure sustainability. NOTE: CPI, based on its environm�ntal resource assessm�nts, has proposed adjustments to the routes specified in the Pittsboro CTP that would reduce the number of CTP stream crossings in Chatham Park PDD. 4) Sustainable Zoning. Seek local governmental zoning to impose a set of environmental, aesthetic, and "good-planning" requirements that will apply to all of the individual development projects that may be constructed in Chatham Park PDD. 5) Infrastructure Coordination/Assistance. Coordinate with and assist governmental entities that have responsibility and authority for major roads and highways and water and sewer infrastructure in order to ensure that the timing and design of such projects promote environmental sustainability in Chatham Park PDD. This may include, if necessary and feasible, private funding to pay for or construct government infrastructure projects or portions of projects. 6) Project Approvals. To the extent practicable, design individual projects to fit within existing regulatory programs that simplify regulatory approval processes for minimal impact projects, such as the Corps' Nationwide Permit Program. 7) Development Review Committee. The Development Review Committee has been established to serve as a conduit through which all proposed individual development projects are submitted to the Town. The 2 Development Review Committee provides guidance on achieving environmental sustainability as set out in the Master Plan. Steps 1 through 7 establish a coordinated "environmental sustainability framework" for the single and complete commercial, institutional, and residential development projects that may be built in the future in Chatham Park PDD. Because of the environmental sustainability framework, each development project can be individually economically viable and functionally independent and consistent with environmental sustainability. The timing, design, and other details of each development project are unknown at this time and will be determined by investor interest and other market forces, probably over a period of several decades, without sacrificing sustainability. The proposed project has been shaped by Steps 2, 3, and 6 and is needed to accomplish Step 5. The timing of the project — now, instead of an unknown date when government funding becomes available to NCDOT — is necessary to satisfy the applicant's need to promote sustainability. Building now allows future construction of secondary roads and future construction of individual development projects to be clearly and concretely guided by the actual location and design of an existing NCDOT road. This clear-cut, concrete guidance for future road-building will reduce or eliminate future demands in the vicinity of the project from individual development project proponents for accommodation of least-cost road options that may be less consistent with NCDOT/Town plans. Despite the high priority the applicant places on environmental sustainability, the applicant needs to maintain profitability while pursuing sustainability. For example, if this proposed road project is delayed pending regulatory approvals, a developer might design and build a development project based on connection to the existing road network rather than connection to the New North-South Connector. 3. The proposed project is an NCDOT road. The proposed project will be a public road under the jurisdiction of and maintained by NCDOT and fully available for public use without any control by CPI. Construction of this section of the New North-South Connector with 100% private funding will allow a needed NCDOT project to be constructed at minimal expense to taxpayers and at an earlier date than could be accomplished using funds as they become available to NCDOT. The proposed project is part of the overall NCDOT and Town of Pittsboro CTP that includes several strategic freeways, expressways, boulevards, and major and minor thoroughfares to alleviate traffic congestion within the Town of Pittsboro's planning area boundary in a manner that 3 will be consistent with plans for the larger transportation network in the region and State. See map from Pittsboro Comprehensive Transportation Plan ("CTP") dated July 8, 2011 (Attachment 1.1). And see Attachment 1.13 (letter from Town of Pittsboro). As shown in the CTP, the New North-South Connector will provide an alternative route from US15-501 north of Town to US15-501 south of Town. The need for the New North-South Connector was determined by NCDOT's ongoing highway planning process. The boulevard was incorporated into the Town of Pittsboro's "Land Use Plan — Highways map" dated June 12, 2012 (Attachment 1.2) and the Town's current "Master Plan" for Chatham Park Planned Development District ("Chatham Park PDD") approved with the zoning of the land in Chatham Park PDD as a planned development district. The project will complete a section of the New North-South Connector that connects the existing dead end of Suttles Road south across the newly constructed bridge over US-64 Bypass to US-64 Business. The proposed road project is not necessary for a currently proposed commercial, institutional, or residential development project. The proposed road is not an attendant feature of any development project, but will promote environmental sustainability when anticipated development projects are proposed and constructed. The nearest CPI development project (a single and complete office buildings project) is nearly two miles away from the nearest part of this proposed linear road project. The road access for that development project was constructed and completed when the development project was constructed and does not include the proposed project. See General Permit (Regional and Nationwide) Verification (9/28/2015) (Act i on I D SAW-2015-01520). 4. Traffic study to answer USACOE Raleigh Field Office questions In order to answer questions posed by USACOE Raleigh Field Office personnel, Chatham Park Investors LLC retained Kimley-Horn and Associates, Inc. to conduct a traffic study. The study used the traffic model developed by the NCDOT for the Pittsboro CTP, but changed the model input by assuming zero land use for the area Iocated in Chatham Park PDD. SeeAttachment 1.3 (Kimley-Horn memorandum dated August 22, 2016). The study revealed that even without any traffic generating land use in Chatham Park PDD, the proposed road project would nonetheless be needed to handle transportation needs for the general public. The traffic study was sent to Mr. Andrew Williams, Raleigh Field Office, by email on August 24, 2016. 5. Impact avoidance and minimization Jurisdictional impacts have been avoided and minimized. This was ac�omplished by the use of bridges to cross two unnamed tributaries and by aligning the boulevard to cross streams as close to perpendicular as practicable and 0 by avoiding stream confluence points. SeeAttachments 1.4, 1.5, 1.6, 1.7, and 1.8. The use of bridges will avoid approximately 463 feet of stream impacts. I n addition, this linear road project will incorporate protections for waters of the U.S. that are not normally associated with projects that are authorized pursuant to NWP 14. The additional protections are requirements of the Chatham Park PDD Master Plan. For example, in order to satisfy the Chatham Park PDD Master Plan, a stormwater management plan ("SMP") specifically for this project (Attachment 1.9) has been developed for DWR review and approval. The plan indudes both bio-filtration areas and constructed wetlands. North Carolina's Jordan Lake riparian buffer rules, 15A NCAC 2B .0267, and the Town of Pittsboro's DWR-approved riparian buffer ordinance require only 50-ft buffers on streams. However, the Chatham Park PDD Master Plan requires riparian buffers to be extended to 100-ft on perennial streams as shown on Attachment 1.10 (construction drawings). Thus, in addition to incorporating the maximum practicable impact avoidance and minimization and satisfying the usual NWP and regional impact limits, the proposed project has additional protections for waters of the U.S. I n summary, the proposed project has less impacts than anticipated by the Corps when NWP 14 was reissued and Regional Conditionswerepromulgated. Durham-Chapel Hill-Carrboro Me�ropolitan Planning Organiza�ion Highway Map Pittsboro Comprehensive Transportation Plan Plan date: July 8, 2011 Freeways � Existing ■ � � � � � Needs Improvement ....... Recommended Expressways Existing � Needslmprovement ••••••• Recommended Boulevards Existing � Needs Improvement ■■■■■■■ Recommended Other Major Thoroughfares � Existing � ■ ■ ■ ■ ■ Needs Improvement ■■■■■■■ Recommended Minor Thoroughfares Existing - - - - - Needs Improvement ------- Recommended OExisting Interchange . Improved Interchange OProposedlnterchange OExisting Grade Separation OProposed Grade Separation Miles 0 0.5 1 2 N Sheet 2 of 5 W . ... �---- I> Base map date: August, 2007 S Refer to CTP document for more details ,%'� : � � i s'; �' `n y_ riral�. .�, ��.. �l� . ... , . .. Future S'lk hOPe G4m Spfin9s . Rq .� �� ara� �N Gr ■ 15 Ir j -- � '' PITTSBORO, NG Land 11s� ��I�r� Map 4: Highways Recommendations from the Highway Element of the Pittsboro Comprehensive Transportation Plan. (CTP) -Adopted by NCDOT Nov. 3, 2011 __-.___ ^;' [I� F_��. J � • � �� '- � �,� _ �4 � � _� - — .....--�-` - - 64 d��� •� �� v �i�� -� . •• ` ''' F� _�'. � 60� i o � � � a � Interchanges CExisting Interchange OProposed Interchange OExisting Grade Separation OProposed Grade Separation �. . ` Improved Interchange Freeways � Existing �■ ■ ■ � Needs Improvement Boulevards � Existing � Needs Improvement • � � � Recommended Expressways � ■ ■ ■ Needs Improvement Recommened Major Thoroughfares � Existing �■ ■ ■ � Needs Improvement Minor Thoroughfares — Existing �- - - • Needs Improvement ---- Recommended Boundaries Pittsboro Corporate Limits � Pittsboro ETJ NCDOT CTP Planning Area Boundary Refer to the CTP document for more details: �tt N.ncUo 1 i. co t ipn/pian rypitLsbo�n.hton - NORTH 1 inch = 1 mile June 12, 2012 �ir�l�� ��� ���� 1 Y�1 J-. �1 F� �� ��� 7* IA �*����,��,111`i4111 RY��P�llrf��,���� � �� `*�l ��. ,.�- .f..--..�� � .� ��� ��������������� T�: C�r ��7���� �rrrikF�, +�h�tlil�eii f'��k� Iryv��� "�r : � ��� � � � �rc�rn: f�. I�1Pk� �arr�, � E. ` ����� � �� �in�le�+�-�i�rr� and A��€���at�s, leu�. � � � ��r � �� {• �'� ����+� � � ��t�.: ��,��,�r z��, z��� �°'�r� �����'w- ��,� �4117�:�C�_ �����i3f�'h �d;F'� �1�+f �f��l'� f [4fL'C�163�7� ��r���+r���r���lAliti►kY I�iA�rll �C�'1 I, Mhae �larlY� ��tt�iin� I���I. c�i �"r�nspc�rl�aior� �I���C7"I'�, wc�r�ii�r� �ro�w� tli� T�Yu'�� nf Piltsbc�r[� ��sdaled II�� F��tils#t��o Tr�w�l �err��nd hvlade�i 1'F�i� �tt€���1 s�r��� �s i9��r �ase foR Ih� PiIC�l��ro �Q�r+�r�M��nsi�++a Tr�n���r��ilc�rr i'�r� ��Tf'� �5�� ��ur� 1j F�yu�� � shav�r� i��� �qac�del €���IF��C C�� kh�e y�a�r �{�4� ���}e�l��d d��ly tr�[Fr�vak��r���s €�r� �I�t��T1� �r���w�y r��4�rw�rkwilh mint�r �r�c��lf��t��nr�� p���a�a� !c� t�J�[�iC]T by iE�� T+awr� h�l�da��li��s �n�ir�rle lht��� t�s��J a�� �i�virc�nmenlal�hlslar�cl�uHi�ra1 f�'�s�+' 41f� ��S�S�#1'��l1�S �]dt3V���'CI tCF I�'I� T'[Vtih+'�l �i�+ � F��II'l�if11 Pr�fG[ IfY"�d�S��S LL� �{Jil�l� �M�' T054ii'$ wt��4c +�r� ��t�fk�rl �1ioe C#��iv� �rk Pl�ri�1 [?�e+r�f�n�en4 [�d�tri�cC (_��ath�rrra �'ark PL�"�tan#'�u�u�l 1�� ��I��. 7fc� rnr�irFc�lic��wrrlll�+nr[�inil�e r`r1�ac��. lo stre��n�l��fl�r��� �t1�d ���le p�rks. �r�ly li�rarc�u�l�fares �r0 �h�+� [��� tk�� �TP vsr�lt� th� h�ewr �1�r�la-5aulf� �r�nr�ect�r d��i��ata�l �s � r�c+�nrMme��d��l �n�.al�+r�r� �a �y�e a[ �har�au�����re). fih�e ��ulp+a.��d � curr�r�lly pro��s,ed ��� ��e�sCr����l�r� �}+ �ri�t��ri� 1���3c I��r�ska� w+hR�#� refer� 4� il �� ,�f���Eian� Park t+'�l�y.F �halh��t� F��rl� �i���s��dr5, JV1 I���t►ri��e t�3 � r$�U�s� !�� ���'�J'i��rnlr��gl�n �i;slroet �`orp� �f Ee�€���tee��, ��ft��rti�i�n�d �4nila�+-Hc�rra dr�d �s��Ci�t�s t�a� a�d �l�ac�m�i�l tli� ��r��l #or ChaCh�an� ��rl� V�Jay �r4lh� �t�d +,�19f�au! �f�velo�rae��nl a�lwhtin 4N�e �f�al��n� ��rk� P�lD d,,s ��c�w,rn �a� F���sr� �, C�it� oric�in,�l �iGl7t�i R�r��ieM rE�r� pr����l�c� y��r �C���D ��II�+ tra��ic v��rrme �vil.���h�I�an��F�rk.i���,[]+�o �ars �er da�� dir��R�y sta�4� �� LJ� �� IByp��s. TN�i� Cfa��� w€�lurrte e�e�rly sh�nt�s She �ubl�e c�eed �or �k�a{h�rti �'ark ��y inlh�r �ut�urc 'L�h� f�C�3�7T rrtrdslau�u�dpr�recltern� �f����l lar��l ���e �13�t as�ir��� ir�ra�e �nl�����v� ka�d us�s 1�9 ��e ��C�u�rti� �r�a�, �nc�s�cfrr�g !�e ���a r�c►w �v+thir� l�� �I�aiF�am Pa�r�. F'�a_ In �rr��r 4� �tis�� II�� 1uf'd'Ifr�nir��t�s�n �i�trkct r�q��st — �c� ��r�rj��x ��il�kr� Cr�i�i� �a�l4xrr�� �IEliout c�an�id�rl�g f����`� �i�+v�tlt�pnti�e�l �1� �and gn+il#�br� th�� �.��alharrti F'a�k pQa - l.I�e n�rd+�l�va� r���n �riC� �CI 2�d� k�n�l u�� �+It�1ir� CI�� �:hatFrant P��rk PC�C� �s�u��e�' t�r �e ��r�r. #��pdt� II�i� e�kre�ne �uc��s�nraCiV� �s��nl,�li�Ie, Fl�Err� 3 s�'�crw� tta� ��r��e�6��i d�fly ira�ff�c rr�l�tn��s �n �halh�n� ParC� VV'0!ls�y It� b� ?.1,�C�(l �c��'� ��r �da�+ dir�ctly s.c�fi#fi� �f IU� 64 �yp�s$, ��air� �I��rl�+ �h��W��� lhe �,��iall� r����tl f+�r #I�Is IV�CN�T�I��:t�rt���d �a���varci. ����t! ���� my ���'i�1A+ �� t�� Rr.�vra� �i�M�t�r��1 r�,��t�l �t�d �h� fi��int��,�� c�ur a����y�rs, Gh�C11��n� �'�ri� 1,l��a� ��� r��Grbr��l B�p�a��V�rd �ilt�� �a� W�khr�►�4 lan� ��� ���rl�ak�l�� t� cl�'�elr�{�rn�r�t auithirp Is7e �i�atha�n P�t� �'9�[� Ily��r kr�va a�1� q��esll��y�, �,le��� �a� n�t �ie�i�aC� to ��nta�et r�r�aS ���IF�� G�7€=��2 ���+�I17,a'�i�i�,iil�,-�+�i�� '� ���'iS°�-.�.�r i; t� ���{4�t��'�i�?'�.I��!, i '� 1�'-4����i�.�k�i?�d�� . � .— -- 3795� 11$ ,�,.� 13,i3 _ mes with �apacity ��aaoo �s5y �12000(150) 31DU0(49) 4600D(25) 5400a (10) -99999 [116) 3 .67 1 � Miles i I 35�9 37953 �S �j� 3815� A353 5.�64 576i J$1@2 �dQ� 14b9 S�B' I a ro � -- • ='o Traffic Volumes without USeS Capacify a000u ��s� ��zoaa ���a) � — - � 3100D (49} asaoa �z�} 3aooa ��a' 0 ,33 .67 1 Miies I I li The National Map ._��s��'� US TOpO PITTSBORO QUADRANGLE NORTH CAROLINA-CHATHAM CO. 7.5-MINUTE SERIES 10' 79°07'30" 664 665 666 667 668 1 960 000 FEET 35°4s � MACK RD ppHP �� � ' ' � �� / � '� ` i � � i FAULKS , 450 � ��oo ` ���/ ����� I��o ��/ , i 400 � %, '� 1� � ; �� ` ; - °Y� - ,/rii,,, ��1� ��� __ �� `�'��-� �� ��� ��-�='''` ,� � I � � � � ��� � � -. �, � � � li ,i � � ��i � i � i �'�(���������� �"_� , �3�50 \ � - - � �` ( � �i�� � ; - _ �, 5so�) ��� I � � � � � ��, ��� � : '- �,:� � �i����� 1�-%��- ���1( 7j%//" � � � 500� � / I � / � � �I � � �' ��1� , � C� , ���� / / . � ( c i �� �� - � : � li�r I / 500�� � . -� 500 � OO��i . � - /� -- �/_-\ �� -��� ..��\�Il�� �%� ( 'i / l�(� -�/: \ I /� �- J �i / ` l ory,F P � 50 ii i 5 _, � /� �`�/( �%('�Ijii- �� �I \ IIIiI ��i� - ' � � ' � �� � � �� j���� = � ' � � � �%�%�A ill\s\ , � ���� �� � � 550 ii � �'- � � 4i0 � � � � o �.-/�h '1 � O `. i -� A ���. ' _� � � vi . � � o �'_" _ � i , , � � � � � �� `RRo 7 � �� J� � �-��� - � � ,. , ��q'-v /�� ���A� �� � I I �)�� -� �j�� _ � _ �_�" � -- �' oA� � ��� � - - � � l���r, `�� ��� ����� %�u/��� ,A� ���„ �/- � _ _ _ � � � =�� � � ; ' ��� � �� � � 64 � � � � ��1l � � ��'����� =�- ���/��%( C� I\� ���1� i � �. �� 3957 _\ -,. ,��� .�. o ..�) �� �.. � ;�� . . . ��� � � l��\ ���/ _�'.. \\� � �\` � 1\��� //�j�� i ��� I ``�� ��\�� i \ � � � , ,f ��, � ;,� ,, _ � _� � �� ,� � � �� �> � \C q�,,� o � � ��, ��(`� � ��� ��i �'� � '�� 1 ��� �i � � ��'�>�r �� i � � � �, �' J � � ' � �� BF<<,�a � �� � � �� ) � / ,ti°°�—��!�/—' � � � � ��� ��� , ��A � � � � �� , ��. �`%—� � j , , � � � � �/�� � � ; �� / ,'' � o _ ;;-� —� �� ���' 50 � i i I � I �,_ � ' � �i � � � � � �� ( �-� � i � \� � �i � �� _ ��� _ � � � � V �' � � ti � � � �--� � � ;��� �l\ __ _ _ _ �� � � � ` � 1 �`�� � � \\ \ i / /�i� �J� � � _ • :%� � �� , , . //� � � `! � � ' � �'1 / J_�1f �� � i ��� % i/ _ , �� ' l� � I �� � �l ����� /���� !/� � � eoo� � -�11� � � � _ � � _ So0 __ � � / � � � % ��. , . : � , 1 i� � �� '�� J����I ��, �� i ��)�I����/����il�i�I����� MWOMBLEqp ��55- � � ���� �. � � _ �, �o .-� � � �� Existin DOT Brid e ,. —� � `� � � �� �� i s � � ,� � �� � I�� �, � � , �' > . � ��� ��� � o, So� o��- �� t ,,�,� , �, �& Suttles Road Ext. ,� _� . � , �� � � __ � � � °p�wO l � � ° ��,// � ' ,����A�_ , �(��` � �� \t V`��o " ' as56 �� _ �o� _- � � � � �, � - c� � ': �l� � � Q„ � ( � � ,�_ --� . � �� . , �,� � , � � 50 �,�DR � � ��- ��_ � � 5�0 � ,�' � , ��� ��� .:�._ � - ���� �� 450 4 ,�� ,` � 1 � > >) I � � � �� � i � � � - � -� / � �- I �. � �� � _ �4k/yp� �� � � i . � � '� "� � � � � � o � v pRWCE �j�k a i /� �:: � 87� � �4' � i � . SPRINGDALE DR , . � � \����� o I ) 1 � Y j � � �' - _ 4'Fir pR -' ; b�� � � � ) � � � �J z �� . _ . . n � , . �:. � ��� Q � 5 �/� � I . m �� � ' � � � ' 00 ,�/ � � � 720 000 / �6 �, n , ��� � \ � ��_ i�' � ♦ w ` ,'1� ��� � ' \ -- � � � 64 � � �� CHATHAM MILL RD ' � � _ EET � \ T (�// > ����� \.��� � � � , � _;."� -- \', i � F �"� �SHFORo�R � �'' m � ,V�� `` - -� � ; � � —_-�'� ������� �, 1 Chatham Park Way �. , i ��� 4 � � � --�j ��_ y \I _ � ���;� r-- so � �i� � ■ a 1 ' ; _ m � � � � Se . � �� _ ��� � � " � �/`") � A , ���i � � � � �� � , .� , � s55 � � � �� � � � - � 1, � o �� ��. i� � �,� � . , ,-- �� �, ' , � ; , I � 400 - ' 3 ���� � � � - _� _ �� � � � �, � HANKS ST . � � � � � I �� , . : �i � �� ' Q 1 �O �', � � ♦ -" ; W SqLISBURY ST � � � �- � --- l ``/ ��\ � ' �� . � 3 �' �2 � THOMPSONST � ' , �� � ���� � �� � II F�XFIRE?RCE �, � NOOE S7' � � I �`._/� � 4p� w � Pittsboro " �� �� � � � m o � � Bus �- ��1H ST � ` i 1 � - � � � ��l oo`. � n ¢ � � 64 � � � � � -� � � � = F � � I ��_ �� � 1 � � � n ;,� S � /�)` , � � � I � � � O� � � � � l;��'� �. . -j... - - 3q� ... S SA,I = .."/ \ - . .. . /��i ..,� .. � . � HAiVKS CHAPEL RD 5 ,�.- �_ � , ,. �� 87 ` � ��� � I �� �� � � � � �. . 902� - - / 0 % � � 1 . �� 350 � . d — ��� �� . � r,�,, � � V�� 0 \ _ ; � �'�—" o ' , ,.,.- � �� ��-� � � � !,� A,��� � ��� � � V � � 3954 � �� � � � � ) � � � � � �� z m '�� � � a 7��� � _� a � ��, �� p ., � DIANNE ST j � \/ , �� /�I .� �`_ d, . ' Q � .. � 400'� � � � � �• � � �..�p 1�� ✓�� . ,� r / J/ � .� . . : . _. c� 1 � �. � I � � �/ /` ! / o � �.�. . � � � . . A . . . I . . � � .. � % /�� \ H � . . � O J o ��. \ \� � �� � CHATHAM COUNTY, NORTH CAROLINA ee�`' PITTSBORO QUADRANGLE ��,5 9�°° Joinssheet48ynum SHEET NUMBER 10 OF 18 �Fa`° 79°10'00" 79° 07'30" 6 64 6 65 � 66 6 67 6 68 669a���^ E — -- � - � � �, � GkE kD �� I Gae W� 35°45'00" GaC GaB o GkD GkE GeC2 �r� GeC2 GkD GaC 2 GkE G aC d�, GkD GeB2 GkE GkD GaC GaC GaC - j5i GaC GoE GkD �s57 GaB GaC �SO� I CmB CmB GkD GkE y NaC - °'n NaC NaC GkE GeC2 GkD �� GoE GaC ��B � GkE c�� _ Ga6 GkE GkD GkD � �, GkD GkD GaC NaB GaC GkD NaC NaC GaC isi6 Ga8 G�B O GaC �a� GaC Ga6 GaB W GkD ) BaE GkD GeB2 Ga6 BaE GkE G4D NaC NaB NaD GaC GkD UdC/� NaB �� NaD BaE I 3956 B G�� CmB Ga6 W = PsB � 1 I � GkD Ga6 GkE �� EXlstll�lg �� I BI�IUge I Ge62 �� O ++I t� .J C + �. � BaE �1702 NaC :-.� C% ��lLl�,�� "`a��i,! 7_�L. I Ps6 NaC PsB BaE Ga6 : - Ps6 Na8 � W GaC �; w� (� W NaD m �T m ChA HrB NaC GaB BaE NaC GkE Ps6 PsB � Cm6 Na6 GaC GaC GaC , NaD GkD � NaC NaD NaB """��� GkD G GkD N�B � ` / GaB NaC / �, ' � NaC NaC Cm8 GnC GaB z Ps6 GkD NaB Ps6 - a� cna sac Nac i ° :�h�thall'1 Park V1i�y � �� z � NaC :a6 �t,�„Fa�� 1 � I � NaC � GaC � Ge62 „ � Ga6 NaB / �B�Yp �' ,� PsB Ps6 � ,_ m GnC . NaB � CmB NaC Pittsboro � � '' W Cine IeUSr 0 � , i7o7 ♦ qU PsB iB �Sl R Q A Na6 '�902� � . 64 i � � �� Ud� HrB t� � _. - - �5 � _ � o Cm6 �� � W NaC � � Ga6 � . PsB �=- 1943 � W GnC GaC Ga6 GeB2 2160 I P,P GnC W .W � . NaB � as5q000m N � � , -r� `Ge62 � � RvA � .' ^ Cm6 Ps8 Cm6 Cm6 GaB ^Cm8 /i \ 1 ".ti n�xi i x ir�e�aai.u-r. �+4 It�'F�.'F� �I � 6 I �1�#ian�l ��etl�n�s In�r�nta� This map is for ge�eral reference only. The US Fish and Wildlife Service is not responsible for the accuracy or currentness of the base data shown on this map. All we[lands related data should be used in accordance with the layer metadata found on the Wetlands Mapper web site. User Remarks: CHATHAM PARK WAY �������� Fr�s�1+�a#er �m�rg�rrk � Freshwater F�resRedlShnab - Eslu�rine and Mlarine C+�epwat�r ESlu,�nn� �hi� h.�arih� � Freshwat�r F'an� - Lake � f�ivarine � {�tYrer N CHATHAM PARK WAY � Phase 1 . �., � .,� , . � ,v � .�� �,1��, •, r �� a , o d � �.' iFlk�. . a ,�i'rP �.;.�5'��� �� ���.1� �,. � ��� �,��i ���►� � �I': �t��� 1 �"'�"�.,rs+l} +ie �� �� � � ���. � � il �.M1 ^T ��� _ �w E Y � � � � � � � � a' �.< 4 �jh'�, , ` � j ' + p � � � +�� 1 � k' A � � e �.� �� iet � � � � t�i�, `��, ��� �� ��� � ��^.. � ��5�' . . ��!" ��' . � � . �'�� ' �, � .'�1, � i�� �, ���'�� � ���f� �.d1 � ��: � ����� '�� � � ra��.�� � _�� � ' � _ ��' �' M � w i' � �� � �. � }p•� ��y � � , . ' , ; �;,� �. , �� r � '�;��j �1F' . .�i�.�� � q� �� n C V' � �` ��''�M�. �, ' J ' �' , . «,�� � �.��. I . 71� � � d9 ��,� ' � + �� s �l � � , J , , - ��yr�Ry��,��' � ,' �� � li, f.. � • � �. �� � . � �7 � � ' �� Y i- P 'S � y �.. � My�. P � f.�N� u l� i � � w � , ��V�ii . �F �� ,� �p ..*',M'� w� � T �� � � t � • ��•, � � � t4tr� �� 4�j e r -�_� � �, Ai�, w � _ ► �i� t i "' �� �—�,t ,��. � a �� °� � r�� � � �� �� �';� _ � � •�y w � �. irrrY '+y � y I�+� ' � � A y' �� i `. ' . '.}, `� � 4�, ,. . i � ti � � ��''M - �� _ ' � _ , ���� � ;1��� ���'�� ��ml' �h� � � i �� �r� , ��� �4 , ' . e, . �� . . �5.,, � . . i �I���i '��. �. � �y� �I . �i� Y S .o _ M'�" . . , ��� ��' , � � �� � �Y MI � � Y j"'^ '� � k'' ,,�� �' � � 7{1�''� ��� � �T h �� � � '�.� i ���'' �y �,.r��'"�R o�y� � .r� �. �4� �'tilStll�lg �OT BCldg� � � � � �� ,_'�' � �i' �p , � ' � i r � - '7Q�' r �1 . ,"p.' 'w ' � , �"�� .��' ti��, . . +�� �, � � �r . ` � �~ � , ��'� �' Suttles Road Ext. r `�" '� " ' "� � � '� � yN i 4�� � � �h . , �. ,n �, �{ , � �� ,'_ '0' '�I�",��"', . , , �- � '� .,y'... '"7+1� r'' +�� � ���ih�'" .#� � � . . ; ,�� .^ r . . '^�� ������ ' 1,�I �Y"'!'• .. .p'. . ,. � . � rr . , , , .y I'�'M�� � M �ry� 1 ��, � �R �' � � ^ '+� k, i '��. , ' � I , _ � � i . ' � d , �. � � �� . .� � �r , � .. .�. . •,�, ., y • _ . . � � S . 1 � r�. .�' . � 1C� N' ly- I.p � r�� . i � �.'. y�' � `��'' ' �ti �� �' ' , F � �1 .^ � �( � � � � �� .. f �.. ° _ . �� .'yet �+ Y��� , . . . � _ . - �Y ��i r ' ..k' ' ii.' �� . �YM� i � � � � ��� ,�� �.� . I � � � •�r,� :►,~��r�' r �,� - .. , ? , i, " F7��,� a', ■'#� �� ,� � ` .� � � �� = � �r. � , i ^ L, �" I : � , , �. . �, . ,, � . � � �A+! a , - IF� ..' . {*. :. e � I ��. � ♦ n y � .. ,- _ r � � �. . � � � �• y r . ' y,• � -��'• �►pry i�y,u. � R y� •.,+i 4,,� ,��! a�� _ ��.r, '« '+� 1Yr��' �, K,; .. ,�.�,. , �' ,��. ,krh ~ � ����,9r R9��.' 1��I���� y .���� �I .6��'�n .��"T� ''tNy �, • - n. �� . - '�Y. d . . �'y�.'4 r� .I���� �. d .�9 � , �� � �'Y'� ` � �,�1,�`� �� �:i"{�,� , '��} Ir `4,fq� 9� � 4 �. . l�.'4���,. � �f' �� y���, ,`� �y�� p �� :� � � . .. �„ c� . d.�� yl�;:�� ���. �h y y� � ,�' k . F,� �'�: � � � �Y � ��� � �C � ������ �, , �� �� � Jl�''„1�� �. w 'k� e1'�� 3�- � I� �� � a.e i s'r � � 5 -�fV �1, �ti' . . �� � 4 _ - ' ' { . .. �, . t � ��`j � f�� "w r � a ,��� ��T_ � wa @,�"u. t � . 1 � f1'v , I_,' I� � . ��� ° ��' �v . f{ _ tp � � �,y �`. i ` ��i. �� � � ��''� �' F^,�r'�u+ � .�'i S �� li''i ,� � � ��� � �� � ii�. � . . ' ,�. �'� �' �tih ��� � � . � . y � ���f 1�+��� �� '��, � � w �' � � ��� � � .. �, I�� �F'' �; YY� � I� ry4�+t +' • o I ��. .y� `f k i �T9 �'�P �q +�i. �1�Y�*1�' � "� f F-�s_ �0. f ,y. �� �:.y . . � . � � , t ,��' J si. � __ ,� ��� .'(, a , �' „ .' . 9 � 4 � y t � °� . � I"� "b 'r'.. i�'�fb • .4�" 1� i p� ��yA , �����ST.� � � . 4r ���.1' � � .i. �� .�W 4' '��I,1 y� + .r�i r��V ��1� . . i . - �. �; � ��� ' �� � fi' F � L � � . .I . , i� . � a �'��� ������ �. '� , �� � �, ,a �� � ' _;hatham P�rk Wa `rc �'' , b �yf �'1��-. �' �'�; ,t • • ". , ' ,� o Y ` �4 � Tp ` ,f � y .�'M '�i�•{ „ � cY+, ., . �� a '�'��I� I �Y� '�i11� � G��P%�.�.� ! ' � i� ° y y � 'k - �r°� "tii�0 I . ����� � � � � �" �g iA, . , . a �k, , ,._ "� � g. �� �� V. � � � ,,� � ,�'W'�� � f � � .,."Rf � . .J;�y `t .4 e ' ��" - 1 �^F � �►�.. dY � �� 4 �,y' , P i , ^� � � - �,yiF-.� a � _ , � ' � 1� ` � �1 � � � "�1� y ,,�!' i��.�. �' � t�Y, w ��p�'� � "�� *4`` �a'� "Ir . � ,�II t� � s : F , %�� �r5 �i, ' `., s�+� +�� , . k_ . w ,� � ` � � � �� � ;.�j��• j.w � ' _ � .:�'�� �r n1 i�. � � �:� �� ^R'* 1,3.� ,1�,..t Y�.�� �� ���� h ��I��' ;. .' y � ^� � Q 1 Y � �m'�� � y - ���ppp``` R_ �i ' � ry . ^ � P,�� � , �- ,� � ��� I�i� �� `^� M ,I���;��� ,� I . �'�+p�-..+r ��' u ��. M�`r�Y �� x t' � � � � � � �' �� � Y��� � o �'� �` �r' � �`.�.� a `� '�:1,�, ?�,.i°� ' '� y. 't��,(',� � r k t a��,, �a�.�� � �' ���� I . .'� � ' �� `,y� ��, � . . � 1 � � '� � Y S b �'' {� ,11k�N� 4 �d i+ � :;� �� A� �� r'''���� T 4 .� r ,�` �,r .i7l�,j � # � � ��,'° ���; � *� � ,� � 4 � � ' 't �3 i �� �+` ! ',l* +�F ^n. F i � , 3 y .f � ' �.�,'�i l4���'We6� .�i ���.F 'F �,��'4 ������� �� .� r ���{���' �[ I�� , / � � Y � �� r� T� 1 . �ia �� � j�'y��- � � .,,;� r.t. 1.1� �, ' +` y� �� i � �{ "'v ,.� �.� �4 '� ��, y* �� � y� + �r 1�.. �� � � ��y a G , - - I. ' � � I 4 a �L Y � i � � vr � `� "� �' " r � +� 'o' � _ . P � e�. , . . � � ���r r � �-., T � a � f�/ � y' r� � � �� � , , � �. a 1-� � �� {tirJ'r}'"lr��i �3.�_. .� y�it. i . 1 .r' � � � idF s, ��' � I,- �" +i '�'' ti�y� �fJ��,. y,..��,# -� � 4 � ��i� k�� � �.(�, '�'�� �.�dR �� ,c '�'��` � � __ , ' + �3;y+ _� w��,� � � �%4+.�?f.� y � � 4�aa�rt � ]�' �+ � �h ,�� '' �� . � ti^- �, ,� �� �� � �' 1 �� � ' r �:t, ♦' � . "II�,' � i,. -�,� � u � ��� �'.:�1 i � e N �� �� � � � .4 � � + ! ,_ R � 1 , � 1- ' ' �' � . � `�" �. - ..a, ! � �- -�., Legend North Carolina Floodplain Mapping Program � Panels Flood Hazard Areas 0 PalitioalAreas - AE StreamCenterline �� Flooduuay(AE) � Cross Seotions 0.296 ChanoeAnnualFlaod Hazard �r ����� a;'��� Future Conditions 1°k Annual Chanoe Flood Ha�ard � .��,� � -�� � ��� ,v T � � �� CHATHAM PARK WAY SHPO HPO-WEB 1:25,940 0 0.225 0.45 0.9 mi NR Points �+ �� �T� � � � �� 0 0.35 0.7 1.4 km � NR Individual Listing � NR Listing, Gone Source: Esri, DigitalGbbe, GeoEye, EaRhstar Geographics, CNES/Airbus 0.S, USDA, USGS, AEX, Getmapping, Aerogrid, IGN, IGP, swisstopo, and ATTA C H M E N T 1. 9 STORMWATER MANAGEMENT P LAN � � • VV�� � �rs���v�n� �ur P"eap��. '�our �uc��ss. �����'��� ���� ��� S T�J'� N�'V�J A►1' i� ��"l r�► � A G E� E I� T� LA i°J P�ttsbvr�, ��C Prepared Fvr: Pittsboro Infrastructure LLC 1�Q Westc�n Estates Way �Cary, hJC 27513 ATfN: Robin Rose R�@F}�i@� 8�1: WithersRaVene! 115 MacKenan Driae Cary, hJC 27511 Revised Sept+ember Zd1 fi az �ar����.�a � � .� a�,��'��,, `� `��� ! - „��.,�. Y ,�.� � � ' ^Y.. � "�3. L. . _,. �,- ; fil��� : �, � ' �"r� . t{`�G j lv� �;� �"i�ti,'*p .���d���� G . �r� �\�'``� 1. �� ' � �. ' � �'-{�-'-r�1.i1'� Hunter Freernan PE CHATHAM PARK WAY STORMWATER MANAGEMENT REPORT PITTSBORO, NORTH CAROLINA INTRODUCTION Pittsboro Infrastructure LLC proposes to construct Chatham Park Way between business 64 and 64 Bypass. The roadway is a new alignment with no other associated development plan. The current cross section generally consists of a 2 lane roadway with a center median. Future plans include widening the roadway to a 4 lane divided section with curb and gutter. This report addresses the projects compliance with NCDOT and Pittsboro requirements for stormwater management. The stormwater management systems are designed for the current buildout. Future widening of the roadway will require a redesign of the control and treatment systems. The stormwater management plan uses a combination of green infrastructure techniques and conventional stormwater control measures. In total, 6 constructed wetland basins will be constructed downstream of pipe outfalls. Bio-filtration areas within the right of way (located in line with the roadside swales) treat roadway runoff from 37% of the total impervious area proposed. STORMWATER MANAGEMENT REQUIREMENTS The proposed development is within Chatham Park PDD boundary and the Jordan Lal<e Watershed. This project is a stand-alone project, future development adjacent to the roadway corridor will require additional stormwater permits which will be applied for on a site by site basis. Compliance with NCDOT and Town requirements will be met using green infrastructure and conventional techniques. NCDOT is using Chatham Parl< as a pilot project to analyze the design, construction, and performance of Green Street technologies. Green Street technologies use stormwater treatment devices within the right of way corridor as a treatment and conveyance measure. Biofiltration areas are roadside treatment facilities which will be located in the proposed roadside swale. The system uses a high flow engineered media to filter runoff before discharging it into the storm drainage network. Runoff is ponded behind a false sump where it the filters through the engineered media to a perforated underdrain pipe. The green infrastructure elements are complimented by stormwater wetlands constructed downstream of pipe outfalls. The wetland BMPs are sized to treat the water quality volume from any impervious area which bypasses the biofiltration areas, and also to provide flood control for the entire watershed. The biofiltration areas are not intended to provide any flood control benefit. METHODOLOGY A stormwater study was conducted using the natural drainage features as depicted by LiDAR topography and existing field surveys. Proposed drainage areas were based on field survey data and proposed roadway grades within the right of way areas. The scope of worl< included the following analyses: Hvdrology ❑ Simulation of the 2-year 2-hour rainfall events for the Pittsboro, NC area for sizing of the biofiltration areas ❑ Simulation of the 1-, 2-, 5-, io-, 25-, 50-, and 1oo-year 24-hour rainfall events for the Pittsboro, NC area for sizing of the constructed wetland areas Chatham Park Way WR Project ozizoq69.7o Stormwater Management Report Revised September zoi6 CHATHAM PARK WAY STORMWATER MANAGEMENT REPORT PITTSBORO, NORTH CAROLINA Hvdraulic ❑ Routing the z-year, 2-hour storm through the biofiltration media ❑ Analyzing results at each biofi�tration area ❑ Routing the i-, 2-, 5-, io-, 25-, 50-, and ioo-year 24-hour rainfall events for the Pittsboro, NC area through constructed wetland areas ❑ Analyzing pre and post development peak flow rates at 3 analysis points The results of the hydrology calculations are used in the hydrau�ic analyses. For water quality documentation, the biofiltration areas were sized using an excel spreadsheet routing. The routing assumed a constant rainfall intensity derived from the duration and depth of the 2 year 2 hour storm. The analysis calculates how much runoff has flowed through the media before the storage depth is exceeded. Water quality compliance is reached when the design of the biofiltration area (a function of total storage depth and infiltration capacity) is exceeded. Storage volume in the roadside swale was calculated using the slope and geometry of the swale upstream of the false sump. HYDROLOGY Intensity/duration functions from NOAA atlas 14 rainfall data were used to determine the depth and intensity of the 2-yr z-hour storm and all z4 hour duration storms. Time of concentration for pre- and post-development drainage areas were developed using the Kirpich method. A minimum time of concentration of 5 minutes was used for the pre and post- development piped drainage systems. HYDRAULICS Computer simulated reservoir routings utilized stage-storage and stage-discharge functions. Stage- storage functions were derived from the proposed geometry of the storage areas upstream of each false sump and each constructed wetland. A non-linear regression relation for volume versus elevation was derived for each BMP impoundment. This relation estimates the incremental volume of the basin to the stage or elevation of the basin. NITROGEN EXPORT The Nitrogen export rates for the development were calculated using the Jordan Falls Stormwater Accounting Tool. The nitrogen boundary consists of area within the proposed right of way within the roadway construction zone. All onsite drainage areas, including open space, roadway and sidewall< were entered in the nutrient export analysis. The biofiltration areas were entered as one sand filter BMP based on similar treatment capabilities. The worl<sheet used to calculate the nutrient export loading rate can be found in the appendices. Because runoff from each outfall was routed to a downstream constructed wetland, and there is no untreated impervious area, the entire roadway was entered into the JFSAT as one drainage area. The portion of the roadway with is treated by the green infrastructure techniques was entered as one cumulative area. Chatham Park Way WR Project ozizoq69.7o Stormwater Management Report Revised September zoi6 CHATHAM PARK WAY STORMWATER MANAGEMENT REPORT PITTSBORO, NORTH CAROLINA CONCLUSIONS Based upon the routing study, the proposed stormwater management plan has sufficient measures to provide the necessary water quality control, removal of nutrients, and flood control as required by Pittsboro, Jordan Lake, and Master Plan standards. The proposed biofiltration areas provide treatment for 36% of the roadway impervious areas while the constructed wetlands treat the remainder and attenuate flows from the roadway. The resulting peal<flows in the receiving stream remain below pre-development levels forthe design storms. The proposed BMPs and accompanying storm drainage system were designed to attenuate the impact of the proposed impervious area on peak flow rates and have sufficient storage to safely pass the 1oo-year storm event. Because the nitrogen export rate exceeds the target rate for the Jordan lake Haw River sub- watershed, a payment to an offsite mitigation bank will be necessary. The phosphorous loading rate is below the target export rate, therefore no additional phosphorous offset is required. 24-Hour Peak Flows Downstream of Pro'ect Pre Dev. Peak Post Dev. Peak % Storm Flow Flow w/ SCMs Flow Change Change 1-yr 2.08 1.29 -0.79 -38% 2-yr 8.26 5.07 -3.19 -39% 5-yr 21.99 14.92 -7.07 -32 % 10-yr 36.03 33.1 -2.93 -8% 25-yr 57.69 86.89 29.2 51% 50-yr 76.65 122.57 45.92 60% 100-yr 97.04 151.58 54.54 56% Chatham Park Way WR Project ozlzoq69.7o Stormwater Management Report Revised September zoi6 Chatham Park Way - SWMP Performance Summary 9/27/2016 Analysis Point: AP 1 Pre Dev. Peak Post Dev. Peak Storm Flow Flow w/ SCMs Flow Change % Change 1-yr 2.08 1.29 -0.79 -38% 2-yr 8.26 5.07 -3.19 -39% 5-yr 21.99 14.92 -7.07 -32% 10-yr 36.03 33.1 -2.93 -8% 25-yr 57.69 86.89 29.2 51% 50-yr 76.5 122.57 46.07 60% 100-yr 97.04 151.58 54.54 56% Analvsis Point: AP 2 Pre Dev. Peak Post Dev. Peak Storm Flow Flow w/ SCMs Flow Change % Change 1-yr 0.62 0.32 -0.3 -48% 2-yr 2.39 1.29 -1.1 -46% 5-yr 6.24 4.29 -1.95 -31% 10-yr 9.81 8.81 -1 -10% 25-yr 15.52 20.65 5.13 33% 50-yr 20.66 29.56 8.9 43% 100-yr 26.19 37.79 11.6 44% Analvsis Point: AP 3 Pre Dev. Peak Post Dev. Peak Storm Flow Flow w/ SCMs Flow Change % Change 1-yr 0.18 0.07 -0.11 -61% 2-yr 0.68 0.27 -0.41 -60% 5-yr 1.77 1.07 -0.7 -40% 10-yr 2.78 1.53 -1.25 -45% 25-yr 4.4 3.68 -0.72 -16% 50-yr 5.86 5.92 0.06 1% 100-yr 7.43 7.94 0.51 7% Analvsis Point: Overall Pre Dev. Peak Post Dev. Peak Storm Flow Flow w/ SCMs Flow Change % Change 1-yr 2.08 1.29 -0.79 -38% 2-yr 8.26 5.07 -3.19 -39% 5-yr 21.99 14.92 -7.07 -32% 10-yr 36.03 33.1 -2.93 -8% 25-yr 57.69 86.89 29.2 51% 50-yr 76.65 122.57 45.92 60% 100-yr 97.04 151.58 54.54 56% CHATHAM PARK WAY STORMWATER MANAGEMENT REPORT PITTSBORO, NORTH CAROLINA CONSTRUCTED WETLAND DESIGN SUMMARI ES Chatham Park Way WR Project ozizoq69.7o Stormwater Management Report Revised September zoi6 Chatham Park Way BMP Summary Tables BMP 1 Constructed Wetland Item Description Elevation Drainage Area 10.72 Ac -- Impervious Area 0.8 Ac -- Pond Bottom -- 375.00 Gate Valve 4" 375.00 Normal Pool 2432 sf 377.00 Drawdown Orifice 1.5" 377.00 WQ Pool 6510 cf 378.00 Attenuation Device 4- 6" Dia. 378.00 Riser Crest 48" CMP 379.50 100 Year WSEL -- 380.74 Top of Dam -- 381.50 Outlet Barrel 30" RCP 375.00 48 LF @ 2.08% 374.00 BMP 2 Constructed Wetland Item Description Elevation Drainage Area 2.61 ac -- Impervious Area 0.55 ac -- Pond Bottom -- 370.00 Gate Valve 4" 370.00 Normal Pool (SF) 1422 sf 372.00 Drawdown Orifice 1" 372.00 WQ Pool Z419 cf 373.00 Attenuation Device 6" Dia 373.00 Riser Crest 24" CMP 374.50 100 Year WSEL -- 375.26 Top of Dam -- 376.00 Outlet Barrel 18" CMP 370.00 44 LF @ 1.14% 369.50 BMP 3 Constructed Wetland Item Description Elevation Drainage Area 5.96 ac -- Impervious Area 1.08 ac -- Pond Bottom -- 378.00 Gate Valve 4" 378.00 Normal Pool (SF) 2249 sf 380.00 Drawdown Orifice 1" 380.00 WQ Pool 5562 cf 381.00 Attenuation Device 4- 6" Dia 382.00 Riser Crest 48" CMP 382.50 100 Year WSEL -- 383.38 Top of Dam -- 384.00 Outlet Barrel 24" CMP 378.00 44 If @ 1.14% 377.50 BMP 4 Constructed Wetland Item Description Elevation Drainage Area 5.22 ac -- Impervious Area 1.0 ac -- Pond Bottom -- 408.00 Gate Valve 4" 408.00 Normal Pool (SF) 1870 sf 410.00 Drawdown Orifice 1" 410.00 WQ Pool 5509 cf 411.00 Attenuation Device 4- 6" Dia 411.00 Riser Crest 36" CMP 412.00 100 Year WSEL -- 412.84 Top of Dam -- 413.00 Outlet Barrel 24" CMP 402.00 72 LF @ 6.25% 396.50 BMP 5 Constructed Wetland Item Description Elevation Drainage Area 6.01 ac -- Impervious Area 0.84 ac -- Pond Bottom -- 432.00 Gate Valve 4" 432.00 Normal Pool (SF) 2215 sf 434.00 Drawdown Orifice 1" 434.00 WQ Pool 4514 cf 435.00 Attenuation Device 4- 6" Dia 435.00 Riser Crest 36" CMP 436.25 100 Year WSEL -- 437.18 Top of Dam -- 438.00 Outlet Barrel 24" CMP 430.00 53 LF @ 1.89% 429.00 BMP 6 Constructed Wetland Item Description Elevation Drainage Area 1.38 ac -- Impervious Area 0.55 ac -- Pond Bottom -- 444.00 Gate Valve 4" 444.00 Normal Pool (SF) 1357 sf 446.00 Drawdown Orifice 1" 446.00 WQ Pool Z541 cf 447.00 Attenutaiton Device 2- 6" DIA 447.00 Riser Crest Z4" CMP 448.00 100 Year WSEL -- 448.45 Top of Dam -- 449.00 Outlet Barrel 18" CMP 444.00 36 LF @ 2.78% 443.00 Chatham Park W ay l.D. S#ruc#ure 4ft} BMP 1 BMP 2 BMP 3 B�u+IP 4 Sl`+�P 5 BA�iP 6 � � 4 3 3 2 1Neightt�f'�J�ter = W�eigh� of Cancrete = ftiser Dimensions Fieigh# Area �ft? (s�. ft.) 4.5 12.6 �F.5 3.1 6.5 12.F� 10 7.1 6.25 7. � 4 3.1 62.4 150 V+nlum�e u {cu. ft.1 56.5 � �4.1 81.7 70.7 �R4. Z 12.6 pcf �cf Buo�ancy Weight Anfi-Flvta#ion Black Damer�sians WeigC�t vf Total Force af Riser 1N�dth LeAgth Thickness A�ti-Flvfatian Weight FaCtor of �Ibs� (Ibs) (ft] {ft} [ft) �Ib�) (Ibsy Safeiy 3529 1l'70 5 � �'.5 J375 9475 2.64 8$� 10�D 3 3 2 27fJ� 280(3 �.17 54� l 1 fl0 5 5 2. 75 1�1312 .5 t 0412.5 2.04 4471 1{7il 5 5 3 11�5a 1135�} Z.57 2757' 1{i4 4 A 2.5 6�0 61C}� 2.21 784 1{Dfl 3 3 2 � l{]Q �$Q(� 3.57 CHATHAM PARK WAY STORMWATER MANAGEMENT REPORT PITTSBORO, NORTH CAROLINA CONSTRUCTED WETLAND SIZING CALCULATIONS Chatham Park Way WR Project ozizoq69.7o Stormwater Management Report Revised September 2oi6 Project Name: Chatham Park Way City/State: Pittsboro, NC STORMWATER BMP 1- Downstream of 407 Total % Impervious Surface Area = 0.9 % Project #: 2120469J Date: 27-Sep-16 1-Inch Runoff Volume Calculation Using the runoff volume calculations in the "Simple Method" as described by Schueler (1987) Rv = 0.05 + 0.009(I) where, Rv = Runoff coefficient, in./in. I = Percent impervious Rv = 0.06 in./in. Total runoff volume from 1-inch precipitation: Runoff volume, S=(Design rainfall) (Rv) (Drainage Area) S = 0.052 acre-ft 2272 cu. ft. Water quality pool elevation = Storage volume provided = Wetland Zone Areas (sq. ftJ WQ Ponding Depth = Deep Pools & Forel Shallow Water Shallow Land Totals ✓linimum Shallow L Orifice Calculator Q =Cd*A*(2gh)"(1/2) 378.00 feet 0.149 acre-ft 6510 cu. ft. 12 in Recommended Provided % of total 454 1203 17% 909 1230 17% 909 4685 66% 2272 7118 100% �auired = 1302 sfl Variables Constants WQ Volume: 0.149 Acre-ft 6510 cf g= 32.2 fds2 Head: 1.00 ft 0.333333333 ft Cd = 0.6 �w down time: 53 hrs 190800 s Orifice Area = 0.0122735 sq. ft 1.767386582 sq. in Orifice Diameter = 1.500103 in USE 1.5 INCH DIAMETER ORIFICE Project Name: Chatham Park Way City/State: Pittsboro, NC STORMWATER BMP 2- Downstream of 521 Area % IA Imp. Area Land Use (ac) (ac) Treated Im ervious 0.14 0 0.0 Untreated Im ervious 0.41 100 0.4 O en S ace 2.06 0 0.0 Totals 2.61 0.4 Total % Impervious Surface Area = 15.7 % Project #: 2120469.7 Date: 2 7-Sep-16 1-Inch Runoff Volume Calculation Using the runoff volume calculations in the "Simple Method" as described by Schueler (1987) Rv = 0.05 + 0.009(I) where, Rv = Runoff coefficient, in./in. I = Percent impervious Rv = 0.19 in./in. Total runoff volume from 1-inch precipitation: Runoff volume, S=(Design rainfall) (Rv) (Drainage Area) S = 0.042 acre-ft 1813 cu. ft. Water quality pool elevation= Storage volume provided = Wetland Zone Areas (sq. ft.) WQ Ponding Depth = Deep Pools & Forel Shallow Water Shallow Land Totals �inimum Shallow L Orifice Calculator Q =Cd*A*(2gh)"(1/2) 3 73.00 feet 0.056 acre-ft 2419 cu. ft. 12 in Recommended 363 725 725 1813 �uired = 484 sf Provided % of total 668 23% 754 26% 1491 51% 2913 100% Variables Constants WQ Volume: 0.056 Acre-ft 2419 cf g= 32.2 fUs2 Head: 1.00 ft 0.333333333 ft Cd= 0.6 �w down time: 48 hrs 172800 s Orifice Area = 0.0050357 sq. ft 0.72513867 sq. in Orifice Diameter = 0.960873 in USE 1 INCH DIAMETER ORIFICE Project Name: Chatham Park Way City/State: Pittsboro, NC STORMWATER BMP 3- Downstream of 511 Area % IA Imp. Area Land Use (ac) (ac) Treated Im ervious 0.62 0 0.0 Untreated Im ervious 0.46 100 0.5 O en S ace 4.88 0 0.0 Totals 5.96 0.5 Total % Impervious Surface Area = 7.7 % Project #: 2120469.7 Date: 2 7-Sep-16 1-Inch Runoff Volume Calculation Using the runoff volume calculations in the "Simple Method" as described by Schueler (1987) Rv = 0.05 + 0.009(I) where, Rv = Runoff coefficient, in./in. I = Percent impervious Rv = 0.12 in./in. Total runoff volume from 1-inch precipitation: Runoff volume, S=(Design rainfall) (Rv) (Drainage Area) S = 0.059 acre-ft 2585 cu. ft. Water quality pool elevation= Storage volume provided = Wetland Zone Areas (sq. ft.) WQ Ponding Depth = Deep Pools & Forel Shallow Water Shallow Land Totals �inimum Shallow L Orifice Calculator Q =Cd*A*(2gh)"(1/2) 383.00 feet 0.128 acre-ft 5562 cu. ft. 12 in Recommended 517 1034 1034 2585 �uired = 1112 � Provided % of total 1143 19% 1107 18% 3924 64% 6174 100% Variables Constants WQ Volume: 0.128 Acre-ft 5562 cf g= 32.2 fUs2 Head: 1.00 ft 0.333333333 ft Cd= 0.6 �w down time: 100 hrs 360000 s Orifice Area = 0.0055577 sq. ft 0.800308481 sq. in Orifice Diameter = 1.009448 in USE 1 INCH DIAMETER ORIFICE Project Name: Chatham Park Way City/State: Pittsboro, NC STORMWATER BMP 4- Downstream of 614 Area % IA Imp. Area Land Use (ac) (ac) Treated Im ervious 0.36 0 0.0 Untreated Im ervious 0.64 100 0.6 O en S ace 4.22 0 0.0 Totals 5.22 0.6 Total % Impervious Surface Area = 12.3 % Project #: 2120469.7 Date: 2 7-Sep-16 1-Inch Runoff Volume Calculation Using the runoff volume calculations in the "Simple Method" as described by Schueler (1987) Rv = 0.05 + 0.009(I) where, Rv = Runoff coefficient, in./in. I = Percent impervious Rv = 0.16 in./in. Total runoff volume from 1-inch precipitation: Runoff volume, S=(Design rainfall) (Rv) (Drainage Area) S = 0.070 acre-ft 3038 cu.ft. Water quality pool elevation= Storage volume provided = Wetland Zone Areas (sq. ft.) WQ Ponding Depth = Deep Pools & Forel Shallow Water Shallow Land Totals �inimum Shallow L Orifice Calculator Q =Cd*A*(2gh)"(1/2) 424.00 feet 0.126 acre-ft 5509 cu. ft. 12 in Recommended 608 1215 1215 3038 � u i red = 1102 � Provided % of total 603 9% 1269 20% 4573 71 % 6445 100% Variables Constants WQ Volume: 0.126 Acre-ft 5509 cf g= 32.2 fUs2 Head: 1.00 ft 0.333333333 ft Cd= 0.6 �w down time: 100 hrs 360000 s Orifice Area = 0.0055047 sq. ft 0.792682384 sq. in Orifice Diameter = 1.004627 in USE 1 INCH DIAMETER ORIFICE Project Name: Chatham Park Way City/State: Pittsboro, NC STORMWATER BMP 5- Downstream of 602 Area % IA Imp. Area Land Use (ac) (ac) Treated Im ervious 0 0 0.0 Untreated Im ervious 0.84 100 0.8 O en S ace 5.17 0 0.0 Totals 6.01 0.8 Total % Impervious Surface Area = 14.0 % Project #: 2120469.7 Date: 2 7-Sep-16 1-Inch Runoff Volume Calculation Using the runoff volume calculations in the "Simple Method" as described by Schueler (1987) Rv = 0.05 + 0.009(I) where, Rv = Runoff coefficient, in./in. I = Percent impervious Rv = 0.18 in./in. Total runoff volume from 1-inch precipitation: Runoff volume, S=(Design rainfall) (Rv) (Drainage Area) S = 0.088 acre-ft 3835 cu. ft. Water quality pool elevation= Storage volume provided = Wetland Zone Areas (sq. ft.) WQ Ponding Depth = Deep Pools & Forel Shallow Water Shallow Land Totals �inimum Shallow L Orifice Calculator Q =Cd*A*(2gh)"(1/2) 435.00 feet 0.104 acre-ft 4514 cu. ft. 12 in Recommended 767 1534 1534 3835 �uired = 903 sf Provided % of total 613 12% 1603 30% 3054 58% 5270 100% Variables Constants WQ Volume: 0.104 Acre-ft 4514 cf g= 32.2 fUs2 Head: 1.00 ft 0.333333333 ft Cd= 0.6 �w down time: 82 hrs 295200 s Orifice Area = 0.0055006 sq. ft 0.792089282 sq. in Orifice Diameter = 1.004251 in USE 1 INCH DIAMETER ORIFICE Project Name: Chatham Park Way City/State: Pittsboro, NC STORMWATER BMP 6- Downstream of 703 Area % IA Imp. Area Land Use (ac) (ac) Treated Im ervious 0 0 0.0 Untreated Im ervious 0.55 100 0.6 O en S ace 0.83 0 0.0 Totals 1.38 0.6 Total % Impervious Surface Area = 39.9 % Project #: 2120469.7 Date: 2 7-Sep-16 1-Inch Runoff Volume Calculation Using the runoff volume calculations in the "Simple Method" as described by Schueler (1987) Rv = 0.05 + 0.009(I) where, Rv = Runoff coefficient, in./in. I = Percent impervious Rv = 0.41 in./in. Total runoff volume from 1-inch precipitation: Runoff volume, S=(Design rainfall) (Rv) (Drainage Area) S = 0.047 acre-ft 2047 cu.ft. Water quality pool elevation= Storage volume provided = Wetland Zone Areas (sq. ft.) WQ Ponding Depth = Deep Pools & Forel Shallow Water Shallow Land Totals �inimum Shallow L Orifice Calculator Q =Cd*A*(2gh)"(1/2) 447.00 feet 0.058 acre-ft 2541 cu. ft. 12 in Recommended 409 819 819 2047 �uired = 508 sf Provided % of total 414 13% 943 30% 1786 57% 3143 100% Variables Constants WQ Volume: 0.058 Acre-ft 2541 cf g= 32.2 fUs2 Head: 1.00 ft 0.333333333 ft Cd= 0.6 �w down time: 48 hrs 172800 s Orifice Area = 0.0052897 sq. ft 0.76171036 sq. in Orifice Diameter = 0.984805 in USE 1 INCH DIAMETER ORIFICE CHATHAM PARK WAY STORMWATER MANAGEMENT REPORT PITTSBORO, NORTH CAROLINA GREEN INFRASTRUCTURE SIZING CALCULATIONS Chatham Park Way WR Project ozizoq69.7o Stormwater Management Report Revised September 2oi6 Project: Site ID: W&R Project #: Chatham Park 2120469.00 BMP Location/Name: 409 - 12+00 RT BMP - HIGH FLOW MEDIA CALCULATIONS Storm Frequency: Storm Duration: Drainage Area % Impervious Impervious Area Basin Slope Base Width Right Side Slope Left Side Slope Max. Depth Dam Width Ponded Length Top Area Surface Storage Volume Notes: 2 Years 2 hr 42393 sf 20% 8478.6 sf 0.018 ft/ft 0.00 ft 2.00 :1 4.00 :1 1.00 ft 6 ft 56 ft 168 sf 56 cf Duration perTime Step 0.24 min Rainfalllntensity 1.02 in/hr Flow Rate 0.20 cf/s First Flush - 1" Passed Total Rainfall Treated 1.057" % of Total Storm Volume 52% Media Area 100.0 sf Infiltration Rate 80.00 in/hr Media Flow Rate 0.19 cf/s Date: Sep. 29, 2016 Designed By: HCF Project: Site ID: W&R Project #: Chatham Park 2120469.00 BMP Location/Name: 408 - 14+00 RT BMP - HIGH FLOW MEDIA CALCULATIONS Storm Frequency: Storm Duration: Drainage Area % Impervious Impervious Area Basin Slope Base Width Right Side Slope Left Side Slope Max. Depth Dam Width Ponded Length Top Area Surface Storage Volume Notes: 2 Years 2 hr 17130 sf 40% 6852 sf 0.018 ft/ft 0.00 ft 2.00 :1 4.00 :1 1.00 ft 6 ft 56 ft 168 sf 56 cf Duration perTime Step 0.24 min Rainfalllntensity 1.02 in/hr Flow Rate 0.16 cf/s First Flush - 1" Passed Total Rainfall Treated 1.163" % of Total Storm Volume 57% Media Area 80.0 sf Infiltration Rate 80.00 in/hr Media Flow Rate 0.15 cf/s Date: Sep. 29, 2016 Designed By: HCF Project: Site ID: W&R Project #: Chatham Park 2120469.00 BMP Location/Name: 404 - 16+50 BMP - HIGH FLOW MEDIA CALCULATIONS Storm Frequency: Storm Duration: Drainage Area % Impervious Impervious Area Basin Slope Base Width Right Side Slope Left Side Slope Max. Depth Dam Width Ponded Length Top Area Surface Storage Volume Notes: 2 Years 2 hr 17276 sf 40% 6910.4 sf 0.018 ft/ft 0.00 ft 2.00 :1 4.00 :1 1.00 ft 6 ft 56 ft 168 sf 56 cf Duration perTime Step 0.24 min Rainfalllntensity 1.02 in/hr Flow Rate 0.16 cf/s First Flush - 1" Passed Total Rainfall Treated 1.057" % of Total Storm Volume 52% Media Area 80.0 sf Infiltration Rate 80.00 in/hr Media Flow Rate 0.15 cf/s Date: Sep. 29, 2016 Designed By: HCF Project: Site ID: W&R Project #: Chatham Park 2120469.00 BMP Location/Name: 405 - 18+50 RT Storm Frequency: Storm Duration: Drainage Area % Impervious Impervious Area Basin Slope Base Width Right Side Slope Left Side Slope Max. Depth Dam Width Ponded Length Top Area Surface Storage Volume Notes: BMP - HIGH FLOW MEDIA CALCULATIONS 2 Years 2 hr 11077 sf 60% 6646.2 sf 0.018 ft/ft 0.00 ft 2.00 :1 4.00 :1 1.00 ft 6 ft 56 ft 168 sf 56 cf Duration perTime Step 0.24 min Rainfalllntensity 1.02 in/hr Flow Rate 0.16 cf/s First Flush - 1" Passed Total Rainfall Treated 1.807" % of Total Storm Volume 89% Media Area 80.0 sf Infiltration Rate 80.00 in/hr Media Flow Rate 0.15 cf/s Date: Sep. 29, 2016 Designed By: HCF Project: Site ID: W&R Project #: Chatham Park 2120469.00 BMP Location/Name: 14+30 LT Storm Frequency: Storm Duration: Drainage Area % Impervious Impervious Area Basin Slope Base Width Right Side Slope Left Side Slope Max. Depth Dam Width Ponded Length Top Area Surface Storage Volume Notes: BMP - HIGH FLOW MEDIA CALCULATIONS 2 Years 2 hr 16343 sf 46% 7517.78 sf 0.018 ft/ft 0.00 ft 4.00 :1 4.00 :1 1.00 ft 8 ft 56 ft 224 sf 75 cf Duration perTime Step 0.24 min Rainfalllntensity 1.02 in/hr Flow Rate 0.18 cf/s First Flush - 1" Passed Total Rainfall Treated 2.04" % of Total Storm Volume 100% Media Area 100.0 sf Infiltration Rate 80.00 in/hr Media Flow Rate 0.19 cf/s Date: Sep. 29, 2016 Designed By: HCF Project: Site ID: W&R Project #: Chatham Park 2120469.00 BMP Location/Name: 402 - 16+50 LT BMP - HIGH FLOW MEDIA CALCULATIONS Storm Frequency: Storm Duration: Drainage Area % Impervious Impervious Area Basin Slope Base Width Right Side Slope Left Side Slope Max. Depth Dam Width Ponded Length Top Area Surface Storage Volume Notes: 2 Years 2 hr 16343 sf 46% 7517.78 sf 0.018 ft/ft 0.00 ft 4.00 :1 4.00 :1 1.00 ft 8 ft 56 ft 224 sf 75 cf Duration perTime Step 0.24 min Rainfalllntensity 1.02 in/hr Flow Rate 0.18 cf/s First Flush - 1" Passed Total Rainfall Treated 2.04" % of Total Storm Volume 100% Media Area 100.0 sf Infiltration Rate 80.00 in/hr Media Flow Rate 0.19 cf/s Date: Sep. 29, 2016 Designed By: HCF Project: Site ID: W&R Project #: Chatham Park 2120469.00 BMP Location/Name: 12+10 LT Storm Frequency: Storm Duration: Drainage Area % Impervious Impervious Area Basin Slope Base Width Right Side Slope Left Side Slope Max. Depth Dam Width Ponded Length Top Area Surface Storage Volume Notes: BMP - HIGH FLOW MEDIA CALCULATIONS 2 Years 2 hr 16343 sf 46% 7517.78 sf 0.018 ft/ft 0.00 ft 4.00 :1 4.00 :1 1.00 ft 8 ft 56 ft 224 sf 75 cf Duration perTime Step 0.24 min Rainfalllntensity 1.02 in/hr Flow Rate 0.18 cf/s First Flush - 1" Passed Total Rainfall Treated 2.04" % of Total Storm Volume 100% Media Area 100.0 sf Infiltration Rate 80.00 in/hr Media Flow Rate 0.19 cf/s Date: Sep. 29, 2016 Designed By: HCF Project: Site ID: W&R Project #: Chatham Park 2120469.00 BMP Location/Name: 517 - 23+00 RT Storm Frequency: Storm Duration: Drainage Area % Impervious Impervious Area Basin Slope Base Width Right Side Slope Left Side Slope Max. Depth Dam Width Ponded Length Top Area Surface Storage Volume Notes: BMP - HIGH FLOW MEDIA CALCULATIONS 2 Years 2 hr 7000 sf 70% 4900 sf 0.034 ft/ft 0.00 ft 2.00 :1 4.00 :1 1.00 ft 6 ft 29 ft 87 sf 29 cf Duration perTime Step 0.24 min Rainfalllntensity 1.02 in/hr Flow Rate 0.12 cf/s First Flush - 1" Passed Total Rainfall Treated 1.791" % of Total Storm Volume 88% Media Area 60.0 sf Infiltration Rate 80.00 in/hr Media Flow Rate 0.11 cf/s Date: Sep. 29, 2016 Designed By: HCF Project: Site ID: W&R Project #: Chatham Park 2120469.00 BMP Location/Name: 24+50 RT Storm Frequency: Storm Duration: Drainage Area % Impervious Impervious Area Basin Slope Base Width Right Side Slope Left Side Slope Max. Depth Dam Width Ponded Length Top Area Surface Storage Volume Notes: BMP - HIGH FLOW MEDIA CALCULATIONS 2 Years 2 hr 7000 sf 70% 4900 sf 0.034 ft/ft 0.00 ft 2.00 :1 4.00 :1 1.00 ft 6 ft 29 ft 87 sf 29 cf Duration perTime Step 0.24 min Rainfalllntensity 1.02 in/hr Flow Rate 0.12 cf/s First Flush - 1" Passed Total Rainfall Treated 1.791" % of Total Storm Volume 88% Media Area 60.0 sf Infiltration Rate 80.00 in/hr Media Flow Rate 0.11 cf/s Date: Sep. 29, 2016 Designed By: HCF Project: Site ID: W&R Project #: Chatham Park 2120469.00 BMP Location/Name: 508.00 27+50 RT BMP - HIGH FLOW MEDIA CALCULATIONS Storm Frequency: Storm Duration: Drainage Area % Impervious Impervious Area Basin Slope Base Width Right Side Slope Left Side Slope Max. Depth Dam Width Ponded Length Top Area Surface Storage Volume Notes: 2 Years 2 hr 7207 sf 20% 1441.4 sf 0.034 ft/ft 0.00 ft 2.00 :1 4.00 :1 1.00 ft 6 ft 29 ft 87 sf 29 cf Duration perTime Step 0.24 min Rainfalllntensity 1.02 in/hr Flow Rate 0.03 cf/s First Flush - 1" Passed Total Rainfall Treated 2.04" % of Total Storm Volume 100% Media Area 20.0 sf Infiltration Rate 80.00 in/hr Media Flow Rate 0.04 cf/s Date: Sep. 29, 2016 Designed By: HCF Project: Site ID: W&R Project #: Chatham Park 2120469.00 Date: Sep. 29, 2016 Designed By: HCF BMP Location/Name: 505.00 2g+60 LT BMP - HIGH FLOW MEDIA CALCULATIONS Storm Frequency: Storm Duration: Drainage Area % Impervious Impervious Area Basin Slope Base Width Right Side Slope Left Side Slope Max. Depth Dam Width Ponded Length Top Area Surface Storage Volume Notes: 2 Years 2 hr 22256 sf 40% 8902.4 sf 0.034 ft/ft 0.00 ft 4.00 :1 4.00 :1 1.00 ft 8 ft 29 ft 116 sf 39 cf Duration perTime Step 0.24 min Rainfalllntensity 1.02 in/hr Flow Rate 0.21 cf/s ERROR: Reduce Media Area. First Flush - 1" Media Area cannot be greater than ponded area. Total Rainfall Treated 2.04" % of Total Storm Volume 100% Media Area 120.0 sf Infiltration Rate 80.00 in/hr Media Flow Rate 0.22 cf/s Project: Site ID: W&R Project #: Chatham Park 2120469.00 BMP Location/Name: 506.00 2g+60 RT BMP - HIGH FLOW MEDIA CALCULATIONS Storm Frequency: Storm Duration: Drainage Area % Impervious Impervious Area Basin Slope Base Width Right Side Slope Left Side Slope Max. Depth Dam Width Ponded Length Top Area Surface Storage Volume Notes: 2 Years 2 hr 38136 sf 3% 1144.08 sf 0.034 ft/ft 0.00 ft 4.00 :1 4.00 :1 1.00 ft 8 ft 29 ft 116 sf 39 cf Duration perTime Step 0.24 min Rainfalllntensity 1.02 in/hr Flow Rate 0.03 cf/s First Flush - 1" Passed Total Rainfall Treated 2.04" % of Total Storm Volume 100% Media Area 100.0 sf Infiltration Rate 80.00 in/hr Media Flow Rate 0.19 cf/s Date: Sep. 29, 2016 Designed By: HCF Project: Site ID: W&R Project #: Chatham Park 2120469.00 BMP Location/Name: 502 LP Median 29+50 Median BMP - HIGH FLOW MEDIA CALCULATIONS Storm Frequency: Storm Duration: Drainage Area % Impervious Impervious Area Basin Slope Base Width Right Side Slope Left Side Slope Max. Depth Dam Width Ponded Length Top Area Surface Storage Volume Notes: 2 Years 2 hr 43347 sf 70% 30342.9 sf 0.020 ft/ft 7.00 ft 4.00 :1 4.00 :1 0.50 ft 11 ft 50 ft 450 sf 92 cf Duration perTime Step 0.24 min Rainfalllntensity 1.02 in/hr Flow Rate 0.72 cf/s First Flush - 1" Passed Total Rainfall Treated 1.179" % of Total Storm Volume 58% Media Area 375.0 sf Infiltration Rate 80.00 in/hr Media Flow Rate 0.69 cf/s Date: Sep. 29, 2016 Designed By: HCF Project: Site ID: W&R Project #: Chatham Park 2120469.00 BMP Location/Name: 611.00 37+00 LT Storm Frequency: Storm Duration: Drainage Area % Impervious Impervious Area Basin Slope Base Width Right Side Slope Left Side Slope Max. Depth Dam Width Ponded Length Top Area Surface Storage Volume Notes: BMP - HIGH FLOW MEDIA CALCULATIONS 2 Years 2 hr 23587 sf 30% 7076.1 sf 0.034 ft/ft 0.00 ft 4.00 :1 4.00 :1 1.00 ft 8 ft 29 ft 116 sf 39 cf Duration perTime Step 0.24 min Rainfalllntensity 1.02 in/hr Flow Rate 0.17 cf/s First Flush - 1" Passed Total Rainfall Treated 2.04" % of Total Storm Volume 100% Media Area 90.0 sf Infiltration Rate 80.00 in/hr Media Flow Rate 0.17 cf/s Date: Sep. 29, 2016 Designed By: HCF Project: Site ID: W&R Project #: Chatham Park 2120469.00 BMP Location/Name: 609.00 43+70 LT BMP - HIGH FLOW MEDIA CALCULATIONS Storm Frequency: Storm Duration: Drainage Area % Impervious Impervious Area Basin Slope Base Width Right Side Slope Left Side Slope Max. Depth Dam Width Ponded Length Top Area Surface Storage Volume Notes: 2 Years 2 hr 9512 sf 60% 5707.2 sf 0.013 ft/ft 0.00 ft 4.00 :1 4.00 :1 1.00 ft 8 ft 76 ft 304 sf 101 cf Duration perTime Step 0.24 min Rainfalllntensity 1.02 in/hr Flow Rate 0.13 cf/s First Flush - 1" Passed Total Rainfall Treated 1.212" % of Total Storm Volume 59% Media Area 60.0 sf Infiltration Rate 80.00 in/hr Media Flow Rate 0.11 cf/s Date: Sep. 29, 2016 Designed By: HCF CHATHAM PARK WAY STORMWATER MANAGEMENT REPORT PITTSBORO, NORTH CAROLINA PONDPACK ROUTING CALCULATIONS Chatham Park Way WR Project ozizoq69.7o Stormwater Management Report Revised September 2oi6 �� � � ;�R � � � � � r� � � �'�" � � Gi� t. ;'.�w !�'i� i f ��?/ � =�.0 ' � ,' p,t�CiiVl�� � �.- � �T��,�� r��, � � 0 e io � 4 Job File: C:\Users\hfreeman\Desktop\Pondpack Temp\CHATHAM PARKWAY.PPW Rain Dir: C:\Users\hfreeman\Desktop\Pondpack Temp\ JOB TITLE Project Date: 3/23/Z016 Project Engineer: H Freeman Project Title: Watershed Project Comments: Peak Flow Analysis and BMP Routing for Roadway Only 5/N: Bentley Systems, Inc. Bentley PondPack (10.00.027.00) 11:21 AM 3/23/2016 Tabl� of Contents Table of Contents i ********************** MASTER SUMMARY ********************** Watershed....... Master Network 5ummary ............. 1.01 ****************** DESIGN STQRMS SUMMARY ******************* Pittsboro 24hr S Design Storms ...................... 2.01 ********************** TC CALCULATIONS ********************* PO5T TO BMP 1... Tc Calcs ........................... 3.01 POST TO BMP 2... Tc Calcs ........................... 3.03 POST TO BMP 3... Tc Calcs ........................... 3.05 POST TO BMP 4... Tc Calcs ........................... 3.07 POST T� BMP 5... Tc Calcs ........................... 3.09 POST TO BMP 7... Tc Calcs ........................... 3.11 PRE TO AP 1..... Tc Calcs ........................... 3.13 PRE TO AP 2..... Tc Calcs ........................... 3.15 PRE TO AP 3..... Tc Calcs ........................... 3.17 ********************** CN CALCULATIONS ********************* POST TO BMP 1... Runoff CN-Area ..................... 4.01 5/N: Bentley Systems, Inc. Bentley PondPack (10.00.027.00) 11:21 AM 3/23/2016 Tabl� of Contents ii Table of Contents (continued) POST TO BMP 2... Runoff CN-Area ..................... 4.02 P�ST TO BMP 3... Runoff CN-Area ..................... 4.03 POST TO BMP 4... Runoff CN-Area ..................... 4.04 POST TO BMP 5... Runoff CN-Ar�a ..................... 4.05 POST TO BMP 7... Runoff CN-Area ..................... 4.06 PRE TO AP 1..... Runoff CN-Area ..................... 4.07 PRE TO AP 2..... RunOff CN-Area ..................... 4.08 PRE TO AP 3..... Runoff CN-Area ..................... 4.09 ***�***************�*** POND VOLUMES **************�******** BMP 1........... Vol: Elev-Area ..................... 5.01 BMP 2........... Vol: Elev-Area ..................... 5.02 BMP 3........... Vol: Elev-Area ..................... 5.03 BMP 4........... Vol: Elev-Area ..................... 5.04 BMP 5........... Vol: Elev-Ar�a ..................... 5.05 BMP 7........... Vol: Elev-Area ..................... 5.06 ******************** OUTLET STRUCTURES ********************* BMP 1 Alt....... Outlet Input Data .................. 6.01 Composite Rating Curve ............. 6.04 BMP 2 Out....... Outlet Input Data .................. 6.06 Composite Rating Curve ............. 6.09 BMP 3 Alt....... Outlet Input Data .................. 6.11 S/N: Bentley Systems, Inc. Bentley PondPack (10.00.027.00) 11:21 AM 3/23/2016 Tabl� of Contents iii Table of Contents (continued) Composite Rating Curve ............. 6.14 BMP 4 Out....... Outlet Input Data .................. 6.16 Composite Rating Curve ............. 6.19 BMP 5 Out....... Outlet Input Data .................. 6.20 Composite Rating Curve ............. 6.23 BMP 7 Out....... Outlet Input Data .................. 6.25 Composite Rating Curve ............. 6.28 S/N: Bentley Systems, Inc. Bentley PondPack (10.00.027.00) 11:21 AM 3/23/2016 Type.... Master Network Summary Page 1.01 Name.... Watershed File.... C:\Users\hfreeman\Desktop\Pondpack Temp\Chatham Parkway.ppw MASTER DESIGN STORM SUMMARY Network Storm Collection: Pittsboro 24hr S Return Event 1 2 5 10 25 50 100 Total Depth in 2.9500 3.5600 4.4600 5.1600 6.1100 6.8700 7.6400 Rainfall Type Synthetic Curve Synthetic Curve Synthetic Curve Synthetic Curve Synthetic Curve Synthetic Curve Synthetic Curve RNF ID TypeII 24hr TypeII 24hr TypeII 24hr TypeII 24hr TypeII 24hr TypeII 24hr TypeII 24hr MASTER NETWORK SUMMARY SCS Unit Hydrograph Method (*Node=Outfall; +Node=Diversion;) (Trun= HYG Truncation: B1ank=None; L=Left; R=Rt; LR=Left&Rt) Return HYG Vol Node ID Type Event cu.ft Trun ----------------- ---- ------ ---------- -- AP 1 POST JCT 1 62056 AP 1 POST JCT 2 99076 AP 1 POST JCT 5 162498 AP 1 POST JCT 1Q 217330 AP 1 POST JCT 25 297512 AP 1 POST JCT 50 365389 AP 1 POST JCT 100 436826 AP 1 PRE JCT 1 21124 AP 1 PRE JCT 2 42562 AP 1 PRE JCT 5 84205 AP 1 PRE JCT 10 123289 AP 1 PRE JCT 25 183810 AP 1 PRE JCT 50 237316 AP 1 PRE JCT 100 295331 Qpeak hrs 14.7500 12.5000 12.1500 12.1000 12.0500 12.0000 12.0000 12.1500 12.1000 12.0500 12.0500 12.0500 12.0500 12.0500 Max Qpeak Max W5EL Pond Storage cfs ft cu.ft 1.22 4.75 14.62 31.67 85.63 122.34 154.64 2.08 8.26 21.99 36.03 57.69 76.65 97.04 S/N: Bentley Systems, Inc. Bentley PondPack (10.00.027.00) 11:21 AM 3/23/2016 Type.... Master Network Summary Page 1.02 Name.... Watershed File.... C:\Users\hfreeman\Desktop\Pondpack Temp\Chatham Parkway.ppw MASTER NETWORK SUMMARY SCS Unit Hydrograph Method (*Node=Outfall; +Node=Diversion;) (Trun= HYG Truncation: Blank=None; L=Left; R=Rt; LR=Left&Rt) Return HYG Vol Node ID Type Event cu.ft Trun ----------------- ---- ------ ---------- -- AP 2 POST JCT 1 15877 AP 2 POST JCT 2 24814 AP 2 POST JCT 5 39980 AP 2 POST JCT 10 53008 AP 2 POST JCT 25 71969 AP 2 POST JCT 50 87963 AP 2 POST JCT 100 104758 AP 2 PRE JCT 1 5138 AP 2 PRE JCT 2 10351 AP 2 PRE JCT 5 20480 AP Z PRE JCT 10 29986 AP 2 PRE JCT 25 44707 AP 2 PRE JCT 50 57722 AP 2 PRE JCT 100 71834 AP 3 POST JCT 1 4795 AP 3 POST JCT 2 6936 AP 3 POST JCT 5 10386 AP 3 POST JCT 10 13241 AP 3 POST JCT 25 17285 AP 3 POST JCT 50 20625 AP 3 POST JCT 100 24079 AP 3 PRE JCT 1 1458 AP 3 PRE JCT 2 2936 AP 3 PRE JCT 5 5810 AP 3 PRE JCT 10 8507 AP 3 PRE JCT 25 12683 AP 3 PRE JCT 50 16375 AP 3 PRE JCT 100 20379 Qpeak hrs 14.3500 12.5000 12.1500 12.1000 12.0500 12.0000 12.0000 12.1000 12.0500 12.0500 12.0500 12.0000 12.0000 12.0000 14.9500 12.7000 12.1500 12.1000 12.0500 12.0500 12.0000 12.1000 12.0500 12.0500 12.0500 12.0000 12.0000 12.0000 Max Qpeak Max WSEL Pond 5torage cfs ft cu.ft .30 1.20 4.20 8.52 20.29 29.18 37.61 .62 2.39 6.24 9.81 15.52 20.66 26.19 .06 .24 1.03 1.50 3.48 5.83 7.83 .18 .68 1.77 2.78 4.40 5.86 7.43 S/N: Bentley Systems, Inc. Bentley PondPack (10.00.027.00) 11:21 AM 3/23/2016 Type.... Master Network Summary Page 1.03 Name.... Watershed File.... C:\Users\hfreeman\Desktop\Pondpack Temp\Chatham Parkway.ppw MASTER NETWORK SUMMARY SCS Unit Hydrograph Method (*Node=Outfall; +Node=Diversion;) (Trun= HYG Truncation: Blank=None; L=Left; R=Rt; LR=Left&Rt) Return HYG Vol Node ID Type Event cu.ft Trun ----------------- ---- ------ ---------- -- BMP 1 IN POND 1 17390 BMP 1 IN P�ND 2 28616 BMP 1 IN POND 5 48291 BMP 1 IN POND 10 65570 BMP 1 IN POND 25 91123 BMP 1 IN P�ND 50 112938 BMP 1 IN POND 100 136032 BMP 1 OUT POND 1 17199 BMP 1 OUT POND 2 28425 BMP 1 OUT POND 5 48099 BMP 1 OUT POND 10 65378 BMP 1 OUT POND 25 90931 BMP 1 OUT POND 50 112746 BMP 1 OUT P�ND 100 135840 BMP 2 IN POND 1 6091 BMP 2 IN POND 2 9378 BMP 2 IN POND 5 14917 BMP 2 IN POND 10 19650 BMP 2 IN POND 25 26511 BMP 2 IN POND 50 32280 BMP 2 IN POND 100 38322 BMP 2 OUT POND 1 5984 BMP 2 OUT POND 2 9271 BMP 2 OUT POND 5 14811 BMP 2 OUT P�ND 10 19543 BMP 2 OUT POND 25 26405 BMP 2 OUT POND 50 32174 BMP 2 OUT POND 100 38216 Qpeak hrs 12.0000 12.0000 11.9500 11.9500 11.9500 11.9500 11.9500 14.0000 12.4500 12.2000 12.1000 12.0500 12.0000 12.0000 11.9500 11.9500 11.9500 11.9500 11.9500 11.9500 11.9000 Max Qpeak Max WSEL Pond 5torage cfs ft cu.ft 6.10 10.70 19.32 26.80 37.69 46.86 56.46 .39 378.19 7977 1.54 378.44 9780 3.85 379.25 16234 11.94 379.83 21289 28.44 380.22 24920 39.66 380.47 27268 46.85 380.74 29969 2.31 3.75 6.14 8.14 11.00 13.37 15.87 14.0500 .12 373.20 3135 12.5000 .40 373.44 3865 12.3500 .89 374.07 6008 12.1500 1.60 374.58 7994 12.0500 6.67 374.93 9490 12.0500 10.01 375.10 10216 12.0000 13.20 375.26 10962 S/N: Bentley Systems, Inc. Bentley PondPack (10.00.027.00) 11:21 AM 3/23/2016 Type.... Master Network Summary Page 1.04 Name.... Watershed File.... C:\Users\hfreeman\Desktop\Pondpack Temp\Chatham Parkway.ppw MASTER NETWORK SUMMARY SCS Unit Hydrograph Method (*Node=Outfall; +Node=Diversion;) (Trun= HYG Truncation: Blank=None; L=Left; R=Rt; LR=Left&Rt) Return HYG Vol Node ID Type Event cu.ft Trun ----------------- ---- ------ ---------- -- BMP 3 IN POND 1 12997 BMP 3 IN P�ND 2 20251 BMP 3 IN POND 5 32563 BMP 3 IN POND 10 43137 BMP 3 IN POND 25 58524 BMP 3 IN P�ND 50 71499 BMP 3 IN POND 100 85115 BMP 3 OUT POND 1 12353 BMP 3 OUT POND 2 19592 BMP 3 OUT POND 5 31879 BMP 3 OUT POND 10 42433 BMP 3 OUT POND 25 57794 BMP 3 OUT POND 50 70750 BMP 3 OUT P�ND 100 84350 BMP 4 IN POND 1 11384 BMP 4 IN POND 2 17737 BMP 4 IN POND 5 28520 BMP 4 IN POND 10 37781 BMP 4 IN POND 25 51258 BMP 4 IN POND 50 62621 BMP 4 IN POND 100 74547 BMP 4 OUT POND 1 10640 BMP 4 OUT POND 2 16972 BMP 4 OUT POND 5 27728 BMP 4 OUT P�ND 10 36966 BMP 4 OUT POND 25 50413 BMP 4 OUT POND 50 61755 BMP 4 OUT POND 100 73662 Qpeak hrs 12.0000 11.9500 11.9500 11.9500 11.9500 11.9500 11.9500 14.1500 12.4500 12.1500 12.1500 12.0500 12.0000 12.0000 12.0000 11.9500 11.9500 11.9500 11.9500 11.9500 11.9500 Max Qpeak Max WSEL Pond 5torage cfs ft cu.ft 4.85 8.02 13.35 17.85 24.29 29.64 35.19 .27 383.16 6717 1.03 383.35 7943 3.15 383.93 11851 4.44 384.51 16105 15.99 384.94 19429 23.48 385.12 20862 30.52 385.29 22295 4.25 7.03 11.69 15.63 21.28 25.96 30.82 15.4000 .18 424.12 6796 12.7500 .64 424.27 7732 12.1500 2.57 424.70 10714 12.1000 5.38 425.15 14032 12.0500 14.24 425.50 16704 12.0000 20.21 425.67 18097 12.0000 26.46 425.85 19515 S/N: Bentley Systems, Inc. Bentley PondPack (10.00.027.00) 11:21 AM 3/23/2016 Type.... Master Network Summary Page 1.05 Name.... Watershed File.... C:\Users\hfreeman\Desktop\Pondpack Temp\Chatham Parkway.ppw MASTER NETWORK SUMMARY SCS Unit Hydrograph Method (*Node=Outfall; +Node=Diversion;) (Trun= HYG Truncation: Blank=None; L=Left; R=Rt; LR=Left&Rt) Return HYG Vol Node ID Type Event cu.ft Trun ----------------- ---- ------ ---------- -- BMP 5 IN POND 1 11365 BMP 5 IN P�ND 2 18170 BMP 5 IN POND 5 29897 BMP 5 IN POND 10 40079 BMP 5 IN POND 25 55011 BMP 5 IN P�ND 50 67677 BMP 5 IN POND 100 81026 BMP 5 OUT POND 1 11082 BMP 5 OUT POND 2 17878 BMP 5 OUT POND 5 29594 BMP 5 OUT POND 10 39766 BMP 5 OUT POND 25 54684 BMP 5 OUT POND 50 67339 BMP 5 OUT P�ND 100 80679 BMP 7 IN POND 1 4916 BMP 7 IN POND 2 7057 BMP 7 IN POND 5 10508 BMP 7 IN POND 10 13363 BMP 7 IN POND 25 17407 BMP 7 IN POND 50 20746 BMP 7 IN POND 100 24200 BMP 7 OUT POND 1 4796 BMP 7 OUT POND 2 6937 BMP 7 OUT POND 5 10387 BMP 7 OUT P�ND 10 13243 BMP 7 OUT POND 25 17287 BMP 7 OUT POND 50 20626 BMP 7 OUT POND 100 24081 Qpeak hrs 12.0000 11.9500 11.9500 11.9500 11.9500 11.9500 11.9500 14.0000 12.4500 12.1500 12.1000 12.0500 12.0000 12.0000 11.9500 11.9500 11.9500 11.9000 11.9000 11.9000 11.9000 Max Qpeak Max WSEL Pond 5torage cfs ft cu.ft 4.14 7.02 12.14 16.51 22.82 28.09 33.58 .24 435.15 5656 .97 435.34 6690 3.17 435.94 10159 7.02 436.46 13455 16.81 436.82 15815 23.91 437.01 17185 29.78 437.19 18467 2.01 2.92 4.36 5.53 7.23 8.62 10.04 14.9500 .06 447.09 3085 12.7000 .24 447.22 3518 12.1500 1.03 447.53 4568 12.1000 1.50 447.85 5725 12.0500 3.48 448.19 7034 12.0500 5.83 448.34 7638 12.0000 7.83 448.45 8080 S/N: Bentley Systems, Inc. Bentley PondPack (10.00.027.00) 11:21 AM 3/23/2016 Type.... Master Network Summary Page 1.06 Name.... Watershed File.... C:\Users\hfreeman\Desktop\Pondpack Temp\Chatham Parkway.ppw MASTER NETWORK SUMMARY SCS Unit Hydrograph Method (*Node=Outfall; +Node=Diversion;) (Trun= HYG Truncation: Blank=None; L=Left; R=Rt; LR=Left&Rt) Return HYG Vol Node ID Type Event cu.ft Trun ----------------- ---- ------ ---------- -- *OUT POST JCT 1 62056 *OUT POST JCT 2 99076 *OUT POST JCT 5 162498 *OUT POST JCT 10 217330 *OUT POST JCT 25 297512 *OUT POST JCT 50 365389 *OUT POST JCT 100 436826 *OUT PRE *OUT PRE *OUT PRE *OUT PRE *OUT PRE *OUT PRE *OUT PRE POST TO BMP 1 POST TO BMP 1 PO5T TO BMP 1 POST TO BMP 1 POST TO BMP 1 POST TO BMP 1 PO5T TO BMP 1 POST TO BMP 2 POST TO BMP 2 POST TO BMP 2 POST TO BMP 2 POST TO BMP 2 POST TO BMP 2 POST TO BMP 2 JCT JCT JCT JCT JCT JCT JCT AREA AREA AREA AREA AREA AREA AREA AREA AREA AREA AREA AREA AREA AREA 1 2 5 10 25 50 100 1 2 5 10 25 50 100 1 2 5 10 25 50 100 21124 42562 84205 123289 183810 237316 295331 17390 28616 48291 65570 91123 112938 136032 6091 9378 14917 19650 26511 32280 38322 Qpeak hrs 14.7500 12.5000 12.1500 12.1000 12.0500 12.0000 12.0000 12.1500 12.1000 12.0500 12.0500 12.0500 12.0500 12.0500 12.0000 12.0000 11.9500 11.9500 11.9500 11.9500 11.9500 11.9500 11.9500 11.9500 11.9500 11.9500 11.9500 11.9000 Max Qpeak Max WSEL Pond 5torage cfs ft cu.ft 1.22 4.75 14.62 31.67 85.63 122.34 154.64 2.08 8.26 21.99 36.03 57.69 76.65 97.04 6.10 10.70 19.32 26.80 37.69 46.86 56.46 2.31 3.75 6.14 8.14 11.00 13.37 15.87 S/N: Bentley Systems, Inc. Bentley PondPack (10.00.027.00) 11:21 AM 3/23/2016 Type.... Master Network Summary Page 1.07 Name.... Watershed File.... C:\Users\hfreeman\Desktop\Pondpack Temp\Chatham Parkway.ppw MASTER NETWORK SUMMARY SCS Unit Hydrograph Method (*Node=Outfall; +Node=Diversion;) (Trun= HYG Truncation: Blank=None; L=Left; R=Rt; LR=Left&Rt) Return HYG Vol Node ID Type Event cu.ft Trun ----------------- ---- ------ ---------- -- POST TO BMP 3 AREA 1 12997 POST TO BMP 3 AREA 2 20251 POST TO BMP 3 AREA 5 32563 POST TO BMP 3 AREA 10 43137 POST TO BMP 3 AREA 25 58524 POST TO BMP 3 AREA 50 71499 POST TO BMP 3 AREA 100 85115 POST TO BMP 4 PO5T TO BMP 4 POST TO BMP 4 POST TO BMP 4 POST TO BMP 4 POST TO BMP 4 POST TO BMP 4 POST TO BMP 5 POST TO BMP 5 PO5T TO BMP 5 POST TO BMP 5 POST TO BMP 5 POST TO BMP 5 PO5T TO BMP 5 POST TO BMP 7 POST TO BMP 7 POST TO BMP 7 POST TO BMP 7 POST TO BMP 7 POST TO BMP 7 POST TO BMP 7 AREA AREA AREA AREA AREA AREA AREA AREA AREA AREA AREA AREA AREA AREA AREA AREA AREA AREA AREA AREA AREA 1 2 5 10 25 50 100 1 2 5 10 25 50 100 1 2 5 10 25 50 100 11384 17737 28520 37781 51258 62621 74547 11365 18170 29897 40079 55011 67677 81026 4916 7057 10508 13363 17407 20746 24200 Qpeak hrs 12.0000 11.9500 11.9500 11.9500 11.9500 11.9500 11.9500 12.0000 11.9500 11.9500 11.9500 11.9500 11.9500 11.9500 12.0000 11.9500 11.9500 11.9500 11.9500 11.9500 11.9500 11.9500 11.9500 11.9500 11.9000 11.9000 11.9000 11.9000 Max Qpeak Max WSEL Pond 5torage cfs ft cu.ft 4.85 8.02 13.35 17.85 24.29 29.64 35.19 4.25 7.03 11.69 15.63 21.28 25.96 30.82 4.14 7.02 12.14 16.51 22.82 28.09 33.58 2.01 2.92 4.36 5.53 7.23 8.62 10.04 S/N: Bentley Systems, Inc. Bentley PondPack (10.00.027.00) 11:21 AM 3/23/2016 Type.... Master Network Summary Page 1.08 Name.... Watershed File.... C:\Users\hfreeman\Desktop\Pondpack Temp\Chatham Parkway.ppw MASTER NETWORK SUMMARY SCS Unit Hydrograph Method (*Node=Outfall; +Node=Diversion;) (Trun= HYG Truncation: Blank=None; L=Left; R=Rt; LR=Left&Rt) Return HYG Vol Node ID Type Event cu.ft Trun ----------------- ---- ------ ---------- -- PRE TO AP 1 AREA 1 15985 PRE TO AP 1 AREA 2 32211 PRE TO AP 1 AREA 5 63726 PRE TO AP 1 AREA 10 93303 PRE TO AP 1 AREA 25 139103 PRE TO AP 1 AREA 50 179594 PRE TO AP 1 AREA 100 223497 PRE TO AP 2 PRE TO AP 2 PRE TO AP 2 PRE TO AP 2 PRE TO AP 2 PRE TO AP 2 PRE TO AP 2 PRE TO AP 3 PRE TO AP 3 PRE TO AP 3 PRE TO AP 3 PRE TO AP 3 PRE TO AP 3 PRE TO AP 3 AREA AREA AREA AREA AREA AREA AREA AREA AREA AREA AREA AREA AREA AREA 1 2 5 10 25 50 100 1 2 5 10 25 50 100 3681 7414 14670 21479 32024 41346 51455 1458 2936 5810 8507 12683 16375 20379 Qpeak hrs 12.1500 12.1000 12.1000 12.1000 12.0500 12.0500 12.0500 12.1000 12.0500 12.0500 12.0500 12.0000 12.0000 12.0000 12.1000 12.0500 12.0500 12.0500 12.0000 12.0000 12.0000 Max Qpeak Max WSEL Pond 5torage cfs ft cu.ft 1.56 6.11 16.45 26.28 42.46 56.71 72.06 .45 1.71 4.47 7.03 11.12 14.80 18.76 .18 .68 1.77 2.78 4.40 5.86 7.43 5/N: Bentley Systems, Inc. Bentley PondPack (10.00.027.00) 11:21 AM 3/23/2016 Type.... Design Storms Name.... Pittsboro 24hr S Page 2.01 File.... C:\Users\hfreeman\Desktop\Pondpack Temp\Chatham Parkway.ppw Title... Project Date: 3/23/2016 Project Engineer: H Freeman Project Title: Watershed Proj ect Comments : Peak Flow Analysis and BMP Routing for Roadway Only DESIGN STORMS SUMMARY Design Storm File,ID = Pittsboro 24hr S Storm Tag Name = 1 ---------------------------------------------------------------------- Data Type, File, ID = Synthetic Storm TypeII 24hr Storm Frequency = 1 yr Total Rainfall Depth= 2.9500 in Duration Multiplier = 1 Resulting Duration = 24.0000 hrs Resulting Start Time= .0000 hrs Step= .1000 hrs End= 24.0000 hrs Storm Tag Name = Z ---------------------------------------------------------------------- Data Type, File, ID = Synthetic Storm TypeII 24hr Storm Frequency = 2 yr Total Rainfall Depth= 3.5600 in Duration Multiplier = 1 Resulting Duration = 24.0000 hrs Resulting Start Time= .00QO hrs Step= .1Q00 hrs End= 24.0000 hrs 5torm Tag Name = 5 ---------------------------------------------------------------------- Data Type, File, ID = Synthetic Storm TypeII 24hr Storm Frequency = 5 yr Total Rainfall Depth= 4.4600 in Duration Multiplier = 1 Resulting Duration = 24.Q000 hrs Resulting 5tart Time= .0000 hrs Step= .1000 hrs End= 24.0000 hrs Storm Tag Name = 10 -------------------------------------- Data Type, File, ID = Synthetic Storm 5torm Frequency = 10 yr Total Rainfall Depth= 5.1600 in Duration Multiplier = 1 Resulting Duration = 24.0000 hrs Resulting Start Time= .0000 hrs Step= Storm Tag Name = 25 Data Type, File, ID = Synthetic Storm Storm Frequency = 25 yr Total Rainfall Depth= 6.1100 in Duration Multiplier = 1 Resulting Duration = 24.0000 hrs Resulting Start Time= .0000 hrs Step= ----------------------------- TypeII 24hr 1000 hrs End= 24.0000 hrs TypeII 24hr 1000 hrs End= 24.0000 hrs S/N: Bentley Systems, Inc. Bentley PondPack (10.00.027.00) 11:21 AM 3/23/2016 5/N: Sentley Systems, Inc. Bentley PondPack (10.00.027.00) 11:21 AM 3/23/2016 Type.... Design Storms Name.... Pittsboro 24hr S Page 2.02 File.... C:\Users\hfreeman\Desktop\Pondpack Temp\Chatham Parkway.ppw Title... Project Date: 3/23/2016 Project Engineer: H Freeman PrQject Title: Watershed Proj ect Comments : Peak Flow Analysis and BMP Routing for Roadway Only DESIGN STORMS SUMMARY Design Storm File,ID = Pittsboro 24hr S Storm Tag Name = 50 ---------------------------------------------------------------------- Data Type, File, ID = Synthetic Storm TypeII 24hr Storm Frequency = 50 yr Total Rainfall Depth= 6.8700 in Duration Multiplier = 1 Resulting Duration = 24.0000 hrs Resulting Start Time= .0000 hrs Step= .1000 hrs End= 24.0000 hrs Storm Tag Name = 100 ---------------------------------------------------------------------- Data Type, File, ID = Synthetic Storm TypeII 24hr Storm Frequency = 100 yr Total Rainfall Depth= 7.6400 in Duration Multiplier = 1 Resulting Duration = 24.0000 hrs Resulting Start Time= .00QO hrs Step= .1Q00 hrs End= 24.0000 hrs S/N: Bentley Systems, Inc. Bentley PondPack (10.00.027.00) 11:21 AM 3/23/2016 Type.... Tc Calcs Name.... POST TO BMF 1 Page 3.01 File.... C:\Users\hfreeman\Desktop\Pondpack Temp\Chatham Parkway.ppw ........................................................................ ........................................................................ TIME OF CONCENTRATION CALCULATOR ........................................................................ ........................................................................ Segment #1: Tc: Us�r Defined Segment #1 Time: .0830 hrs ------------------------------------------------------------------------ Total Tc: .0830 hrs Calculated Tc < Min.Tc: Use Minimum Tc... Use Tc = .0833 hrs S/N: Bentley Systems, Inc. Bentley PondPack (10.00.027.00) 11:21 AM 3/23/2016 Type.... Tc Calcs Name.... PO5T TO BMF 1 Page 3.02 File.... C:\Users\hfreeman\Desktop\Pondpack Temp\Chatham Parkway.ppw Tc Equations used... ------------------------------------------------------------------------ User Defined Tc = Value entered by user Where: Tc = Time of concentration S/N: Bentley Systems, Inc. Bentley PondPack (10.00.027.00) 11:21 AM 3/23/2016 Type.... Tc Calcs Name.... POST TO BMF 2 Page 3.03 File.... C:\Users\hfreeman\Desktop\Pondpack Temp\Chatham Parkway.ppw ........................................................................ ........................................................................ TIME OF CONCENTRATION CALCULATOR ........................................................................ ........................................................................ Segment #1: Tc: Us�r Defined Segment #1 Time: .0830 hrs ------------------------------------------------------------------------ Total Tc: .0830 hrs Calculated Tc < Min.Tc: Use Minimum Tc... Use Tc = .0833 hrs S/N: Bentley Systems, Inc. Bentley PondPack (10.00.027.00) 11:21 AM 3/23/2016 Type.... Tc Calcs Name.... PO5T TO BMF 2 Page 3.04 File.... C:\Users\hfreeman\Desktop\Pondpack Temp\Chatham Parkway.ppw Tc Equations used... ------------------------------------------------------------------------ User Defined Tc = Value entered by user Where: Tc = Time of concentration S/N: Bentley Systems, Inc. Bentley PondPack (10.00.027.00) 11:21 AM 3/23/2016 Type.... Tc Calcs Name.... POST TO BMF 3 Page 3.05 File.... C:\Users\hfreeman\Desktop\Pondpack Temp\Chatham Parkway.ppw ........................................................................ ........................................................................ TIME OF CONCENTRATION CALCULATOR ........................................................................ ........................................................................ Segment #1: Tc: Us�r Defined Segment #1 Time: .0830 hrs ------------------------------------------------------------------------ Total Tc: .0830 hrs Calculated Tc < Min.Tc: Use Minimum Tc... Use Tc = .0833 hrs S/N: Bentley Systems, Inc. Bentley PondPack (10.00.027.00) 11:21 AM 3/23/2016 Type.... Tc Calcs Name.... PO5T TO BMF 3 Page 3.06 File.... C:\Users\hfreeman\Desktop\Pondpack Temp\Chatham Parkway.ppw Tc Equations used... ------------------------------------------------------------------------ User Defined Tc = Value entered by user Where: Tc = Time of concentration S/N: Bentley Systems, Inc. Bentley PondPack (10.00.027.00) 11:21 AM 3/23/2016 Type.... Tc Calcs Name.... POST TO BMF 4 Page 3.07 File.... C:\Users\hfreeman\Desktop\Pondpack Temp\Chatham Parkway.ppw ........................................................................ ........................................................................ TIME OF CONCENTRATION CALCULATOR ........................................................................ ........................................................................ Segment #1: Tc: Us�r Defined Segment #1 Time: .0830 hrs ------------------------------------------------------------------------ Total Tc: .0830 hrs Calculated Tc < Min.Tc: Use Minimum Tc... Use Tc = .0833 hrs S/N: Bentley Systems, Inc. Bentley PondPack (10.00.027.00) 11:21 AM 3/23/2016 Type.... Tc Calcs Name.... PO5T TO BMF 4 Page 3.08 File.... C:\Users\hfreeman\Desktop\Pondpack Temp\Chatham Parkway.ppw Tc Equations used... ------------------------------------------------------------------------ User Defined Tc = Value entered by user Where: Tc = Time of concentration S/N: Bentley Systems, Inc. Bentley PondPack (10.00.027.00) 11:21 AM 3/23/2016 Type.... Tc Calcs Name.... POST TO BMF 5 Page 3.09 File.... C:\Users\hfreeman\Desktop\Pondpack Temp\Chatham Parkway.ppw ........................................................................ ........................................................................ TIME OF CONCENTRATION CALCULATOR ........................................................................ ........................................................................ Segment #1: Tc: Us�r Defined Segment #1 Time: .0830 hrs ------------------------------------------------------------------------ Total Tc: .0830 hrs Calculated Tc < Min.Tc: Use Minimum Tc... Use Tc = .0833 hrs S/N: Bentley Systems, Inc. Bentley PondPack (10.00.027.00) 11:21 AM 3/23/2016 Type.... Tc Calcs Name.... PO5T TO BMF 5 Page 3.10 File.... C:\Users\hfreeman\Desktop\Pondpack Temp\Chatham Parkway.ppw Tc Equations used... ------------------------------------------------------------------------ User Defined Tc = Value entered by user Where: Tc = Time of concentration S/N: Bentley Systems, Inc. Bentley PondPack (10.00.027.00) 11:21 AM 3/23/2016 Type.... Tc Calcs Name.... POST TO BMF 7 Page 3.11 File.... C:\Users\hfreeman\Desktop\Pondpack Temp\Chatham Parkway.ppw ........................................................................ ........................................................................ TIME OF CONCENTRATION CALCULATOR ........................................................................ ........................................................................ Segment #1: Tc: Us�r Defined Segment #1 Time: .0830 hrs ------------------------------------------------------------------------ Total Tc: .0830 hrs Calculated Tc < Min.Tc: Use Minimum Tc... Use Tc = .0833 hrs S/N: Bentley Systems, Inc. Bentley PondPack (10.00.027.00) 11:21 AM 3/23/2016 Type.... Tc Calcs Name.... PO5T TO BMF 7 Page 3.12 File.... C:\Users\hfreeman\Desktop\Pondpack Temp\Chatham Parkway.ppw Tc Equations used... ------------------------------------------------------------------------ User Defined Tc = Value entered by user Where: Tc = Time of concentration S/N: Bentley Systems, Inc. Bentley PondPack (10.00.027.00) 11:21 AM 3/23/2016 Type.... Tc Calcs Name.... PRE TO AP 1 Page 3.13 File.... C:\Users\hfreeman\Desktop\Pondpack Temp\Chatham Parkway.ppw ........................................................................ ........................................................................ TIME OF CONCENTRATION CALCULATOR ........................................................................ ........................................................................ Segment #1: Tc: Us�r Defined Segment #1 Time: .2500 hrs ------------------------------------------------------------------------ Total Tc: .2500 hrs S/N: Bentley Systems, Inc. Bentley PondPack (10.00.027.00) 11:21 AM 3/23/2016 Type.... Tc Calcs Name.... PRE TO AP 1 Page 3.14 File.... C:\Users\hfreeman\Desktop\Pondpack Temp\Chatham Parkway.ppw Tc Equations used... ------------------------------------------------------------------------ User Defined Tc = Value entered by user Where: Tc = Time of concentration S/N: Bentley Systems, Inc. Bentley PondPack (10.00.027.00) 11:21 AM 3/23/2016 Type.... Tc Calcs Name.... PRE TO AP 2 Page 3.15 File.... C:\Users\hfreeman\Desktop\Pondpack Temp\Chatham Parkway.ppw ........................................................................ ........................................................................ TIME OF CONCENTRATION CALCULATOR ........................................................................ ........................................................................ Segment #1: Tc: Us�r Defined Segment #1 Time: .1700 hrs ------------------------------------------------------------------------ Total Tc: .1700 hrs S/N: Bentley Systems, Inc. Bentley PondPack (10.00.027.00) 11:21 AM 3/23/2016 Type.... Tc Calcs Name.... PRE TO AP 2 Page 3.16 File.... C:\Users\hfreeman\Desktop\Pondpack Temp\Chatham Parkway.ppw Tc Equations used... ------------------------------------------------------------------------ User Defined Tc = Value entered by user Where: Tc = Time of concentration S/N: Bentley Systems, Inc. Bentley PondPack (10.00.027.00) 11:21 AM 3/23/2016 Type.... Tc Calcs Name.... PRE TO AP 3 Page 3.17 File.... C:\Users\hfreeman\Desktop\Pondpack Temp\Chatham Parkway.ppw ........................................................................ ........................................................................ TIME OF CONCENTRATION CALCULATOR ........................................................................ ........................................................................ Segment #1: Tc: Us�r Defined Segment #1 Time: .1700 hrs ------------------------------------------------------------------------ Total Tc: .1700 hrs S/N: Bentley Systems, Inc. Bentley PondPack (10.00.027.00) 11:21 AM 3/23/2016 Type.... Tc Calcs Name.... PRE TO AP 3 Page 3.18 File.... C:\Users\hfreeman\Desktop\Pondpack Temp\Chatham Parkway.ppw Tc Equations used... ------------------------------------------------------------------------ User Defined Tc = Value entered by user Where: Tc = Time of concentration S/N: Bentley Systems, Inc. Bentley PondPack (10.00.027.00) 11:21 AM 3/23/2016 Type.... Runoff CN-Area Name.... POST TO BMF 1 Page 4.01 File.... C:\Users\hfreeman\Desktop\Pondpack Temp\Chatham Parkway.ppw RUNOFF CURVE NUMBER DATA .......................................................................... .......................................................................... Area Soil/Surface Description CN aeres -------------------------------- ---- --------- Treated impervious 98 .700 Untreated Impervious 98 .100 Open space (Lawns,parks etc.) - Goo 61 9.920 Impervious Adjustment Adjusted oC %UC CN ----- ----- ------ 98.00 98.00 61.00 COMFOSITE AREA & WEIGHTED CN ---> 10.720 63.76 (64) ........................................................................... ........................................................................... S/N: Bentley Systems, Inc. Bentley PondPack (10.00.027.00) 11:21 AM 3/23/2016 Type.... Runoff CN-Area Name.... POST TO BMF 2 Page 4.02 File.... C:\Users\hfreeman\Desktop\Pondpack Temp\Chatham Parkway.ppw RUNOFF CURVE NUMBER DATA .......................................................................... .......................................................................... Area Soil/Surface Description CN aeres -------------------------------- ---- --------- Treated Impervious 98 .140 Untreated Impervious 98 .410 Open space (Lawns,parks etc.) - Goo 61 2.060 Impervious Adjustment Adjusted oC %UC CN ----- ----- ------ 98.00 98.00 61.00 COMFOSITE AREA & WEIGHTED CN ---> 2.610 68.80 (69) ........................................................................... ........................................................................... S/N: Bentley Systems, Inc. Bentley PondPack (10.00.027.00) 11:21 AM 3/23/2016 Type.... Runoff CN-Area Name.... POST TO BMF 3 Page 4.03 File.... C:\Users\hfreeman\Desktop\Pondpack Temp\Chatham Parkway.ppw RUNOFF CURVE NUMBER DATA .......................................................................... .......................................................................... Area Soil/Surface Description CN aeres -------------------------------- ---- --------- Treated Impervious 98 .620 Untreated Impervious 98 .460 Open space (Lawns,parks etc.) - Goo 61 4.880 Impervious Adjustment Adjusted oC %UC CN ----- ----- ------ 98.00 98.00 61.00 COMFOSITE AREA & WEIGHTED CN ---> 5.960 67.70 (68) ........................................................................... ........................................................................... S/N: Bentley Systems, Inc. Bentley PondPack (10.00.027.00) 11:21 AM 3/23/2016 Type.... Runoff CN-Area Name.... POST TO BMF 4 Page 4.04 File.... C:\Users\hfreeman\Desktop\Pondpack Temp\Chatham Parkway.ppw RUNOFF CURVE NUMBER DATA .......................................................................... .......................................................................... Area Soil/Surface Description CN aeres -------------------------------- ---- --------- Treated Impervious 98 .360 Untreated Impervious 98 .640 Open space (Lawns,parks etc.) - Goo 61 4.220 Impervious Adjustment Adjusted oC %UC CN ----- ----- ------ 98.00 98.00 61.00 COMPOSITE AREA & WEIGHTED CN ---> 5.220 68.09 (68) ........................................................................... ........................................................................... S/N: Bentley Systems, Inc. Bentley PondPack (10.00.027.00) 11:21 AM 3/23/2016 Type.... Runoff CN-Area Name.... POST TO BMF 5 Page 4.05 File.... C:\Users\hfreeman\Desktop\Pondpack Temp\Chatham Parkway.ppw RUNOFF CURVE NUMBER DATA .......................................................................... .......................................................................... Area Soil/Surface Description CN aeres -------------------------------- ---- --------- Untreated Impervious 98 .840 Open space (Lawns,parks etc.) - Goo 61 5.170 Impervious Adjustment Adjusted oC %UC CN ----- ----- ------ 98.00 61.00 COMPOSITE AREA & WEIGHTED CN ---> 6.010 66.17 (66) ........................................................................... ........................................................................... S/N: Bentley Systems, Inc. Bentley PondPack (10.00.027.00) 11:21 AM 3/23/2016 Type.... Runoff CN-Area Name.... POST TO BMF 7 Page 4.06 File.... C:\Users\hfreeman\Desktop\Pondpack Temp\Chatham Parkway.ppw RUNOFF CURVE NUMBER DATA .......................................................................... .......................................................................... Area Soil/Surface Description CN aeres -------------------------------- ---- --------- Untreated Impervious 98 .550 Open space (Lawns,parks etc.) - Goo 61 .830 Impervious Adjustment Adjusted oC %UC CN ----- ----- ------ 98.00 61.00 COMPOSITE AREA & WEIGHTED CN ---> 1.380 75.75 (76) ........................................................................... ........................................................................... S/N: Bentley Systems, Inc. Bentley PondPack (10.00.027.00) 11:21 AM 3/23/2016 Type.... Runoff CN-Area Name.... PRE TO AP 1 Page 4.07 File.... C:\Users\hfreeman\Desktop\Pondpack Temp\Chatham Parkway.ppw RUNOFF CURVE NUMBER DATA .......................................................................... .......................................................................... Area Soil/Surface Description CN aeres -------------------------------- ---- --------- Woods - good 55 24.230 Impervious Adjustment Adjusted oC %UC CN ----- ----- ------ 55.00 COMPOSITE AREA & WEIGHTED CN ---> 24.230 55.00 (55) .......................................................................•••- .......................................................................•••- S/N: Bentley Systems, Inc. Bentley PondPack (10.00.027.00) 11:21 AM 3/23/2016 Type.... Runoff CN-Area Name.... PRE TO AP 2 Page 4.08 File.... C:\Users\hfreeman\Desktop\Pondpack Temp\Chatham Parkway.ppw RUNOFF CURVE NUMBER DATA .......................................................................... .......................................................................... Area Soil/Surface Description CN aeres -------------------------------- ---- --------- Woods - good 55 5.580 Impervious Adjustment Adjusted oC %UC CN ----- ----- ------ 55.00 COMPOSITE AREA & WEIGHTED CN ---> 5.580 55.00 (55) .......................................................................•••- .......................................................................•••- S/N: Bentley Systems, Inc. Bentley PondPack (10.00.027.00) 11:21 AM 3/23/2016 Type.... Runoff CN-Area Name.... PRE TO AP 3 Page 4.09 File.... C:\Users\hfreeman\Desktop\Pondpack Temp\Chatham Parkway.ppw RUNOFF CURVE NUMBER DATA .......................................................................... .......................................................................... Area Soil/Surface Description CN aeres -------------------------------- ---- --------- Woods - good 55 2.210 Impervious Adjustment Adjusted oC %UC CN ----- ----- ------ 55.00 COMPOSITE AREA & WEIGHTED CN ---> 2.210 55.00 (55) .......................................................................•••- .......................................................................•••- S/N: Bentley Systems, Inc. Bentley PondPack (10.00.027.00) 11:21 AM 3/23/2016 Type.... Vol: Elev-Area Name.... BMP 1 Page 5.01 File.... C:\Users\hfreeman\Desktop\Pondpack Temp\Chatham Parkway.ppw Elevation Planimeter Area A1+A2+sqr(A1*A2) Volume Volume Sum (ft) (sq.in} (sq.ft) (sq.ft) (cu.ft) (cu.ft) 377.00 ----- 6078 0 0 0 378.00 ----- 7113 19766 6589 6589 381.00 ----- 10355 26050 26050 32639 POND VOLUME EQUATIONS * Incremental volume computed by the Conic Method for Reservoir Volumes. Volume = (1/3) * (EL2-ELl) * (Areal + Area2 + sq.rt.(Areal*Area2)) where: EL1, EL2 = Lower and upper elevations of the increment Areal,Area2 = Areas computed for EL1, EL2, respectively Volume = Incremental volume between EL1 and EL2 S/N: Bentley Systems, Inc. Bentley PondPack (10.00.027.00) 11:21 AM 3/23/2016 Type.... Vol: Elev-Area Name.... BMP 2 Page 5.02 File.... C:\Users\hfreeman\Desktop\Pondpack Temp\Chatham Parkway.ppw Elevation Planimeter Area A1+A2+sqr(A1*A2) Volume Volume Sum (ft) (sq.in} (sq.ft) (sq.ft) (cu.ft) (cu.ft) 372.00 ----- 2217 0 0 0 376.00 ----- 5340 10998 14664 14664 POND VOLUME EQUATIONS * Incremental volume computed by the Conic Method for Reservoir Volumes. Volume = (1/3) * (EL2-EL1) * (Areal + Area2 + sq.rt.(Areal*Area2)) where: EL1, EL2 = LQwer and upper elevations of the increment Areal,Area2 = Areas computed for EL1, EL2, respectively Volume = Incremental volume between EL1 and EL2 S/N: Bentley Systems, Inc. Bentley PondPack (10.00.027.00) 11:21 AM 3/23/2016 Type.... Vol: Elev-Area Name.... BMP 3 Page 5.03 File.... C:\Users\hfreeman\Desktop\Pondpack Temp\Chatham Parkway.ppw Elevation Planimeter Area A1+A2+sqr(A1*A2) Volume Volume Sum (ft) (sq.in} (sq.ft) (sq.ft) (cu.ft) (cu.ft) 382.00 ----- 5311 0 0 0 386.00 ----- 9105 21370 28493 28493 POND VOLUME EQUATIONS * Incremental volume computed by the Conic Method for Reservoir Volumes. Volume = (1/3) * (EL2-EL1) * (Areal + Area2 + sq.rt.(Areal*Area2)) where: EL1, EL2 = LQwer and upper elevations of the increment Areal,Area2 = Areas computed for EL1, EL2, respectively Volume = Incremental volume between EL1 and EL2 S/N: Bentley Systems, Inc. Bentley PondPack (10.00.027.00) 11:21 AM 3/23/2016 Type.... Vol: Elev-Area Name.... BMP 4 Page 5.04 File.... C:\Users\hfreeman\Desktop\Pondpack Temp\Chatham Parkway.ppw Elevation Planimeter Area A1+A2+sqr(A1*A2) Volume Volume Sum (ft) (sq.in} (sq.ft) (sq.ft) (cu.ft) (cu.ft) 423.00 ----- 5552 0 0 0 426.00 ----- 8401 20783 20783 20783 POND VOLUME EQUATIONS * Incremental volume computed by the Conic Method for Reservoir Volumes. Volume = (1/3) * (EL2-EL1) * (Areal + Area2 + sq.rt.(Areal*Area2)) where: EL1, EL2 = LQwer and upper elevations of the increment Areal,Area2 = Areas computed for EL1, EL2, respectively Volume = Incremental volume between EL1 and EL2 S/N: Bentley Systems, Inc. Bentley PondPack (10.00.027.00) 11:21 AM 3/23/2016 Type.... Vol: Elev-Area Name.... BMP 5 Page 5.05 File.... C:\Users\hfreeman\Desktop\Pondpack Temp\Chatham Parkway.ppw Elevation Planimeter Area A1+A2+sqr(A1*A2) Volume Volume Sum (ft) (sq.in} (sq.ft) (sq.ft) (cu.ft) (cu.ft) 434.00 ----- 4485 0 0 0 438.00 ----- 7965 18427 24569 24569 POND VOLUME EQUATIONS * Incremental volume computed by the Conic Method for Reservoir Volumes. Volume = (1/3) * (EL2-EL1) * (Areal + Area2 + sq.rt.(Areal*Area2)) where: EL1, EL2 = LQwer and upper elevations of the increment Areal,Area2 = Areas computed for EL1, EL2, respectively Volume = Incremental volume between EL1 and EL2 S/N: Bentley Systems, Inc. Bentley PondPack (10.00.027.00) 11:21 AM 3/23/2016 Type.... Vol: Elev-Area Name.... BMP 7 Page 5.06 File.... C:\Users\hfreeman\Desktop\Pondpack Temp\Chatham Parkway.ppw Elevation Planimeter Area A1+A2+sqr(A1*A2) Volume Volume Sum (ft) (sq.in} (sq.ft) (sq.ft) (cu.ft) (cu.ft) 446.00 ----- 2509 0 0 0 449.00 ----- 4581 10480 10480 10480 POND VOLUME EQUATIONS * Incremental volume computed by the Conic Method for Reservoir Volumes. Volume = (1/3) * (EL2-EL1) * (Areal + Area2 + sq.rt.(Areal*Area2)) where: EL1, EL2 = LQwer and upper elevations of the increment Areal,Area2 = Areas computed for EL1, EL2, respectively Volume = Incremental volume between EL1 and EL2 S/N: Bentley Systems, Inc. Bentley PondPack (10.00.027.00) 11:21 AM 3/23/2016 Type.... Outlet Input Data Name.... BMP 1 Alt Page 6.01 File.... C:\Users\hfreeman\Desktop\Pondpack Temp\Chatham Parkway.ppw REQUESTED POND WS ELEVATION5: Min. Elev.= 377.00 ft Increment = .10 ft Max. Elev.= 381.00 ft ***************�***************�************** OUTLET CONNECTIVITY ******�********�******�********�******�******* ---> Forward Flow Only (UpStream to DnStream) <--- Reverse Flow Only {DnStream to UpStream) <---> Forward and Reverse Both Allowed Structure No. Outfall E1, ft E2, ft Orifice-Circular 02 ---> CO 378.000 381.000 Stand Pipe RO ---> CO 379.500 381.000 Orifice-Circular 00 ---> CO 377.000 381.000 Culvert-Circular CO ---> TW 375.000 381.000 TW SETUP, DS Channel S/N: Bentley Systems, Inc. Bentley PondPack (10.00.027.00) 11:21 AM 3/23/2016 Type.... Outlet Input Data Name.... BMP 1 Alt Page 6.02 File.... C:\Users\hfreeman\Desktop\Pondpack Temp\Chatham Parkway.ppw OUTLET STRUCTURE INPUT DATA Structure ID = 02 Structure Type = Orifice-Circular ------------------------------------ # of Openings = 4 Invert Elev. = 378.00 ft Diameter = .5000 ft Orifice Coeff. _ .600 Structure ID = RO Structure Type = Stand Pipe # of Openings = 1 Invert Elev. = 379.50 ft Diameter = 4.0000 ft Orifice Area = 12.5664 sq.ft Orifice Coeff. _ .600 Weir Length = 12.57 ft Weir Coeff. = 3.000 K, Reverse = 1.000 Mannings n = .0000 Kev,Charged Riser = .00Q Weir Submergence = No Structure ID = 00 Structure Type = Orifice-Circular ------------------------------------ # of Openings = 1 Invert Elev. = 377.OQ ft Diameter = .1200 ft Orifice Coeff. _ .600 S/N: Bentley Systems, Inc. Bentley PondPack (10.00.027.00) 11:21 AM 3/23/2016 Type.... Outlet Input Data Name.... BMP 1 Alt Page 6.03 File.... C:\Users\hfreeman\Desktop\Pondpack Temp\Chatham Parkway.ppw OUTLET STRUCTURE INPUT DATA Structure ID = CO Structure Type = Culvert-Circular ------------------------------------ No. Barrels = 1 Barrel Diameter = 2.5000 ft Upstream Invert = 375.00 ft Dnstream Invert = 374.00 ft Horiz. Length = 50.00 ft Barrel Length = 50.01 ft Barrel Slope = .02000 ft/ft OUTLET CONTROL DATA... Mannings n = .0240 Ke = .5000 Kb = .031414 Kr = .5000 HW Convergence = .001 INLET CONTROL DATA... Equation form = Inlet Control K = Inlet Control M = Inlet Control c = Inlet Control Y = T1 ratio (HW/D) _ T2 ratio (HW/D) _ 51ope Factor = 1 .0078 2.0000 .03790 .690Q .000 1.286 -.500 (forward entrance loss) (per ft of full flow) (reverse entrance loss) +/- ft Use unsubmerged inlet control Form 1 equ. below T1 elev. Use submerged inlet control Form 1 equ. above T2 elev. In transition zone between unsubmerged and submerged inlet control, interpolate between flows at T1 & T2... At T1 Elev = 375.00 ft ---> Flow = 27.16 cfs At T2 Elev = 378.22 ft ---> Flow = 31.05 cfs Structure ID = TW 5tructure Type = TW SETUP, DS Channel ------------------------------------ FREE OUTFALL CONDITIONS SPECIFIED CONVERGENCE TOLERANCES... Maximum Iterations= 40 Min. TW tolerance = .O1 ft Max. TW tolerance = .O1 ft Min. HW tolerance = .O1 ft Max. HW tolerance = .O1 ft Min. Q tolerance = .00 cfs Max. Q tolerance = .00 cfs S/N: Bentley Systems, Inc. Bentley PondPack (10.00.027.00) 11:21 AM 3/23/2016 Type.... Composite Rating Curve Name.... BMP 1 Alt Page 6.04 File.... C:\Users\hfreeman\Desktop\Pondpack Temp\Chatham Parkway.ppw ***** COMPOSITE OUTFLOW SUMMARY **** WS Elev, Total Q Elev. ft 377.00 377.10 377.20 377.30 377.40 377.50 377.60 377.70 377.80 377.90 378.00 378.10 378.20 378.30 378.40 378.50 378.60 378.70 378.80 378.90 379.00 379.10 379.20 379.30 379.40 379.50 379.60 379.70 379.80 379.90 380.00 380.10 380.20 380.30 380.40 380.50 380.60 380.70 Q cfs .00 .O1 .02 .03 .03 .04 .04 .04 .05 .05 .05 .15 .41 .81 1.32 1.96 2.30 2.61 2.88 3.12 3.35 3.56 3.76 3.95 4.14 4.31 5.67 8.02 10.99 14.48 18.42 22.74 27.44 32.32 36.88 41.15 45.17 46.66 Notes -------- Converge ----- --------------- TTnT Flov Frrnr ft +/-ft Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Contributing Structures (no Q: 02,RO,OO,CO) OO,CO (no Q: 02,R0) OO,CO (no Q: 02,R0) OO,CO (no Q: 02,R0) OO,CO (no Q: 02,R0) OO,CO (no Q: 02,R0) OO,CO (no Q: 02,R0) OO,CO (no Q: 02,R0) OO,CO (no Q: 02,R0) OO,CO (no Q: 02,R0) OO,CO (no Q: 02,R0) 02,OO,CO (no Q: RO) 02,OO,CO (no Q: RO) 02,OO,CO (no Q: RO) 02,OO,CO (no Q: RO) 02,OO,CO (no Q: RO) 02,OO,CO (no Q: RO) 02,OO,CO (no Q: RO) 02,OO,CO (no Q: RO) 02,OO,CO (no Q: RO) 02,OO,CO (no Q: RO) 02,OO,CO (no Q: RO) 02,OO,CO (no Q: RO) 02,OO,CO (no Q: RO) 02,OO,CO (no Q: RO) 02,OO,CO (no Q: RO) 02,RO,OO,CO 02,RO,OO,CO 02,RO,OO,CO 02,RO,OO,CO 02,RO,OO,CO 02,RO,OO,CO 02,RO,OO,CO 02,RO,OO,CO 02,RO,OO,CO 02,RO,OO,CO 02,RO,OO,CO RO,CO (no Q: 02,00) S/N: Bentley Systems, Inc. Bentley PondPack (10.00.027.00) 11:21 AM 3/23/2016 Type.... Composite Rating Curve Name.... BMP 1 Alt Page 6.05 File.... C:\Users\hfreeman\Desktop\Pondpack Temp\Chatham Parkway.ppw ***** COMPOSITE OUTFLOW SUMMARY **** WS Elev, Total Q Elev. Q ft cfs -------- ------- 380.80 47.17 380.90 47.68 381.00 48.17 Notes -------- Converge ----- --------------- TW Elev Error ft +/-ft Contributing Structures -------- ----- -------------------------- Free Outfall RO,CO (no Q: 02,00) Free Outfall 02,RO,OO,CO Free Outfall RO,CO (no Q: 02,00) S/N: Bentley Systems, Inc. Bentley PondPack (10.00.027.00) 11:21 AM 3/23/2016 Type.... Outlet Input Data Name.... BMP 2 Out Page 6.06 File.... C:\Users\hfreeman\Desktop\Pondpack Temp\Chatham Parkway.ppw REQUESTED POND WS ELEVATION5: Min. Elev.= 372.00 ft Increment = .10 ft Max. Elev.= 376.00 ft ***************�***************�************** OUTLET CONNECTIVITY ******�********�******�********�******�******* ---> Forward Flow Only (UpStream to DnStream) <--- Reverse Flow Only {DnStream to UpStream) <---> Forward and Reverse Both Allowed Structure No. Outfall E1, ft E2, ft Orifice-Circular O1 ---> CO 373.000 376.000 Stand Pipe RO ---> CO 374.500 376.000 Orifice-Circular 00 ---> CO 372.000 376.000 Culvert-Circular CO ---> TW 370.000 376.000 TW SETUP, DS Channel S/N: Bentley Systems, Inc. Bentley PondPack (10.00.027.00) 11:21 AM 3/23/2016 Type.... Outlet Input Data Name.... BMP 2 Out Page 6.07 File.... C:\Users\hfreeman\Desktop\Pondpack Temp\Chatham Parkway.ppw OUTLET STRUCTURE INPUT DATA Structure ID = O1 Structure Type = Orifice-Circular ------------------------------------ # of Openings = 1 Invert Elev. = 373.00 ft Diameter = .5000 ft Orifice Coeff. _ .600 Structure ID = RO Structure Type = Stand Pipe # of Openings = 1 Invert Elev. = 374.50 ft Diameter = 2.0000 ft Orifice Area = 3.1416 sq.ft Orifice Coeff. _ .600 Weir Length = 6.28 ft Weir Coeff. = 3.000 K, Reverse = 1.000 Mannings n = .0000 Kev,Charged Riser = .00Q Weir Submergence = No Structure ID = 00 Structure Type = Orifice-Circular ------------------------------------ # of Openings = 1 Invert Elev. = 372.OQ ft Diameter = .0833 ft Orifice Coeff. _ .600 S/N: Bentley Systems, Inc. Bentley PondPack (10.00.027.00) 11:21 AM 3/23/2016 Type.... Outlet Input Data Name.... BMP 2 Out Page 6.08 File.... C:\Users\hfreeman\Desktop\Pondpack Temp\Chatham Parkway.ppw OUTLET STRUCTURE INPUT DATA Structure ID = CO Structure Type = Culvert-Circular ------------------------------------ No. Barrels = 1 Barrel Diameter = 1.5000 ft Upstream Invert = 370.00 ft Dnstream Invert = 369.50 ft Horiz. Length = 44.00 ft Barrel Length = 44.00 ft Barrel Slope = .01136 ft/ft OUTLET CONTROL DATA... Mannings n = .0240 Ke = .5000 Kb = .062076 Kr = .5000 HW Convergence = .001 INLET CONTROL DATA... Equation form = Inlet Control K = Inlet Control M = Inlet Control c = Inlet Control Y = T1 ratio (HW/D) _ T2 ratio (HW/D) _ 51ope Factor = 1 .0078 2.0000 .03790 .690Q 1.130 1.291 -.500 (forward entrance loss) (per ft of full flow) (reverse entrance loss) +/- ft Use unsubmerged inlet control Form 1 equ. below T1 elev. Use submerged inlet control Form 1 equ. above T2 elev. In transition zone between unsubmerged and submerged inlet control, interpolate between flows at T1 & T2... At T1 Elev = 371.70 ft ---> Flow = 7.58 cfs At T2 Elev = 371.94 ft ---> Flow = 8.66 cfs Structure ID = TW 5tructure Type = TW SETUP, DS Channel ------------------------------------ FREE OUTFALL CONDITIONS SPECIFIED CONVERGENCE TOLERANCES... Maximum Iterations= 40 Min. TW tolerance = .O1 ft Max. TW tolerance = .O1 ft Min. HW tolerance = .O1 ft Max. HW tolerance = .O1 ft Min. Q tolerance = .00 cfs Max. Q tolerance = .00 cfs S/N: Bentley Systems, Inc. Bentley PondPack (10.00.027.00) 11:21 AM 3/23/2016 Type.... Composite Rating Curve Name.... BMP 2 Out Page 6.09 File.... C:\Users\hfreeman\Desktop\Pondpack Temp\Chatham Parkway.ppw ***** COMPOSITE OUTFLOW SUMMARY **** WS Elev, Total Q ---------------- Elev. ft 372.00 372.10 372.20 372.30 372.40 372.50 372.60 372.70 372.80 372.90 373.00 373.10 373.20 373.30 373.40 373.50 373.60 373.70 373.80 373.90 374.00 374.10 374.20 374.30 374.40 374.50 374.60 374.70 374.80 374.90 375.00 375.10 375.20 375.30 375.40 375.50 375.60 375.70 Q cfs .00 .O1 .O1 .Ol .02 .02 .02 .02 .02 .02 .03 .05 .12 .22 .34 .50 .59 .67 .74 .80 .85 .91 .96 1.01 1.05 1.10 1.73 2.87 4.32 6.03 7.96 10.08 12.10 13.97 14.49 14.68 14.84 15.00 Notes -------- Converge ------------------------- TTni Flov Frrnr ft +/-ft Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Contributing Structures (no Q: O1,RO,OO,CO) OO,CO (no Q: O1,R0) OO,CO (no Q: O1,R0) OO,CO (no Q: O1,R0) OO,CO (no Q: O1,R0) OO,CO (no Q: O1,R0) OO,CO (no Q: O1,R0) OO,CO (no Q: O1,R0) OO,CO (no Q: O1,R0) OO,CO (no Q: O1,R0) OO,CO (no Q: O1,R0) 01,OO,CO (no Q: RO) O1,00,C0 (no Q: RO) 01,OO,CO (no Q: RO) 01,OO,CO (no Q: RO) 01,OO,CO (no Q: RO) 01,OO,CO (no Q: RO) 01,OO,CO (no Q: RO) 01,OO,CO (no Q: RO) 01,OO,CO (no Q: RO) 01,OO,CO (no Q: RO) 01,OO,CO (no Q: RO) 01,OO,CO (no Q: RO) 01,OO,CO (no Q: RO) 01,OO,CO (no Q: RO) O1,00,C0 (no Q: RO) O1,RO,OO,CO O1,RO,OO,CO O1,RO,OO,CO O1,RO,OO,CO O1,RO,OO,CO O1,RO,OO,CO O1,RO,OO,CO O1,RO,OO,CO O1,RO,OO,CO RO,CO (no Q: 01,00) O1,RO,OO,CO RO,CO (no Q: 01,00) S/N: Bentley Systems, Inc. Bentley PondPack (10.00.027.00) 11:21 AM 3/23/2016 Type.... Composite Rating Curve Name.... BMP 2 Out Page 6.10 File.... C:\Users\hfreeman\Desktop\Pondpack Temp\Chatham Parkway.ppw ***** COMPOSITE OUTFLOW SUMMARY **** WS Elev, Total Q Elev. Q ft cfs -------- ------- 375.80 15.15 375.90 15.30 376.00 15.46 Notes -------- Converge ----- --------------- TW Elev Error ft +/-ft Contributing Structures -------- ----- -------------------------- Free Outfall RO,CO (no Q: 01,00) Free Outfall O1,RO,OO,CO Free Outfall RO,CO (no Q: 01,00) S/N: Bentley Systems, Inc. Bentley PondPack (10.00.027.00) 11:21 AM 3/23/2016 Type.... Outlet Input Data Name.... BMP 3 Alt Page 6.11 File.... C:\Users\hfreeman\Desktop\Pondpack Temp\Chatham Parkway.ppw REQUESTED POND WS ELEVATION5: Min. Elev.= 382.00 ft Increment = .10 ft Max. Elev.= 386.00 ft ***************�***************�************** OUTLET CONNECTIVITY ******�********�******�********�******�******* ---> Forward Flow Only (UpStream to DnStream) <--- Reverse Flow Only {DnStream to UpStream) <---> Forward and Reverse Both Allowed Structure No. Outfall E1, ft E2, ft Orifice-Circular O1 ---> CO 383.000 386.000 Stand Pipe RO ---> CO 384.500 386.000 Orifice-Circular 00 ---> CO 382.000 386.000 Culvert-Circular CO ---> TW 378.000 386.000 TW SETUP, DS Channel S/N: Bentley Systems, Inc. Bentley PondPack (10.00.027.00) 11:21 AM 3/23/2016 Type.... Outlet Input Data Name.... BMP 3 Alt Page 6.12 File.... C:\Users\hfreeman\Desktop\Pondpack Temp\Chatham Parkway.ppw OUTLET STRUCTURE INPUT DATA Structure ID = O1 Structure Type = Orifice-Circular ------------------------------------ # of Openings = 4 Invert Elev. = 383.00 ft Diameter = .5000 ft Orifice Coeff. _ .600 Structure ID = RO Structure Type = Stand Pipe # of Openings = 1 Invert Elev. = 384.50 ft Diameter = 4.0000 ft Orifice Area = 12.5664 sq.ft Orifice Coeff. _ .600 Weir Length = 12.57 ft Weir Coeff. = 3.000 K, Reverse = 1.000 Mannings n = .0000 Kev,Charged Riser = .00Q Weir Submergence = No Structure ID = 00 Structure Type = Orifice-Circular ------------------------------------ # of Openings = 1 Invert Elev. = 382.OQ ft Diameter = .0833 ft Orifice Coeff. _ .600 S/N: Bentley Systems, Inc. Bentley PondPack (10.00.027.00) 11:21 AM 3/23/2016 Type.... Outlet Input Data Name.... BMP 3 Alt Page 6.13 File.... C:\Users\hfreeman\Desktop\Pondpack Temp\Chatham Parkway.ppw OUTLET STRUCTURE INPUT DATA Structure ID = CO Structure Type = Culvert-Circular ------------------------------------ No. Barrels = 1 Barrel Diameter = 2.0000 ft Upstream Invert = 378.00 ft Dnstream Invert = 377.00 ft Horiz. Length = 48.00 ft Barrel Length = 48.01 ft Barrel Slope = .02083 ft/ft OUTLET CONTROL DATA... Mannings n = .0240 Ke = .5000 Kb = .042300 Kr = .5000 HW Convergence = .001 INLET CONTROL DATA... Equation form = Inlet Control K = Inlet Control M = Inlet Control c = Inlet Control Y = T1 ratio (HW/D) _ T2 ratio (HW/D) _ 51ope Factor = 1 .0078 2.0000 .03790 .690Q 1.125 1.286 -.500 (forward entrance loss) (per ft of full flow) (reverse entrance loss) +/- ft Use unsubmerged inlet control Form 1 equ. below T1 elev. Use submerged inlet control Form 1 equ. above T2 elev. In transition zone between unsubmerged and submerged inlet control, interpolate between flows at T1 & T2... At T1 Elev = 380.25 ft ---> Flow = 15.55 cfs At T2 Elev = 380.57 ft ---> Flow = 17.77 cfs Structure ID = TW 5tructure Type = TW SETUP, DS Channel ------------------------------------ FREE OUTFALL CONDITIONS SPECIFIED CONVERGENCE TOLERANCES... Maximum Iterations= 40 Min. TW tolerance = .O1 ft Max. TW tolerance = .O1 ft Min. HW tolerance = .O1 ft Max. HW tolerance = .O1 ft Min. Q tolerance = .00 cfs Max. Q tolerance = .00 cfs S/N: Bentley Systems, Inc. Bentley PondPack (10.00.027.00) 11:21 AM 3/23/2016 Type.... Composite Rating Curve Name.... BMP 3 Alt Page 6.14 File.... C:\Users\hfreeman\Desktop\Pondpack Temp\Chatham Parkway.ppw ***** COMPOSITE OUTFLOW SUMMARY **** WS Elev, Total Q Elev. ft 382.00 382.10 382.20 382.30 382.40 382.50 382.60 382.70 382.80 382.90 383.00 383.10 383.20 383.30 383.40 383.50 383.60 383.70 383.80 383.90 384.00 384.10 384.20 384.30 384.40 384.50 384.60 384.70 384.80 384.90 385.00 385.10 385.20 385.30 385.40 385.50 385.60 385.70 Q cfs .00 .O1 .O1 .O1 .O1 .02 .02 .02 .02 .02 .03 .12 .38 .78 1.28 1.92 2.27 2.57 2.84 3.08 3.31 3.52 3.72 3.91 4.09 4.27 5.62 7.97 10.95 14.44 18.37 22.71 27.40 30.87 33.64 34.27 34.53 34.79 Notes -------- Converge ----- --------------- TTnT Flov Frrnr ft +/-ft Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Contributing Structures (no Q: O1,RO,OO,CO) OO,CO (no Q: O1,R0) OO,CO (no Q: O1,R0) OO,CO (no Q: O1,R0) OO,CO (no Q: O1,R0) OO,CO (no Q: O1,R0) OO,CO (no Q: O1,R0) OO,CO (no Q: O1,R0) OO,CO (no Q: O1,R0) OO,CO (no Q: O1,R0) OO,CO (no Q: O1,R0) 01,OO,CO (no Q: RO) O1,00,C0 (no Q: RO) 01,OO,CO (no Q: RO) 01,OO,CO (no Q: RO) 01,OO,CO (no Q: RO) 01,OO,CO (no Q: RO) 01,OO,CO (no Q: RO) 01,OO,CO (no Q: RO) 01,OO,CO (no Q: RO) 01,OO,CO (no Q: RO) 01,OO,CO (no Q: RO) 01,OO,CO (no Q: RO) 01,OO,CO (no Q: RO) 01,OO,CO (no Q: RO) O1,00,C0 (no Q: RO) O1,RO,OO,CO O1,RO,OO,CO O1,RO,OO,CO O1,RO,OO,CO O1,RO,OO,CO O1,RO,OO,CO O1,RO,OO,CO O1,RO,OO,CO O1,RO,OO,CO RO,CO (no Q: 01,00) O1,RO,OO,CO RO,CO (no Q: 01,00) S/N: Bentley Systems, Inc. Bentley PondPack (10.00.027.00) 11:21 AM 3/23/2016 Type.... Composite Rating Curve Name.... BMP 3 Alt Page 6.15 File.... C:\Users\hfreeman\Desktop\Pondpack Temp\Chatham Parkway.ppw ***** COMPOSITE OUTFLOW SUMMARY **** WS Elev, Total Q Elev. Q ft cfs -------- ------- 385.80 35.05 385.90 35.30 386.00 35.56 Notes -------- Converge ----- --------------- TW Elev Error ft +/-ft Contributing Structures -------- ----- -------------------------- Free Outfall RO,CO (no Q: 01,00) Free Outfall O1,RO,OO,CO Free Outfall RO,CO (no Q: 01,00) S/N: Bentley Systems, Inc. Bentley PondPack (10.00.027.00) 11:21 AM 3/23/2016 Type.... Outlet Input Data Name.... BMP 4 Out Page 6.16 File.... C:\Users\hfreeman\Desktop\Pondpack Temp\Chatham Parkway.ppw REQUESTED POND WS ELEVATION5: Min. Elev.= 423.00 ft Increment = .10 ft Max. Elev.= 426.00 ft ***************�***************�************** OUTLET CONNECTIVITY ******�********�******�********�******�******* ---> Forward Flow Only (UpStream to DnStream) <--- Reverse Flow Only {DnStream to UpStream) <---> Forward and Reverse Both Allowed Structure No. Outfall E1, ft E2, ft Orifice-Circular O1 ---> CO 424.000 426.000 Stand Pipe RO ---> CO 425.000 426.000 Orifice-Circular 00 ---> CO 423.000 426.000 Culvert-Circular CO ---> TW 420.000 426.000 TW SETUP, DS Channel S/N: Bentley Systems, Inc. Bentley PondPack (10.00.027.00) 11:21 AM 3/23/2016 Type.... Outlet Input Data Name.... BMP 4 Out Page 6.17 File.... C:\Users\hfreeman\Desktop\Pondpack Temp\Chatham Parkway.ppw OUTLET STRUCTURE INPUT DATA Structure ID = O1 Structure Type = Orifice-Circular ------------------------------------ # of Openings = 4 Invert Elev. = 424.00 ft Diameter = .5000 ft Orifice Coeff. _ .600 Structure ID = RO Structure Type = Stand Pipe # of Openings = 1 Invert Elev. = 425.00 ft Diameter = 3.0000 ft Orifice Area = 7.0686 sq.ft Orifice Coeff. _ .600 Weir Length = 9.42 ft Weir Coeff. = 3.000 K, Reverse = 1.000 Mannings n = .0000 Kev,Charged Riser = .00Q Weir Submergence = No Structure ID = 00 Structure Type = Orifice-Circular ------------------------------------ # of Openings = 1 Invert Elev. = 423.OQ ft Diameter = .0833 ft Orifice Coeff. _ .600 S/N: Bentley Systems, Inc. Bentley PondPack (10.00.027.00) 11:21 AM 3/23/2016 Type.... Outlet Input Data Name.... BMP 4 Out Page 6.18 File.... C:\Users\hfreeman\Desktop\Pondpack Temp\Chatham Parkway.ppw OUTLET STRUCTURE INPUT DATA Structure ID = CO Structure Type = Culvert-Circular ------------------------------------ No. Barrels = 1 Barrel Diameter = 2.0000 ft Upstream Invert = 420.00 ft Dnstream Invert = 419.00 ft Horiz. Length = 39.00 ft Barrel Length = 39.01 ft Barrel Slope = .02564 ft/ft OUTLET CONTROL DATA... Mannings n = .0240 Ke = .5000 Kb = .042300 Kr = .5000 HW Convergence = .001 INLET CONTROL DATA... Equation form = Inlet Control K = Inlet Control M = Inlet Control c = Inlet Control Y = T1 ratio (HW/D) _ T2 ratio (HW/D) _ 51ope Factor = 1 .0078 2.0000 .03790 .690Q 1.123 1.284 -.500 (forward entrance loss) (per ft of full flow) (reverse entrance loss) +/- ft Use unsubmerged inlet control Form 1 equ. below T1 elev. Use submerged inlet control Form 1 equ. above T2 elev. In transition zone between unsubmerged and submerged inlet control, interpolate between flows at T1 & T2... At T1 Elev = 422.25 ft ---> Flow = 15.55 cfs At T2 Elev = 422.57 ft ---> Flow = 17.77 cfs Structure ID = TW 5tructure Type = TW SETUP, DS Channel ------------------------------------ FREE OUTFALL CONDITIONS SPECIFIED CONVERGENCE TOLERANCES... Maximum Iterations= 40 Min. TW tolerance = .O1 ft Max. TW tolerance = .O1 ft Min. HW tolerance = .O1 ft Max. HW tolerance = .O1 ft Min. Q tolerance = .00 cfs Max. Q tolerance = .00 cfs S/N: Bentley Systems, Inc. Bentley PondPack (10.00.027.00) 11:21 AM 3/23/2016 Type.... Composite Rating Curve Name.... BMP 4 Out Page 6.19 File.... C:\Users\hfreeman\Desktop\Pondpack Temp\Chatham Parkway.ppw ***** COMPOSITE OUTFLOW SUMMARY **** WS Elev, Total Q Elev. Q ft cfs -------- ------- 423.00 .00 423.10 .O1 423.20 .O1 423.30 .O1 423.40 .02 423.50 .02 423.60 .02 423.70 .02 423.80 .02 423.90 .02 424.00 .03 424.10 .12 424.20 .38 424.30 .78 424.40 1.29 424.50 1.92 424.60 2.27 424.70 2.57 424.80 2.84 424.90 3.08 425.00 3.31 425.10 4.42 425.20 6.25 425.30 8.55 425.40 11.25 425.50 14.27 425.60 17.58 425.70 21.15 425.80 24.97 425.90 28.08 426.00 30.64 Notes -------- Converge ----- --------------- ft +/-ft Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Contributing Structures (no Q: O1,RO,OO,CO) OO,CO (no Q: O1,R0) OO,CO (no Q: O1,R0) OO,CO (no Q: O1,R0) OO,CO (no Q: O1,R0) OO,CO (no Q: O1,R0) OO,CO (no Q: O1,R0) OO,CO (no Q: O1,R0) OO,CO (no Q: O1,R0) OO,CO (no Q: O1,R0) OO,CO (no Q: O1,R0) 01,OO,CO (no Q: RO) O1,00,C0 (no Q: RO) 01,OO,CO (no Q: RO) 01,OO,CO (no Q: RO) 01,OO,CO (no Q: RO) 01,OO,CO (no Q: RO) 01,OO,CO (no Q: RO) 01,OO,CO (no Q: RO) 01,OO,CO (no Q: RO) 01,OO,CO (no Q: RO) O1,RO,OO,CO O1,RO,OO,CO O1,RO,OO,CO O1,RO,OO,CO Ol,R0,00,C0 O1,RO,OO,CO O1,RO,OO,CO O1,RO,OO,CO O1,RO,OO,CO O1,RO,OO,CO S/N: Bentley Systems, Inc. Bentley PondPack (10.00.027.00) 11:21 AM 3/23/2016 Type.... Outlet Input Data Name.... BMP 5 Out Page 6.20 File.... C:\Users\hfreeman\Desktop\Pondpack Temp\Chatham Parkway.ppw REQUESTED POND WS ELEVATION5: Min. Elev.= 434.00 ft Increment = .10 ft Max. Elev.= 438.00 ft ***************�***************�************** OUTLET CONNECTIVITY ******�********�******�********�******�******* ---> Forward Flow Only (UpStream to DnStream) <--- Reverse Flow Only {DnStream to UpStream) <---> Forward and Reverse Both Allowed Structure No. Outfall E1, ft E2, ft Orifice-Circular O1 ---> CO 435.000 438.000 Stand Pipe RO ---> CO 436.250 438.000 Orifice-Circular 00 ---> CO 434.000 438.000 Culvert-Circular CO ---> TW 430.000 438.000 TW SETUP, DS Channel S/N: Bentley Systems, Inc. Bentley PondPack (10.00.027.00) 11:21 AM 3/23/2016 Type.... Outlet Input Data Name.... BMP 5 Out Page 6.21 File.... C:\Users\hfreeman\Desktop\Pondpack Temp\Chatham Parkway.ppw OUTLET STRUCTURE INPUT DATA Structure ID = O1 Structure Type = Orifice-Circular ------------------------------------ # of Openings = 4 Invert Elev. = 435.00 ft Diameter = .5000 ft Orifice Coeff. _ .600 Structure ID = RO Structure Type = Stand Pipe # of Openings = 1 Invert Elev. = 436.25 ft Diameter = 3.0000 ft Orifice Area = 7.0686 sq.ft Orifice Coeff. _ .600 Weir Length = 9.42 ft Weir Coeff. = 3.000 K, Reverse = 1.000 Mannings n = .0000 Kev,Charged Riser = .00Q Weir Submergence = No Structure ID = 00 Structure Type = Orifice-Circular ------------------------------------ # of Openings = 1 Invert Elev. = 434.OQ ft Diameter = .0833 ft Orifice Coeff. _ .600 S/N: Bentley Systems, Inc. Bentley PondPack (10.00.027.00) 11:21 AM 3/23/2016 Type.... Outlet Input Data Name.... BMP 5 Out Page 6.22 File.... C:\Users\hfreeman\Desktop\Pondpack Temp\Chatham Parkway.ppw OUTLET STRUCTURE INPUT DATA Structure ID = CO Structure Type = Culvert-Circular ------------------------------------ No. Barrels = 1 Barrel Diameter = 2.0000 ft Upstream Invert = 430.00 ft Dnstream Invert = 429.00 ft Horiz. Length = 53.00 ft Barrel Length = 53.01 ft Barrel Slope = .01887 ft/ft OUTLET CONTROL DATA... Mannings n = .0240 Ke = .5000 Kb = .042300 Kr = .5000 HW Convergence = .001 INLET CONTROL DATA... Equation form = Inlet Control K = Inlet Control M = Inlet Control c = Inlet Control Y = T1 ratio (HW/D) _ T2 ratio (HW/D) _ 51ope Factor = 1 .0078 2.0000 .03790 .690Q 1.126 1.287 -.500 (forward entrance loss) (per ft of full flow) (reverse entrance loss) +/- ft Use unsubmerged inlet control Form 1 equ. below T1 elev. Use submerged inlet control Form 1 equ. above T2 elev. In transition zone between unsubmerged and submerged inlet control, interpolate between flows at T1 & T2... At T1 Elev = 432.25 ft ---> Flow = 15.55 cfs At T2 Elev = 432.57 ft ---> Flow = 17.77 cfs Structure ID = TW 5tructure Type = TW SETUP, DS Channel ------------------------------------ FREE OUTFALL CONDITIONS SPECIFIED CONVERGENCE TOLERANCES... Maximum Iterations= 40 Min. TW tolerance = .O1 ft Max. TW tolerance = .O1 ft Min. HW tolerance = .O1 ft Max. HW tolerance = .O1 ft Min. Q tolerance = .00 cfs Max. Q tolerance = .00 cfs S/N: Bentley Systems, Inc. Bentley PondPack (10.00.027.00) 11:21 AM 3/23/2016 Type.... Composite Rating Curve Name.... BMP 5 Out Page 6.23 File.... C:\Users\hfreeman\Desktop\Pondpack Temp\Chatham Parkway.ppw ***** COMPOSITE OUTFLOW SUMMARY **** WS Elev, Total Q Elev. ft 434.00 434.10 434.20 434.30 434.40 434.50 434.60 434.70 434.80 434.90 435.00 435.10 435.20 435.30 435.40 435.50 435.60 435.70 435.80 435.90 436.00 436.10 436.20 436.25 436.30 436.40 436.50 436.60 436.70 436.80 436.90 437.00 437.10 437.20 437.30 437.40 437.50 437.60 Q cfs .00 .O1 .O1 .O1 .02 .02 .02 .02 .02 .02 .03 .12 .38 .78 1.29 1.92 2.27 2.57 2.84 3.08 3.31 3.52 3.72 3.82 4.23 5.74 7.81 10.30 13.13 16.28 19.72 23.40 27.26 29.94 32.21 33.05 33.31 33.56 Notes -------- Converge ----- --------------- TTnT Flov Frrnr ft +/-ft Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Contributing Structures (no Q: O1,RO,OO,CO) OO,CO (no Q: O1,R0) OO,CO (no Q: O1,R0) OO,CO (no Q: O1,R0) OO,CO (no Q: O1,R0) OO,CO (no Q: O1,R0) OO,CO (no Q: O1,R0) OO,CO (no Q: O1,R0) OO,CO (no Q: O1,R0) OO,CO (no Q: O1,R0) OO,CO (no Q: O1,R0) 01,OO,CO (no Q: RO) O1,00,C0 (no Q: RO) 01,OO,CO (no Q: RO) 01,OO,CO (no Q: RO) 01,OO,CO (no Q: RO) 01,OO,CO (no Q: RO) 01,OO,CO (no Q: RO) 01,OO,CO (no Q: RO) 01,OO,CO (no Q: RO) 01,OO,CO (no Q: RO) 01,OO,CO (no Q: RO) 01,OO,CO (no Q: RO) 01,OO,CO (no Q: RO) O1,RO,OO,CO Ol,R0,00,C0 O1,RO,OO,CO O1,RO,OO,CO O1,RO,OO,CO O1,RO,OO,CO O1,RO,OO,CO O1,RO,OO,CO O1,RO,OO,CO O1,RO,OO,CO O1,RO,OO,CO O1,RO,OO,CO RO,CO (no Q: 01,00) O1,RO,OO,CO S/N: Bentley Systems, Inc. Bentley PondPack (10.00.027.00) 11:21 AM 3/23/2016 Type.... Composite Rating Curve Name.... BMP 5 Out Page 6.24 File.... C:\Users\hfreeman\Desktop\Pondpack Temp\Chatham Parkway.ppw ***** COMPOSITE OUTFLOW SUMMARY **** WS Elev, Total Q Elev. Q ft cfs -------- ------- 437.70 33.81 437.80 34.05 437.90 34.29 438.00 34.54 Notes -------- Converge ----- --------------- TW Elev Error ft +/-ft Contributing Structures -------- ----- -------------------------- Free Outfall RO,CO (no Q: 01,00) Free Outfall RO,CO (no Q: 01,00) Free Outfall O1,RO,OO,CO Free Outfall RO,CO (no Q: 01,00) S/N: Bentley Systems, Inc. Bentley PondPack (10.00.027.00) 11:21 AM 3/23/2016 Type.... Outlet Input Data Name.... BMP 7 Out Page 6.25 File.... C:\Users\hfreeman\Desktop\Pondpack Temp\Chatham Parkway.ppw REQUESTED POND WS ELEVATION5: Min. Elev.= 446.00 ft Increment = .10 ft Max. Elev.= 449.00 ft ***************�***************�************** OUTLET CONNECTIVITY ******�********�******�********�******�******* ---> Forward Flow Only (UpStream to DnStream) <--- Reverse Flow Only {DnStream to UpStream) <---> Forward and Reverse Both Allowed Structure No. Outfall E1, ft E2, ft Orifice-Circular O1 ---> CO 447.000 449.000 Stand Pipe RO ---> CO 448.000 449.000 Orifice-Circular 00 ---> CO 446.000 449.000 Culvert-Circular CO ---> TW 444.000 449.000 TW SETUP, DS Channel S/N: Bentley Systems, Inc. Bentley PondPack (10.00.027.00) 11:21 AM 3/23/2016 Type.... Outlet Input Data Name.... BMP 7 Out Page 6.26 File.... C:\Users\hfreeman\Desktop\Pondpack Temp\Chatham Parkway.ppw OUTLET STRUCTURE INPUT DATA Structure ID = O1 Structure Type = Orifice-Circular ------------------------------------ # of Openings = 2 Invert Elev. = 447.00 ft Diameter = .5000 ft Orifice Coeff. _ .600 Structure ID = RO Structure Type = Stand Pipe # of Openings = 1 Invert Elev. = 448.00 ft Diameter = 2.0000 ft Orifice Area = 3.1416 sq.ft Orifice Coeff. _ .600 Weir Length = 6.28 ft Weir Coeff. = 3.000 K, Reverse = 1.000 Mannings n = .0000 Kev,Charged Riser = .00Q Weir Submergence = No Structure ID = 00 Structure Type = Orifice-Circular ------------------------------------ # of Openings = 1 Invert Elev. = 446.OQ ft Diameter = .0833 ft Orifice Coeff. _ .600 S/N: Bentley Systems, Inc. Bentley PondPack (10.00.027.00) 11:21 AM 3/23/2016 Type.... Outlet Input Data Name.... BMP 7 Out Page 6.27 File.... C:\Users\hfreeman\Desktop\Pondpack Temp\Chatham Parkway.ppw OUTLET STRUCTURE INPUT DATA Structure ID = CO Structure Type = Culvert-Circular ------------------------------------ No. Barrels = 1 Barrel Diameter = 1.5000 ft Upstream Invert = 444.00 ft Dnstream Invert = 443.00 ft Horiz. Length = 35.00 ft Barrel Length = 35.01 ft Barrel Slope = .02857 ft/ft OUTLET CONTROL DATA... Mannings n = .0240 Ke = .5000 Kb = .062076 Kr = .5000 HW Convergence = .001 INLET CONTROL DATA... Equation form = Inlet Control K = Inlet Control M = Inlet Control c = Inlet Control Y = T1 ratio (HW/D) _ T2 ratio (HW/D) _ 51ope Factor = 1 .0078 2.0000 .03790 .690Q 1.121 1.282 -.500 (forward entrance loss) (per ft of full flow) (reverse entrance loss) +/- ft Use unsubmerged inlet control Form 1 equ. below T1 elev. Use submerged inlet control Form 1 equ. above T2 elev. In transition zone between unsubmerged and submerged inlet control, interpolate between flows at T1 & T2... At T1 Elev = 445.68 ft ---> Flow = 7.58 cfs At T2 Elev = 445.92 ft ---> Flow = 8.66 cfs Structure ID = TW 5tructure Type = TW SETUP, DS Channel ------------------------------------ FREE OUTFALL CONDITIONS SPECIFIED CONVERGENCE TOLERANCES... Maximum Iterations= 40 Min. TW tolerance = .O1 ft Max. TW tolerance = .O1 ft Min. HW tolerance = .O1 ft Max. HW tolerance = .O1 ft Min. Q tolerance = .00 cfs Max. Q tolerance = .00 cfs S/N: Bentley Systems, Inc. Bentley PondPack (10.00.027.00) 11:21 AM 3/23/2016 Type.... Composite Rating Curve Name.... BMP 7 Out Page 6.28 File.... C:\Users\hfreeman\Desktop\Pondpack Temp\Chatham Parkway.ppw ***** COMPOSITE OUTFLOW SUMMARY **** WS Elev, Total Q Elev. ft 446.00 446.10 446.20 446.30 446.40 446.50 446.60 446.70 446.80 446.90 447.00 447.10 447.20 447.30 447.40 447.50 447.60 447.70 447.80 447.90 448.00 448.10 448.20 448.30 448.40 448.50 448.60 448.70 448.80 448.90 449.00 Q cfs .00 .O1 .O1 .O1 .02 .02 .02 .02 .02 .02 .03 .07 .21 .41 .66 .98 1.15 1.30 1.44 1.56 1.67 2.37 3.57 5.07 6.83 8.82 10.99 13.09 14.69 15.21 15.62 Notes -------- Converge ----- --------------- TTnT Flov Frrnr ft +/-ft Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Contributing Structures (no Q: O1,RO,OO,CO) OO,CO (no Q: O1,R0) OO,CO (no Q: O1,R0) OO,CO (no Q: O1,R0) OO,CO (no Q: O1,R0) OO,CO (no Q: O1,R0) OO,CO (no Q: O1,R0) OO,CO (no Q: O1,R0) OO,CO (no Q: O1,R0) OO,CO (no Q: O1,R0) OO,CO (no Q: O1,R0) 01,OO,CO (no Q: RO) O1,00,C0 (no Q: RO) 01,OO,CO (no Q: RO) 01,OO,CO (no Q: RO) 01,OO,CO (no Q: RO) 01,OO,CO (no Q: RO) 01,OO,CO (no Q: RO) 01,OO,CO (no Q: RO) 01,OO,CO (no Q: RO) 01,OO,CO (no Q: RO) O1,RO,OO,CO O1,RO,OO,CO O1,RO,OO,CO O1,RO,OO,CO Ol,R0,00,C0 O1,RO,OO,CO O1,RO,OO,CO O1,RO,OO,CO O1,RO,OO,CO O1,RO,OO,CO S/N: Bentley Systems, Inc. Bentley PondPack (10.00.027.00) 11:21 AM 3/23/2016 Appendix A Index of Starting Page Numbers fQr ID Names ----- B ----- BMP 1... 5.01 BMF 1 Alt... 6.01, 6.04 BMP 2... 5.02 BMP 2 Out... 6.06, 6.�9 BMP 3... 5.03 BMP 3 Alt... 6.11, 6.14 BMP 4... 5.04 BMP 4 Out... 6.16, 6.19 BMP 5... 5.05 BMP 5 Out... 6.20, 6.23 BMP 7... 5.06 BMP 7 Out... 6.25, 6.28 ----- P ----- Pittsboro 24hr 5... 2.01 POST TO BMP 1... 3.01, 4.01 POST TO BMP 2... 3.03, 4.02 POST TO BMP 3... 3.05, 4.03 POST TO BMP 4... 3.Q7, 4.04 POST TO BMP 5... 3.09, 4.05 POST TO BMP 7... 3.11, 4.06 PRE TO AP 1... 3.13, 4.07 PRE TO AP 2... 3.15, 4.08 PRE TO AP 3... 3.17, 4.09 ----- W ----- Watershed... 1.01 A-1 S/N: Bentley Systems, Inc. Bentley PondPack (10.00.027.00) 11:21 AM 3/23/2016 CHATHAM PARK WAY STORMWATER MANAGEMENT REPORT PITTSBORO, NORTH CAROLINA NITROGEN LOADING CALCULATIONS Chatham Park Way WR Project ozizoq69.7o Stormwater Management Report Revised September 2oi6 lordan Lake Developer Nutrient Reporting Form (Note: A separate form is available for Neuse, Tar-Pamlico, and Falls Lake reporting.) Please complete and submit the following information to the local government permitting your development project to characterize it and assess the need to purchase nutrient offsets. Contact and rule implementation information can be found online at http://portal.ncdenr.or�/web/wq/ps/nps/nutrientoffsetintro. PROJECT INFORMATION (for.lordan Applicant Name: Pittsboro Infrastructure LLC Project Name: Chatham Park Way ProjeCt Address (if available): Street: Chatham Park Way Date: (mo/d/yr) 3/23/16 Is this Redevelopment? ❑ - Yes �-No Impervious Cover (%): 0% (Pre-Construction) Impervious Cover (%): 38.25% (Post-Construction) City/Town: Pittsboro Project Lat: (decimal degrees) Location : : 35.7277 Gounty: Chatham Long: (decimal degrees) -79.1523 Development Type (Please check all that apply) � Commercial ❑ ; Industrial ❑ Institutional � : Transportation Mixed-Use Duplex Residential Single Fam. Residential Multi-Fam. Residential JORDAN WATERSHED INFORMATION Small Watershed ID (6 digits): (See next page or online map.) : New Development Load Requirements (See individual rules 060020 for a full description of nutrient requirements.) Jordan Subwatershed (Please check one) Loading Rate Targets Offsite Thresholds Nitrogen (N) & Phosphorus (P) � Haw River 3.8 N Ib/ac/yr 1.43 P Ib/ac/yr 6 N Ibs/ac Residential; ❑ Upper New Hope 2.2 N Ib/ac/yr 10 N Ibs/ac Commercial 0.82 P Ib/ac/yr (must meet all onsite treatment 4.4 N Ib/ac/yr requirements) ❑ Lower New Hope 0.78 P Ib/ac/yr NUTRIENT OFFSET REQUEST(Must meet the offsite thresholds — see above) Nitrogen Loading / Offset Needs (A) (B) I Untreated Treated Loading Rate Loading Rate € Loading Rate € Target (Ibs/ac/yr) s (Ibs/ac/yr) s (Ibs/ac/yr) 6.21 4.15 3.80 Phosphorus Loading / Offset Needs �A) �B) �C) Untreated Treated = Loading Rate € Load Rate Load Rate = Target (Ibs/ac/yr) s (Ibs/ac/yr) _ (Ibs/ac/yr) 2.13 0.79 1.43 Authorizing Local Government Name: Staff Name: � Fred Royal Staff Email: ; froyal@pittsboronc.gov (D) I (F) _ (G) (H) _ (I) (Where Applicable) Reduction Need : Project : Offset = Delivery s State Buy Down = Local Gov't Buy Down (Ibs/ac/yr) Size (ac) s Duration (yrs) = Factor (%) s Amount (Ibs) = Amount (Ibs) B—C = D*E*F*G = 0.35 15.40 30 = 95 161.70 = (D) (E) Reduction Need € Project € (Ibs/ac/yr) Size (ac) ; B-C 0.00 : 15.40 : : Town of Pittsboro (F) (G) (H) � (I) (Where Applicable) Offset = Delivery s State Buy Down = Local Gov't Buy Down Duration (yrs) = Factor (%) ; Amount (Ibs) = Amount (Ibs) = D*E'F*G = 30 97 0.00 ` Phone: ` 919-542-2063 Jordan Nutrient Load Reporting Form. September 12, 2012 I � Jord�n L�k� N� utr�ent Strate��T I � Nonpoint 5c�urce Delivery Factors j '�`�- � � . �_�-� I sr��ces + Roc�c�ncGH�. � caswe�� ! Map Extent i %'law River , �3�n, -- � U14U1Q �n�ao�o� Up�er IVew H+ape � �utawatershed i ,- � --- — -_-��� f SubwatersFred Legencf � ,� ' ` — — `� �— — — ��-�""{ ,� , ` , _ 41D�140 � 43Q030 � � Jardan Lake Watershed � . -� i�,i� U10024 - 61D0500 � y — — — — �- � I Couu�ty Bound�ry � �>_ nrr:;,,;�;�, � U3U42G 1 � Jordan 5ubwatershed gaundary � 034949 � ,;,,� 02U030 ��a�7a � � River Basin Boundary FC�RSYTH - fl20U20 � ., . � 430060 � � ��a�l W�tershed �oundary 02{l014 03D074 02UOs0 � p3U010 � Major Rfvers ken�:-�.��i_ � I ;�:,.;- ._ I Municipalities � Q2DQ40 � �-� 03005fl � ��^���ar� " ,� _ Interstates .� :;sn� GU1k�F�apfl U46450 t� ,t�:.;, �� ,- � i. � �� s�ta { D4QU60 UA0116 L!S Highav�ys ;/ ... � 640�20 " `-' d3DD80 �r ,��rr, � pR�4NGE 1ti'Illl2s �e .._.,�g: I 0 6 1_' + ' D20050 4d{1SI36 '->r=p=�-' 1e {M5001Q � U4G046 a Q401d0 _,u, . +� j f Ir,i,� ° '.^ 94001fl I , � O�QQ�� 06d110 ��' , ��.,. aaoo7n I ! + Q5012I7 DURHA'M U4dD90. �:�rr r::; 3�rden � 060100 ' T 04fla80 U50U2U 05U646 _,..: r r� I ;`'`� �=' i ~ ~ ~ � T, ,�' ' � ALAMANCE DSDOfi{I U6�iD70 ' � 1 � Q6U08D 080130 -._. _� ir� � \`� RAN��LPf-8 � + 05Q056 — � _ � _ Sma9i Small Small + fl500$p sr 0 014a F;_d;,;:ii, Watershed ID TM TP Watersiied 14 TN TP LNatershed ID TN TP Small '�� f O1f3010 2596 1�'Y 030040 4Z% 30% 63U11.D 56��. �� Q3qp7�, � OSOOZO 37Y 3G% 413005� GA:� 62% OSftCi10 7qa� �,gf �aEershedlb TN 7P �$0,��� �` 1 I:WT�svill= OfiL�D50 9�`Yu 95 0 46409U' f Q1IX130 44a- 4U% 0300E+0 39� 19:� OSOt720 81°k 7�?G - � �� . � 01C1040 d9'� 41ry. 030070 3G°�, 18�m O�f3030 42 0 17ry ��� ��% 9�'`�' � .. f O6D150 Olf]f150 55� 48� � 0317080 73yo 6450 059040 8m3: 733a ��61 g$�� ��' d5009Q � �- 660fl 14 �� � i .-. , o��o aa� ��o asoazo � t,,� � OZ0010 15iSo 4Yc� D4Q010 30-�U 14:F, OSf10i0 71% 67% i 020020 22`Y.�. 12v� Q7C�020 28 /0 14% �59�66 797'� 73� '��� 5'}Yo 45 Y LJ"k� � 46E1U 6f3� �60040 � s��r�- /'� !`^-� o6csp90 s2'Y 4ar -a� CHATHAM ��"` � �� G J an�� 02i1030 481. 43Y�. G40030 71'� G3:w 059U70 78^��� 7Z'3; Ciry FBi€I»ru l �`� 05DxD0 69'Yo 63 Yo ��'� ��r � 1 WA 020040 3�2! 33%. 64(767D 32�, 1��k �SIX730 8U`!e. 73� l d6aU3d p60082�T'�� � 060i6Q) 02f1050 32Y 32hr. fW0050 �n, 0� OSt7Ll40 793. 73ry 06C7i1f� 61`Yo 58:a y�' �,R������ � 020i]60 A7Y a29c 04D0G0 4� '�lY 0�41Q0 81`Y, 7�3� a51J12s G4'F`o 63% .. '.- � �. � . 02�70 5�3'y 47ry MOQ70 67Yo 60% QG9910 81Y. 74.�'a '�7130 Ci9`l6 63"Y 060�150� . � Lovuer �lew Ho�e ., JW :F, , 03IX710 5UY ��Y 440G80 53:X 51'X, �G9CiZ0 95�F 97�.�, ��`� g$`�+ �� Sauree: �vi.Herrmann �'�'j��� � � 5ubwatershed 034020 4�ik 31'Y 4!40090 4`� 51% OE9030 88'ti� 91?� Ob'J1.5U E3$`SU 41 o August 3, 2f}�11 ��•��.w,V`,- � J.^ �-- - o3aei3o �sry, a°Y ealoiaa � ;� ���;, e+�a�iao ��� �s� [u�bz� �53ti � � L�� � ! Jordan Nutrient Load Reporting Form. September 12, 2012 Watershed Characteristics Ver2.0 Clear All Values 1 Return to Instructions I � Proceed to BMP Charecteristics J Skip to Development Summary �I � Instructions 1. Select your physiographic/geologic region. (see map on'instructions' page) 2. Enter the area of the entire development in square feet (f['�. 3. Select the location that is most representative of the site's precipitation characteristics. (see map on'instructions' page) 4. For each applicable land use, enter the total area of that land use that lies within the development under pre-development mnditions. 5. For each applicable land use, enter the total area of that land use that lies within the development under posUdevelopment mnditions, before BMP implementation. 6. Ensure thai the sum of pre- and post-development areas entered equal the orginal development area. 7. Continue to "BMP Characteristid' tab. Additionol Guidelines - For nomresidential watersheds, indicate acreages of each land use type in Column 1 for both pre- and post-development conditions. - For residential watersheds, complete the required information in Column 2 for both pre- and post-development conditions. - If a given land use is not present in the given watershed, leave the cell blank or enter a zero. - Ensure that land use areas entered for both pre- and poshdevelopment conditions match the total development area entered in cell 021. - Residential areas may 6e entered by average lot size (mlumn, part A�, or may be separated into individual land uses (mlumn 2, pari B) -- do NOT list out individual land uses within an area already described by lot size. - Unless runoff flowing onm the development from offsite is routed separately around or through the site, the offsite catchment area draining in musi be induded in the acreage values of the appropria[e land use(s) and [reated. Physiographic/Geologic Region: Triassic Basin Total Development Area (ft ): 670,762 Soil Hydrologic Group B Development Name: Chatham Park Way Precipitation location: Raleigh Model Prepared By: HCF COMMERCIAL Parking lot Roof Open/Landscaped INDUSTRIAL Parking lot Root Open/Landscaped TRANSPORTATION High Density (interstate, main) Low Density (secondary, feeder) Rural Sidewalk PERVIOUS Managed pervious Unmanaged (pasture) Forest JURISDICTIONAL LANDS* Natural wetland Riparian buffer Open water LAND TAKEN UP BY BMPs I�6L�G1 Pre- Post- TN EMC TP EMC Development Development (mg/L� (mg/L) (ft') (ft') 1.44 1.08 2.24 1.44 1.08 2.24 3.67 1.4 1.14 1.4 3.06 3.61 1.47 0.16 0.15 0.44 0.39 0.15 0.44 0.43 0.52 0.47 1.16 0.59 1.56 0.25 1.08 0.15 calculations. � T 23,130 256,598 414,164 647,632 Custam Lot Size (ac) PART A %-ac lots %-ac lots %-ac lots 1-ac lots 2-ac lots Multi-tamily Townhomes Custom Lot Size PART 6 Roadway Driveway Parking lot Roof Sidewalk/Patio Lawn Managed pervious Forest Natural wetland` Riparian buffer* Open water* LAND TAKEN UP BY BMPs Pre- Post- Age TN EMC TP EMC Development Development (yrs) (mg/L) (mg/L� (ft�) (ft') 1.4 1.44 1.44 1.08 1.4 2.24 3.06 1.47 1.08 LAND USE AREA CHECK Tatal Development Area Entered (ft'): Tatal Pre-Development Calculated Area (ft��: Total Post-Development Calculated Area (ft��: 0.52 0.39 0.39 0.15 1.16 0.44 0.59 0.25 0.15 670,762 670,762 670,762 BMP Characteristics Ver2.0 Clear All Values Instructions 1. Select the type of BMP for each catchment. 2. Enter the area of each land use type in the contributing drainage area for each BMP 3. Continue to "Development Summary" tab. Return to Instructions I Return to Watershed Charecteristics Proceed to Dev Summa Additional Guidelines - This spreadsheet allows the development to be divided into as many as 6 smaller catchments. - BMPs 1, 2, and 3 for a given catchment are assumed to operate in series, with the outflow from 1 serving as the inflow to 2, etc. - If the outflow from an entire catchment (including outflow from selected BMPs) drains to another BMP, indicate this in the drop down menu below the BMP type and leave all cells for individual land uses blank. - Not all BMP or catchments must be utilized. Simply leave fields blank in the columns not needed. - Leave cells blank or insert zeroes if a land use is not present in the area draining to the BMP. - For water harvesting BMPs, be sure to enter the percent volume reduction that will be achieved by your system. Volume detention (catch-and-release mechanisms) will not be considered - only proven volume red� - The BMP undersizing option should only be used for existing development or retrofit sites. - Volume reduction efficiencies for undersized BMPs are calculated based on a 1:1 ratio (a BMP that is 60% smaller than the required design size is assigned a removal efficiency equal to 60% of the standard efficienc value). Effluent concentrations remain the same as full-sized BMPs. - IMPORTANT: for the land area calculation checks to occur, you MUST press enter after entering a value for area to be treated by a BMP (not just click on the next cell). - See User's Manual for instructions on modeling oversized BMPs. Type of BMP If BMP is undersized, indicate the BMP's size relative to the design size required to capture the designated water quality depth (i.e. 0.75 = BMP is 75% of required design size): *For water harvesting BMP, enter percent volume reduction in decimal form. Catchment 1: Catchment 2: Catchment 3: Catchment 4: Catchment 5: Catchment 6: Drainage Area Land Use COMMERCIAL Parking lot Roof Open/Landscaped INDUSTRIAL Parking lot Roof Open/Landscaped TRANSPORTATION High Density (interstate, main) Low Density (secondary, feeder) Rural Sidewalk MISC. PERVIOUS Managed pervious Unmanaged (pasture) Forest RESIDENTIAL 2-ac lots (New) 2-ac lots (Built after 1995) 2-ac lots (Built before 1995) 1-ac lots (New) 1-ac lots (Built after 1995) 1-ac lots (Built before 1995) %-ac lots (New) '/:-ac lots (Built after 1995) %-ac lots (Built before 1995) %-aclots(New) %-ac lots (Built after 1995) %-ac lots (Built before 1995) %-aclots�New) %-ac lots (Built after 1995) %-ac lots (Built before 1995) Townhomes (New) Townhomes (Built after 1995) Townhomes (Built before 1995) Multi-family (New) Multi-family (Built after 1995) Multi-family (Built before 1995) Custom Lot Size (New) Custom Lot Size (Built after 1995) Custom Lot Size (Built before 1995) Roadway Driveway Parking lot Roof Sidewalk Lawn Managed pervious Forest LAND TAKEN UP BY BMP TOTAL AREA TREATED BY BMP (ftZ): TOTAL AREA TREATED BV SERIES (ftZ): •--------------------- CATCHMENT 1 ---------------------• BMP #1 BMP #2 BMP #3 Sand Filter Wetland no no no no no no no no no no no no no no no Area treated Area treated Area Treated by BMP #3 that is not by BMP by BMP #2 that is not treated by BMPs #1 treated by BMP #1 ar #2 (ftZ) (ftZ) (ftZ) I 78,934 130,856 147,592 216,735 226,526 347,591 0 574,117 �------------------- CATCHMENT 2 ---------------------- BMP #1 BMP #2 BMP tf3 no no no no no Does BMP accept the outflow fr no no no no no no no no no no Area treated Area treated Area Treated by BMP #3 that is not by BMP by BMP #2 that is not treated by BMPs #1 2 treated by BMP #1 (ft � Z or #2 (ft � (ftZ) 0 BMP #1 �m another Catchmen no no no no no � Area Treated by BMP (ft2) 3. Development Summary Development: Chatham Park Way Prepared By: HCF Date: September 27, 2016 WATERSHED SUMMARY Ver2.0 BMP VOLUME REDUCTIONS/EFFLUENT CONCENTRATIONS REGION: Triassic Basin TOTAL DEVELOPMENT AREA (ft�): 670,762 � - Volume Reduction TN Effluent Concen. TP Effluent Concen. Pre-Development Conditions Post-Development Conditions Post-Development w/ BMPs (�) (mg/L) (mg/L) Percent Impervious � 3.4% 383% 383% Bioretention with 35% 0.95 012 (%) IWS Annual Runoff Volume 205,689 1,000,822 864,105 Bioretention 15% 1.00 0.12 (c.f.) - without IWS Total Nitrogen EMC (mg��) 1.44 1.53 1.19 Dry Detention Pond 0% 1.20 0.20 Total Nitrogen Loading L20 6.21 4.15 Gressed Swale 0% 111 0.26 (Ib/ac/yr) Total Phosphorus EMC � (mg��) 036 0.60 0.23 Green Roof 50% 1.08 0.15 Total Phosphorus Loading i Level Spdr, Pilter (Ib/ac/yr) 0.30 2.13 0.79 Strip 20% 1.20 0.15 i Permeable 0% 1.44 039 Percent Difference Between: Pavement* Pre-Dev. & Pre-Development & Post-Dev without BMPs & Post-Dev. without BMPs Post-Development with BMPs Post-Dev with BMPs Sand Filter 5% 0.92 0.14 Percentlmpervious(%) 35% 35% 0% Annual Runoff Volume (c.f.) 387% 320% _14� Water Harvesting user defined 1.08 0.15 Total Nitrogen EMC (mg/L) 6% -18% -23% Wet Detention Pond 5% 1.01 0.11 Total Nitrogen Loading (Ib/ac/yr� 416% 245% -33% Total Phosphorus EMC (mg/L) 67% -37% -w- -62% Total Phosphorus Loading (Ib/ac/yr) 612% 164% -63% Wetland 15% 1.08 0.12 *Negative percent difference values indicate a decrease in runoff volume, pollutant concentration or pollutant loading. Positive values indicate an inuease. *if tfeating CommefCial pafking lot, TP efflUent ConCent�ation = 0.16 mg/L � Return to Instructions � LReturn to Watershed Characteristics � Return to BMP Characteristics ] ` Print Summary � BMP SUMMARY Ver2.0 Total Area Treated (ac) Total Inflow Volume (t.f.) Percent Volume Reduced (%) Inflow Nitrogen EMC � ImB/�) Total Inflow Nitrogen (Ib/ac/yr) Inflow Phosphorus EMC (mg/L) Totallnflow Phosphorus (Ib/ac/yr) � BMP Outflow Nitrogen (Ibs/ac/yr) BMP Outflow Phosphorus (Ibs/ac/yr) Catchment Outflow Nitrogen EMC (mg/L) Catchment Outflow Total Nitrogen (Ib/ac/yr) Percent Reduction in Nitrogen Load (%) Catchment Outflow Phosphorus EMC (mg/L) Catchment Outflow Total Phosphorus (Ib/ac/yr) Percent Reduction in Phosphorus Load (%) BMP1 Sand Filter 5.20 311,690 5% � 1.55 5.80 0.526 1.97 �� � 3.50 0.64 � CATCHMENT 1 BMP2 Wetland 13.18 807,536 15% 131 5.09 0.386 1.53 3.59 0.45 1.11 3.59 32% 0.149 0.482 71% 3. Development Summary Development: Chatham Park Way Prepared By: HCF Date: September 27, 2016 CATGHMENT 2 CATCHMENT 3 CATCHMENT 4 8MP3 BMP1 BMP2 BMP3 BMP1 BMP2 BMP3 BMP1 BMP2 BMP3 BMP1 -- -- -- -- -- -- -- -- -- -- -- -- -- -- � -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- — -- -- -- -- -- — — -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- � ! � � � '- -- '- � CATCHMENT 5 BMP2 BMP3 BMP1 � CATCHMENT 6 BMP2 BMP3 -- -- CHATHAM PARK WAY STORMWATER MANAGEMENT REPORT PITTSBORO, NORTH CAROLINA DRAFT MAINTENANCE AGREEMENTS Chatham Park Way WR Project ozizoq69.7o Stormwater Management Report Revised September 2oi6 Pettnit Number: (!o he pi:m�rded hr Di1'O) Draihage Area Number: Stormwater Wetland Operation and Maintenance Agreement I wi11 keep a maintenartce record on this BMP. This mainlenance record will be kept in a log u1 a known set location. Any defirient BMP elements noted u� t�1e inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of sh uctures, safety of the public, and the removal efficiency of the BMP. Important mauitenance procedures: - Inunediately followuzg const7•uction of the stormw�ter wetl��nd, Ui-weekly ulspections will be conducted and wetland plants will lie �vatered bi-weekly until vegetatian beeomes established (coinmonly six weeks). - No portion of the storm��ater wetland will be fertilized �fter the first iiutial fertiliz�tion tliat is required to establish the wetl�u-id plants. - Stable groundcover will be maintained ui d1e draixla�;e area to reduce the sediment Ioad t� i11e wetland. - Once a year, a dam safety expert should inspect the emUankment. After the stormwater wetland is establishea, I will inspect it montl�ly and within 24 hours after every storin event greaier Ehan 1.0 inches (or 1.5 inches if in a Coasial Couniy). Records of operation and inau�tenance will be ke�t in a known set location anci will Ue availaUle upon request. Inspection activities shall be perforzned as EoIlows. Any problems that are found sh�ll be repaired immediately. BMI' elemenh Poten4ial roblem: How I will remediate the toblem: �ntire BMP Trash/deUris is resent�. Remove the trasIi/debris. Perimeter of wetland '� Areas of bare soil and/ox erosive Regrade tlie soil if necessary to remove the gul[ies have formed. gully, aiid then plant a growld cover and ' water until it is established. Provide lime and a one-time fertilizer a lication, Vegetalion is too short or too long. Maintain vegetation at an appropriate hei ht. Inlet device: pipe or The pipe is cIogged (if applicable). Unclog hhe pipe. Dispose of the sediment swale offsite. The pipe is cracked or otherwise Replace the pipe. dama ed (if a licaUle). Erosion is occurrulg ui the swale (if Regrade fhe swale if necessary to smootli applicable). it over and provide erosion conirol devices such as reinfnrced iurf nlatting or . ripra�i to avoid future problems with erosion. Form SW401-Wetland O&M-Rev.4 Page 1 of 3 Pcrmit Number: (!o he prorided ��� DI►'O) BMP elemenh Potential roblem: How I will remediate the roblem:' Parel�ay Sedinient llas accumuIated in Ehe Search f�r the source of the sediinenE and forebay to a depth that inhiUits the remedy the problem if possible. Remove forebay from functioning well. lhe sediment and dispose of it in a location where it will not �ause impacts to streatns or tl�e BMP: Erosion has occw•red:: Provicie adciitional erosioii protection such as reinforced turf matting or riprap if needed to prevent future. erosion problems. Weeds are present. Remove the weeds; preferably by hand. If a pesti�ide is used, wipe it on tl�e plants rather than spra ing. Deep pool, shallow waEer Aig1I growth covers over 50% of the Consult a professionai to remove and and shallow land areas dee �ool and shalIo�� K�ater areas. contz•ol tlie al ;al ,rowth. ClttaiIs, phragmites or other invasive Remove invasives Uy physical remaval or plants cover 50% of the deep pool and by wiping hhem with pesticide {do noi shallow water areas. s ra )- consult a rofessional, Shallow laiid remains flooded more Unclo� the outlet device immediately. t�lan � cia s after a storm event. Plants are dead, diseased or dyulg. Determine the source of the problem: soils, hydrology, disease, etc. Remedy the problem and replace plants. Provide a one-tisne fertilizer applicaHon to estabIish the round.cover if necessaiy. Best professional pracdces show that Prune accorciing to best proEessional pruning is needed to maintain optimaI practices. planf liealth. Sediment has accumulated �nci Searrh for the source of the sediment and reduced the de�th to 75% of ti�e , remedy the problem if.possiUle. Recnove original design dephh of the deep the sedinient and dispose of it in a locatian pools. where it will not cause impacts to streams or the BMP. Cmbankment A h•ee has st�rted to grow on tlie Consult a dam safety specialist to remove embankment. the tree. An aiulual inspection Uy appropriate Make all needed repairs. professi�nal sho�vs ihat the embankment needs repair. L"vidence of muskrat or beaver activity Consult a professional tp remove muskrats is resent. or Ueavers. . Mieropool Sediinent has accuinulated and Search foi' the source of the sediment and reduced the depth to 75% of the remedy tlie problem if possible. Remove originaI design depth. the sediment anci dispose of it in a location where it will not cause iulpacts to streams or the BMP, Outlet device Gogging has occurred. Clean out tlie outlet device. Dispose of the sediment off-site. Z'he outlet device is dama eci Re air or re lace the outlet device. Receiving water Erosion or other signs of damage have Contact the NC Division of Water Quality . occurred at the outlet. 401 Oversight Unit at 919-733-178G. Foro� SW401-Wetland O&M-Rev.4 Page 2 oi3 Perniit Number: -- (Iv be pro��iderlbt' Uil'O) I acicnowledge and agree by my signature below that I am responsible for filie performance of the mainienance procedures listed above. i agree to notify DWQ o�any problems with tl�.e system or prior io any changes to the system or responsible party: Project name: BMP di•ctinage ar.ea nurixlic,�i :_ Print na.me: Title: Address: Yhone: Signature: Date: NOte: The legally responsible party shotild not be a homeowners association unless moi�e than SA% nf khe lofs I�ave been sold and a resident oFthe subdivision has been nam'ed the president. I, , a Notary Public for the State of . County of . do hereby certify ihat personally appeared before me this day of , and acknowledge the due executian of the forgoing stormwater wetland maintenance requirements. Witness my hand and official seal, SEAL My commission e�pires Form S:W401-Wetland L)�iM-Rev.4 Pag� 3 of' 3 Permit Number: (ro be provided by 7'otivn) Drainage Area Numbet: Biofltration Area Operation and Maintenance Agreement I ti�ill keep a maintenance record on this BMP. This maintenance record will l�e kepL in a log in a kno��n set location. Any deficient.BMP elements noted in the inspection will be corrected, repaired or repIaced iminediately. These �ieficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BIVIP. Important operation anci maintenance procedures: - Immediately after the roadside swal� and bio#iltraHon area aTe established, the grass wilI be watered twice weekly if needed untiI t•he grass becoitte established (corninonly six weeks). - Heavy equipment will NEVER Ue driven over the biofiltration area. - Special care will be taken to prevent sediment from construction sites hom entering the roadside swale. - Once a year, an infiltration test of the soil media will be conducted. After fhe biofilf�ration area is,estaUlished, I will inspect it once a mvnth and within 24 hours after eve .ry storm evenfi greater than 1.0 inches. Records of operation and maintenance �nTill Ue kept in a known set location and will be available upon request. Inspection activilies sliall Ue perfarmed as follows. Any problems that are found shall be repairecl immediately. I3MP element: Potential roblems: How I will remediate the roblem: The entire BMP Trash/ debris is resent. Remove the trash/ debris. The perimeter of the Areas of bare soil and/or Regrade the soil iE necessary to biofiIfrafion area erosive gullies have formed. remove the �ully, and then plant a ground cover and water until it is established, PrQvide lime and a on�-time fertilizer a lication. The roadside swale � Sedimerit is present Remove the sedimerit. Dispose of the sediment ofE-site. Reestablish ,round cover. Erosion is occurring in the Regrade the et�gineered inedia if biofiltration area necessary to smooth it over and provide erosion control devices such as a check dam, to avoid future roblems with erosion. Bioiilt�ation area Maintenance Pa�e 1 of 4 BMP element: Potential roblems: How I wili remediate the problein: The pretreatment area Sediment i�as accunlulated to Search for Elle source of the a depth greaier than three sediment and remedy the proUlem if inches, possible. lZemove the sedinient and restabilize the retreahnent area. �rosion has occurrec�. Provide additional erosion proteciion such as reinforced turf mattin� or riprap if needed to revent fuEure erosion rol�lems. Weeds are present. Remove the weeds, preEerably by hand. The biofiItratiori area: I3est professional practices Prune or mow lccording to best vegetation show that pruning or professional praci�ices. mowing is needed to maintain optimal plant health. Grass is �ead, diseased or Determine the source of the dying. problem: soils, hydrolagy, disease, etc. Remedy the problem and replace grass, New sod should aecommodate infiltration through the medil. Provide a one-time fertiIizer lpplication to esEablish the ground cover if a soil test indicates it is necessai• . The biofiltration area: Soils are clagged with Determine lhe extent of the dogging soils seciiment. - remove anei replace either just the top layers or khe entire tnedia as needed. Dispose of the spoil u� an appropriate �ff-sit� ]ocation. Search for the source of the sediment and remed the roblem if ossible. An aru�ual soil test sho.ws that Doiomitic linle shall be appIied as pI-I has dropped or heavy recomcnended per the soil test anci met�zls have accumulated in toxic soils shall be removed, the soil inedia. disposed of properly and replaced with new lanting media. Biofiltration area iviaitttenance Paae 2 of 4 BMP element: Potential roblems: I-Iow I will remediate the roblem: The underdrain system Clogging has occurred. Wash out t�ie underdrain system. (if a licable) The graEe inlet or Clogging has occurred. Clean out the grate. Dispose of the drownstream storm sediment off site. drainage system Ti�e stormwaEer system is Consult a professional engineer. datnlged Repair or replace the stormK�ater i es.. The receiviztg waker Erosion or ot}ier signs of Contact the Town of Pittsboro dama�;e have occurred at the outlet. Biofiltration area Maintenance Page 3 oi4 Permit Nuntber: (ro be p�•ovrded bv Toinn) I acknowledge and agree tiy my signature below that I am responsible for the performance of the maintenarice procedures listed above. I agree io notify the Town of Pittsboro of any problems with the system or prior to any changes to the system or responsible party. Project nrnne: BMP drainuge a�•ea number: Print name: Title: Address: Yhone: Signature: Date: Note; 1'he legally responsible party should not be a homeownet•s association unless moce than 50% of the lots have been sold and a resi�ient of the subdivision has been named the president. 1, , a Notary Public fox the State of . County of . do hereby certify that personally appeared before me this _ day of , and acicnowledge tlae due execution of the forgoing bioretention maintenance requirements. Witness Iny hand and ofiicial seal, � SEAL My commission expi Biofiltration area Page 4 of 4 ATTA C H M E N T 1.10 CONSTRUCTION DRAWINGS IMPACTMAPEXHIBITS WETLANU PERMIT IIu�ACT SUMMARY � WETLAN� IhAPACFS Sl1RFACE SNATEF21W1PPiCTS ' �� � and Permanent Ezisling Epsting � PermartBnt €'ermanent 7emp. Ewcair<atronh�echenice�l Cleanng swimpacts 7emp. cnannea Cnannei Naturai site StatiCn SlruoWre Fal In Fill In in Cl4aring in $W Impacls ���anne{ SW Impatts ImpeCS5 stream � {PipglFlilj Na. [FraNToJ 3ize! 7ype YS�eilands Wetlands LVe9Yands in W�eilands Weaands Imprqsqqm2nt5) impacts Permanent 7emp. �esign e f� 6C dC 4C 9� dC BC 04 Ef ft. (f17 � �. ,s•es.ss I i � 1 �L�zal+r�.sr o.t2 o.Os I SITE l (cont'd) BUFFER ZONE 2 IMPACTS EST 4401.4 SF O BUFFER ZONE 1 N IMPACTS EST 5430.9 SF PERMANENT FILL ln IN WETLANDS CV EST 0.03 ACRES � BUFFER ZONE 1 � NIM1RATY6RIPRAP �T F1,�v1A71pN 377', TYP � � � (SEE STRUCTURAL PLANS) r � r / ZONE 1 JORDAN LAKE RIPARIAN BUFFER (TYP) � ZONE 2 IORDAN LAKE RIPARIAN BUFFER (TYP) � ZONE 3 100' TOWN OF PITT580R0 RIPARIAN BUFFER (TYP) ///��� STORMWATER WETL4ND BMP I AND 100'TOWN OF PITfSBORO VEGETATIVE BUFFER �NP� �/x,7,�� �SEE SHEET BMP-3 � — � � BUFFER ZONE 3 � IMPACTS � � EST 9510.6 SF (SOUTH BANK) E5T 9047.7 SF (NORTH BANK) � -L- PT Sta.22+67.75 � i OFF �rA _+0/90 0 /50' U TURN LANE � q� o l00' L7 TURN TAP�R � � , � or�.�nnR�; ����`'�i� m o g y � '`E97 tl3�,} SF * � � � i i� j'-r✓n rr�v� � saiNc � I � - � A ?l+7/?.85 � ,a r- �., ��. 1--.64g l_7"/ � y O � m F � _ F F O m CLASS 'B' RIP RAP I - � 24" RCP-III E5T 3 TONS RR � i - �� -- — „ � — — — _ F E5T 11 SY GFD �' e � :i is� acr-iv - — ' - - F - - — - � I -L- PC Sto. 27+82.46 � ——— � F R � \ I FALSE SUMP (TVP) I � �� 0515 S'P.S. 15" RCP-IV O50 n C '. GRAU 350 0570 F� SHEDE2DL14 FI O 8_77 � 0:l /'-'C&G� CB N CB �g � 2G1 � _ 050 I R p 2GI p��. d GRAU 350 0513 0 � O �5'R 24" RCP-III � 2GI �� O _% � 052 p../ �--- `�.Q:/ r_ M 0514 6 R 55' N 18" RCP-III � �''S�i �g O -- � _ � _ 15" RCP-III 18" RCP-IV � � �y. ;� 18" RCP-IV N O m � �� :� zc� o -- 22' 2' /55" E 5' a � ,c — Y3� � 15" RC - � 0517 � ' � . \ � 0518 � 0516 2Gi ��� __..�„.-..._..._.---..__.,_. 5'`�R p mr � I as�z_ __i � � /r 75'R � � o ce o cs o ce y �. __— -.� � rv , � � � I O50 m� a- 15" R•I� mw F ��1� 24" RCP-III 2G1 050 050 15" RCP-IV O50 50 ' ' � � I -L- STA22+6298 - m — BIO-FILTRATION BMP /e � 15" RCP-IV � i-' OFF. 27.50' Ri �52 F — — — — _ _ _ SEE SHEET 8MP-7, TYP � — — — — F — — —, R � P 15" RCP-III F _ ' _ _ _ _ _ — _ � — _ _ — _ _ _ _ Y _ ' _ CLA55 '6' RIP RAP F � GlN 2'"'S�C&G EST 5 TONS RR I I � � �I _� STA.2/`kf/9.18 EST 14 SY GFD � / I / � r 1 o v 7 ��'(1C,�JC&G 18" RCP�II o N � � .70'RT00.00 CLP,55'B'RIP RAP I � o +� 50'lNC r,Nj �� - �Q � - E57 2 TONS RR �00' UkN � � � �( B ci' B�b�,�G I EST 7 SY GPD LT T !APER +� o -�s7 � +oa.000 isacr ruRro cqNE � + PROIECT REFERENCE NO. SHEET NO. KI��V����■ ■Or� ��RhV�HETNO � ROADWAY OESIGN HYDRAULICS P.O. BOX 33068 • RALEIGH, N.C. 27636�068 ENGINEER ENGINEER 1�1[$]E]LII�d][N 1[3� 1�1L.a�iti� 11.5��5 DO NOT USE FO CONSTRUCTTON i���i PLANS � �o�� DO�.1�'��T�FOT CONSIDERED FINAL NI.��/�t�� $���TURES COMPLETED RADII DIMENSlON5 ARE TO THE EDGE OF PAVEMENT UNLESS OTNERWISE NOTED lAPPL/ES TO ACL SHEET51 �� � �\\\\\ _ .�._� � .�., . .' _ ���',i� ALLOWABLE IM'r;.... ... .�. �. � DENOTES FILL IN W ETLAND ,,I� DENOTCS TEN.. . ru�iN w�i�..�. � DENOTE$ IMPACT$ IN $URFACE WATER (PIPF/FILL) � DENOTES IMPACiS I� S f WATER �CHANNEI. '�Mt � � �iSl � � n _ BI0.FlLTRATION BMP r SEE SHEET BMP-7, TYP rn O50 r- � 2GI y 18" RCP-III m� 5' P• n 18" RCP-IV �._('C w O P K Y �,_ �c�G = m CH T H �e , s. m 15" RCP-IV R in 0501 2 rn _ — — — — — � � � F F . — — _ F _ _ _ � m CURB CUT AT -L- STA'S: 29+30, 29+70, 30+10, 30+50, 30+90, 31+30, 31+80, 32+20, 32+60, 33+00 SEE BMP-7, TYP .�\ �-� ��� '� �' ZONE 1 JORDAN LAKE RIPARIAN BUFFER �TVP) WETLAND� Ihl BUF�ERS IMPACTS SUMhi'VARY �\ .` ZONE 2 JORDAN LAKE RIPARIAN BUFFER (TYP) �` I '{��\ ZONE 3 100'TOWN OF PITTSBORO RIPARIAN BUFFER (NP) AND 100'TOWN OF PITTSBORO VEGETATIVE BUFFER (TYP) k STORMWATER WETLAND BMP WETLAN�S IfV BLIFFERS y W�� ��. SEE SHEET BMP-2 B FE Z NE3 � � S 53RTiO�t 20�lE � Z�N€ 2 . ZORI� 3 ES 3.0 SF SiT€rycJ. lFRciM;iul (n'� �n�� {tt'� -L- t9+89.55 NAD BY NSRs zao� 1 �L- 21+77 21 -03-0.4 909.7 214f1 9 �� � BUFFER IhAPACTS SUMMARY � � IMPACT � 4 � 6p, rv�� a�t�wa6�E MFiIG,4BLE BLJFF�R REPLAGE1w'lENT i 6 J�J Sn2llC�JRE Slh. r STpnOM ROAO PARALLEL �NE 9 �pNE 2' ZONf 3 iqTAL ICNE 1' ZQM1'E 2� 20h'E 3 TpTAL ZONE 1 ZONE 2 ZC]NE 3 StTENO T`fPE (FROM!TO) CR45SIh1� E3�'�Gk IMpA�;7 ir�4 i��1 (h"Y [R`1 fn�l I��] i��] [rt`i I��l fh�l IR�] � pRK ,�AY � CNA�NA �.,wse.ss TO FEARINGTON—' ' � z�•»z� x ay3asu: �az5a �zz��rz a5ir,ya � . ,Ea . . . . _ . � . i w �Q J � red z 0 > � � �� � � � I PROIECT REFERENCE NO. Pl Sta 35+33.60 p= 45' l8' 063' �LT 1 D = 3' /0' 59.2' L = 1,42320' T = 75/✓4' R = I.SOOAO' e = 03 NAD 8Y NSRS l00] -� � Vi W J � 4 � 6p, C�`/ATy,� J5 s � � y'AY � J � TO FEAR/NGTON y fq T TEOI � W `^ Q J, � red SHEET NO. b HYDRAUUCS ENGINEER �U..'��i� UCTTON ERED FINAL COMPLETED )F PAVEMENT ) ALL SHEET51 ,cE ce INFORMATION TO BE SHOWN ON PLANS WS EL Token @ R ver Sfat on 2804.8 Design: Discharge __600 _,�.fs. Frequency zs ...yr. Elev.....__ 3�S.I p, BaseFlood: Discharge.......���........�{.s. Frequenq......100_______yr. Elev._______3�5:94______H, OvertoPP��9: Dischorge """"""" 5000"""'""c.f.s. Fre9uencY ......>SOO.......Yr. Elev. """"""" 389"0""""""" N. ADDITIONAL INFORMATION AND COMPUTATIONS FOBESO�yCFEEa_TRIBUTARY 21S_PdFi OF iHE_FLOOp I!{$l1RdNCE_STUpY_FOR CHdTHdI� COIIyiY�OdiE�_EFFECiIyE__ FEBRUdFr 2�2008_ <Fi5'_ 3iO3TCy000A _LiM�iEQ.OETdiL.STypYi_ THE_ DdTA RE[EiyEQ.FROl�_ FEMA_ f(AS_ �ly HEC_RAS___. FORMA?_(ROBESON_CFEEK iFIBUTARY 2 AOJ.PRJI. pt1PLICATE�CORRECTEO EFFECTIyE�AN9.PROPOSE�_�IOOELS.�'EFE__. CREAiE� FROM.���S__MOOEL. EFFEC?iyE FE�IA OiSCNARGES.Akp_USGS_piSCNAFGES_J�ERE. SiMULdiE�_.�'iTxiK_iHESE___. _�100ELS._USGS_ �i5[MAAGES_ J�EFE_ CALCULOiEO_ BASED_01{ SiR_20i9:5030_ A�yO ASSOCiATED SPFEApSNEEi _i00L_____._ .�'C?5.�9K!•�..?.EGiQN.!?�4?E55!Oh.�RUAii4�'14.i1�?�.LLS�P..�A$�Q_9.�i.A, 29%, PERC�NiA�iE. Q�.IM?�Ry�Q4$. AREA......... iHI.S PLRCEp1TAGC.'dAS.$E.i.BA.4EP..QN. THE.F.ViURE.LANQUSL.ISINE.9F.1�i%EO.VSL AND..TH� PES.iRICTI.QN"S!F'A""'"""' .MA%iMJlM.R�.29:.RUIL.i.UPQN. AREA. F9R.N9K:RESiDE.KiiAI.DLI'ELDP�CNi.1LIiNik TNF..WS:IY.PA.I�lATLPSHEI2 APLA.""" iNl_4 R�TRI(T(ply l$_J�qLSlMEKLED..�'ITNiK_iN�_�ryAiHA�I_SQV�ITY_�'(Ai[R$NER PROiECiIQ.y_9RJ�IKANCL �JI�NE.2Q.2Q15.�. ii00%.HYpFOLOGC EGi�yri"°o�. � o°i�5ES0.A�,.iA ...... ............................................................... 010 = 4i8 CFS _ E80 CFS .."""' '"""'""' "'"""""' "'"_'""" """""__'" ""'"_"' """"'""'" 025 = 5)0 CFS -> 600 Cf5 FE4A Oi00 FROM NEC-RAS 40�EL AN� "'"""""""""""'"""'"""'""""""""""'"""'""""""""""""""""' """""'"""'"""""""""""'"""'"""'""""""'""""'"""""""""""'"""' O50 = 633 CFS -> 650 CFS Fi5 REPORT tFiS• 3T03iCV000A1 0100 = TOICFS => 100 CFS 0100 ='155 CFS 0500 = 849 CFS -> 850 CFS _$[OUP_ COMPU?dT10N5_ _ IPERFORMEO_ tISIyG_ HEC_ RAS� BASED _OK HEC_ IB SCOUF CALCULdiION_ MEiH0U5l 100_TP_ C91yTRACT10y_SCOUli ���5[MdpGE_Ayp_�(iDTH_yALUES FOF_APPFOdLN_SECTiON_ idxEN.FR0A1_ RS_2892_91: 6/i 1(I w2.:.yi oz 9 ....flMl�@z ......... ......... ......... ......... ......... """"' v2.`.4.49 t5i5.25i3i3.3]i6/i �i5.6/21.40.69'""6.1""""""""'""'___"'"""""""'""'_"'"'"""""""""___"'"""""""""'_"' :!5.:. ?:2..-. rG...... Y9. -_ 6.5.:.5:� .................................."_..............................._.................. 7s' �Cxi"'i,3. Fr""""""""""""""""""""""""""""""""""""""""""""""""""""' 8/I/2016 K:\RAL.Roodway\01232s030 - CPW Extenslon\Hydraullcs\CADD\BRG.CUL.REPOFTS\BSR.Robeson.Crk.Trib2.d9n SITE DATA o.re so A�i cxerNeM couN*r uoea coN*ouas Drainage Area ,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,, $o�rce AN� I15G5 SiREAMSiATS VERSIO_y_3_0 .,. RrverBosin CAPEFEAR � E�%STNL:Rt1RG� _________________ Characler uTURE. Mi%E� lISE DEVELOPMEyT _. _._ UNCLASSiFiEO STpEAy LpCATEO 'NiiNIN $iream CIa55ifitation (SUCh OS TrOUi, High Q�Olity Woter, ett.) 1YAiER Sl1PPLY ryAiERSHE� �'S-ly' PA Data on Existing Sfr�cNre """"N/A"""""""""'""""""""""""'""""""""""""'"""'"""'""""""""'"""'"""'""""""""'""""""""'" '"""'"""'""""""""""'""""""""'"""'"""'"""""""'"""'"""""""'""""'"""'""""'"".. TotalWaferway Openin9"'""N/A"'"""'.-s.{. Woterway Opening Below 100yr. WS EL.... N�A....... s.f. Debris Pofenfial: Low....... Moderafe ...x._..High.._... Data on $ir�ct�res Up and Down $fream „�5 .> NONEiDS -> 36;RCP IINUER PRiyAiE UNPdyEO ROdp . . ............ ........ ............ I'pg yE EXiSiiNG Design Conirol Elev. _FEM� i00-xR: 3�5.6 H. Gage Starion No ._.___._ k/A .... Period of Records N/e """"' """"' """"' """'Yrs Max. Dischar N/d'""""""'"" c.fs. Dote .."""'-N/A""'"'""""" Frequency .""'"""' Nid"""'"" 9e. """""'"_' Historical Flood Informafion: Date N/A__, /A q_ e � � Period of ....._ Elev.""y'"k.Es1.Fre .Ni Y.So�rte""""""""""'/A""""""".Knowledge..N/A...yrs. Period of Date ..""' Elev """ k Est. Fre9. "" Yr So�rce "' """"' """". Knowledge """yrs. Per od of Dafe.......Elev ......REst.Freq.N.... yr5o�rte... N.N........ ....N...N.....Knowledge_ ___.___yrs. Hislorical Sco�rinfo. : Generol.08�ERyEp_ft. Coniraction. OBSERyE�_ft. LocaI.O85ER�E�._f�. Ghannel Slope......0;008,,, Wfr $ource,,,,CHANk,EL_SII.RYEY Normal Wafer $urfoce Elev.E....,..,369.T ft. Manning's n: LeN O.B. "' �""'Chonnel a_oa5 RigM O B . 0:�� . So�rce _. � EiO� V��IFFLAi qy"""_ Fi5 • 3'I031CVOOOA LIMITED DETAIL STUDY Non-Encroochment Flood Study/Status _._EFfECTiyE FEBRl1ARv 2,200] Esta6lished? .___.rES '"""'""""""""""'"" """" Flood Stvdy 100yr. Discharge....�ss.. c.f.s. WS Elev.: With Wiihout Non-Encroochment., 3845 ry Non-Encroachment „ je4:o � @ River $falion 3556 DESIGN DATA Hydrological Method SIR 20i4:5030 AND ASSOCiAiED SPFEdOSNEEi TOOL yEFSiON �.� ............ ....... ......................... .................................... Hydroulic Design Method ___HEC:RAS 5.0 Floods Eval�afed: Freq. Q Elev. Backwater Bridge Opening Velocity Ivr.l I�.I.sl Ili.l Ih.l If.p.s.l Oi0 E00 3i5_i i.0 6.6 """" """"' "' """ """' """""""" r�i River Station 2804.8 "'"" 025"'"""' '""'""'600'"""'"" ""'"" 3T5"I"'"""' '" 0.8""'" 6.8 ""'""""""'""""'"""""" "'"" O50"'"""' '""'"""650'"""'"" ""'"" 3i5"2'"""' "" 0"9""'" 6.9 .... Oi00 .......100 ..... 315.94.... ..�:4T.... ........6:9 0500 850 3i6_5 Waterway Opening Provided Below:Design W.S. Elev...!49____s.f.,t00yr W.S. Elev.. �83....s.f.,Total.. 563____s.f., " """ L.O.B. = 0.9 Average Channel Velocity (Designj_...4•.'3. f.p.s. Average Overbonk Velocity �Design).___ R:O:B._=_i.4__ f.ps. Compufed Scour : Generai _______________ N. Coniracfion ........t•3.........H. Lo<al ._____y_.____._______ fl. Is a FloodwaY Revision Re9uiredi ..... rES ........................................................................ Z O Z ¢ ' � �: Designed 6y: "" �: i Ass�sied by: ._. E Projecf Engineer � Re��ewed by: ._. BASiN� CAPE FEAR FEAIA�uMiiEO DEtAiL BRIDGE SURVEY & HYDRAULIC DESIGN REPORT N.C.DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS HYDRAUlICS UNIT RALEIGH, N. C. NBL� 20+5i.35 I.D. No......N/A........, Proiect No . ............ N/A.............., Proj, Slafion . SBL; 20y8.4o.............. County ,,,,,,,,.,��ATxd�l g�idge Over,AOBESON CREEK TRiBllidFv 2 gridge Inv. No.,,,,N!e_,,, ................ ...... On Highway �HATHdM PORN �'dT Be�ween . �5_64 �BIlSiNESS� a�d SlliiLES ROA� . . . ." ....."".. ..."..."..." Rewmmended $huctu�e PdFALLEL BFiDGES�NBL:ic 60'- 2<'COFEO SLdBo�SE REiAiN�NG �'dLLS� """'""" ""'"""""" ""'"""""" """'""""" """""'""" ""'"""_""""" SBL:iO 60'- 24' COFE� SLAB; 45E RETAINiNG �'ALLS '"""""""'"""'""""""""""'""""""""" """"'"""'"""'""""""'""""'""""""'""""""""""'"""'""""'""' '""'"""'""""'"""'"""' NBL: 33' 011i i0 OIIT� 30'-8' FA[E i0 FdCE �4•-59'-i8' Recommended Widih of Roadway.SBL _36:OlIT i0_ OIli;33__8_FACE_ �0 FACE_______ $kew. idkGEryi_ i0_ CyF_�E Recommended Locotion is ( Up, At, Down) Sfream from Ezisting Crossing.,N/A ME�' LOCAiiON AOA�i ...... .. ........ ............ Stalewide Tier ❑ RegionalTier ❑ 5�6-RegionalTier � Bench Mork is _____ L_ STATiON <0�00:55_i4i_20 Fi, TBM 8 CONTROL POiNT.N� GR�O 83/20n . . . . . . . . . . . .......................................................... Elev. ____ 450_5� H. Dof�m:____._ NAyO 88 Temporory Crossing ..NONE cNE�' LOCATiON_ROAD/BRipGE� ' """ "'...... ."""" """""' TOA) GRAY,PE " _ """"". _ ... ""' _ _ "' """"' ""' VANCE BLANiON. PE .......... Da1e ""_"""""""""""" .. _..""_'"'_'__ _'" yON�E BLdN�ON.PE ___ �f�l^�)��uo�� """""""'_'__""""' aroieC No.: oin5030 Oate Prini�ed: B/I/2016 i . � . -. __ J � �� � I . I .._ . � dS- ,Sl j . . � i . . � . . ; _ _ - j XlyVB � � , � � -_ I . �i .�o d I � �J� � { �,�y��, i nr-a�n si i - -- t� /` � � i i i i i' i u i_!:- i i �\ a�� e� ni a�a „si I I � \� � �� y I -- i+ v� ae �- is vis oi ii r� aro+ is vis � , ni a�a , si - --- � � ni�a�a _ - � . NOIlJ3S 3JaRl9 l`dJldXl -�- ----�-�\ \ � -�l�� J/�� I � „sE � \ T : � T �� _ '' � ; � i ���� o ' d !N6 � i � J � � - I�� y bV-,',� i i / i I � s� �. r r.� � �JO GO 00 OO G� `�� p0 � „ 00 n ,C ) �.� 00 � �O JO �O �� � � � � _ - /� e� - / �. � z0 0 � iNioa . �. a0 0 �. . �. ' - - � - - � . . `� v � `" . a� � � d 5 e� i _ ti . . . . J. ni a�a , �� _ . i . . . . 1 . . . aava� � � 1 � _.-�. . . +- a . � e� p i . . - �-= ej , �. _ ,o- 9� � . - � . . . . . - �� „& 0 r r � __ � fl� . -_ � 1 _. ni a� - � o �� . ;' ..� �� . . . � � � � � . "s� �. � : J'• I . � l553N�S/181 v,e ,e e ,zi ai ,zi „e s„9,s1 .,s,i `., \ I I i ni-a�a .- s�i -�_-- m, I � --T-_e� i t�5 sn dl� �I„E,l .. .. ... ... . , ._ .. .. . � . .... .. . . '. i „9�,45 i ..\ . . . I - . . . . . ' . . . . . . . .. � I. I I �'i � � ,LS . . . I i _?.- _ _ I . . I . I �\ . ' . . . . . . I . '� . _ -_ -'_ _'_ 1_ _ _'_ '-._ �'��, . . � I` _ . _. . I . TI _. .- I �. I . i . I _ � � � _ --- -- � T � � - _ "'. id 63 n �a I � i ��� �� ` _- t-- �-`^,-a��, - -- _ dAi'sK� ani� ais 3s� i i I � I . I � _. . I .0'Obb.'A3l Ql - - '�$ � �' I . . . -. - '� � � I . _. ' ,' . . � . � . � � .T . dV2i dlail S tll3 � . : I � ` � - i L I � i i 1 -: I �. ., i i 1 ',- i i i 1 I: . . � I . ' . i . � - . . � . . : , o� m�'� � . � I �. : : �. I . . I - ! _ ._ / / - I ` � 1S .38 011 2N3ddV SN I 8 73tyNqH� IyV �}V3fi1S_ ' .. -.` v� �._ . . _: � �i : : i . � � ` `/ / �5U U � : . i � . .. � .__ . . -- �J .l "N'/1N�Z�d 5/M830 �� 31V�3Oo '� Hll 7 5 07 AlA ::3dA1 7i0 ` . . X . . . . . . 3�Q/aH j0 79 � . � : . p�� . . . � ' CI M � l� . . $ � _ . � : - ON�01f� 7Vlfl11VN . i . y7�N"F/ONHBj0�31V0 �0 � g - - - _ _. _ - . �� � ' � : dVNdINN SSV7.7 ,-�f+ F9F{- `'7 SM 03AH35 0 � . . I . . � I . . . . : . i � , ' .. 8€ �'7� raA-sz� psis3a i � ki+ �9f6 =7�S�17V/j'b(JN_ i . . � J3fDNd S/Hl dH 03137d/{' A73S!{3� - __ _ -- - N@-i-7fM �3�3��17N� 1 ��.� 5��3N��j��6'15 j}'V3b'� � 3b'15dR D �i: _ _. i . �. . i ._ � - _ :..: ..: _ _ �i . . •�i£'8£ i =.'7�SM � HA-00/ .. i /�, _ T _� .. _. . _ i- _ __ _ . . i �. I . �. � . . . . . . . .� , . -__ _ . -� iyp'3F/15N� _ � . . � � � : _ . I :�1DA':. I _ . . � - . - , . -- �, - ON�0219 7V21l11VN -. j .._: � . - . �. . . �. . . �. - - -- . . . �y 32I15d� - . . . . . . . . . . . . . . . _ _ . �. �. �. � �. i �- : : - ONhb2/9 7V2//IlVN � . . _ \ . __ . i . . .. ���� i �i i i � i - . _ . _ - � i.. _ ___ _ _ Obb ,� ��' � �� Obb � _ i aaain aa sNivao N�aa oN ' - � ' � � _ _ _- _. :..__ ' --- _ - - . - � � � � � \ � \ � , � �� -- -- _ - .r � � �\ _ � ! - �� sre =avaaas - - �. �. : : : � : : . � �. : . : : . : : � / �. �. . . �\ �. : �. �. �. �. : �. : �. �. �. �I . . . . ... . . . / / . . .... . �id sce -uiaiM aaa�nous . ... �. � -. ._- --- _ . . . . _ ... . ; _ _--- _., __ � �, �o o-3ao,5 =soa� � _ 0� b _=- � _- 0� b I - - . . .. � earo�o �i= sioos ivoianii�Noi � --- . �. : : : : : . � � .�. . . . . . . . . . . . . . . . . . . . . _ y.o _� . _ ..... . . �. . . ... . . .. i \ \ ... . ... i I � "�^'! r = i �. _ �. �. : : : . : : : �. ' . : : : : : . . . . '. \h \ � --- . � : �. : : . �. �. ' ... . .. . . . . . . . . , oco o -� va � � � � � � � SISAIVNV OV3Nd$ � � I I I , I . . / . . . . . . . . . , \~� _ _ � . . . . . . . . � .. ..... .. / . . . .. .. .. ... . .. . -� ..... _._._ _._ . � � . . ... . . �_._.._.. ._.._... _.. ... � 09b r �.. ______ _ _ - ` _. _ , 09b i <� � I � Lt5 NOLL�3Sia , . i . . . . . . . . . . . . . . . . � . �\ \ � � . . I 4�9E4 SE�9E4 E"eE4 E�BEV Z�8E4 43SOdONd ��.��.. ' . . . . . . . . . . . . . . . . . . � . . �. \ � - �. �. �. �. . �. �. . . . . ... � ' . . .. .. .... .... ..... .. . . ... \ - � _ - - . ..... . ... S'8E4 C6'8E4 4'BE4 9'8£4 V�BE4 9NI151X3 � �' � -� � � � � � � � � � � � � � � � � � - - - '- - � i � . .. ... . ... . .� . ...... .. � . . . �i � �� 58E4 Lv�BEY Y�8E4 v�8£4 V�9E4 �b'Nf11VN . . . �. � . I . . . . . . . . . . . . . . . . . . � . � . _. _ . � � � � __._.._.. .-�. .....__._ - _. . . O�+OS� NO/1d15'X021dd1+ . . . . . . „coos ,,cooi „cps „csZ „cpi OL{7 I � ,6F'£96 I 373 �� � � = 696 9 N ddOlX3ib 0 L b , /+ 30Vb 9 / � � �: � ' D6 3N5 � � (Ni� 7Vf,�'a0N � %0'c�l _ ' , , A�Na�D3ai . . . . . . . . . ! i . S1N3�ylI)�p' 7VJi1N3� M av�s oaa�J✓Z 73315 mv�'3015 �M� '0�oor�,�v H� _✓ 1 � ❑ . .. . ; +� � . . . . A �l - � i srs id _ . ... . . � c�. _ ' 37VJ5 loa�N i /pE9� r�•F�+�s Is � I _ _ _ _. _ /9� -'-- - _ _ --- . 00+9� OO+SS OO+bS 00+�5 OO�+ZS 0 i+IS 00�-0� 00+6b 00+8b ..----�--�----�--�----�-� �----�--�----�-� �----�-� �--------------------------------------------�-� �----....----......................................................................................................................................................................................................................................................................................................................... SITE DATA BASIN: CAPE FEAR INFORMATION TO BE SHOWN ON PLAN$ : STREAMSiATS AND : a; FEMA:N/A WS EL. Token @ River Station 511 � Drainage Area ,,,,,,,,?�•?, A�,,,,,,,,,,,,,,,,,,,,, Source ,,,.._,ROA�}�,AY. DESiGN. FiLES,_______,____,.____„ ' Desi Dischar e .'_'....��0 25 """ Elev. __.. 438_3 {�. ; River Basin _"' . CAPE iEAR """""" Choracter .._' ' ' ' -.Rl1RAL .. . .... . .... BRIDGE REPORT ; � SURVEY & HYDRAULIC DESIGN 9n: g .. .... ..c.f.s. Frequency ______ _ Yr. ' a: N. C. DEPARTMENT OF TRANSPORTATION Base Flood: Dischorge ........!20........c.f.z. Frequency ..._...100_______yr. Elev. ,,,,,_„?38.35 ft. ; Stream Classificaiion (Such as Trout, High qualiry Water, etc.) NONE ; a: DIVISION OF HIGHWAYS ....... '-"-""-""" -"""'-"-""-"""'_"' HYDRAULICS UNIT Overtopping: Dischar9e ........�2000.....c.f.s. Frequency ...... >500______Yr. Elev. <59.7....... ft. ; Data on Existing Siructure .'N�A"""""'....."'....."'....."'....."' ......................"""""........ ; <: RALEIGH, N. C. x. � ....................................."""""".................. . . .....To}al Waterway Opening ...r1!A........s.f. ; ...' m: ; Waterway Opening Below 100yr. WS EL. ...Wd__..... s.f. • - ADDITIONAL INFORMATION AND COMPUTATIONS � Debris PotentioL Low._..... Moderate .._X....High,..... � �; �.D. No.___NiA projec} No. ____N/A proj. S}otion ___ Si+73_74 _ L_ �. ' Doto on Siructures Up and Down Stream US => N�A; ' w; Counry ____ CHATHAM ge Over __ �T 70 ROBESON CREEK 7RiB2 9 iA ; "___......___"'___...'___...'__'...""'...'__'..."'_'...'__'.. : W __________. Brid ............................... Brid e Inv. No...._N......_ �NNA�ED TRiBIITARv TO ROBESON CREEK TRiBl1TARv 2 i5 A NON-FEMA REGULA7ED STREA�) FE4Tl1RE. THE ; �S => N�A.CONFLUENCE {�iTH ROBESON CREEK 7RiBllTARr 2 450'OO�NSTREAM ; z; On Highway__.4HATHA�1_PARK_�AY____ Beiween _5l5=541&U$IyESSL__ and.......SS1Tt��4_ROAp_______________ .......................................................................................................................... ......._......._......._......._......._..._..._......._......._......._......._......._......._......._......._.......... o. DRAiNOGE dREd CLIRRENTLv CONSiSTS OF �OODLAN� FORES7 �iTH SOA1E OPEN A�EdDO�j. THE FL1Tl1RE PROJECT ; : a; Recommended S}ructure ____________________________________________________________________________________________ Io50' 21' CORED SLAB; {�/ yERTICdL RETAINMG '�dLLS ............................................. ............................ . .. .. .... ............ ; ......................................"'....."'....................................""....""""""""""....""' : a. Bl1ILD OUT IN«��ES A DRAINAGE AREA OF 37.7 ACRES,INCWDING SEVERAL ACRES OF �NTERCHANGE AREA TNAT I Design CoMrol Elev. ._..CL!? ................... ff. : ------------------------------------------------------------------------------------------------------------------------- �. """' _"""' _"""' _"""_"""' _"""' _"""' _ _""' _"""' _"""' _"""' _"""' _"""' _'...." �: CURRENTLY FLO TO ANOiHER LOCATiON. THE RATiONAL METHOD AS USED TO CALCULAtE PEAK FLO 5. A•C• � Ga /A Period of Records N�A Y � �; Recommended Width of Roadwoy.__ 54_6' FACE 70 FACE Skew .....90� ............. .................�1..... ....... ....................... ....... .....�1....................................�.......... ; 9e Station No.."'K"""""""""""""' """"""""""""""""""""" rs ' ~� yALUE OF 0.5 AS USED FOR THE BASIN AND A TIME 0: CONCENTRATION EOl/AL TO 15 MIN�TES TO COMPUTE ; y /A c.f.s. Da}e ___. N!A Fre y,_..�?_____________ � Recommended Locahon is � Up, At, Down� Sfream from Exisiing Gossing, �NE�' LOCATiON_RaADI �_. o; ... ....... .... .... .... .... ........................................................... . ............................. , Max. Dischar e."""""y """""""' quenc N : �v. INTENSITIES FOR THE DIFFERENT STORM EVENTS. THE FUTURE PROJECT BUILD OUT CONDITIONS OF THE DRAiNAGE : Historiml flood Informa}ion: ; LL $fafewitJe Tier ❑ Regional Tier ❑ $Ub-Regional Tier � ....................................................................................................................... BASIN,}�',ERE ACCOUN?EO FOR IN,BOTH ;C. yALl1E AND TI�IE OF CONCEN?RATION;,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,, : Date,N!?... Elev.. N!A.,,ft. Est. Fre ...N/A__ $ource N�A Period of N/A ; g 8ench Mark is ____ ABC. _L_ STATION 57.29_27 3_31RT, TBA) & CONTROL POINT. NC GRI� NAO 83/201I _ "' . . . . . . . . , 9 Yr. .. ......... ......... .......Knowled9e__________yrs. . . : Period of : :................................................................. Elev. ____ 474.28___fr. Datum: ...NAVD 88 .......................................................................................................................... j Date________ Elev......... ff.Est. Freq. .......yr.Source ....................................... Knowledge__________ � _......._... Period of Yrs. ; ; � . Knowled � � Temporary Crossing __NaNE �NE�J LOCATiON ROAD/BRIDGE7 ................................"........................................................................................ � Dafe________ Elev......... fi. Esf. Freq. .......yr.5ource ..._..........'..'_..'..'_..'."_ . 9e._._.__._yrs. • � . . .......................................................... RATIONAL METHOp� TO CALCl1LATE PEAK Rl1NOFF : NONE NONE NONE ' a' C=0.50, Tc = 15 MM. DA = 3T.7 AC � �� .......................................................................................................................... ; Hisforical Scour Info. : Genera1..085ERVED.R. Conlracfion.OBSERyED. h. LocaI..OBSERVEO.}t. : r, 010 = 96.ICF5 => 95 CFS _,__,__ , ; Channel Slope ,,0.0346 kN Source,.__.... SURyEY Normal Water Surface Eev 436.1 j� Z ' . � ��+-. '.� .... .. . .. . . . . . . . . . . . . . . . _ � r . . .......... . .. ... ..................... ; Manning's n. Lef1 0 6 .... ... ChanneL """"' R ght 0.6. _._ _ .__. Source " I """"""""""" � ��� � � ! � ., � y' � X Y f .� �� . . . . "" ` . J �` � 0.06 4 i I . 0 0 0.06 i T v 025 - 105.6 CFS -> IIO Ci5 FIEL� I EST G4 lo ................ .. ......................................................... ........ • ' "" ""Nv N _ �� i i ° y" ' � 050 ' In.2 CFS '> IIO ci5 ........................................................................................ . Flood Sfudy/Status N/d... ....... ... ... ....... ....... ... ... .......... Floodway Esfablished?... N/A _.. d . .., _ 1 �..:'/ '� .................................. . � .. �. • w rh w rho�f : ._. r. � 'M1 : 3 oiao I16.9 CFS '> 20 CFS ....... .. .... .. .... .. .... ....... .. .... .. .... .. .... ....... .. .... .. .... ; Flood $iudy 100yr Discharge N�A c f s WS Elev Floodwoy N�A ft. Floodwoy "' NiA"""'.ft. : ; ,, . � � ,�' � ,;-; � i ,� � . . .................. ....... .. .... � @ River Stafion piA } - E 0500 - 127.8 CFS -> 130 CFS � � ... ....... ... .. ... .. ... .. ... .. ... .. ... .. .... .. ... .. ... .. ... .. ... .. ... .. ... .. ... . . . - _ a� i :J 6 ..... ... . ..... . ... ...... . ... ...... . ... ... ... . ...... ... . .... . ... ....... . ... ...... • Z _ � . DESIGN DATA ; ' '. " ��. ~ � � - -� � ' RATIONAL I�ETHOD TO CALCl1LATE PEAK Rl1NOFF IC-O.SO,Tc 15 (AIN.DA - 37.7 ACI ' ' ; �� �`�1� �. .......................................................................................................................... ; Hydrological Method ......... ......... ........ ......... ..... ...... ........ : 0 1' :'_ . . .�"`k�% ��% � � � F. �' ,.i �: . : - �i' . _ �"`' ' .�.G'» - - .......................................................................................................................... : Hydroulic Design Method ___HEC-RAS VERSION 5.0.0 IFlLE�uNNAMEDTRiBU74Rv70ROBE50NCRKTRiB2.PRd� _________ __ : Q; . �� _ - -->. � ��°.y ..f ' � Floods Evaluated: Freq. Q Elev. 8ackwafer Bridge Opening Vebc fy � ' �� - ��' � ....... . . "_"'" ' '""'""_".. . . "'""_ ' "_"'"""" ' '""_"'""' ' "'""_"' ' "'""'""_ ' ' "'""'"" ' • br.l Icfsl Ik.l IN.I (f.ps.� ; ' �•♦ -'�-��i+� ; : @ River Stafion OIO""" "'95"' "' "" 438'2' "' '0.0 3.4 : ' r � - � �% � z� Z � . - . "S`�`'�` t _ ............... ............................... ....... . ... .......................................................... • 11 :��.. � F ___ ________ _________ • \' � � - ,� - ,r� Y �.�' .''' �_ ♦ SCOUR COI�PUTATIONS WEC-19.APRIL 2012,fROM HEC RASI ; 025 IIO 4383 0.0 3.6 - - �,-��y�y 5 � "� �;' � �. �L� ! f�94,�"J _ } �.,T� � ............... .......................................................................................................... " """" " """ "" "" `3 � % 11 . . . . . . . . .... ......... .. ...... '��� � �` ��r e j � . 100 YEdR CONTRACTION SCOUR cDiSCHARGE AN� �DTH yALUES FOR APPROACH SELTION TAKEN FROA� RS 58<�. I O50 n0 a383 0.0 36 �-..y '.g .............................................................. ............. .... . .... .......... . . . ____ ___ l i _ c � ... . N � : •rs� ��ar�', _+� ..-� Y2 :YI(02/OI16/7(�I/'�21K� ............................................................................................ ' O100 120_" ""'438_35'_" 0.0 ""'3 8 : ..... ...................... • ' '_""" "' "" """"' ' Y2 = 1.77120.56/71.3116/7(6.7/4.410.69 _ O.BI ' ""0500""' """'130"""" _""438_4 "'0.0"' 3.9 : ..............""'...""'...........................""'...""'...""'...""""""""""'...""'........... , , . , og� Ys = Y2 - vo .______"______"______"______"______"______"______"______"______"______"______"______"______" ; Wa}erway Opening Provided Belowflesign W.S. Elev..__5P____s.f.,l00yr W.S. Elev. "??"'_s.f.,Total.. 990...s.f., j �`� Designed 6y:.......�ANCE BIAN ON PE ... .............. ................ .... �x: .. . � L.O.B. = 4.6 : �w. EpNIFHp vEpA�iNE. Ei.. T , Ys eCN� = 0.0 FT � Avera Channel Velocii Desi 3•34 f. Avero e Overbank Veloci Desi n R:9:@;' �•� f. � �-�I Assis}ed b �oK1 GRAv, PE Date I .......................................................................................................................... ; 9e Y � 9n�__.__ ____.__ P.s. 9 N( 9 I... ....... P.s. : ��. Y� , """""'. _ _. _ _.. _...""""""_"_'.... .......................................................................................................................... : Computed Scour : General .._.__.._._.__.. ft. Coniraction ._______�.9________F. Local ......h/A............ fi. : a Projeci Engineer : VANCE BLANTON. PE„".....""" � Kimley»>Horn `���� 8/I/2016 : Is a Floodway Revision Required? _____N/A________________________________________________________________________ : � Reviewed by: """"__"__"_____"__"""""""""" Kr+a Prolect No.: 0R325030 ''•...-...--.. . K:ARALRoodwcy�012325030 - CPW Extens'on�Hydraul4cs�CADD�BRG_CGLREPORT5�6SR_U1_+o_Roboson_Crk_Trib2.d'gn Date Printed: BiV20i6 Statement af Mitig�tion Credit Availability Chatham Umi�rella Mitigatian Bank [SAW-2p10-Q09$�) Stinking Creek Streaut & Wefland iVIitigafion Site 1Vav�mber 21, 201 fi CJ.S. Army Cor�s of Engineets {iJSACE) Raleigh Regeilatory Pield Qffice 3331 Heritage Trade Driwe, Suite 105 Wake Forest, NC 27587 Attachment 1.11 N.C. Division of Wat�r Rescsurces (DWR} 40i & Buffer Permittiag Unit Arehdale Building— 9�' Fl[x�r 512 Ncrrth Salis�ury Street Raleigh, NC 276Q4 Project: �hatham Park Way {US-f4 Business to US-64 By�aass Bridge} Cnunty: Chatham River Basin; Ca e�ear CU Location 8-di it HUC : 430300Q� Dear USACE & DWR Agents, Cn accordance with 33 CFR §332.$(r), we are providing this letter as canfirmatian that the following aredits (Credits) from the Chatham UmbreTla Mitigatian Bank (Bank) are currently aVailable. If a permit is iss�ed, and the credits are still a�aitable, these credits �(or portiQn Qf these credits requi��d to satisfy perrmit mitigatian requirements) will be allacated to Chatham Park Inrestars LLC (Applicant), anee transferred, tn satisfy a portion or all of the cumpensatory rriitigation permit conditions required For the C�rathar�t Park Way project. • 0.36 Riparian Wetland Mitigatio�n Credits, and A Camp�nsatory Mitigation Respansibilrly Transfer Form �Tran�fer Form) wifl be completed and executed per�ding permit issuance and receipt in fult 4f any applicable payment for the Credits. We will send cvpies af #he completed and executed Transfer Form ta the AppliGant, the USACE Pr+aject Manager assigned ta the Bar�k (currently 1W-. Andrew Willia.ms) and, if needed, ather regulatory agencies (e.g., QWR}, An updaCed oopy ofthe Bank's Ledger, reflecting the transaction, will be pro�ided to the USACE. Shuuld yaur office har+e any questitrns, ptease aantact me at (9I9) 645-43�D. 5incereiy, Chatham Fark Investars, LLC (SpQnsor� �7 � ��f� �� Z � � �"f �" " �. Timothy R. 5mith, Manager 5���q Nearest Town Pittshdr�r Ro6eso tinkin GreeklJardan Lake Ri�er Basir� eaL �'�xr Cane Fesr Goardinates AI 35.71254 W-74.2154 site is narth �nd sn�th of 64 at Pitts�ora Ch t am Caunt N�C and cxt nds soati� ad acent ta .Iordao Lake. B�sod on prelirninary informatit�n, �here m�y b�e wetlands an the abo�e described praperty, We sVongly sug,�est you haas lhis praperty inspected to determine the extent af Dapart�nent af the Army (DA) jurisdict�a�t. Ta be considereci fulal, a juris�iiciional decermination must be v�rified by the Cpr�as. 'This preliminflry determinatian is nQt �n appealable actian under tl�e RegulaWry Progr�m .A.d�ninistrative Appeal Process i Ref�s'snce 33 CF� Part 33l}. Tl�ere are N�vig�hle Waters af thc llnited States within the abave desce�bed property subje tfl d�e p�rmit reyuireme�sts af Section IO of the Rivers ane! hlarb�ors Aet and Section 40�4 af the Cleari Water Act. Ilnless ere is a change in the lmw ar nur pubtished regulalians, this decer►nination may be rclicd uppn For a period nnl to excaed ve years fram the date of this ect area subject to dte �iex�nit requiremenis is a cliAnge in the law nr our publisltes� d�ve years �ram the date oFthis nvtificaticr We strvngly suggest yau hav� the w�tlands nn your property delineated. L7ue sent wcrrkload, th� �arps may nal be able to aCcomplisf� this watfand delineat ineation, you anay wisla tc� ohtain a consult�.nt, Ta be considered final, any de sir.e of your property andlor aur a timely manner. ['or a more ti�n 4n it�ust be veritied by th� +Gorps. X The waters af the U.S. including wetland on yaur �rrc�ject arca have be$n delineated and tlYe delinea�iot� has vere�ed 6y dic Corps. We 'sa'ongly suggest you have thi� delineation surv�y�d. Upon campletion, tifis survey reviewed and veriFed by the Corps. �nce veri�ed, this survey w.ili provide an accurate depic�ion of all �reas s CWA jurisdictian on yaur praperty which, provided �ilere is no c[zan�;e u� the law or our published regulatians, reIied u}�an far a per�ad n�t to exceed five ycars. The wetlands have n delineated and surveyed and are accural�eiy depicted F�egulatory Offieisl id fied l�elvw on . Unless th�re �s a change in the 1 deker�ni�alion m�y be �d upan far a period noc to exce�d five years Fro1n ihe Evidenee of an c�rdi��arv hi�h rwater mark and use af !he 1987 Wetlands �elineatiun Manual on waters +�f tihe US with surfaee connectio� to Jor�ian Lak� a TN'VS+: This cnan�eti�n as either ciirec ar throu h Stinkin Creek or Rabest►n = Chatham Park - � �............ ._ n......r January 19.2009 . �'� 5&ECProject#9948 �.—. c.r...r.r.. — i v.—...r.� .r— ��y ^�f - — I (� ? I I I I II � J � / � �r� - �"� �� — �� J '� I ,/ � 1 / � � —. __ � } F ! I V � j \..�� +! f � � J � L� ,_ +' � 1 � _ .= �-'�`� '!` � � � �:- � ... � �� 1, � ��.. L � � �nemvemPa�,s�sew�oim��e��r Areas n WetlantlsnT onwoP�sar�x � ai D.alnagesWO e� � `1 ,�_, {� � � ��� . f V r� �� L �^"`..__ .. '�4 __ . - - - ,- _.j � � /f ._ . , _ �� �; � �r � i , , f! ,� _ __ � �• - � � - _ I �f%�`4}� ��_�`-_1 ��. s� '� q __ ..�va � I g.l � 1 M � �. � t _, � W � ..> � �� _._- _ � f , _ _ . + � � `_ '� � 1 � , , . , . .� ✓ _ , ; � , r._ � , , , __... I ��:f � � �J � �� � �� ' �'�, � �� 1 ' .._ � � . . � �.,� � � �� k � r� y i ., ,. , , � � '� ---'� _.' - - - �p �.. -...__�3- �� �.- 1 -s .= '`� �, :,�; � 4,� �__ � � .� I �� ' ,: N uryPfS. c neSP e'eB'JfBS. ions or w�c 1 inCh eqUals 850 feet o i,�zs z,zso a,a�s a,soo Fee� S I I I I YA aax r�$ sss �m SB�R�, .C.2731 20 E?5 Army Cnrps af Engir��rs Raleigh ltegulat�ry. I�fe}.d Of�l At�nc Andreva Wiliiams 3331 erit�age'Frade �3rtve, Wake ares� N� 2758T rm ittin i� ,�rehd S�e ign Icway +.�, � � �, C' ��Q" ,,,,i'� , _ `- ` , . � `'� cc. �� $���`�� +� �"', � �` . � :;. �.' ��� ��/ CC3 4Mf.S�?M FD�EY J�HN BC1Ni7� re�e nced above is cnr�sisiered a art the n's Comprehensf '!�-atesps�rtati�nn P (�TF) ay min ed as the Nr�rth-5outh Conn cta n th dateci j�iy 8. 21�5 aS adopted i�y the r,�n raf Fitts was alsca adapted y Chatham Co ntp nr� Septemb 19, 2�1i anct 1�C�0 on Nc�vetr� r 3. 2a �crrthertnore t-�ls rnject �s with� ti�e "i'awr�'s ETJ d we concur ttsat th �i�rrient th� pr 1t is onc unders�nding thax G�ati►am Park I�n�restors LLC is appiying to permit the Empa+�ts under a NaYonwide Permlt {24] far a Llttear Transport�ticsn �raject Th� Tawn anticipates �that NGDQT �will acce tt►is right-uf-way #'�nr maintenas�ce u�ran �am�letinn. HQw�ver, uve la�k fnrtEvard to working in partnersh wit:it F�CDOT and Cl�atha�n �at`i� because ithe prc��ect w dl�ec onnectan fram U5 Hw� 54 Buseness to Su'�es Raad �cur ntiy a dead e� Hwy -SEII. W antic paCe th�t i�tts�ora and Chath�m �ounty siden�. as we t�cerely� � � ad� a�d ntua other tr lers �� s�z