HomeMy WebLinkAbout20080994 Ver 1_More Info Received_20080620Will this project (based on past and reasonably anticipated fitture impacts) result in additional
development which could impact nearby downstream water quality? Yes ? No
If yes, please submit a qualitative or quantitative cumulative impact analysis in accordance with
the most recent North Carolina Division of Water Quality policy posted on our website at
http://h2o.enr.state.nc.us/ncwetlands. If no, please provide a short narrative description:
XV. Other Circumstances (Optional):
It is the applicant's responsibility to submit the application sufficiently in advance of desired
construction dates to allow processing time for these permits. However, an applicant may
choose to list constraints associated with construction or sequencing that may impose limits on
work schedules (e.g., draw-down schedules for lakes, dates associated with Endangered and
Threatened Species, accessibility problems, or other issues outside of the applicant's control).
2-0
Applicant/ gent's Signature Date
(Agent's signature is valid only if an authorization letter from the applicant is provided.)
Page 13 of 13