Loading...
HomeMy WebLinkAbout20080545 Ver 1_Application_200805060000 %+ ItIqy NCDENR drJS?;: ? goo North Carolina Department of Environment and Natural Resourc?q'F? 8 t6 Division of Coastal Management nv?F?ry Michael F. Easley, Governor James H. Gregson, Director William G. Ross Jr., Secreta4rNy May 5, 2008 Mr. Clay Willis N.C. Department of Transportation Division One 113 Airport Drive, Suite 100 Edenton, NC 27932 Re: CAMA Major Permit Application for the Replacement of Bridge #13 on SR 1226 over Indian Creek (aka Dillards Creek), Chowan County. Dear Mr. Willis: This letter is in response to a permit application request under the Coastal Area Management Act (LAMA) from the NC Department of Transportation (NCDOT) for the above referenced project. Processing of the permit application package for this project, which was received as complete by the Division of Coastal Management's (DCM's) Elizabeth City District office on March 17, 2008, is ongoing. However, it has been determined that additional information will be required prior to DCM taking final action on your application. This item is summarized below: The N.C. Division of Water Quality (DWQ) determined that a Stormwater Management Permit is required for this project. In that the rules of the Coastal Resources Commission state that "If the application is found to be incomplete or inaccurate after processing has begun or if additional information from the applicant is necessary to adequately assess the project, the processing shall be terminated pending receipt of the necessary changes or necessary information from the applicant" [T15A:0710204(d)], the Division has determined that in cases such as this, the Stormwater Management Permit required by DWQ must be obtained prior to the issuance of a CAMA permit. Therefore, it is necessary that processing of your permit application be placed in abeyance until such time as a copy of the Stormwater Management Permit is supplied to this office. 1638 Mail Service Center, Raleigh, North Carolina 27699-1638 Phone: 919-733-2293 \ FAX: 919-733-1495 \ Internet: http://www.nccoastalmanagement.net An Equal Opportunity \ Affirmative Action Employer - 50% Recycled \ 10% Post Consumer Paper As required by T15A:07J.0204(d), during the pendency of any termination of processing, the permit processing period will not run. Upon resolution of the above listed item, DCM will resume processing of the application at the point where it was terminated. Please feel free to contact me at (919) 733-2293 x238 or via e-mail at Cathy.Brittingham@ncmail.net if you have any questions or concerns. Sincerely, ) fCathy Bnttmgham ' Transportation Project Coordinator cc: Bill Biddlecome, USACOE Jim Hoadley, DCM Garcy Ward, DWQ David Wainwright, DWQ Roger Thorpe, DWQ