May 5, 2008
Mr. Clay Willis
N.C. Department of Transportation
Division One
113 Airport Drive, Suite 100
Edenton, NC 27932
Re: CAMA Major Permit Application for the Replacement of Bridge #13 on SR 1226 over Indian
Creek (aka Dillards Creek), Chowan County.
Dear Mr. Willis:
This letter is in response to a permit application request under the Coastal Area Management Act
(LAMA) from the NC Department of Transportation (NCDOT) for the above referenced project.
Processing of the permit application package for this project, which was received as complete by the
Division of Coastal Management's (DCM's) Elizabeth City District office on March 17, 2008, is
ongoing. However, it has been determined that additional information will be required prior to DCM
taking final action on your application. This item is summarized below:
The N.C. Division of Water Quality (DWQ) determined that a Stormwater Management Permit
is required for this project.
In that the rules of the Coastal Resources Commission state that "If the application is found to be
incomplete or inaccurate after processing has begun or if additional information from the applicant is
necessary to adequately assess the project, the processing shall be terminated pending receipt of the
necessary changes or necessary information from the applicant" [T15A:0710204(d)], the Division has
determined that in cases such as this, the Stormwater Management Permit required by DWQ must be
obtained prior to the issuance of a CAMA permit. Therefore, it is necessary that processing of your
permit application be placed in abeyance until such time as a copy of the Stormwater Management
Permit is supplied to this office.
1638 Mail Service Center, Raleigh, North Carolina 27699-1638
Phone: 919-733-2293 \ FAX: 919-733-1495 \ Internet: http://www.nccoastalmanagement.net
An Equal Opportunity \ Affirmative Action Employer - 50% Recycled \ 10% Post Consumer Paper
As required by T15A:07J.0204(d), during the pendency of any termination of processing, the
permit processing period will not run. Upon resolution of the above listed item, DCM will
resume processing of the application at the point where it was terminated.
Please feel free to contact me at (919) 733-2293 x238 or via e-mail at
Cathy.Brittingham@ncmail.net if you have any questions or concerns.
Sincerely,
) fCathy Bnttmgham '
Transportation Project Coordinator