Loading...
HomeMy WebLinkAbout20141138 Ver 2_Approval Letter_20161128Environmental Quality NOTA CAMA PERMIT November 28, 2016 PAT MCCRORY Governor DONALD R. VAN DER VAART Secretary JAY ZIMMERMAN DWR Director DWR # 2014-1138 Ver. 2 Dare County Kitty Hawk Landing Association, Inc. Attn: Mr. Robert Darden and Mr. Peter Collins PO Box 923 Kitty Hawk, NC 27949 Subject: Approval of 401 Water Quality Certification with Additional Conditions KH Landing South Entrance Dredging Dear Messrs. Darden and Collins: You have our approval for the impacts listed below for the purpose described in your application dated November 1, 2016 and received by the Division of Water Resources (Division) on November 7, 2016. These impacts are covered by the attached Water Quality General Certification Number 3900 and the conditions listed below. This certification is associated with the use of CAMA Major Permit and General Permit(s) 198000291 issued by the US Army Corps of Engineers (USACE). This Certification allows you to use the CAMA Major Permit when the Division of Coastal Management issues it. Please note that you should get any other federal, state or local permits before proceeding with your project, including those required by (but not limited to) Sediment and Erosion Control, Non -Discharge, and Water Supply Watershed regulations. This approval requires you to follow the conditions listed in the enclosed certification(s) or general permit and the following additional conditions: 1. The following impacts are hereby approved provided that all of the other specific and general conditions of the Certification are met. No other impacts are approved, including incidental impacts. [15A NCAC 02B .0506(b)(c) and 15A NCAC 02B. 0233(8)] Type of Impact Amount Approved Amount Reduced Plan location/ (units) (units) Reference Permanent Temporary Attached Open Water OW -1 (Dredge) South Entrance 2.02 (acres) 0 (acres) Dredging CAMA Plan 2. This approval is for the purpose and design described in your application. The plans and specifications for this project are incorporated by reference as part of the Certification. If you change your project, you must notify the Division and you may be required to submit a - � Nothing Compares `_- State of North Carolina I Environmental Quality I Water Resources -Water Quality Regional Operations Section -Washington Regional Office 943 Washington Square Mall, Washington, North Carolina 27889 252-946-6481 KITTY HAWK LANDING ASSOCIATION, INC. ATTN: MR. ROBERT DARDEN AND MR. PETER COLLINS DWR# 2014-1138 VER. 2 401APPROVAL Page 2 of 5 new application package with the appropriate fee. If the property is sold, the new owner must be given a copy of this approval letter and General Certification and is responsible for complying with all conditions. [15A NCAC 02B .0507(d)(2)] 3. Water Qualitv Certification The proposed project must comply with all the conditions of the General Water Quality Certifications) 3900. [15A NCAC 02B .0507(c)] Continuing Compliance 4. No waste, Spoil, Solids, or Fill of Any Kind No waste, spoil, solids, or fill of any kind occur in wetlands, waters, or riparian buffer areas beyond the footprint of the impacts depicted in the application. All construction activities, including design, installation, operation, and maintenance of sediment and erosion control Best Management Practices, shall be performed so that no violation of state water quality standards, statutes, or rules occur. [15A NCAC 02H .0501 and .0502] 5. Please note that the area surrounding the channel contains submerged aquatic vegetation (SAVs). No impacts to SAVs are authorized by this certification outside the approved impacts specified herein. [15A NCAC 07H .0208(b)] 6. All mechanized equipment operated near surface waters or wetlands will be regularly inspected and maintained to prevent contamination of waters and wetlands from fuels, lubricants, hydraulic fluids or other potential toxic chemicals. In the event of a hydrocarbon or chemical spill, the permitee/contractor shall immediately contact the Division of Water Quality, between the hours of 8 am to 5 pm at the Washington Regional Office at 252.946.6481 and after hours and on weekends call (800) 858-0368. Management of such spills shall comply with provisions of the North Carolina Oil Pollution and Hazardous Substances Control Act. [15A NCAC 02H .0506 (b)(3) and (c)(3), 15A NCAC 02B.0200 (3)(f), and GS 143 Article 21A] 7. Turbidity Standard The Permittee shall adhere specially to 15A NCAC 02B .0222 Tidal Salt Water Quality for Class SB Waters (3)(g) pH: shall be normal for waters in the area, which generally shall range between 6.8 and 8.5 except that swamp waters may have a pH as low as 4.3 if it is the result of natural conditions; (1) Turbidity: the turbidity in the receiving water shall not exceed 25 NTU; if turbidity exceeds this level due to natural background conditions, the existing turbidity level shall not be increased. [15A NCAC 02B .0220] 8. Spills KITTY HAWK LANDING ASSOCIATION, INC. ATTN: MR. ROBERT DARDEN AND MR. PETER COLLINS DWR# 2014-1138 VER. 2 401 APPROVAL Page 3 of 5 The permittee shall report to the local DWR Regional Office, within 24 hours, all significant spills as defined under Section 311 of the Clean Water Act (Ref; 40 CFR 110.10 and CFR 117.21) or section of CERCLA (Ref: 40 CFR 302.4). Additionally, the permittee shall report spills including: any oil spills of 25 gallons or more and any spill regardless of amount that causes sheen on surface waters. Other Conditions 9. Re Opener Clause Kitty Hawk Landing Association, Inc. and their authorized agents shall conduct their activities in a manner consistent with State water quality standards (including any requirements resulting from compliance with section 303(d) of the Clean Water Act) and any other appropriate requirements of State law and federal law. Kitty Hawk Landing Association, Inc. shall require their contractors (and/or agents) to comply with all of the terms of this Certification, and shall provide each of their contractors (and/or agents) a copy of this Certification. A copy of this Certification shall be included in the construction contract and available on the job site at all times. If DWR determines that such standards or laws are not being met (including the failure to sustain a designated or achieved use) or that State or federal law is being violated, or that further conditions are necessary to assure compliance, DWR may reevaluate and modify this certification to include conditions appropriate to assure compliance with such standards and requirements in accordance with 15A NCAC 2H.0507(d). Before modifying the certification, DWR shall notify the Kitty Hawk Landing Association, Inc. and the US Army Corps of Engineers, provide public notice in accordance with 15A NCAC 2H.0503 and provide opportunity for public hearing in accordance with 15A NCAC 2H.0504. Any new or revised conditions shall be provided to DWR in writing, shall be provided to the United States Army Corps of Engineers for reference in any permit issued pursuant to Section 404 of the Clean Water Act, and shall also become conditions of the 404 Permit for the project. 10. Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, any subsequent modifications, the applicant is required to return the attached certificate of completion to the 401 & Buffer Permitting Unit, NC Division of Water Resources, 1617 Mail Service Center, Raleigh, NC 27699-1650. [15A NCAC 02H .0507 (c)] 11. The applicant and/or authorized agent shall provide a completed Certificate of Completion form to the Division within thirty (30) days of project completion (available at http://Portal.ncdenr.org/web/wq/swp/ws/401/certsandpermits/apply/forms). [15A NCAC 02H .0506(b)(5)] 12. This approval and its conditions are final and binding unless contested. [G.S. 143-215.5] These Certifications can be contested as provided in Articles 3 and 4 of General Statute 150B by filing a written petition for an administrative hearing to the Office of Administrative Hearings (hereby known as KITTY HAWK LANDING ASSOCIATION, INC. ATTN: MR. ROBERT DARDEN AND MR. PETER COLLINS DWR# 2014-1138 VER. 2 401APPROVAL Page 4 of 5 OAH). A petition form may be obtained from the OAH at http://www.ncoah.com/ or by calling the OAH Clerk's Office at (919) 431-3000 for information. Within sixty (60) calendar days of receipt of this notice, a petition must be filed with the OAH. A petition is considered filed when the original and one (1) copy along with any applicable OAH filing fee is received in the OAH during normal office hours (Monday through Friday between B:OOam and S:OOpm, excluding official state holidays). The petition may be faxed to the OAH at (919) 431-3100, provided the original and one copy of the petition along with any applicable OAH filing fee is received by the OAH within five (5) business days following the faxed transmission. Mailing address for the OAH: If sending via US Postal Service: If sending via delivery service (UPS, FedEx, etc.): Office of Administrative Hearings Office of Administrative Hearings 6714 Mail Service Center 1711 New Hope Church Road Raleigh, NC 27699-6714 Raleigh, NC 27609-6285 One (1) copy of the petition must also be served to DENR: Sam H. Hayes, General Counsel Department of Environmental Quality 1601 Mail Service Center Raleigh, NC 27699-1601 This letter completes the review of the Division under section 401 of the Clean Water Act. Please contact Anthony Scarbraugh at 252-948-3924 or anthony.scarbraugh@ncdenr.gov if you have any questions or concerns. Sincerely, 191 -If Robert Tankard, :Assistant:qi alSupervisor Water Quality Regional Operations Section Division of Water Resources, NCDEQ Enclosures: GC 3900 Certification of Completion KITTY HAWK LANDING ASSOCIATION, INC. ATTN: MR. ROBERT DARDEN AND MR. PETER COLLINS DWR# 2014-1138 VER. 2 401 APPROVAL Page 5 of 5 cc: Doug Huggett, DCM Morehead City Office (via email) Josh Pelletier, USACE Washington Regulatory Field Office (via email) Laserfiche File Brian Rubino, Quible & Associates, P.C. (via email: brubino@quible.com) a E r a C6 0 N N N 3 m X 0 i 0 d o+ 3 0 0 r 0 a a 0 ci KITTY HAWK, NC 27949 IVU V G G I-" 3. PERMITTED WORK UNDER CAMA MAJOR PERMIT 153-09: Re Tonal 80 LF X 25 FT TO —4.0 FT (NWL) = Water Quality 9 2,000 SF , 111 CU YRDS Operations Section Washington Regional Office 4. PROPOSED WORK: A. NEW PROPOSED CHANNEL EXPANSION: 2,166 LF X 40 FT (38FT BOX CUT) TO —5.5 FT (NWL) _ 84,353 SF , 3,058 CU YRDS (CALCULATED VOLUME BASED ON WATER DEPTH SURVEY) B. ADDTIONAL APPROX. —1.5 FT DEPTH (TO —5.5 FT) IN PERMITTED CHANNEL = 2,000 SF , 94 CU YRDS (CALCULATED VOLUME BASED ON WATER DEPTH SURVEY) C. TOTAL PROPOSED CHANNEL EXCAVATION (INCLUDING EXISTING PERMITTED WORK) 86,353 SF , 3,263 CU YRDS 5. THIS IS NOT A BOUNDARY SURVEY. BOUNDARY INFORMATION BASED ON DARE COUNTY GIS TAX DATA. WATER DEPTHS, CHANNEL MARKER LOCATIONS AND SAV DELINEATION WERE FIELD SURVEYED ON 6-21-2016 AND 6-27-2016 BY QUIBLE & ASSOCIATES, P.C., USING GPS, RTK NETWORK. THIS INFORMATION SHALL NOT BE CONSIDERED A CERTIFIED SURVEY. THIS SHALL BE CONSIDERED PRELIMINARY AND FOR PERMITTING ONLY. APPROVED North Carolina Environmentae Management Commission Division of Water Resources ia_ 1112Y' 20-y-�-- Permit # 2 t �(- I p � VE R - DREDGE CHANNEL , Elf 9865/1a�6/345 w w PER LAMA MAJOR x"I h' 3 w Y w 153-09 x x -IS w � X-1 ED6E OF 5A x"25X ,.�F" X-2. .1,; F. 2° s w w w w w w w w w 04-3 .3 'r X-3.,3 SHORELINE PER "3-9113 33X :: + DARE COUNTY 615 w v w PROPOSED CHANNEL x" 68364. pe 2,166 LF X 40 FT x" 13 w w w w w v AT —5.5 FT (NWL) w w y v w d o w x"3 ;i: k. 1 w -y w �• w✓ w X- �. ; . 5 EDGE OF 5AV w w N/F X, 3 ii 4! y- y EARTH RES9,/RCES 11 x"3- °�,z'•;;.1, 3 Deed Bookl"e 1846A x3�0�bX��;,,,643X�1'i w w986�0.�03r y FX15T1N6 GHAT'h. L M/!:Y.t-K x.3. ? 3.�. 4-44 1 w w w w DASHED L/NE x-3 8•��v���, 4• �3."�S w w APPROX.-3• x 4� EDGE OF 5AV -- -- - "3. 3.3.8x4k� •x"10 w w w w w BASED ON {NATER DEPTH MOT SURVEYED) 3�3_� � .I� 4• -3 � v v W )!' w W w x -s z-3 bid 3 °k°4 `F 3 8� DASHED LINE w X 4544 pxF�3l 25°X 4' APPROX y EDGE OF 5A BASED ON SNA .60 DEPTH (NOT SUR D) _SHORELINE PES x,4.5Xs4 4.64.? 5 �X-5"4. t w w DARE COUNTY x-4 hx�."k-y.3X.5'IX_y5X 5 � x"4.1.g545.1� 51�-5t!5! x-4 ii 54552-5-k-5bx-4 x"4.0-5.1�-5,bx53x"566-45 x,4.-i�.5!�c.5.5X-b QbS•8X 5�1r� x5bxb(9 51Xybxy5 C -5.2x 5 �x-6 3x-5.bx y.�-5 i v u - w w w y a• w w .v .v w w w NIP EARTH RE5CMCE5 INC Deed Boom-oge 1846/0189 98650050.3580 Elevations Table Number Minimum Elevation Maximum Elevation Color 1 —7.000 —6.060 2 —6.000 —5.000 L 3 —5.000 —4.000 4 —4.00D —3.000 5 1 —3.000 1 —2000 6-2-000 —1.000 7 —1.000 0.000 APPROVED North Carolina Environmentae Management Commission Division of Water Resources ia_ 1112Y' 20-y-�-- Permit # 2 t �(- I p � VE R - DREDGE CHANNEL , Elf 9865/1a�6/345 w w PER LAMA MAJOR x"I h' 3 w Y w 153-09 x x -IS w � X-1 ED6E OF 5A x"25X ,.�F" X-2. .1,; F. 2° s w w w w w w w w w 04-3 .3 'r X-3.,3 SHORELINE PER "3-9113 33X :: + DARE COUNTY 615 w v w PROPOSED CHANNEL x" 68364. pe 2,166 LF X 40 FT x" 13 w w w w w v AT —5.5 FT (NWL) w w y v w d o w x"3 ;i: k. 1 w -y w �• w✓ w X- �. ; . 5 EDGE OF 5AV w w N/F X, 3 ii 4! y- y EARTH RES9,/RCES 11 x"3- °�,z'•;;.1, 3 Deed Bookl"e 1846A x3�0�bX��;,,,643X�1'i w w986�0.�03r y FX15T1N6 GHAT'h. L M/!:Y.t-K x.3. ? 3.�. 4-44 1 w w w w DASHED L/NE x-3 8•��v���, 4• �3."�S w w APPROX.-3• x 4� EDGE OF 5AV -- -- - "3. 3.3.8x4k� •x"10 w w w w w BASED ON {NATER DEPTH MOT SURVEYED) 3�3_� � .I� 4• -3 � v v W )!' w W w x -s z-3 bid 3 °k°4 `F 3 8� DASHED LINE w X 4544 pxF�3l 25°X 4' APPROX y EDGE OF 5A BASED ON SNA .60 DEPTH (NOT SUR D) _SHORELINE PES x,4.5Xs4 4.64.? 5 �X-5"4. t w w DARE COUNTY x-4 hx�."k-y.3X.5'IX_y5X 5 � x"4.1.g545.1� 51�-5t!5! x-4 ii 54552-5-k-5bx-4 x"4.0-5.1�-5,bx53x"566-45 x,4.-i�.5!�c.5.5X-b QbS•8X 5�1r� x5bxb(9 51Xybxy5 C -5.2x 5 �x-6 3x-5.bx y.�-5 i v u - w w w y a• w w .v .v w w w NIP EARTH RE5CMCE5 INC Deed Boom-oge 1846/0189 98650050.3580 w w