Strickland, Bev
From:JONATHAN HINKLE <jonathanhinkle@bellsouth.net>
Sent:Monday, November 21, 2016 5:07 PM
To:Mitchell, Robert K
Subject:Re: Holdings 282 Mark Twain Drive
It is definitely 380 sq ft above. The area below its the 3’ plus half of the 3’3” of footing. So the area below is
351 sq ft.
Jonathan Hinkle
Marathon Builders
WNC Dock Company
jonathanhinkle@bellsouth.net
On Nov 21, 2016, at 5:01 PM, Mitchell, Robert K <kevin.mitchell@ncdenr.gov> wrote:
Jonathan,
So we are looking at 380 sq. feet above and 475 sq. feet below. Is that correct?
Regarding Ashley Rogers. I did not take her position. Were you trying to get a trout buffer
variance? Those now go to Stan Aiken with DEMLR. You can reach him at 828-296-4610 or via email
at stan.aiken@ncdenr.gov. Hope that helps. Let me know if you have other questions.
Kevin Mitchell
Environmental Specialist – Asheville Regional Office
Water Quality Regional Operations Section
NCDEQ – Division of Water Resources
828-296-4650 Office
Email Kevin.mitchell@ncdenr.gov
2090 U.S. Hwy. 70
Swannanoa, N.C. 28778
<image001.png>
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties.
From: JONATHAN HINKLE \[mailto:jonathanhinkle@bellsouth.net\]
Sent: Monday, November 21, 2016 4:47 PM
1
To: Mitchell, Robert K <kevin.mitchell@ncdenr.gov>
Subject: Re: Holdings 282 Mark Twain Drive
Good Afternoon Mr Mitchell
I will try to clarify. We are going to excavate a footing that is 3’3” x76 which is 247 sq ft. This
will ultimately be below the 990 when the lake is filled backed to full pond. When we are
excavating the lake will be dropped 8-10 ft. When the retaining wall is completed we will be
installing rip rap on the water side of the seawall. The area for the rip rap is 228 sq ft. We will
also be installing washed stone behind the seawall. That area is 380 sq ft. I hope that is helpful.
Did you take over Ashley Rodgers position. I sent an application to her in August and still have
not had an answer.
Jonathan Hinkle
Marathon Builders
WNC Dock Company
jonathanhinkle@bellsouth.net
On Nov 21, 2016, at 4:13 PM, Mitchell, Robert K <kevin.mitchell@ncdenr.gov>
wrote:
Jonathan,
I am reviewing the application for the subject property and had a question. The square
footage of disturbance on items 10 and 11 page 3 do not match what is proposed on the
illustration on page 4. Can you clarify? Thanks.
Kevin Mitchell
Environmental Specialist – Asheville Regional Office
Water Quality Regional Operations Section
NCDEQ – Division of Water Resources
828-296-4650 Office
Email Kevin.mitchell@ncdenr.gov
2090 U.S. Hwy. 70
Swannanoa, N.C. 28778