Loading...
HomeMy WebLinkAboutWQ0018489_Monitoring - 10-2016_20161128South Cary WRF Quality Control/Quality Assurance Statement for NDMR October 2016 Matrix Spike Duplicate did not meet acceptance criteria for the NO2- NO3 analysis on 10/17/16. All other QA/QC and Method requirements were met. Data is valid. GGA standard did not meet acceptance criteria for the BOD analysis on 10/19/16 and 10/20/16. All other QA/QC and Method requirements were met. Data is valid. Mrs. Kelly Spainhour SCWRF Laboratory Supervisor 4900 West Lake Road Apex NC 27539 919-779-0697 y