HomeMy WebLinkAbout20160995 Ver 1_More Info Received_20161031Strickland, Bev From: Cindy Lancaster <clancaster@jewellengr.com> Sent: Monday, October 31, 2016 1:19 PM To: Bailey, David E SAW Cc: Homewood, Sue Subject: RE: PCN Forms/Na rrative&Exi bits for Lake Miller Permanent Dam Breach, MillerCoors David -- Following up on our phone conversation this morning, here is a summary of estimated riprap volumes: We will itemize the check dam and breach channel separately as 990 s.f. for the check dam and 570 s.f. for the portion of the breach channel riprap within the OHWM for the lake. The estimated riprap volumes are 134 c.y. for the check dam and 53 c.y. for the upper portion of the breach channel. As I mentioned on the phone, there is no plan to remove the check dam because MillerCoors is trying to close out their involvement on the site as soon as possible. We expect a new stream channel to erode itself through the accumulated bottom sediments back to approximately the historical channel grade, but there is no expectation of severe headcutting because the check dam will provide grade control. We computed the estimated sediment volume resulting from eroded stream channels through the lake bottom as compared to the available storage volume between the existing pond bottom and the elevation of the top of the check dam. Although they were rough calculations, the intent was to be conservative and allow for a factor of safety in setting the elevation of the check dam. The purpose of the check dam is to make sure those eroded soils stay within the pond bottom area instead of migrating downstream beyond the breach. Feel free to give me a call if you have other questions. When you have decided the most appropriate NWP for us to use let me know and we will re -submit the PCN forms, plus an updated drawing showing OHWMs. Thanks, Cindy Cynthia C. Lancaster, P.E., CFM JEWELL Engineering Consultants, P.C. Phone: 336-996-9974, ext. 102 -----Original Message ----- From: Bailey, David E SAW[mailto:David.E.Bailey2@usace.army.mil] Sent: Friday, October 28, 2016 12:46 PM To: Cindy Lancaster Cc: Homewood, Sue Subject: RE: PCN Forms/Na rrative&Exibits for Lake Miller Permanent Dam Breach, MillerCoors Hi Cindy, and thanks for the PCN and attached plans. A few questions for you: 1) Would it be possible to overlay the current Ordinary High Water Mark (OHWM) of the pond and the start of the stream channel downstream of the dam on a planview sheet, and then also overlay the footprint of fill occurring with the ordinary high water mark on either side of the dam? 2) On the PCN can you itemize out fill due to the checkdam from fill due to rip rap lining of channel? Just to be clear, the only fill that would require authorization would be the portion of the checkdam or rip rap lining that are within the existing pond or stream OHWM. 3) Please include the volume of fill (in cubic yards) of material proposed for the check dam within the existing OHWM of the pond. 4) Will the check dam be removed? If so, what is the timing of the removal? 5) Is any stream channel restoration/re-establishment proposed within the pond bed upon completion of the dam breach? Also, will any grade controls within the pond bed be necessary to prevent severe headcutting through the highly erodible sediments as the stream channel forms? Responses to the above will help determine if NWP 27 is justifyable for this project, or if another NWP is better suited. Thanks, and please let me know if you have any questions. -Dave Bailey David E. Bailey, PWS Regulatory Project Manager US Army Corps of Engineers CE -SAW -RG -R 3331 Heritage Trade Drive, Suite 105 Wake Forest, North Carolina 27587 Phone: (919) 554-4884, Ext. 30. Fax: (919) 562-0421 Email: David. E. Bailey2@usace.army.mil The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so, please complete the Customer Satisfaction Survey located at http://corpsmapu.usace.army.mil/cm_apex/f?p=136:4:0. -----Original Message ----- From: Cindy Lancaster[mailto:clancaster@jewellengr.com] Sent: Friday, October 14, 2016 10:48 AM To: Bailey, David E SAW<David.E.Bailey2@usace.army.mil> Cc: Homewood, Sue <sue.homewood@ncdenr.gov> Subject: [EXTERNAL] PCN Forms/Na rrative&Exibits for Lake Miller Permanent Dam Breach, MillerCoors David - Attached is a PCN for the proposed dam breach at Lake Miller on the MillerCoors property in Eden, NC. We are mailing the required four copies of the submittal to NC DEQ for the water quality certification. Thanks, Cindy Cynthia C. Lancaster, P.E., CFM Water Resources Engineer PO Box 2294 Kernersville, NC 27285-2294 Phone 336-996-9974, ext. 102 clancaster@jewellengr.com <mailto:clancaster@jewellengr.com> Blockedwww.jewellengineering.pro <Blockedhttp://www.jewellengineering.pro> NOTICE: This electronic mail message including attachments, if any, is intended for the use of the individual or entity to whom it is addressed. It may contain information that is privileged, proprietary, confidential, and/or exempt from disclosure. If you are not the intended recipient, you are hereby notified that any dissemination, distribution or copying of this communication is strictly prohibited. If you have received this message in error, please notify the sender via reply e-mail and delete this message from your computer immediately.