Loading...
HomeMy WebLinkAbout20161155 Ver 1_Rand510_hyd_Construction_Sequence_4b_20161122L• COI�STI�UCTI01� S=�UENC� — I�H,��E \�',�INTqI�� Ci—IqNi�E� ��0�11 il—IROUGI—� EXISTING �Q��RE� — `� QND QQRRE� —20 �,� REMO�E IMPERVIOUS DIKE FROM IN�ET OF PROPOSED 3qRRE� — I SEC I IONg QDD NEIIII IMPER�IOUS DIKE q�ONG �ROPOSED BQRRE� — 20 �,� COMP! ETE CONSTRUCT OF PROPOSED QARRE� — lo �'„ C0�1� 1 RUCT IUIPERVIOUS DiKE TO RESTRICT qCCESS TO �XISTING BqRRE�S — 2 qND � ON UPSTREQM qND DOWNSTREQM ENDS9 AS SHOWN IN PHQSE I� PICTUREo REMOVE IMPERVIOUS DIKE QC�O�� PRCF'CSED �q�RE� — io 5o DIVERT CHANNE� F�OW THROUGi—I PROPOSED Qq�RE� — lo 0 NOTES CU�VERT CONSTRUCTION SHq�� BE PER�ORMED IN ON�Y DRY OR ISO�qTED SECIIONS OF CHQNNE�o 2o IMPER�IOUS DIKES QRE TO BE USED TO ISO�ATE WORK FROM STREQM ��O�II QS NECESSqRYo 3o q�� GRADED qREqS SHq�� BE STQBI�IZED WITHIN 24 HOURSo qo M�,INTENQNCE 0� STREAM F�OW OPERQTIONS SHq�� BE INCIDENTq� TO THE IIIIORKo THIS INC�UDES PO�YETHY�ENE SHEETING9 DI�ERSION PIPES9 PUMPS qND HOSESo 5o PUMPS qND HOSES SHq�� BE SUF�ICIENT SIZE TO DEVIIqTER THE VIIORK qREQo 6o THE CONTRqCTOR SHQ�� NOT PUMP SEDIMENT—�QDEN VIIqTER DIRECT�Y INTO STREqMo FOR DE—WqTERING OF CU��ERT SITESo THE CONTRQCTOR SHQ�� �I�TER SEDIMENT—�QDEN �IIQTER THROUGH SP� CIQ� STU_�ING BQSIN� ����TR����T �� SE�������E �N,��� � � C;?NST�?UCTION SE�UEI�JC- — 1�-IaSE I� P��CE PHQSE-4 DO�IINS—�=�EQM IMPFR�IOUS I�I��F qCROSS PROPOSEC� BqRRE� — 2 END�� 2� REMQVE REM�II�ING �'O�T�ON OF EXIST�NG B,�RRE� — 2 �ND �� �o COM��ETE CONSTRUCT 0� BQRRE� — 2 qND CH�I��IE� IM�ROVE�ENTSo 4� B�CKFI�� /�ND CONSTRUCT PROPOSED RO�D�II�"� 5o REMOVE q�� IM�'E��iOUS �IKES /�N� STI�-ING ��SI�!So �o STQBI�IZE FINQ� CHQI�NE� IMPROVEMENTSo CO�STRUCTO� SEQUE�C ��qSE 4 DU�Ii�G CJ�VE�T CONST���JC ION �EQUENCE —�HqS�S III9 I� � �9 T�q���IC IS S�II� I E� NOI�T�o l�� OR DE I QI�ED M/�INTENQNC� 0� I�A���Cg I���ER TO I HE TI�q��IC CONTI�O� P�ANS�