Loading...
HomeMy WebLinkAbout20161155 Ver 1_Rand510_hyd_Construction_Sequence_4a_20161122COf�ISTRUCTION S��UENC� — PHAS� o CONSTRUCT STI��ING BqSINS TO SIZFS SPECI�IED qT �OCATIONS SHO�IINo 2� �'I qC� �!�qS�—I IMI�EI��IOUS DIKESo �a MqINTQIN CHqNI��I ��OW TH��O�JGH �XISTING RiGHT BARR�� — �o 4� RFMO�E q��ROXo 47 �� 0� �XISTING �E�T QND �E�T CFNTER BQ1�=�RE�S — I� 29 �IEaDWQI �S qND Illlli�u�llq��So 5o CONS i RUCT DOWNS i REqM POR I IONS OF PROPOSED Bq�RE�S— I& 2� QN� II111NGWq��� �o RF�O�E �OWNSTREqM P� IqS�—I IM�ER�IO�S DIKEo 0 NOTES CU�VERT CONSTRUCTION SHq�� BE PER�ORMED IN ON�Y DRY OR ISO�qTED SECIIONS OF CHQNNE�o 2o IMPER�IOUS DIKES QRE TO BE USED TO ISO�ATE WORK FROM STREQM ��O�II QS NECESSqRYo 3o q�� GRADED qREqS SHq�� BE STQBI�IZED WITHIN 24 HOURSo qo M�,INTENQNCE 0� STREAM F�OW OPERQTIONS SHq�� BE INCIDENTq� TO THE IIIIORKo THIS INC�UDES PO�YETHY�ENE SHEETING9 DI�ERSION PIPES9 PUMPS qND HOSESo 5o PUMPS qND HOSES SHq�� BE SUF�ICIENT SIZE TO DEVIIqTER THE VIIORK qREQo 6o THE CONTRqCTOR SHQ�� NOT PUMP SEDIMENT—�QDEN VIIqTER DIRECT�Y INTO STREqMo FOR DE—WqTERING OF CU��ERT SITESo THE CONTRQCTOR SHQ�� �I�TER SEDIMENT—�QDEN �IIQTER THROUGH SP� CIQ� STU_�ING BQSIN� ���STRUCT ��I� SEQJ���� �N�S� CONSTRUCTION SEQUENCE — PHASE � P�QCE PHQSE-2 DOWNSTREqM IMPER�IOUS DIKES ACROSS PROPOSED BQRRE� — I/�ND EXISTING BARRE� �o 2� DI�ERT CHqNNE� F�OW THROUGH PROPOS�� BqRR=- — 2 USII�G 30" TEMPORqRY PIPEo �� REMO�E �PPROXo 56' 0� EXISTING DOWNSTREqM = X�STING B/�RRE� — � QND DOWNST�EQM HE�DW/���o �a CONSTRUCT RIGHT WINGIIII,q�� DOWNSTREAVo 5� REMO�E IMP�R�IOUS DIKE DOIIIII�STRE,�M qi�D EAST 0�- ��O�OSED BQRRE� — 20 �,�!�.ST��,�T �!�. 5��._,E��E ����E � DU�Ii�G CJ�VE�T CONST���JC ION �EQUENCE —�HqS�S I& IIS TI�q��IC IS SHI�T��D SOU�H� l�� OR DE I QI�ED M/�INTENQNC� 0� I�A���Cg I���ER TO I HE TI�q��IC CONTI�O� P�ANS�