Loading...
HomeMy WebLinkAbout20050234 Ver 2_Information Letter_20080410-DVJQ n)o. 05,6Z3( ? DWQ Project No.: 0 S 0 2 34 Applicant: N C-OOT D ? d 5 Project Name: 5 Date of Issuance of 401 Water Quality Certification: 024,1110 Certificate of Completion Upon completion of all work approved within the 401 Water Quality Certificati or applicable Buffer Rules, and any subsequent modifications, the applicant is required to return this certifica to the 401/Wetlands Unit, North Carolina Division of Water Quality, 1621 Mail Service Center, Raleigh, N , 27699-1621. This form may be returned to DWQ by the applicant, the applicant's authorized agent, or project engineer. It is not necessary to send certificates from all of these. Applicant's Certification I, , hereby state was used in the observation of the construction such that the compliance and intent of the 401 Water Quality Certifica ' n specifications, and other supporting materials. Signature: ,? r County: nh G. rV ance Date: r/ , as a duly registered Professional Engineer in the State of North authorized to observe (periodically, weekly, full time) the construction of the project, for the that, to the best of my abilities, due care and diligence was used in the observation of the the construction was observed to be built within substantial compliance and intent of the 401 atior, and Buffer Rules, the approved plans and specifications, and other supporting materials. Agent's Certification 1. was used in the observation of the a compliance and intent of the 401 W specifications, and other supporting Signature: Engineer's Certification Partial Final I, Carolina, having Permittee hereby construction suc Water Quality 'e Signature Date 11 Registration No. Date: -, hereby state that, to the best of my abilities, due care and diligence such that the construction was observed to be built within substantial Certification and Buffer Rules, the approved plans and t1fat. to the best of my abilities, due care and diligence onstruction was observed to be built within substantial and Buffer Rules, the approved plans and