Loading...
HomeMy WebLinkAbout20160846 Ver 1_Approval Letter_20161121Environmental Quality Mr. Jeff Akin 11308 Brass Kettle Road Raleigh, NC 27614 NOT A CAMA PERMIT November 21, 2016 PAT MCCRORY Governor DONALD R. VAN DER VAART Secretary JAY ZIMMERMAN DWR Director DWR # 2016-0846 Hyde County Subject: Approval of 401 Water Quality Certification with Additional Conditions Approval of Tar -Pamlico Riparian Buffer Impacts with Additional Conditions Jeff Akin Property -4638 Loop Road, Scranton, NC Dear Mr. Akin: You have our approval for the impacts listed below for the purpose described in your application dated July 1, 2016 and received by the Division of Water Resources (Division) on August 19, 2016. These impacts are covered by the attached Water Quality General Certification Number 3900, Tar -Pamlico River Riparian Buffer Rules, and the conditions listed below. This certification is associated with the use of CAMA Major Permit and General Permit(s) 198000291 issued by the US Army Corps of Engineers (USACE). This Certification allows you to use the CAMA Major Permit when the Division of Coastal Management issues it. Please note that you should get any other federal, state or local permits before proceeding with your project, including those, required by (but not limited to) Sediment and Erosion Control, Non -Discharge, and Water Supply Watershed regulations. This approval requires you,to follow the conditions listed in the enclosed certifications) or general permit and the following additional conditions: 1. The following impacts are hereby approved provided that all of the other specific and general conditions of the Certification are met. No other impacts are approved, including incidental impacts. [15A NCAC 02B .0506(b)(c) and 15A NCAC 02B. 0233(8)] Type of Impact Amount Approved (units) Permanent Amount Reduced (units) Temporary Plan location/ Reference Attached Coastal Wetlands W-1 (Dredged of Upland Basin) 0 (acres) "51 ftZ" 0 (acres) Sheet 6 of 7 404 Wetlands W-2 (Fill for Access Road) 0.05 (acres) 0 (acres) Sheet 6 of 7 Open Water OW -1 (Fill for Boat Ramp) 0.01 (acres) 0 (acres) Sheet 6 of 7 OW -2 (Shading for Dock) 0.01 (acres) 0 (acres) Sheet 6 of 7 Buffers -Zone 1 — rvocmng �.ompares— State of North Carolina I Environmental Quality I Water Resources -Water Quality Regional Operations Section -Washington Regional Office 943 Washington Square Mall, Washington, North Carolina 27889 252-946-6481 MR. JEFF AKIN D W R# 2016-0846 401 AND BUFFER APPROVAL Page 2 of 5 B-1 (Dredging of Upland Basin) 1,466 (square feet) 0 (square feet) Sheet 6 of 7/Supplement D B-2 (Boat Ramp) 410 (square feet) 0 (square feet) Supplement C B-4 (Bulkhead) 0 (square feet) 2,569 (square feet) Supplement C Buffers -Zone 2 B-1 (Dredging of Upland Basin) 166 (square feet) 0 (square feet) Sheet 6 of 7/Supplement D B-3 (Access Road to Boat Ramp) 220 (square feet) 0 (square feet) Supplement C B-4 (Bulkhead) 0 (square feet) 25 (square feet) Supplement C 2. This approval is for the purpose and design described in your application. The plans and specifications for this project are incorporated by reference as part of the Certification. If you change your project, you must notify the Division and you may be required to submit a new application package with the appropriate fee. If the property is sold, the new owner must be given a copy of this approval letter and General Certification and is responsible for complying with all conditions. [15A NCAC 02B .0507(d)(2)] 3. Water Quality Certification The proposed project must comply with all the conditions of the General Water Quality Certification(s) 3900. [15A NCAC 02B .0507(c)] Continuine Compliance 4. All mechanized equipment operated near surface waters or wetlands will be regularly inspected and maintained to prevent contamination of waters and wetlands from fuels, lubricants, hydraulic fluids or other potential toxic chemicals. In the event of a hydrocarbon or chemical spill, the permitee/contractor shall immediately contact the Division of Water Quality, between the hours of 8 am to 5 pm at the Washington Regional Office at 252.946.6481 and after hours and on weekends call (800) 858-0368. Management of such spills shall comply with provisions of the North Carolina Oil Pollution and Hazardous Substances Control Act. [15A NCAC 02H .0506 (b)(3) and (c)(3), 15A NCAC 02B .0200 (3)(f), and GS 143 Article 21A] 5. Turbidity Standard The Permittee shall adhere specially to 15A NCAC 02B .0220 Tidal Salt Water Quality for Class SA Waters (3)(g) pH: shall be normal for waters in the area, which generally shall range between 6.8 and 8.5 except that swamp waters may have a pH as low as 4.3 if it is the result of natural conditions; (1) Turbidity: the turbidity in the receiving water shall not exceed 25 NTU; if turbidity exceeds this level due to natural background conditions, the existing turbidity level shall not be increased. [15A NCAC 02B .0220] 6. Spills MR. JEFF AKIN DWR# 2016-0846 401 AND BUFFER APPROVAL Page 3 of 5 The permittee shall report to the local DWR Regional Office, within 24 hours, all significant spills as defined under Section 311 of the Clean Water Act (Ref; 40 CFR 110.10 and CFR 117.21) or section of CERCLA (Ref: 40 CFR 302.4). Additionally, the permittee shall report spills including: any oil spills of 25 gallons or more and any spill regardless of amount that causes sheen on surface waters. Other Conditions 7. Re Opener Clause Jeff Akin and his authorized agents shall conduct their activities in a manner consistent with State water quality standards (including any requirements resulting from compliance with section 303(d) of the Clean Water Act) and any other appropriate requirements of State law and federal law. Jeff Akin shall require their contractors (and/or agents) to comply with all of the terms of this Certification, and shall provide each of their contractors (and/or agents) a copy of this Certification. A copy of this Certification shall be included in the construction contract and available on the job site at all times. If DWR determines that such standards or laws are not being met (including the failure to sustain a designated or achieved use) or that State or federal law is being violated, orthat further conditions are necessary to assure compliance, DWR may reevaluate and modify this certification to include conditions appropriate to assure compliance with such standards and requirements in accordance with 15A NCAC 2H.0507(d). Before modifying the certification, DWR shall notify the Jeff Akin and the US Army Corps of Engineers, provide public notice in accordance with 15A NCAC 2H.0503 and provide opportunity for public hearing in accordance with 15A NCAC 2H.0504. Any new or revised conditions shall be provided to DWR in writing, shall be provided to the United States Army Corps of Engineers for reference in any permit issued pursuant to Section 404 of the Clean Water Act, and shall also become conditions of the 404 Permit for the project. 8. Diffuse Flow All constructed stormwater conveyance outlets shall be directed and maintained to flow in a diffuse manner at a non-erosive velocities through the entire protected stream buffers without re -concentrating. If this is not possible it may be necessary to provide stormwater facilities that are considered to remove nitrogen and phosphorus. Additionally, a stormwater management plan for this project shall provided to this Office before any impacts approved herein are conducted. The plan shall specify all stormwater discharge points, plan details, and calculations to indicate that diffuse flow through the protected buffers or nitrogen and phosphorus removal as described above will be achieved. [15A NCAC 02H .0506(b)(5) and 15A NCAC 02B.0259(5)] 9. The Permittee shall replant the vegetation within temporarily disturbed areas associated with this project in an "in kind" manner immediately following construction. (Example: Disturbed areas with pre-existing grassed lawns must be replanted with grass. Disturbed areas with pre-existing trees or woody vegetation must be replanted with trees and woody vegetation. Disturbed areas with pre-existing forest vegetation must be replanted with forest vegetation including at least two different native hardwood tree species at a MR. JEFF AKIN DWRfi 2016-0846 401 AND BUFFER APPROVAL Page 4 of 5 density sufficient to provide 260 trees per acre at maturity. This density can usually be achieved by planting approximately 360 (11 x 11 spacing) to 538 (9 x 9 spacing) trees per acre.) Restoration of trees/shrubs/forest must be completed by the first subsequent planting season (November 1 through March 30). Note, if the tree plantings do not survive, they will need to be replaced such that the density is sufficient to provide 320 trees per acre at maturity. [15A NCAC 02H .0507 (c), 15A NCAC 02H .0506 (b)(3), and 15A NCAC 02B,.0259(6)] ' 10. Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, any subsequent modifications, the applicant is required to return the attached certificate of completion to the 401 & Buffer Permitting Unit, NC Division of Water Resources, 1617 Mail Service Center, Raleigh, NC 27699-1650. [15A NCAC 02H .0507 (c)] 11. The applicant and/or authorized agent shall provide a completed Certificate of Completion form to the Division within thirty (30) days of project completion (available at htt[):Hi)ortal.ncdenr.org/web/wo/swp/ws/401/certsandpermits/apply/forms). [15A NCAC 02H .0506(b)(5)] 12. This approval and its conditions are final and binding unless contested. [G.S. 143-215.5] These Certifications can be contested as provided in Articles 3 and 4 of General Statute 15013 by filing a written petition for an administrative hearing to the Office of Administrative Hearings (hereby known as OAH). A petition form may be obtained from the OAH at http://www.ncoah.com/ or by calling the OAH Clerk's Office at (919) 431-3000 for information. Within sixty (60) calendar days of receipt of this notice, a petition must be filed with the OAH. A petition is considered filed when the original and one (1) copy along with any applicable OAH filing fee is received in the OAH during normal office hours (Monday through Friday between 8:OOam and S:OOpm, excluding official state holidays). The petition may be faxed to the OAH at (919) 431-3100,.provided the original and one copy of the petition along with any applicable OAH filing fee is received by the OAH within five (5) business days following the faxed transmission. Mailing address for the OAH: If sending via US Postal Service: If sending via delivery service (UPS, FedEx, etc.): Office of Administrative Hearings Office of Administrative Hearings 6714 Mail Service Center 1711 New Hope Church Road Raleigh, NC 27699-6714 Raleigh, NC 27609-6285 One (1) copy of the petition must also be served to DENR: MR. JEFF AKIN DW R# 2016-0846 401 AND BUFFER APPROVAL Page 5 of 5 Sam H. Hayes, General Counsel Department of Environmental Quality 1601 Mail Service Center Raleigh, NC 27699-1601 This letter completes the review of the Division under section 401 of the Clean Water and Tar -Pamlico Buffer Rules. Please contact Anthony Scarbraugh at 252-948-3924 or anthonv.scarbrauehC@ncdenr.gov if you have any questions or concerns. Sincerely, W #!%"" Robert Tankard, Assistant Regional Supervisor Water Quality Regional Operations Section Division of Water Resources, NCDEQ Enclosures: GC 3900 Certification of Completion cc: Daniel Govoni, DCM Morehead City Office (via email) Raleigh Bland, USACE Washington Regulatory Field Office (via email) Laserfiche File Laura Stasavich, Land Management Group, Inc. (via email: Istasavich@lmgroup.net) "404” Wetland Limit Legend „,ViVBD1NCflENP4DWR N0V 21 PIS Water Quality Reglonel operations Washing ton Regional 0110, Road Maintenance Approx 398-Ift to remain within ex. footprint CREP Easement Limit "404 Wetland" Limit Landward Limit Coastal Marsh Proposed Bulkhead Limits of Disturbance "404" Wetland Limit CREP Boundary (approx overlay) C/L Loop Road (SR 1145) APPR0 North Carolina En r ental Management m fission )ivision of we esources Crete I i L I / �0 ._ Permit #' i CREP Boundary j��✓r (approx overlay) Fixed Dock 4'x 32' — — — — — Property and CREP boundary provided by Billy Leggett (surveyor). Publicly available data, including aerial and GIS data, overlaid by LMG for CAM. ------- Depths are approximate and were field measured by LMG. Resource boundaries have been GPS -located by LMG and approved by NCDCI _... _... _... _ Boundaries are approximate. This is not a survey. Maintenance Ex. Access Road Upland Area - 1,885 sqft Maintenance Ex. Access Road Wetland Area - 2,084 sqft 0 0 0 0 0 New Road to Ramp Upland Area - 110 sqft Wetland Impact - 180 sgft Temporary Upland Disturbance (bulkhead tie back installation) - 2,533 sgft Temporary Wetland Disturbance (bulkhead tie back installation) - 61 sqft Upland Excavation for Basin Final Depth -2.4' NLW - 1,632 sqft Coastal Marsh Excavation for Basin - 51 sqft �. mx O Road Maintenance 00 0' ®' Oto remain within I pt 012/4 ex. road footprint o ,� ® x pt # 0 0- o a / o q o eo o 0 .............. x pt (-2.4' NWL) pt 2 (-2.4' NWL) Wetland impact ........' (180 sqft) ... x #13 (-2.4' NWL) p #3 (-2.4' NWL) (-2.4' NWL) NWL) Existing, Connecting Depth at Proposed Basin -2.4' NWL Coastal Marsh Impact 51 sqft (fringe width - 5') x pt (-2.4' NWL) C� V� I permitting only. / 0 25 50 100 list NUSACE. x pt #5 (-3.0' NWL) 4638 Loop Road, Scranton, Hyde County, NC 7/21/2016 LMG HOOP.,. Mc Jeff Akin (owner/applicant) Scale: Job umber: Fml.on.... Can .".-, Title: 1"=50' 01-15-187 3805 Wrightsville Ave., Suite 15 CAMA Major Permit Application Telephone: 910-052-0001 i n mp c eas LES 6 of 7 APPkOVE North Carolina Environmental IRECENED/NCDENR/DWR Management Commission Ex. Road in )lvielon of Water Resource:: Prop. Zone 2 NOV 212016 Ex. Road in Prop. Zone 1 // Water Quality Reglomal F>ermit# (.' oXq`t- Operations Section -�.-. - /• / Washington Regional Office Ex. Road in � '--- � � Prop. Zone 2 � \ /� Structures in Riparian Buffer: –J \ Proposed Basin Proposed Bulkhead (Water Dependent) Temporary Disturbance - Bulkhead Ramp 2,594 scift New Road to Boat Ram —' Y (Water Dependent) , ; ' 0 %, • :.: Boat Ram(Water Dependent) / 5 : "•' 410 sq.ft. Temp `;• Disturbance New Road to Ramp (Water Dependent) :!. j ;: r ` Bulkhead 220 sq.ft. . ; �.'•,. •. , •�,f: .e " (Water Dependent) p •.r....,, . ..., . Boat Ramp i. Ex. Road in Proposed Buffer Expansion `.• (Water Dependent)�\ \ `` - .•,' .. ;.. , e , . Zone 1 = 420 sq.ft. 0 \ Zone 2 = 556 sq.ft. 0 Temp Disturbance \\\� Bulkhead (water \\`\ V Legend Dependent) 44i'� Landward Limit Coastal Marsh — — \ Tar -Pam Buffer Zone 1 ---------- \ Prop. Tar -Pam Buffer Tar -Pam Buffer Zone 2 ................. Zone 2 Limit Prop, Tar -Pam Buffer Zone 1 Limit Coastal Wetland Limit ' 15 30 60 Property and CREP boundary provided by Billy Leggett (surveyor). Project: Date: - Revision Date: Publiclyavailable data, including aerial and GIS data, overlaid b LMG for CAMA permitting only. 11/4/2016 g y p g y LMG 4636 Loop Road, Scranton, HydeCounty, NC 11/21/2016 Depths are approximate and were field measured by LMG. man aeewrauerngocr". Mr. Jeff Akin (owner/applicant) Scale:- Job umber: Resource boundaries have been GPS -located by LMG and approved by NCDCM/USACE. `"""°""""'""""""""" - 1" = 30' 01.15-167 Title: Boundaries are approximate. This is not a survey. PP y 3805WdghtavllleAve.,Suital5 CAMA Major Permit Application Drawn By: Sheet: Wilmington, North Carolina 28403 Tar -Pam Riparian Buffer Impacts LES Supplement Telephone: 910-052-0001