Loading...
HomeMy WebLinkAbout20161150 Ver 1_B-4950 Nationwide Cumberland Sampson November 21 2016_201611217'r�nspc�, �c�tr��r November 21, 2016 U. S. Army Corps of Engineers Regulatory Field Office 69 Darlington Ave Wilmington, NC 28403 Attention: Ms. Liz Hair NCDOT Coordinator E'AT [v� c �. €�fJ �.Y �.n��rnor- hIICH�L�� J, TEhINY�C�hI i�.i�r r{.f��F: Subject: Application for Section 10, Section 404 Nationwide Permits 12, 23 and Section 401 Water Quality Certi�cation for replacement of Bridge Nos. 171 and 172 over the South River on SR 1851/1426 (Faircloth Road), Cumberland and Sampson Counties, North Carolina, Federal Aid Project No. BRZ-1851(3), TIP No. B-4950. Debit $240.00 from WBS Element No. 40108.1.1 Dear Madam, The North Carolina Department of Transportation (NCDOT) proposes to replace existing Bridge Nos. 171 and 172 in Cumberland and Sampson Counties. Bridge No. 171 is a 91-foot bridge to be replaced with a 120-foot bridge. Bridge No. 172 is a 151-foot bridge to be replaced with a 185- foot bridge. The new bridges will be placed on existing alignment. The new bridges will include two 10-foot lanes in each direction and 6-foot shoulders on each side. Traffic will be detoured offsite. Please find enclosed the Pre-Construction Notification (PCN) form, DMS Acceptance Letter stonnwater inanagement plan, permit drawings, utility permit drawings, and roadway design plans for the above referenced project. A Programmatic Categorical Exclusion (PCE) was completed for this proj ect on February 24, 2016, and distributed shortly thereafter. Additional copies are available at the NCDOT website: https://connect.ncdot.�ov/resources/Environmental/ The proposed let date for the project is May 16, 2017 with a review date of March 28, 2017. However, the let date may advance as additional funds become available. Regulatory Approvals Section 404 Permit: All aspects of this project are being processed by the Federal Highway Administration as a"Categorical Exclusion" in accordance with 23 CFR 771.115(b). The NCDOT requests that the project be authorized by a NW 23 for bridge construction. We are also requesting issuance of NW 12 for utility pole and line installation. = ;_`��"l�lc�thi�g ��r��are�'"-�.�. State of North Carolina I Depaitment of Transportation � PDEA-Natural �nvironment Section 1020 Birch Ridge Drive, 27610 I 1598 Mail Seivice Center I Raleigh, North Carolina 27699-1598 919-707-6000 T 919-212-5785 F Section 10 Permit: South River is listed as a Section 10 water. NCDOT is requesting a Section 10 permit. Section 401 Permit: We anticipate 401 General Certification numbers 3884 and 3891 will apply to this project. NCDOT is requesting written concurrence from the North Carolina Department of Environmental Quality, Division of Water Resources. A copy of this permit application and its distribution list will be posted at the NCDOT website at https://connect.ncdot.�;ov/resources/Environmental/. Should you have any questions regarding this information, please contact Deanna Riffey at (919) 707-6151 or driffey@ncdot.gov Sincerely, it .-------�.. —�� � 1` Philip S. Harris III, P.E., C.P.M. Natural Environment Section Head cc: NCDOT Permit Application Standard Distribution List �o�,,N����� Office Use Only: i � � F Corps action ID no. � � , i , � � � DWQ project no. �' ; Form Version 1.4 January 2009 Pre-Construction Notification (PCN) Form A. Applicant Information 1. Processing 1 a. Type(s) of approval sought from the Corps: � Section 404 Permit � Section 10 Permit 1 b. Specify Nationwide Permit (NWP) number: 23 12 or General Permit (GP) number: 1c. Has the NWP or GP number been verified by the Corps? ❑ Yes � No 1d. Type(s) of approval sought from the DWQ (check all that apply): � 401 Water Quality Certification — Regular ❑ Non-404 Jurisdictional General Permit ❑ 401 Water Quality Certification — Express ❑ Riparian Buffer Authorization 1 e. Is this notification solely for the record For the record only for DWQ 401 For the record only for Corps Permit: because written approval is not required? Certification: ❑ Yes � No ❑ Yes � No 1f. Is payment into a mitigation bank or in-lieu fee program proposed for mitigation � Yes ❑ No of impacts? If so, attach the acceptance letter from mitigation bank or in-lieu fee program. 1 g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1 h ❑ Yes � No below. 1 h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ❑ Yes � No 2. Project Information 2a. Name of project: Replacement of Bridges 171 and 172 on SR 1851/1426 (Faircloth Bridge Road) over South River 2b. County: Cumberland / Sampson 2c. Nearest municipality / town: Stedman 2d. Subdivision name: nof applicable 2e. NCDOT only, T.I.P. or state g�g50 project no: 3. Owner Information 3a. Name(s) on Recorded Deed: North Carolina Department of Transportation 3b. Deed Book and Page No. not applicable 3c. Responsible Party (for LLC if not applicable applicable): 3d. Street address: 1598 Mail Service Center 3e. City, state, zip: Raleigh, NC 27699-1598 3f. Telephone no.: (919) 707-6151 3g. Fax no.: (919) 212-5785 3h. Email address: driffey@ncdot.gov 4. Applicant Information (if different from owner) 4a. Applicant is: ❑ Agent ❑ Other, specify: 4b. Name: not applicable 4c. Business name (if applicable): 4d. Street address: 4e. City, state, zip: 4f. Telephone no.: 4g. Fax no.: 4h. Email address: 5. Agent/Consultant Information (if applicable) 5a. Name: not applicable 5b. Business name (if applicable): 5c. Street address: 5d. City, state, zip: 5e. Telephone no.: 5f. Fax no.: 5g. Email address: B. Project Information and Prior Project History 1. Property Identification 1a. Property identification no. (tax PIN or parcel ID): not applicable 1 b. Site coordinates (in decimal degrees): Latitude: 35.0527 Longitude: - 78.6566 (DD.DDDDDD) (-DD.DDDDDD) 1 c. Property size: 14.5 acres 2. Surface Waters 2a. Name of nearest body of water (stream, river, etc.) to South River proposed project: 2b. Water Quality Classification of nearest receiving water: C-SW 2c. River basin: Cape Fear 3. Project Description 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: Land use within the vicinity is agriculture, low desity residential housing, and forested areas. 3b. List the total estimated acreage of all existing wetlands on the property: 3.5 acres 3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: 147 linear feet 3d. Explain the purpose of the proposed project: Both bridges are considered structurally deficient and is functionally obsolete due to structure and substructure conditions. 3e. Describe the overall project in detail, including the type of equipment to be used: The project involves replacement of existing Bridge No. 171 , a 91 -foot 3 span bridge, with a 120-foot 3 span bridge and Bridge No. 172, a 151- foot 5 span bridge, with a 185-foot 5 span bridge. Both new bridges will have 10-foot travel lanes in each direction with 6-foot shoulders on each side. The new bridges will be placed on the same alignment as the existing bridges. Traffic will be detoured offsite. Standard road building equipment, such as trucks, dozers, and cranes will be used. 4. Jurisdictional Determinations 4a. Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / � Yes ❑ No ❑ Unknown project (including all prior phases) in the past? Comments: 4b. If the Corps made the jurisdictional determination, what type of determination was made? � Preliminary ❑ Final 4c. If yes, who delineated the jurisdictional areas? Agency/Consultant Company: NCDOT Name (if known): John Merritt Other: 4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. 5/18/2011 5. Project History 5a. Have permits or certifications been requested or obtained for � Yes � No ❑ Unknown this project (including all prior phases) in the past? 5b. If yes, explain in detail according to "help file" instructions. 6. Future Project Plans 6a. Is this a phased project? ❑ Yes � No 6b. If yes, explain. C. Proposed Impacts Inventory 1. Impacts Summary 1a. Which sections were completed below for your project (check all that apply): � Wetlands � Streams - tributaries ❑ Buffers ❑ Open Waters ❑ Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. 2b. 2c. 2d. 2e. 2f. Wetland impact number - Type of impact Type of wetland Forested Type of jurisdiction Area of impact Permanent (P) or (if known) (acres) Tem ora T Site 1/2 � P❑ T Fill Riverine Swamp Forest a YNo O pWQ <0.01 Site 1/2 � P❑ T Excavation Riverine Swamp Forest 0 YNo � pWQ <0.01 Mechanized � Yes � Corps Site 1/2 � P❑ T Clearing Riverine Swamp Forest � No � pWQ 0.01 Site 2� P❑ T Fill Riverine Swamp Forest � Yes � Corps 0.14 ❑ No ❑ DWQ Mechanized � Yes � Corps Site 2� P❑ T Clearing Riverine Swamp Forest � No � pWQ 0.06 Site 2/3 � P❑ T Fill Riverine Swamp Forest 0 YNo � pWQ <0.01 Site 2/3 � P❑ T Excavation Riverine Swamp Forest 0 YNo � pWQ 0.01 Mechanized � Yes � Corps Site 2/3 � P❑ T Clearing Riverine Swamp Forest � No � pWQ 0.02 Site 3� P❑ T Fill Riverine Swamp Forest � Yes � Corps 0.03 ❑ No ❑ DWQ Mechanized � Yes � Corps Site 3� P❑ T Clearing Riverine Swamp Forest � No � pWQ 0.03 0.32 ac 2g. Total wetland impacts Permanent 0 ac Temporary 2h. Comments: Bridge Hand clearing: Site 1/2 = 0.03 acres and Site 2/3 = 0.18 acres.Utilities Hand Clearing: Site1 = 0.10 acres, Site2 = 0.08 acres, and Site 3= 0.05 acres for poles/lines. 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. 3b. 3c. 3d. 3e. 3f. 3g. Stream impact Type of impact Stream name Perennial Type of Average Impact length number - (PER) or jurisdiction stream (linear feet) Permanent (P) or intermittent (Corps - 404, width Temporary (T) (INT)? 10 (feet) DWQ - non- 404, other) Site 1/2 ❑ P� T Bridge171 South River � PER � Corps 110 80 ❑ INT ❑ DWQ Site 2/3 ❑ P� T Bridge172 South River � PER � Corps 110 48 ❑ INT ❑ DWQ 3h. Total stream and tributary impacts 0 ft Perm 128 ft Temp 3i. Comments: Bents: Bridge #171 =<0.01 acres and Bridge #172 =<0.01 acres 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then individuall list all o en water im acts below. 4a. 4b. 4c. 4d. 4e. Open water Name of impact number — waterbody Type of impact Waterbody Area of impact (acres) Permanent (P) or (if applicable) type Tem ora T 01 ❑P❑T 02 ❑P❑T 03 ❑P❑T 04 ❑P❑T 4f. Total open water impacts X Permanent X Temporary 4g. Comments: 5. Pond or Lake Construction If ond or lake construction ro osed, then com lete the chart below. 5a. 5b. 5c. 5d. 5e. Wetland Impacts (acres) Stream Impacts (feet) Upland Pond ID Proposed use or (acres) number purpose of pond Flo Flooded Filled Excavated ode Filled Excavated Flooded d P1 P2 5f. Total 5g. Comments: 5h. Is a dam high hazard permit required? ❑ Yes ❑ No If yes, permit ID no: 5i. Expected pond surFace area (acres): 5j. Size of pond watershed (acres): 5k. Method of construction: 6. Buffer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts below. If an impacts require miti ation, then ou MUST fill out Section D of this form. 6a. ❑ Neuse ❑ Tar-Pamlico ❑ Other: Project is in which protected basin? ❑ Catawba ❑ Randleman 6b. 6c. 6d. 6e. 6f. 6g. Buffer impact number — Reason for impact Buffer Zone 1 impact Zone 2 impact Permanent (P) or Stream name mitigation (square feet) (square feet) Tem ora T re uired? B1 ❑P❑T ❑Yes ❑ No B2 ❑P❑T ❑Yes ❑ No B3 ❑P❑T ❑Yes ❑ No 6h. Total buffer impacts 6i. Comments: Buffer impacts for this project are less than 40 linear feet for the road crossings and are exempt. D. Impact Justification and Mitigation 1. Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. Replace in place was incorporated to minimize water resources impacts along with lengthening both bridges and grassed shoulder section were incorporated to diffuse runoff along the slopes and to facilitate infiltration. Other than no build the minimal effects to the wetlands and stream on this project is unavoidable. 1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. NCDOT Best Management Practices for Construction and Maintenance Activities will be empioyed. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for � Yes ❑ No impacts to Waters of the U.S. or Waters of the State? If no, ex lain: 2b. If yes, mitigation is required by (check all that apply): ❑ DWQ � Corps ❑ Mitigation bank 2c. If yes, which mitigation option will be used for this project? � Payment to in-lieu fee program ❑ Permittee Responsible Mitigation 3. Complete if Using a Mitigation Bank 3a. Name of Mitigation Bank: not applicable 3b. Credits Purchased (attach receipt and letter) Type Quantity 3c. Comments: 4. Complete if Making a Payment to In-lieu Fee Program 4a. Approval letter from in-lieu fee program is attached. � Yes 4b. Stream mitigation requested: 0 4c. If using stream mitigation, stream temperature: � warm ❑ cool ❑cold 4d. Buffer mitigation requested (DWQ only): square feet 4e. Riparian wetland mitigation requested: 0.32 acres 4f. Non-riparian wetland mitigation requested: acres 4g. Coastal (tidal) wetland mitigation requested: acres 4h. Comments: 5. Complete if Using a Permittee Responsible Mitigation Plan 5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan. 6. Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ 6a. Will the project result in an impact within a protected riparian buffer that requires ❑ Yes � No buffer mitigation? 6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the amount of mitigation required. 6c. 6d. 6e. Zone Reason for impact Total impact Multiplier Required mitigation (square feet) (square feet) Zone 1 3(2 for Catawba) Zone 2 1.5 6f. Total buffer mitigation required: 6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in-lieu fee fund). 6h. Comments: E. Stormwater Management and Diffuse Flow Plan (required by DWQ) 1. Diffuse Flow Plan 1 a. Does the project include or is it adjacent to protected riparian buffers identified ❑ Yes � No within one of the NC Riparian Buffer Protection Rules? 1 b. If yes, then is a diffuse flow plan included? If not, explain why. ❑ Yes ❑ No Comments: 2. Stormwater Mana ement Plan 2a. What is the overall percent imperviousness of this project? N/A 2b. Does this project require a Stormwater Management Plan? � Yes ❑ No 2c. If this project DOES NOT require a Stormwater Management Plan, explain why: 2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan: See attached permit drawings. ❑ Certified Local Government 2e. Who will be responsible for the review of the Stormwater Management Plan? ❑ DWQ Stormwater Program � DWQ 401 Unit 3. Certified Local Government Stormwater Review 3a. In which local governmenYs jurisdiction is this project? not applicable ❑ Phase II 3b. Which of the following locally-implemented stormwater management programs ❑ NSW apply (check all that apply): ❑ USMP ❑ Water Supply Watershed ❑ Other: 3c. Has the approved Stormwater Management Plan with proof of approval been ❑ Yes ❑ No N/A attached? 4. DWQ Stormwater Pro ram Review ❑ Coastal counties 4a. Which of the following state-implemented stormwater management programs apply ❑ HQW (check all that apply): ❑ ORW ❑ Session Law 2006-246 ❑ Other: 4b. Has the approved Stormwater Management Plan with proof of approval been attached? ❑ Yes ❑ No N/A 5. DWQ 401 Unit Stormwater Review 5a. Does the Stormwater Management Plan meet the appropriate requirements? ❑ Yes ❑ No N/A 5b. Have all of the 401 Unit submittal requirements been met? ❑ Yes ❑ No N/A F. Supplementary Information 1. Environmental Documentation (DWQ Requirement) 1 a. Does the project involve an expenditure of public (federal/state/local) funds or the � Yes ❑ No use of public (federal/state) land? 1 b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State � Yes ❑ No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1 c. If you answered "yes" to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval letter.) � Yes ❑ No Comments: 2. Violations (DWQ Requirement) 2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards, ❑ Yes � No or Riparian Buffer Rules (15A NCAC 26 .0200)? 2b. Is this an after-the-fact permit application? ❑ Yes � No 2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s): 3. Cumulative Impacts (DWQ Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in ❑ Yes additional development, which could impact nearby downstream water quality? � No 3b. If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy. If you answered "no," provide a short narrative description. Due to the minimal transportation impact resulting from the bridge replacement, this project will neither influence nearby land uses nor stimulate growth. Therefore, a detailed indirect or cumulative effects study will not be necessary. 4. Sewage Disposal (DWQ Requirement) 4a. Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. not applicable 10 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Wili this project occur in or near an area with federally protected species or � Yes ❑ No habitat? 5b. Have you checked with the USFWS concerning Endangered Species Act � Yes ❑ No impacts? � Raleigh 5c. If yes, indicate the USFWS Fieid Office you have contacted. ❑ Asheville 5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? USFWS county list and NCNHP database along with field surveys. Surveys last conducted for Pondberry and Michaux's sumac on July 20, 2016. Habitat is present, but no Pondberry or Michaux's sumac were found during survey. Biological conclusion is No Effect. Habitat was not found in the study area for American chaffseed, red-cockaded woodpecker, rough-leaved loosestrife, and Saint Francis' satyr buttertly. Biological conclusion is No Effect. 6. Essential Fish Habitat (Corps Requirement) 6a. W ill this project occur in or near an area designated as essential fish habitat? ❑ Yes � No 6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat? NMFS County Index 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal govemments have designated as having historic or cultural preservation � Yes � No status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)? 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? NEPA Documentation 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA-designated 100-year floodplain? � Yes ❑ No 8b. If yes, explain how project meets FEMA requirements: NCDOT Hydraulics Unit coordination with FEMA 8c. What source(s) did you use to make the floodplain determination? FEMA Maps � Philip S. Hams III, P.E., C.P.M. �� �,'� ---""'=.. �! _ Z�...Z�% �, Applicant/AgenYs Printed Name Date Applicant/Agent's Signature (AgenYs signature is valid only if an authorization letter from the applicant is rovided. 11 Mitrgation Services ENVIRONMENTAL OUALITY PAT MCCRORY �=c��z�,�u�» DONALD R, VAN DER VAART Secrer�rr�r November 4, 2016 Mr. Philip S. Harris, III, P.E., CPM Project Development and Environmental Analysis Unit North Carolina Department of Transportation 1598 Mail Service Center Raleigh, North Carolina 27699-1598 Dear Mr. Harris: Subject: Mitigation Acceptance Letter: B-4950, Replace Bridges 171 and 172 on SR 1851 / SR 1426 {Faircloth Bridge Road) over the South River, Cumberland Gounty The purpose of this letter is to notify you that the Division of Mitigation Services (DMS) will provide the compensatory wetland mitigation for the subject project. Based on the inforniation supplied by you on November 3, 2016, the itnpacts are located in CU 03030006 of the Cape Fear River basin in the Southern Inner Coastal Plain (SOCP) Eco-Region, and are as follows: Cape Fear Stream Wetlands Buffer (Sq. Ft.) 03030006 Non- Coastal SICP Cold Cool Warm Riparian �parian Marsh Zone 1 Zone 2 Impacts 0 0 0 0.32 � 0 0 0 (feet/acres) *Some of the stream and/or wetland impacts may be proposed to be mitigated at a 1:1 mitigation ratio. See permit application for details. The impacts and associated mitigation needs were under projected by the NCDOT in the 2016 impact data. DMS will commit to implement sufficient compensatory wetland mitigation credits to offset the impacts associated with this project as determined by the regulatory agencies using the delivery timeline listed in Section F.3.c.iii of the In-Lieu Fee Instrument dated July 2$, 2010. If the above referenced impact amounts are revised, then this mitigation acceptance letter will no longer be valid and a new mitigation acceptance letter will be required from DMS. If you have any questions or need additional information, please contact Beth Harmon at 919-707-8420. �� � B. Stanfill Management Supervisor cc: Ms. Liz Hair, USACE — Wilrnington Regulatory Field Office Ms. Amy Chapman, NCDWR File: B-4950 Siate of Norlh C:arolina � F,nvironmental Quality Mitigation Services 1652 Mail Service Center � 217 W.lones Stree4 Suite 3000 � Raleigh, NC 27609-1652 919 7D7 8976 T /��'�,. Hi hWa North Carolina Department of Transportation �` \ f� Y {* V�/ � ���� Highway Stormwater Program STORMWATER MANAGEMENT PLAN ---- (Version 2.06; Released June 2016) FOR NCDOT PROJECTS WBS Element: 40108.1.1 TIP No.: B-4950 Count ies : Cumberland Sam son Pa e 1 of 2 General Project Information WBS Element: 40108.1.1 TIP Number: B-4950 Pro"ect T e: Brid e Re lacement Date: 11/9/2016 NCDOT Contact: Paul Atkinson Contractor / Desi ner: Richard Bollin er, PE Will Weathersbee, PE Address: 1020 Birch Ridge Rd. Address: g601 Six Forks Road, Suite 260 Raleigh, NC 27610 Raleigh, NC 27615 Phone: 919-707-6707 Phone: 919-480-4066 Email: atkinson ncdot. ov Email: richard.bollin er rsandh.com will.weathersbee rsandh.com Ci /Town: Stedman Coun ies : Cumberland Sam son River Basin s: Ca e Fear CAMA Count ? No No Wetlands within Project Limits? Yes Pro ect Descri tion Pro'ect Len th lin. miles or feet : 0.20 Surroundin Land Use: �Noods, Residential Pro osed Pro'ect Existin Site Pro'ect Built-U on Area ac. 0.7 ac. 0.5 ac. Typical Cross Section Description: Two 10' lanes with 6' shoulders on the approach, and two 10' lanes with 5'-5" shoulders Two 10' ianes with no shoulder on the approach, and two 10' lanes with 2' shoulders on on the bridge the bridge. Annual Avg Daily Traffic (veh/hr/day): Desi n/Future: 1038 Year: 2037 Existin : 654 Year: 2017 General Project Narretive: This is a bridge replacement project. Existing bridge 171 is 1@30' -4", 1@30'-1", and 1@30'-4". Existing bridge 172 is 1@30' 3", 3@30'-1", and 1@30'-3". Proposed bridge 171 (Description of Minimization of Water is a 1@35' 21", 1@55' 24", and 1@30' 21". Proposed bridge 172 is a 1@35' 21", 2@55' 24", and 1@40' 21". Quality Impacts) To minimize impacts, grassed shoulder sections were used to diffuse roadway sheet flow runoff along the slopes and to facilitate infiltration. No deck drains were used on either bridge replacement. W Information Surface Water Bod 1: South River NCDWR Stream Index No.: 18-68-12- 0.5 NCDWR Surface Water Classification for Water Body Prima Classiflcation: Class C Su lemental Classification: Swam Waters Sw Other Stream Classification: None Im airments: None A uatic T8E S ecies? Yes Comments: American Alli ator, Pondber , Wood Stork, Michaux's Sumac - no impacts, no effect NRTR Stream ID: South River Buffer Rules in Effect: N/A Pro'ect Includes Brid e S annin Water Bod Yes Deck Drains Dischar e Over Buffer? No Dissi ator Pads Provided in Buffer? No Deck Drains Dischar e Over Water Bod ? No (If yes, provide justification in the General Project Narrative) (If yes, describe in the General Project Narrative; if no, justify in the (If yes, provide justification in the Generai Project Narrative) General Project Narrative) 1-lif;tlVV ly North Carolina Department of Transportation �� ��1wax� ` ,� .,, . Highway Stormwater Program { ;:% STORMWATER MANAGEMENT PLAN --�-� (Version 2.06; Released June 2016) FOR NCDOT PROJECTS WBS Element: 40108.1.1 TIP No.: B-4950 Count ies : Cumberland Sampson Pa e 2 of 2 Additional Waterbod Information Surface Water Bod 2: Ut to South River NCDWR Stream Index No.: 18-68-12- 0.5 NCDWR Surface Water Classification for Water Body Prima Classification: Class C Su lemental Classification: Swam Waters Sw Other Stream Classification: None Im airments: None A uatic T&E S ecies? Yes Comments: American Alli ator, Pondber , Wood Stork, Michaux's Sumac - no im acts, no effect NRTR Stream ID: SA1 Buffer Rules in Effect: N/A Pro'ect Includes Brid e S annin Water Bod ? Yes Deck Drains Dischar e Over Buffer? No Dissi ator Pads Provided in Buffer? N/A Deck Drains Dischar e Over Water Bod ? No (If yes, provide justification in the General Project Narrative) (If yes, describe in the General Project Narrative; if no, justify in the (If yes, provide justification in the Generai Project Narrative) General Project Narrative) z 0 � r � � � O I i � � E � a a T 2 i O � � m � � � c m E c O � > c w � � � � w � � � U .] �o o� N� �� �_ �� �� ' 1 � � �4 � V W 0 � � � � See Sh�et fA For Index of' Slae�ts See Sl�et !B For Conventlono! Sympols See Sheet 1C-1 For Survey Co�tra! Sheet -L- dF * Y * { ? i � Y � y d �. : s *���_� �— ro se isae � ll ��� �� 1V ���� ������lr � ��VI���1�T �]F ]E�[��1�[�A�� CU1�[B�RLAII�D A11tD SAMPSa11� C� U11tTlES LOCATION: REPLACE BRIDGES 171 AND 172 OVER SUUTH RIVER 011� SR 1851 /SR I426 (FAIRCLOTH BRIDGE RDAD) TYPE OF WURK.• GRADING, DRAINAGE, PAVING, AND STRUCTURES WETLAND AND SURFACE WATER IMPACTS PERMIT 0 � � � , l= . � � �� � t � � � f {� � � f f/w t � '� -L' .t � � �, � aF y '�' � �F � { � � k y � d� i '� � '� �k � � � � t � Y $ �/ iF 4 � � � � d:* Y * � } ) * � � ..�q�}�^"� .p � * / � �_�—•�-'��' + —� ` � o. m SITE 1 � �� � � I Y f� i � 1 � i1 THERE 15 NO CONTROL OF ACCE55 ON THIS PRDJECT. THIS PROJECT IS NOT WRHIN ANY MUNICIPAL BOUNQARIES. �� CLEAWNG ON THIS PROJEGT SHALL BE PERFORMEd TO THE LIMITS ESTABLISHED BY MEfHOD _ � V GRAPHIC SCALHS DESIGN DATA �0 2s o 30 �oo '°'�T 2017 = 654 ADT 2037 = 1,038 P�S K = 10 % � D = 60 % � �0 2s o 3o ioo T= 3 %• V = 60 MPH OPROFILE [HORIZONTALj •(�'�ST=196 + DUAL=2%] �0 5 0 �0 2a FUNC CLASS = LOCAL V SUB-REG14NAL TIER aQn�ii� rv�aTireii SITE 2 � �� � �xa'� � * ' * � � .� � f $ � � -��YNf,-����*�*���,��}��_� �SITE3 �t * � '� � * a * j � �F * � t � � � Y �r � } � � * �, �i � � � * ,� � �� i * � � �. * '� * * .� '� '� Y � ` i� '� Jk * �1E � . r '� '� � t '� '* � � '� � +t 1 '� a Y � � � � � y] � i� � � � * � � .�F� * Y * � �� ��� * � '� �� * p j * � ' Y �k t -L- �R ]B51 FAIRCLQ]H B�tID6E R� '� ,� * ,� �7'�' :, � �' �. � � i� t �_.—._�_. ._ . -. .�� � Ho. �bz I^ ----� � r � � * d � � � � * Y � � � � dF Y F � { � � � PROJBCT LENGTH LENGTH ROADWAY TiP PROJECT B-4950 = LENGTN STRUCTURE TIP PROJECT B-4950 = TOTAL LENGTH TIP PROJEGT B-4950 = Q.139 MILE Q.058 MILE Q.197 MILE �� � Y� �1 Y ! �F � * b � � � � � � /� � i � � +F f/ � Y � Y' f / ' �" 'yr.��'� � � * � � � JF * dF '� * � '� * � Jk X. JF �_. ��� s6e2 sfxAi 9 9 6 918BT 25 S aso ■ RA7i 11101�4T 7QYIY10 1R '' �P�950 ,.. �1'11� �1�N6 RL��L16 aaioe.i.i BRZ-1851 f3 —L— ___ .. . .._._..—.. TO SR 1424 --� HYDR4rILICS BNGITTSER amz sr.�nm�xn srBcrFrrarrwvs JENNIFER FARINO, PE .s�+uir,xs: RIGIYT OF WAY DATE: �e�cr � ROADWAY DESIGN JULY 22. 2016 �qRED BOND, PE ffivG�v�x rxol8cr c�ssrcx �rcn�sR �TT�G ��' TATIA L. WHITE, PE, PLS MAY 16. 2017 ,�,. �,.,,�,. PS �� PERMIT DRAWING SHEET 1 OF 10 � �. O a`� BEGIN TIP PROJECT B-4950 °°���_ —L— POC Sta. 11 + 00.00 ��. ♦ � � , l � � � � � � �� / /� �F � � � ` � �TB 2GI � � �� / �� � � � � e � � � � �� , � ,� � � ,� ,� � . � � � � � t� ` � / � �F ����� / �F � � � ���, � �F � MO E EXIS � � � � � � � BRID� Z ` � � � ���'� � � � �F ��� Q `w� � �F �F N � ����� ��.� � � � � � � W � � � �-- � � � � � � � �F � � _ � � � , MTL�GIli°� � �F � � �,_ _ � — — — v � � _ � � � e _ �_ ��� ���' i � � — — — — — — — — — 1�"_R P-I I I _ .- f� TA� ,��. � _ � — _ 1 ^ � � — �'.�s�lL � r � � � � � � � � � � � � � � �� w �� �. TB 2GI i� F�� o�'f7tl , � � � N � i L N Q � L Q � T L � � 0-' � � / N �1 C " 3 �D L O / � � +� C N E C 0 L > C W � � � � w � / N U �� � �d � LC � � 2 ��6 O�� � � � ��� � �T _ SR /85/ FAIR�LOT BR/DGE E�� �3'' � � F — � � �� �.�� � �"� � � � � � � � � � �� � Q +� � � � � � � � �`�� �e� �.� � �� �'� ��- �—t: -� � — � � � � OUTLET 0401 � � � � / � Q10=0.60 CFS � � < �� V10=0.50 FPS � �� EXCAVATION IN WETLA�D� � EXCAVATION L�MITS � � HAND CLE�RING ����� � � � �, � � �:. � ��r �DENOTES EXCAVATION IN WETLANDS � DENOTES HAND CLEARING L_L_L_LJ DENOTES TEMPORARY IMPACTS IN SURFACE WATER L.L_L_L1J DENOTES FILL IN WETLAND • • • • DENOTES MECHANIZED • � •� •' • CLEARING ISLAND PoND �� � C �. �� 1 � �e �, �� �������������� �� r�=� �� �o� ������� �� . � � x � � � � � aF � ���s � � � � � � � � rn � � � � � � � � � � � � � � � � � � ; � � � � � � � � � � � m� � � � � � � �n � � � � � � RH610VE EXISTING ��� � � � � � �F � � BRIDGE � � � � ��F � � � � ��� �F EXCA�TIOI� IN WETLAtYIDS � �F . � � � � : ° � � . . � , .• . fi, �. , �xR , ` -�� - `�"� . �&� ., , • �, . .. y , - ' ' d i�s.d ,�^� �y.r-'`T��` . y, .�-� ,,.�`�.'—`�,e. " 3e. . , , �,�_ , \ � °-"� �� � � � �` ?`� '�.����^�" � y' � di � ,Q , � t t � � � EXCAVATION LIMITS .,_ �c y 0 � PROJECT REFERENCE NO. B-4950 � RtW SHEET NO. � ROADWAY DESIGN N ENGINEER SHEET NO. 4 HYDRAULICS ENGINEER INCOMPLE�E PLANS DO NOT U3B FOR / W ACQUISITION DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED PERMIT DRAWI NG SHEET 2 OF 10 : � � ;� �� ` v �pY � � �h � �� �. � � i�w���������� i����u:��� ���a�� `► � o �� ��FE, Lr�d�� ���L �I�E�S � �� .� � � . � � � � � � � � � rz � � � � � � � � _ � � XCAVATIO� IN ETLANDS � � � � � EXC�/ATION LIM� �F � I .� � � � � � � � � � � � � � � � � �.m _ � �E � � s: �'"x',�,�'�a• � �'S.�•� 'a���a , �z.,.�� , .�' ° � � `.�������� � � �E . _ � i �TB 2GI � s��3�� `�� �-�� t ` ��. END T�P PROJECT B-4950 �������� —L— P. Sta. 21 + 40.00 � � — — — .'� �_� � e ° ♦ , b � � � -r � �. .:. _ - -- _ .a. .a. �f _,. � - � � � � � � � . — EXCAVATION �NIITS�. � EXCAVATION IN WETLANDS � � `��� � �F �E �F � � � � \ � - � � / � ������ q . . 3 � � 7 � 'Dz �� � OUTLET 0406 � � � ` Q10 = 0.80 CFS � � V10=0.53 FPS � ����I�� I" II������ ����;�� � �,��- ���� ' `� �s�i+�r�� ��,�"�� �'� �w'IPI��IP'�k��� 4 � � � ■�■�■�■�■� � � � c 0 U N m � L N Q i � L Q � T L � � 0-' � � / N �1 C " 3 �D L O / � � +� C N E C 0 L > C W � � � � w � / N U�" �a � �� L O � 2 ��6 O�� � O � / � � , ! ,� '� �. BEGIN TIP PROJECT B-4950 , � '� ,� '� ,� � � ,�° � °• —L— POC Sta. 11 + 00.00 �� � � � �FTB 2GI '� � � �� � � � � a � .' i � '� : . . �; ��= . � � ,� '� � . �� . •' // � � � � � � m". . ��� � � ° : • ��4 O,.W���� / �F � � '�EMO E EXIS � ,. , ` gI . �' ��, , � ` � Il� • . � � �� � � � � \ � ���. — ,.o��� ��.�_� � , ��, � , . `�. � . . � q . � � , . • � 'HI��: � , f ,. . � , o. . � � � '' � g � �-�,� ..� ,' � °' '�,�� � .. ,. , � a� � � �,�.. � _� _ ���.� �/ � � �� �,<� <.<... • .• ' -' , �.. �� " �� ,C � V � .. .. �4•�:, , � �• � � � / ` �� � , 1 � r — � � � MTL GATE' L � � � �F � �,_ � — — — — — — i __ __�-- ��,•R�p.-111�. � �__ � _ � e � I�° F2C� � � — — — — — �, , .�. .� g,_,.�. _ � _ ,� _ .` , , �, TA�I N�— � /.3'� ai01L � F — -- — — — — — — — — — — — � i � �— - TB 2GI - �� SR � � a _ _ ` �, � sR �s� Fa�tor er��DCE �� �a�s°r � _ _ -- � 4� q� �} — — — — — — — �? �` � � +43 4� t`3 � � � �i � �f . . . . t� {� � � � 4� �: i t:� � � 4� �� r,� t'� � -� � _, � � � � � � � �. , _ , , � � � — F _ �� � __-_�� � � . / � �� � OUTLET 0401 � �� � �(�` V10 = 0 50 PS � � 1 ��: �� � �: �:. 1 �� ' � � �'�N�I�Ii!�6� �� I�������� � � � � � � � � � � � � �: � � � � � rn � � � � � � � � � � � � � � � � � � � m � � � � '� ,� '� ,� � � '� ,� '� �n � � � � � � � � � � � RH610V �EXISTING > � � � �F � BRIDGE � . � �F � � � ����� �F EXCA�TIOI� IN WETLAtYIDS �F � � � � � � � , , , : . „ .. . . ., . . }_ � - : -� \ � . "y.i'`"`y.��T j^ ��,¢'t -y"."�n,�y�,..y'r��e��+a* - � - .''�" 4�' ., ��,.,��d"� _ �.-,� . „3`sa.,9°` � r �� � _ � � � di � 4.a .�.- _ '�. � � Q� �, EXCAVATION IN WETLA�D� � � �, �, _ � EXCAVATION L�MITS � � � � ��' Q� � HAND CLE�RING ��� ��'�=� �� ��� � '` F`. __ _• ,- - _— `_ � � � �. � � �� , � � �` � N: �� � � �ry PoND I y � � � a� m Z �' �� � � � � � ���, � � � d �� � �� m � , , �,, � � , ��, � I �, Z '� � � _. : � � � � � � ��' c� . � . . ar��� €' �_ +e � �'' 8 t �' Q �`�,�} ; "� ISLAN�..� 9 s I� � �Q� � �. � ' �R` � �DENOTES EXCAVATION IN WETLANDS � DENOTES HAND CLEARING L_L_L_LJ DENOTES TEMPORARY IMPACTS IN SURFACE WATER L.L_L_L1J DENOTES FILL IN WETLAND • • • • DENOTES MECHANIZED • � •� •' • CLEARING � � � W00 � t t � � � EXCAVATION LIMITS .,_ �c � PROJECT REFERENCE NO. B-4950 � RtW SHEET NO. � ROADWAY DESIGN N ENGINEER � � ���� � =� �� v � az � t / �� , _ �' �' � �� £ �� �'�:���K�'� �:����� � w�ww : w� p� �� �� � , $��IIIFE. LINDA GAIL� O�N�NS '��,� ' i � r. �� ' �� � � � � � � � � � � � �� � � � � � ' �z � � � � � � � � � � � XCAVATIO� IN �VETLANDS � � � 'a � EXC�/ATI �N LIMITS �F � ` -� �F �i v. � � � � � � � � � � � � � , '�. °� '� � I y"a.e.� ` ��p.c �_�am� "* � �"`�kv? �� e �� _ � ��- "�"' . '� �. '�" -,�� �M,1�4.��� .. . �. � – _ � � - EXCAVATION �NIITS � � � /� � � �� ��: ,� ;� SHEET NO. 4 HYDRAULICS ENGINEER INCOMPLE�E PLANS DO NOT U3B FOR / W ACQUISITION DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED PERMIT DRAWI NG SHEET 3 OF 10 ���w �° �"'��I. END eT�P PROJECT B-4950 ��y-������ —L— P�T Sta. 21 + 40.00 �y.-',v .g�. k; .Bx.m��...3.a ,.. .. 0 �_ �` TO SR /424 ^ - ��4 i �. i � .. `�......�� aft ��50 FAU�LOTM BR/�GE �IJ 2�0' BST � � " _ .e.- � — ,. _ _ _ � � — �=s- "�e,��� ��� , , . ,K . . . . . �'� �. ��..y. � `` � ' � � � � � � � � � . � , �F � EXCAVATION IN WETLANDS � � '� � . � � �F �E aF � ` . , , . � � . � �ODS F � � � � � � • � �� • � � � OUTLET 040G � � Q10 = 0.80 CFS V10=0.53 FPS ' I y y L� . s `�` . �. � � � ��° � ,34 N @4� � ,�a a h � , . �°i�5 PftANKLIN MIILLIAMS '� 9.,, �: �� d F � wiF�� ����¶ �� �m��R�,�S �'',..m = -t. -._ -�._-� _ 4 � �,� � � � ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ � 0 W � � �, � N +� C N E N �1 L � �--i C W � N � L N Q � L Q � T L i � � 0-' � � / N �1 C " 3 �D L O / �D +� C � � c 0 L > C w � � � � � w � i � U; ;< �� L� O�� �� M=L ��C 0��. �� _ � ���� � � ��� � �� �� �� �. �, � �, � � � � � � � � � � � � � � � � � � � � � � � � � � � � � RC—�010VE EXISTING - � � � � � BRI DGE � � ��� � EXCAV TI O I N WETLAI�DS � � � � . �n.��.���-��.�.F�..,__ � � � E �� DENOTES HAND CLEARING DENOTES TEMPORARY IMPACTS IN SURFACE WATER DENOTES FILL IN WETLAND DENOTES MECHANIZED CLEARING �� . DENOTES EXCAVATION IN WETLANDS � L/��/`1 r/""� 1 1 V 1�I �fs/1�\1 1 J� �� �► ' � ' . � � � � � ��;�--��►��L �'����►�� ��Y�,����Y � �� �IIIF�� ��I��� � I� �►II��N � � � � � � � � � � � � � � i XCAVATI O I N ETLAN DS � � � � EXC��/ATI O N LIMITS � ., � � � I/ � �� �/ � �TB 2 G I � � EXCAVAT I O N � � � � O UTLET 0406 Q10 = 0.80 C FS V10=0.53 FPS � I N WETLAN � � PROJECT REFERENCE NO. SHEET NO. B -4950 4 RtW SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER INCOMPLE E PLANS DO NOT USB FOR / W ACQUISITION DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED ��� � '' F __ _ _ _ _________ ' �_ _ _ _ _ _ _ _ _ _ � � � � � _ — � e�"` ���� � � "� �'� ���^ �. � � DS � � ����� �� � �� � � 0 � W � � �, � � 0 U � N +� C N E N �1 L � �--i C W � N � L N Q � L Q i � T L � m � o- � � i � rn c � 3 �D L O / �D +� C � � c 0 L > C w � � � � � w � i � U� tO �. L� O � M=L ��C 0��. �`I��I�I� �� H��H�� � �, � � � � � � � � � � � � � � � � � � � � � � � � � � � � � RC—�010VE EXISTING - � � � � � BRI DGE � � ��� � EXCAV TI O I N WETLAI�DS � � � � . � n . ��.�� � - � � . � . . �., _ _ � � � � �� --- _ _ y � � � __ _ � _ _�_� --�.�.. _ � - ��z � _ v_� � E �� DENOTES HAND CLEARING DENOTES TEMPORARY IMPACTS IN SURFACE WATER DENOTES FILL IN WETLAND DENOTES MECHANIZED CLEARING �� . DENOTES EXCAVATION IN WETLANDS � R� ` ��� .4 � �s � � .� � � �'� � . � J � -0,> 0 � � � `� - V . ,�� _, , f . .. _ 0.� ... � � .�.- �-� .� � ° ������` �� / � �r: y � Z . � � � �'` 0 � �� �� � � � r�� , :� rQ � �� f � . �� � �—�� � t� $� � �` �� ��'` � �� � w �� � , � � � �� � a �O . ,.� .�� d � . � �`� � � � yt*� � _ � / � � ����., k � � ����:;��►.��-������IN�4RD OWENS � -_ PE RM �F� -.�. 8�����f��E9 LINDA GAIL �O�NS SHEI � � � � � � � � � � � � � � ► XCAVATIO IN ETLANDS � � :,� � � � EXC��/ATI O N LIMITS � ., 1� � � L/��/`1 r/""� 1 1 V 1�I tifs/1�\1 1 J� � r� ' ���' �/_ ,� y , ,� �s ,r � ' � � �� � � � ' � �� i � � y "� - EX � �TB 2 G I CAVATI O N � � � � i�A � —� � O UTLET 0406 � p Q� 0= �.8� C FS G� � � V10=0.53 FPS IN � WET�AN � PROJECT REFERENCE NO. SHEET NO. B —4950 4 RtW SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER INCOMPLE E PLANS DO NOT USB FOR / W ACQUISITION DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED �� � � ''__ �� � F __ _ � = � —1�� ' � � _ – – – – – � �—! ' �_ _ _ _ _ _ •.. _ _ _ � � � � � _ — � , - r �_ -�" _ ;�—Ty � ' ..., , ,-. � _ .:�i��. � _ _ �, - � � � `I `I `I `I I� I� PROJEGf REFERENCE NO. SHEEf NO. � B-4950 5 \ �. � �. � � � � �. � �. � ROADWAY DESIGN NYDRAULICS ENGINEER ENGINEER INCOMPLE E PLANS IDO NOT U8E POIt /F ACQUBITION STRUCTURE HYDRAUUC DATA STRUCTURE HYDRAULIC DATA DA= 203 SaA//. DA= 203 SQAI/. DES/GN D/SCHARGE = 6/00 CFS DES/GN D/SCHARGE = 6100 CFS DES/GN FREIX/ENCY = 25 YRS �S/GN FREQUENCY = 25 YRS DOCUMENT NOT CONSIDERED FINAL DES/GN HW ELEVATION = lOI.B FT DES/GN HW ELEVATION = lO/B FT UNLESS ALL S16NATURES COMPLETED BASE D/SCHARGE = 890i0 CFS BASE D/SCHARGE = 8900 CFS BASE FREOUENCY = l00 YRS BASE FREWENCY = l00 YRS BASE HW ELEVATION = 103.6 FT BASE HW ELEVATION = 1038 FT ��� OVERTOPP/NG DISCIiARGE = 9700 CFS OVERTOPP/NG �SCHARGE = 9700 CFS OVERTOPP/NG FRE01/ENCY= IOOt YRS OVERTOPP/NG FREOUENCY= 100+ YRS � � � � � OVERTOPP/NG ELEVAT/ON = 104A FT I� � : � A N �� , :. � � BR/DGE STA= 13f98A0 -L- -- BR/QGE STA= 18+p7,5p -L- � 1�35' 2� CORED SLAB.lo55' 24 CORED SLAB. 1�35' 2l' CORED S[.A� 2�55' 24' CORED SLA� Pi = i2f00A0 i�.30� 2r CORED SLAB, wmH 4� En►D BE�►T CAPS l= 15+95A0 i� 2� CORED SLAB i= 20+3om EL = 10382' SKEW = 90' E� '�'� W/TH 4' END BENT CAPS �-�� -K = 286 C ELEK= 104.62' ��= 28� SKEW = 90' C_= 200' C ELEV.= 10470' � �I,� � � �— � �— �— I — —� + - � I I BEG/N PROPOSED GRADE' � END PROPoSED GRADE -L- �a//,�,�m BEG/N BRIDGE END Bl4/DGE BEG/N BRIDGE END BRIDGE -L- STA2/f40.00 ELEV.= l04l6' -L- STA/3f38 f/- _-L- STA/4t58 f/-e L- STA/7+35 +/- -L- ST�l19+20 f/ E�y= �pqqg• N ` p I � NW ELEV. 94.2 + y� e� I /�, II NWS ELEV. =9 94.6 y � �+M I �� �{// �� u � i. I Wt - - - .�_ .. �.�.... . :. . ,r.- � --� � _ I t- � z t+ . . - � �- -� - � - - -�� - - �� � i . �� � � �- , P� , � � � e _ � � �1 �� � �� �. >�i_ i � � � �, ' ` IXG TE TO RNLROAD SP/KE /N 24 P/NE � � I E 96.0' �- ELEV. 6.0' � ELEV 96.0' � E . 96.0 -I � -L- 5fA /O+OOAO —�4 � � — - �— N 85 /P437PW D/ST /9&79 4 �P f�' I R+P .l wr (NP. RIP r Rrr ELEV. _ 104J4' � � � � f f f m � �l— � �l— �l� !— �l� !— �l� � —! � —! � � a E a ti L m � Q� V / m C 3 0 O / 0 ✓ E �� � �� � � � � � �� � �� � PERMIT DRAWING 0 � � �_ � �_ � �_ � �_ � � _� � SHEET 8 OF 10 w N F E � � i FOR -L- ALIGNMENT, SEE SHEEf NO. 4 0 �Q o� M= \�. O`[L' � Z O Z O 1 O 1 O 1 O 1 O 1 O 2 2 � O � O � O � O � O Z O 2 O PROJEGf REFERENCE NO. SHEEf NO. � B-4950 � ROADWAY DESIGN NYDRAULICS � W��� N D I M�� C T S ENGINEER ENGINEER INCOMPLE E PLANS DU NOT II96 POR /W AWU181TWN � ♦ �A DOCUMENT NOT CONSIDERED FINAL � � � � � WETLJIN DS � � � � �. WETLI'iN DS � � � � � UNLESS ALL SIGNATURES COMPLETED BOUNDARY BOUNDARY � 100 S ITE 1 - --- - - - - - - -- 80 —L— 13 + 38 N o WETLAN DS WETLAN DS � BOUNDARY BOUNDARY l0U ,:, SITE2 --____ _______ 80 —L— 16 + 00 WETLAN DS WETLAN DS BOUNDARY BOUNDARY � m � . � „A , m 100 y� � a — — — — — — — — — - x S ITE 3 - -- a —L— 20+00 = 80 m � � � m � 3 0 � 4 � � m E C 0 ; C W N � PERMIT DRAWING � % SHEET 9 OF 10 � o�. �o �o �o �o �o �o �o � � �o �o �o �o �o �o �o ._ ,. .� WETLAND PERMIT IMPACT SUMMARY WETLAND IMPACTS SURFACE WATER IMPACTS Hand Existing Existing Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural Site Station Structure FillIn FillIn in Clearing in SW SW Impacts Impacts Stream No. (From/To) Size / Type Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp. Design (ac) (ac) (ac) (ac) (ac) (ac) (ac) (ft) (ft) (ft) 1/2 -L- 13+10 TO 14+71 Bridge 171 < 0.01 < 0.01 0.01 0.03 0.02 80 2 -L- 14+71 TO 17+23 Roadway Fill Slope 0.14 0.06 2/3 -L- 17+23 TO 19+33 Bridge 172 < 0.01 0.01 0.02 0.18 < 0.01 48 3 -L- 19+33 TO 20+73 Roadway Fill Slope 0.03 0.03 TOTALS*: 0.18 0.02 0.12 0.21 0.02 128 *Rounded totals are sum of actual impacts NOTES: Proposed Brid_qe Impacts from SMU Bridge 171: <.Ol acres for all permanent bents. No temporary impacts will be required. Bridge 172: <.Ol acres for all permanent bents. No temporary impacts will be required. 2013 10 24 • � BEGI N T 1 P PROJECT B-4950 —L — P�C Sta. II fQD.�� ��I`.��"I�I��: C��I�� \�C�)I'�"I'I-I ��.��I'�C�)I.I\.�\ II�I��I�IC�)\� �i)l�� I-II��I-I���.a��� L�CATI�11�: REPLA�E BRIDGES l7l A11tD l72 �VER S� UTH RIT�ER n11t SR 1851/SR 142� �FAIRCLDTH BRIDGE RnAD} T�'P� �F W�RK: P� WER Ll11lE REL�CA T1�11 � BRIDGE -L - POT / Sta.13 f38 f/- �Sp�B /Spd9 ; ��__..r�'__� �•.� •-- ' -'- -�'•�� t .�.._ ���.._ � TO SR 1$4$ -L- SR 1851 FAIRCLOTH BRIDGE RD 's.��z N C --I 2 7D rn �a UCTURE EXCAVATION (STR. PAY REM] — CLASS II RIP RAP — (STRUCTURE PAY ITEM] THERE IS NO CONTROL OF ACCESS ON THIS PROJECT. THIS PROJECT IS N�T WITHIN ANY MUNICIPAL BOUNDARIES. CLEARING ON THIS PR4JECT SHALL BE PERFORMED TQ THE LIMITS ESTABLISHED BY METHOD II (MODIFIED). END BRIDGE -L - POT Sta.14 t58 t/- BEGIN BRIDGE -L- POT Sta.17t35 t/- (STR. PAY ITEM] — CLASS II RIP R (STRUCTURE PA� � -L- SR 1851 FAIRCL4TH BRIDGE RD END BRI� -L - POT T.I.P. NO. B-4950 SHE]ET NO. U E-1 � 1223 Jones Franklin Road � Raleigh, N.C. 27b06 � / ETHERILL License No. F-0377 E NG I N E E R I NG B�S: 9i 9 asi sa�� Fax: 919 851 81fl7 TRANSPORTATION PLANNING/DESIGN - BRIDGE/STRUCTURE DESIGN CIVIL/51TE DESIGN - GIS/GPS - CONSTRUCTION OBSERVATION �'q'Q�0 END TIP PR�JECT 8-4950 —L — POT Sta. 21 f40o00 TO SR 7424 �� ]�l�]E]LINIIN�]L�Y PLANS DO N�T U5E FOR C�N5TRUCTION GRAPHIC SCALES 2012 STA2IIDARD SPECIFICATIONS I11 tDEX OF SH�ETS UTILIT Y O W11 tERS �11 t PR OfECT P�p� �� OFFICE OF: 0 50 100 llIG�IT OF WAY DATE: DIVISl011t OF HIGHWAYS SHEET 11 t0. DESCRIPTl011 t UTILITIES UKIT 22 .l U LY 2 Q16 o UTILITIES ENGIII�EERING � o PLANS U�1 TITLE SHEET {A) SUUTH RIVER EMC {PUWER) � 1355 MAIL SERVICES CENTER LET "IING DATE: 9 � �IGH NC 2769S�I555 0 50 100 UE-2 UTILITY BY �THERS PLA11l SHEETS � se° FAXN 9 j so-'4isi b� 16 MAY 2 017 oF T�►� P RD F I LE � H O RI ZO N TAL� �oger Worthangton, P.E. UTILITIES SECTION ENGINEER 0 10 20 Bo Hemphill UTILITIES SQUAD LEADER PRQJECT ENGINEER John D. Schriner, PLS UTILITIES PROJECT DESIGII�ER PROFILE ERTICAL i � N Utility Sum�nary Sheet WETLAND IMPACTS SURFACE WATER IMPACTS Hand Existing Existing Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural Site Station Structure Fillln Fillln in Clearing in SW SW Impacts Impacts Stream No. (From/To) Size / Type Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp. Design ac ac ac ac ac ac ac ft ft ft 1 10+88 to 13+87 Power Lines 0.10 2 14+43 to 18+32 Power Lines 0.09 3 18+71 to 20+79 Power Lines 0.05 TOTALS: 0.24 Note: Clearing for utility relocation will not exceed the current clear zone being maintained for the existing utilities. • .. . . . O � O� � I •� See Sheet 9 A For I ndex of Sheets See Sheet � B For Conventi onal Symbols See Sheet � C- � For Survey Control Sheet BEGIN TlP PROJECT B -4950 -L - POC Sta. ll f00.00 �— TO SR 1848 � � � � 0 � 7� , �-,� ---�� --� � � I � '� � I � I "' C�> I "' \� C�> I'� � I � I I ( '� I'� (�) I I \� '� II)I �'I�I(�>\ (�>I.� I-I I� ��I-I ��'.�� �"� ✓ BRIDGE +38 f/- LOCATI0111: REPLACE BRIDGES l7l A11tD l72 O T�ER SO UTH RI VER 011 r SR 1851 /SR 1426 (FAIRCLOTH BRIDGE ROAD) T YPE OF WORK: GRADI11lG, DRAI11 tA GE, PA VI11 tG, A11 tD S TR UCT URES NO. 171 N 0 � _ � < rn � END BRIDGE -L - POT Sto. l4 f58 +/ - -L- SR 1851 FAIRCLOTH BRIDGE RD .� ---__---�--- BEGIN BRIDGE -L - POT Sta.17+35 f/- THERE IS NO CONTROL OF ACCESS ON THIS PROJECT. THIS PROJECT IS NOT WITHIN ANY MUNICIPAL BOUNDARIES. CLEARING ON THIS PROJECT SHALL BE PERFORMED TO THE LIMITS ESTABLISHED BY METHOD III "MODIFIED" W/HAND CLEARING BEYOND THE SLOPE STAKES. y 0 C Z � � /� , 1 ' ; > > � i N � � o;o ,z � � �, �c ; � N0.1�2 \ � -L- POT Sto.19+20 +/- END T lP PROJECT B-4950 -L - POT Sta. 2/ f 40.00 ,— -------_ TO SR 1424 —� DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED PLANS PREPARED BY: HYDRAULICS E111G111�EER GRAPHIC SCALES DESIG11t DATA PR�JECT LE11tGTH 8601 SIX FORKS Rn, SUITE 260 ADT 2017 = 654 RS� RALEIGH, 11iC 27615 50 25 � 50 100 919-926-4100 0� �0� p� ADT 2037 = 1,038 LENGTH ROADWAY TIP PROJECT B-4950 = 0.139 MILE FOR THE NORTH CAROLINA DEPARTMENT OF TRANSPORTATION ��� ��y�o P�N S K = 1 O % _ 2012 STA11iDARD SPECIFICATI011iS � Q� D= 60 % LENGTH STRUCTURE TIP PROJECT B-4950 — 0.058 MILE pE o � 50 25 0 50 100 _ JENNIFER FARINO, PE SIGNATURE: � � T= 3 %* TOTAL LENGTH TIP PROJECT B-4950 — 0.197 MILE �GHT OF WAY DATE: PROJECT ENGINEER � o V= 60 MPH JULY 21, 2016 ROADWAY DESIG11t * _ o _ o JARED BOND, PE E11tGI11lEER �� �@ PROFILE HORIZONTAL � � �TTST — ��0 + D UAL — 2/o� PROJECT DESIGN E11iGI11tEER p o � 10 5 0 10 20 FUNC CLASS = LOCAL LETTI11lG DATE: �� ��p��� SUB—REGIONAL TIER MAY 16, 2017 TATIA L. WHITE, PE, PLS 11iCDOT C011iTACT PROFILE (VERTICAL) P�' SIGNATURE: BQUND�4RIES 14ND PROPERTY.• State Li ne ----- ----- �ounty Line --- ---- Township Line -- -- �ity Line - - Reservation Line - - Property Line Existing Iron Pin EO Property Corner � Property Monument � Parcel/Sequence Number �23 Existing Fence Line -x x x- Proposed Woven Wire Fence Proposed Chain Link Fence Proposed Barbed Wire Fence Existing Wetland Boundary - - - -W�B- - - - Proposed Wetland Boundary W�B Existing Endangered Animal Boundary EAB Existing Endangered Plant Boundary EPg Existing Historic Property Boundary HPg Known Contamination Area: Soil - •1• •1• Potential Contamination Area: Soil - � � Known Contamination Area: Water - '�` '�` Potential Contamination Area: Water - .��' .��' Contaminated Site: Known or Potential '■' � BIIII.DINGS �4ND DTHER CULTURE: Gas Pump Vent or LVG Tank Cap o Sign � Well ° w Small Mine 'Sz' Foundation 0 Area Outline Cemetery fi Building School � Church � Dam HYDROLOGY.• Stream or Body of Water --- --- Hydro, Pool or Reservoir �_ _ _ � Jurisdictional Stream �S ... — BufFer Zone 1 az � BufFer Zone 2 Bz � Flow Arrow �--- --- Disappearing Stream �--- --- Spring C��� ��_- .� Wetland � Proposed Lateral, Tail, Head Ditch � FLOW False Sump � ����� �� ����� ������ �y �� V' ����� �� ���� IYIY � 1L � Note: Not to Scale *S. U.E. = Suhsurface Utility Engi�aeerang R�4ILR0�4DS: Standard Gauge RR Signal Milepost Switch RR Abandoned RR Dismantled RrcxT oF iv��• Baseline Control Point Existing Right of Way Marker Existing Right of Way Line Proposed Right of Way Line Proposed Right of Way Line with Iron Pin and Cap Marker Proposed Right of Way Line with Concrete or Granite R1W Marker Proposed Control of Access Line with Concrete CJA Marker Existing Control of Access Proposed Control of Access Existing Easement Line Proposed Temporary Construction Easement - Proposed Temporary Drainage Easement Proposed Permanent Drainage Easement Proposed Permanent Drainage / Utility Easement Proposed Permanent Utility Easement Proposed Temporary Utility Easement Proposed Aerial Utility Easement CSX TRANSPORTATION 0 MlLEPQST 35 0 SWlTCH t t t t � 0 Proposed Permanent Easement with Iron Pin and Cap Marker R0�4DS �4ND REL�4TED FEI4TURES: Existing Edge of Pavement — Existing Curb — Proposed Slope Stakes Cut - Proposed Slope Stakes Fill - � ` � � ��v in� L�► =' �:� �c� \ / E E TDE PDE DUE PUE TUE AUE � c F Proposed Curb Ramp cR Existing Metal Guardrail T T T Proposed Guardrail T T T T Existing Cable Guiderail n n � Proposed Cable Guiderail n n n n Equality Symbol � Pavement Removal T�EGET�4TION,• Single Tree Single Shrub � � Hedge Woods Line � � � � � � � � - � 4rchard Vi neya rd EXISTING STRUCTURES: MAJOR: Bridge, Tunnel or Box Culvert Bridge Wing Wall, Head Wall and End Wall - MINOR: Head and End Wall Pipe Culvert Footbridge Drainage Box: Catch Basin, DI or JB Paved Ditch Gutter Storm Sewer Manhole Storm Sewer UTILITIES: P4WER: Existing Power Pole Proposed Power Pole Existing Joint Use Pole Proposed Joint Use Pole Power Manhole Power Line Tower Power Transformer I.V�G Power Cable Hand Hole H-Frame Pole I.V�G Power Line LOS B�S.U.E.*} I.V�G Power Line LOS C�S.U,E.*� WG Power Line LOS D(S.U.E.*) TELEPHONE: Existing Telephone Pole Proposed Telephone Pole Telephone Manhole Telephone Pedestal Telephone Cell Tower l� Telephone Cable Hand Hole la�G Telephone Cable LOS B�S.U.E.*] - la�G Telephone Cable LOS C[S.U.E.*j - la�G Telephone Cable L4S D[S.U.E.*j - la�G Telephone Conduit L4S B(S.U.E.*j la�G Telephone Conduit L4S C�S.U.E.*� l�G Telephone Conduit L4S D(S.U.E.*) la/IG Fiber Optics �able L45 B(S.U.E.*j la/IG Fiber Optics �able L45 C�S.U.E.*) la/IG Fiber Optics �able L45 D�S.U.E.*) � � � � Vineyard CONC , carvc ww C CONC HW �--------� � CB \CJ 5 • • O ►� n � � O ❑T � HH --TC--- TC — — — —T FO— — — — —T FO— — — T FO WATER: Water Manhole Water Meter Water Valve Water Hydrant LI/fG Water Line LOS B�S.U.E*� LI/fGG Water Line LOS C�5. U. E*) U/G Water Line LOS D�S. U. E*} Above Ground Water Line TV: TV Pedestal TV Tower W�G N Cable Hand Hole W�G N Cable LOS B(S.U.E.*) W�G N Cable LOS C(S.U.E.*j l�G N Cable LOS D(S.U.E.*} U/fGG Fiber Optic Cable LOS B�S.U.E.*� U/fGG Fiber Optic Cable LOS C�S.U.E.*} U/fGG Fiber Optic Cable LOS D(S.U.E.*} GAS: Gas Valve Gas Meter U�G Gas Line LOS B(S.U.E.�`� U�G Gas Line LOS C�S.U.E.*) U�G Gas Line LOS D(S.U.E.*) Above Ground Gas Line SANITARY SEWER: Sanitary Sewer Manhole Sanitary Sewer Cleanout LV� Sanitary Sewer Line Above Ground Sanitary Sewer SS Forced Main Line LOS B�S.U.E.*) SS Forced Main Line LOS C(S.U.E.*� SS Forced Main Line LOS D(S.U.E.*� MISCELLANEOUS: Utility Pole Utility Pole with Base Utility Located 4bject Utility Traffic Signal Box Utility Unknown l�G Line LOS B�S.U.E.*� l�G Tank; Water, Gas, Oil Underground Storage Tank, Approx. Loc. - A� Tank; Water, Gas, Oil Geoenvironmental Boring l�G Test Hole L4S A(S.U.E.*� Abandoned According to Utility Records - End of Information w A/G Water - -Tv- - TV - - - -TV FO- - - - -TV FO- TV FO 0 � — — — —G— — — - — —G— — —c— A/G Gas OO O SS A/G 5anitary Sewer ----F55---- - — FSS F55 • 0 � ❑5 — 7UTL — 0 UST 0 � m AATU R E.O.I. � � � N \ C_0 �■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ i i � �■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ �■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ � • ����������������������������������� �■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■����� ■■■■■■■■■■■■■■■■■■■■■■\1■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■�I■■■ ■■■■■■■■■■■■■■■■■■■■■■■\■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■I■■■■ ■■■■■■■■■■■■■■■■■■■■■■■\�■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■I■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■►\■■■■■■■■■■■■■■■■■■■■■■■■■■■■■Ii■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■\■■■■■■■■■■■■■■■■■■■■■■■■■■■■�I■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■1\■■■■■■■■■■■■■■■■■■■■■■■■■■■II■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■��n�2■�����■nn���■■■■■■■■■■��■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■\\rY`■i��■r■��vii■■■■■■■■■■11■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■\\■■■■■■■■■■■■■■■■■■■■■■■��■■■■■r7 \\■■■■■■■■■■■■■■■■����������"������---------------- ����:��r,��-i..� �■■■■■■`� �:�rir�Rn�i�*��T•.�■�ii�\�i-fi��i�1:�:�:E:J�������■■■■■■■■■■l'i'i!i!�! lir■rii�■ ■■■ii�111/�L',l�'11�11II�■■■■■■■■■■■■■■1 �'=':':�����ee��ee�:��_r,=_� --'',"■■■■■■■■ ........ ■■■■■■�■■■ ■■■■■■■■■■ ■■■■■■■I i i!i!i' 1■��1 I■■■■■ ■■■■�1 I■■1:�:� a�:� :■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■I � �:�: :i■■■11■■■■■■■■■■1 I■■C�;�:�Z�� i ■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■\\■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■I■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■\\■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■I■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■�����■■■■■■�■��������■■■■■■■■■■■■■►�■■■■■■■■■■■n�R����■������■■■■■■■■■■■■■■r�■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■II�_'If�IC �IIIIIG/Ili■■■I\■■�Irii,.'/Afil/,U�I.i■■■■■■■■■■■■■■\■■■■■■■■■■Yilll`�I�iiYi�fi�riii■■■■■■■■■■■■■■I■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■I�Yf�JiC��J�:���►r„����......������i���■■■r7■■■■■■\�■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■II■■■■■■■■■■■■■■■■■■■■�\■■■■■■■■■■■■■ --������'������...������������u�u�������...�� ■■■■■■■■■■■■■■■■■i��i■■■■■■■■■■■■■■■■■\+����■�� ����ec����e�:»e��»o�«»�«��.�� _ �■ii�■�■i��■ri��■ri��■ri��■ri��■ri��■r��r■r■■■■■■ �:►2�5 ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■f:�:�S:�:�:�rr�rii���iiiti��li�9iiS�]i71��7�:�i:y�i�7.'i ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■r�; :::: -:�������e�:��eee»oees»CCi»De:.�:�:���: ■■■■■■■■■IJ■li ��J�'ll��■■■■■���L���i�1C■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■�'! i!►!i!i'■■■■ ■■■■■■■■■■■ ■■■■■■■■■■■ �■■�!i!i!i!i!i �i �■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■���:►��►■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■►i!�������!■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■ ■■■■■■■■■■ ■■■■■■■■■� ■■■■■■■■■■ ■■■■■■■■■� ■�■■■■■■■■ ����■■■�■� � '_n■►�1►'_�� ,ltiiiiilii�i ■■■■■■■■■■ ■■■■■■■■■■ ■■■■■■■■■■ ■■■■■■■■■■ ■■■■■■■■■■ ■■■■■■■■■■ ■■■■■■■■■� ■■■■■■■■■■ 1r"_� ■►1r'�■ 'Jl'�,�/ �1 ll l� 1 �����s�ra��r■ ���ia�r��� iiiiiiiiii ■�■■■■�■■� ■■■■■■■■■■ ■■■■■■■■■■ ■■■■■■■■■■ ■■■■■■■■■■ ■■■■■■■■■■ ■■■■■■■■■■ ■■■■■■■■■■ ■■■■■■■■■� ■■■■■■■■■■ ■�■■■■■■■� ■�■■■■■■■■ iiiiiiiiii � . �■ :��: ■ ������aiir�■� :iiiiiiiiii :�r,�■:::_�■ ■■�I■�iC��� ■�■ I� ■■■■�i ■■■I■■■■■�■ ■■�I■■■■■■� ■■■I■■■■■■■ ■■II■■■■■■■ ■■■■■■■■■■ ■■��■■i■i■�� ■�_:��i���►� �■■■■■�■���e ■■C7i�i■I■■■ �■■■■■I■I■■■ ■■■■■■I■I■■■ ■■■■■■I■I■■■ ■■■■■■I■I■■■ ■■■■■■■■■■ ■■■■■■■■■■ ■r������ur ■ i r� �� it �r 1� �_ i ����a����� ■�■■■■■■■� ■��■■■��■■ ■■■■■■�■■■ ■■■■■■■■■■ ■■■■�■■■■■ ■■�■■■■■■■ ■■■■■■■■■■ r,►��i��ruui �`�����`�■ ■■■■■■■■■■ ■■■■■■■■■■ ■■■■■■■■■■ ■■■■■■■■■■ ■■■■■■■■■■ ■■■■■■■■■■ ■■■■■■■■■■ ■■■■■■■■■■ 'JI.��� �11(1� 1 �1111���1111�■ �►r�i`�\�� ■�■■■��■■■ ■�■■■■��■■ ■■■■■■�■■■ ■■■■■■■■■■ ■■■■�■■■■■ ■■■■■■■■■■ ■■■■■■■■■■ ■■■■■■■■■■ ■■■■■■■■■■ ■■■■■■■■■■ ■■■■■■■■■■ ■■■■■■■■■■ ■■■■■■■■■■■■■ ������ � 1/��■►1��� Ititil�lilil�l I 11 +� 1� \I Jl 1� 1 ■\rii`r\�■ ■■■■■■■■■■ ■■■■■■■■■■ ■■■■■■■■■■ ■■■■■■■■■■ ■■■■■■■■■■ ■■■■■■■■■■ ■■■■■■■■■■ ■■■■■■■■■■ �l �� l� �I 1l 1� � �■�����■�� ■■�■■■�■■■ ■■■■■■■■■■ ■■■■■■■■■■ ■■■■■■■■■■ ■■■■■■■■■■ ■■■■■■■■■■ ■■■■■■■■■■ ■■■■■■■■■■ ■■■■■■■■■� ■■■■■■■■■■ ■■■■■■■■■� ■■■■■■■■■■ ■■■■■■■■■■ ■■�■■■■■■■ ■���■■��■■ ■�1r1�/�■li■■ Ill���fl111�1 J►:.S7�Jt�� ■■■■■■■■■■ ■■■■■■■■■■ ■■■■■■■■■■ ■■■■■■■■■■ ■■■■■■■■■■ ■■■■■■■■■■ ■■■■■■■■■■ ■■■■■■■■■■ ■■■■■■■■■■ ■��■■�■■■■ ■■■■■■■■■■ ■��■■■■■■■ ■■■■■■�■■■ ■�■■■■�■■■ ■�A■���■A■ ►lf,� 1� ull,� 1 1 �l 1� ■f �I ll 1■ ■ �L��■■■■■A■ �lC�■iir�■ �■■■■■■■■■ ■■■■■■■■■■ ■■■■■■■■■■ ■■■■■■■■■■ ■■■■■�■■■� 7r� �� :1r: ■ �ii�■�a�����■ ��►� ��.■►�►�..a ■� is-a�.�■� i� �r i� �� a� �r u■ ■1 Il �' J�� I■�,�r��+rl�.�►l►�� a ������������■�■������� ■■■■■■■■■■■�■■■■�■■■ ■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■ ■��I 1■I If � tl 1 ' `�JOI'���J �■■■■■■�■■ ■■■■■■■■■■ ■■■■■■■■■■ ■■■■■■■■■■ ■■■■■■■■■■ ■■■■■■■■■■ ■■■■■■■■■■ ■■■■■■■■■■ ■■■■■■■■■■ ■■■■■■■■■■ ■■■■■■■■■■ ■■■■■■■■■■ ■■■■■■■■■■ ■■■■■■■■■■ ■■■■■■■■■■ ■■�■■■■■■■ �r. �■ :1r: ■ ,�i i■ ■� ai ir r■ � ■■■■■■■■■■ ■■■■■■■■■■ ■■■■■■■■■� ■■■■■■■■■■ ■�■■■■■■■� ■�■■■■■■■■ ����■���■� ■ ��■���A■ � v�s�� ■�ir,. ■ �i �� ■i �� i� �� ■ �r,�r�i>>ru■ 1 ]I�[/ 1� �1 Jl 111 ��n���� � ■�■■■■■■■� ■■■■■■■■■■ ■■■■■■�■■� ■■■■■■■■■■ ■■■■■■■■■■ ■■■■■■■■■■ 71��1�11111�� r\�ii`�\r■ ■■■■■■■■■■ ■■■■■■■■■■ ■■■■■■■■■■ ■■■■■■■■■■ ■■■■■■■■■■ ■■■■■■■■■■ ■■■■■■■■■■