Loading...
HomeMy WebLinkAbout20151312 Ver 1_PH II Stormwater Booklet_20161118STORMWATER CALCULATIONS, FIOR Jordan Manors Apeaa, Nc rtH Carolin a May 11, 2016 111701711.I011 C A. P fA:3ii WILLIA M G DANIEL & ASSa C IATE S, P.A. 115 G S. E. MAYNA RU ROAD, SUITE 216 0 C ARY, NC 27511 (9191) 467-91708 TA BILE OF CONTENTS Stormwatcr Impact Stlaillemeint Wet Paind Detention Calculations Sectlioni 1 Storm Draiinagle, H)idraullic Graidei IJine, & Guilllleir Spread Calculations Section 21 Prei-Post DeMelaipmeint Scction 2 Storm Water Run -Off and Routing Downstream Stormwateir Impact) & Exhibits AppcndiNi Jordan Mainors (New Hill 0114ve Chapel Road, Apex, NC) Ste rmwiiate r Impact Stbtement The proposed site contains 121+ acnes and abutls Little Beaver Creek to the south and New Hill Olive Chapel Road to the eastl. The entire assemikllagei iisi contributory to Jordan Bake and is located within the Town of Apem's Primary Water Supply Watershed. The drainage patterin of the property its primarily south / north to Hittle Beiamf ri Creeeik. The proposed Jordan Mlanoris project includes 240 single-family deitached homes. The assemblage of properties that comprise Jordan Manors has rece iime d zoning approval as PUD -CZ, and a Master Subdimiis coni Alan for the project has been appromed. The accomipanypeng Ahase 3 Consitruction Plans conforimis to the infrastructure and lot configurations shown on the approved Master Subdivision Allan. Eighty-six. (86; single famielm lots are included iene these constructieone planes. This Storim-%mater Imipact Statemient ies offered in support of the proposed Phases 2 Conestruction Plans. Ire conformity to the representations of the appromed Master Subdivision Alan, the Phase 3 Conestlructieon Alans includes stormwater mianiagementl measures that will mieiet water quality) and nate-of- disc harige regulatlory requirements of both the Town of Apex and NCDE NN. Two of the fours wet Mond s derliecte d on the Master Slubldiemiision Alan are included 4thin the Phase 3 Construction Planes. The infrastructures and proposed 86 lots shown on these constructieone plans are contributory to these two BMPs. Each of the BMFIs vaeiriei designed to intercept and tlreat the post-demeloflmieint sterimwateiri runoff fromi the proposed lots and infrastructure to achieve conformity to the neutriient emporit and Teak rate i of discharge requirements of the Town of Apex aped NIC DE N14. The systami of stormwater managemient measures priorloseid within Jcerdan Mancrs wuiell ensures that), for thea 1, 10, & 25 year return intlenial stcrnmis, atl no pcint along thea parimieter of the Jordan Manoris assemblage will the post-demeilopmientl rate of storimiwatleri point discharges emceeed that associated with thea prie-development conditions. As such, neo degradation c f downstreami recaiming wa tleiriceourses and cc nmeyances is anticipated. The measurers preplosied within Ahase 3 Construction Plans is ai logical phased iempleimieintlatlion of the overall stormwater managemient plan of Jordan Pointe to achiemei conforimiitM to nct only the appliii local and stlatei rieigulatienes, but also the conditions assceciated with appriomail of the J oridain Manoris PUD. Section l WET PIG ND DETENTION DATA CALCULATIONS Jordan Manors Ar ex, North Carolina HMP Stermwaiter Wet Detention Raisin Desilrn Cailculatians Da9ad: `1/11/3(116 Mavised: SA/DA Ra�io3 for Purruanent Pool Siaing to Achima 90% TSS Reic catiori IMFORIVIIC US FORICENT 3.00 FERIMA NONT AQ C H UEIFI IIHS IN FEET 3.50 4.00 4.50 9.00 10% (1.90 0.80 0.8(I (1.70 (1.60 X% 1.50 1.30 1.1(1 1.00 1.00 1.90 1.80 1.1(1 1.50 1.40 40% 2.'10 2.'410 3.00 1.90 1.80 _110% 3.00 2.80 13(1 2.;10 3.00 ((1% 3._10 3.:10 7.8(1 2.70 3.50 11% 4.00 3.10 3.3(1 3.10 3.80 £I(1% 4.410 4.10 3.80 3.'10 3.:10 9(1% 5.00 4.J0 4.00 3.80 3.50 BMP Arc v A a. Uescri tion I 19.02 I Wat Detcmlion Basin Normal Foall Surlauei Area Calculations WetDelerition Basun Valume to bci conti ailed from the V storm Option 3 Cala Re uirocl Frovidcd BMA # IMF. % DEPTH FT SA/DA PC C U A R UA SF AOC L ARIDA SF 1 51.95 4 2.56 211,201 27,151 WetDelerition Basun Valume to bci conti ailed from the V storm Option 3 Cala 0.5175 = Rlv (Rluncdllaoeffiaierit) Pern. Paal 27.151 sf Honorr sf alf 23510 sfl 35,739.111 = Val ume to ba conti ailed (cf) Hot1om pone 12995 sfl 102,02 = Volume provided (cf) Pool durjif _`I.a ft averagei depth: 4.34 5368109 Pond Report HydrlflmA Hydraclnarlt s t y InleliSCINEl Wednesday, May '11 2016, 2:216 FIM Pend No. 1 - Pond 1 Pand Clata Pend storace is basec cn known cicniC(r areas. AuEragE erlc area rrlEihoc used. Sialge / Storalgle TaiHie Stage (fllJ Elevation) Ift) 0.00 291.(0 1.00 519x.(10 51.00 3.00 :194.(1(1 4.0(1 5115ACI 4.5(1 219 ACI 9.0(1 5196.(Ia 9.11,1(1 4196.90 EIA(1 2197 ACI 1.aa 2198.00 EI.(ICI 299.aa 9.(ICI 2160.a0 '10.C1a 2I61AO 10.90 2161.90 C antaur allea isgft; 9,916 14,189 17,168 '19,622 :11,'l42 513,570 .17,'151 31,05:1 33,OgEl 39,7<,17 3g,51d ia,2£IEI 45,119 4E1,991 Incr. Storage (cufil) 0 1.1,3521 19,978 1 £1,399 51(1,8£11 11,428 151,6£1(1 14,591 1 E1,038 :14,44£1 .11,£19£1 4CI,9CIC1 43,7(111 213,g11 Total storage (cufllj 0 "1:1,353 20,3211 a 6,7510 E11,60EI 7g,03E1 91,710 1 OEI,5161 1.151,309 1f16,7F13 194,x(18 2i19,3(1£I 279,0(19 3(11,9519 Culvert / Orifice Sirucltures Weir Structures [A] [B] IC] [a] [A] [Bl [C] [al Rise (inlj = 18.Cla 2.50 0.0a a.(I(1 C rest Len (fIJ = 20.0(1 20.00 a.C1a CLCICI SFlanl lin) = 18.00 2.50 0.00 a.aa C resit El. Iftj = 259.(1(1 260.00 a.cici a.cici Na. Barrels = '1 1 0 a WairCoeff. = 3.33 2.Ela a.CICI 0.00 Invert El. (fl] = 252.50 5196.(11 OAO a.aa Wair Ty Fla = Real Efoclac Lerigth (ft; _ '100.00 (1.0(1 OAO aAa MLlti-Stage = Yes No No No Slope (1),) _ 'i.aa (I.O(I 0.00 a.C1a N -'value = .x13 .Ml A00 .(ICICI C rif. C aefil. = 0.60 (1.6(1 0.00 OACI Multi -Stage = nda No Na No Exfillnation = O.OaO iri t n IlContal. IQ TaHWEREM Elee. = CL(ICI ft t a te: Culvert/Ori lla a outflovu have be an an ah pe d undo a inlet and a utlet control. EItalgle i EItoralge / Discharge Table Silage Storage Elevation) C Iv A C Iv B C l% C C Iv 0 Wr A Wr B Wr C Wr 0 HAI Total ft Cufll ft afs cfs afs ats cfsl Cfs cfs da eft del CLCICI 0 m,i.aa (L(I(1 0.00 --- --- 0.00 0.00 --- --- O.aa 'I.(ICI '12,393 2192.aa (1.(l(I 0.00 --- (1.00 0.00 --- --- O.CIa 2.(1(1 28,33.1 xm.aa (I.CI(I (1.00 --- --- (1.00 0.00 --- --- 0.00 3.aCI 46,726 294.00 aaa (1.00 --- --- 0.00 0.00 --- --- O.aa 4.0a 67,608 2195.aa CLCICI (1.00 --- --- (1.00 0.00 - --- --- O.aci 4.9a 79,06 255.9a a.cia (1.00 --- (1.00 0.0(1 --- --- --- OAa 5.C10 91,116 2196.aa a.aci (1.0(1 --- (1.00 0.0(1 --- --- --- 0.00 5.90 '106,261 2196.90 OACI (I.1(I --- --- (1.00 0.(1(1 0.110 6.Cla '1251,305 397.00 aAC1 (1.19 CI.00 0.(1(1 - --- --- 0.119 7.aa '156,753 5158A0 a.aa C1.5121 --- --- CI.0(1 0.0(1 --- --- --- 0.23 8.00 194,408 259.00 am (1.28 --- --- CIA(I 0.(1(1 --- 0.28 9.a0 239,308 260A0 20.98 (1.351 51(1.91 OACI --- --- 30.90 IO.a0 27EI,OOEI 261.00 22.x9 C1.21EI --- --- CI.(I(I 551.(1(1 --- --- 74.42 10.90 301,921 261.50 22.13 (1.21£1 --- CI. M 89.93 --- --- 1'18.64 Permit Ito be provded by DMI 0- 14CDENR D0� \NA7g Site Characteristics STORMWATER MANAGEMENT PERMIT APPLICATION FORM Drainage area 401 CERTIFICATION APPLICATION FORM Impervious area, post -development WET DETENTION BASIN SUPPLEMENT % impervious chis term must be filed our; Qrinred are sutrmined. Design rainfall depth The aegutre Items Clwldisr (Parr ill) mum be printed, filled our and submitted along w1h all of the "used information. I, PROJECT INFORMATION Project name Jordan Manors Contact person Bill Daniel Phone number 919.467-9708 Date 511 V2016 - Drainage area number #1 Il. DESIGN INFORMATION Site Characteristics Drainage area $2$,511 ft2 Impervious area, post -development 430,412 ft' % impervious 51.95 °% Design rainfall depth 1.0 in Storage Volume: Non -SA Waters Minimum volume required Volume provided Storage Volume- SA Waters 1.5" runoff volume Pre -development 1 -yr, 24 -hr runoff Post -development 1 -yr, 24 -hr runoff Minimum volume required Volume provided Peak Plow Calculations Is the prelpost control of Ute lyr 24hr storm peak flow required? 1 -yr, 24 -hr rainfall depth Rational C, pre -development Rational C, post -development Rainfall intensity: l -yr, 24 -hr storm Pre -development 1 -yr, 24 -hr peak flow Post-davelopment 1 -yr, 24 -hr peak flow PrelPost 1 -yr, 24 -hr peak flow control Elevations Temporary pool elevation Permanent pool elevation SHWT elevation (approx. at the perm. pool elevation) Top of 1 Oft vegetated shelf elevation Bottom of IOft vegetated shelf elevation Sediment cleanou 1. top elevation (bottom of pond) Sediment cleanout, bottom elevation Sediment storage provided Is there additional volume stored above the state -required temp. pool? Elevation of the top of the additional volume 35,739 ft' 102,692 ft' 0i(, volume provided is equal to or in excess of volume required. ft3 ft' ft3 ft' ft' Y (Y or N) 2.9 In 0.22 (unitless) 0.60 (unitless) 0.13 inlhr OK 0.54 ft'lsec 1.48 ft'lsec 0.94 ft3lsec 259.00 fmsi 256.00 fmsl fmsl 256.50 fmsi 255.50 fmsl 251.00 fmsl 250.00 fmsi 1.00 ft (Y or N) 259.0 Hsi 01( Form SW441 •Wer Detention Be Sin -Rey 9.4M8112 Parts L & II. Design Summary. Page 1 of 2 It. DESIGN INFORMATION Surface Areas Area, temporary pool 42,286 ft' 10:1 Area REQUIRED, permanent pool 21,210 ft' OK SAIDA ratio 2.56 (unitless) 3.91 Area PROVIDED, permanent pool, A, � 27,151 fl' OK Area, bottom of 10ft vegetated shelf. A., sem, 23,570 ft' N (Y or N) Area, sediment cleanout, top elevation (bottom of pond). AW_P+d 9,916 ft' OK Volumes OK 6” Gate Valve @ Box Riser Volume, temporary pool 102,692 ft' OK Volume, permanent pod, Vim,,,, pm, 91,716 ft' Volume, forebay (sum of forebays if more than one forebay) 22,392 ft3 Forebay °% of permanent pool volume 24-4%% Insufficient forebay volume. SAIDA Table Data Design TSS removal 90 °% Coastal SAIDA Table lysed? N (Y or N) MountairdPiedmont SAIDA Table Used? Y (Y or N) SAIDA ratio 2.56 (unittess) Average depth (used in SAIDA table): Calculation option 1 used? (See Figure 10-2b) N (Y or N) Volume, permanent pool, V,, �, 91,716 ft3 Area provided, permanent pod, An. P„ 27,151 R Average depth calculated ft Need 3 ft min Average depth used in SAIDA, d.„ (Round to nearest 0.5ft) It Calculation option 2 used? (See Figure 10-21b) Y (Y or N) Area provided, permanent pool, A,__,�, 27,151 ftp Area, bottom of 1 Oft vegetated shelf, Atd dw, 23,570 fl Area, sediment cleanout, top elevation (bottom of pond), A,,,,,, 9,916 ft2 'Depth' (distance bM bottom of 10ft shelf and top of sediment) 4.50 It Average depth calculated 4.06 ft OK Average depth used in SNDA, d„, (Round to down to nearest 0.511) 4.0 It OK Drawdown Calculations Drawdown through orifice? Diameter of orifice (if circular) Area of orifloe (if -non -circular) Coefficient of discharge (Ci)) Driving head (Ha) Drawdown through weir? Weir type Coefficient of discharge (C.) Length of weir (L) Driving head (H) Pre -development 1 -yr, 24 -hr peak flow Post -development 1 -yr, 24 -hr peak flow Storage volume discharge rate (through discharge orifice or weir) Storage volume drawdown time Additional Information Vegetated side slopes Vegetated shelf slope Vegetated shelf width Length of flowpath to width ratio Length to width ratio Trash rack for overflow & orifice? Freeboard provided Vegetated filter provided? Recorded drainage easement provided? Capures all runoff at ultimate build -out? grain mechanism for maintenance or emergencies is: Y (Y or N) 2.50 in int 0.60 (unitless) 1.15 It (Y or N) (unitless) (uniliess) fl ft 0.54 ft'Isec 1.48 ft'Isec 0.15 ft'Isec 2.76 days OK, draws down in 2-5 days. Permit (to be provided by DWQ.J 3 :I OK 10:1 OK 10,0 It OK 3 :1 OK 3.91 OK Y (Y or N) OK 1.0 ft OK N (Y or N) OK Y (Y or N) OK Y (Y or N) OK 6” Gate Valve @ Box Riser Form SW401-Wel Detention Basin -Rev 9-08112 Paris i & n. Design Summary, Page 2 of 2 Jordan Manors A fc1x, North Carolina HMP Stalrm%aiter Wet Detention Basun Deslimn Cadaulaitions Dated: I !I /aE X12(1 I_I Rav ise!d: SA/CIA Ratias for Permarianl Paal Sizirg to Aahie!va 901/8 TS9 Rladucl ion IMPERVIOIUSI PERC©NT 21,0(1 HEIRMANEINT FOOL DEPTHS IIN PIE ET 3.'110 4.(10 4.90 5.0(I I (10/4 (I.SI(1 U10 0.8(I (I. W] (.6( WO/O 1.5(1 1.30 1.1(1 1.0(I I.0( 30°/a 1.90 I .E 0 I 'Al 1.51(I 1.4(1 41% 3.50 2.3(1 3.0(1 1.90 1.80 50% 3.00 3.8(1 3.50 213a '1.00 60% 3..`10 3.20 3.80 3.70 21.50 70% 4.00 3.7(1 3.30 3. i 0 21.80 80% 4.M 4.10 3.80 3.50 3.:10 90% .11.(I(I 4.50 4.00 3.80 3.M EMIP Area (A(.) I Description _ 2 r 7.519 lWel Datentiari Basin Nammal Pool Surface Aiea Cailculaliom Wet DelenI&ii Basini Volume to be coritrolled 11rom 11he V storm Clption 3 Cala (1.4 MI = Rv QRun ollf eaefficient) Aaum. Pool 94451 sf Botlom shelf) 74B sf 1111,459 = Molume to be coritrulled (cf) Bottom pond 1988 sf 112,067 = Molume provided (cf) Paol depth 51.0 fil averaga depth: 3.6131 14',151 Re u'fned Provid(id BMA IMP. DEPTH # 0/41 (FT) SADA HOIOLAREA SF POOLIARHA SF 2 40.(51 3..1 128 7,538 9,455 Wet DelenI&ii Basini Volume to be coritrolled 11rom 11he V storm Clption 3 Cala (1.4 MI = Rv QRun ollf eaefficient) Aaum. Pool 94451 sf Botlom shelf) 74B sf 1111,459 = Molume to be coritrulled (cf) Bottom pond 1988 sf 112,067 = Molume provided (cf) Paol depth 51.0 fil averaga depth: 3.6131 14',151 Pond Rleporl Hydraflaw H ydnalrar t s li y In9Ellisalve Monc Ely, Nav 9 AICt19, '10:'18 P N Pond No. 21 - Pond 2 Pond Da1tal Pc1nd storaglc iS kissed cn knclwn con(aL r alrelals. Average) E1nd circa methad used. SivEle / Stduage Tat le Stage (fl) Elevatior (fll) C.00 2571Aa 1.00 258AC 'IACI 259.CIO 2ACI 260. CIO 3AC1 261.00 4.93 26.1.00 5.9CI 263.00 6.a0 2E11.50 6.90 .IE14.00 7.50 �IEIE.00 EI.50 2EIEL,OCI 9.50 �IEI71.0(I C ontot, r area (sgftj 1,33'1 1,988 2,354 ;1,835 4,951 EI,'1621 1,46SI S1,459 11,4971 3,X16 14,1981 15,7134 Ir oil. Storage (tuft', (1 1,6EI(I ,OEI(1 3,099 4,393 9,9971 6,EI1 EI 4,131 5,238 '12,41A '14,046 '15, 145 Total slarage IlaLft, CI 1,EIEla el,7�9 ',l,E40 1RA1113 191jincI �I2,E108 2EI,83A 33,(1719 44,491 98,9371 13,7182 Culaerl ! Crificlel Strudiliesl (Meir Siructulesl [A] [B] [Cl [D] [A] [B] [C] ID] Rise Ilin) = '18ACI 1.50 CLOO (1.00 Clnest l an (flq = 1EIAICI 1(1.0(1 a.Cla 0.00 Span Qinl = ' 8.(10 1.50 a.00 Cl. 00 C nest BL lfti = 2814.4 Cl elE16.CICI CLCICI O.aO No. Barrels = 1 I Cl Cl Weir Coeff. _ 3.3;1 2.E10 a cici O.aO Imarl El.iifl) = 258.90 263.9' a,OCI CLOO Weir Npe = FElal Broac --- --- Lengtt ifl) = 70 -CIO 0. CIO am C3.00 Mulli-Stage = YElsi No No Na Slope i%) = 1.00I O.CIa OA(I CLO(I N -Value = .0'13 A13 (I(I(I .00(1 Or3f. Coeff. = C1.60 0.EIO OACI 0.(ICI Multi -Stage rlla No Nc No E011tratlori = O.CICIO irirlhr (Cantaua; Tailwalan Be%. = 0.00 f H ote: 0ulaert, Oiiii ice ounlovo.. f ave bac n analyzed under in let and outlet control. Siage ! Steleage I Clislchalrgiel Table Stage Storage) Elevation C11% P Cliv B CIV Cl C11V a WrA Wr B Ar C Wr a ExfiI Total ft aufl fl afs afs aft; ails (Ills cis da cfs als afs a.(Ia 0 2971.50 0.(ICI 0.0CI --- --- (1.00 (IA(I --- -•- --- 0.00 1.(101 1,660 :198.50 O.fla 0.C1a --- (1.00 CIAO) ROO 1.EIICI 2,745 199.00 O.CICI OACI --- CLOO CIACI --- --- --- CLOCI 2.93 9,E140 .IEICLOCI O.CICI O.CIO --- 3.00 CIACI --- --- CLOO 3ACI '10,233 ,IEl1.0(1 O.CIa O.CIO --- --- 3.00 CIACI .-- --- a.00I 4. ICI '15,719(1 2IEIZCICI O.CICI 0.0CI --- --- 3.(10 CLCICI 0.(CI 5.90 22,EICIEI 283.(1(1 o. CIO OACI --- --- CIACI a.aci CIACI 6.00 26,8131 ;IE13AC1 0.00 0. CIO --- OACI via --- --- a.00i 6.90 32,073 264ACI 0.00 OA4 --- --- O.CICI am --- --- CIAO 7.90 44,4191 269.(ia 19.90 0.07 -•- 19.E9 CI.00 --- --- 19.971 8.90 58,937 266.Cla 713.05 0.09 --- --- 22.(12 OAO .-- 221.12 9.90 73,il21 2167.Cla 221.66 0.11 •-- 23.811 26.00 - 49.12 AMA MCDENR Permit No STORMWATER MANAGEMENT PERMIT APPLICATION FORA 401 CERTIFICATION APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This farm must be frilad out, printed and suhmiffed. The Required kerns Checkfisl (Part tit) must be printed, filled out and submitted along with all of the required information. I. PROACT INFORMATION Project name Jordan Manor Contact person Bill Daniel Phone number 919A67-9708 Date November 9, 2015 Drainage area number #2 fro be provided by DWQ) II. DESIGN INFORMATION Site Characteristics Drainage area 330,620 g2 lmpervicus area, past -development 134,397 e % impervious 40.65 % Design rainfall depth 1.0 in Storage Volume: Non -SA Waters Minimum volume required Volume provided Storage Volume: SA Waters 1.5" runoff volume Pre -development 1 -yr, 24 -hr runoff Post -development 1 -yr, 24 -hr runoff Minimum volume required Volume provided Peak Flow Calculations Is the prelpost control of the lyr 24hr storm peak flow required? 1 -yr, 24 -hr rainfall depth Rational C, pre -development Rational C, poll -development Rainfall intensity: 1 -yr, 24 -hr storm Pre -development 1 -yr, 24 -hr peak flow Past -development 1 -yr, 24 -hr peak tow PretPcsl 1 -yr, 24 -hr peak flow control Elevations Temporary pool elevation Permanent pool elevation SHWT elevation (approx. at the peen. pool elevation) Top of 1Oft vegetated shelf elevation Bottom of 1 Oft vegetated shelf elevation Sediment cleanout, top elevation (bottom of pond) Sediment cleanout, bottom elevation Sediment storage provided 11,459 fts 12'067 ft' OK, volume provided is equal to or in excess of volume required. ft3 ft3 fts fts ft' Y (Y or N) 2.9 in 0.22 (unitless) 0.51 (unikless) 0.13 n1hr OK 0,22 ft'lsec 0.50 ftsisec 0.29 ftsisec 264.40 fmsl 263.50 fmsl fmsl 264.00 fmsl 263.00 fmsl 256.50 fmsl 257.50 fms.l 1,00 it Is there additional volume stored above the state -required temp. pool? Y (Y or N) Elevation of the top of the additional volume 2$4.4 fmsl OK Fomn SW401-Wel Delenlion Basin-Rev.9-4118112 Parts 1. & It, Design Surnmary, Page 1 of 2 EI. DESIGN INFORMATION Surface Areas Area, temporary pool 12,323 ft' Area REQUIRED, permanent pool 7,538 ft' SAIDA ratio 2 28 (unilless) Area PROVIDED, permanent pool, A,,m_pm Area, bottom of 10ft veg elated shelf, A& 011 Area, sediment deanout, top elevation (bottom of pond), Au„ ,,d Volumes Volume, temporary pool Volume, permanent pool, Vp®rm-pcd Volume, forebap (sum of forebays if more than one forebey) Forebay % of permanent pool volume SAIDA Table Data Design TSS removal Coastal SAIDA Table used? Mountain/Piedmont SAIDA Table Used? SAIDA rallo Average depth (used in SAIDA table): Calculation option 1 used? (See Figure 10-2b) Volume, permanent pool, Vvbm per, Area provided, permanent pool, Apa"J"I Average depth calculated Average depth used in SAIDA, d,,, (Round to nearest 0.5ft) Calculation option 2 used? (See Figure 10-2b) Area provided, permanent pool, Ap „-Kd Area, bottom of 10ft vegetated shelf, Ate, 8ml, Area, sediment cleanout, top elevation (bottom of pond), Aw jmo 9,455 ft` OK 7,469 ft' 1,988 ft` 12,067 ft' OK 26,837 ft' 5,430 ft' 20.2% % OK go % N (Y or N) N (Y or N) 2.28 (unilless) N (Y or N) 26,837 ft' 9,455 ft` ft ft Y (Y or N) 9,455 ft' 7,489 ft` 1,988 ft, "Depth" (distance btw bottom of 10R shelf and top of sediment) 4.50 It Average depth calculated 3.61 ft Average depth used in SAfDA, d., (Round to down to nearest 0.50) 3.5 ft Drawdown Calculations Drawdown through orifice? Diameter of orifice (if circular) Area of orifice (if -non -circular) Coefficient of discharge (Cc) Driving head (H j Drawdown through weir? Weir type Coefficient of discharge (Cw) Length of weir (L) Driving head (H) Pre -development 1 -yr, 24 -hr peak flow Post -development 1 -yr, 24 -hr peak flow Storage volume discharge rate (through discharge orifice or weir) Storage volume drawdown time Add itf on al Information Vegetated side slopes Vegetated shelf slope Vegetated shelf width Length of flowpalh to width ratio Length to width ratio Trash rack for overflow & orifice? Freeboard provided Vag elated filter provided? Recorded drainage easement provided? Capures all runoff at ultimate build -cut? Drain mechanism for maintenance or emergencies is: Y (Y or N) 1.50 in int 0.60 (unilless) 0.85 ft N (Y or N) (unitless) (unilless) R It 0.22 ftlisec 0.50 ft'Isec 0,06 ft'Isec 221 days Need 3 ft min. OK OK OK, draws down in 2.5 days. Permit No (to be pmvrded by DA10) 3 :1 OK 10 :1 OK 104 ft OK 3 :1 OK 2,7 :1 OK Y (Y or N) OK 1.0 ft OK N (Y or N) OK Y (Y or N) OK Y (Y or N) OK 6m Gate Valve @ Box Riser Form SW441-Wel Delenlion Basin-Rev.9-4118112 Parts I. & II. Design Summary. Page 2 of 2 Jordaln Manclrs Apex, North Carc lina HMP Sto rm wal er Wel Hel enl i a nl Basin Do in Calcu laltieins Daled: I LI06/20 19 Revised: mpedil SAADA Railiosi ftr nemmianent Pool 9iaine 1c Achieve 50%1ISS Redualiam IMPERVIOUS AIERCENT 3.00 PERMANENTPC 01 DEPTHIS IN FEET 3.50 4.00 4.501 3.00 10% 0.90 (1.80 0.80 (1.70 (1.60 20% 1.10 J0 1.10 1.00 1.00 ;10% 1.90 1.80 11.70 1.50 1.40 40% 2.'0 2.10 2.00 .1.90 1.80 10% i.(I(I 2.80 2.40 2.10 2.00 6(1% 1.!(1 3.30 2.£10 2.70 2.90 7(1% 4.(ICI 3.10 �L10 3.10 2.£10 8CI% 41CI 4.10 1.£1(1 3.'10 3.10 ICI% 1 9.00 4.3(1 4.00 :1.80 3.!10 BMP Anea (Ac.) I Dusicription 3 26.E 1 Writ Dell arition E asin Normal Brncd Surflaaf Area Calaulatinnsi Wei Detention Basin Volume ila to com1rullyd Itum Iliu 1 " storm Opticri 2 Calc 0.4907 = Rv (Runuffleoefficiunt) nevem. Pool _T1916 sf Bottom shelf) 11432 sf 47,664 = Wolume to to contial led (af) Bottom pane I _` 863 sf 1111,480 = Mol ume provided (cf) PcaV depth '.0 fil averagei depth: 4.23048(119 Required Pnovid'eid BMIN # IMIA. EHHTH1 %I FT SAjEA NOOLAREA SF POOLARBA SF -.1 48.91 4 2.47 28,779 35,9116 Wei Detention Basin Volume ila to com1rullyd Itum Iliu 1 " storm Opticri 2 Calc 0.4907 = Rv (Runuffleoefficiunt) nevem. Pool _T1916 sf Bottom shelf) 11432 sf 47,664 = Wolume to to contial led (af) Bottom pane I _` 863 sf 1111,480 = Mol ume provided (cf) PcaV depth '.0 fil averagei depth: 4.23048(119 Pond Report Hydrallaw Hyc uagnaphs I;y IrIelisol%EI Flniday, Noy 3 2019, 21:23 PM Pond No. 3 - Ponc 3 Por d Data Rc nd stclrage is based elrl known cantclur areas. AVElralge End alrEla methcd used. Sta gel J Sto ralgjel llablel Sllalclel Ifl) Elevadion qft) Conil our arela lvcIfl) Incr. Stoialflel lcuflq Total clorage (cuft) a.(I(I 24.00 Ele%alion 14,22E ft CI 0 afs a.00 'Lucl 24£1.00 0.00 19,863 '19,045 '15'(149 1',I, (14 9 21.0(1 3:1,969 2.CICI 215(1.00 3-Ou 2211,1:189 2191.00 '18,9214 33,1.1E9 83,11 EI 21921.00 3.aa 2191.00 '111,730 34,51 O.CIa 23,2186 9x,2139 393.50 O.aa 4.CICI 21921.00 2194.0(1 37,2121(1 6.90 25,884 83,118 0.aa 7.Clu 5.00 2193.0(1 0.aO 30,(1(14 328,1 EM 28,E12 1'l1,13a 9. aa 2375,<143 5.90 2193.5(1 10.00 31,4 321 398.00 115,399 1211,09 380,948 399.(10 6.a0 2194.0(1 438,1219 35,91E 3E1.83 116,837 143,926 015 6.90 2194.,'1(1 0.clu 40,EaE 119,'13'1 1E 3,057 --- 21.81 7.00 2199.(10 2IA' 42,999 20,800 183,857 22.22 8.00 2196.(1(1 25.33 46,a91 --- --- 44,326 238,183 26.99 9.00 291.CICI 174.06 49,484 47,76'1 9-48,943 10.00 258.(1(1 52,287 50,876 1126,819 11.00 259.CICI 55,167 53,727 380,946 121.00 260. as 60,000 51,584 438,129 Cullaelrl J Crilice Structlunes Weir Structures [A] [e] [c] [a] [A] [B] [C] Ila] Rise Ili n) = 18.a0 2I.9a 0X(1(1 13.00 Crest Leur (I'l = 21(1.0(1 21(1.0(1 a.C1a OAO Spain (inj = 18.00 23. flu 0X0(1 (LOCI Crest Ell. (NI) = 219E.9a 2198.(1(1 a.cia O.QO No. Barrels = 1 0 CI Weir Coeff. _ 3.33 21.60 a.(la 0.00 In%elrl EL Qfi) = 21<£1.30 254.a'I OAa (1.0(1 Weir Type = Red Braac --- Length Qftl) = Ell 00 OAa OAa a.0(1 Multi-Stalde = Yelsl No No Na Slope II%) = (1.70 O.CIa O.CIa OAa N -Value = .013 113 aaa .(ICICI Clrif. Coeff. = (1.60 0.60 O.Oa O.clu Multi -Stage = rila No Na No Ertfiltratiorl = OAaO irdhr(Clarltatim) 'Itkaler Ele%. = 0.130 fl Stage J Stclrage J 0iscHarglel Tahle St:algel Storage Ele%alion CIh A ft CA fi fl afs a.00 0 22 EI.00 0.00 'I.00 '19,045 229.00 O.CIO 21.0(1 3:1,969 219(1.00 0X(10 3-Ou 91,235 2191.00 O.aa 4.(Ia 83,11 EI 21921.00 o. aa 5.11(1 '111,730 2193.00 O.CIa 5.90 1237,0fKl 393.50 O.aa 6.00 'I43,921E 2194.0(1 O.CIa 6.90 '163,01 394.9(1 0.aa 7.Clu 'I83,flt 1 2199.(1(1 0.aO 8.aa 328,1 EM 2196.(1(1 0.a0 9. aa 2375,<143 2197.(1(1 211.87 10.00 326,819 398.00 213.97 'll.a0 380,948 399.(10 219.45 13.00 438,1219 360.(10 3E1.83 Note: Club Mon lice a utflaa!i 1 ave been analyzed under inlet and outlet aontaal. Civ B Clly Cl C Iv cl Wr A Wr B WI CI Wr Q Exfil Total clfs afsl (ills (Ills cfsl afs cfs clls cels a.0C1 --- (1.00 (1.00 0.00 0.0(1 --- --- (1.00 (1.00 --- 0.00 0.11(1 --- (1.00 (1.011 - 0.00 OACI --- --- (1.00 (I.0(I 0.00 O.Clu --- 0X(10 (LOCI --- --- 0.00 0. CIO --- a.(10 CLCICI (1.00 0.(10 --- CLCICI CLCICI 0.00 6.(la --- cl.C1Cl CLCICI --- 0.00 0.'Ia --- CLCICI 11.(1(1 (1.110 0.119 --- CLCICI CLCICI 015 0.33 0.clu 0X(1(1 (1.23 0.218 --- 21.81 CLCICI --- --- 2IA' 0.32 --- 23.93 0.00 - 22.22 0.36 --- 25.33 92.C1a --- --- 71.68 0.40 --- 26.99 '147.a8 --- --- 174.06 Permit No.. ffo be pfoWbW by aw41 �,y/. ATF�Q 0 G NCDENR p Y STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form must be hNed out, printed and submitted. The Required Items Checkhst (Part 111) must be printed, fitted out and submitted along with ail of the required information. I. PROJECT INFORMATION Project name Jordan Manor Contact person Bill Daniel Phone number 919467.9708 Date Novemeber 9, 2015 Drainage area number 93 II. DESIGN INFORMATION Site Characteristics Drainage area 1,165,666 ft2 Impervious area, post -development 570,826 ft' %impervious 497 % Design rainfall depth 1.0 in Storage Volume: Non -SA Waters Minimum volume required 47,664 N' Volume provided 111,480 ft' OK, volume provided is equal to or in excess of volume required. Storage volume: $A Waters 1.5° runoff volume ft3 Pre -development 1 -yr, 24 -hr runoff ft3 Post -development 1 -yr, 24 -hr runoff 4' Minimum volume required $ Volume provided its Peak Flow Calculations Is the prelposl control of the 1 y 24hr storm peak flow required? Y (Y or N) 1 -yr, 24 -hr rainfall depth 2.9 in Rational C, pre -development 0.22 (unilless) Rational C, post -development 0.57 (unitless) Rainfall intensity: 1 -yr. 24 -hr storm 0.13 In/hr OK Pre -development 1 -yr, 24 -hr peak flow 0.77 ftaisec Post -development 1 -yr, 24 -hr peak flow 1.98 ftaisec PrelPost 1 -yr, 24 -hr peak flow control 1.22 ftsisec Elevations Temporary pool elevation 256.50 fmsl Permanent pool elevation 254.00 fmsl SHWT elevation (approx. at the perm, pool elevation) fmsl Top of 1 O vegetated shelf elevation 254.50 fmsl Bottom of 10R vegetated shelf elevation 253,50 fmsl Sediment cleanout, top elevation (bottom of pond) 249.00 fmsl Sediment cleanout, bottom elevation 248.00 first Sediment storage provided 1.0D it Is there additional volume stored above the state -required temp. pool? Y (Y or N) Elevation of the top of the additional volume 256.5 first OK Form SW491-Wat Delention Basm-Rev.9414a112 Paris I. & n. Design summary. Page 1 of 2 Permit No (to be provided by DW4) 4. DESIGN INFORMATION 111,480 113 Surface Areas Volume, permanent pool, VPS,,,-Pw Area, temporary pool 48,073 ft' Area REQUIRED, permanent pool 28,792 ft' SAIDA ratio 2.47 (unitless) Area PROVIDED, permanent Pool, APrm,_PW 35,916 ft' OK Area, bottom of 1 oft vegetated shelf, Aw, Ste„ 31,432 ft' Area, sediment cleanout, top elevation (bottom of pond), Ate, � m 15,863 ft` Volumes OK Volume, temporary pool 111,480 113 OK Volume, permanent pool, VPS,,,-Pw 143,926 ft3 OK Volume, forebay (sum of forebays if more than one forebay) 32,074 ft' OK Forebay % of permanent pool volume 22.3% % Insufficient forebay volume. SAIDA Table Data 2 :1 Insufficient flow path to width ratio, Must not short-circuit pond. Design TSS removal 90 % OK Coastal SAIDA Table Used? N (Y or N) OK MountainlPiedmont SAIDA Table Used? N (Y or N) OK SAIDA ralio 2,47 (unitless) OK Average depth (used in SAIDA lab le): Y (Y or N) OK Calculation option 1 used? (See Figure 10.2b) N (Y or N) OK Volume, permanent pool. Vpvrkm 143,926 ft' Area provided, permanent pool, Ars,m.Paa, 35,916 112 Average depth calculated ft Need 3 ft min. Average depth used in SAIDA, da,,, (Round to nearest 0.5ft) ft Calculation option 2 used? (See Figure 10-2b) Y (Y or N) Area provided, permanent pool, APmm.pod 35,916 ft` Area, bottom of 10ft vegetated shelf, A,„ ,a 31,432 ft` Area, sediment cleanout, top elevation (bottom of pond), Ate, Pond 15,863 112 "Depth" (distance b1w bottom of 1Oft shelf and top of sediment) 4.50 ft Average depth calculated 4.23 It 0K Average depth used in SAIDA, d.„ (Round to doom to nearest 0.511) 4.0 R OK Drawdown Calculations Drawdown through orifice? Y (Y or N) Diameter of orifice (if circular) 2.50 in Area of orifice (if -non -circular) int Coefficient of discharge (Co) 0:60 (unitless) Driving head (Hj 2.20 ft Orawdown through weir? N _ (Y or N) Weir type (unifless) Coefficient of discharge (C.) (unitless) Length of weir (L) R Driving head (H) ft Pre -development 1 -yr, 24 -hr peak flow 0,77 ft'lsec Post -development 1 -yr, 24-hrpeak flow 1.98 ft'Isec Storage volume discharge rate (through discharge orifice or weir) 0.24 ft3lsec Storage volume drawdown time 2.30 days 01 draws down in 2-5 days. Additional Information Vegetated side slopes 3 :1 OK Vegetated shelf slope 10 :1 OK Vegetated shelf width 10.0 It OK Length of Rowpath to width ratio 2 :1 Insufficient flow path to width ratio, Must not short-circuit pond. Length to width ratio 2.9 :1 OK Trash rack for overflow & orifice? Y (Y or N) OK Freeboard provided 1.0 ft OK Vegetated filter provided? N (Y or N) OK Recorded drainage easement provided? Y (Y or N) OK Capures all runoff at ultimate bulld-out? Y (Y or N) OK Drain mechanism for maintenance or emergencies is: 6" Gate Valve at Box Riser Fotm SW401-Wet Detention Basin.Rev.9.4118112 Parts. I. & It. Destgn Summary, Page 2 of 2 Jondaln Manors Aplem, Nonth Canolina HMP Slolrmwlaler Wet Detention Harlin Design Cadculatian�l Dal ed: l a)129/2019 Haviscid: SA/DA Ratios for Barmanent kiol Sizing la Ack ieve 90% ISS Redc aliar IMPERVIOUS PE RCENT 3.00 HERMANHNT Pa OIU DEPTHS IN FEET 3.50 4.00 4.50 _'.00 10% 0.90 0.80 0.£10 0.70 0.60 20% 1.110 1.90 1.10 1.00 1.00 :10% lA(1 110 1.70 1.50 1.40 40% 2.9CI 2.30 2.0 1.90 1.80 _`0% ].(ICI 2.80 2.110 2.30 2.00 60% '1.9(1 110 2.£10 2.70 2A0 10% 4.00 :1.1(1 3.30 3.10 2.£10 8(I% 4.50 4.10 3.8(1 :1.510 3.30 q(I% 51.00 4.5 (I 4.C1(I ;1110 3.51(1 BMF I Area (Ac.) I Description 4 1 6.04 Met Dlcileintion Beisin Normal Bciad Suirf tciei Area Calculations Wei Dleientiion Basin Malume to to conlrallcd fiom Ilia 11" storm Required Piauiccid BMPI # IMP, % DHPITH SA/DA FT BOOL ARRA POOL ARRA SF (SF) 4 48.76 15 2.69 7,073 10,674 Wei Dleientiion Basin Malume to to conlrallcd fiom Ilia 11" storm avarage depth : 3.110430(14 USI Opliar 2 Calc 0.4888 = RW (Aunofllcoefficicm t) Paami. Plool 10674 sf Bottom shelf 8817 sf 110,7110 = Volume to tc contrcilled (ef) Bottom flonc 2990 A 32,3411 = Volume provided (cf) Paal depth 11.0 f91 avarage depth : 3.110430(14 USI Pond Report H)dnaflowHydnograritaty Inlalisolve Pond No. 4 - Pond 4 Pond Data Ponc ciciiacE is Hased c krlcvan coniCLr arEals. Averace end zimal mEttcd used. Slag el II Storage Table Stage ilk Elevatiori Ifi) Cl. 00 253.90 1.00 254.90 1.50 255.00 21.50 250.00 3.50 257.00 4ACI 215iELOO 5.9(1 25%00 5. CICI 799.50 6.9CI 21EICI.00I 7ACI 216' .00I 8.50 2182.0(1 9.50 21E3ACI Culvelrl / Orifice Strucltluielsl Storage [A] [B] Rise Ilinl = 18.CICI 1.951 S pan Qin) = 18ACI 1.9(1 No. Barrels = 1 1 Inv ctrl EI. Ifil) = 2154.50 259.9 Length (fill = (1(1.00 O. CIG Slope I1%) = C1.60 O.CIG N -Value = .0'13 .0'13 Orif. Coeff. = C1.60 0.80 Multi -stager =- n/a Na Clontol. r area (sciftj Stalglel / Stclrage / Discharge Tahle Stacici Storage Elev al !on CIN AI ft ca H Po cfs CLOO 0 2993.5(1 O,GG 1.00 21,679 '2194.5(1 OACI '1.50 4,258 2199.0(1 OAG 2ACI 8,634 2I9E.O(I 0. CIO 3AG '14,8129 39110 O.GO 4AC1 21,73E 2198.(1(1 0.00 5.9G 30,0(19 299.CICI (LOCI 6.GCI 34,E11EI 21f19.9131 (L00 6.9G 40,1821 260.CICI CLOO 7ACI 54,991 216'LGCI Cl. 00 8.90 70,GGG 262. CIO 9,0111 9.50 86,98G 263AO 211.91 2,368 :1,990 :1,324 9,428 EI, 528 A. 721 El, 811 1 Cl, 674 2,8021 '14,119 '16,183 '16,£137 Iriclr. Slorage (cuftj (1 21,6751 1,5x9 4, 31EI 9,68 1,1219 8,.169 4,813 5,884 '13,189 ' 5,449 '16,960 Talal Morage Ilauft CI 21,EI719 ,2 98 f1,8214 14,812 211,136 3CI,CIC15 :14,E118 � C1,162 94,95' 10,0100 86,560 Monday, Nm c Al 19. -10:90 AN Weir Structuress [c] [o] [A] [B] [c] IDiI GOO (1.00 Crest L air (fill = 121.00 1 Cl. OCI O.CICI O.GO G.00I GOO Crest EI. (ft) = 2EI1.39 382.(1(1 OACI 0.00 a G Weir Coeff. = 3.33 21.EM O. CICI 0.00 G.CI(1 CLOO Weir Type = Fled Eraad CLCICI --- --- CLOCI Cl.c1Cl G.0(I Multi•Stagel = Vels No Na No 011(1(1 0.0(I --- --- O.CIG CI.(IQ CIACI 0.04 - 0.00 AGCI CI(I(I (1.07 --- --- O.CICI G.CIQ --- --- CLCI1 (1.09 O.GG OACI 9.(151 (1.1 I --- --- 21.91 26.00 4 8. (12 No No Exfiltratiorl = O.GGG indhr (C aniaui; Tailwaler 91ev. = 0.00 f1 hate: Gu hieitQriilice outflows have been analyzed under inlet and outlet control, CIN B Clly C CIV 11 Wr A Wr B Wr C Wr 0 Exftt Tolal cis afs (lis cis cfs cfs cifsl ofs afs o.GG --- --- CLOO o.Ocl CLOO O. CIO --- CLOO (111(10 --- --- (1.00 0.GG --- CI.Ocl CI.(ICI --- --- (L00 0. CIO --- --- am CI.(ICI CLOO 0.00 --- 0.51(1 CLCICI --- --- CLOCI 0.00 --- --- 0•CI(1 CI.(ICI (1.0(1 0.00 --- CIAO Via --- --- CLOG 0.00 --- --- O.CIG CI.(IQ CIACI 0.04 - 0.00 Q.OQ --- --- CI.(14 (1.07 --- --- O.CICI G.CIQ --- --- CLCI1 (1.09 --- --- 5,00 CI.CIQ --- --- 9.(151 (1.1 I --- --- 21.91 26.00 4 8. (12 Ar ' NCDENR Permit STORMWATER MANAGEMENT PERMIT APPLICATION FORA 401 CERTIFICATION APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form must be rifled out, printed and submitted. The Required Items CheckNst (Pani Ill) must be printed, tilted out and submitted along vdh all of the required Wormation. I, PROJECT INFORMATION Project name Jordan Manor Contact person aill Daniel Phone number 919167-9708 Date Wovember9, 2015 Drainage area number #4 (to be provided by DW4) II. DESIGN INFORMATION Site Characteristics Drainage area 263,102 ft' Impervious area, post -development 128,289 ft7 impervious 48.76 % Design rainfall depth to in Storage Volume: Non -SA Waters Minimum volume required Volume provided Storage Volume: SA Waters 1.5" runoff volume Pre -development 1 -yr, 24 -hr runoff Post -development 1 -yr, 24 -hr runoff Minimum volume required Volume provided Peak Flow Calculations Is the pre/post control of the l yr 24hr storm peak flow required"? 1 -yr, 24 -hr rainfall depth Rational C, pre -development Rational C, post -development Rainfall intensity: 1 -yr, 24 -hr storm Pre -development 1 -yr, 24 -hr peak flow Post -development 1 -yr, 24 -hr peak flow PrelPost 1 -yr, 24 -hr peak flow control Elevations Temporary pool elevation Permanent pool elevation SHWT elevation (approx, at the peon, pool elevation) Tap of loft vegetated shelf elevation Bottom of 1 oft vegetated shelf elevation Sediment cleanout, top elevation (bottom of pond) Sediment cleanout, bottom elevation Sediment storage provided Is there additional volume stored above the state -required temp- pool? Elevation of the top of the additional volume 14,710 ft' 32,341 ft5 CK, volume provided is equal to or in excess of volume required. 4a it, ftx fta ha Y (Y or N) 2.9 in 0.22 (unitless) 0.57 (unitless) 0.13 in/hr OK 0.17 R'/sec 0.45 fPtsec 0.27 ft'isec 261.75 fmsl 259.50 fmsl fmsl 260.00 Imsl 259.00 fmsl 254.50 fmsl 253.50 fmsi 1 A0 ft Y (Y or N) 261.8 fmsl OK Form SW401•Wel Delenhon Basin-Rev.2-4118112 Parts 1.8 {I. Design Summary, Page 1 or 2 Permit No. fro be p ova dby D010) II. DESIGN INFORMATION Surface Areas Area, temporary pool 15,810 It' Area REQUIRED, permanent pool 7,077 ft' OK SAIDA ratio 2.69 (unitless) OK Area PROVIDED, permanent pool, Apprm PW 90,674 ft` OK Area, bottom of 1 Off vegetated shelf, Air mop 8,617 ft` Insufficient flow path to width ratio. Must not short-circuit pond. Area, sediment cleanout, top elevation (bottom of pond), Aa„_,,, 2,990 ft' OK Volumes Y (Y or N) OK Volume, temporary pool 32,341 ff OK Volume, permanent pool, V,.,,, 34,878 ft' OK Volume, forebay (sum of forebays if more than one forebay) 7,927 ft3 OK Forebay % of permanent pool volume 22.7% % Insufficient forebay volume, SALSA Table Data 6" Gate Valve at Box Riser Design TSS removal 90 % Coastal SAIDA Table Used? N (Y or N) Mountain/Piedmont SAIDA Table Used? N (Y or N) SAIDA ratio 2.69 (unitless) Average depth (used in SAIDA table): Calculation option 1 used? (See Figure 10.2b) N (Y or N) Volume, permanent pool, Vpe,m_po 34,878 It' Area provided, permanent pool, Am. pj 10,674 ft` Average depth calculated ft Need 3 It min. Average depth used in SAIDA, d,,,, (Round to nearest 0.54) 4 Calculation option 2 used? (See Figure 10.2b) Y (Y or N) Area provided, permanent pool, Ap, M 10,674 ft' Area, bottom of 1Oft veg elated shelf, Awt,wj 8,817 ft` Area, sediment cleanout, top elevation (bottom of pond), A._,,,, 2,990 ftp "Depth" (distance bfw bottom of 10ft shelf and top of sediment) 4.50 ft Average depth calculated 3.60 ft OK Average depth used in SAIDA, d.„ (Round to down to nearest 0.5h) 3.5 It Insufficient. Check calculation. Drawdown Calculations Drawdown through orifice? Y (Y or N) Diameter of orifice (if circular) 1,50 in Area of orifice (if -non -circular) int Coefficient of discharge (Co) 0.60 (unitless) Driving head (Ho) 0.80 It Drawdown through weir? N (Y or N) Weir type (unitless) Coefficient of discharge (Q (unitless) Length of weir (L) ft Driving head (FI) fl Pre -development 1 -yr, 24 -hr peak flow 0.17 ft'lsec Post -development 1 -yr, 24 -hr peak flow 0.45 ftlisec Storage volume discharge rate (through discharge orifice or weir) 0.05 ft3lsec Storage volume drawdown time 2.48 days OK, draws down in 2-5 days. Additional Information Vegetated side slopes 3 :1 OK Vegetated shelf slope 10 :1 OK Vegetated shelf width 10.0 ft OK Length of flowpath to width ratio 2 :1 Insufficient flow path to width ratio. Must not short-circuit pond. Length to width ratio 2.6 :1 OK Trash rack for overflow & orifice? Y (Y or N) OK Freeboard provided 1.0 It OK Vegetated filter provided? N (Y or N) OK Recorded drainage easement provided? Y (Y or N) OK Capures all runoff at ultimate build-oul? Y (Y or N) OK Drain mechanism for maintenance or emergencies is: 6" Gate Valve at Box Riser Form SW401-Nle[ Detention Basin•Rev:9411 W12 Paris I & II. Design Surnmasy.. Page 2 of 2 Jcrldari Manors Draw dovA In C alar latic n Date: 11/2(1/19 Re%19ed: EIM P #11 Dnav, c awr Time waler quality volume- 4391319 ft^3/sec 4 1 minutu " 11 Haun * 1 cay dim1-ar61eiIrani21.51"cidilicei4-) 0.715 ft^13/sec (10!ecerds EIO minulci 214hauns = 2.�6 CcYS BMA #2 Dnawdowr limo water qc alily vain mcH 4 114159 fi "9/scic * 71 mirulc * 11 haur * 1 day c ischau€le from J,9' anifice44 0.06 ft^:I/sec f 1 secards 90 min les 214 hours = 2.21 dc YS BMA #31 Drawd(m ri 1 iniE1 ,AatenCIL aIilyvcdumEi341161441ftl"-I/selc * lminuIel * Ihour * 1tay c isd ang(i hom 3.9" orifice->-) (1.2141 fi" hcc ED seconc s 60 mir c les 24 Hauri 2.30 days BMP 44 Drawc w ri Time walen quality volume --)4 lf� ft"3/9EIc * 1 minula * 1 hoc n * 1 day disch argEi 11110M1.9" ariflce-" ft"31/9ec 60 sucor c s 6(I miriules NI Hau r: = 2.48 daly 9 Sec Ilion 2 STORM DRAINAGE, HYDRAULIC C RADE LINE, C UTTER S PREA D, & SWALE DATA CA LCU BA TIONS ,Jordan Manors - Phase 3 Apex, Nora Carcikr Sklrm Cliart (10 YearFivan0 Llallei: 4,20,20 16 Reivisec: DOMSAREfM 371RUCTURE LPSTRBAM STRL(171URE TOP ELEV. UPS71REAM STRUCTURE DIF. in PIPE SEGMENT DATA L7W PIPs ft TYPE £1% ARE/ ac TOTAL UPS7IREAM AREA(acl IND C I IN/HR Q1111OT) CFS GI(YND, CFS iNVaI171 INVERT 11OWNSTRM LPSTRM STAUCTLRE STRUC17IURE BMP1 FEE1100 CB 901 265.5(1 42 49.92 RCP C1.6CI 117.15 as4 CL45 7.22 3372 1.75 2:16.(10 256.80 CIB '16111 CS 902 26.1.89 36 73.113 RCP C1.96 96.61 a(P (145 7.22 33.97 CL29 257.30 258.CI0 CB '1612 CB 1103 26672 3E (15.79 RCP 1.28 96.52 a(12 CL45 7.22 33.67 (Lae 258.20 259.30 CB'IC13 CB 904 266.37 361 48.(2 RCP 1.03 7.10 a47 CL45 7.22 23.07 9.53 239.E10 2(0.30 CB'1614 CB 105' 266.57 13 27.00 RCP 1.111 11.26 J.26 CL45 7.22 4.09 4.09 26'1.45 261.75 CIA 110 CB 906 269.22 3CI 193.1H RCP 1.35 5.37 a43 0.45 7.22 17.45 11.461 26a50 263.10 CIA 1616 CB 1107 269.22 15 27(10 RCP 1.:11 692 a92 0.45 7.22 2.99 2.99 2(4.110 264.40 CIB'IC6 CB 108 272.661 24 200.(10 RCP 1.63 4.62 0.42 0.45 7.22 13.06 9.36 263.E0 266.85 CIB JC18 CB 109 272.60 15 27.00 RCP 1.111 CL97 0.97 C1.45 7.22 3.115 3.15 267.50 267.80 CIB 11018 CEI 91161 276.71 24 2(10.(10 RCP 1.78 2.63 0.611 0.45 7.22 EL54 1.961 267.65 270.60 CIB :110 CEI 1111 276.71 24 27.[10 RCP 1.111 2.02 0.62 0.45 7.22 6.56 2.01 27aE10 27:1.110 CIB :1111 CB 1112 279.63 EI 140.24 RCP 1.93 11.40 0.0 a45 7.22 4.55 (6'16 271.0 274.30 CIB :112 CB 193 282.:19 18 58.36 RCP 4.20 11.33 0.97 CL45 722 4.39 0.53 274.50 276.95 CIB :113 CEI 194 282.38 115 27.50 RCP 1.09 (1.44 0.44 0.45 722 1.43 11.43 277.25 277.55 CIB :113 CEI 195 294.661 115 205.24 RCP 3.83 (1.74 0.0 C1.45 7.22 2.40 0.19 277.30 289.30 CIB :11:1 CEI 196 294.6CI 113 27.00 RCP 1.:11 (1.57 0.57 C1.45 7.22 1.85 1.85 2f 19.50 289110 CB ;113 CEI 1-,17 303.74 13 130.50 RCP 7.03 (1.19 0.111 C1.45 7.22 036 0.36 2(19.70 298.90 CB 1103 CB 1-,161 267.89 361 92.42 RCP 1.061 9.40 0.23 C1.45 7.22 3([34 0.75 2661.10 26'1.90 CB 111(1 CB 119 26EL07 :15 28.(7 RCP 1.22 069 0.0 C1.45 7.22 2.24 2.24 262.90 263.25 CB MEI CB 120 277.49 361 2°18.72 RCP 2.76 R48 0.63 C1.45 7.22 27.55 CAO 2('1.75 268.90 CB 1120 CS 12'1 277.56 24 48.62 RCP 2.861 I 6.612 0.75 C1.45 7.22 19.56 2.44 21GICI0 27'1.40 CB 129 CB 122 277.56 :15 27.60 RCP 1.'11 CL77 0.77 CL45 7.22 1 2.561 2.561 272.45 272.75 CB 111'I CIS :129 21113.117 24 1 205.75 RCA 2,45 4.561 0165 0.45 7.212 114.Cp 2.1111 :1721061 1177.05 Ca 1113 CIB :12s 2813.17 15 27.0161 RCIA 11',1 01116 0186 (1.45 7.221 2.79 2.79 1178105 1178.35 CB 1113 CB 125 2119.67 214 20CLOCI RCP C5 2.519 CL63 CL45 7.221 51.711 2.(15 1177.60 1183.70 CB 1115 CB 1211 2119.61 15 27.061 RCP 1 111 0.91 LLAT (145 7.22 2.516 2.516 1184.40 21114.70 Cal '125 CB 127 2515.311 15 1100011 RCP 2.60 1.45 CL57 (145 7.22 4.711 1185 2184.115 2L5I0.C15 CB '127 CB 128 295.5111 15 27.00 RCIP 011 688 0118 (145 7.221 2.86 2.E16 K161215 2190.55 Ca'1110 CB 129 271l.&I 214 121.27 RCP (1611 2.44 110'1 (1.45 7.221 1 19.1 O.CIB 269.40 21x0.40 Cis I lil CB 1311 271.35 24 121.63 RCP (1.811 2.4"1 61.58 CL45 7.221 1901 11110 2176160 2111.60 CIa 151(1 CB 131 277.35 15 117.(10 RCP 1.11 0.218 CLA CL45 7.221 (191 0.511 2112.215 1112.55 CIB 1510 CB 132 280, 75 2k 57.119 RCP 4.51 1.51 01110 (145 7.22 5.101 0.65 11111.80 2174.4(1 CIS 132 CB 1351 2EICL75 15 35.00 RCP 1.6111 0.11 0.17 C1.45 722 (155 (1.55 2115.10 275.45 C18 11361 CB 134 293.151 18 251.46 RCP 4.951 1.210 0.210 CL45 7.221 11.901 (1.65 274.85 2117,25 CB 11314 CB 1115 2951.'151 15 515.03 RCP 1.011 0.210 0.2IO LL45 7.22 CL65 (1.65 287.45 21117.8( CB 11314 081176 16k.55 15 21111(10 RCP 4.17 0.811 0.23 C45 7.22 2.601 (175 2817.815 2518.7(1 CB 1136 CEI 1,'17 11614.55 .15 515.00 RCP 1.001 (1.57 0.57 CL45 7.212 1.85 1.85 2LI890 299.25 FES 110610 RISER 10CIti n1a :I EI 10:1.111 RCP LL49 (ILLI OLIO 61.4 7.112 CLOG OACI 252.LICI 252.5(1 FBa4Cl AES 4:1 as 18 1(19.(10 RCP 7.34 3.611 aClsl CL49 7.212 51.78 51.761 263.50 271.50 Ca IS( ATCH BF SIN. YI IS YF RD INI ST PBS IS FD RED 9NO Sf1CTICH- NCDOT STD. 310.01; HW IS FEAOWALI - N CIOC1T STa 838.1'; OIR IS DIJ CTII S IACIA WAE; HDPE TO BE SMOOTH INTBRIOR AOS N-12 CIA EIQUFL ELEVATION GIVaN IS RCIR IA VEAT OA H W / AD Pas, TOR CIF CV' STING FOR Y1, TOP OA CLAS FCIR CIS. Da ble Clakh Basin "' - sdandefd IVamla and grate NOIf S: '1. Risen IS COOL retf I pimca51 5X5' Inside dim E nsian. ^- Sea sizing CF31C inckc eC WIN stcur IWakm CalChlati00S Hydraflow Plan View I awl x mtm 1s t9illA ffi am na m 1 W II ' m1a 'aim S 5 m1t6 m 119 118 fl S m 118 10 ss A�1f m m 17 tz m1x1 M41 amts mtm to m sy la€ m to m 131 m�1J1� m 1s1 zt � ml3x :9m 133 Project File: 100 phase 3.stm No. Lines: 37 05-09-2016 Hydraflow Storm Sewers 2005 Storm Sewer Inventory Report Page 1 Line Alignment Flow Data Physical Data Line ID No. Dnstr Line Defl Junc Known Drng Runoff Inlet Invert Line Invert Line Line N J -loss Inlet/ line length angle type Q area coeff time EI Dn slope EI Up size type value coeff Rim EI No. (ft) (deg) (cfs) (ac) (C) (min) (ft) N (ft) (in) (n) (K) (ft) 1 End 49.9 113.7 Comb 0.00 0.54 0.45 5.0 256.50 0.60 256.80 42 Cir 0.013 1.46 265.50 fes 100 to cb 101 2 1 73.1 -75.9 Comb 0.00 0.09 0.45 5.0 257.30 0.96 258.00 36 Cir 0.013 1.18 265.89 cb 101 to cb 102 3 2 85.8 48.4 Comb 0.00 0.02 0.45 5.0 258.20 1.28 259.30 36 Cir 0.013 1.33 266.72 cb 102 to cb 103 4 3 48.6 -44.7 Comb 0.00 0.47 0.40 5.0 259.80 1.03 260.30 30 Cir 0.013 1.21 266.57 cb 103 to cb 104 5 4 27.0 39.9 Comb 0.00 1.26 0.45 5.0 261.45 1.11 261.75 15 Cir 0.013 1.00 266.57 cb 104 to cb 105 6 3 92.4 5.4 Comb 0.00 0.23 0.45 5.0 260.10 1.08 261.10 30 Cir 0.013 1.43 267.85 cb 103 to cb 118 7 4 193.1 -50.1 Comb 0.00 0.43 0.45 5.0 260.50 1.35 263.10 30 Cir 0.013 1.50 269.22 cb 104 to cb 106 8 6 28.7 70.3 Comb 0.00 0.69 0.45 5.0 262.90 1.22 263.25 15 Cir 0.013 1.00 268.07 cb 118 to cb 119 9 7 27.0 90.0 Comb 0.00 0.92 0.40 5.0 264.10 1.11 264.40 15 Cir 0.013 1.00 269.22 cb 106 to cb 107 10 6 258.2 0.0 Comb 0.00 0.03 0.45 5.0 261.75 2.77 268.90 30 Cir 0.013 1.59 277.49 cb 118 to cb 120 11 7 200.0 0.0 Comb 0.00 0.42 0.45 5.0 263.60 1.63 266.85 24 Cir 0.013 1.50 272.60 cb 106 to cb 108 12 10 48.6 -50.1 Comb 0.00 0.75 0.45 5.0 270.00 2.88 271.40 24 Cir 0.013 1.21 277.56 cb 120 to cb 121 13 11 27.0 90.0 Comb 0.00 0.97 0.40 5.0 267.50 1.11 267.80 15 Cir 0.013 1.00 272.60 cb 108 to cb 109 14 12 27.0 39.9 Comb 0.00 0.77 0.45 5.0 272.45 1.11 272.75 15 Cir 0.013 1.00 277.56 cb 121 to cb 122 15 10 121.3 -4.3 Comb 0.00 0.01 0.45 5.0 269.40 0.82 270.40 24 Cir 0.013 0.53 278.69 cb 120 to cb 129 16 11 200.0 0.0 Comb 0.00 0.61 0.45 5.0 267.05 1.78 270.60 24 Cir 0.013 1.50 276.71 cb 108 to cb 110 17 12 205.8 -50.1 Comb 0.00 0.65 0.45 5.0 272.00 2.45 277.05 24 Cir 0.013 1.50 283.17 cb 121 to cb 123 18 15 121.9 -17.6 Comb 0.00 0.58 0.45 5.0 270.60 0.82 271.60 24 Cir 0.013 1.67 277.35 cb 129 to cb 130 19 16 27.0 90.0 Comb 0.00 0.62 0.40 5.0 270.80 1.11 271.10 24 Cir 0.013 1.50 276.71 cb 110 to cb 111 20 17 27.0 90.0 Comb 0.00 0.86 0.45 5.0 278.05 1.11 278.35 15 Cir 0.013 1.00 283.17 cb 123 to cb 124 21 18 27.0 88.8 Comb 0.00 0.28 0.45 5.0 272.25 1.11 272.55 15 Cir 0.013 1.00 277.35 cb 130 to cb 131 Project File: 100 phase 3.stm Number of lines: 37 Date: 05-09-2016 Hydraflow Storm Sewers 2005 Storm Sewer Inventory Report Page 2 Line Alignment Flow Data Physical Data Line ID No. Dnstr Line Defl Junc Known Drng Runoff Inlet Invert Line Invert Line Line N J -loss Inlet/ line length angle type Q area coeff time EI Dn slope EI Up size type value coeff Rim EI No. (ft) (deg) (cfs) (ac) (C) (min) (ft) N (ft) (in) (n) (K) (ft) 22 19 140.2 -90.0 Comb 0.00 0.05 0.45 5.0 271.60 1.93 274.30 18 Cir 0.013 1.13 279.63 cb 111 to cb 112 23 22 58.4 45.0 Comb 0.00 0.17 0.45 5.0 274.50 4.20 276.95 18 Cir 0.013 1.13 282.19 cb 112 to cb 113 24 23 27.5 -34.0 Comb 0.00 0.44 0.45 5.0 277.25 1.09 277.55 15 Cir 0.013 1.00 282.38 cb 113 to cb 114 25 17 200.0 0.0 Comb 0.00 0.63 0.45 5.0 277.60 3.05 283.70 24 Cir 0.013 1.50 289.67 cb 123 to cb 125 26 18 57.7 -44.4 Comb 0.00 0.20 0.45 5.0 271.80 4.51 274.40 24 Cir 0.013 1.45 280.75 cb 130 to cb 132 27 23 205.2 45.0 Comb 0.00 0.06 0.45 5.0 277.30 5.85 289.30 15 Cir 0.013 1.50 294.60 cb 113 to cb 115 28 25 27.0 90.0 Comb 0.00 0.91 0.45 5.0 284.40 1.11 284.70 15 Cir 0.013 1.00 289.67 cb 125 to cb 126 29 26 35.0 46.8 Comb 0.00 0.17 0.45 5.0 275.10 1.00 275.45 15 Cir 0.013 1.00 280.75 cb 132 to cb 133 30 27 27.0 -90.0 Comb 0.00 0.57 0.45 5.0 289.50 1.11 289.80 15 Cir 0.013 1.00 294.60 cb 115 to cb 116 31 25 200.0 0.0 Comb 0.00 0.57 0.45 5.0 284.85 2.60 290.05 15 Cir 0.013 1.50 295.38 cb 125 to cb 127 32 26 251.5 -36.4 Comb 0.00 0.20 0.45 5.0 274.85 4.93 287.25 18 Cir 0.013 1.50 293.19 cb 132 to cb 134 33 27 130.5 0.0 Comb 0.00 0.11 0.45 5.0 289.70 7.05 298.90 15 Cir 0.013 1.00 303.74 cb 115 to cb 117 34 31 27.0 90.0 Comb 0.00 0.88 0.45 5.0 290.25 1.11 290.55 15 Cir 0.013 1.00 295.38 cb 127 to cb 128 35 32 35.0 90.0 Comb 0.00 0.20 0.45 5.0 287.45 1.00 287.80 15 Cir 0.013 1.00 293.19 cb 134 to cb 135 36 32 260.0 2.3 Comb 0.00 0.23 0.45 5.0 287.85 4.17 298.70 15 Cir 0.013 1.50 304.55 cb 134 to cb 136 37 36 35.0 90.0 Comb 0.00 0.57 0.45 5.0 298.90 1.00 299.25 15 Cir 0.013 1.00 304.55 cb 136 to cb 137 Project File: 100 phase 3.stm Number of lines: 37 Date: 05-09-2016 Hydraflow Storm Sewers 2005 Storm Sewer Summary Report Page 1 Line Line ID Flow Line Line Invert Invert Line HGL HGL Minor HGL Dns No. rate size length EL Dn EL Up slope down up loss Junct line (cfs) (in) (ft) (ft) (ft) N (ft) (ft) (ft) (ft) No. 1 fes 100 to cb 101 34.51 42 c 49.9 256.50 256.80 0.601 258.30 258.60 n/a 258.60 End 2 cb 101 to cb 102 33.57 36 c 73.1 257.30 258.00 0.957 259.15 259.85 n/a 259.85 1 3 cb 102 to cb 103 33.58 36 c 85.8 258.20 259.30 1.282 260.34 261.15 n/a 261.15 j 2 4 cb 103 to cb 104 14.11 30 c 48.6 259.80 260.30 1.028 261.86 261.79 0.41 262.19 3 5 cb 104 to cb 105 4.09 15 c 27.0 261.45 261.75 1.111 262.35 262.56 n/a 262.56 j 4 6 cb 103 to cb 118 23.35 30 c 92.4 260.10 261.10 1.082 261.72 262.72 1.08 262.72 3 7 cb 104 to cb 106 10.91 30 c 193.1 260.50 263.10 1.346 262.45 264.20 n/a 264.20 j 4 8 cb 118 to cb 119 2.24 15 c 28.7 262.90 263.25 1.221 263.50 263.85 n/a 263.85 6 9 cb 106 to cb 107 2.66 15 c 27.0 264.10 264.40 1.111 264.75 265.05 0.26 265.05 7 10 cb118to cb 120 21.65 30 c 258.2 261.75 268.90 2.769 263.30 270.45 1.12 270.45 6 11 cb106to cb 108 8.44 24 c 200.0 263.60 266.85 1.625 264.63 267.88 n/a 267.88 7 12 cb 120 to cb 121 17.47 24 c 48.6 270.00 271.40 2.879 271.48 272.88 0.92 272.88 10 13 cb 108 to cb 109 2.80 15 c 27.0 267.50 267.80 1.111 268.22 268.47 n/a 268.47 j 11 14 cb 121 to cb 122 2.50 15 c 27.0 272.45 272.75 1.111 273.40 273.39 n/a 273.63 j 12 15 cb 120 to cb 129 6.40 24 c 121.3 269.40 270.40 0.825 271.10 271.30 n/a 271.30 j 10 16 cb 108 to cb 110 5.84 24 c 200.0 267.05 270.60 1.775 268.24 271.46 n/a 271.46 j 11 17 cb 121 to cb 123 13.44 24 c 205.8 272.00 277.05 2.454 273.36 278.35 n/a 278.35 j 12 18 cb129to cb 130 6.56 24 c 121.9 270.60 271.60 0.820 271.57 272.51 n/a 272.51j 15 19 cb 110 to cb 111 4.48 24 c 27.0 270.80 271.10 1.111 271.75 271.85 n/a 271.85 j 16 20 cb 123 to cb 124 2.79 15 c 27.0 278.05 278.35 1.111 278.87 279.02 n/a 279.02 j 17 21 cb130to cb 131 0.91 15 c 27.0 272.25 272.55 1.111 272.85 272.93 n/a 272.93j 18 22 cb111to cb 112 3.30 18 c 140.2 271.60 274.30 1.925 272.29 274.99 n/a 274.99 19 23 cb 112 to cb 113 3.22 18 c 58.4 274.50 276.95 4.198 275.21 277.63 n/a 277.63 j 22 24 cb113to cb 114 1.43 15 c 27.5 277.25 277.55 1.091 277.87 278.03 n/a 278.03j 23 25 cb 123 to cb 125 9.31 24 c 200.0 277.60 283.70 3.050 278.81 284.78 n/a 284.78 j 17 26 cb 130 to cb 132 4.33 24 c 57.7 271.80 274.40 4.507 272.83 275.14 n/a 275.14 j 18 27 cb 113 to cb 115 1.86 15 c 205.2 277.30 289.30 5.847 277.86 289.85 n/a 289.85 j 23 28 cb 125 to cb 126 2.96 15 c 27.0 284.40 284.70 1.111 285.14 285.39 n/a 285.39 j 25 29 cb 132 to cb 133 0.55 15 c 35.0 275.10 275.45 1.000 275.40 275.75 n/a 275.75 26 30 cb115to cb 116 1.85 15 c 27.0 289.50 289.80 1.111 290.04 290.34 0.20 290.34 27 31 cb 125 to cb 127 4.67 15 c 200.0 284.85 290.05 2.600 285.72 290.92 n/a 290.92 25 32 cb132to cb 134 3.55 18 c 251.5 274.85 287.25 4.931 Number 275.57 287.97 0.42 287.97 26 Project File: 100 phase 3.stm of lines: 37 [Run Date: 05-09-2016 NOTES: c = cir; e = ellip; b = box; Return period = 10 Yrs. ; j - Line contains hyd. jump. Hydraflow Storm Sewers 2005 Storm Sewer Summary Report Page 2 Line Line ID Flow Line Line Invert Invert Line HGL HGL Minor HGL Dns No. rate size length EL Dn EL Up slope down up loss Junct line (cfs) (in) (ft) (ft) (ft) N (ft) (ft) (ft) (ft) No. 33 cb 115 to cb 117 0.36 15 c 130.5 289.70 298.90 7.050 290.05 299.14 n/a 299.14 j 27 34 cb127to cb 128 2.86 15 c 27.0 290.25 290.55 1.111 291.24 291.23 n/a 291.50j 31 35 cb 134 to cb 135 0.65 15 c 35.0 287.45 287.80 0.999 288.17 288.16 0.08 288.24 32 36 cb 134 to cb 136 2.56 15 c 260.0 287.85 298.70 4.173 288.49 299.34 n/a 299.34 32 37 cb 136 to cb 137 1.85 15 c 35.0 298.90 299.25 1.000 299.56 299.79 n/a 299.79 j 36 Project File: 100 phase 3.stm Number of lines: 37 Run Date: 05-09-2016 NOTES: c = cir; e = ellip; b = box; Return period = 10 Yrs. ; j - Line contains hyd. jump. HydraFlow Storm Sewers 2005 Inlet Report Page 1 Line Inlet ID Q = Q Q Q Junc Curb Inlet Grate Inlet Gutter Inlet Byp No CIA carry capt byp type line Ht L area L W So W SW Sx n Depth Spread Depth Spread Depr No (cfs) (cfs) (cfs) (cfs) (in) (ft) (sqft) (ft) (ft) (ft/ft) (ft) (ft/ft) (ft/ft) (ft) (ft) (ft) (ft) (in) 1 cb 101 1.40 0.49 1.89 0.00 Comb 5.0 3.00 3.19 3.00 2.00 Sag 2.00 0.042 0.020 0.000 0.09 2.17 0.21 2.17 2.00 Off 2 cb 102 0.23 0.00 0.23 0.00 Comb 5.0 3.00 0.00 3.00 2.00 0.013 2.00 0.042 0.020 0.013 0.10 2.70 0.14 1.33 2.00 1 3 cb 103 0.05 0.04 0.09 0.00 Comb 5.0 3.00 0.00 3.00 2.00 0.010 2.00 0.042 0.020 0.013 0.07 1.74 0.10 0.99 2.00 2 4 cb 104 1.08 0.38 1.46 0.00 Comb 5.0 3.00 3.19 3.00 2.00 Sag 2.00 0.042 0.020 0.000 0.05 1.13 0.17 1.65 2.00 Off 5 cb 105 3.26 1.16 4.42 0.00 Comb 5.0 6.00 6.40 6.00 2.00 Sag 2.00 0.042 0.020 0.000 0.16 5.67 0.28 5.67 2.00 Off 6 cb 118 0.60 0.00 0.55 0.04 Comb 5.0 3.00 0.00 3.00 2.00 0.020 2.00 0.042 0.020 0.013 0.13 4.10 0.18 1.73 2.00 3 7 cb 106 1.11 0.39 1.12 0.38 Comb 5.0 3.00 0.00 3.00 2.00 0.015 2.00 0.042 0.020 0.013 0.18 6.75 0.26 4.72 2.00 4 8 cb 119 1.79 0.00 1.30 0.49 Comb 5.0 3.00 0.00 3.00 2.00 0.020 2.00 0.042 0.020 0.013 0.18 6.80 0.26 4.87 2.00 1 9 cb 107 2.12 0.88 1.84 1.16 Comb 5.0 3.00 0.00 3.00 2.00 0.015 2.00 0.042 0.020 0.013 0.22 8.95 0.32 7.57 2.00 5 10 cb 120 0.08 0.00 0.08 0.00 Comb 5.0 3.00 0.00 3.00 2.00 0.020 2.00 0.042 0.020 0.013 0.06 1.43 0.08 0.81 2.00 6 11 cb 108 1.09 0.49 1.18 0.39 Comb 5.0 3.00 0.00 3.00 2.00 0.020 2.00 0.042 0.020 0.013 0.17 6.45 0.25 4.37 2.00 7 12 cb 121 1.94 0.63 2.57 0.00 Comb 5.0 3.00 3.19 3.00 2.00 Sag 2.00 0.042 0.020 0.000 0.13 4.17 0.25 4.17 2.00 Off 13 cb 109 2.23 0.32 1.68 0.88 Comb 5.0 3.00 0.00 3.00 2.00 0.020 2.00 0.042 0.020 0.013 0.20 7.90 0.29 6.32 2.00 9 14 cb 122 1.99 1.21 3.21 0.00 Comb 5.0 3.00 3.19 3.00 2.00 Sag 2.00 0.042 0.020 0.000 0.17 6.17 0.29 6.17 2.00 Off 15 cb 129 0.03 0.00 0.03 0.00 Comb 5.0 3.00 0.00 3.00 2.00 0.010 2.00 0.042 0.020 0.013 0.04 1.07 0.06 0.61 2.00 10 16 cb 110 1.58 0.22 1.31 0.49 Comb 5.0 3.00 0.00 3.00 2.00 0.020 2.00 0.042 0.020 0.013 0.18 6.85 0.26 4.87 2.00 11 17 cb 123 1.68 0.52 1.58 0.63 Comb 5.0 3.00 0.00 3.00 2.00 0.030 2.00 0.042 0.020 0.013 0.18 6.85 0.26 4.87 2.00 12 18 cb 130 1.50 0.00 1.50 0.00 Comb 5.0 3.00 3.19 3.00 2.00 Sag 2.00 0.042 0.020 0.000 0.06 1.37 0.18 1.74 2.00 Off 19 cb 111 1.43 0.00 1.11 0.32 Comb 5.0 3.00 0.00 3.00 2.00 0.020 2.00 0.042 0.020 0.013 0.17 6.20 0.25 3.97 2.00 13 20 cb 124 2.23 1.08 2.09 1.21 Comb 5.0 3.00 0.00 3.00 2.00 0.030 2.00 0.042 0.020 0.013 0.21 8.10 0.30 6.52 2.00 14 21 cb 131 0.73 0.00 0.73 0.00 Comb 5.0 3.00 3.19 3.00 2.00 Sag 2.00 0.042 0.020 0.000 -0.01 -0.30 0.11 1.06 2.00 Off 22 cb 112 0.13 0.00 0.13 0.00 Comb 5.0 3.00 0.00 3.00 2.00 0.022 2.00 0.042 0.020 0.013 0.07 1.71 0.10 0.98 2.00 19 Project File: 100 phase 3.stm Number of lines: 37 Rate: 05-09-2016 NOTES: Inlet N -Values = 0.016 ; Intensity = 74.06 / (Inlet time + 13.30) 10.88; Return period = 2 Yrs. ; " Indicates Known Q added Hydraflow Storm Sewers 2005 Inlet Report Page 2 Line Inlet ID Q = Q Q Q Junc Curb Inlet Grate Inlet Gutter Inlet Byp No CIA carry capt byp type line Ht L area L W So W Sw Sx n Depth Spread Depth Spread Depr No (cfs) (cfs) (cfs) (cfs) (in) (ft) (sqft) (ft) (ft) (ft/ft) (ft) (ft/ft) (ft/ft) (ft) (ft) (ft) (ft) (in) 23 cb 113 0.44 0.00 0.44 0.00 Comb 5.0 3.00 0.00 3.00 2.00 0.040 2.00 0.042 0.020 0.013 0.10 2.80 0.14 1.36 2.00 22 24 cb 114 1.14 0.20 1.12 0.22 Comb 5.0 3.00 0.00 3.00 2.00 0.040 2.00 0.042 0.020 0.013 0.15 5.15 0.21 2.32 2.00 16 25 cb 125 1.63 0.34 1.45 0.52 Comb 5.0 3.00 0.00 3.00 2.00 0.030 2.00 0.042 0.020 0.013 0.17 6.50 0.26 4.42 2.00 17 26 cb 132 0.52 0.01 0.52 0.00 Comb 5.0 3.00 0.00 3.00 2.00 0.050 2.00 0.042 0.020 0.013 0.10 2.95 0.14 1.39 2.00 18 27 cb 115 0.16 0.00 0.16 0.00 Comb 5.0 3.00 0.00 3.00 2.00 0.070 2.00 0.042 0.020 0.013 0.06 1.48 0.09 0.83 2.00 23 28 cb 126 2.36 0.71 1.99 1.08 Comb 5.0 3.00 0.00 3.00 2.00 0.030 2.00 0.042 0.020 0.013 0.20 7.85 0.29 6.22 2.00 20 29 cb 133 0.44 0.09 0.53 0.00 Comb 5.0 3.00 0.00 3.00 2.00 0.050 2.00 0.042 0.020 0.013 0.10 2.95 0.15 1.40 2.00 Off 30 cb 116 1.48 0.00 1.27 0.20 Comb 5.0 3.00 0.00 3.00 2.00 0.070 2.00 0.042 0.020 0.013 0.14 4.70 0.20 1.93 2.00 24 31 cb 127 1.48 0.00 1.14 0.34 Comb 5.0 3.00 0.00 3.00 2.00 0.024 2.00 0.042 0.020 0.013 0.16 6.00 0.24 3.72 2.00 25 32 cb 134 0.52 0.01 0.53 0.01 Comb 5.0 3.00 0.00 3.00 2.00 0.050 2.00 0.042 0.020 0.013 0.10 2.95 0.15 1.40 2.00 26 33 cb 117 0.28 0.00 0.28 0.00 Comb 5.0 3.00 0.00 3.00 2.00 0.070 2.00 0.042 0.020 0.013 0.08 1.83 0.11 1.05 2.00 27 34 cb 128 2.28 0.00 1.57 0.71 Comb 5.0 3.00 0.00 3.00 2.00 0.024 2.00 0.042 0.020 0.013 0.19 7.25 0.28 5.47 2.00 28 35 cb 135 0.52 0.28 0.71 0.09 Comb 5.0 3.00 0.00 3.00 2.00 0.024 2.00 0.042 0.020 0.013 0.13 4.50 0.19 1.87 2.00 29 36 cb 136 0.60 0.00 0.58 0.01 Comb 5.0 3.00 0.00 3.00 2.00 0.040 2.00 0.042 0.020 0.013 0.11 3.40 0.16 1.53 2.00 32 37 cb 137 1.48 0.00 1.20 0.28 Comb 5.0 3.00 0.00 3.00 2.00 0.040 2.00 0.042 0.020 0.013 0.15 5.35 0.22 2.72 2.00 35 Project File: 100 phase 3.stm Number of lines: 37 Run Date: 05-09-2016 NOTES: Inlet N -Values = 0.016 ; Intensity = 74.06 / (Inlet time + 13.30) ^ 0.88; Return period = 2 Yrs. ; " Indicates Known Q added Hydraflow Storm Sewers 2005 Line Profile (Line 1) - fes 100 to cb 101 Page 1 of 1 Invert Elevation Depth of Flow Hydraulic Grade Line Velocity Cover Line # Q (cfs) Dn (ft) Up (ft) Dn (ft) Up (ft) Hw (ft) Dn (ft) Up (ft) Jnct (ft) Dn (ft/s) Up (ft/s) Dn (ft) Up (ft) 1 34.51 256.50 256.80 1.80 1.80 1.80 258.30 258.60 258.60 6.93 6.93 4.00 5.20 File: --TProject No. Lines: 37 Run Date: 05-09-2016 Hydraflow Storm Sewers 2005 Line Profile (Line 2) - cb 101 to cb 102 EIev (ft) 269.00 265.00 259.131) 256r 00o W-INVIIII Line 2 - cb 101 to cb 102 1L. .4 rilrb K'MW r I,X 256.00 LEIS. 0 0 Reach (ft) Page 1 of 1 Invert Elevation Depth of Flow Hydraulic Grade Line Velocity Cover Line # Q (cfs) Dn (ft) Up (ft) Dn (ft) Up (ft) Hw (ft) Dn (ft) Up (ft) Jnct (ft) Dn (ft/s) Up (ft/s) Dn (ft) Up (ft) 2 33.57 257.30 258.00 1.85 1.85 1.85 259.15 259.85 259.85 7.35 7.35 5.20 4.89 File: --TProject No. Lines: 37 Run Date: 05-09-2016 Hydraflow, Storm Sewers 2005 Line Profile (Line 3) - cb 102 to cb 103 E Iev (ft) 271).00 .OG 264.00 I.OG Y2iffli'.11 Line 3 - cb 102 to cb 103 270.1) 264.00 261.{0 firan. 0 5 10 1 E, 20 25 30 35 40 4E, E.0 .5 15 60 6E. TO TLE 90 35 90 9E. 100 Reach (ft) Page 1 of 1 Invert Elevation Depth of Flow Hydraulic Grade Line Velocity Cover Line # Q (cfs) Dn (ft) Up (ft) Dn (ft) Up (ft) Hw (ft) Dn (ft) Up (ft) Jnct (ft) Dn (ft/s) Up (ft/s) Dn (ft) Up (ft) 3 33.58 258.20 259.30 2.14 1.85 1.85 260.34 261.15 j 261.15 6.24 7.35 4.69 4.42 File: --TProject No. Lines: 37 Run Date: 05-09-2016 Hydraflow Storm Sewers 2005 Line Profile (Line 4) - cb 103 to cb 104 Page 1 of 1 E lev (ft) Line 4 - cb 103 to cb 104 G 269.00 .{ 262.00 26ZOD _ _ % 259. 0,13 259DO 256.0 0 256.00 0 5 10 15 20 25 30 4'11 60 Reach (ft) Invert Elevation Depth of Flow Hydraulic Grade Line Velocity Cover Line # Q Dn Up Dn Up Hw Dn Up Jnct Dn Up Dn Up (cfs) (ft) (ft) (ft) (ft) (ft) (ft) 261.86 (ft) 261.79 (ft) (ft/s) (ft/s) (ft) (ft) 4 14.11 259.80 260.30 2.06 1.49 1.89 262.19 3.26 4.64 4.42 3.77 File: No. Lines: 37 --TProject Run Date: 05-09-2016 Hydraflow, Storm Sewers 2005 Line Profile (Line 5) - cb 104 to cb 105 Elea (ft) 267.00 26 5.00 26x.00 261.00 259.0 0 '7,r-7 nn 0. 10 1:5 20 25 30 40 267.00 26 E°. 0 0 26.010 261.001 . 001 ONFU 45 �°O Reach (ft) Page 1 of 1 Invert Elevation Depth of Flow Hydraulic Grade Line Velocity Cover Line # Q (cfs) Dn (ft) Up (ft) Dn (ft) Up (ft) Hw (ft) Dn (ft) Up (ft) Jnct (ft) Dn (ft/s) Up (ft/s) Dn (ft) Up (ft) 5 4.09 261.45 261.75 0.90 0.81 0.81 262.35 262.56 j 262.56 4.31 4.87 3.87 3.57 File: --TProject No. Lines: 37 Run Date: 05-09-2016 Hydraflow, Storm Sewers 2005 Line Profile (Line 6) - cb 103 to cb 118 Elev (ft) 271.00 IS.00 261`.00 262.00 "E9.00 �r-nn Lire 6 - cb 103 to cb 118 NEWMAN, IM r W-416R:hI1 W4�_' N.I . 00 12rA an. 0 E. 10 1 E. 20 2 E, N 35 40 45 50 55 60 65 70 7E_ 90 BE 90 9E 100 105 Reach. (ft) Page 1 of 1 Invert Elevation Depth of Flow Hydraulic Grade Line Velocity Cover Line # Q (cfs) Dn (ft) Up (ft) Dn (ft) Up (ft) Hw (ft) Dn (ft) Up (ft) Jnct (ft) Dn (ft/s) Up (ft/s) Dn (ft) Up (ft) 6 23.35 260.10 261.10 1.62 1.62 1.62 261.72 262.72 262.72 6.96 6.96 4.12 4.25 File: --TProject No. Lines: 37 Run Date: 05-09-2016 Hydraflow Storm Sewers 2005 Line Profile (Line 8) - cb 118 to cb 119 0 Reach (ft) Page 1 of 1 Invert Elevation Depth of Flow Hydraulic Grade Line Velocity Cover Line # Q MM Dn Up Dn Up Hw Dn Up Jnct Dn Up Dn Up (cfs) (ft) (ft) (ft) (ft) (ft) (ft) (ft) (ft) (ft/s) (ft/s) (ft) (ft) 8 2.24 262.90 263.25 0.60 0.60 0.60 263.50 263.85 263.85 3.86 3.86 3.70 3.57 Project File: No. Lines: 37 Run Date: 05-09-2016 Hydraflow, Storm Sewers 2005 0 Reach (ft) Page 1 of 1 Invert Elevation Depth of Flow Hydraulic Grade Line Velocity Cover Line # Q Dn Up Dn Up Hw Dn Up Jnct Dn Up Dn Up (cfs) (ft) (ft) (ft) (ft) (ft) (ft) (ft) (ft) (ft/s) (ft/s) (ft) (ft) 8 2.24 262.90 263.25 0.60 0.60 0.60 263.50 263.85 263.85 3.86 3.86 3.70 3.57 Project File: No. Lines: 37 Run Date: 05-09-2016 Hydraflow, Storm Sewers 2005 Line Profile (Line 7) - cb 104 to cb 106 Elev (ft� 2-72.00 268.00 -6.0 0 266.0 0- 260.00. - Line 7 - cb 104 to cb 106 2T2. 0 G 266.00 2' .7 0 0- I I I I I I I I I I I I I I I I I I I I I I E I 2 E DD uu 0 10 0 ;0 40 O 60 70 90 90 10 0 110 120 1 v O 140 11H 1 0 170 ISO 1 H 0 0 210 X2.0 Reach (ft Page 1 of 1 Hydraflow Storm Sewers 2005 Invert Elevation Depth of Flow Hydraulic Grade Line Velocity Cover Line # Q (cfs) Dn (ft) Up (ft) Dn (ft) Up (ft) Hw (ft) Dn (ft) Up (ft) Jnct (ft) Dn (ft/s) Up (ft/s) 5.22 Dn (ft) 3.57 Up (ft) 3.62 7 10.91 260.50 263.10 1.95 1.10 1.10 262.45 264.20 j 264.20—F 2.66 Project File: No. Lines: 37 Run Date: 05-09-2016 Hydraflow Storm Sewers 2005 Line Profile (Line 9) - cb 106 to cb 107 Elea (ft) 270.00 269.00 2.00 .00 262.00 n.nn, 0 5 10 15 20 25 30E. 40 270.00 6-mx '!: 45 �°O Reach (ft) Page 1 of 1 Invert Elevation Depth of Flow Hydraulic Grade Line Velocity Cover Line # Q (cfs) Dn (ft) Up (ft) Dn (ft) Up (ft) Hw (ft) Dn (ft) Up (ft) Jnct (ft) Dn (ft/s) Up (ft/s) Dn (ft) Up (ft) 9 2.66 264.10 264.40 0.65 0.65 0.65 264.75 265.05 265.05 4.10 4.10 3.87 3.57 File: --TProject No. Lines: 37 Run Date: 05-09-2016 Hydraflow, Storm Sewers 2005 Line Profile (Line 10) - cb 118 to cb 120 EIelo (ft', 276.00 271.40 216.00 261.00 Lias 10-cb118tocb1D �1. 11 "&n L: Lf 1 iL� 291.00 276.00 2'1.00 266.1"1' 256.0 I 1 1 1 1 1 1 1 1 1 1 1 1 1 12 OO 0 21J 40 60 80 100 129 140 160 190 200 220 240 260 290 NO Reach (ft) Invert Elevation Line # Q Dn Up (cfs) (ft) (ft) 10 21.65 261.75 268.90 Project File: Page 1 of 1 Depth of Flow Hydraulic Grade Line Velocity Cover Dn (ft) Up (ft) Hw (ft) Dn (ft) Up (ft) 270.45 Jnct (ft) Dn (ft/s) Up (ft/s) Dn (ft) Up (ft) 1.55 1.55 1.55 263.30 270.45 6.75 6.75 3.60 6.09 --TNo. Lines: 37 Run Date: 05-09-2016 Hydraflow, Storm Sewers 2005 Line Profile (Line 12) - cb 120 to cb 121 Page 1 of 1 E lev (ft) 290.00 LILF 14U Line 1 - cb 120 to cb 121 290. GO 277.00 277.00 274-00 2+1.00 2.9.00 266-. 0 0 0 5 10 o 15 20 25 F e - 30 40 274.00 271.00 269.00 26E•. 0 0 60 Reach (ft) Invert Elevation Depth of Flow Hydraulic Grade Line Velocity Cover Line # Q (cfs) Dn (ft) Up (ft) Dn (ft) Up (ft) Hw (ft) Dn (ft) Up (ft) Jnct (ft) Dn (ft/s) Up (ft/s) Dn (ft) Up (ft) 12 17.47 270.00 271.40 1.48 1.48 1.48 271.48 272.88 272.88 7.01 7.01 5.49 4.16 File: No. Lines: 37 --TProject Run Date: 05-09-2016 Hydraflow, Storm Sewers 2005 Line Profile (Line 14) - cb 121 to cb 122 Elea (ft) L 9.00 ZTc�.00 274.00 2x2.01) -70.00 y'8.fin 0. 10 1:5 20 25 30 40 275.00 x.00 274-00 .001 270.E _nn 45 L.°O Reach (ft) Page 1 of 1 Invert Elevation Depth of Flow Hydraulic Grade Line Velocity Cover Line # Q (cfs) Dn (ft) Up (ft) Dn (ft) Up (ft) Hw (ft) Dn (ft) Up (ft) Jnct (ft) Dn (ft/s) Up (ft/s) Dn (ft) Up (ft) 14 2.50 272.45 272.75 0.95 0.64 0.88 273.40 273.39 j 273.63 2.49 3.99 3.86 3.56 File: --TProject No. Lines: 37 Run Date: 05-09-2016 Hydraflow, Storm Sewers 2005 Line Profile (Line 11) - cb 106 to cb 108 Elev (ft� 275.00 272.00 .01) x.00 263.00 Lias 11 - cb 106 to cb 108 272.00 269.00 x.00 -N O 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 I I 2613.00 kL rl 00 260.00 0 10 0 ;0 40 E O 60 70 90 90 100 110 120 1 v O 140 11H 1-q-0 170 ISO 1H 200 210 220 L� L� Reach (ft Page 1 of 1 Hydraflow Storm Sewers 2005 Invert Elevation Depth of Flow Hydraulic Grade Line Velocity Cover Line # Q (cfs) Dn (ft) Up (ft) Dn (ft) Up (ft) Hw (ft) Dn (ft) Up (ft) Jnct (ft) Dn (ft/s) Up (ft/s) Dn (ft) Up (ft) 11 8.44 263.60 266.85 1.03 1.03 1.03 264.63 267.88 267.88 5.18 5.18 3.62 3.75 Project File: No. Lines: 37 Run Date: 05-09-2016 Hydraflow Storm Sewers 2005 Line Profile (Line 13) - cb 108 to cb 109 fEle-V (ft) 277.00 271.0E x.00 267.00 265.00 I. an 5 10 1 30 a�. 40 273.13.0 X71.00 x_00 267.001 . 001 ,5m nn 45 �°O Reach (ft) Page 1 of 1 Invert Elevation Depth of Flow Hydraulic Grade Line Velocity Cover Line # Q (cfs) Dn (ft) Up (ft) Dn (ft) Up (ft) Hw (ft) Dn (ft) Up (ft) Jnct (ft) Dn (ft/s) Up (ft/s) Dn (ft) Up (ft) 13 2.80 267.50 267.80 0.72 0.67 0.67 268.22 268.47 j 268.47 3.85 4.18 3.85 3.55 File: --TProject No. Lines: 37 Run Date: 05-09-2016 Hydraflow Storm Sewers 2005 Line Profile (Line 15) - cb 120 to cb 129 Eley (ft) 290.00 277.00 274.0 01 271.00 268.00 Line 1 - cb 120 to cb 1 n6.1 "M. 280.00 274.00 271.00 268.00 26E.00 I I I I I I I I I I I I I I I I C GO 0 10 20 30 50 60 70 90 100 110 120 1 aO 140 150 .F l��I Reach (ft) Invert Elevation Line # Q Dn Up (cfs) (ft) (ft) 15 6.40 269.40 270.40 Project File: Page 1 of 1 Depth of Flow Hydraulic Grade Line Velocity Cover Dn (ft) Up (ft) Hw (ft) Dn (ft) Up (ft) Jnct (ft) Dn (ft/s) Up (ft/s) Dn (ft) Up (ft) 1.70 0.90 0.90 271.10 271.30 j 271.30 2.25 4.70 6.09 6.29 --TNo. Lines: 37 Run Date: 05-09-2016 Hydraflow, Storm Sewers 2005 Line Profile (Line 18) - cb 129 to cb 130 Eley (ft) 292.010 279.00 276.00 27100 270.00 ct 15 Line 18 - cb 12.9 to cb 130 x.00 00— 1n1 l 273.0 REA, 267.00 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 I ar 57-0 1 0 1 IJ 20 30 40 50 60 70 95 90 105 110 120 1 aG 140 150 Reach (f) Page 1 of 1 Invert Elevation Depth of Flow Hydraulic Grade Line Velocity Cover Line # Q (cfs) Dn (ft) Up (ft) Dn (ft) Up (ft) Hw (ft) Dn (ft) Up (ft) Jnct (ft) Dn (ft/s) Up (ft/s) Dn (ft) Up (ft) 18 6.56 270.60 271.60 0.97 0.91 0.91 271.57 272.51 j 272.51 4.34 4.74 6.09 3.75 File: --TProject No. Lines: 37 Run Date: 05-09-2016 Hydraflow, Storm Sewers 2005 Line Profile (Line 21) - cb 130 to cb 131 Elea (ft) NG 274.0 -T2.0 0 7"'.R. n n 0 5 10 15 20 25 30E. 40 275.00 I ,e1: _nn 45 �°O Reach (ft) Page 1 of 1 Invert Elevation Depth of Flow Hydraulic Grade Line Velocity Cover Line # Q (cfs) Dn (ft) Up (ft) Dn (ft) Up (ft) Hw (ft) Dn (ft) Up (ft) Jnct (ft) Dn (ft/s) Up (ft/s) Dn (ft) Up (ft) 21 0.91 272.25 272.55 0.60 0.38 0.38 272.85 272.93 j 272.93 1.57 2.87 3.85 3.55 File: --TProject No. Lines: 37 Run Date: 05-09-2016 Hydraflow, Storm Sewers 2005 Line Profile (Line 16) - cb 108 to cb 110 Page 1 of 1 E (ft) 2- 0 0 Line 16 - cb 108 to cb 11 110- 279.00 2- E.0 275.00 272.00 269.00. 266.00 PEI I I I Ell 0 10 20 30 40 6.0 60 IEE I 70 90 90 I 100 110 272.0 0 269.00 2%.00.�0V. DO 120 1 v O 140 1 EA- 1-q-0 170 ISO 1H 200 210 220 Reach (ft Invert Elevation Depth of Flow Hydraulic Grade Line Velocity Cover Line # Q (cfs) Dn (ft) Up (ft) Dn (ft) Up (ft) Hw (ft) Dn (ft) Up (ft) Jnct (ft) Dn (ft/s) Up (ft/s) Dn (ft) Up (ft) 16 5.84 267.05 270.60 1.19 0.86 0.86 268.24 271.46 j 271.46 2.99 4.55 3.55 4.11 File: No. Lines: 37 --TProject Run Date: 05-09-2016 Hydraflow Storm Sewers 2005 Line Profile (Line 19) - cb 110 to cb 111 EIe-V (ft) CL ; Line 19 - cb 110 to cb 11 F cb 111 275.00 Invert Elevation Depth of Flow Hydraulic Grade Line Velocity Cover Line # Q (cfs) Dn (ft) Up (ft) Dn (ft) 273.00 Hw (ft) Dn (ft) Up (ft) Jnct (ft) Dn (ft/s) Up (ft/s) Dn (ft) Up (ft) 19 4.48 270.80 271.10 0.95 271.00 0.75 271.75 271.85 j 271.85 3.06 4.17 3.91 3.61 File: --TProject No. Lines: 37 Run Date: 05-09-2016 Hydraflow, Storm Sewers 2005 ---------- 0 5 10 15 20 25 30 40 45 Reach (ft) Page 1 of 1 Invert Elevation Depth of Flow Hydraulic Grade Line Velocity Cover Line # Q (cfs) Dn (ft) Up (ft) Dn (ft) Up (ft) Hw (ft) Dn (ft) Up (ft) Jnct (ft) Dn (ft/s) Up (ft/s) Dn (ft) Up (ft) 19 4.48 270.80 271.10 0.95 0.75 0.75 271.75 271.85 j 271.85 3.06 4.17 3.91 3.61 File: --TProject No. Lines: 37 Run Date: 05-09-2016 Hydraflow, Storm Sewers 2005 Line Profile (Line 1) - fes 100 to cb 101 Eley (ft) 2ga.00 Line 2 - cb 111 to cb 112 28.00 2T7.00 274.0 271.00 258.00 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 I I 263.00 0 10 0 30 M TO 80 DO 100 110 120 1 M 1X40 1 CEO 1 C-0 170�4RP �PkF Reach. (ft) Invert Elevation Line # Q Dn Up (cfs) (ft) (ft) 22 3.30 271.60 274.30 Project File: Depth of Flow 1 .• 1 .• I Hydraulic Grade Line Hw Dn Up Jnct (ft) (ft) (ft) (ft) 0.69 272.29 274.99 274.99 No. Lines: 37 Page 1 of 1 Velocity Cover Dn Up Dn Up (ft/s) (ft/s) (ft) (ft) 4.13 4.13 3.61 3.83 Run Date: 05-09-2016 Hydraflow Storm Sewers 2005 Line Profile (Line 23) - cb 112 to cb 113 Page 1 of 1 Eley (ft) Line 23 - cb 112 to cb 113 286.00 2&6.00 11 -eb 2.93.00 1 . 2.90.0 290.00 2. DD 2TT. 0 0 F 274.00 274.00 271.00 271.00 0 10 15 20 2'-; 30 35 40 45 50 55 60 65 70 Rea ch (ft) Invert Elevation Depth of Flow Hydraulic Grade Line Velocity Cover Line # Q Dn Up Dn Up Hw Dn Up Jnct Dn Up Dn Up (cfs) (ft) (ft) (ft) (ft) (ft) (ft) (ft) (ft) (ft/s) (ft/s) (ft) (ft) 23 3.22 274.50 276.95 0.71 0.68 0.68 275.21 277.63 j 277.63 3.93 4.10 3.63 3.74 File: No. Lines: 37 --TProject Run Date: 05-09-2016 Hydraflow, Storm Sewers 2005 Line Profile (Line 24) - cb 113 to cb 114 Elea (ft) 291.00 279.00 2+7.00 27E.00 "7',� nn r— C1W Line 24 - cb 113 to, cb 114 cb. 114 10 15 20 z 30 21.00 x_00 2T7. 001 275.E ,Yrq nn aE.40 45 E o. Reach (ft) Page 1 of 1 Invert Elevation Depth of Flow Hydraulic Grade Line Velocity Cover Line # Q (cfs) Dn (ft) Up (ft) Dn (ft) Up (ft) Hw (ft) Dn (ft) Up (ft) Jnct (ft) Dn (ft/s) Up (ft/s) Dn (ft) Up (ft) 24 1.43 277.25 277.55 0.62 0.48 0.48 277.87 278.03 j 278.03 2.33 3.31 3.69 3.58 Project File: No. Lines: 37 Run Date: 05-09-2016 Hydraflow, Storm Sewers 2005 Line Profile (Line 17) - cb 121 to cb 123 EIev (ft) -97.00 293.00 279.00- 2 7 r -.,. 79.00' 27r,. 0 0 271. DO 7 Line 17 - cb 121 to cb 123 Ell NNW___. OF M SIro WWMM 0-0 I MME 297.00 29x.00 279.00 275.00 271.00 ?,W7 an . 0 20 40 6 90 100 120 140 160 190 200 220 240 260 Regi (ft) Page 1 of 1 Invert Elevation Depth of Flow Hydraulic Grade Line Velocity Cover Line # Q (cfs) Dn (ft) Up (ft) Dn (ft) Up (ft) Hw (ft) Dn (ft) Up (ft) Jnct (ft) Dn (ft/s) Up (ft/s) Dn (ft) Up (ft) 17 13.44 272.00 277.05 1.36 1.30 1.30 273.36 278.35 j 278.35 5.91 6.23 3.56 4.12 Project File: No. Lines: 37 Run Date: 05-09-2016 Hydraflow, Storm Sewers 2005 Line Profile (Line 20) - cb 123 to cb 124 Elea (ft) 294.00 2.00 2SO.00 278.00 276.00 7A. M 0 5 10 15 20 25 30E. 40 24.00 R -17; 'A. 45 �°O Reach (ft) Page 1 of 1 Invert Elevation Depth of Flow Hydraulic Grade Line Velocity Cover Line # Q (cfs) Dn (ft) Up (ft) Dn (ft) Up (ft) Hw (ft) Dn (ft) Up (ft) Jnct (ft) Dn (ft/s) Up (ft/s) Dn (ft) Up (ft) 20 2.79 278.05 278.35 0.82 0.67 0.67 278.87 279.02 j 279.02 3.27 4.18 3.87 3.57 File: --TProject No. Lines: 37 Run Date: 05-09-2016 Hydraflow, Storm Sewers 2005 Line Profile (Line 25) - cb 123 to cb 125 EIev (ft) 29a. 0 0 29D. 0 0- 285.00 2,91.00 2r'7.0G 27'� n n Lias 25 - cb 123 to cb 125 W-" ! I 299.00 29L,. 0 0 231.00 27,q an. 0 13 20 30 40 EEO 60 70 90 90 100 110 120 1 N 140 1 EA 160 1 TO 190 1 DO 200 210 220 Reach. (ft) Invert Elevation Line # Q Dn Up Dn (cfs) (ft) (ft) (ft) 25 9.31 277.60 283.70 1.21 Project File: Page 1 of 1 Depth of Flow Hydraulic Grade Line Velocity Cover Up (ft) Hw (ft) Dn (ft) Up (ft) Jnct (ft) Dn (ft/s) Up (ft/s) Dn (ft) Up (ft) 1.08 1.08 278.81 284.78 j 284.78 4.67 5.38 3.57 3.97 --TNo. Lines: 37 Run Date: 05-09-2016 Hydraflow Storm Sewers 2005 Line Profile (Line 28) - cb 125 to cb 126 Elea (ft) Line 28 - cb 125 to cb 1 0 E 10 15 20 25 30E 40 45 E� Reach (ft) Page 1 of 1 Invert Elevation Depth of Flow Hydraulic Grade Line 299.00 Cover Line # Q (cfs) Dn (ft) Up (ft) Dn (ft) Up (ft) 0.69 Hw (ft) Dn (ft) Up (ft) Jnct (ft) 285.39 Dn (ft/s) 3.91 Up (ft/s) 4.27 Dn (ft) 4.02 Up (ft) 3.72 28 2.96 284.40 284.70 0.74 0.69 285.14 285.39 j File: --TProject No. Lines: 37 Run Date: 05-09-2016 Hydraflow, Storm Sewers 2005 0 E 10 15 20 25 30E 40 45 E� Reach (ft) Page 1 of 1 Invert Elevation Depth of Flow Hydraulic Grade Line Velocity Cover Line # Q (cfs) Dn (ft) Up (ft) Dn (ft) Up (ft) 0.69 Hw (ft) Dn (ft) Up (ft) Jnct (ft) 285.39 Dn (ft/s) 3.91 Up (ft/s) 4.27 Dn (ft) 4.02 Up (ft) 3.72 28 2.96 284.40 284.70 0.74 0.69 285.14 285.39 j File: --TProject No. Lines: 37 Run Date: 05-09-2016 Hydraflow, Storm Sewers 2005 Line Profile (Line 26) - cb 130 to cb 132 Invert Elevation Line # Q Dn Up (cfs) (ft) (ft) 26 4.33 271.80 274.40 Project File: Depth of Flow Dn Up (ft) (ft) 1.03 0.74 Page 1 of 1 mom Hydraulic Grade Line Velocity Cover Hw (ft) Dn (ft) Up (ft) Jnct (ft) Dn (ft/s) Up (ft/s) Dn (ft) Up (ft) 0.74 272.83 275.14 j 275.14 2.67 4.12 3.55 4.35 --TNo. Lines: 37 Run Date: 05-09-2016 Hydraflow Storm Sewers 2005 Line Profile (Line 29) - cb 132 to cb 133 Elea (ft) Line 29 - cb 132 to cb 13-3 279.00 - --------_ -- -- . 1 5 10 15 20 25 30 40 45 10 Reach (ft) Page 1 of 1 Invert Elevation Depth of Flow Hydraulic Grade Line Velocity Cover Line # Q Dn Up Dn Up Hw Dn Up Jnct Dn Up Dn Up (cfs) (ft) (ft) (ft) (ft) (ft) (ft) (ft) (ft) (ft/s) (ft/s) (ft) (ft) 29 0.55 275.10 275.45 0.30 0.30 0.30 275.40 275.75 275.75 2.46 2.47 4.40 4.05 Project File: No. Lines: 37 Run Date: 05-09-2016 Hydraflow, Storm Sewers 2005 Line Profile (Line 27) - cb 113 to cb 115 Elev (ft.� R �'1 2�. 0 0- 2R1.00 286.0G 276. DO 1 17 —1- 01-11 -6— —.1 -1-1r. —6 d 11 C 20 #9 60 2.0G 21.00 x.00 2,31.00 1 nn 90 100 120 140 160 1 M 200 M 240 2 C,0 Reach (ft) Page 1 of 1 Invert Elevation Depth of Flow Hydraulic Grade Line Velocity Cover Line # Q Dn Up Dn Up Hw Dn Up Jnct Dn Up Dn Up (cfs) (ft) (ft) (ft) (ft) (ft) (ft) (ft) (ft) (ft/s) (ft/s) (ft) (ft) 27 1.86 277.30 289.30 0.56 0.55 0.55 277.86 289.85 j 289.85 3.49 3.61 3.64 4.05 --TProject File: No. Lines: 37 Run Date: 05-09-2016 Hydraflow, Storm Sewers 2005 Line Profile (Line 30) - cb 115 to cb 116 r 101001 MENEM ■��� i 5 10 15 20 25 30 40 45 so Reach (ft) Page 1 of 1 Invert Elevation Depth of Flow Hydraulic Grade Line Velocity Cover Line # Q Dn Up Dn Up Hw Dn Up Jnct Dn Up Dn Up (cfs) (ft) (ft) (ft) (ft) (ft) (ft) (ft) (ft) (ft/s) (ft/s) (ft) (ft) 30 1.85 289.50 289.80 0.54 0.54 0.54 290.04 290.34 290.34 3.61 3.61 3.85 3.55 --TProject File: No. Lines: 37 Run Date: 05-09-2016 Hydraflow, Storm Sewers 2005 Line Profile (Line 31) - cb 125 to cb 127 EIev (ft) 299.00 2RE.00- 1.00 29a. 0 0- 771� nn Line 31 - cb 125 to cb 127 299.00 295.00 2D1.00 237.00 W;A IX Q. 0 10 20 30 40 EEO 60 70 90 90 100 110 120 1 N 140 1 EA 160 1 TO 190 1 DO 200 210 220 Reach. (ft) Page 1 of 1 Invert Elevation Depth of Flow Hydraulic Grade Line Velocity Cover Line # Q (cfs) Dn (ft) Up (ft) Dn (ft) Up (ft) Hw (ft) Dn (ft) Up (ft) Jnct (ft) Dn (ft/s) Up (ft/s) Dn (ft) Up (ft) 31 4.67 284.85 290.05 0.87 0.87 0.87 285.72 290.92 290.92 5.16 5.16 3.57 4.08 File: --TProject No. Lines: 37 Run Date: 05-09-2016 Hydraflow, Storm Sewers 2005 Line Profile (Line 34) - cb 127 to cb 128 0 5 10 15 a�. 40 45 L.O. Reach (ft) Page 1 of 1 Invert Elevation Depth of Flow Hydraulic Grade Line Velocity Cover Line # Q (cfs) Dn (ft) Up (ft) Dn (ft) Up (ft) Hw (ft) Dn (ft) Up (ft) Jnct (ft) Dn (ft/s) Up (ft/s) Dn (ft) Up (ft) 34 2.86 290.25 290.55 0.99 0.68 0.95 291.24 291.23 j 291.50 2.73 � r ■�'�■��iiiiiiili�i� i ■��� 3.88 3.58 Project File: No. Lines: 37 Run Date: 05-09-2016 Hydraflow, Storm Sewers 2005 0 5 10 15 a�. 40 45 L.O. Reach (ft) Page 1 of 1 Invert Elevation Depth of Flow Hydraulic Grade Line Velocity Cover Line # Q (cfs) Dn (ft) Up (ft) Dn (ft) Up (ft) Hw (ft) Dn (ft) Up (ft) Jnct (ft) Dn (ft/s) Up (ft/s) Dn (ft) Up (ft) 34 2.86 290.25 290.55 0.99 0.68 0.95 291.24 291.23 j 291.50 2.73 4.19 3.88 3.58 Project File: No. Lines: 37 Run Date: 05-09-2016 Hydraflow, Storm Sewers 2005 Line Profile (Line 32) - cb 132 to cb 134 Eley (ft) 294.00 2139.00 2M.00 279.01) 274. 01 G �v,r4nn Line 32 - cb 132 to cb 134 C. 1 a4 pill ng M_lam MMmoo -0. MW Owl -- MC -S emmv W W-Ipi d MonsonS 299.00 294.00 279.00 I"OLIX° 0 20 40 60 80 100 129 140 160 190 200 M 240 260 2'90 NO Reach (ft) Page 1 of 1 Invert Elevation Depth of Flow Hydraulic Grade Line Velocity Cover Line # Q (cfs) Dn (ft) Up (ft) Dn (ft) Up (ft) Hw (ft) Dn (ft) Up (ft) Jnct (ft) Dn (ft/s) Up (ft/s) Dn (ft) Up (ft) 32 3.55 274.85 287.25 0.72 0.72 0.72 275.57 287.97 287.97 4.24 4.24 4.40 4.44 Project File: No. Lines: 37 Run Date: 05-09-2016 Hydraflow, Storm Sewers 2005 Line Profile (Line 35) - cb 134 to cb 135 Elea (ft) 294.00 292.00 .!OD 299.0'0 -x.00 ?RA. flfl 0 Line 35 - cb 134 to cb 135 —W +i nC 284.00 x_00 290.00 <001 . 001 ORAnn 45 �°O Reach (ft) Page 1 of 1 Invert Elevation Depth of Flow Hydraulic Grade Line Velocity Cover Line # Q (cfs) Dn (ft) Up (ft) Dn (ft) Up (ft) Hw (ft) Dn (ft) Up (ft) Jnct (ft) Dn (ft/s) Up (ft/s) Dn (ft) Up (ft) 35 0.65 287.45 287.80 0.72 0.36 0.44 288.17 288.16 288.24 0.89 2.21 4.49 4.14 File: --TProject No. Lines: 37 Run Date: 05-09-2016 Hydraflow, Storm Sewers 2005 Line Profile (Line 33) - cb 115 to cb 117 Eley (ft) N E.00 N1.00 297.00 29x.00 289. DO Line 33 - cb 115 to cb 117 01AW11111 1 41o. 247. GO .GO 289. GO 29Ic:.00 285. GO 0 10 20 30 40 50 60 70 30 90 100 110 120 1 M 140 150 160 Regi (ft) Invert Elevation Line # Q Dn Up (cfs) (ft) (ft) 33 0.36 289.70 298.90 Project File: Depth of Flow 0.35 1 0.24 Hydraulic Grade Line Hw Dn Up Jnct (ft) (ft) (ft) (ft) 0.24 290.05 299.14 j 299.14 No. Lines: 37 Page 1 of 1 Velocity Cover Dn Up Dn Up (ft/s) (ft/s) (ft) (ft) 1.28 2.18 3.65 3.59 Run Date: 05-09-2016 Hydraflow, Storm Sewers 2005 MEN W�s %�� iowms d I� ���11110 01AW11111 1 41o. 247. GO .GO 289. GO 29Ic:.00 285. GO 0 10 20 30 40 50 60 70 30 90 100 110 120 1 M 140 150 160 Regi (ft) Invert Elevation Line # Q Dn Up (cfs) (ft) (ft) 33 0.36 289.70 298.90 Project File: Depth of Flow 0.35 1 0.24 Hydraulic Grade Line Hw Dn Up Jnct (ft) (ft) (ft) (ft) 0.24 290.05 299.14 j 299.14 No. Lines: 37 Page 1 of 1 Velocity Cover Dn Up Dn Up (ft/s) (ft/s) (ft) (ft) 1.28 2.18 3.65 3.59 Run Date: 05-09-2016 Hydraflow, Storm Sewers 2005 Line Profile (Line 36) - cb 134 to cb 136 Elev (ft) M7.00 x02.00 297.00 292.00- 297.00 92.00' 297.00 Line 36 - ch 134 to cb 1 M7.11) iO iX ,.X P 2 01) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 I I 232 00 LCL illi 0 1J 60 100 129 140 160 190 200 240 260 2'90 �•�OL9��7�F Reach (ft) Invert Elevation Line # Q Dn Up (cfs) (ft) (ft) 36 2.56 287.85 298.70 Project File: Depth of Flow 0.64 1 0.64 Hydraulic Grade Line Hw Dn Up Jnct (ft) (ft) (ft) (ft) 0.64 288.49 299.34 299.34 No. Lines: 37 Page 1 of 1 Velocity Cover Dn Up Dn Up (ft/s) (ft/s) (ft) (ft) 4.04 4.04 4.09 4.60 Run Date: 05-09-2016 Hydraflow Storm Sewers 2005 Line Profile (Line 37) - cb 136 to cb 137 Elea (ft:, aOE%00 203.00 301.00 299.00 2RT00 /4r -.nn sL- A n0 sL- 11 n -F 10 1 40 3115.00 303-00 3011-00 299.001 297.001 45 �°O Reach (ft) Page 1 of 1 Invert Elevation Depth of Flow Hydraulic Grade Line Velocity Cover Line # Q Dn Up Dn Up Hw Dn Up Jnct Dn Up Dn Up (cfs) (ft) (ft) (ft) (ft) (ft) (ft) (ft) (ft) (ft/s) (ft/s) (ft) (ft) 37 1.85 298.90 299.25 0.66 0.54 0.54 299.56 299.79 j 299.79 2.82 3.61 4.40 4.05 --TProject File: No. Lines: 37 Run Date: 05-09-2016 Hydraflow Storm Sewers 2005 Inlet Section (Line 1 - Combination Inlet) - cb 101 SII dimensiians in feet Lisle 1 - Combination Inlet in .fag - Gb 101 Page 1 of 1 Line # Catch (cfs) 1 1.40 Q Inlet Gutter Depth Spread Byp Carry Capt Byp Length Depr Throat Width Slope SW Sx Gutter Inlet Gutter Inlet Line (cfs) (cfs) (cfs) (ft) (in) (in) (ft) (ft/ft) (ft/ft) (ft/ft) (ft) (ft) (ft) (ft) (ft) 0.49 1.89 0.00 3.00 2.00 5.0 2.00 Sag 0.042 0.020 0.09 0.21 2.17 2.17 Sag Project File: No. Lines: 37 Run Date: 05-09-2016 Hydraflow Storm Sewers 2005 Inlet Section (Line 2 - Combination Inlet) - cb 102 All dimensions. in feet Line 2 - Camlainution Inlet on Grade Gb 102 Page 1 of 1 Line # Catch (cfs) 2 0.23 Q Inlet Gutter Depth Spread Byp Carry (cfs) Capt (cfs) Byp (cfs) Length (ft) Depr (in) Throat (in) Width (ft) Slope (ft/ft) SW (ft/ft) Sx (ft/ft) Gutter (ft) Inlet (ft) Gutter (ft) Inlet (ft) Line (ft) 0.00 0.23 0.00 3.00 2.00 5.0 2.00 0.013 0.042 0.020 0.10 0.14 2.70 1.33 1 Project File: I No. Lines: 37 Run Date: 05-09-2016 Hydraflow Storm Sewers 2005 Inlet Section (Line 3 - Combination Inlet) - cb 103 All dimensions. in feat Line a - Combination Inlet on Grade -cla103 Page 1 of 1 Line # Catch (cfs) 3 0.05 Q Inlet Gutter Depth Spread Byp Carry (cfs) Capt (cfs) Byp (cfs) Length (ft) Depr (in) Throat (in) Width (ft) Slope (ft/ft) SW (ft/ft) Sx (ft/ft) Gutter (ft) Inlet (ft) Gutter (ft) Inlet (ft) Line (ft) 0.04 0.09 0.00 3.00 2.00 5.0 2.00 0.010 0.042 0.020 0.07 0.10 1.74 0.99 2 Project File: I No. Lines: 37 Run Date: 05-09-2016 Hydraflow Storm Sewers 2005 Inlet Section (Line 4 - Combination Inlet) - cb 104 SII dimansilans in feet Line 4 -Combination Inlet in Sag cla104 Page 1 of 1 Line # Catch (cfs) 4 1.08 Q Inlet Gutter Depth Spread Byp Carry (cfs) Capt (cfs) Byp (cfs) Length (ft) Depr (in) Throat (in) Width (ft) Slope (ft/ft) SW (ft/ft) Sx (ft/ft) Gutter (ft) Inlet (ft) Gutter (ft) Inlet (ft) Line (ft) 0.38 1.46 0.00 3.00 2.00 5.0 2.00 Sag 0.042 0.020 0.05 0.17 1.13 1.65 Sag Project File: No. Lines: 37 Run Date: 05-09-2016 Hydraflow Storm Sewers 2005 Inlet Section (Line 5 - Combination Inlet) - cb 105 SII dimensions. in feet Line 5 -Combination Inlet in Sag -cla105 Page 1 of 1 Line # Catch (cfs) 5 3.26 Q Inlet Gutter Depth Spread Byp Carry (cfs) Capt (cfs) Byp (cfs) Length (ft) Depr (in) Throat (in) Width (ft) Slope (ft/ft) SW (ft/ft) Sx (ft/ft) Gutter (ft) Inlet (ft) Gutter (ft) Inlet (ft) Line (ft) 1.16 4.42 0.00 6.00 2.00 5.0 2.00 Sag 0.042 0.020 0.16 0.28 5.67 5.67 Sag Project File: I No. Lines: 37 Run Date: 05-09-2016 Hydraflow Storm Sewers 2005 Inlet Section (Line 6 - Combination Inlet) - cb 118 SII dimansions. in faat Line.6-Combination Inlet on Grade Gb11.9 Page 1 of 1 Line # Catch (cfs) 6 0.60 Q Inlet Gutter Depth Spread Byp Carry (cfs) Capt (cfs) Byp (cfs) Length (ft) Depr (in) Throat (in) Width (ft) Slope (ft/ft) SW (ft/ft) Sx (ft/ft) Gutter (ft) Inlet (ft) Gutter (ft) Inlet (ft) Line (ft) 0.00 0.55 0.04 3.00 2.00 5.0 2.00 0.020 0.042 0.020 0.13 0.18 4.10 1.73 3 Project File: I No. Lines: 37 Run Date: 05-09-2016 Hydraflow Storm Sewers 2005 Inlet Section (Line 1 - Combination Inlet) - cb 101 SII dimansions. in feat Line.9 - Combination Inlet on Grade - cla 11-9 Page 1 of 1 Line # Catch (cfs) 8 1.79 Q Inlet Gutter Depth Spread Byp Carry (cfs) Capt (cfs) Byp (cfs) Length (ft) Depr (in) Throat (in) Width (ft) Slope (ft/ft) SW (ft/ft) Sx (ft/ft) Gutter (ft) Inlet (ft) Gutter (ft) Inlet (ft) Line (ft) 0.00 1.30 0.49 3.00 2.00 5.0 2.00 0.020 0.042 0.020 0.18 0.26 6.80 4.87 1 Project File: I No. Lines: 37 Run Date: 05-09-2016 Hydraflow Storm Sewers 2005 Inlet Section (Line 7 - Combination Inlet) - cb 106 SII dimansions. in faet Line 7 - Combination Inlet on Grade Gb 1 Page 1 of 1 Line # Catch (cfs) 7 1.11 Q Inlet Gutter Depth Spread Byp Carry (cfs) Capt (cfs) Byp (cfs) Length (ft) Depr (in) Throat (in) Width (ft) Slope (ft/ft) SW (ft/ft) Sx (ft/ft) Gutter (ft) Inlet (ft) Gutter (ft) Inlet (ft) Line (ft) 0.39 1.12 0.38 3.00 2.00 5.0 2.00 0.015 0.042 0.020 0.18 0.26 6.75 4.72 4 Project File: I No. Lines: 37 Run Date: 05-09-2016 Hydraflow Storm Sewers 2005 Inlet Section (Line 9 - Combination Inlet) - cb 107 SII dimensions. in feet LilneS,- Camlainution Inlet on Grade Gb107 Page 1 of 1 Line # Catch (cfs) 9 2.12 Q Inlet Gutter Depth Spread Byp Carry (cfs) Capt (cfs) Byp (cfs) Length (ft) Depr (in) Throat (in) Width (ft) Slope (ft/ft) SW (ft/ft) Sx (ft/ft) Gutter (ft) Inlet (ft) Gutter (ft) Inlet (ft) Line (ft) 0.88 1.84 1.16 3.00 2.00 5.0 2.00 0.015 0.042 0.020 0.22 0.32 8.95 7.57 5 Project File: I No. Lines: 37 Run Date: 05-09-2016 Hydraflow Storm Sewers 2005 Inlet Section (Line 10 - Combination Inlet) - cb 120 All dimensions. in faet Line 10 -Combination Inlet on Grade -eb120 Page 1 of 1 Line # Catch (cfs) 10 0.08 Q Inlet Gutter Depth Spread Byp Carry (cfs) Capt (cfs) Byp (cfs) Length (ft) Depr (in) Throat (in) Width (ft) Slope (ft/ft) SW (ft/ft) Sx (ft/ft) Gutter (ft) Inlet (ft) Gutter (ft) Inlet (ft) Line (ft) 0.00 0.08 0.00 3.00 2.00 5.0 2.00 0.020 0.042 0.020 0.06 0.08 1.43 0.81 6 Project File: No. Lines: 37 Run Date: 05-09-2016 Hydraflow Storm Sewers 2005 Inlet Section (Line 12 - Combination Inlet) - cb 121 All dimens.ions in feet Line 12 - Combination Inlet in Sag - cla 121 Page 1 of 1 Line # Catch (cfs) 12 1.94 Q Inlet Gutter Depth Spread Byp Carry (cfs) Capt (cfs) Byp (cfs) Length (ft) Depr (in) Throat (in) Width (ft) Slope (ft/ft) SW (ft/ft) Sx (ft/ft) Gutter (ft) Inlet (ft) Gutter (ft) Inlet (ft) Line (ft) 0.63 2.57 0.00 3.00 2.00 5.0 2.00 Sag 0.042 0.020 0.13 0.25 4.17 4.17 Sag Project File: No. Lines: 37 Run Date: 05-09-2016 Hydraflow Storm Sewers 2005 Inlet Section (Line 1 - Combination Inlet) - cb 101 SII dimensions. in feet Line 14 - Combination Inlet in Sag - cla 122 Page 1 of 1 Line # Catch (cfs) 14 1.99 Q Inlet Gutter Depth Spread Byp Carry (cfs) Capt (cfs) Byp (cfs) Length (ft) Depr (in) Throat (in) Width (ft) Slope (ft/ft) Sag SW (ft/ft) 0.042 Sx (ft/ft) Gutter (ft) Inlet (ft) Gutter (ft) Inlet (ft) Line (ft) 1.21 3.21 0.00 3.00 2.00 5.0 2.00 0.020 0.17 0.29 6.17 6.17 Sag Project File: No. Lines: 37 Run Date: 05-09-2016 Hydraflow Storm Sewers 2005 Inlet Section (Line 11 - Combination Inlet) - cb 108 All dimens.ions in feet Line 11 - Combination Inlet on Grade - cb 10,3 Page 1 of 1 Line # Catch (cfs) 11 1.09 Q Inlet Gutter Depth Spread Byp Carry (cfs) Capt (cfs) Byp (cfs) Length (ft) Depr (in) Throat (in) Width (ft) Slope (ft/ft) SW (ft/ft) Sx (ft/ft) Gutter (ft) Inlet (ft) Gutter (ft) Inlet (ft) Line (ft) 0.49 1.18 0.39 3.00 2.00 5.0 2.00 0.020 0.042 0.020 0.17 0.25 6.45 4.37 7 Project File: No. Lines: 37 Run Date: 05-09-2016 Hydraflow Storm Sewers 2005 Inlet Section (Line 13 - Combination Inlet) - cb 109 All dimensions. in faet Lime 13 -Combination Inlet on Grade -r -b109, Page 1 of 1 Line # Catch (cfs) 13 2.23 Q Inlet Gutter Depth Spread Byp Carry (cfs) Capt (cfs) Byp (cfs) Length (ft) Depr (in) Throat (in) Width (ft) Slope (ft/ft) SW (ft/ft) Sx (ft/ft) Gutter (ft) Inlet (ft) Gutter (ft) Inlet (ft) Line (ft) 0.32 1.68 0.88 3.00 2.00 5.0 2.00 0.020 0.042 0.020 0.20 0.29 7.90 6.32 9 Project File: No. Lines: 37 Run Date: 05-09-2016 Hydraflow Storm Sewers 2005 Inlet Section (Line 15 - Combination Inlet) - cb 129 SII dimansions. in faet Line 15 -Combination Inlet on Grade -r -b12-9, Page 1 of 1 Line # Catch (cfs) 15 0.03 Q Inlet Gutter Depth Spread Byp Carry (cfs) Capt (cfs) Byp (cfs) Length (ft) Depr (in) Throat (in) Width (ft) Slope (ft/ft) SW (ft/ft) Sx (ft/ft) Gutter (ft) Inlet (ft) Gutter (ft) Inlet (ft) Line (ft) 0.00 0.03 0.00 3.00 2.00 5.0 2.00 0.010 0.042 0.020 0.04 0.06 1.07 0.61 10 Project File: No. Lines: 37 Run Date: 05-09-2016 Hydraflow Storm Sewers 2005 Inlet Section (Line 1 - Combination Inlet) - cb 101 All dimens.ions in feet Lisle 18 - Combination Inlet in Sag - r -b 130 Page 1 of 1 Line # Catch (cfs) 18 1.50 Q Inlet Gutter Depth Spread Byp Carry (cfs) Capt (cfs) Byp (cfs) Length (ft) Depr (in) Throat (in) Width (ft) Slope (ft/ft) SW (ft/ft) Sx (ft/ft) Gutter (ft) Inlet (ft) Gutter (ft) Inlet (ft) Line (ft) 0.00 1.50 0.00 3.00 2.00 5.0 2.00 Sag 0.042 0.020 0.06 0.18 1.37 1.74 Sag Project File: No. Lines: 37 Run Date: 05-09-2016 Hydraflow Storm Sewers 2005 Inlet Section (Line 21 - Combination Inlet) - cb 131 All dimensions. in feet Line # Catch (cfs) 21 0.73 L Carry Capt (cfs) (cfs) 0.00 0.73 0.11 Lisle 21 - Combin tion Inlet in fag -cb 131 2.0 Page 1 of 1 Project File: I No. Lines: 37 Run Date: 05-09-2016 Hydraflow Storm Sewers 2005 Inlet Gutter Depth Spread Byp Byp (cfs) Length (ft) Depr (in) Throat (in) Width (ft) Slope (ft/ft) SW (ft/ft) Sx (ft/ft) Gutter (ft) Inlet (ft) Gutter (ft) Inlet (ft) Line (ft) 0.00 3.00 2.00 5.0 2.00 Sag 0.042 0.020 -0.01 0.11 -0.30 1.06 Sag Project File: I No. Lines: 37 Run Date: 05-09-2016 Hydraflow Storm Sewers 2005 Inlet Section (Line 16 - Combination Inlet) - cb 110 All d imen sio n s. in feet Line 1�-Combination Inlet on Grade -cb 110 Page 1 of 1 Line # Catch (cfs) 16 1.58 Q Inlet Gutter Depth Spread Byp Carry (cfs) Capt (cfs) Byp (cfs) Length (ft) Depr (in) Throat (in) Width (ft) Slope (ft/ft) SW (ft/ft) Sx (ft/ft) Gutter (ft) Inlet (ft) Gutter (ft) Inlet (ft) Line (ft) 0.22 1.31 0.49 3.00 2.00 5.0 2.00 0.020 0.042 0.020 0.18 0.26 6.85 4.87 11 Project File: No. Lines: 37 Run Date: 05-09-2016 Hydraflow Storm Sewers 2005 Inlet Section (Line 19 - Combination Inlet) - cb 111 All dimens.ions in feet Line 19 - Combination Inlet on Grade - r -b 111 Page 1 of 1 Line # Catch (cfs) 19 1.43 Q Inlet Gutter Depth Spread Byp Carry (cfs) Capt (cfs) Byp (cfs) Length (ft) Depr (in) Throat (in) Width (ft) Slope (ft/ft) SW (ft/ft) Sx (ft/ft) Gutter (ft) Inlet (ft) Gutter (ft) Inlet (ft) Line (ft) 0.00 1.11 0.32 3.00 2.00 5.0 2.00 0.020 0.042 0.020 0.17 0.25 6.20 3.97 13 Project File: No. Lines: 37 Run Date: 05-09-2016 Hydraflow Storm Sewers 2005 Inlet Section (Line 22 - Combination Inlet) - cb 112 All dimensions. in feet Line # Catch (cfs) 22 0.13 L Carry Capt (cfs) (cfs) 0.00 0.13 Line 22 -Combination Inlet on Grade -cb 112 0.1 2.01 Page 1 of 1 Project File: No. Lines: 37 Run Date: 05-09-2016 Hydraflow Storm Sewers 2005 Inlet Gutter Depth Spread Byp Byp (cfs) Length (ft) Depr (in) Throat (in) Width (ft) Slope (ft/ft) SW (ft/ft) Sx (ft/ft) Gutter (ft) Inlet (ft) Gutter (ft) Inlet (ft) Line (ft) 0.00 3.00 2.00 5.0 2.00 0.022 0.042 0.020 0.07 0.10 1.71 0.98 19 Project File: No. Lines: 37 Run Date: 05-09-2016 Hydraflow Storm Sewers 2005 Inlet Section (Line 23 - Combination Inlet) - cb 113 All dimens.ions in feet Line 23 - Combination Inlet on Grade - eb 113 Page 1 of 1 Line # Catch (cfs) 23 0.44 Q Inlet Gutter Depth Spread Byp Carry (cfs) Capt (cfs) Byp (cfs) Length (ft) Depr (in) Throat (in) Width (ft) Slope (ft/ft) SW (ft/ft) Sx (ft/ft) Gutter (ft) Inlet (ft) Gutter (ft) Inlet (ft) Line (ft) 0.00 0.44 0.00 3.00 2.00 5.0 2.00 0.040 0.042 0.020 0.10 0.14 2.80 1.36 22 Project File: No. Lines: 37 Run Date: 05-09-2016 Hydraflow Storm Sewers 2005 Inlet Section (Line 24 - Combination Inlet) - cb 114 All d imen sio n s. in faet Line 24 -Combination Inlet on Grade -eb114 Page 1 of 1 Line # Catch (cfs) 24 1.14 Q Inlet Gutter Depth Spread Byp Carry (cfs) Capt (cfs) Byp (cfs) Length (ft) Depr (in) Throat (in) Width (ft) Slope (ft/ft) SW (ft/ft) Sx (ft/ft) Gutter (ft) Inlet (ft) Gutter (ft) Inlet (ft) Line (ft) 0.20 1.12 0.22 3.00 2.00 5.0 2.00 0.040 0.042 0.020 0.15 0.21 5.15 2.32 16 Project File: No. Lines: 37 Run Date: 05-09-2016 Hydraflow Storm Sewers 2005 Inlet Section (Line 17 - Combination Inlet) - cb 123 All d imen sio n s. in faet Line 17 -Combination Inlet on Grade -eb123 Page 1 of 1 Line # Catch (cfs) 17 1.68 Q Inlet Gutter Depth Spread Byp Carry (cfs) Capt (cfs) Byp (cfs) Length (ft) Depr (in) Throat (in) Width (ft) Slope (ft/ft) SW (ft/ft) Sx (ft/ft) Gutter (ft) Inlet (ft) Gutter (ft) Inlet (ft) Line (ft) 0.52 1.58 0.63 3.00 2.00 5.0 2.00 0.030 0.042 0.020 0.18 0.26 6.85 4.87 12 Project File: No. Lines: 37 Run Date: 05-09-2016 Hydraflow Storm Sewers 2005 Inlet Section (Line 20 - Combination Inlet) - cb 124 All d imen sio n s. in faet Line 20 -Combination Inlet on Grade -eb124 Page 1 of 1 Line # Catch (cfs) 20 2.23 Q Inlet Gutter Depth Spread Byp Carry (cfs) Capt (cfs) Byp (cfs) Length (ft) Depr (in) Throat (in) Width (ft) Slope (ft/ft) SW (ft/ft) Sx (ft/ft) Gutter (ft) Inlet (ft) Gutter (ft) Inlet (ft) Line (ft) 1.08 2.09 1.21 3.00 2.00 5.0 2.00 0.030 0.042 0.020 0.21 0.30 8.10 6.52 14 Project File: No. Lines: 37 Run Date: 05-09-2016 Hydraflow Storm Sewers 2005 Inlet Section (Line 25 - Combination Inlet) - cb 125 All dimens.ions in feet Line 25 - Combination Inlet on Grade - cb 125 Page 1 of 1 Line # Catch (cfs) 25 1.63 Q Inlet Gutter Depth Spread Byp Carry (cfs) Capt (cfs) Byp (cfs) Length (ft) Depr (in) Throat (in) Width (ft) Slope (ft/ft) SW (ft/ft) Sx (ft/ft) Gutter (ft) Inlet (ft) Gutter (ft) Inlet (ft) Line (ft) 0.34 1.45 0.52 3.00 2.00 5.0 2.00 0.030 0.042 0.020 0.17 0.26 6.50 4.42 17 Project File: No. Lines: 37 Run Date: 05-09-2016 Hydraflow Storm Sewers 2005 Inlet Section (Line 28 - Combination Inlet) - cb 126 All dimensions. in faet Line 213 -Combination Inlet on Grade -eb12.6 Page 1 of 1 Line # Catch (cfs) 28 2.36 Q Inlet Gutter Depth Spread Byp Carry (cfs) Capt (cfs) Byp (cfs) Length (ft) Depr (in) Throat (in) Width (ft) Slope (ft/ft) SW (ft/ft) Sx (ft/ft) Gutter (ft) Inlet (ft) Gutter (ft) Inlet (ft) Line (ft) 0.71 1.99 1.08 3.00 2.00 5.0 2.00 0.030 0.042 0.020 0.20 0.29 7.85 6.22 20 Project File: No. Lines: 37 Run Date: 05-09-2016 Hydraflow Storm Sewers 2005 Inlet Section (Line 26 - Combination Inlet) - cb 132 All dimens.ions in feet Line 2� - Combination Inlet on Grade - eb 132 Page 1 of 1 Line # Catch (cfs) 26 0.52 Q Inlet Gutter Depth Spread Byp Carry (cfs) Capt (cfs) Byp (cfs) Length (ft) Depr (in) Throat (in) Width (ft) Slope (ft/ft) SW (ft/ft) Sx (ft/ft) Gutter (ft) Inlet (ft) Gutter (ft) Inlet (ft) Line (ft) 0.01 0.52 0.00 3.00 2.00 5.0 2.00 0.050 0.042 0.020 0.10 0.14 2.95 1.39 18 Project File: No. Lines: 37 Run Date: 05-09-2016 Hydraflow Storm Sewers 2005 Inlet Section (Line 29 - Combination Inlet) - cb 133 All dimens.ions in feet Line 2-9 - Combination Inlet on Grade - eb 13a Page 1 of 1 Line # Catch (cfs) 29 0.44 Q Inlet Gutter Depth Spread Byp Carry (cfs) Capt (cfs) Byp (cfs) Length (ft) Depr (in) Throat (in) Width (ft) Slope (ft/ft) SW (ft/ft) Sx (ft/ft) Gutter (ft) Inlet (ft) Gutter (ft) Inlet (ft) Line (ft) 0.09 0.53 0.00 3.00 2.00 5.0 2.00 0.050 0.042 0.020 0.10 0.15 2.95 1.40 Offsite Project File: No. Lines: 37 Run Date: 05-09-2016 Hydraflow Storm Sewers 2005 Inlet Section (Line 27 - Combination Inlet) - cb 115 All dimensions. in faet Line 27 - Combination Inlet on Grade - eb 115 Page 1 of 1 Line # Catch (cfs) 27 0.16 Q Inlet Gutter Depth Spread Byp Carry (cfs) Capt (cfs) Byp (cfs) Length (ft) Depr (in) Throat (in) Width (ft) Slope (ft/ft) SW (ft/ft) Sx (ft/ft) Gutter (ft) Inlet (ft) Gutter (ft) Inlet (ft) Line (ft) 0.00 0.16 0.00 3.00 2.00 5.0 2.00 0.070 0.042 0.020 0.06 0.09 1.48 0.83 23 Project File: No. Lines: 37 Run Date: 05-09-2016 Hydraflow Storm Sewers 2005 Inlet Section (Line 30 - Combination Inlet) - cb 116 All dimensions in feet Line M- - Combination Inlet on Grade - cb 116 Page 1 of 1 Line # Catch (cfs) 30 1.48 Q Inlet Gutter Depth Spread Byp Carry (cfs) Capt (cfs) Byp (cfs) Length (ft) Depr (in) Throat (in) Width (ft) Slope (ft/ft) SW (ft/ft) Sx (ft/ft) Gutter (ft) Inlet (ft) Gutter (ft) Inlet (ft) Line (ft) 0.00 1.27 0.20 3.00 2.00 5.0 2.00 0.070 0.042 0.020 0.14 0.20 4.70 1.93 24 Project File: No. Lines: 37 Run Date: 05-09-2016 Hydraflow Storm Sewers 2005 Inlet Section (Line 31 - Combination Inlet) - cb 127 All dimensions. in faet Line 31 - Combination Inlet on Grade - eb 127 Page 1 of 1 Line # Catch (cfs) 31 1.48 Q Inlet Gutter Depth Spread Byp Carry (cfs) Capt (cfs) Byp (cfs) Length (ft) Depr (in) Throat (in) Width (ft) Slope (ft/ft) SW (ft/ft) Sx (ft/ft) Gutter (ft) Inlet (ft) Gutter (ft) Inlet (ft) Line (ft) 0.00 1.14 0.34 3.00 2.00 5.0 2.00 0.024 0.042 0.020 0.16 0.24 6.00 3.72 25 Project File: No. Lines: 37 Run Date: 05-09-2016 Hydraflow Storm Sewers 2005 Inlet Section (Line 34 - Combination Inlet) - cb 128 All dimensions. in faet Line 34 - Combination Inlet on Grade - eb 128 Page 1 of 1 Line # Catch (cfs) 34 2.28 Q Inlet Gutter Depth Spread Byp Carry (cfs) Capt (cfs) Byp (cfs) Length (ft) Depr (in) Throat (in) Width (ft) Slope (ft/ft) SW (ft/ft) Sx (ft/ft) Gutter (ft) Inlet (ft) Gutter (ft) Inlet (ft) Line (ft) 0.00 1.57 0.71 3.00 2.00 5.0 2.00 0.024 0.042 0.020 0.19 0.28 7.25 5.47 28 Project File: No. Lines: 37 Run Date: 05-09-2016 Hydraflow Storm Sewers 2005 Inlet Section (Line 32 - Combination Inlet) - cb 134 SII dimansilans in feet Line 32 -Combination Inlet on Grade -eb134 Page 1 of 1 Line # Catch (cfs) 32 0.52 Q Inlet Gutter Depth Spread Byp Carry (cfs) Capt (cfs) Byp (cfs) Length (ft) Depr (in) Throat (in) Width (ft) Slope (ft/ft) SW (ft/ft) Sx (ft/ft) Gutter (ft) Inlet (ft) Gutter (ft) Inlet (ft) Line (ft) 0.01 0.53 0.01 3.00 2.00 5.0 2.00 0.050 0.042 0.020 0.10 0.15 2.95 1.40 26 Project File: No. Lines: 37 Run Date: 05-09-2016 Hydraflow Storm Sewers 2005 Inlet Section (Line 35 - Combination Inlet) - cb 135 All d imen sio n s. in faet Line 35 -Combination Inlet on Grade -eb135 Page 1 of 1 Line # Catch (cfs) 35 0.52 Q Inlet Gutter Depth Spread Byp Carry (cfs) Capt (cfs) Byp (cfs) Length (ft) Depr (in) Throat (in) Width (ft) Slope (ft/ft) SW (ft/ft) Sx (ft/ft) Gutter (ft) Inlet (ft) Gutter (ft) Inlet (ft) Line (ft) 0.28 0.71 0.09 3.00 2.00 5.0 2.00 0.024 0.042 0.020 0.13 0.19 4.50 1.87 29 Project File: No. Lines: 37 Run Date: 05-09-2016 Hydraflow Storm Sewers 2005 Inlet Section (Line 33 - Combination Inlet) - cb 117 All dimensions. in faet Line 33 - Combination Inlet on Grade - eb 117 Page 1 of 1 Line # Catch (cfs) 33 0.28 Q Inlet Gutter Depth Spread Byp Carry (cfs) Capt (cfs) Byp (cfs) Length (ft) Depr (in) Throat (in) Width (ft) Slope (ft/ft) SW (ft/ft) Sx (ft/ft) Gutter (ft) Inlet (ft) Gutter (ft) Inlet (ft) Line (ft) 0.00 0.28 0.00 3.00 2.00 5.0 2.00 0.070 0.042 0.020 0.08 0.11 1.83 1.05 27 Project File: No. Lines: 37 Run Date: 05-09-2016 Hydraflow Storm Sewers 2005 Inlet Section (Line 36 - Combination Inlet) - cb 136 All dimens.ions in feet Line 36 - Combination Inlet on Grade - eb 136 Page 1 of 1 Line # Catch (cfs) 36 0.60 Q Inlet Gutter Depth Spread Byp Carry (cfs) Capt (cfs) Byp (cfs) Length (ft) Depr (in) Throat (in) Width (ft) Slope (ft/ft) SW (ft/ft) Sx (ft/ft) Gutter (ft) Inlet (ft) Gutter (ft) Inlet (ft) Line (ft) 0.00 0.58 0.01 3.00 2.00 5.0 2.00 0.040 0.042 0.020 0.11 0.16 3.40 1.53 32 Project File: No. Lines: 37 Run Date: 05-09-2016 Hydraflow Storm Sewers 2005 Inlet Section (Line 37 - Combination Inlet) - cb 137 All d imen sio n s. in faet Line 3T -Combination Inlet on Grade -eb137 Page 1 of 1 Line # Catch (cfs) 37 1.48 Q Inlet Gutter Depth Spread Byp Carry (cfs) Capt (cfs) Byp (cfs) Length (ft) Depr (in) Throat (in) Width (ft) Slope (ft/ft) SW (ft/ft) Sx (ft/ft) Gutter (ft) Inlet (ft) Gutter (ft) Inlet (ft) Line (ft) 0.00 1.20 0.28 3.00 2.00 5.0 2.00 0.040 0.042 0.020 0.15 0.22 5.35 2.72 35 Project File: No. Lines: 37 Run Date: 05-09-2016 Hydraflow Storm Sewers 2005 Section 31 FIRE -POST DIE VIDIJO FIMENII STORMWATERJ RUNOFF ANU RIO UT ING DATA CA IJCULATIO NS Jond an Man c CSI 11 /20/201 _ Apem, North Caroilina SIbirmwaiter Run -Off Data (On -Sika o nly] Eatisling Conditional : 1121.10 = Tolal C rods Areia (Aa 1.00 — lmpeirvious Area (Au.) 1155 = C Ieareic - glramed (Am.; 106.55 = Wooded (Am.; Type C 0.17 = Coml1osite Runaff Cloeff. (Cc) Imp. I C ras;ied 0._15 Wooded 0.25 hirci-Mmelower11 NRCE Rcinoff Values Conilributory Com pasiteRun- Area Off Ca 121.10 (1.17 NRIC c CN llable Wooded 77 C ultivatod 80 Im (l iOLS 98 Composite Composite NRCS h [m pervious (°/a) CN (1.01 78 Jordan Manlors Ap(m, Nor1H Carolina Stcirmvealer Run -Off Dalai Existing Conditions Total: (Pre-D(melcipment� 4 i 111/2016 Are -Dem l Year 2 Year 51 year 1C yeat 251 year 5C year 1C0 year Ruin -off (cfs) 38.32 47.51 118.95 188.61 307.711 391.06 485.28 Proposed Ccinditlicins ToltIaL (Bast-Dlevelaipmentl) BMP A] Past-Dcm Rhin -aff cfs 1 'hear 2 Year 51 year ]IO year 25 yeat 510 yeay 1 1100 year 0.18 0.23 1.54 1(1.02 28.29 51.18 MIA BMP h2 Past-Dev Hun-aff cfs 1 Year :1.87 2 Year -.1.419 5 yeat 19.25 10 year 20.83 2_'I yeat 22.412 510 year 31.031 100 yeat 43.04 BMP 43 Post-Dev Rhin-aff cfs 1 Year 0.19 2 hear 0.24 5 yeat 6.6E 10 year 251 year 510 ycar 100 yeai 23.05 4141.08 83.76 123.8 BMP 44 Host-Dev Run-off (cfs) ]I Year 0.0E 2 Year (1.(17 51 year 0.54 10 yeat 41.13 2 51 year 24111 510 ycar :12.51 100 year 39.93 Pcst-17em 11 Year 2 Year 51 year 10 ycar 251 year 510 year 10C year Run-ofll(cfs) 24.44 30.67 7(1.17 11051.27 174.17 2151.18 265.831 Total Past-Dfim 1 Year 2 Year 51 year 110 year 251 year 50 year 100 year Hun -aff(cfs) 1 27.8 341.8 98.7E 1(7.9 2514.71 423.66 `.65.92 Hydrograph Plot Hydraflow Hydrographs by lntelisolve Hyd. No, 1 Curve number Pre-Dev Hydraulic length Hydrograph type = SCS Runoff Storm frequency = 2 yrs Drainage area = 121.100 ac Basin Slope = 0.7% Tc method = KIRPICH Total precip. = 2.20 in Storm duration = 24 hrs Pre-Dev Hyd. No. 1 -- 2 Yr Thursday, Nov 5 2015, 8:5 AM Peak discharge = 47.90 cfs Time interval = 4 min Curve number = 78 Hydraulic length = 5020 ft Time of cont, (Tc) = 37.26 min Distribution = Type II Shape factor = 484 Hydrograph Volume = 253,983 tuft 40.00 30.00 20,00 10.00 a.Oa 0 3 5 $ 11 Hyd No. 1 Q (Cfs) 50M 40.00 30.00 20.00 10.00 o.oa 13 16 19 21 24 27 Time (hrs) Hydrograph Plot Hydraflow Hydrographs by Intelisolve Thursday, Nov 5 2015. &5 AM Hyd. No. I Pre-Dev Hydrograph type = SCS Runoff Peak discharge = 118.95 cfs Storm frequency = 5 yrs Time interval = 4 min Drainage area = 121.100 ac Curve number = 78 Basin Slope = 0.7% Hydraulic length = 5020 ft Tc method = KIRPICH Time of cone. (TO = 37.26 min Total precip. = 3.30 in Distribution = Type IG Storm duration = 24 hrs Shape factor = 484 Q (Cfs) 120.00 100.00 80.00 s0M 40.00 20.00 0.00 0 3 5 8 Hyd No. 1 Hydrograph Volume = 592,183 Cuft Pre-Dev Hyd. No. 1 -- 5 Yr Q (Cfs) 120.00 100.00 40.00 20.00 a.aa 11 13 15 19 21 24 27 Time (hrs) Hydrograph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. 1 Pre-Dev Hydrograph type = SCS Runoff Storm frequency = 10 yrs Drainage area = 121.100 ac Basin Slope = 0.7% Tc method = KIRPICH Total precip. = 4,25 in Storm duration = 24 hrs Q (cfs) 210.00 180.00 150.00 120.00 90.00 60.40 30.00 0.00 0 3 5 8 Hyd No. 1 Pre-Dev Hyd. No. 1 -- 10 Yr Thursday, Nov 5 2015, 8:5 RM Peak discharge = 188.61 cfs Time interval = 4 min Cure number = 78 Hydraulic length = 5020 ft Time of cone. (Tc) = 37.26 min Distribution = Type Il Shape factor = 484 Hydrograph Volume = 917,901 cult 1 s0. ©a 150.00 120.00 30.00 0.00 11 13 16 19 21 24 27 Time (hrs) Hydrograph Plot Hydraflow Hydrographs by fnWisoive Hyd. No. 1 Pre-Dev Hydrograph type = SCS Runoff Storm frequency = 25 yrs Drainage area = 121.100 ac Basin Slope = 0.7% Tc method = KIRPICH Total precip. = 5.77 in Storm duration = 24 hrs Q (of s) 320.00 280.00 240.00 200.00 160.00 120.00 80.00 40.00 0.00 0 Thursday, Nov 5 2015, 8:5 AIM Peak discharge = 307.71 cfs Time interval = 4 min Curve number = 78 Hydraulic length = 5020 ft Time of cone. (Tc) = 37.216 min Distribution = Type II Shape factor = 484 Hydrograph Volume = 1,484,297 cuff Pre-Dev Hyd. No. 1 -- 25 Yr 3 5 8 11 13 16 19 21 24 Hyd No. 1 Q (cfs) 320.00 280.00 240.00 200.00 160.00 120.00 80.00 40.00 0.00 27 Time (hrs) Hydrograph Plot Hydraflow Hydrographs by Intelisolve Hyd. No, I Pre-Dev Hydrograph type = SCS Runoff Storm frequency = 50 yrs Drainage area = 121.100 ac Basin Slope = 0.7% Tc method = KIRPICH Total precip. = 6.80 in Storm duration = 24 hrs Q (Cfs) 420.00 360.00 300.00 240.00 180.00 12.0.00 60.00 0.00 0 3 5 8 11 Hyd No. 1 Thursday, Nov 5 2015, 8:5 AM Peak discharge = 391.06 cfs Time interval = 4 min Curve number = 78 Hydraulic length = 5020 ft Time of cone. (Tc) = 37.26 min Distribution = Type Il Shape factor = 484 Hydrograph Volume = 1,887,523 tuft (ire-Dev Hyd. Na. 1 -- 50 Yr Q {cfs} 420.00 360.00 300.00 240.00 180.00 120.00 0.00 13 16 19 21 24 27 Time {hrs} Hydrograph Plot Hydraflow Hydrographs by Inteiisoive Thursday, Nov 5 2015, 8;5 AM Hyd. No. 1 Pre-Dev Hydrograph type = SCS Runoff Peak discharge = 485.28 cfs Storm frequency = 100 yrs Time interval = 4 min Drainage area = 121.100 ac Curve number = 78 Basin Slope = 0.7 % Hydraulic length = 5020 ft Tc method = KI'RPICH Time of conc. (Tc) = 37.26 min Total precip. = 7.95 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 490.{]0 420.00 350.00 280.00 210.00 140.00 70.00 0.00 0 3 5 8 Hyd No. 1 Hydrograph Volume = 2,349,548 cult Pre-Dev Hyd. No. 1 -- 100 Yr Q (cfs) 490.00 420.00 350,00 280.00 210.40 140.00 70.00 0.00 11 13 16 19 21 24 27 Time (hrs) Hydrograph Plot HydraFlow Hydrographs by Intelisolve Wednesday, May 11 2016,2:5 PM Hyd. No. 4 Pond 1 Routing Hydrograph type = Reservoir Peale discharge = 0.23 cfs Storm frequency = 2 yrs Time interval = 4 min Inflow hyd. No. = 2 Max. Elevation = 258.07 ft Reservoir name = Pond 1 Max. Storage = 159,417 cuft Storage Indication method used. Vliet pond routing start elevation = 256.00 ft. Q (cfs) 35.00 30.00 25.00 20.00 15.00 10.00 5.00 0.00 0 19 Hyd No. 4 Pond 1 Routing Hyd. No. 4 -- 2 Yr Hydrograph Volume = 75.234 cult 39 58 77 97 115 135 155 174 Hyd No. 2 fM I 1 1 Req. Stor = 159,417 cult Q (cfs) 35,00 30.00 25.00 20.00 15.00 10.00 5.00 coo 193 Time (hrs) Hydrograph Plot Hydraflow Hyd rographs by Intelisolve Wednesday, May 112016, 2:6 PM Hyd. No. 4 Pond 1 Routing Hydrograph type = Reservoir Peak discharge = 1.54 cfs Storm frequency = 5 yrs Time interval = 4 min Inflow hyd. No. = 2 Max. Elevation = 259.06 ft Reservoir name = Pond 1 Max. Storage = 195,854 cult Storage Indication method used. Wet pond routing start elevation = 256.00 ft. Hydrograph Volume = 136,072 tuft Pond 1 Routing Hyd. No. 4 -- 5 Yr 50.00 40.00 30.00 20.00 10.00 0.00 0 19 Hyd No. 4 39 58 77 97 116 135 165 174 Hyd No. 2 11 1 1 1 1 1 Req. Star = 196,854 cuft Q (cfs) 60.00 50.00 40.00 30.00 10.00 0.00 193 Time (hrs) Hydrograph Plot Hydraflow Hydrographs by Intelisolve Wednesday, May 11 2016, 2:6 PM Hyd. No. 4 Pond 1 Routing Hydrograph type = Reservoir Peak discharge = 11.02 cfs Storm frequency = 10 yrs Time interval = 4 min Inflow hyd. No. = 2 Max. Elevation = 259.28 ft Reservoir name = Pond 1 Max. Storage = 205„583 cult Storage Indication method used. Wet pond routing start elevation = 256.00 tt. Q (cfs) 80.00 70.00 60.00 501.00 40.00 30.00 20.00 10.00 0.00 0 15 Hyd No. 4 Hydrograph Volume = 193,364 tuft Pond 1 Routing Hyd. No. 4 10 Yr Q (cfs) 80.00 70.00 60,00 50.00 40.00 30.00 20.00 10.00 0.0{7 77 92 107 123 138 153 Time (hrs) 1 1 1 1 1 1 Req. Stor = 205,683 cuft 31 46 61 Hyd No. 2 Hydrograph Plot Hydraflow Hydrographs by Intelisolve Wednesday, May 11 2018, 2:6 PM Hyd. No. 4 Pond 1 'Routing Hydrograph type = Reservoir Peak discharge = 2 8.2 9 cfs Storm frequency = 25 yrs Time interval = 4 min Inflow hyd, No. = 2 Max. Elevation = 260.26 ft Reservoir name = Pond 1 Max. Storage = 246,660 cult Storage Indication method used. Wet pond routing start elevation = 256.00 ft. Pond 1 Routing Hyd. No. 4 -- 25 Yr Hydrograph Volume = 287,483 cult 100,00 :m 40.00 20.00 0.00 0 3 Hyd No. 4 5 8 11 13 16 19 21 Hyd No. 2 1-1.1 1 1 1 Req. Stor = 246,660 cuff Q (cfs) 120.00 100.00 40.00 20.00 000 24 27 Time (hrs) Hydrograph Plot Hydraflow Hydrographs by intelisolve Wednesday, May 11 2016,2:7 PM Hyd. No. 4 Pond 1 Routing Hydrograph type = Reservoir Peak discharge = 87,18 cfs Storm frequency = 50 yrs Time interval = 4 min Inflow hyd, No. = 2 Max. Elevation = 260.77 ft Reservoir name = Pond 1 Max. Storage = 268,903 cuff Storage Indication method used. Wet pond routing start elevation = 256.00 ft. Hydrograph Volume = 352,206 cult Q (cfs) 140,00 120.00 100.00 .1 i1 40.00 20.00 0.00 0 3 Hyd No. 4 Pond 1 Routing Hyd. No. 4 -- 50 Yr 5 8 11 13 16 19 21 Hyd No. 2 SCI Req. Stor = 268,903 cuft Q (Cf S) 140.00 120.00 100.00 40.00 20.00 o. Qo 24 27 Time (hrs) Hydrograph Plot Hydraflow Hydrographs by Inteiisolve Wednesday, May 11 2016.2:7 PM Hyd. No. 4 Pond 1 Routing Hydrograph type = Reservoir Peak discharge = 89.32 cfs Storm frequency = 100 yrs Time interval = 4 min Inflow hyd, No. = 2 Max. Elevation = 261.18 ft Reservoir name = Pond 1 Max. Storage = 287,252 tuft Storage Indication method used. Wet pond routing start elevation = 256.00 ft. Q (cfs) 180.00 - 160.00 140.00 120.00 100.00 80.00 60.00 40.00 20.00 0.00 0 3 Hyd No. 4 Pond 1 Routing Hyd, No. 4 -- 100 Yr Hydrograph Volume = 424,999 cult 5 8 11 13 16 19 21 24 Hyd No. 2 U=J i Req. Stor = 287,252 cuft Q (cfs) 180.00 160.00 140.00 120.00 100.00 80.00 60.00 40.00 20.00 0.00 27 Time (hrs) Hydrograph Plat Hydraflow Hydrographs by Intelisolve Monday, Nov 9 2015, 130 PM Hyd. No. 5 Pond 2 Routing Hydrograph type = Reservoir Peak discharge = 3.59 cfs Storm frequency = 2 yrs Time interval = 2 min Inflow hyd. No. = 3 Max. Elevation = 264.55 ft Reservoir name = Pond 2 Max. Storage = 39,625 cuft Storage Indication method used. Wet pond routing start elevation = 263.50 ft. Q (cfs) 14.00 12.00 10.00 MI AM 4.00 2.00 Pond 2 Routing Hyd. No. 5 -- 2 Yr Hydrograph Volume = 26,179 cuff Q (cfs) 14.00 12.00 10.00 :IM we] 4.00 2.00 0.00 -1 1r r 0.00 0 6 12 18 24 30 36 42 48 54 60 Hyd No. 5 Hyd No. 3 ir1= Req. Stor = 39,025 cuff Time (hrs) Hydrograph Plat Hydraflow Hydrographs by Intelisolve Monday, Nov 9 2015, 3:30 PM Hyd. Na 5 Pond 2 Routing Hydrograph type = Reservoir Peak discharge = 19,25 cfs Storm frequency = 5 yrs Time interval = 2 min Inflow hyd. No. = 3 Max. Elevation = 254.93 ft Reservoir name = Pond 2 Max. Storage = 43,649 tuft Storage Indication method used. Wet pond routing start elevation = 263.50 ft. Hydrograph volume = 50,430 cult Pond 2 Routing Hyd. No. 5 w- 5 Yr 24.00 20.00 16.00 12.00 8.00 4.00 0.0a 0 2 5 7 9 Hyd No. 5 Hyd No. 3 Q (cfs) 28.00 24.00 20.00 16.00 12.00 MN 4.00 0.00 12 14 16 19 21 23 26 Time (hrs} Req. Star = 43,649 cult Hydrograph plat Hydraflow Hydrographs by Intelisolve Hyd, No. 5 Pond 2 Routing Hydrograph type = Reservoir Storm frequency = 10 yrs Inflow hyd. No. = 3 Reservoir name = Pend 2 Storage Indication method used. Wet pond routing start elevation = 263.50 ft. 0 (Gfs) 40.00 30.00 20M 10.00 Pond 2 Routing Hyd. No. 5 -- 10 Yr ,Monday, Nov 9 2015, 3:30 PM Peak discharge = 20.83 cfs Time interval = 2 min Max. Elevation = 265.30 ft Max. Storage = 48,718 cuft Hydrograph Volume = 72,728 cuff 2 5 7 9 12 14 16 19 21 Hyd No. 5 Hyd No. 3 LJI; J-1 Req. Stor = 48,718 tuft 23 0 (cfs) 40.00 30.00 20.00 10.00 0.00 26 Time (hrs) Hydrograph Plot Hydraflaw Hydrographs by lntelisolve Monday, Nov 9 2015, 3:31 PM Hyd. No. 5 Pond 2 Routing Hydrograph type = Reservoir Peak discharge = 22.52 cfs Storm frequency = 25 yrs Time interval = 2 min Inflow hyd. No. = 3 Max. Elevation = 266.04 ft Reservoir name = Pond 2 Max. Storage = 59,158 tuft Storage Indication method used. Wet pond routing start elevation = 263.50 h. Q (cfs) 60.00 50.00 40.00 30.00 20.00 10.00 0.00 0 2 5 Hyd No. 5 Pond 2 Routing Hyd. No. 5 -- 25 Yr Hydrograph Volume = 109,674 cuff 7 9 12 14 16 19 21 Hyd No. 3 OU -011 I Req. Stor = 59,158 cuft Q (cfs) 60.00 50.00 40.00 30.00 20.00 10.00 0.00 23 26 Time (hrs) Hydrograph Plot Hydraflow Hydrographs by Cntelisolve Monday, Nov 9 2015. 3:31 PM Hyd. No. 5 Pond 2 Routing Hydrograph type = Reservoir Peak discharge = 31.03 cfs Storm frequency = 50 yrs Time interval = 2 min Inflow hyd. No. = 3 Max. Elevation = 266.46 ft Reservoir name = Pond 2 Max. Storage = 65,549 tuft Storage Indication method used. Wet pond routing start elevation = 263.64 ft. Hydrograph Volume = 135,211 tuft Pond 2 Routing Hyd. No. 5 -- 50 Yr 60.00 50.00 40.00 30.00 20.00 10.00 0.00 0 2 5 7 9 12 Hyd No. 5 Hyd No. 3 0 (cfs) 70.00 .M MM 40.00 30.00 20.00 10.00 0.00 14 16 19 21 23 26 Time (hrs) [L[1 Req. Stor = 65,549 cuff Hydrograph Plot Hydraflow Hydrographs by Intelisolve Monday, Nov 9 2015, 3:31 PM Hyd. No. 5 Pond 2 Routing Hydrograph type = Reservoir Peak discharge = 43.04 cfs Storm frequency = 100 yrs Time interval = 2 min Inflow hyd. No. = 3 Max. Elevation = 266.83 ft Reservoir name = Pond 2 Max. Storage = 71,177 cult Storage Indication method used. Wet pond routing start elevation = 263.50 ft. Hydrograph Volume = 164,006 cult Pond 2 Routing Hyd. No. 5 -- 100 Yr 70,00 60.00 50.00 40.00 30.00 20.00 10.00 0.00 0 2 5 7 9 Hyd No. 5 Hyd No. 3 Q (cfs) 80.00 70.00 60.00 50.00 40.00 30.00 20.00 10.00 0.00 12 14 16 19 21 23 26 Time (hrs) U-111_I_U_i Req. Stor = 71,177 cult Hydrograph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. 8 Pond 3 Routing Hydrograph type = Reservoir Storm frequency = 2 yrs Inflow hyd. No. = 6 Reservoir name = Pond 3 Storage Indication method used. wet pond routing start elevation = 254.00 ft. Pond 3 Routing Hyd. No. 8 -- 2 Yr Monday, Nov 9 2015, 3:31 PM Peals discharge = 0.24 cfs Time interval = 4 min Max. Elevation = 256.30 ft Max. Storage = 242,621 cult Hydrograph Volume = 100,946 tuft •1 !R 30.00 20.00 10.00 19 39 58 77 97 116 135 155 174 Hyd No. 8 Hyd No. 6 IFFEELI_i l Rea. Stor = 242,621 tuft 40.00 30.00 20.00 10.00 0.00 193 Time (hrs) Hydrograph Plot Hyd rafIow Hydrograp hs 6y Intelisolve Monday, Nov 9 2015, 3:31 PM Hyd. No. S Pond 3 Routing Hydrograph type = Reservoir Peak discharge = 6.66 cfs Storm frequency = 5 yrs Time interval = 4 min Inflow hyd. No. = 6 Max. Elevation = 256.71 ft Reservoir name = Pond 3 Max. Storage = 262,031 cult Storage Indication method used. Wet pond routing start elevation = 254.00 ft. Pond 3 Routing Hyd. No. 8 -- 5 Yr Hydrograph Volume = 187,601 cult 70.00 60.00 50.00 40.00 30.00 20.00 10.00 a, on 0 19 39 58 77 Hyd No. 8 Hyd No. 6 Q (cfs) 80.00 70.00 60.00 50.00 40.00 30.00 20.00 10.00 0.00 97 116 135 155 374 193 Cf1-f 1] Req. Stor = 262,031 cuff Time (hrs) Hydrograph Piot Hydrafiow Hydrographs by lntelisolve Monday, Nov 9 2015, 3:31 PM Hyd. No. 8 Pond 3 Routing Hydrograph type = Reservoir Peak discharge = 23.05 cfs Storm frequency = 10 yrs Time interval = 4 min Inflow hyd. No. = 6 Max. Elevation = 257.29 ft Reservoir name = Pond 3 Max. Storage = 290,765 cuft Storage lndicatlon method used. Wet pond routing start elevation = 254.00 R. Hydrograph Volume = 268,192 cult Q (cfs) 120.00 100.00 :M EM 20.00 ©.00 0 Pond 3 Routing Hyd. No. 8 -- 10 Yr 5 9 14 19 23 28 33 37 42 47 Hyd No. 8 Hyd No. 6 11 FJMJ Req. Stor = 290,765 tuft Q (cfs) 120.00 100.00 40.00 20,00 0.00 51 Time (hrs) Hydrograph Plot Hydraflow Hydrographs by Intelisolve Monday, Nov 9 2015, 3:31 PM Hyd. No. 8 Pond 3 Routing Hydrograph type = Reservoir Peak discharge = 45.08 cfs Storm frequency = 25 yrs Time interval = 4 min Inflow hyd. No. = 5 Max. Elevation = 258.53 ft Reservoir name = Pond 3 Max. Storage = 355,211 cuff Storage Indication method used. Wet pond routing start elevation = 254.00 ft. Q (cfs) 160.00 140.00 120,00 100.00 80.00 60.00 40.00 20.00 0.00 0 Pond 3 Routing Hyd, No. 8 -- 25 Yr Hydrograph Volume = 400,594 cult 3 5 8 11 13 16 19 21 24 — Hyd No. 8 Hyd No. 6 [TTTT.7 111 Req. Stor = 355,211 cuft Q (cfs) 160.04 140.00 120.00 100.00 80.00 60.04 40.00 20.00 0.00 27 Time (hrs) Hydrograph Plot Hydraflow Hydrographs by Intelisoive Monday, Nov 9 2015, 3:31 PM Hyd. No. 8 Pond 3 Routing Hydrograph type = Reservoir Peak discharge = 83.76 cfs Storm frequency = 50 yrs Time interval = 4 min Inflow hyd, No. = 6 Max. Elevation = 259,08 ft Reservoir name = Pond 3 Max. Storage = 384,909 cuft Storage Indication method used. Wet pond routing start elevation = 254.00 ft. Hydrograph Volume = 491,647 tuft Q (cfs) 2.10.00 180.00 150.00 120.00 •r it 30.00 0.00 0 3 Hyd No. 8 Pond 3 Routing Hyd. No. 8 -- 50 Yr 5 8 11 13 16 19 21 24 Hyd No. 6 111111) I 1 Req. Stor = 384,909 cult Q (cfs) 210.00 180.00 150.00 120.00 30.00 0.00 27 Time (hrs) Hyd rag raph Plot Hydraflow Hydrographs by Inteliso'lve Monday, Nov 9 2015, 3:31 PM Hyd. No. S Pond 3 Routing Hydrograph type = Reservoir Peak discharge = 123.80 cfs Storm frequency = 100 yrs Time interval = 4 min Inflow hyd. No. = 6 Max. Elevation = 259.52 ft Reservoir name = Pond 3 Max. Storage = 410,461 tuft Storage Indication method used. wet pond routing start elevation = 254.00 ft. Q (cfs) 240. UU 210.00 180.00 150.00 120.00 90.00 60.00 30.00 o.00 0 Pond 3 Routing Hyd. No. 8 -- 100 Yr Hydrograph Volume = 594,053 cuft 3 5 8 11 13 16 19 21 24 Hyd No. 8 Hyd No. 6 U-LLIJTI I Req. Stor = 410,461 cuft Q (cfs) 240.00 210.00 180.00 150.00 120.00 90.00 60.00 30.00 0.00 27 Time (hrs) Hydrograph Plot Hydraflow Hydrographs by Intefsolve Monday, Nov 9 2095, 3:29 PM Hyd. No. 10 Pond 4 Routing Hydrograph type = Reservoir Peak discharge = 0.07 cfs Storm frequency = 2 yrs Time interval = 4 min Inflow hyd. No. = 7 Max. Elevation = 261.12 ft Reservoir name = Pond 4 Max. Storage = 56,342 cult Storage Indication method used. Wet pond routing start elevation = 259.50 ft. Hydrograph Volume = 24,030 cuft Q (cfs) 12.00 10.00 MR . it 4.00 2.00 Pond 4 Routing Hyd. No. 10 -- 2 Yr 19 39 58 77 97 116 135 155 174 Hyd No. 10 Hyd No. 7 CITFM f l Req. Stor = 56,342 cu ft 10.00 ri E M 4M 2.00 a.00 193 Time (hrs) Hydrograph Plot Hydra►low Hydrographs by Intelisolve Monday, N'ov 9 2015, 3:29 PM Hyd. No. 10 135 155 Hyd No. 10 Pond 4 Routing 11 1 1.1 1 1 IL; Req. Stor = 66,915 tuft Hydrograph type = Reservoir Peak discharge = 0.54 cfs Storm frequency = 5 yrs Time interval = 4 min Inflow hyd. No. = 7 Max. Elevation = 261.80 ft Reservoir name = Pond 4 Max. Storage = 66,915 cuft Storage 'Indication method used. Wet pond routing start elevation = 259.50 ft, Hydrograph Volume = 43,622 cult Pend 4 Routing Hyd. No. 10 -- 5 Yr 15.00 12.00 • it WC 3.00 19 39 58 77 97 116 135 155 Hyd No. 10 Hyd No. 7 11 1 1.1 1 1 IL; Req. Stor = 66,915 tuft 174 Q (cfs) 18.00 15.00 - 12.00 3.00 0.00 193 Time (hrs) Hydrograph Plot Hydraflow Hydrographs by Intelisolve Monday, Nov 9 2015, 3:29 PM Hyd. No. 10 Pond 4 Routing Hydrograph type = Reservoir Peak discharge = 4.73 cfs Storm frequency = 10 yrs Time interval = 4 min Inflow hyd. No. = 7 Max. Elevation = 261.99 ft Reservoir name = Pond 4 Max. Storage = 69,792 tuft Storage Indication method used. 'Wet pond routing start elevation = 259.50 ft. Q (cfs) 28.00 24.00 20.00 16.00 12.00 ra r 4.00 0.00 0 Pond 4 Routing Hyd. No. 10 -- 10 Yr Hydrograph Volume = 61,813 cuft Q (cfs) 28.00 24.00 20.00 12.00 M 4.00 0.00 11 23 34 45 57 68 79 91 102 113 125 Hyd No. 10 Hyd No. 7 M.JJJ i Req. Stor = 69,792 cuff Time (hrs) Hydrograph Plot Hydraflow Hyd rographs by Intel isolve Hyd. No. 10 Pond 4 Routing Hydrograph type = Reservoir Storm frequency = 25 yrs Inflow hyd. No. = 7 Reservoir name = Pond 4 Storage Indication method used. Wet pond routing start elevation = 259.50 ft. Q (cfs) 40.00 30.00 20.00 10.00 Pond 4 Routing Hyd, No. 10 -- 25 Yr Monday, Nov 9 2015, 3:29 PM Peak discharge = 24.65 cfs Time interval = 4 min Max. Elevation = 262.36 ft Max. Storage = 76,013 tuft Hydrograph Volume = 91,700 cuft 3 5 8 11 13 1E 19 21 24 Hyd No. 10 Hyd No. 7 B=111 Req. Scor= 78,013 cuff Q (cfs) 40.00 30.00 20.00 0.00 27 Time (hrs) Hydrograph Plot Hyd raflow Hyd rograp hs by Intel iso lve Monday, Nov 9 2015, 129 PM Hyd. No. 10 Pond 4 Routing Hydrograph type = Reservoir Peak discharge = 3151 cfs Storm frequency = 50 yrs Time interval = 4 min Inflow hyd. No. = 7 Max. Elevation = 262.58 ft Reservoir name = Pond 4 Max. Storage = 79,532 cult Storage Indication method used. Wet pond routing start elevation = 259.50 ft. Hydrograph Volume = 112,252 cult Q (cfs) 50.00 40.00 30.00 20.00 10.00 Pond 4 Routing Hyd, No. 10 -- 50 Yr 3 5 8 11 13 16 19 21 24 Hyd NQ. 10 Hyd No. 7 Illllllll Req. Star = 79,532 cult Q (cfs) 50.00 40.00 20.00 BE 0.00 27 Time (hrs) Hydrograph Plot Hydraflow Hydrographs by Intelisolve Monday, Nov 9 2015, 3:29 I'M Hyd, No, 10 Pond 4 Routing Hydrograph type = Reservoir Peak discharge = 39.93 cfs Storm frequency = 100 yrs Time interval = 4 min Inflow hyd, No. = 7 Max. Elevation = 2612,79 ft Reservoir name = Pond 4 Max. Storage = 83,100 tuft Storage Indication method used. Wet pond routing start elevation = 259.50 ft. Hydrograph Volume = 135,367 tuft Pond 4 Routing Hyd, No. 10 -- 100 Yr 50.00 40.00 30.00 20.00 10.00 0.00 0 3 Hyd No. 10 5 8 11 13 16 19 21 Hyd No. 7 11 1 1 1 1 1 11 Req. Stor = 83,100 cuff 24 Q (cfs) 60.00 50.00 40.00 30.00 20.00 O.00 27 Time (hrs) Hydrograph Plot Hydraflow Hydrographs by Intelisolve Friday, Nov 6 2015, 2:56 PM Hyd. No. 9 Remaining Site Area Hydrograph type = SCS Runoff Peak discharge = 30.617 cfs Storm frequency = 2 yrs Time interval = 4 min Drainage area = 64.760 ac Curve number = 80 Basin Sfope = 0.7% Hydraulic length = 5020 ft Tc method = KIRPICH Time of cone. (Tc) = 37.2E min Total precip. = 2.20 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 35.00 30.00 25.00 20.00 15.00 10.00 5.00 0.00 0 3 5 8 Hyd No. 9 Hydrograph Volume = 161,756 cult Remaining Site Area Hyd. No, 9 -- 2 Yr Q (cfs) 35.00 30.00 25.00 20.00 15.00 10.00 5.00 0.00 11 13 16 19 21 24 27 Time (hrs) Hydrograph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. 9 Remaining Site Area Hydrograph type = SCS Runoff Storm frequency = 5 yrs Drainage area = 64.760 ac Basin Slope = 0.7% Tc method = KIRPICH Total precip. = 3.30 in Storm duration = 24 hrs Q (cfs) sa.00 70.00 60.00 50.00 40.00 30.00 20.00 10.00 0.00 0 Friday, Nov 6 2015, 2:56 FM Peak discharge = 70.77 cfs Time interval = 4 min Curve number = 80 Hydraulic length = 5020 ft Time of cane. (Tc) = 37.26 min Distribution = Type II Shape factor = 484 Hydrograph Volume = 347,739 cuff Remaining Site Area Hyd. No. 9 -- 5 Yr 3 5 8 11 13 16 19 21 -- Hyd No. 9 Q (cfs) 80.00 70.00 60.00 50.00 40.00 30.00 20.00 10.00 0.00 24 27 Time (hrs) 56 F S 27 c Ql 12� I& IMM 40 20 O.0 (hr Hydrograph Plot Hydraflow Hydrographs by IMelisolve Hyd. No. 9 Curve number Remaining Site Area Hydraulic length Hydrograph type = SCS Runoff Storm frequency = 100 yrs Drainage area = 64.760 ac Basin Slope = 0.7% Tc method = KIRPICH Total precip. = 7.95 in Storm duration = 24 hrs Q (cfs) 280.00 240.00 200.00 160.00 120.00 80.00 40.00 n.Oa 0 3 5 8 Hyd No. 9 Friday, Nov 6 2015, 2:57 PM Peak discharge = 269.83 cfs Time interval = 4 min Curve number = 80 Hydraulic length = 5020 ft Time of cone. (Tc) = 37.26 min Distribution = Type lI Shape factor = 484 Hydrograph Volume = 1,311,302 tuft Remaining Site Area Hyd, No. 9 -- 100 Yr Q (cfs) 280.00 240.00 200.00 160.00 124.00 40.00 0.00 11 13 16 19 21 24 27 Time (hrs) Jo rdain Manors IINew Hill Olive Chapell Road, Apex, NC) Downstream Stlarmwratler Impacts In accordance with 1lhe repluire ri cif Seatien 6.1 of the Mown cif Apex's ICIO rEiaeiving mileraoL rse! dowr <itiieam cif Jcirdan Mancirs were evaluateid to deiile,rmine 1 hEi location cf pc inis at which the cciriilributony atie a within Jcirdar Marcuis is leis than 10% cif lihe tcillal ccirtributleiry area. This point is designated as (tlhE "10%i ploiniP";. Fein Jorcar Manors, this pciint is onsite,, and isi deipictEc on the acccirrpanyiing Exhibill eirtitled"101A gcint Exhibit". THe Ili poiril is IocallEe along Liiltle BEaver CreEk aplproximatEly 31000f'EE1t (as nrEasured alcngl 11HE sitream) west of New Hill CHVE CHapel Rciad. The ccintlriftliciry area atilhei analysis pcirtl is 1,544 acres. ThE tollal area of Jorcar Mancirs is apprcximallely 121 acres,, cir aboull E.21%o1 llhE tleital corilributory area all the analysis poiril. An exHibitl is attached depicilingl ilHese areas. VE rEceivinglwatericciursEieciwnstlrearr ofJcrdar Mancirs isicharaclleriaed by well-defined cHarnels,, establishes fllooc plains,, and relatively 11at longitudinal channel sleipE_i cif less tH an % 'Y. The ar alysis point which was eivaluatE c is at thei farilHE sil downstream extents ciflJordar Mancirs. llhisi poinil is onsite cue tici the flact thattifiel properilies comprising Jordan Manors are wholly ceintribuilory ilci the analysis p oinll, and the ticital area cif icirc an Mancirs is less ilhar 1CI% of the tectal contributory basin arEia. THe Silormwatler Man ageirrE r tl Fllan for Jar d an N ar ors corn rr its lie emp Iciy ing BE sitl Van agErT E nll PraCCCe9 to ensurE thall at no poi nil cif) c ischargE along) tlHE pro,jecll perimetE r, shall the AEak ratE of stormwateir runciflfelxcEEIc the peak ralle eifstarmwallEir runofflassociated wit[ pre -developed conditions. nuc[ measurEis adereiss storm events fcirtfle 1-yEiar, 24-hour; 10-yEiar, 24-hour; & 2151 -year, 24 -Hour storms. As such, nci sEglrrents of sitrearr channel cowrsllreiam of Jordan Mancrs will be subjected Ile increased ratles of stormwatler flow as a result of the develeiprrEnt cii.lordan Manors,, and nci neglatlive impacts related to flooding or channel sllabilitly are 2nlliaipatlec. `\,`i111'r11/,j,,� —M r X e -- w c D za) _ Cl) hCG o Note: Jordan Manors is located within Creedmore & White Store Soils, designated as Hydrologic Soils Group D Existing Conditions Total: (Pre -Development) A Storm a ter rumo-OffData (Cln-Site Oniv) ---------- f F xis t � Conditions 1.10 T BOUNDARY ;''PROJECT 13OUND - ------ I.UQ n kmpei =t Am L -le j - C�1_-d ---a CA�j ------ - -- - -- 11 I06M W..&A 0.1 ------ -------- T�_P' C U C.M.'teR. L '7 Pm -D eyelanment N RCS RmGff Va Cm b'd_y C..W_iwR_0ff CnompaSGte C. pan. NRCS CN IjUa 'WeDded -,7 90 99 ---------- ------ ------- ---------- V :7-: J-1, ---------- - - - -------- 7 ------ F" 0 An 'z A ---------------- V % ------ — — — — — j �7 - ---------- - ANALYSIS POINT 13 UN - ---------- - DARY PR T 0 sN "R 0JF_U - ----- - ----- I'M Z, - ----- Pre-Development 25 Year - 24 Hour Stormwater Run -Off Exhibit for Jordan Manor Apex North Carolina 01 400' Boo, 1200' I INCH = 400 FT Pre-DevI Year 2 Year 5 Wear 10 year 25 year 50 year 100 year Run-off (CfS) 38.32 47.9 118.95 188.61 307.71 391.06 485.28 A Storm a ter rumo-OffData (Cln-Site Oniv) ---------- f F xis t � Conditions 1.10 T BOUNDARY ;''PROJECT 13OUND - ------ I.UQ n kmpei =t Am L -le j - C�1_-d ---a CA�j ------ - -- - -- 11 I06M W..&A 0.1 ------ -------- T�_P' C U C.M.'teR. L '7 Pm -D eyelanment N RCS RmGff Va Cm b'd_y C..W_iwR_0ff CnompaSGte C. pan. NRCS CN IjUa 'WeDded -,7 90 99 ---------- ------ ------- ---------- V :7-: J-1, ---------- - - - -------- 7 ------ F" 0 An 'z A ---------------- V % ------ — — — — — j �7 - ---------- - ANALYSIS POINT 13 UN - ---------- - DARY PR T 0 sN "R 0JF_U - ----- - ----- I'M Z, - ----- Pre-Development 25 Year - 24 Hour Stormwater Run -Off Exhibit for Jordan Manor Apex North Carolina 01 400' Boo, 1200' I INCH = 400 FT Note: Jordan Manors is located v6thin Creedmore & White Store Soils, designated as InIP Contributor- Area Brealcdonn 2 Year 5 near 10 sear 25 near 50 sear 100 near 27.8 34.8 Oji- 167.9 294.71 423.66 565.92 37 BMP 3 037 48.97 Hydrologic Soils Group D I BMP 4 057 48.76 89 Remaining Asea 0.27 1216 SO area Run-OffCoeffrimt %Impemous NRCSCane#CN RV 0.73 9rea R`ithin RP1V Urea Within Area'45`itmn Rec. Area'4'1`itmn OlS 9reaWithm (YS 9rea (7H -site I©tal @utriI)utorr- OiSCleared 0.25 5.00 SO Lots (,kc) site (.kc) Cleared(.1c) Uncleared (.3c) {.3c} area(.4c) so 89 i BN.IP 1 4.73 11.75 0.00 2.16 0.00 038 19.02 r > Bh>g 2 1.43 1.80 2.05 1.40 0.02 0.90 759 - BNIP 3 BNIP 4 6.41 1.71 1536 3.08 0.00 0.00 3.33 1.13 0.00 0.00 1.65 0.13 26.76 6,04 ? ] i h Rerrtamng Site Area 2,65 9.56 0.13 13.84 38.57 0.00 64.76 r, `"-+---=r-=ter .,,� }', "`• Total On -Site Areas 16.93 4155 3.17 21.86 38.59 ----__--- -<=�=r-s•-, I � 1 Ft lii Total Site Area 121.10 Proposed Conditions Total: (Post -Development) Total Post -Des° Run-off(cfs) 1 Year 2 Year 5 near 10 sear 25 near 50 sear 100 near 27.8 34.8 1 98.76 167.9 294.71 423.66 565.92 --------------- S_11PRun-0ff Coefficient (Cc) Calculation Contrtlulrr- Area Composite Run-off Composite Composite MRCS# Cc Imperciuus(45) CN BNIP 1 060 51.95 59 BNIP 2 051 40.65 37 BMP 3 037 48.97 89 BMP 4 057 48.76 89 Remaining Asea 0.27 1216 SO area Run-OffCoeffrimt %Impemous NRCSCane#CN RV 0.73 70.00 93 Lots 0.62 55.00 90 OiSCleared 0.25 5.00 SO O'S Uncleared & off-site 0.15 0.00 77 Recreation Site 0.59 50.00 89 NRCS CN Table Wooded 77 Culmated 80 .. "1L'u5 98 Post -Development 25 Year - 24 Hour Stormwater Run -Off Exhibit for Jordan Manor Apex North Carolina 0' 400' 800' 1200' 1 INCH = 400 FT