HomeMy WebLinkAbout20140957 Ver 1_FERC Consultation for FAST-41 Update_20161116Burdette, Jennifer a
From: Nicholas Tackett <Nicholas.Tackett@ferc.gov>
Sent: Wednesday, November 16, 2016 8:02 AM
To: david.gouveia@noaa.gov; jennifer.goebel@noaa.gov; david.bernhart@noaa.gov;
fritz.rohde@noaa.gov; andrew.herndon@noaa.gov; michelle.lennox@noaa.gov;
USDOI-NPS ANSI- (mary_c_krueger@nps.gov); mark_woods@nps.gov;
herbertyouungsjr@nps.gov; sheila_gasperson@nps.gov; mark.a.taylor@usace.army.mil;
adam.e.fannin@usace.army.mil; jon.t.coleman@usace.army.mil;
josh ua.d.shaffer@usace.army.mi1; william.t.walker@usace.army.mil;
peter. r.kube@usace.army.mi1; steven.w.gibson@usace.army.mil;
scott.c.mclendon@usace.army.mil; craigj.brown@usace.army.mil;
tyler.crumbley@usace.army.mil; emily.b.hughes@usace.army.mil;
John_Schmidt@fws.gov; barbara_douglas@fws.gov; elizabeth_stout@fws.gov;
troy_andersen@fws.gov; john_hammond@fws.gov; john_ellis@fws.gov;
lora_zimmerman@fws.gov; melinda_turner@fws.gov; jenniferpadams@fs.fed.us;
afaught@fs.fed.us; jobeth brown @fs.fed.us; klandgraf@fs.fed.us;
cnthompson@fs.fed.us; djclark@fs.fed.us; wwilson@fs.fed.us; kkarriker@fs.fed.us;
laura.mckay@deq.virginia.gov; Willets, William; Higgins, Karen; Burdette, Jennifer a;
susan.m.pierce@wv.gov; julie.langan@dhr.virginia.gov;
roger.kirchen@dhr.virginia.gov; Bartos, Ramona; Gledhill-earley, Renee;
smcdougal@pa.gov; patrick.v.campbell@wv.gov; wilma.reip@wv.gov;
conniej.anderson@wv.gov; joseph.w.cochran@wv.gov; john.m.perkins@wv.gov;
janine.howard@deq.virginia.gov; Bettina.Sullivan@deq.virginia.gov; Reeder, Tom;
aroda@pa.gov; melanie.davenport@deq.virginia.gov; dave.davis@deq.virginia.gov;
steven.hardwick@deq.virginia.gov; frederick.cunningham@deq.virginia.gov; Bennett,
Bradley; Holley, John; beverly.d.mckeone@wv.gov; carrie.mccumbers@wv.gov; WV -
DEP - (Nancy.J.Dickson@wv.gov); Fewell, David R (David. R.FewelI@wv.gov);
michael.dowd@deq.virginia.gov; tamera.thompson@deq.virginia.gov;
Bettina.Sullivan@deq.virginia.gov; Butler, Patrick; Hall, Steve; blair.aaronM@epa.gov;
McCurdy.Alaina@epa.gov; joe.t.scarberry@wv.gov; Angela.M.Woolard@dom.com;
Matthew.R.Bley@dom.com; dougl79@dom.com; bill.williams@piedmontng.com;
heather.sagar@noaa.gov; Elizabeth_Klein@ios.doi.gov; edward.e.belk.civ@mail.mil;
lisa.mensah@osec.usda.gov; Wilson.Shari@epa.gov
Subject: RE: FERC Consultation for FAST -41 -Atlantic Coast Pipeline, Supply Header, and Lease
Project
Attachments: Updated -Atlantic Coast Project Permitting Timetable.xlsx
Good morning,
Thank you for providing feedback on the Coordinated Project Plan and Permitting Timetable for the Project. I am
attaching a spreadsheet displaying the latest version of the Permitting Timetable. Please submit any additional comments
by the end of this week. I plan to post the Permitting Timetable on the publicly available Dashboard beginning next week,
November 22�d.
In addition to the notes provided in the attached spreadsheet, all state authorizations will be accompanied by the
following note: "[State agency] has not chosen to participate in the FAST -41 process. This authorization is listed for
information purposes only, and does not transfer any responsibility to the [state agency] to conform to the Permitting
Timetable."
Feel free to call with any questions you might have.
Nicholas Tackett
Federal Energy Regulatory Commission
888 1st Street NE ( Washington, DC 20426
202-502-6783 ( niich€ llas.taakeffiter- 1 -1 -
From: Nicholas Tackett
Sent: Friday, November 04, 2016 2:10 PM
To: david.gouveia@noaa.gov; jennifer.goebel@noaa.gov; david.bernhart@noaa.gov; mark_woods@nps.gov;
herbertyouung_jr@nps.gov; sheila_gasperson@nps.gov; mark.a.taylor@usace.army.mil; adam.e.fannin@usace.army.mil;
jon.t.coleman@usace.army.mil; joshua.d.shaffer@usace.army.mil; william.t.walker@usace.army.mil;
peter.r.kube@usace.army.mil; steven.w.gibson@usace.army.mil; scott.c.mclendon@usace.army.mil;
craig.j.brown @usace.army. mi1; tyler.crumbley@usace.army.mil; emily.b.hughes@usace.army.mil;
John _Schmidt@fws.gov; barbara_douglas@fws.gov; elizabeth_stout@fws.gov; troy_andersen@fws.gov;
john_hammond@fws.gov; john_ellis@fws.gov; lora _zimmerman@fws.gov; melinda_turner@fws.gov; tspeaks@fs.fed.us;
afaught@fs.fed.us; jobeth brown @fs. fed. us; klandgraf@fs.fed.us; cnthompson@fs.fed.us; djclark@fs.fed.us;
wwilson@fs.fed.us; kkarriker@fs.fed.us; laura.mckay@deq.virginia.gov; william.willets@ncdenr.gov;
karen.higgins@ncdenr.gov; jennifer.burdette@ncdenr.gov; susan.m.pierce@wv.gov; julie.langan@dhr.virginia.gov;
roger.kirchen@dhr.virginia.gov; ramona.bartos@ncdcr.gov; renee.gledhill-earley@ncdcr.gov; smcdougal@pa.gov;
patrick.v.campbell@wv.gov; wilma.reip@wv.gov; connie.j.anderson@wv.gov; joseph.w.cochran@wv.gov;
john.m.perkins@wv.gov; janine.howard@deq.virginia.gov; tom.reeder@ncdenr.gov; dd ra ke@dep. state. pa. us;
melanie.davenport@deq.virginia.gov; dave.davis@deq.virginia.gov; steven.hardwick@deq.virginia.gov;
frederick.cunningham@deq.virginia.gov; andrew.hammond@deq.virginia.gov; brad ley. ben nett@ ncden r. gov;
john.holley@ncdenr.gov; david.lee@ncdenr.com; james.p.fedczak@wv.gov; beverly.d.mckeone@wv.gov;
carrie.mccumbers@wv.gov; michael.dowd@deq.virginia.gov; tamera.thompson@deq.virginia.gov;
patrick.butler@ncdenr.gov; steve.hall@ncdenr.gov; bhatch@pa.gov; blair.aaronM@epa.gov; McCurdy.Alaina@epa.gov;
joe.t.scarberry@wv.gov; Angela. M.Woolard@dom.com; Matthew. R.Bley@dom.com; dougl79@dom.com;
bill.williams@piedmontng.com; heather.sagar@noaa.gov; Elizabeth_Klein@ios.doi.gov; edward.e.belk.civ@mail.mil;
lisa.mensah@osec.usda.gov; Wilson.Shari@epa.gov
Subject: FERC Consultation for FAST -41 -Atlantic Coast Pipeline, Supply Header, and Lease Project
To whom it may concern -
On December 4, 2015, the President signed into law the Fixing America's Surface Transportation (FAST) Act. Title 41 of
the FAST Act (FAST -41) requires additional oversight and coordination of project reviews, with the goal of improving early
consultation and coordination between government agencies. On September 22, 2016, the Executive Director of the
Federal Infrastructure Permitting Improvement Steering Council finalized an inventory of projects covered by FAST -
41. Included on that list is the Atlantic Coast Pipeline, Atlantic Coast Pipeline Amendment, Supply Header, and ACP -
Piedmont Lease Project (Project).
In compliance with section 41003(c) of FAST -41, staff of the Federal Energy Regulatory Commission (FERC) has drafted a
Coordinated Project Plan and Permitting Timetable for the Project. FERC staff is now seeking consultation with
cooperating and participating agencies on the attached Coordinated Project Plan and Permitting Timetable. Under FAST -
41, a "participating agency" is an agency participating in an environmental review or authorization for a covered
project. A "cooperating agency" is any agency with: (1) jurisdiction under federal law, or (2) special expertise with
respect to an environmental issue. We are also seeking consultation with the project sponsor and relevant state resource
agencies on the Permitting Timetable, and are seeking the concurrence of each cooperating agency on the Permitting
Timetable.
FERC staff has identified you as a representative of a consulting entity, and is seeking feedback on the attached document
by no later than the close of business on November 14, 2016. Please submit any such feedback via email to
Nicholas.Tackett@ferc.gov, and feel free to contact me with any procedural questions regarding the FAST -41 consultation
process. FERC's rules prohibit off-the-record communications regarding the merits of contested proceedings. See 18
C.F.R. § 385.2201.
Please forward this email, as needed, to agency representatives with decision-making authority on the applicable
authorization or review being carried out by your agency. Absent a response from your agency, FERC staff must assume
that this portion of FAST -41 consultation is complete and that you concur with the attached document, under such
circumstances, we will use best -available information to estimate completion dates for your review/authorization.
The President's Office of Management and Budget has requested that this Coordinated Project Plan and the associated
Permitting Timetable be uploaded to max.gov and the Permitting Dashboard, respectively, by November22, 2016.
Thanks in advance for your attention to this matter, and again, if you have any questions, please contact me.
File: Atlantic Coast Project CPP.docx >>
Nicholas Tackett
Federal Energy Regulatory Commission
888 1st Street NE ( Washington, DC 20426
202-502-6783 ( niich€ llas.taakatU&I—o1-1-
Permitting Timetable for Atlantic Coast Pipeline, Atlantic
Coast Pipeline Amendment, Supply Header, and ACP -Piedmont Lease
Responsible Federal Agency
Federal Permit/Review
Intermediate
Completion Date
Final Completion
Date
Federal Energy Regulatory Commission
Certificate of Public Convenience and Necessity for
Interstate Natural Gas Pipelines
N/A
TBD*
Federal Energy Regulatory Commission
National Environmental Policy Act (NEPA) Compliance
(Draft/Final NEPA documents)
12/30/2016
6/30/2017
Federal Energy Regulatory Commission
NEPA Compliance Cont'd (Record of decision, as issued
with final FERC certificate order)
N/A
TBD*
NOAA-NMFS, Southeast Region
Endangered Species Act Consultation (DOC)
N/A
11/12/2017
National Park Service, Blue Ridge Parkway
Non -Impairment Determination (separate from NPS
permit)
N/A
9/28/2017**
National Park Service, Blue Ridge Parkway
NPS Permit
N/A
9/28/2017**
U.S. Army Corps of Engineers, Huntington
Clean Water Act Section 404 Permit
N/A
9/28/2017**
U.S. Army Corps of Engineers, Huntington
Section 10 Permit
N/A
9/28/2017**
U.S. Army Corps of Engineers, Pittsburgh
Clean Water Act Section 404 Permit
N/A
9/28/2017**
U.S. Army Corps of Engineers, Pittsburgh
Section 10 Permit
N/A
9/28/2017**
U.S. Army Corps of Engineers, Norfolk
Clean Water Act Section 404 Permit
N/A
9/28/2017**
U.S. Army Corps of Engineers, Norfolk
Section 10 Permit
N/A
9/28/2017**
U.S. Army Corps of Engineers, Wilmington
Clean Water Act Section 404 Permit
N/A
9/28/2017**
U.S. Army Corps of Engineers, Wilmington
Section 10 Permit
N/A
9/28/2017**
U.S. Fish and Wildlife Service, WV
Endangered Species Act Consultation (DOI)
N/A
9/28/2017**
U.S. Fish and Wildlife Service, VA
Endangered Species Act Consultation (DOI)
N/A
9/28/2017**
U.S. Fish and Wildlife Service, NC
Endangered Species Act Consultation (DOI)
N/A
9/28/2017**
U.S. Fish and Wildlife Service, PA
Endangered Species Act Consultation (DOI)
N/A
9/28/2017**
U.S. Forest Service, GW Forest and Appalachian Trail
Si- ecial Use Permit (FS)
N/A
9/28/2017**
U.S. Forest Service, Monongahela NF
[SpecialUse Permit (FS)
N/A
9/28/2017**
*According to 18 C.F.R. § 3c. 2(b), "The nature and time of any proposed action by the Commission are confidential and shall not be divulged to anyone
outside of the Commission. The Secretary of the Commission has the exclusive responsibility and authority for authorizing the initial public release of
information concerning Commission proceedings. "
**The final completion dates are calculated according to 18 C.F.R. § 157.22 (2016), which provides that "a final decision on a request for a Federal
authorization is due no later than 90 days after the Commission issues its final environmental document, unless a schedule is otherwise established by
Federal law. "
Amended
according to
11/10/2016
email from
NMFS 11/12/2017
Permitting Timetable for Atlantic Coast Pipeline, Atlantic
Coast Pipeline Amendment, Supply Header, and ACP -Piedmont Lease
Intermediate
Final Completion
Responsible State Agency
Federal Permit/Review
Completion Date
Date
Virginia Department of Environmental Quality,
Coastal Zone Management Program
Section 307 CZMA Review
N/A
9/28/2017**
North Carolina Department of Environment and
Natural Resources
Section 307 CZMA Review
N/A
9/28/2017**
West Virginia Division of Culture and History
Section 106 NHPA Cultural Resources Review
N/A
9/28/2017**
Virginia Department of Historical Resources
Section 106 NHPA Cultural Resources Review
N/A
9/28/2017**
North Carolina State Historic Preservation Office
Section 106 NHPA Cultural Resources Review
N/A
9/28/2017**
Pennsylvania Historical and Museum Commission,
Bureau for Historic Preservation
Section 106 NHPA Cultural Resources Review
N/A
9/28/2017**
West Virginia Department of Environmental
Protection, Division of Water and Waste Management
Section 401 CWA Review - Water Quality Certification
N/A
9/28/2017**
Virginia Department of Environmental Quality, Water
Division
Section 401 CWA Review - Water Quality Certification
N/A
9/28/2017**
North Carolina Department of Environment and
Natural Resources, Division of Water Resources
Section 401 CWA Review - Water Quality Certification
N/A
9/28/2017**
Pennsylvania Department of Environmental
Protection, Bureau of Point and Non -Point Source
Management
Section 401 CWA Review - Water Quality Certification
N/A
9/28/2017**
West Virginia Department of Environmental
Section 402 CWA Review - National Pollutant Discharge
Protection, Division of Water and Waste Management
Elimination System, Stormwater General Permit
N/A
9/28/2017**
Virginia Department of Environmental Quality, Water
Section 402 CWA Review - National Pollutant Discharge
Division
Elimination System, Stormwater General Permit
N/A
9/28/2017**
North Carolina Department of Environment and
Natural Resources - Division of Energy, Mineral, and
Section 402 CWA Review - National Pollutant Discharge
Land Resources
Elimination System, Stormwater General Permit
N/A
9/28/2017**
West Virginia Department of Environmental
Section 402 CWA Review - National Pollutant Discharge
Protection, Division of Water and Waste Management
Elimination System, Hydrostatic Test Discharge Permit
N/A
9/28/2017**
Virginia Department of Environmental Quality, Water
Section 402 CWA Review - National Pollutant Discharge
Division
Elimination System, Hydrostatic Test Discharge Permit
N/A
9/28/2017**
Pennsylvania Department of Environmental
Protection, Bureau of Point and Non -Point Source
Section 402 CWA Review - National Pollutant Discharge
Management
Elimination System, Hydrostatic Test Discharge Permit
N/A
9/28/2017**
West Virginia Department of Environmental
Protection, Division of Air Quality
Title V CAA Review - Operating Permit for Air Emissions
N/A
9/28/2017**
Virginia Department of Environmental Quality, Air
Division
Title V CAA Review - Operating Permit for Air Emissions
N/A
9/28/2017**
North Carolina Department of Environment and
Natural Resources - Division of Air Quality
Title V CAA Review - Operating Permit for Air Emissions
N/A
9/28/2017**
Pennsylvania Department of Environmental
Protection, Bureau of Air Quality
Title V CAA Review - Operating Permit for Air Emissions
N/A
9/28/2017**
**The final completion dates are calculated according to 18 C.F.R. § 157.22 (2016), which provides that "a final decision on a request for a Federal
authorization is due no later than 90 days after the Commission issues its final environmental document, unless a schedule is otherwise established by
Federal law. "
1I Xwo
National Oceanic and Atmospheric Administration
(NOAA) — National Marine Fisheries Service
(NMFS), Northeast Region
Endangered Species Act Consultation (DOC)
N/A
9/28/2017**
Removed
according to
11/10/2016
email from
David Bernhart