Loading...
HomeMy WebLinkAbout20080634 Ver 1_Approval Letter_20080616O?O? W A rFR?G o` Mr. Gary W. Loflin 7229 Bridlewood Drive Trinity, NC 27370 Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Coleen H. Sullins, Director Division of Water Quality June 16, 2008 DWQ# 08-0634 Randolph County APPROVAL of 401 Water Quality Certification with Additional Conditions Dear. Mr. Loflin, You have our approval, in accordance with the attached conditions, to place temporarily fill in 30 linear feet of stream, in order construct a temporary sewer line crossing for the Steeplegate North residential subdivision located near Trinity, NC in Randolph County, as described in your application received by the Division of Water Quality (Division) on April 4, 2008 and additional information received May 21, 2008. After reviewing your application, we have determined that this fill is covered by General Water Quality Certification Number 3699, which can be viewed on our web site at http•//www.ncwatelqualiiy.org/wetlands.html. This Certification allows you to use Nationwide Permit Number 12 when it is issued by the U.S. Army Corps of Engineers. In addition, you should secure any other applicable federal, state or local permits before you proceed with your project, including (but not limited to) those required by Sediment and Erosion Control, Non-Discharge, and Water Supply Watershed regulations. Also, this approval will expire when the accompanying 404 permits expire unless otherwise specified in the General Certification. This approval is valid only for the purpose and design that you have described in your application. If you change your project, you must notify us in writing, and you may be required to send us a new application for a new certification. If the property is sold, the new owner must be given a copy of the Certification and approval letter and is thereby responsible for complying with all conditions. If total wetland fill for this project (now or in the future) exceeds one acre, or total fill to perennial streams equals or exceeds 150 linear feet, additional compensatory mitigation may be required as described in 15A NCAC 2H .0506 (h). For this approval to be valid, you must follow the conditions listed in the attached certification, as well as the additional conditions listed below: 1. The following additional impacts are hereby approved as long as all other specific and general conditions of this Certification are met. No other impacts, including incidental impacts, are approved: Identifier Impact length Little Uwharrie River - temporaryimpact 30 linear feet 2. Upon finishing the project, the Applicant shall fill out and return the enclosed "Certificate of Completion" to notify NCDWQ when all work included in the §401 Certification has been completed. This certificate should be returned to the Winston-Salem Regional Office of the NC Division of Water Quality at the address listed on the form. Along with the Certificate of Completion, please send photographs showing the restored stream reach. Noe Carolina Nawally North Carolina Division of Water Quality 585 Waughtown Street Phone (336) 771-5000 Customer Service Winston-Salem Regional Office Winston-Salem, NC 27107 Fax (336) 771-4630 1-877-623-6748 Internet: www.ncwaterguality.org An Eoual Opportunity/Affirmative Action Employer- 50% Recycledl10% Post Consumer Paper Mr. Gary Loftin June 16, 2008 DWQ # 08-0634 Page 2 If you do not accept any of the conditions of this certification, you may ask for an adjudicatory hearing. You must act within 60 days of the date that you receive this letter. To ask for a hearing, send a written petition which conforms to Chapter 150B of the North Carolina General Statutes to the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, N.C. 27699-6714. This certification and its conditions are final and binding unless you ask for a hearing. This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water Act. If you have any questions, please contact Sue Homewood in the DWQ Winston-Salem Regional Office at 336-771-4964 or at sue.homewood@ncmail.net. Sincerely, Coleen H. Sullins, Director Division of Water Quality cc: John Thomas, U. S. Army Corps of Engineers, Raleigh Regulatory Field Office Joe Humble, DMP Inc., 6415 Old Plank Rd, High Point, NC 27265 DWQ Winston-Salem Regional Office DWQ Central Files DWQ Wetlands/401 Mr. Gary Loftin June 16, 2008 DWQ # 08-0634 Page 3 DWQ Project No.: County: Applicant: Project Name: Date of Issuance of 401 Water Quality Certification: Certificate of Completion Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any subsequent modifications, the applicant is required to return this certificate to the 401/Wetlands Unit, North Carolina Division of Water Quality, 1621 Mail Service Center, Raleigh, NC, 27699-1621. This form may be returned to DWQ by the applicant, the applicant's authorized agent, or the project engineer. It is not necessary to send certificates from all of these. 4pplicant's Certification I , hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Date: tent's Certification I , hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Date: Engineer's Certification Partial Final I , as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe (periodically, weekly, full time) the construction of the project,for the Permittee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature Registration No. Date