Loading...
HomeMy WebLinkAboutNCG030027 DMR SW (15) Semi-Annual Stormwater Discharge Monitoring Report for North Carolina Division of Water Quality General Permit No. NCG030000 _�_` Date submitted 06/03/2016 CERTIFICATE OF COVERAGE NO. SAMPLE COLLECTION YEAR 2016 FACILITY NAME Eaton Corporation—Engine Components Division T'" SAMPLE PERIOD ®Jan-June 0 July-Dec COUNTY Person or Ei Monthly1 (month) PERSON COLLECTING SAMPLES Dustin A. LaClair DISCHARGING TO CLASS ❑ORW DHQW ❑Trout ❑PNA LABORATORY ESC Lab Cert.#ENV375/DW21704/B10041 ❑Zero-flow Water Supply ESA Comments on sample collection or analysis: RECEIVED ®Other WS-III; NSW JUN 1 5 2016 PLEASE REMEMBER TO SIGN ON PAGES 3 4 CENTRAL FILES Part A: Stormwater Benchmarks and Monitoring Results DWR SECTION n No discharge this period?2 Date Sample 24-hour rainfall Non-Polar Outfall No. Collected) amount, Total Suspended Solids pH, Copper Lead Zinc • O&G/Total Total Toxic (mm/dd/yr) Inches3 Standard units Petroleum Organicss Hydrocarbons Benchmarks===> - - 100 mg/L or 50 mg/L4 6.0—9.0 0.007 mg/L 0.03 mg/L 0.067 mg/L 15 mg/L 1 mg/L Pond(001) 05/17/2016 0.70 inches - 10.7 mg/L 7.1 0.007 mg/L* 0.002 mg/L* 0.0859 mg/L 0.725 mg/L* 0.005988 mg/L Tool R(005)om Trench 05/17/2016 0.70 inches 7.56 mg/L 7.0 0.0142 mg/L 0.003 mg/L 0.0329 mg/L 0.725 mg/L* 0.003394 mg/L :.- 1 Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall. 2 For sampling periods with no discharge at any single outfall,you must still submit this discharge monitoring report with a checkmark here. 3The total precipitation must be recorded using data from an on-site rain gauge. Unattended sites may be eligible.for a waiver of the rain gauge requirement. 4 See General Permit,Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies. 5 Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture electronic crystals,or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11;for semiconductor manufacture use the definition as found in 40 CFR 469.12;for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray tube manufacture use the definition found in 40 CFR 469.31). * Results returned ND (Not Detected)—Maximum Detection Limits(MDL) reported as result. ND for TTO listed as non-detect. Permit Date:11/1/2012-10/31/2017 SWU-245,last revised 10/25/2012 ,-. Page 1 of 2 , e \ FOR PARTA AND PART B MONITORING RESULTS: • A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ® NO ❑ IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ® NO El REGIONAL OFFICE CONTACT NAME: Danny Smith,The Tier III notification and supporting documentation will be sent to the DWQ Regional Office Supervisor in accordance with the General Stormwater Permit. Mail an original and one copy of this DMR, including all"No Discharge"reports, within 30 days of receipt of the lab results(or at end of monitoring period in the case of"No Discharge"reports)to: Division of Water Quality Attn: DWQCentral Files er 1617 Mail Service Center Raleigh, North Carolina 276994617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: :---- "I certify, under penalty of law,that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information,the information submitted is,to the best of my knowledge and belief,true, accurate, and complete. I am aware that there ar si ' icant penalties for submitting false information,including the possibility of fines and imprisonment for knowing violations." oq2-016 . (Signature of Permit e) (Date) i • - Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 2 of 2