HomeMy WebLinkAboutNCG030293 DMR SW (7) 1 t .�
CNGIME RM .`!G, A�iBiC.
June 15, 2016
Jason Reichert
Director, Global Environmental, Health & Safety
Colfax Fluid Handling
1710 Airport Road
Monroe,North Carolina 28110 RECEIVED
Subject: Monthly Stormwater Sampling—May 2016 JUN. 16 2016
Certificate of Coverage No. N93
CENTRAL FILES
Colfax/IMO Industries—Monroe,NC
SWR SECTION
Shield Project No. 1150109-02
Dear Mr. Reichert:
Shield Engineering, Inc. (Shield) successfully collected a monthly stormwater sample for
Stormwater Discharge Outfall (SDO)#004 at the Colfax—Monroe facility for the month of May.
During the May 17, 2016 sampling event, Shield's field measurement of pH was 7.4 at SDO
#004. Total event precipitation was 0.43 inches. In addition to collection of samples, Shield
performed Qualitative Monitoring at SDO #004 (attached). As discussed between Melinda M.
Greene of Shield and Krista Baker of Colfax on June 7, 2016, Colfax — Monroe facility should
complete all relevant sections of the Stormwater Discharge Monitoring Report (DMR) using the
results of analyses from the commercial laboratory that the Colfax facility has contracted with
and the field pH values indicated above. The completed DMR form should then be mailed along
with the Qualitative Monitoring Report Form to the regulatory agency's Central Files.
Shield will continue to perform monthly sampling per Tier Two requirements until instructed to
halt by Colfax. Shield greatly appreciates the opportunity to provide environmental services to
the Colfax/IMO Industries. If you have any questions in reference to this document or require
further information, please feel free to contact either of the undersigned at (704) 394-6913.
Respectfully,
SHIELD ENGINEERING, INC
Com' a.
Melinda , rcene Keith A. Anthony, PE
Senior ln_i eer Chief Engineer
ATTACHMENT
tH\Projects\2014\1140109-02 Mount Holly SW Sampling 20161Cover Letters\Cover Letter-May 2016-Mt Holly Facility docxy docx
4301 Taggart Creek Road Telephone 704.394 6913
Charlotte,NC 28208 www shieldengineenng corn
Fax 704 394 6968
Semi-annual Stormwater Discharge Monitoring Report
for North Carolina Division of Water Quality General Permit No. NCG030000
Date submitted 6/15/16
CERTIFICATE OF COVERAGE NO.' Y3 SAMPLE COLLECTION YEAR 2016
FACILITY NAME Colfax/IMO Industries, Inc. SAMPLE PERIOD ❑Jan-June ❑July-Dec
PERSON COLLECTING SAMPLES Danny Hefner, Shield Engineering or ® Monthly' May
LABORATORY: Pace Analytical Services, Inc. Lab Cert.# 12 DISCHARGING TO CLASS ❑ORW ❑HQW ❑Trout ❑PNA
Comments on sample collection or analysis: Benchmark was exceeded q g ❑Zero-flow ❑Water Supply EISA
for Copper. � a� id ®Other_Class C—Dry Fork Creek
JUN f �' 2016
PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 -›
CENTRAL FILES
Part A: Stormwater Benchmarks and Monitoring Results SWR SECTION
❑ No discharge this period?2
Non-Polar O&G/
Date Sample 24-hour rainfall pH, Total Toxic
Outfall No. Collected' amount, Total Suspended Solids Standard units Copper Lead Zinc Total Petroleum Organics
(mo/dd/yr) Inches' Hydrocarbons
Benchmarks===> - - 100 mg/L or 50 mg/L4 6.0—9.0 0.007 mg/L 0.03 mg/L 0.067 mg/L 15 mg/L 1 mg/L
SDO 004 05/17/16 0.43 12.2 mg/L 7.4 0.0082 0.005 0.0539 0.638 0.4873
1 Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall.
2 For sampling periods with no discharge at any single outfall,you must still submit this discharge monitoring report with a checkmark here.
3The total precipitation must be recorded using data from an on-site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement.
4 See General Permit,Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
s Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture
electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA
Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor
manufacture use the definition as found in 40 CFR 469.12;for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray
tube manufacture use the definition found in 40 CFR 469.31).
Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012
Page 1 of 3
Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring
may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General
Permit. For those facilities electing to employ the TTO monitoring waiver,the discharger shall sign the following certification statement:
"Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics
(TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or
stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the
solvent management plan included in the Stormwater Pollution Prevention Plan."
(� JDJ
Name(Print name)
7-4 i c -1
Title(Print title)
• - •/ / / S (�
(S ature) (Date)
Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non-detect, ND, or other similar non-numerical
format. When results are below the applicable limits,they must be reported in the format, "<XX mg/L",where XX is the numerical value of the detection
limit, reporting limit, etc. in mg/L.
Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text.
Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month.
n No discharge this period?2
Outfall No. Date Sample 24-hour rainfall
Collected' amount, Non-polar O&G/TPH by
(mo/dd/yr) Inches3 EPA 1664(SGT-HEM) Total Suspended Solids pH
Benchmarks===> - - 15 mg/L 100 mg/L or 50 mg/L* 6.0—9.0 SU
Footnotes from Part A also apply to this Part B
*See General Permit text,Table 5, identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012
Page 2 of 3
Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier Z or Tier 3 responses. See General Permit text.
FOR PART A AND PART B MONITORING RESULTS.
• A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS SEE PERMIT PART II SECTION B.
• 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B.
• TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES x NO❑
IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ❑ NO❑
REGIONAL OFFICE CONTACT NAME•
Mail an original and one copy of this DMR, including all "No Discharge"reports, within 30 days of receipt of the lab results(or at end of monitoring period
in the case of"No Discharge"reports)to:
Division of Water Quality
Attn: DWQ Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
"I certify, under penalty of law,that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to
assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or
those persons directly responsible for gathering the information,the information submitted is,to the best of my knowledge and belief,true, accurate, and complete I
am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations."
/P. 7/ OC//6
(Sign.• re of Permittee) (Date)
Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012
Page 3 of 3