HomeMy WebLinkAbout20080985 Ver 1_CAMA Application_200806191 f
400 A
r?
NCDENR
North Carolina Department of Environment and Natural Resources
Division of Coastal Management
Michael F. Easley, Governor James H. Gregson, Director William G. Ross Jr., Secretary
June 16, 2008 -08 0 9 8 5 D 2%
MEMORANDUM: JUN 1 8 2008
TO: Cyndi Karoly, Supervisor wEaN NDSTORMWATTEERBRAMCH
401 Oversight & Express Permits Unit
Division of Water Quality-Surface Water Protection
FROM: Doug Huggett, NC DENR-DCM Major Permits Coordinator
400 Commerce Ave., Morehead City, NC 28557 (Courier 11-12-09)
SUBJECT: CAMA / Dredge & Fill Major Permit Application Review
Applicant: Bald Head Island Limited, LLC
Project Location: Keelson Row & N. Bald Wynd, adjacent to Bald Head Creek, in Bald Head Island,
Brunswick County.
Proposed Project: to extend existing bulkhead and construct boardwalk over marsh
Please indicate below your agency's position or viewpoint on the proposed project and return
this form by July 9, 2008. If you have any questions regarding the proposed project,
contact Heather Coats at (910) 796-7424, when appropriate, in-depth comments with supporting
data is requested.
REPLY: This agency has no objection to the project as proposed.
This agency has no comment on the proposed project.
This agency approves of the project only if the recommended changes are
incorporated. See attached.
This agency objects to the project for reasons described in the attached
comments.
SIGNED DATE
127 Cardinal Drive Ext., Wilmington, North Carolina 28405-3845
Phone: 91 0-796-721 5 1 FAX: 910-395-39641 Internet: www.nccoastalmanagement.net
An Equal Opportunity 1 Affirmative Action Employer - 50% Recycled 110% Post Consumer Paper
DIVISION OF COASTAL MANAGEMENT
FIELD INVESTIGATION REPORT
APPLICANT'S NAME: Bald Head Island Limited, LLC, c/o Kent Mitchell
PROJECT NAME: BHI Bulkhead Extension
2. LOCATION OF PROJECT SITE: Keelson Row & N. Bald Head Wynd, adjacent to Bald Head
Creek, in Bald Head Island, Brunswick County.
Photo Index - 2006: 11-6178 T-V, 12-13 2000: 11-104 C-E, 12-13 1995: 9-104 R-T, 18-19
State Plane Coordinates - X: 2303506 Y: 47123
Lat:33°52'30.97047"N Long: 78°00'00.98137"W
3. INVESTIGATION TYPE: LAMA/ Dredge & Fill ROVER FILE # - Q010818A
4. INVESTIGATIVE PROCEDURE: Dates of Site Visit -1/8/08
Was Applicant Present - No (agent present)
5. PROCESSING PROCEDURE: Application Received - Complete 6/5/08
Office - Wilmington
6. SITE DESCRIPTION:
(A) Local Land Use Plan - Village of Bald Head Island
Land Classification From LUP - Conservation
(B) AEC(s) Involved: IHA
(C) Water Dependent: No
(D) Intended Use: Public
(E) Wastewater Treatment: Existing - N/A
Planned - N/A
(F) Type of Structures: Existing -Roads, marina with associated facilities & bulkhead
Planned - Bulkhead extension with boardwalk
(G) Estimated Annual Rate of Erosion: 8'/year
Source - LTAASCR 1998 Update
7. HABITAT DESCRIPTION: [AREA]
DRFDCTFD FTT,T.ED OTHER
(A) Vegetated Wetlands 1,572 sq. ft.
(shaded)
(B) Non-Vegetated Wetlands
(Open water)
(C) Other (High ground) - 9,500 sq. ft.
(D) Total Area Disturbed: 11,072 sq. ft. (0.25 acres)
(E) Primary Nursery Area: No
(F) Water Classification: SA Open: No
8. PROJECT SUMMARY: The applicant proposes to extend an existing bulkhead an additional 670 linear
feet and construct a boardwalk over marsh, adjacent to Bald Head Creek.
I .
Bald Head Island Limited, LLC/ Bulkhead Extension
Page 2
9. PROJECT DESCRIPTION:
The project site is located at the southern extension of Keelson Row on Bald Head Island. From the ferry
terminal, travel south to the intersection of Marina Wynd and N. Bald Head Wynd. The beginning of the
cart bridge is proposed to start approximately 0.10 mile north of this intersection, at the intersection of
N. Bald Head Wynd and Keelson Row. The bridge would then terminate approximately 0.1 mile south
of the intersection of Marina Wynd and N. Bald Head Wynd.
The property consists of a 24.36 acre tract, elevated approximately 4' above Normal High Water
(NHW). The vegetated portion of the tract consists primarily of coastal wetlands. The wetland boundary
to the north, along N. Bald Head Wynd, has been stabilized with a bulkhead. Wetland vegetation
consists primarily of Salt Meadow Hay (Spartina patens), Sea Lavender (Limonium carolinianum),
Glasswort (Salicornia spp.), Spikegrass (Distichlis spicata), Black Needlerush (Juncus roemerianus)
and Salt Marsh Cordgrass (Spartina alterniflora). Eastern red cedar (Juniperus virginiana) also grows
in the areas with higher elevation. The upland area north of the bulkhead is primarily occupied by built-
upon area associated with the marina and supporting facilities, including roads, a restaurant,
administration building, ferry terminal parking lots and retail space.
A State Dredge and Fill permit (#22-74) was issued to Carolina Cape Fear Association on 2/13/74 for
the construction of the Bald Head Island marina. In 1976, the permit was transferred to Bald Head Island
Corporation. The permit was later transferred to Bald Head Island Management, Inc. in 1983 and a
major modification of the permit was approved authorizing a redesign of the marina, including approval
of the ferry terminal building. State permit #172-87 was issued on 8/19/87 for additional work to the
marina, which has been continuously renewed and modified numerous times. The permit will expire on
December 31, 2008.
The current erosion rate in the adjacent Ocean Erodible Area is currently 8'/ year; however, the erosion
rate when originally permitted (in 1987) was 2'/year. The 100-year storm recession line for the adjacent
area is 325 feet, creating a total Ocean Erodible (and therefore Inlet Hazard) Area of Environmental
Concern (AEC) of 445 feet. A portion of the project is also located within the High Hazard Flood AEC
as indicated by zones V 1-30 on the Flood Insurance Rate Maps of the Federal Insurance Administration.
The Village of Bald Head Island Land Use Plan classifies the adjacent waters as Conservation, and the
adjacent high ground portion of the project area as Mixed Use. The waters of Bald Head Creek are
classified SA by the Division of Water Quality. They are NOT designated as a Primary Nursery Area
(PNA) by the N.C. Division of Marine Fisheries and they are CLOSED to the harvest of shellfish.
PROPOSED PROJECT:
The applicant proposes a major modification of State Permit # 172-87 to extend the existing bulkhead
305 linear feet to the south and 340 linear feet to the north of its existing location. The applicant is also
proposing to bulkhead around the high ground island to the south of the project (which is included in the
340' length). An elevated wood walkway (boardwalk) is proposed over the coastal wetlands to access
the island. The walkway would measure 6' in width and 44' in length, approximately 15' of which
Bald Head Island Limited, LLC/ Bulkhead Extension
Page 3
would span the coastal wetland area. The proposed bulkhead to the south, as well as the bulkhead
located on the island and approximately 93 linear feet of bulkhead to the north of the existing bulkhead
would also have a 5' wide walkway integrated into the bulkhead cap. The walkway is proposed to
cantilever 3' out over the marsh with the remaining 2' in width over high ground. Both the boardwalk
and cantilevered walkway would be elevated a minimum of 3' above the marsh substrate.
10. ANTICIPATED IMPACTS
The proposed bulkhead cap/cantilevered walkway would result in the shading of approximately 1,512
square feet of coastal wetlands. The proposed elevated walkway construction to the island would
approximately shade an additional 60 sq. ft. of Coastal Wetlands. The backfill of the bulkhead and
installation of the associated tieback system would result in approximately 9,500 square feet of high
ground disturbance.
Submitted by: Heather Coats Date: 6/12/2008 Office: Wilmington
Creek Bulkhead Extension (172-87)
DOE DIM
APPLICATION for
Major Development Permit'
?cB 1 4 70F
(last revised 12/27/06)
0 8 0 9 8 5 North Caro IMDIVISION OF COAST
AL MANAGEMENT
1. Primary Applicant/ Landowner Information
Business Name Project Name (if applicable)
Bald Head Island Limited, LLC Creek Bulkhead Extension
Applicant 1: First Name MI Last Name
Stephen 0. Robertson
Applicant 2: First Name MI Last Name
If additional applicants, please attach an additional page(s) with names listed.
Mailing Address PO Box City State
3069 Bald Head Island NC
ZIP o ntry
r Phone No. FAX No.
28461 A
u 91 0 - 457 - 7358 ext. 910 - 457 - 7220
Street Address (if different from above) City State ZIP
P.O. Box Indigo Plantation Drive Southport NC 28461
Email
srobertston@bhisland.com
2. Agent/Contractor Information
Business Name
Bruce Marek, P.E.
Agent/ Contractor 1: First Name MI Last Name
Bruce Marek --
Agent/ Contractor 2: First Name MI Last Name
Mailing Address PO Box City State
5489 Eastwind Road Wilmington NC
ZIP
V Phone No. 1 Phone No. 2
28403 910 - 228 2484 ext. 910 - 457 - 7517 ext.
FAX No. Contractor #
910-457-7463
Street Address (if different from above) City State ZIP
Email
marekyd@ec.rr.com or bmarek@bhisland.com
<Form continues on back>
FEB 1 4 2008
V-1 r V " L-'
DDA WILMINGTON, NC
252-808-2808 .. 1-888-4RCOAST :. www.nccoastaimanagement.net
Creek Bulkhead Extension (172-87)
Form DCM MP-1 (Page 2 of 4)
APPLICATION for
Major Development Permit
3. Project Location
County (can be multiple) Street Address State Rd. #
Brunswick Behind 6 Marina Wynd
Subdivision Name City State Zip
Bald Head Island N - 28461
Phone No. Lot No. (s) (if many, attach additional page with list)
- ext.
a. In which NC river basin is the project located? b. Name of body of water nearest to proposed project
Cape Fear Bald Head Creek
c. Is the water body identified in (b) above, natural or manmade? d. Name the closest major water body to the proposed project site.
[?Natural ?Manmade ?Unknown Cape Fear River
e. Is proposed work within city limits or planning jurisdiction? f. If applicable, list the planning jurisdiction or city limit the proposed
[NYes ?No work falls within.
Village of BHI
4. Site Description
a. Total length of shoreline on the tract (ft.) b. Size of entire tract (sq.ft.)
3,712 LF 24.36 AC
c. Size of individual lot(s)
N/A d. Approximate elevation of tract above NHW (normal high water) or
NWL (normal water level)
(If many lot sizes, please attach additional page with a list) NHW or ?NWL 4 '
e. Vegetation on tract Coastal wetlands & variety of trees - cedar, oak, palm
f. Man-made features and uses now on tract Road, admin bldg, restaurant, ferry terminal,
parking lot, retail shop, marina, creek
bulkhead(s)
g. Identify and describe the existing land uses adjacent to the proposed project site. Commercial /marina
h. How does local government zone the tract? i. Is the proposed project consistent with the applicable zoning?
PD3 C (Attach zoning compliance certificate, if applicable)
tYes ?No ?NA
j. Is the proposed activity part of an urban waterfront redevelopment proposal? ?Yes -'UNo
k. Has a professional archaeological assessment been done for the tract? If yes, attach a copy. ?Yes ?No 6NA
If yes, by whom?
I. Is the proposed project located in a National Registered Historic District or does it involve a ?Yes [NNo ?NA
National Register listed or eligible property?
RECEIVED
<Form continues on next page> DCM WILMINGTON, NC
FEB 1 4 2008
252-808-2808 .. 1.888-4RCOAST :. www.nccoastalmanagement.net
Creek Bulkhead Extension (172-87)
Form DCM MP-1 (Page 3 of 4)
APPLICATION for
Major Development Permit
m. (1) Are there wetlands on the site? Yes ?No
(ii) Are there coastal wetlands on the site? ]Yes ?No
(iii) If yes to either (i) or (ii) above, has a delineation been conducted? Yes ?No
(Attach documentation, if available)
n. Describe existing wastewater treatment facilities. Village of Bald Head Island Utilities
o. Describe existing drinking water supply source. Village of Bald Head Island Utilities
p. Describe existing storm water management or treatment systems. Infiltration basins & low density
5. Activities and Impacts
a. Will the project be for commercial, public, or private use? ?Commercial ?Public/Government
Private/Community
b. Give a brief description of purpose, use, and daily operations of the project when complete.
Project is for addition of 670 +/- LF of wood bulkhead/boardwalk
along marsh as extension of existing 500 LF of boardwalk bulkhead per
GP 40454 and minor mod 5/1/07. Plus 6' x 15' wood walkway as shown.
c. Describe the proposed construction methodology, types of construction equipment to be used during construction, the number of each type
of equipment and where it is to be stored. Water jet and backhoe
d. List all development activities you propose.
Wood bulkhead, most with 5' width boardwalk cap per existing
approved detail sealed 3/20/07
e. Are the proposed activities maintenance of an existing project, new work, or both? Bulkhead, boardwalk bulkhead
f. What is the approximate total disturbed land area resulting from the proposed project? 9 , 5 0 0 ??]SgTt or ?Acres
g. Will the proposed project encroach on any public easement, public accessway or other area ?Yes No ?NA
that the public has established use of?
h. Describe location and type of existing and proposed discharges to waters of the state. N/A
i. Will wastewater or stormwater be discharged into a wetland? ?Yes No ?NA
If yes, will this discharged water be of the same salinity as the receiving water? ?Yes ?No ?NA
j. Is there any mitigation proposed? ?Yes No ?NA
If yes, attach a mitigation proposal.
<Form continues on back> CCM WILMINGTON, NC
FEB 1 4 2008
252-808-2808 -. 1-888-4RCOAST .. www.ncconstalmanagement.net
Creek Bulkhead Extension (172-87)
Form DCM MP-1 (Page 4 of 4)
APPLICATION for
Major Development Permit
6. Additional Information
In addition to this completed application form, (MP-1) the following items below, if applicable, must be submitted in order for the application
package to be complete. Items (a) - (f) are always applicable to any major development application. Please consult the application
instruction booklet on how to properly prepare the required items below.
a. A project narrative.
b. An accurate, dated work plat (including plan view and cross-sectional drawings) drawn to scale. Please give the present status of the
proposed project. Is any portion already complete? If previously authorized work, clearly indicate on maps, plats, drawings to distinguish
between work completed and proposed.
c. A site or location map that is sufficiently detailed to guide agency personnel unfamiliar with the area to the site.
d. A copy of the deed (with state application only) or other instrument under which the applicant claims title to the affected properties.
e. The appropriate application fee. Check or money order made payable to DENR. ($400)
f. A list of the names and complete addresses of the adjacent waterfront (riparian) landowners and signed return receipts as proof that such
owners have received a copy of the application and plats by certified mail. Such landowners must be advised that they have 30 days in
which to submit comments on the proposed project to the Division of Coastal Management.
Name Old Baldy Foundation Phone No.
Address p,p_ Box 3007, Bald Head Island, NC 28461
Name Phone No.
Address
Name Bald Head Island Realty Ventures PnoneNo.
Address p,0. Box 3217, Bald Head Island, NC 28461
g. A list of previous state or federal permits issued for work on the project tract. Include permit numbers, permittee, and issuing dates.
Bald Head Island Limited, LLC-CAMA 172-87 (8/19/87), CAMA 191-86 (9/24/86)
SW8-070805 (8/30/07), SW8-971223 (11/6/07 MOD), SW8-940918 (2/21/05 MOD)
h. Signed consultant or agent authorization form, if applicable.
i. Wetland delineation, if necessary.
j. A signed AEC hazard notice for projects in oceanfront and inlet areas. (Must be signed by property owner)
k. A statement of compliance with the N.C. Environmental Policy Act (N.C.G.S. 113A 1-10), if necessary. If the project involves expenditure
of public funds or use of public lands, attach a statement documenting compliance with the North Carolina Environmental Policy Act.
7,_ Certification and Permission to Enter on Land
I understand that any permit issued in response to this application will allow only the development described in the application.
The project will be subject to the conditions and restrictions contained in the permit.
I certify that I am authorized to grant, and do in fact grant permission to representatives of state and federal review agencies to
enter on the aforementioned lands in connection with evaluating information related to this permit application and follow-up
monitoring of the project.
I further certify that the information provided in this application is truthful to the best of my knowledge. U R `:J ??? D
Date Print Name Stephen 0. Robertson
Signature l? JUN 1 8 2008
DENR-WATER QUAUTY
WETLANDS AND STDRMWATER BRANCH
Please indicate application attachments pertaining to your proposed project.
]DCM MP-2 Excavation and Fill Information ?DCM MP-5 Bridges and Culverts
?DCM MP-3 Upland Development RECEIVED
tDCM MP-4 Structures Information 0CM WILMINGTON, NC
FEB 1 4 2008
252-808-2808 ,. 1-888-4RCOAST .. www.nccoastalmanagement.net
Bald Head Island Limited, LLC
Creek Bulkhead Extension
Form DCM MP-2
EXCAVATION and FILL
(Except for bridges and culverts)
Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to complete all other sections of the Joint
Application that relate to this proposed project. Please include all supplemental information.
Describe below the purpose of proposed excavation and/or fill activities. All values should be given in feet.
Access Other
Channel
(NLW or Canal Boat Basin Boat Ramp Rock Groin Rock
Breakwater (excluding
shoreline
NWL stabilization
Length
Width
Avg. Existing NA NA
Depth
Final Project
NA
NA
Depth
1. EXCAVATION This section not applicable '
a. Amount of material to be excavated from below NHW or NWL in b. Type of material to be excavated.
cubic yards.
C. (i) Does the area to be excavated include coastal wetlands/marsh d. High-ground excavation in cubic yards.
(CW), submerged aquatic vegetation (SAV), shell bottom (SB),
or other wetlands (WL)? If any boxes are checked, provide the
number of square feet affected.
?CW ?SAV ?SB
?WL ?None
(ii) Describe the purpose of the excavation in these areas:
2. DISPOSAL OF EXCAVATED MATERIAL L] this section not applicable
a. Location of disposal area. b. Dimensions of disposal area.
C. (i) Do you claim title to disposal area? d. (i) Will a disposal area be available for future maintenance?
?Yes ?No ?NA ?Yes ?No ?NA
(ii) If no, attach a letter granting permission from the owner. (ii) If yes, where?
e. (i) Does the disposal area include any coastal wetlands/marsh f. (i) Does the disposal include any area in the water?
(CW), submerged aquatic vegetation (SAV), shell bottom (SB), ?Yes ?No ?NA
or other wetlands (WL)? If any boxes are checked, provide the
how much water area is affected?
(ii) If yes
number of square feet affected.
nu ,
?CW ?SAV ?SB
?WL ?None
(ii) Describe the purpose of disposal in these areas:
RECEIVED
DCM WILMINGTON, NC
.JAN 2 9 2008
Bald H a?3 Isl n Limited, LLC
rrn DUA MP- (Eecav anion and Fife. Page 2 of 2) Creek ?uikheaed ?xtens ion
3. SHORELINE STABILIZATION ?This section not applicable
(If development is a wood groin, use MP-4 - Structures) /
a.Ttype of shoreline stabilization: b. Length: 5-- 7 -ae
ObUlkheao Limprap Libreakwaten5nu Liumer
c. Average distance waterward of NHW or NWL:
0
e. Type of stabilization material:
Wood bulkhead
g. Number of square feet of fill to be placed below water level.
Bulkhead backfill 0 Riprap
Breakwater/Sill Other
i. Source of fill material.
Width: _
d. Maximum distance waterward of NHW or NWL:
0
f. (i) Has there been shoreline erosion during preceding 12
months?
?Yes 6No ?NA
(ii) If yes, state amount of erosion and source of erosion amount
information.
h. Type of fill material.
Sand
Bald Head Island Limited, LLC sites on Island: (out of AEC)
Bald Head Island Limited, LLC owns Deep Point Marina (has mining permit)
4. OTHER FILL ACTIVITIES This section not applicable
(Excluding Shoreline Stabilization)
a. (i) Will fill material be brought to the site? ?Yes ?No ?NA b. (i) Will fill material be placed in coastal wetlands/marsh (CW),
If yes,
(ii) Amount of material to be placed in the water
(iii) Dimensions of fill area
(iv) Purpose of fill
submerged aquatic vegetation (SAV), shell bottom (SB), or
other wetlands (WL)? If any boxes are checked, provide the
number of square feet affected.
?CW ?SAV ?SB
?WL ?None
(ii) Describe the purpose of the fill in these areas:
5. GENERAL
a. How will excavated or fill material be kept on site and erosion b. What type of construction equipment will be used (e.g., dragline,
controlled? backhoe, or hydraulic dredge)?
Brought & directly placed behind water jet, back hoe
bulkhead
c. (i) Will navi ational aids be required as a result of the project?
?Yes TNo ?NA
(ii) If yes, explain what type and how they will be implemented.
d. (i) Will wetlands b crossed in transporting equipment to project
site? ?Yes FSNo ?NA
(ii) If yes, explain steps that will be taken to avoid or minimize
environmental impacts.
Bald Head Island Limited, 'LLC
Date f ? G Applicant Name
Creek Bulkhead Extension
Project Name Applicant Signature
n&v 5.7.0 ?h p r r ;?
v' / "-,?y?l<
2S2-308-2808 a: 1-838-4# C0AS"T :: wvv-.v.nf-co _tgtmarta_gernent.net i+? .W-
DGM WILMINGTON, NG
.JAN 2 9 2008
13 ?f t L 1ecl< K, 4.r7-id
c-4 R4 17A-i>7
Form DCM MP-4
STRUCTURES
(Construction within Public Trust Areas)
Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to complete all other sections of the Joint
Application that relate to this proposed project. Please include all supplemental information.
1. DOCKING FACILITYIMAR1NA CHARACTER1ST1CS ®lfiis section nctapplicab;e
a. (i) Is the docking facility/marina: b. (i) Will the facility be open to the general public?
?Commercial ?Public/Government ?Private/Community ?Yes ?No
c. (i) Dock(s) and/or pier(s)
(ii) Number
(iii) Length
(iv) Width
(v) Floating ?Yes ?No
e. (i) Are Platforms included? ?Yes ?No
If yes:
(ii) Number
(iii) Length
(iv) Width
(v) Floating ?Yes ?No
Note: Roofed areas are calculated from dripline dimensions.
d. (i) Are Finger Piers included? ?Yes ?No
If yes:
(ii) Number
(iii) Length
(iv) Width
(v) Floating ?Yes ?No
t (i) Are Boatlifts included? ?Yes ?No
If yes:
(ii) Number
(iii) Length
(iv) Width
g. (i) Number of slips proposed
(ii) Number of slips existing
i. Check the proposed type of siting:
? Land cut and access channel
?Open water; dredging for basin and/or channel
?Open water; no dredging required
?0ther; please describe:
k. Typical boat length:
m. (i) Will the facility have tie pilings?
?Yes ?No
(ii) If yes number of tie pilings?
h. Check all the types of services to be provided.
? Full service, including travel lift and/or rail, repair or
maintenance service
? Dockage, fuel, and marine supplies
? Dockage ("wet slips') only, number of slips:
? Dry storage; number of boats:
? Boat ramp(s); number of boat ramps:
? Other, please describe:
j. Describe the typical boats to be served (e.g., open runabout,
charter boats, sail boats, mixed types).
RECEIVED
LLCM WILMINGTON, NC
FEB 1 4 2008
1. (i) Will the facility be open to the general public?
?Yes ?No
FER i. t no
252-808-2808 :: 1-888-4RCOAST :: www.nccoastalmana.gement. net
revised: 12127/06
Form DCM MP-4 (Structures. Page 2 of 4)
2. DOCKING FACILITY1MARINA OPERATIONS ®This section not.applicable
a. Check each of the following sanitary facilities that will be included in the proposed project.
? Office Toilets
? Toilets for patrons; Number: ; Location:
? Showers
? Boatholding tank pumpout; Give type and location:
b. Describe treatment type and disposal location for all sanitary wastewater.
C. Describe the disposal of solid waste, fish offal and trash.
d. How will overboard discharge of sewage from boats be controlled?
e. (i) Give the location and number of "No Sewage Discharge" signs proposed.
(ii) Give the location and number of "Pumpout Available" signs proposed.
f. Describe the special design, if applicable, for containing industrial type pollutants, such as paint, sandblasting waste and petroleum products.
g. Where will residue from vessel maintenance be disposed of?
h. Give the number of channel markers and "No Wake" signs proposed.
i. Give the location of fuel-handling facilities, and describe the safety measures planned to protect area water quality.
j. What will be the marina policy on overnight and live-aboard dockage?
k. Describe design measures that promote boat basin flushing?
1. If this project is an expansion of an existing marina, what types of services are currently provided?
RECEIVED
m. Is the marina/docking facility proposed within a primary or secondary nursery area? DCM WILMINGTON, NC
?Yes ?No
, EB 1 4 2008
252-808-2808 :: 1-888-4RCOAST :: vuwvv..nccoastalmanagement.et revised: 12/27106
Form DCM MP-4 (Structures, Page 3 of 4)
n. Is the marina/docking facility proposed within or adjacent to any shellfish harvesting area?
?Yes ?No
o. Is the marina/docking facility proposed within or adjacent to coastal wetlands/marsh (CW), submerged aquatic vegetation (SAV), shell bottom
(SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected.
?CW ?SAV ?SB
?WL ?None
p. Is the proposed marina/docking facility located within or within close proximity to any shellfish leases? ?Yes ?No
If yes, give the name and address of the leaseholder(s), and give the proximity to the lease.
3.96-At HOU$E (ir7cludrny covered lifts) - pThis section not appticahle.
a. (i) Is the boathouse structure(s):
?Commercial ?Public/Government ?Private/Community
(ii) Number
(iii) Length
(iv) Width
Note: Roofed areas are calculated from dripline dimensions.
4..GROIN, (e.g., wood, sheetpile etc,., If a?fock,groin, use MP-2, Excavation and Filt;) ? ®This se'66'pn not applicable
a• (i) Number
(ii) Length
(iii) Width
5. BREAKWATER (e g. tivood, sheotpile;.etc.) ®This section nvt applicab%e'.;
a. Length b. Average distance from NHW, NWL, or wetlands
c. Maximum distance beyond NHW, NWL or wetlands
6. MOORING PILINGS and'BUpYS- ZThis section not applr''cabie
a. Is the structure(s): b. Number
?Commercial ?Public/Government ?Private/Community
C. Distance to be placed beyond shoreline d. Description of buoy (color, inscription, size, anchor, etc.)
Note: This should be measured from marsh edge, if present.
e. Arc of the swing
7. GENERAL i}
DCM VVILMNGTON, INC
FEB 1 4 2008
252-808-2808 :: 1-888-4RCOAST :: www,.nccoastalmanagemen_t.net revised: 12127106
Form DCM MP-4 (Structures, (Page 4 of 4)
a. Proximity of structure(s) to adjacent riparian property lines b. Proximity of structure(s) to adjacent docking facilities.
S ?,? 1K laded ?ACp? OVA
Note: For uoy or mooring piling, use arc of swing including length
of vessel.
c. Width 9f water body
6 {
e. (i) Will navigational aids be required as a result of the project?
?Yes Vo ?NA
(ii) If yes, expl in what type and how they will be implemented.
d. Water pth at waterward end of structure at NLW or NWL
-2 C0 va ,0A e S 4
8. OTHER ?l his section not"applicable
a. Give complete description: -
6'x44' walkway from upland along Keelson Row to proposed bulkheaded area near Eb & Flo's 10' + is over marsh. Remainder
is on upland leading to Keelson Row
Applicant Signature
RECEIVED
XM WILMINGTON, NC
I= EB 1 4 2008
252-808-2808 :: 1-888-4RCOA5Y :: www.,ncc...oa lmanagement.,net revised: 12/27106
LINE TABLE FOR CAMA COASTAL WETLAND LINE 01-08-2008 (MORE RESTR ICTIVE THAN 404 WETLA ND LIN E
LINE LENGTH BEARING LINE LENGTH BEARING LENGTH BEARING LINE LENGTH BEARING LINE LENGTH BEARING
Lt 16.00 N32'17 35 W L11 25.38 N02'2912 W 12.36 N27'00 24 W L31 21.10 S05'03 03 E L41 36.67 N50'05 37 E
L2 36.32 I`31'22 38 W L12 17.09 N78'21 44 W 41.12 N63'16 58 E 1_32 18.57 S55'31 53 E
L3 44.12 N09'15 42 W L13 51.61 N04'2211 W 44.16 N85'18 45"E L33 17.20 N40'46 10 E
L4 51.33 N11*17'24"W L14 30.76 N34'39'50"E 21.37 S78'10'0CE L34 39.36 N03'15'34"E
L5 45.58 N1 4'5225"W L15 37.43 N53'05'35"E 1 38.21 S30'l7'21"E L35 34.72 N49'1530"W
L6 29.22 N23.31 32'W Lib 41.04 N66'15'03"E 27.99 S59'25 24'E L36 42.96 N67'04 25"E
L7 19.49 N11'07'50"W L17 38.87 N61'40 O6 E 13.03 S78'2911 E L37 28.52 N59'58 33 E
L8 44.53 N17'09 58 W L18 43.11 N57'14'08"E 29.64 N8232 37 E L38 41.35 N54'2310 E
L9 18.00 N12'52 59 W 1_19 16.34 N66'22 20 E 29.04 N81'55 24 E L39 38.89 N72'19 13 E
L10 2.11 N26'52'40' W L20 16.72 N40'56 27 E L
3 23.06 S36'39'17"E L40 13.03 N32'34'00 E
fit"n
N r,
?c Y
z 1 A10
i
f
W I
WV A9
? +Ac?11
I O
I=
I
,
L14
L13 L11
EXISTING BULKHEAD ,f ,
ENDS AT THIS POINT ?
L12 Li
? C u?L
L10 Lll
OCTOBER 2004
404 WETLAND LINE
Al
Le A
3 PROPOSED
305 LF ADDITONAL
L1
500 LF EXISTING BULKHEAD
PER GENERAL PERMIT #40454
01-18-07
& WOOD WALKWAY 5' WIDE
172-87 MINOR MOD. 05-01-07
LEGEND
PROPOSED BULKHEAD & BOARDWALK
COASTAL WETLANDS LINE 1$2008 0
COASTAL WETLANDS LINE 01.2007
404 WETLANDS LINE
NOTE: 404 WETLANDS SIGN-OFF 12-27-2004
EXPIRATION 12-27-09
USACE ACTION ID #200500013
NOTE: COASTAL WETLANDS LINE AND 404 LINE
ARE A JOINT LINE FROM L10 TO L29,
AND AT L36. LINES DIVERGE ELSWHERE.
-ATWIN BLDG _]F--? DOCK
6 MARINA WYNDI L-, STORE
1 1
10
?r00
ks
_00
Ll
L19`1?,,__LzuA X25.
JANUARY 2007
COASTAL WETLAND LINE
a
L24
NOTE: 404 WETLANDS SIGN-OFF 12-27-2004
7 EXPIRATION 12-27-09
A USACE ACTION ID #200500013 L26
172-87 CAMA MAJOR MOD.
CART BRIDGE APPROACH T
CREEK BULKHEAD EXTENSION L27`'?ATV
NO WALKWAY THIS AREA
645 LF TOTAL OF NEW BULKHEAD CART BRIDGE APPROACH
NO WALKWAY THIS AREA _? L28
JANUARY 8, 2008
COASTAL WETLAND LINE L29
404 WETLAND LINE
A12
A13
TABLE OF POINTS
POINT NORTHING EASTING
Al 46785.14 2303094.44
A2 46763.13 2303096.10
A3 46763.13 2303096.10
A4 46727.87 2303109.15
A5 46709.39 2303118.96
A6 46684.98 2303121.50
A7 46648.67 2303132.95
A8 46609.72 2303132.57
A9 46581.43 2303140.03
A10 46552.39 2303156.31
All 46529.98 2303183.43
A12 46538.42 2303212.36
A13 46549.94 2303243.77
PROPOSED
6' WIDE WOOD WALKWAY-
APPROX. 44' LONG
(10' OVER MARSH) L31<
60 0 60 120 ECEI RECEIVED
SCALE: 1 " = 60' 2008
Garden
Of
Eatin'
& FLO'S
4
s
S
C
C_
v PAVERS LJ
c, BRICK "
KEELSON ROW TMH
BRICK PAVERS
D SIGN ?SIGN
.._,
L35 PROPOSED BULKHEAD WITH
L3 NO BOARDWALK - 95 FEET
40
z?,_ \ OCTOBER 2004
L3 404 LINE
L34 r EXISTING
13 BULKHEAD
fOBER 2004
404 LINE
JANUARY 2008
DCM WILMINGTON COASTAL WETLAND LINE
BARGE LANDING
FUEL DOCK I
LIBRARY
REVISION DATES
ISSUE
OZ 14-08
CORRECTIONS PER REV.
CAMA COMMENTS 03-13-08
CORRECTIONS PER 5$08 REV,
CAMA COMMENTS 050808
CORRECTIONS PER REV.
CAMA COMMENTS 0602-08
FOR:
Bald Head Island Limited LLC
Planning Dept.
\ ??{ CARP '
SEAL
15684
tP?CG ' LNG I NE??'' Q??'
SAME
1j11111110
BRUCE MAREK, P.E.
P.O. Box 3069 BALD HEAD ISLAND,
NORTH CAROLINA 28461
(910)4577517
BALD HEAD ISLAND
CAMA 172-87 MAJOR MOD.
BALD HEAD ISLAND, NC
BALD HEAD CREEK
BULKHEAD EXTENSION
JUNE 2, 2008
CREEK BULKHEAD EXTENSION
1 OF 3
Notes:
1. Underlying Photograph dated 2002.
2. Registration misalignment due to
distortion of photograph.
i
torn,208.86
eofSta5re JETTY EXTENSION
r ?-2?08 t
_ Vegetation SAND
01-22-120,08 CG4 T S/CAMA +
O
100 0 100 200 300
SCALE: 1" = 200'
REVISION DATES
--- T .
.-°
}
#172-87 MARINA DEVELOPMENT
DES SLIPS, LANDINGS S RAMPS)
172.87 Proposed 'A-?- - - _ - -
January 8, 2008
340 LF Additional 75' MARINA AEC y
AJOR MOD. Coastal wetland line
Proposed Bulkhead -
Proposed E' Wide Wood with no Boardwalk - 95 Feel "
tsiC.4MA Walk way Approx.45'Long t" . , Existing ? ?
SCENT PROPERTY OWNER Ocrober2o04 \,Bulkhead
Coastal Wetland ,r 8
_D BALDY FOUNDATION 404 Line 01 LIGHTHOUSE-WYNp R9
NORMAL HIGH WATER
MARCH, 2006
yr. ?"lr.s+i ?,
Iy,
M- "Fis X"
7 HARBOR VI1
BALD HEAD CREEK
BALD
It- ?w'VE
RECTAX PARCEL 26000005 24.36 ACRES
BM HEAD ISLAND LTD. JUNE 14,1983 DEED
BOOK 532, PAGE 546, PARCEL A
FOR:
Bald Head Island Limited LLC
Planning Dept.
1,,111111,,,,
(N CARO'? ,
0 .oFESSto?. ti?
_ SEAL
15684
GINE??'
C, ...... P `
JA M
71 illll {j1
BRUCE MAREH, P.E.
P.O. Box 3069 BALD HEAD ISLAND,
NoFrrH CAROLINA 28461
(810) 457.7517
BALD HEAD ISLAND
CAMA 17287 MAJOR MOD.
BALD HEAD ISLAND, NC
HARBORICREEK AREA
REFERENCE DRAWING
JUNE 2, 2008
tiEET:
GREEK BULKHEAD EXTENSION
20F3
6.25 FMSL
(2) 518" GALV. THRU-BOLT
AT EACH PILE W/ NUT
AND WASHERS
2x6 RAIL CAP
2x6 RAIL
4x6 POST @ 5'0 C
.
2x6 RAIL
2x4 CURB
• 1 (2) 518" GALV. THRU-BOLT
• AT EACH POST WI NUT
AND WASHERS
6.6 PILE @ 10' O.C.
• 1 2x6 JOISTS
• 1 24"O. C.±
16'-0"
MARSH -1.74 FMSL -
8' MINIMUM
TIP PENETRATION
(TYPICAL)
SCALE: 1" = 4'-0"
44' WALKWAY - ELEVATION
(-10' OVER MARSH)
SCALE: 1" = 2'-0"
6'-0"
2x6 RAIL CAP
2x6 RAIL
NOTE. FINAL RAIL STYLE TED
4x6 POST
2x6 RAIL
4x6 POST
2x4 CURB 2x6 DECK BOARDS
6.25 FMSL-
2x6JOISTS
24" O.C.f
e 1
.I
2x8 LEDGER
I•
I•
2x8 LEDGER (TYP.)
3'-6"±
(2) 518" GALV. THRU-BOLT
AT EACH POST WI NUT
AND WASHERS
J (2)5/8"GALV THRU-BOLT
• AT EACH PILE W/ NUT
AND WASHERS
e Y E' 7 E C
6x6 PILE
MARSH-1.74 FMSL ? ? ..
8' MINIMUM _
TIP PENETRATION
WALKWAY - SECTION
(TYPICAL) IDAL)
SCALE: 1" = 2'-0"
REVISION DATES
ISSUE
02-1408
CORRECTIONS PER REV.
CAMA COMMENTS 031308
CORRECTIONS PER 5$-08 REV.
CAMA COMMENTS 050808
DATE CHANGED TO REV.
MATCH SET 06-02-08
FOR:
Bald Head Island Limited LLC
Planning Dept.
\tt,l iillllllll
? ,?oFE oti,?,. 9
Q 1'
_ SEAL
15684 ! - o
DAME
111111 Itttt
BRUCE MAREK, P.E.
P.O. Box 3069 BALD HEAD ISLAND,
NORTH CAROLINA 28461
(910) 457-7517
BALD HEAD ISLAND LANDING
BALD HEAD ISLAND, NC
BALD HEAD CREEK
BULKHEAD EXTENSION
??JUNE 2, 20082, 2008
7 DETAILS
30F3
BULKHEAD BOARDWALK DETAIL