Loading...
HomeMy WebLinkAbout20061804 Ver 5_Flowers SMP-POD9-PH4_11-16-16_20161116Environmental Consultants, Ralro, NC 27615 • Phtme: (91t1) 846-5900 smd".Co November 16, 2016 S&EC Project # 6658.P6 To: NC DWR, 401 & Buffer Permitting Unit Attn: Karen Higgins Archdale Building - 91h Floor 512 N. Salisbury Street Raleigh, NC 27604 Re The Village at Flowers Plantation Stormwater Management Plan -POD 9 -Phase 4 DWQ Project #20061804, Ver.5/Certification No. 3766 Johnston County, NC On behalf of the permittee Mrs. Rebecca Flowers of River Dell Company Inc.. please find the attached Stormwater Management Plan for POD 9 -Phase 4. According to the Individual 401 Water Quality Certification Approval Certification No. 3766, Condition No. 9, `a final, written stormwater management plan for each phase of this project shall be submitted to the DWQ 401 Oversight/Express Permitting Unit for review and approval". Therefore, please see attached Stormwater Management Plan for your review and anticipated Approval. If you have any questions. please contact me at DShirlevt7o Sand EC. com or (919) 846-5900. Sincerely, Soil & Environmental Consultants, PA (ub- oi, _ - q� j Deborah E. Shirley J Environmental Specialist Attachments: 1) Flowers Plantation -North East Quad Master Lot Layout 2) Flowers Plantation Pod 9 -Phase 4 Sitework Calculations 3) Trillium (Phase 4) Pod NW -9 -Construction Plat -CE -01 4) Trillium (Phase 4) Pod NW -9 -Plan & Profile -CE -02, CE -03 5) Trillium (Phase 4) Pod NW -9 -Master Grading -CE -04 6) Trillium (Phase 4) Pod NW-9-Bioretention Detail -CE -05 7) Trillium (Phase 4) Pod NW -9 -Erosion Control Plan -CE -06 8) Trillium (Phase 4) Pod NW -9 -Erosion Notes/Details-CE-07, CE -08 9) Trillium (Phase 4) Pod NW -9 -Drainage Plan -CE -09