Loading...
HomeMy WebLinkAboutNC0000396_Duke Letter to DEQ 1982 Ash Basin Closure Nov 2016_201611176uRE ENERGY November 17, 2016 North Carolina Department of Environmental Quality Asheville Regional Office Mr. La r, y Frubt Mr. Landon Davidson 2090 U.S. 7U Highway Swannanoa, NC 28778 RE: Asheville Steam Electric Generating Plant 1982 Ash Basin Documentation for Closure - Visual Removal of Ash Dear Messrs. Frost and Davidson: 410 S. Wilmington Street. Haleig4 NG 27601 Mailing Address Mail Code NG 13 Raleigh, NG 27601 919-546-7863 919-546-6302 (fax) Duke Energy Progress, LLC. (DEP) has completed the removal of ash from the 1982 ash basin at the Asheville Steam Electric Generating Plant (Asheville Plant) located in Arden, North Carolina. The enclosed letter dated September 22, 2016 from AMEC Foster Wheeler documents removal of all ash utilizing visual observations of samples from a 1uu foot By 1uu foot grid. The enclosed memorandum dated September 29, 2016 from SynTerra Corporation documents confirmatory laboratory testing by polari4ed light microscopy (PLM). The samples for these analyses were collected at a rate of one sample per acre. 1 hese documents were prepared consistent with the enclosed North Carolina Department of Environmental Quality document titled "CCR Surface Impoundment Closure Guidelines for Protection of Groundwate' received under ever letter dated Nuvem6C, 4, 2016. DEP also collected soil samples at a rate of one sample per acre and submitted the samples for chemical testing per the enclosed DEQ document. The , ezoaltb from these zuil aamplez. will be incurpurated into an updated fate and transport groundwater model for Asheville Plant. unce this updated model is available, it will Be submitted to DEQ to tultill the closure guidelines for protection of groundwater per the enclosed DEQ docament. It yon have any questions or need any clay itication regarding the information provided, feel free to contact me at iohn.toepferca)duke-energy.com or at 919-54b-78bi at your convenience. Respectf Ily sub 'ted, J n Toepfer, . . Lead Engineer Environmental Services cc: Ed Sullivan — DuRe Energy Steve Lanier & Ed Mabbler - DEQ enc: CCR Reniuval vel ificatiun Eetter 1981 AsFI Basin, ARIEC Fuster Wheeler, septemBer 12, ZU16 AsheJlu Plant 19152 Ash Basin Llusure Pular izcd light IOlicruscupy (P❑PI) Results 50mmai y, Jcptember Z9, zutb CCR Surffaoe Impoundment Closure Guidelines for protection of Groundwater, DEQ November 4, 2016