Loading...
HomeMy WebLinkAbout20080828 Ver 1_Triage Comments_20080614Use this form instead of writing inside the folder Triage Comment Sheet DwQ# S- 0162 Issue with conditions (Reviewer 2) Triaged By: Reviewer 1 Date: V Reviewer 2 Date: l Reviewer 3 Date: Issue Project (Reviewer 1) ? Issue Project (Reviewer 2) A Issue with conditions (Re1) - Am;ii a? b sr ?r how ? More Information (Reviewer 1) ? More Information (Reviewer 2) ? Return Application (Reviewer 1) ? Return Application (Reviewer 2) ? Send to Regions (Reviewer 1) ? Send to Regions (Reviewer 2) SATriage Forms\Triage Issue Sheet.doc PLEASE PRINT CLEARLY 08-0828 White Oak Development AML comments June 14, 2008 Per the requirements of the Neuse Riparian Buffer Rule, all stormwater drainage from this site must be discharged through a correctly designed level spreader. Level spreader design requirements are set forth in Chapter 8 of the North Carolina Stormwater BMP Manual (http://h2o.enr.state.nc.us/su/bmp_forms.htm). Please provide one Level Spreader Supplement Form for each proposed level spreader, including the Required Items checklist and all items listed therein. 2. Please provide a depiction of a proposed BMP (state the type of BMP you plan to use) on the site plan that is correctly sized based on the water quality volume.