HomeMy WebLinkAbout20080828 Ver 1_Triage Comments_20080614Use this form instead of writing inside the folder
Triage Comment Sheet
DwQ# S- 0162
Issue with conditions (Reviewer 2)
Triaged By:
Reviewer 1 Date: V
Reviewer 2 Date: l
Reviewer 3 Date:
Issue Project (Reviewer 1)
? Issue Project (Reviewer 2)
A
Issue with conditions (Re1)
- Am;ii a?
b
sr ?r how
? More Information (Reviewer 1) ? More Information (Reviewer 2)
? Return Application (Reviewer 1) ? Return Application (Reviewer 2)
? Send to Regions (Reviewer 1)
? Send to Regions (Reviewer 2)
SATriage Forms\Triage Issue Sheet.doc
PLEASE PRINT CLEARLY
08-0828 White Oak Development
AML comments
June 14, 2008
Per the requirements of the Neuse Riparian Buffer Rule, all stormwater drainage
from this site must be discharged through a correctly designed level spreader.
Level spreader design requirements are set forth in Chapter 8 of the North
Carolina Stormwater BMP Manual (http://h2o.enr.state.nc.us/su/bmp_forms.htm).
Please provide one Level Spreader Supplement Form for each proposed level
spreader, including the Required Items checklist and all items listed therein.
2. Please provide a depiction of a proposed BMP (state the type of BMP you plan to
use) on the site plan that is correctly sized based on the water quality volume.