Loading...
HomeMy WebLinkAbout20161108 Ver 1_790188 Permit_Application_20161114Transportation November 11, 2016 Mr. John Thomas US Army Corps of Engineers 3331 Heritage Trade Dr. Suite 105 Wake Forest, NC 27615 PAT McCR�RY Governor NICHOLAS j. TENNY50N secrera�y SUBJECT: Nationwide Permit #14 Bridge No. 188 on Shive Rd (SR 2564) over Second Creek, Class C, Rowan County, NC, WBS Project No.: 17BP.9.R.62 Dear Mr. Thomas, We are requesting a Nationwide 14 permit for replacement of Bridge No. 188 with a triple barrel box culvert on Shive Rd (SR 2564) over Second Creek (Class C) in Rowan County. I have attached a Pre-Construction Notification application, a Vicinity, Soils, and USGS Topographical map with the project area called out, the Stormwater Management Plan, a'No Survey Required form for Historic Architecture', and a'No Archaeological sites are present or Affected' for Archeology, and a Mitigation Acceptance Letter from NC Division of Mitigation Services (NCDMS). Also attached are the Permit Drawings and the Culvert Survey Report. The project will permanently impact 141 linear feet (53'- culvert, 88'-bank stabilization) and temporarily impact 61 linear feet (dewatering) of Second Creek. Low stream flow will be isolated into the center barrel, with 1' sills, and the culverts will be buried 1' below the stream bed to ensure aquatic passage. The outer high flow barrels will have 2' sills and floodplain benches constructed at the inlet and outlet of the culverts. The low flow barrel will be backfilled with material that is excavated from the stream or floodplain and may be supplemented with rip rap if needed. The high flow barrel will be backfilled with rip rap or native bed material of appropriate size to the sill elevation in order to expedite the establishment of a natural stream bed. The site for the installation of the culverts will be dewatered during construction in accordance with NCDOT's Best Management Practices. A temporary overhead power line will be installed over the upstream waters during construction. The power line will be located approximately 40 feet upstream of the proposed culvert inlet. No additional impacts to Waters of the US are proposed as a result of the utility installation. The USFWS lists Schweinitz's sunflower (Helianthus schweinitzii) as endangered and Northern Long-Eared Bat (NLEB-Myotis septentrionalis) as threatened for Rowan County. Due to habitat in the project area for Schweinitz's sunflower, a survey was conducted on November 12, 2014 to rule out the presence of these individuals within the project area. No Schweinitz's sunflower individuals were found. Therefore; it was �Nothing Compares�_ State oY'North Carolina � Department of Transportation I Division 9—CONSTRUCTION 375 Silas Creek Parkway � Winston-Salem, NC 27127 (336)747-7800 T � (336)703-6693 F 7Ya n.ipo�ita�lai n f A11 McCROF 11 Ceve� uor �ICFiOLA'I ]. TATNY9ON :lecrit��ry cleterrninecl tF at tf ere ►nii11 t e`na effeat' on Sahweinitz's SunflaN�er. V�e determined tf at tr e q ra je at `May Plfilect but ia � ot L ikel}� ta Adrie rs a ly � ffiea t' the N l EB. Antia ipated tree a learing impaats fa r tf is pra ject are estimated to be 0.2 acres . A � L Ea Sa re e n ing a hecklist is attacf a cl. Thua , for the proposed actia n, f� C❑OT has corn rn itted to the aonservation meaaiires listed below: 1} No alteratia ns af a N nawn hibernac�ilurn's entrance or inkerior environrne nt if it im p a irs an essentia l k er avioral pattern, incliiclin g sheltering � a r f a rn la n g-a a red bats (, an�iary 1 tf roug�h Cleaember 31); 7} �o tree rernaval witf in a 0.25 mile radiva af a E nawn hit arnaaiila (.lanuary 1 tf raugh Cleaember 31); ancl �) � o cuttin g� or dea trayin g� a M n awn, oca uq ied matern ity roost tree, or any otf er trees ►niithin a 150-faat radius from the knov� n, aacupied mateanik}� tnae cluring� tr e qeriod from June 1 tf rough and inaluding July �1. �C047fas cleterrninedtFattfe qraposeclaationdoesnotreqiiinesaparate aonsultatian on the graunds that the proposed actia n is con s istent with th e final Section �I (d) rule, aaclified at50 C.F.FI, § 1 �.�IO{o) and efilecki�ie Flek ruary 16, 7019. Sectian + responsik ilities a�e tf erefore consiclered ftilfilled. Bald aag les are qrataated under tf e ti igratar� Bird Treaty �Ict and the Bald and Clofclen Eagle Protection Aat. AI 16elcl suNey o'I the project 9tiid}� area �nias concliiated on Eliig�ust 4, 2014. N a s p ecies or nest Niera a bs e rved. Th e reflore, this species will not be impactecl as a result af q noja at construction. By copy of this letter, we ala o requea t�101 reriiew and approval from tf e� C❑ivis ion af Wa ta n Fiesaurces Niith one copy of the appliaation packa g�e q no►iided to � Irn 51 Cf aprn a n, Transpar atian Permitting� Lnit Supenisar, and Dave Wanuar a, C10T Hraject Cloordinator. Ptease charge the appliaation fee of $270 to VI �S Hro�eat N o. 17BP.9.R.9 9 . B�� aoqy of thia letter, Hie alsa request Manla Clhamt ers, Ntl WEldlife Hesources Commis s ion, ta camment diaectl}� to the Carps aa naern ing the permit request, If you have any q�iestions, comments or need additianal information after reviewing� tf is matenial please aantaakAm}� Euliss at(336) 747-7800. Thar E}�ou �br )purcooperation in this matter, Sin ae re I}�, Almy Euliss Civision Ervironmental Ofiliaar, �QOC1T ❑ivision 9 �'fr a thfng Clompauas�..� Sta[e of M� rlh Carplina � I epar nent oETranspoAtltiu � Aivision 9—UOi ISTR�IC7[0 N 375 Silas Ureek AerkW�ay � WinstonSalem, Nfl 27127 (336} 747-780D 7 �(336) 703-6193 F Transportation Attachments: Application package and plans PAT McCR�RY Governor NICHOLAS j. TENNY50N secrera�y CC: Amy Chapman, NCDEQ-DWR, Transportation Permitting Unit Supervisor- e- copy Dave Wanucha, NCDEQ-DWR, Environmental Specialist- e-copy Kelly Seitz, P.E., NCDOT Rowan Resident Engineer - e-copy Phil Suggs, P.E., NCDOT Division 9 Roadside Environmental Engineer- e-copy Marla Chambers, NCWRC- e-copy Andrew Henderson, USFWS Asheville Field Office, e-copy Beth Harmon, NCDEQ-DMS, e-copy Christy Huff, P.E., NCDOT Priority Projects Unit, e-copy �Nothing Compares�_ State oY'North Carolina � Department of Transportation I Division 9—CONSTRUCTION 375 Silas Creek Parkway � Winston-Salem, NC 27127 (336)747-7800 T � (336)703-6693 F Office Use Only: Corps action ID no. DWQ project no. Form Version 1.4 January 2009 Pre-Construction Notification (PCN) Form A. Applicant Information 1. Processing 1 a. Type(s) of approval sought from the Corps: � Section 404 Permit ❑ Section 10 Permit 1 b. Specify Nationwide Permit (NWP) number: 14 or General Permit (GP) number: 1c. Has the NWP or GP number been verified by the Corps? ❑ Yes � No 1d. Type(s) of approval sought from the DWQ (check all that apply): � 401 Water Quality Certification — Regular ❑ Non-404 Jurisdictional General Permit ❑ 401 Water Quality Certification — Express ❑ Riparian Buffer Authorization 1e. Is this notification solely for the record For the record only for DWQ For the record only for Corps Permit: because written approval is not required? 401 Certification: ❑ Yes � No ❑ Yes � No 1f. Is payment into a mitigation bank or in-lieu fee program proposed for mitigation � Yes ❑ No of impacts? If so, attach the acceptance letter from mitigation bank or in-lieu fee program. 1 g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1 h ❑ Yes � No below. 1 h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ❑ Yes � No 2. Project Information 2a. Name of project: Bridge to culvert replacement of Bridge No. 188 on Shive Road. 2b. County: Rowan County 2c. Nearest municipality / town: Rockwell 2d. Subdivision name: N/A 2e. NCDOT only, T.I.P. or state 176P.9.R.62 project no: 3. Owner Information 3a. Name(s) on Recorded Deed: NCDOT Division 9 3b. Deed Book and Page No. 3c. Responsible Party (for LLC if pat Ivey, P.E. Division Engineer applicable): 3d. Street address: 375 Silas Creek Parkway 3e. City, state, zip: Winston - Salem, NC 27127 3f. Telephone no.: 336-747-7800 3g. Fax no.: 336-703-6693 3h. Email address: pivey@ncdot.gov Page 1 of 10 PCN Form — Version 1.4 January 2009 4. Applicant Information (if different from owner) 4a. Applicant is: ❑ Agent � Other, specify: DEO 4b. Name: Amy Euliss 4c. Business name NCDOT Division 9 (if applicable): 4d. Street address: 375 Silas Creek Parkway 4e. City, state, zip: Winston- Salem, NC 27127 4f. Telephone no.: 336-747-7802 4g. Fax no.: 336-703-6693 4h. Email address: aeuliss@ncdot.gov 5. Agent/Consultant Information (if applicable) 5a. Name: 5b. Business name (if applicable): 5c. Street address: 5d. City, state, zip: 5e. Telephone no.: 5f. Fax no.: 5g. Email address: Page 2 of 10 B. Project Information and Prior Project History 1. Property Identification 1a. Property identification no. (tax PIN or parcel ID): N/A 1 b. Site coordinates (in decimal degrees): Latitude: 35.531 Longitude: - 80.456 1 c. Property size: 0.66 acres, 312 linear feet (within project area) 2. Surface Waters 2a. Name of nearest body of water to proposed project: Second Creek 2b. Water Quality Classification of nearest receiving water: C 2c. River basin: Yadkin 3. Project Description 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: The existing site is a bridge. The surrounding land is a mixture of agricultural, rural residential, and forested areas. 3b. List the total estimated acreage of all existing wetlands on the property: 0 3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: 246 3d. Explain the purpose of the proposed project: Replacing a structurally deficient single span bridge with (3) 10' X 8' RCBC's on a 120 degree skew. 3e. Describe the overall project in detail, including the type of equipment to be used: Traffic will be detoured off-site and erosion and sedimentation control measures will be installed. Water will be diverted around the construction area and the old bridge will be removed. The proposed structure will be replaced on its existing alignment and a new culvert structure (3) 10' X 8' RCBC will be cast in place. The channel will then be excavated and realigned for low flow shaping, and a floodplain bench with stabilization will be established on each bank. Water will be pumped around the work area during construction by installed impervious dikes upstream and downstream of the existing bridge. Pumped water between dikes will be directed into a special stilling basin. Equipment to be used includes a track hoe, dump truck, paving equipment, pumps, and various hand tools. 4. Jurisdictional Determinations 4a. Have jurisdictional wetland or stream determinations by the � Yes � No ❑ Unknown Corps or State been requested or obtained for this property / project (including all prior phases) in the past? 4b. If the Corps made the jurisdictional determination, what type of determination was made? ❑ Preliminary ❑ Final 4c. If yes, who delineated the jurisdictional areas? Name (if known): Agency/Consultant Company: Other: 4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. 5. Project History 5a. Have permits or certifications been requested or obtained for � Yes � No ❑ Unknown this project (including all prior phases) in the past? 5b. If yes, explain in detail according to "help file" instructions. 6. Future Project Plans 6a. Is this a phased project? ❑ Yes � No 6b. If yes, explain. Page 3 of 10 PCN Form — Version 1.4 January 2009 C. Proposed Impacts Inventory 1. Impacts Summary 1 a. Which sections were completed below for your project (check all that apply): ❑ Wetlands � Streams — tributaries ❑ Buffers ❑ Open Waters ❑ Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. 2b. 2c. 2d. 2e. 2f. Wetland impact Type of jurisdiction number Type of impact Type of wetland Forested Corps (404, 10) or Area of impact Permanent (P) or (if known) DWQ (401, other) (acres) Tem ora T - Choose One Choose one Yes/No - 0 2g. Total wetland impacts 0 2h. Comments: 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. 3b. 3c. 3d. 3e. 3f. 3g. Stream impact Type of impact Stream name Perennial Type of jurisdiction Average stream Impact number (PER) or width length Permanent (P) or intermitte (feet) (linear Temporary (T) nt (INT)? feet) S1 P Culvert Second Creek PER Corps 8-10 53 S2 P Stabilization Second Creek PER Corps 8-10 88 S3 T Dewatering Second Creek PER Corps 8-10 61 3h. Total stream and tributary impacts 202 3i. Comments: Of the 202 LF of stream impacts, only 141 LF are associated with permanent impacts to the stream for the purpose of stream alignment and stabilization with respect to the culvert installation. The 61 LF of temporary impact which overlaps the proposed 88 LF of bank stabilization is proposed for the impervious dikes that will be used upstream and downstream of the proposed crossing. 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then individuall list all o en water im acts below. 4a. 4b. 4c. 4d. 4e. Open water Name of impact number — waterbody Type of impact Waterbody type Area of impact (acres) Permanent (P) or (if applicable) Tem orar T 01 Choose one Choose One Choose 0 4f. Total open water impacts 4g. Comments: Page 4 of 10 PCN Form — Version 1.4 January 2009 5. Pond or Lake Construction If ond or lake construction ro osed, then com lete the chart below. 5a. 5b. 5c. 5d. 5e. Wetland Impacts (acres) Stream Impacts (feet) Upland Pond ID Proposed use or (acres) number purpose of pond Flooded Filled Excavated Flooded Filled Excavated Flooded P1 Choose One P2 Choose One 5f. Total 5g. Comments: 5h. Is a dam high hazard permit required? ❑ Yes ❑ No If yes, permit ID no: 5i. Expected pond surFace area (acres): 5j. Size of pond watershed (acres): 5k. Method of construction: 6. Buffer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts below. If an im acts re uire miti ation, then ou MUST fill out Section D of this form. 6a.Project is in which protected basin? ❑ Neuse ❑ Tar-Pamlico ❑ Catawba ❑ Randleman ❑ Other: 6b. 6c. 6d. 6e. 6f. 6g. Buffer impact number — Reason Buffer mitigation required? Zone 1 impact Zone 2 impact Permanent (P) or for Stream name (square feet) (square feet) Tem ora T im act 6h. Total buffer impacts 6i. Comments: Page 5 of 10 D. Impact Justification and Mitigation 1. Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. The proposed project will remove and replace a structurally deficient bridge and replace it with a triple box culvert. Roadway approach work is minimized as much as is practical to reduce the overall project footprint. An off-site detour will be employed to avoid the need for a temporary parallel structure. The culvert slope is 0.94 %, so native bed material shall be placed between the sills in the center culvert to provide a continuous low flow channel. Further justification is provided in the stormwater management plan. Bank stabilization will be minimized to those areas where deemed necessary. 1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. Erosion and sedimentation BMPs will be installed prior to construction. Water will be diverted around the work area to prevent sedimentation of downstream aquatic resources. Impacts will be minimized by strict enforcement of Best Management Practices for the protection of surface waters, restrictions against the staging of equipment in or adjacent to waters of the US and coordination (including a pre-construction meeting) with the Division Environmental Supervisor. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for � Yes ❑ No impacts to Waters of the U.S. or Waters of the State? 2b. If yes, mitigation is required by (check all that apply): ❑ DWQ � Corps ❑ Mitigation bank 2c. If yes, which mitigation option will be used for this project? � Payment to in-lieu fee program ❑ Permittee Responsible Mitigation 3. Complete if Using a Mitigation Bank 3a. Name of Mitigation Bank: N/A Type: Choose one 3b. Credits Purchased (attach receipt and letter) Type: Choose one Type: Choose one 3c. Comments: N/A 4. Complete if Making a Payment to In-lieu Fee Program 4a. Approval letter from in-lieu fee program is attached. � Yes 4b. Stream mitigation requested: 53 linear feet 4c. If using stream mitigation, stream temperature: warm 4d. Buffer mitigation requested (DWQ only): square feet 4e. Riparian wetland mitigation requested: acres 4f. Non-riparian wetland mitigation requested: acres 4g. Coastal (tidal) wetland mitigation requested: acres 4h. Comments: N/A 5. Complete if Using a Permittee Responsible Mitigation Plan Page 6 of 10 5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan. 6. Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ 6a. Will the project result in an impact within a protected riparian buffer that requires ❑ Yes � No buffer mitigation? 6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the amount of mitigation required. 6c. 6d. 6e. Zone Reason for impact Total impact Multiplier Required mitigation (square feet) (square feet) Zone 1 3(2 for Catawba) Zone 2 1.5 6f. Total buffer mitigation required: 6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in-lieu fee fund). 6h. Comments: Page 7 of 10 E. Stormwater Management and Diffuse Flow Plan (required by DWQ) 1. Diffuse Flow Plan 1 a. Does the project include or is it adjacent to protected riparian buffers identified � Yes � No within one of the NC Riparian Buffer Protection Rules? 1 b. If yes, then is a diffuse flow plan included? If no, explain why. ❑ Yes ❑ No Comments: 2. Stormwater Mana ement Plan 2a. What is the overall percent imperviousness of this project? 15.7 % 2b. Does this project require a Stormwater Management Plan? � Yes ❑ No 2c. If this project DOES NOT require a Stormwater Management Plan, explain why: 2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan: Stormwater Management Plan is attached. 2e. Who will be responsible for the review of the Stormwater Management Plan? DWR TPU 3. Certified Local Government Stormwater Review 3a. In which local government's jurisdiction is this project? ❑ Phase II 3b. Which of the following locally-implemented stormwater management programs ❑ NSW apply (check all that apply): ❑ USMP ❑ Water Supply Watershed ❑ Other: 3c. Has the approved Stormwater Management Plan with proof of approval been ❑ Yes ❑ No attached? 4. DWQ Stormwater Pro ram Review ❑ Coastal counties ❑ HQW 4a. Which of the following state-implemented stormwater management programs apply � ORW (check all that apply): ❑ Session Law 2006-246 ❑ Other: 4b. Has the approved Stormwater Management Plan with proof of approval been attached? � Yes ❑ No 5. DWQ 401 Unit Stormwater Review 5a. Does the Stormwater Management Plan meet the appropriate requirements? ❑ Yes ❑ No 5b. Have all of the 401 Unit submittal requirements been met? ❑ Yes ❑ No Page 8 of 10 PCN Form — Version 1.3 December 10, 2008 Version F. Supplementary Information 1. Environmental Documentation (DWQ Requirement) 1 a. Does the project involve an expenditure of public (federal/state/local) funds or the � Yes ❑ No use of public (federal/state) land? 1 b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State ❑ Yes � No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1 c. If you answered "yes" to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval letter.) ❑ Yes � No Comments: 2. Violations (DWQ Requirement) 2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards, ❑ Yes � No or Riparian Buffer Rules (15A NCAC 26 .0200)? 2b. Is this an after-the-fact permit application? ❑ Yes � No 2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s): 3. Cumulative Impacts (DWQ Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in � Yes � No additional development, which could impact nearby downstream water quality? 3b. If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy. If you answered "no," provide a short narrative description. This project is a bridge to culvert project and will not increase access to nearby properties. 4. Sewage Disposal (DWQ Requirement) 4a. Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. It is not anticipated that this project will generate any wastewater as it is a roadway project. Page 9 of 10 PCN Form — Version 1.3 December 10, 2008 Version J. Enclang�re�l9qecies ancl Designatecl Cnitical H�t itat(Corps Req iiiremeut} 9a. Will this project ccaur in or riear an area H ith federall±� Kroteatecl s{�ecies ar � Ye9 ❑ Na f abitat? 9t. Ha�ey�oiiahnaked►�itf theU5FW5aonaerningEnclangeredSpeciesAat �Ye9 ❑Na impacts? 9a . If ya s, in dic ate the U5FW5 Rielcl Offlce ya u ha� e a ontacte cl. As hn � ille 9c1. Wf at clata souraea clicl y�ou u�e to cleterrnine wf etl er yuur site �oiild irnpaat Ericlan9e re�l 9 peniea or De9ignatecl aritiaaf Hat itat? USFWS a n d N C h IHP Dala for Su h►� ein itz's s un flov�ier. A s urrey fa r Scl we initz's � u nfla � er � a� ca n di ia tec I on Na � em bn r 12, 7d 14. Na 5c1 we init�'s sunia we rs la cate d. 9. E�senlial Fi: f Flat itat (Coups Req uinement} 9a. Will tf is p rojeat aacur in ar near an area clesignaled as essantial fish f abitat? ❑ Ye9 � Na At. Wf at clata souraes cli�l y�ou use to cleterrnine wf etl e r yaur site v�io�ild impaat E9aential Fisr Ha! itat� 7fistridgereqlacamentprajeattalesqfaaeinftcaianCounf±�►�ihinh isnotnearan��Qaa.kalortidalhatikatthatv�iouldsuplla� Ef H(i.e. salt marihei, o±�:tnr reefi, eta.). 7. Hiata ria ou Puehia ta nia Cultural Reaa uraes (Corpa Re c uii�eme nt) ]a. Will this project acaur in or naar an area that #he 9tate, fecleral ar trit al g ove rnme nts F a+ ie de s iy n ate cl a� h a+ ing r i�toria or cultural p rese ruation � Ye9 � No status (a.g., National Hiitoria Truit designatian or qraportiea significant in Na rtF Clarolin a f ista ry a nd a rcha e ola c y)'! ]t . Wf at clata s aurues cli� I y�o�i use to clekerrtiine wf ekhe r yo�ir site v�io�dd impaat i istaric a r ara rea log ica I resouraes? Se e atta cl e cl Hi� toria Arcl itea iure a nd l a n� Is ca q e� "Na Surve y Req�uire cl Rorrn" an� I Ara he c la c in a 1 Re9 0� ira ei "P la Nationa I Regi:ter af Historia Plaaea ali9ibla or Listacl Arcf eolagiaal 9 ite� Rreae nt a rAffeaie�l Rorrn". 8. Floodaone Deai��nation jCorpa Recuirem�nt� 8 a. Will tf is p roje at u a cur in a FEN A-c le sig n ate cl 1 fl�-ya a r flu a dpfain? � Yes ❑ P la 8k. If ��ei, e;iqlain haw qroject meets FENA requiraments: 7F e prajeat is in a FEN A Detaile d St�icly. 7h e Project will k e an N CIA T±�qe �IA. Ror rriore inforrnatian p lease refer ta the Cul�ia rl 9 urvn y� Repa rl. 8 c. Wf at �a urce (s) �lid ±�c u u.e ta niake th e floo�lqlain deterniination� RENA FIRM Ma� s. Amy Hu�is9 � � , f / ica U ent's gnat re �� tG Flppiican t IAg�e n t's Printecl Na rn e (Algen t's s ig ature is va lid on ly if an a ukhoriaafia n a te le tter from fhe a q q lic ant is pro� i� la d. ) Aage 1fl af 10 �^A■�f� � ��! �r��"i� :"�ir��rj►� ����1 ,�+���� ���r► • ��� irs�'��.'�,x����! l�r��'1'�,�� ���#r I Project Vicinity L � u�e cn�n� Grouc L1hdl� Kann ipoli:, � � o;� N Concord S :siishtiry • �; +W I trern ar I , ��F µORTJr c,�9 4 � �p ro � e� � ���'''4F TFAN'r'Rb EiUGINEE�lIMG & C�hf STRUC7`IDId Figure 1 - Project Vicinity REPLACE BRIDGE NO. 790188 OVER SECOND CREEK ON SR 2564 (SHIVE RD) ROWAN COUNTY JUNE 23, 2016 `r 0 250 500 1,000 Feet Soil Legend � � �� � ,� �� � , � �{ ` Loan 2 to 8 pe�� � � � � � . . .. . ;y Loan, 8 to 15 pE _ _. ��. �� � �b�,,� � � '� � LdB2 - Lloyd clay loam, 2 to 8 percent slopes � � ti -� 1 f32 - Mecklenburg clay loam 2 to 8 percent sloy:� � ,,,y"1, ��. .�2 - MPck�enbur� clay loam 8 to 15 i erreit s.� ' �� ' � ���� �'�'� � - 'ti � :r � �;��''. yw `�, t ,� *r �1,,4 � �4 ,fr'` ' Yr ,�;'< 3' � �ti . ti� : _ _ ._ 'y;� '�` . ' :� �� � �i�,�"� ( Y r� � ��,� + TV1� �`�� � .� y ^. '� � � � L C - �+' ��. � Jr �. � `���'� �; r,. ' , l �;,� +�. 1�' � � ;� �; ��a � �;, �A ,, - 1. , - . . '� .�. �, x , � � �e.. ��'�.J � '�� � �,r . . 1� �4 `, �, , ,� +.,o , ' ..'�- , � ' � , 4 � ••'+,�` Ij�"�,� ;, ^�+ �.� ., i � � �+� l� � Y . ��. ,.. � • �: � � � " a � �' ` :� �� � � .. 1,,. � �' `� ,� T � �� \Y ,l ,�. ras T .�' ` `� �:���,� �+, ,�k. �� N"�1r'� y '1. ,�, � � �� � - '. � ` � - n�i � ' ' � t� � ,;`r t �k;, ,��t��� k..., ` � � �+�+ „�ry � � a �'.. �s a v ia.. . .� � � ,. x • ', . `� ��)•; �� � � ti � A a�. � ~- f ! "t• d Y F'� � : '. 1 /"' . � �. �3 ' 1 MA �' '.�y�` '1 �, �_ ,M ]�w �' -y_i i � � 71 � �r '�'���`� ' '� � ' � ' � •III � � r � .�. � x� : 4+ . . K �,. � . tl� . .� -.�::,, ,.b��i s" ��1s .��.i `f'�1� y�, �"'` �� i��e� � � : t n� b � � '� �,�e� � iY r.__�a'l� M,i ;:yl'. /I� 4 �� : ,�,!�fi�i' 1'Q' ����. �`L � _" _j��� � �� � "� Y,y , r � . "�i r �''�, f :47 1 ` ti " . . ' � � � � � ,� ,�� 1'1, . 'j,� ' yy i :.�� ¢ ��. , �y,� ' . � �� � i I.'� . � ,� - ' ' � , �` � t,, � , � � U� �1. ` t. ,` 1 ��r :Ss ,� ��i�\ ,� ..�' , 1, � .l; � ' �� ���� ? � � � �C•�� ] �� , } , » f � ♦ � . Y . t � � y���' . '� w ���n�� ����. . ��,�t'1�. �.��� �� �%°�, ���1 � �� 1 ��� ii T � �' � Y �`1 'f . �'� , �' � Ys � 1 ` �..�i �� t` ' F . � t`� F, � A te%�'. ' � . i �/ � R `` � ! " - � �\ �� S k � N �r � , � �� � ra, �t ``1�.�� ` � a , v h F �q � � ��' `�f, � � � t,h� � � `r � 1.1''i , �i �i.'� , �� ��'` � , ��`� ` � �� � � � �" ` ; ��i. � -0 , Q _ 1�' ti �.'y �l� �'r� . ° +�' '! �. r . s S �.-�. , � S�, 4y�y .� I'' ,' 'w� �� : �` /S-3. ��' ` 1; � '� 'jt-a��F ''�'�� > ,�, `� "' " � R2 �3� '� r i�i� �� :` ,+('s ��►��. ;�i f` � ,} ��' � S6�/S+ w , _ I� ,..`^ �: ':�t�' k,; � � ' .;,y,r'� 4 ,' h'iV � , � � '' ��, ". � . _�'� , F;Q , �� � •�, ' '1 � N+{�i'� ..� c.: O ,.,+ rt �� �. � . � � �..�� , �. +�. � ' Y� � . ` " ��, �` �'1� ; ��� � � .� , ; �.,. ' u• , - t .� � r• � , .�� �� � '� # ;I,, r J�t�y .�� � „� 1i�� `�` �j �.d a i=, �• �`�r ��•J _ - 4 ..a�Z `.Y � ,�' . � �,�fp � � ` . ��. � !Z �Tr Y� � . �� } t 'y,-: , \� ,... . ,+� � �, � �i.� '. w . � � C ' �''i "+i 4 � � '�',��1\ , ` '�\. • � . � j� � f�''�,� ,r j � -,� � . �� N� � � ! � � � � , �ti �_,�'►� . � �� e .���� � � ��a �„ ,«Y` �� �` �.�, ,y�r .f �� t ,, _ ` '.t �y�,�' .� �� �� ' �,-J'�' • � k�}. _ t'► ' � ' � a}'i' F , �t ��� k` - � 'µ�id':;�� �+w���+�1�� ti`1^ �4R � T� ;i�. � s � .��� �a;� �,��� t x' �i . �i � `� �,'. � �•�, �?.,,'� "��i'�� ' ►''t'�. •<'� + "'� ��\ � � � . ,� •t'�;�� \��+� i °1.t�,� �� � ti ; �` ��� z y � �,� , � ��z . .- � 'a�ti �� ���?_� "'� �� � �^ .��. ����a�,� �,� r J ' � ' � � ,V � � � �4t � �' �AN ti�. '+ �,t' , �� - �, �•, ���- ��!'.. `�',4`�,1.,�� - �,', .< �' t ' �, �� � t '. ., t,� � ,'� . �� � s J � t":�, �, �� � . t.��, , �' t'� � � r ��- 'ti �"� 4 � . � , � �i w � �► ; ��� . �. �� Map Location Soil Map Figure 2 REPLACE BRIDGE NO. 790188 l, -���,R,,;�,� ROWAN OVER SECOND CREEK N n��,��,�° �� ��'r�y. � ON SR 2564 (SHIVE RD) � ROWAN COUNTY �,t '` �r�r ��` � . � CABARRUS JUNE 22, 2016 � � `� �� � STAN LY 1'` �� '�'"� ����rt3f 7RA��'4�� 1 inch = 200 feet � - _ • 11�� .. R ! ! ' �!— ' ` �, � , � , � . . 1` ' ��� - � � � � . . �� '1 � � ' J�fi�i 1 ! ' � .�f ,' � � � � �� � � . . ' � �'� 1 :• � •-�, ,� .; � � • L� . _-� � - � �'�aa��i ti- � , � . � '� > , , � ,�,• � __ `�`� • � � . _ � . , �-� ��� , � � � "., _\ ' `� s _ � � 1 - � � . � - ���� - : � ' -_ 5 � '� � _ - _ - ' ' . c e4� , � �; • ' _ „, � • �. � i � �. _ 4,r � , � �-_ � 'w �� .� A'' ,' 1 � � . � .• _,,�,�,,, � , ►' . . � ��' ,� � . r . • ', �' `�, , � , � # �. 1' '/ .' � - ' • `_ " ����_ �. _ - . .�, - ,� �► h� _ — - � . w ,.�_ t �..� - ���—'� � . , .Y\` _ �* '- __ F� � ` ^a .. � _ ' ' � .� . � � � � _ -- _ � , �J •• � . i _ � ` � � � .��_ � . '� - �1 �� � • � 4�[ _ -•—�� - � 4 _ . ' ���� � ' �4 ' ':���r'R. `� - ,� _ . ��, , i � �ti- , . + • , -,�-� � '�, , _ - . - "- � ��l� ' ' i " �' (�C3 ,� � i + If �� f , � . , �,. �� f," � � � ,' , � } _. � - � . . � �� ,�,� e r� , � ��� ' � ' ' i . . • �- -�� � _ Q� , ;� � ,� • �„� . , �"-� ��_ • , � � . � � - �; ~� � `�� * i A� � • � � � ��� f`,•� S/� � * f� � • � M i ,r f • � � * �\ � # ' '__ � � +► ���� . . JJ//�, ' � J��r +� i 'i� FJJ }\ � � f `�/"�\ � � .� _ _ _ _ � Map Location USGS Map Figure 3 REPLACE BRIDGE NO. 790188 D IDSON OVER SECOND CREEK ,-'pF �,�fR��f� c� � ON SR 2564 (SHIVE RD) N �,"��'�4' ;`,( f:� • ROWAN ROWAN COUNTY �`' �� � �7k j ` '-� '� • JUNE 23, 2016 ; �. � << � � �� � USGS Topography, 2013 `� � � � CABARRUS STANLY Rockwell Quadrangle ��"�a� ��� 1 inch = 1.000 feet ��'r�� aan��e� ��- �_ I l J' M i _ i i� _� � i, � �. : 1! i' � l i.. ?� � i � � i Fedaral agencies should use this form far the optional streamlined consu�tatian fi�amewark for the northern long-eared bat (NLEB}. This framework allows federal agencies to rely upan the U.S. Fish and Wildlife Service's (USFWS) January 5, 20I6, intra-5ervice Program�natic Biological C}pinion (BO} on the final4(d) ntle for the NLEB for seotion 7(a}{2) compliance by: (1) notifying the LISFWS tha# an action agez�cy will use the streamIined fiamework; (2j describing the proj ect with sufficient detail to support the requirec� determination; and {3) enabling the USFWS to track effects and deterrnine if reinifiiation of oonsultation is required per 50 CFR 402.16. This form is na# ne.cessary if an agency determin�s that a proposed �ction wi�l have no effect to the 1'1LEB or if the USFWS has concurred in w�ting with an agency's determination t}�at a proposed action ma,y affeci, but is nat Iilcely to adversely affec# the NLEB (i.e., ihe standard informal consultation process). Actians that may cause prahibited incidental take requu-e separate formal consultation. Providing tla�is inforination does not address section 7{a)(2} compliance for any other listed speeies. Information to Determine 4(d) Rule Compliance: YES NO 1. Does the project occur wholly autside of the WNS Zone'? ❑ x 2. Have you contacted the appropriate agency� to detennine if your proj eci is near x � known hibernacula or maternity roast trees? 3. Cnuld the project disturb lubernating i�TLEBs in a known hibernaculum? ❑ x 4. Could the proj ect alter the entrance or interior environment of a]�awn � x hibernacul.um? 5. Does the proj ect remove any trees within 0.25 miles of a known hibernaculum at � � any time of year? 6. Would the project cut or destroy Irnown occupied maternity ronsi trees, or any at}�er trees within a 150-foot radius frorn the ma.ternity roo�t tree from June 1 � x throu 7u1 31. You are eligible to use this form if you Ykave ansvvered yes t�o questian # 1 or ves to question #2 �,no to questions 3, 4, 5 and 6. The remaindex af the form will be used by the USFWS to tracl� Qu.r assumptians in the BO. Agency and Applicant3 (Natne, Emai.1, Phone No.): NCD�T Division 9, aeuXiss{,'1a ncdot.gov, 336-747-78Q2 Pro'ect Name: Praject Loeation {include ctiordinates if lczxown): 35.531$OA�, -80.45b52$ Basic Project Descriptian (provide narraYive belcaw or attach a�.ditional infozmation); Replace existing bridge with a 2 barrel, concrete box culvert 1 htip:l/www.fws.gov/midwesdendangered/rnammals/nieb/pdf/W'NSZone.pdf z See http://www.fws.gov/midwest/endanger�d/mammalslnieb/nhisites.html 3 If applicable - onZy needed for federal actions with applicants (e.g., for a peruiit, etc.) who are party to the consultation. General Prajeck �nform�tion I'ES NQ A�encv Determination: By signing this form, the action agency determines that this pra�ect may affect the NLEB, but that any resulting incidental take of the NLEB is not prohibited by the final 4(d) nzle. If the USFWS does not respond within 34 days from submittal of this form, the action agency may presume that its deterxninahon is fnformed by the best available information a.nd that its project responsibilities under 7{a}(2} wiih respect to the NLEB are fttlfillee� through the USFWS Jazivary 5, 2016, Prograrnmatic BQ. The action agency will update this determination annually for multi-year activities. The action agency understands that the USFWS presunies that all activities are implemented as described herein. The action agency will pramptly repart any departures from tl�e descr��bed activities to the appropriate USFWS F'ield Office. The action agency will provide the appropriate USFWS Field Office with the results of any surveys conducted far the NLEB. Involved parties will promp#1y notify the appropriate USFWS Field Office upan findix�g a dead, injured, or sick NLEB. Signature: Date Submitted: � � "Any ac�ivity that temporarily or pem�anently remaves suitable farested habitat, including, but not limited to, tree removal fram development, energy production and transmzssion, mining, agricultu.re, etc. (see page 48 of the BO). 5 If the project removes less tban 10 trees and the acreage is unla�own, report the acreage as Iess than 0.1 acre. 5 If the activity ineludes tree eleari.ng in June and July, alsa inelude those acreage in April to October. Prr�frct Tr'athGi�; No. {I�rterna[ Use� 14-11-0018 HISTI�RIC ARCHICTECTURE AND LANDSCAPES NU SLTRVEY REQUIRED FURM This forzn only pertains to Historic A.rehitecture and Landscapes for this project. it is not �alid for Archaeologieal Resourees. You must consult separately with the Archaeolagy Group. PRO.TF.CT iNFORMATION Project No: Sir. # 790188 Caunty: R�wan WBS Na.: 17SP.9.R.61 Document PCE T e_ Fed Aid 11�0: Funding: State Federal Federal Yes No Permit l�iWP 3 ar 14 Permit�sj: T e(s}: Proiect Descrintion: Re tace Brid e Nv. 188 on SR 25G4 Shi�e Rd} over Second Creek. SLIMMARY QF HISTUAIC ARCHICTECTURE AND LANDSCAPES REVIEW �'lescr�intion oireview activitfes. �esult�, and cv�clusions: Review of HPC? quad maps, rele�ant backgraund reports, historic designativns roster, and the Rowan County GIS Tax database was undertaken an November 24, 2�I4. Based on this review there are no resources over 50 years of age in the APE of this project which would be eligible for Natianal Register Listing. There is ane house in the APE but it was canstructed in 1983.1Vo sur�ey is required. Whv the available in1'ormation pravides a reliahle basis for reasnnablv p�'�dtctinF that the�e are no unidenai�ed si��rifcant historic architectur�ai or landscave r�saurces in the p�oiect area: Using HP� GIS website and Rowan Cvunty GIS Tax database provides reliable infvrmatian regarding the stntctures in the APE. These utilities are cansidered �alid for the purposes of deternuning the likelihoad af histnric resources being present, SUPPURT D�CU1VIElVTATIQN �IVIap(s} ❑Freviaus Survey Info. �Phatos ❑Correspondence ❑Design Plans FINDING SY NCDUT ARCHITECTURA,L HISTQRIAlY Historic Archxtecture and Landscapes -- NC3 SURVEY REQUIRED NCDOT Architectural Date Nislor•Ic Arehlleclr�r�e r�+�d Lmulscapes N� SURYEYREQUIRED jornt far Mir�or Tra�+spw7QEivii Arajecls ns Qrrrslifrerl ia flre 2U071'rogr�nnirrrrrtic Agreeixeii7. Fage 1 of 2 , f► 4{r�i ;/7 .8 v,+�-.-;� � ` �J ,� r �' h f }�� �� �, ,� P7 �-��}, � 1"rt �. �J� �r . � S�' � j�'� � �� �-�� '1.�� � a i�'� {�3 -�- +, �',� r F�{ A � rl�� �7t �� 4 4 }` u l 8� r�" �'"� { r Y f s� 'k�t.�� 7 1J' '��' R y nl �i' �, �q�r,+�+4 ,�y�y+�, 1������ l91�,dr 1� 1x5��1 h ��fi A'�+7'��a y`� ey��, ����4! ' �� 4�� . f�}�r ��� ^ � . r�! '�,F A-.�,��_ ,�}''�+'.s3 ��lfr� .° �� "lr'� ''r-.i: '�. w ��.R. . � ���_ � ♦ � ���1f�► C�' -� �- � �� �i 3 r��r�.i?j � �y'.' �? �e�+ ��`� �4 ly��� �`�.� •., ,_ �,.}T y � }�� ; , - .�� �' '� � � s��,'� + y� � , � f rA�. F s ti � `y� �?'!� � d . ,! �¢" � c ,�i w�,t�.�,���pl� ��.� �'.v .F'`��j fy� ��'Y S � ` ✓ � � .' 1 !, , � �•,- ��� ; � ` � +r � _ i .1 � �F-'�,/�1y� ^+t4'. �yt,�y�._ .;Y.',TI� eY4 � r�:�. � � .1"•.� �E�- h.� ;'�'�.��. , �9i[{ ! SJ-:� Tf�y i�.�k ';6'' �� -.,.Py�. � -' f"�y :`-�T��1���� � :i ��Y ;X�����rr�.��'�+R� f�„ ��,����, � S � � L�' �i�S ���� ,��`�'K(��'�..{b +fr � ��"{ 1 � ��%i �`rF�'•' rt ` "`�,��a-�`� 1��t�� i r �, �, �� i� ��.�:' �1 +.1�r t ��� ti � ���� '! �r �.rz' � �� 11+�1 u�y �� ��J in� ''�s,�Y" � ii � �� � •�,� ' q � V-� -x L i� i_�l f „�,:i f ; d I��� �+4'} � � 4 'E�' 4.j' (7 ..r��r r �, f � 5� �_ ..ia� �Q ' i t� J��-'�t�'i� � i ^ �� -� '�'d _ y, �. : ; b" .. 4 �l FI y�a .�{�t F J � (F f I ( i � -.�p��.� f,t�Tj�� ,ID ��� � �n .:��� �� ,.�l�l_.. 4 ;/� �t.P `��Ai ����'p� I e�y . � 4 � � Fs"�{;r � �.td?7 �i - ..1 �Y �+����y� �� I r� -� ^/+a �~� y '�"�,4 r�.�. + „ ,.��'' '._? � i f, I � ,� �� y�{� � . �,/�_� A°P�f'#y;����1l, x���P��X"r�f,� �`fI ���. ��f".`�C� Y}l�i�� ^��+ J � ` _- �� �j��� �--� F� � t� � f�} �1��;�.r - q F. r�i'i� ..;�Gf �A[ .�¢� f3 .r sY^^ .! �'����� �� (�� �,�,� �� �� Y �� +c � �r't �i i �:. '.' J , tsf�'�,j + . , ir,c,{�� � � A �� -� _ I� : �•�„�^L "� ��� . �.. � �`� ��. �,'1� - � . �{. , :.Q l� Y� �� � � i:aar �' � � � �* �� . y . � Y r j� "{ g"� � � �"�' M `' � I t� } �� I_ . � - _ �P fb 4 �,�}'@ }r �r �y,6 � � � .IY R'��� � � r �� r��!_ f .w� . { � 4 YF' � � 1 � �^T' � � Y � de? rF �. ,�� h 1.Fz� . .. i'^ � � { ' -. � �'� ' �' ( !r� � ,y, .�._ �° ,�' � „'� 5 � � �� `� p� � .:� C a�.° f 1,� ° ;i�� ��� r'', t �-� �� r %1'"��� <�'�E,�. ��iT ��w! i � _ �,� .�A ✓ �m ..�� ! �� � � ;�a P n.�.. sJ•��� /��`� '��,�,��i� t �r�r - �.�� � �� :i � � ,,���i }� ��'� C -� . : � � �� l ,i�:�+�' -yr�-f� � ._ �r �- � � r r ._ _ I.:� , ��'� J i]a ... � � ��a T� � _.,��" f.�� ,�� � '¢� r�. �.�� � ��`. �F��-; r�r'4,5 � . _ ._ . �r_ ` _ :��, �.r�G�'r�,�� �',� �, . ..��' , i � < +���,�; o- e$f � , p _ ` �, �_. A � r�•�a.,ri'at.,, t` � . " �.1alcG` " � �'�,�+r` �` ' = '��t��` A.ti r.,,��r�4j'�-� ii , . -� � P ��,�`tv� ��,, {r.s r �,' �����f ,� t t' '�'`K.�t�'I,.- _ �'�.� .. f �fi Ff� �n�s11; p 1/ ' . � . ��i,f�'�'� � ' �-� �� 'p {. '�"r" �,'�yik �,� �.�,g i ..,� k�i �� y �- � . ,� =.•,s� L.� ��� y�y,�.L �-� � �'�� � � _ � ,L�� �i� � '� . p � .� " i � _•1 Q _ ` ,�g' I �:✓"S JM1�r,lR � .�' r � � 1 r sM1..�K w . �;•�i ily� -'': � �� � � .� �x" ��. r��w ,.� � y �� � � ,,� , � �° `�,� � ,� � ��, r��. ' �y'. � � $ ��, � , �; � ' ��' �F �...... + `�„"�`tY e .. ,'��+i:. �_ �� rSY�-�i`y�i� r _ � �..:,� � �' •. ■ �'r.A� .._�y�w,`,� � fi� � � , - t � �,�� ���-0� '�. � _ ��a �. � � �.� -� • ti � �.�� � tiX ��i: �}��. c`.,l ,��ia 1 ��. � ��' - ,�: . � � 4+� tC �� �' � 'S��" {:� ��� .hr M ���� '����fi� ,�I ��� x. � ��Y y��a� .',_a�:, fi�., �..r� 4ir ����'"�i ,� %-1 r '�� F �: � l i' � F ,y� �; � Lfi��'�����'� ��� �iy�--���� -�_r �#4� �i++-�v ���:�2t�s`lY'�rt ,ar� � h� h�-w, .1.�.: �j�'��,Y.ir' 3�'7?b�� ��, �a \ � � �� ■ .� � `'�.._ `��Yl ��� -{',, . 3� � a'�. ,M1 4 ?. / 4„� } s �"`j r.. V T �'��� � 1� � �G � p . .���r� � � � ��i r �R ,�'1�� �r. ���� R�'�� '�'� ��; � fL�,�%'� ""� W � '�'"�` � "�, ` � 4 � � �6 �0 � � , � � : � , , � � � ' - ,�� � ■ r � , � :. , �,� � F,i , �, �. � �n��'.�'�'„.. _ . � c�:a,Ls , j ". - -i�� X g,a' ` rt�'� • , ,y � . f - � � 4 I L1 � y� � C r � � )�`� y "'� ?i .�: { ;� . .. . ' � � Il�v}� �� � S`, i� y�i +"C .. ,y�_ P. -k' ..� t ; 78 •_� P ,s�,��`�� t{l'.s 4 i. �wF� � �', 5 ,.r . .. 4 ��'� y��T ' . �.;��tS+�t l„�,�� i's, .n��� _ ��y �.� ti� �'• �y� , t� yp� ` �{ct� � `" ���'Y'�"�� ���: � . '.� • I.� ,�� . :4y.. - d' .: �!�,!.�'�C,�''�,-rr' S�'�h ; :,r.+ �+�� ..� .-: _ � + � ', �� �: e: � : e� ,�'p��' `�` � �`' d 5° �- � '� � F i�"i�.�„y �� . j�,�� �j , w��� ., . . J���r4 ' �'� {,� � �, �y.F � � J P . L��+ 4; ;i.. r� .,� e .�3 � -.-, � .��.�`, �- °S�'y <`s # ��V iW�,,, y� ' �z,:.�„� _ �'� , �� �, ��,-�r��',�'' ,: � �,.r 7 sl� _��` #.s;, � � �, J'`� � �y' ��� > „ 7 � 'Y��i's � � u � _ � . � p �`4. �3':r� �� K�"-. � 'J { �t i]al ' '� � � ti'�f `,� ki ��,,g�`. '�x'. r �'r Y� ��"1 � �''�� '�. ��g�. � ��.�:'�i�'f�f�T,:' .�.r�e� - -�Fr.`9 lria��w4ef: R `,'�`L: r� y�s ,y�{ � � C � �� y�.� �a`r �� ,ji�.�'����7P4.:'� � �Irn 4w`�'�l �j �^ . . �it.;�'..� - � T —' y` }- � 'TM`+ e� . t 'y.� r ����� ', . .� � � ?h4 '�� , _ `-E� y� � ,`''.� �3" �"`T. �.if .�' � � ..31 ' i av '�' ...Qi�t � �t = ��,T `,�1't � � � �ur . �'E £ �'� MY��.�-� p y aFt � " ��i� _�; �� �� �. � � , re- � � . . � � ,- �r`� � „a � , i �1 9 � �,d,.ry.�''� . . �„� 1',�,���1. r�,�� � �h .���'' ..;�/� �y7:} '.�� . �� a� � � � ae �,r ;;.s�4' � . � �•` . �� .. ��� '�c �-��j� '�' _$ s ~ �`x-�� ` 1 � � � o I , �. ,�' +�'��# �,� ..•!*v ' t�",, ie'��°, '' .+8d �' - � � ,�� ,��, _�' �;�.� �� - r °� _ � , ,� � � , � �'�,.� � �,�, � f � ' � � �: � .�� ^� . i. � �� ��3 ��„�� �4�'�; � .r � y`.. ,e� � t' . � I'. r �" � � rir ry_: .r. '���1 �� � ��- . � � Z = � �-_ �a . f ,� +� 3 5s "4 l� �. F' '�L �,iY y,.. �i �.�F � ti ' �'i'� 1 '.f � � �r��� ,�� 'q ,s�' � �y��,�y�;. _ ��,� � . �"x f� • < � � �� II Y� � ,. � ;�'.�y � .� ��� p "!'��a,� ,�'� '� _. �J " � d /{y� ,� � � � � �.,- ��� „�"�- i Jp,/���� � � ' �„�'� . . 'Q tS'� �.\ IC#��51 ' ai�w,-�-s' . `� ,.. ...�7� £i�".J �R S YR�.'� ,(��' �•'� .i y{4���' 4�� �Y - � ���'�� R° %% � �i�"�J . t, • �' � t� ti7 � -.~ : A �� �����r ���,:.� .� i ' � ��. _._ �` I+r.alrr��e�.:lrz�Ad?e.rtrra rrrr�, rrr� s��. .�'�!).�f. i['f:�}' �,.{)�'1��,''��al r�i�r.rr��� �1}+e� ;irrrspr r�.r�:r �u�_G.r�:rt �� . :-, r -. -.,. ���.�r� ti �+ i}y�e�riir��xt� P�t�,�c 2 E?t 2� � i �� � �� � �� ��. 'f �. • i � � �V �� ,J 1M�\ , � _ �� ,�- � � !� , f r / .. ��Hbl1�� y . , .. " ;i��. � o � • ' � '•,... �J rt� A r I� � • 4 � � -_- � x'� . `� �� ��1 •! � f . ' fyf � y��sy � " � � ` � ; �� . {�I�i. _•f }.l��.` � , �1�1 ; . .�+ '- ��,.. y� � - • � I�}.� -- !!�r „Vf� ^ � ` � + ., �!` � . �T. ;;; , , , `' r� , ,`"1 � .�._____ , . . :�--. "' •._r �'i. W =. . .. � - _ � � . •• t. t . i :� �- � r '� ' ,�. ��+��3 " � ,r ti�, a ,� - I� � ' /` ,°�' � � �7Gfl �}ti�' !�,{ . � .,�, . . � z f m �" 'd >`r^+,�i �w. 1 C � ! � � —�. r r� •r . +'.y"r''�� .''i �, � ,r• � r _�,Yq., �_ � '.: � •i ,�, � s r"� � � Y' � �� �r 1� ��` `.. hl N�/,�}��J .•� .�, ��t�. 'I ,�� � f � " r i'� ' t � r i � � a J � �--- • �'' r, ' `T. �T y - � • - - �V"��� '. �" y . ___�`<. . . r � "� ��F� 4 �.�' { ,. � . ` 1 + � "�} �r,/�r� r �A ��y�... 4. ._• ,l 'I! " . �.( - ' _ i �`• � _ � iy : � ( �_ . � . ��',�.'4'S��_ i � �y'y� l;l�.l� r^' ' �A p ' � � � �",� � / � � ~ � � ��. •� � ;4 r • � y��, � � 1 ,1; �, ..y, �f , � � .��r'��r ` �`'i�+ ? � � ;''�, '�, ��� . /'`iiL�+4$Rr � '. - �� '1�"/� ��.P�''� -y �U �, �i� �''��4 �3 '. r j a i3 � '� � • . � M .,; 1 . .; � '�[9� � 7 vvJ +c h��'�I � i'�.�1 �� Cf�6• ' .. � � � " ! � . ' . , . . . ��, �,'��r C3 � ����, � . �''� , _ � .,_ , . j � . . �y�� ��� � , .� � �,4 � ", �l f�-� �` ' , �^'- � '"' a r � ' � ��: ° �_ ���`� .:�� . .. A .. ��� �:� r �, � � l � �y 1 � � . ' r . /� � ��a} '3 L ] F��} � � �1�.' ' � � � • 4 . "..� .-�` . � ' ���y�c' � �� i�a� - �r' R� A '` �Qf �� . ' ,gr,� }j� # �T�� ' � _'� � � � r j � ,�.�—.,_ �+ i � .� � �'* � , � � CC] �,�,`�' �,� '� . 4 � , r��r .� -�: _ a� � ..� � � ��,, 4 : ;�''�.- r y , --.� _ . :-'�i � - s� :?�, • r , r � 1 � �� . � � � � _ ,A �,�. . a _ � ! �r. _ � . -' . '� } _ � � n� , � � �F ����!"�a1.s t e t ■ 1' . T �,,.,�,r--- - �y � �, , tt; 1 . :7i � . . y �4 � ti� d" / a�% id .� .� � r • ''� � �, � � . n �_ � ` °' � , "�, � � �- ��': • j• �3 � � ,�k.,.; , , �� . ... � � � - � F �� . _^ �'` � '�� • . �� . �— ' .J , ' .. Y# tii f �a� k i, � F ' ���� ��'� . } 9 r _ �• J . �, .. � I �, � {�` ��. � ' � .� .i•� � � f�!� f � � ���; `-'' �, �'4' r , ,�o . � � ��� } ' 1,�� � , ,� � q �, ..;a � �1�, � ' �"�„ ��...r a � .v� � , � �' • , , Y'�.� C7t � . � ; . ' " ��y� '� �. ., J , ` ,� �' • � i9�i . { - • � ��-- r • `� � � �+� ; � �•+ ' � :f • �% � / " .. f � }�tl� /�"�: � � . � " l) .. �f „� � } �a ;' �� ��� '��, �ti��d ty,,r ' .�'� ' + - � � � ' . f„//` ��f� � ' � . �, '� � .. ..;� Y Y � 7 �� . . f � .�'.� �4. i9 . � 1.� i. � '� - , ,.. 1 �• � � . �p2, �� `�, ' ' ,i � " ,!i["+ f� 'j' t� L1.lY� � � � {r •y� l� .. � • at..'Y�. •7� � .. � . r�� � ti�1 r �'� �� r;y�f , r►� • {� . T- � c ,. � r�.+ � :r'F 'q� . s� . .. . , � � � � � ` � �.�',.. ` + � ' 4+•*� �.� `�• o� h'. � � , � . . � s k/�Ns'.�' r � • � ' % • . . � . . � � ,. �.� � , ' � t '� � � . Project Tracking No.: 14-11-0018 NO NATIONAL REGISTER OF HISTORIC PLACES , oQ.��� ELIGIBLE OR LISTED ARCHAEOLOGICAL SITES ,:� ���,� °'�� �� � �, PRESENT OR AFFECTED FORM �: �� � t �� ` �,� i� o¢°_`�'' This form onl ertains to ARCHAEOLOGICAL RESOURCES for this ro ect. It is not �: �.. � Y P P J �, : •...; . ,.:' `'�:�,�� valid for Historic Architecture and Landscapes. You must consult separately with the �.3 �� Historic Architecture and Landscapes Group. PROJECT INFORMATION Project No. WBS No Str# 790188 17BP.9.R.61 County: Document: Rowan Minimum Criteria Sheet or PCE F.A. No: N/A Funding.• � State ❑ Federal Federal Permit Required? � Yes ❑ No Permit Type: NWP 3 or NWP 14 Project Description: This project is an intensive archaeological survey and evaluation for the replacement of Bridge No. 188 on SR 2564 (Shive Road) over Second Creek in Rowan County. As defined by the NCDOT, the Area of Potential Effects (APE) for archaeology measures approximately 300 feet (91.44 m) from either end of Bridge No. 188. The corridor is approximately 150 feet (45. 72 m) wide, extending 75 feet (22.86 m) on each side of SR 2564 from its present centerline. SUMMARY OF ARCHAEOLOGICAL FINDINGS The North Carolina Department of Transportation (NCDOT) Archaeology Group reviewed the subject project and determined.• � There are no National Register listed ARCHAEOLOGICAL SITES within the project's area of potential effects. ❑ No subsurface archaeological investigations are required for this project. ❑ Subsurface investigations did not reveal the presence of any archaeological resources. � Subsurface investigations did not reveal the presence of any archaeological resources considered eligible for the National Register. � All identified archaeological sites located within the APE have been considered and all compliance for archaeological resources with Section 106 of the National Historic Preservation Act and GS 121-12(a) has been completed for this project. � There are no National Register Eligible or Listed ARCHAEOLOGICAL SITES present or affected by this project. (Attach any notes oY documents as needec� "NO NATIONAL REGISTER ELIGIBLE OR LISTED ARCHAEOLOGICAL SITES PRESENT OR AFFECTED" form for Minor Transpartation Projects as Qualifzed in the 2007 Programmatic Agreement. 1 of I 1 Project Tracking No.: 14-11-0018 f�K� �7►� 1►� i �1►��17�1 An archaeological survey and evaluation of the proposed replacement of Bridge No. 188 on SR 2564 (Shive Road) over Second Creek in Rowan County was conducted on February 5, 2015, by Terri Russ and Laurie Griesmer of Environmental Services, Inc. (ESI). As a result of the investigations, one prehistoric isolated artifact find (31RW262) was located within the project's APE. This archaeological site was recommended not eligible for the National Register; no further archaeological investigations are needed for this project. I concur with this recommendation as the proposed bridge replacement project will not impact significant archaeological resources. If the project expands and impacts subsurface areas beyond the deiined APE, further archaeological consultations will be necessary. SUPPORT DOCUMENTATION See attached: � Map(s) Other: Signed: � ❑ Previous Survey Info � Photos ❑Correspondence C. Damon Jones NCDOT ARCHAEOLOGIST 2/23/15 Date "NO NATIONAL REGISTER ELIGIBLE OR LISTED ARCHAEOLOGICAL SITES PRESENT OR AFFECTED" form for Minor Transportation Projects as Qualifaed in the 2007 Programmatic Agreement. 2of11 Project Tracking No.: 14-11-0018 Brief description of review activities, results of review, and conclusions: ESI conducted an intensive archaeological survey for the replacement of Bridge No. 188 over Second Creek on SR 2564 (Shive Road) in Salisbury, Rowan County, North Carolina (Figures 1 and 2). As defined by the NCDOT, the survey area (Area of Potential Effects [APE]) for archaeology measures approximately 300 feet (91.44 m) from either end of Bridge No. 188. The corridor is approximately 150 feet (45.72 m) wide, extending 75 feet (22.86 m) on each side of SR 2564 from its present centerline. A map review and site file search conducted by NCDOT on 1 December 2014 revealed that no previously recarded archaeological sites have been identified within a one mile radius of the APE. A search of the North Carolina State Historic Preservation Office online database (HPOWEB GIS Service) revealed no previously recorded historic architectural resources within the APE that have the potential to yield intact archaeological deposits. Topographic maps, aerial photography, United States Department of Agriculture (USDA) soil survey maps, and historic maps were examined for information on natural or cultural factors that might have affected site location or preservation. The c. 1910 Rural Delivery Routes map shows what appears to be the current road alignment and crossing. The 1914 Soil Survey map for Rowan County also shows a road or crossing in the vicinity of the current bridge. Later maps, including the 1938 and 1953 Rowan County Highway maps, show no apparent changes to the road alignment or bridge. No structures are depicted within the APE. The APE consists of wooded areas, overgrown fallow fields, and a residential driveway and lawn. Bridge No. 188 and Shive Road cross Second Creek from the northwest to southeast. Second Creek flows to the east and north east into High Rock Lake, part of the Yadkin-Pee Dee River Basin. Map units (soil series) are named for the major soil or soils within the unit, but may have minor inclusions of other soils (NRCS 2013). The three soil units mapped within the APE are listed in Table 1. The floodplain of the APE is composed of Chewacla loam (ChA), a nearly level, somewhat poorly drained soil series. The side slopes and terraces are mapped as well drained Enon fine sandy loam (EnB; 2-8% slopes) and Mecklenburg clay loam (MeB2; 2-8% slopes). Mecklenburg clay loam is a moderately eroded soil with a typical profile (if intact) of less than 20 centimeters of clay loam over clay subsoil. Table 1: Project Area Soils Soil Name Code Slope Drainage Landform Chewacla loam, frequently flooded ChA 0-2% Somewhat Poorly Floodplains Enon fine sandy loam EnB 2-8% Well Interfluves Mecklenburg clay loam, moderately eroded MeB2 2-8% Well Interfluves The current archaeological investigation included pedestrian (visual) inspection and shovel testing within the APE. Photographs of the project area are shown as Figures 3-8. Surface visibility was generally poor due to ground cover and existing vegetation; however, a systematic visual inspection of the APE was undertaken to search for surface artifacts, above-ground structural remnants, or other signs of cultural activity. No cultural materials or above ground remains were observed. All excavated shovel tests measured 30 centimeters in diameter and were excavated to sterile subsoil or the water table. Soils were excavated by natural levels (soil strata) and screened through a 0.25-inch hardware mesh. The northeastern quadrant of the APE consisted of a fallow, overgrown field. Three shovel tests (STs 55— 57) were excavated in this portion of the project area. ST 55 revealed 25 centimeters of brown sandy loam (plowzone) over brown and grayish brown mottled silty clay loam. The water table was "NO NATIONAL REGISTER ELIGIBLE OR LISTED ARCHAEOLOGICAL SITES PRESENT OR AFFECTED" form for Minor Transportation Projects as Qualified in the 2007 Programmatic Agreement. 3of11 Project Tracking No.: 14-11-0018 encountered at 35 centimeters below surface. STs 56 and 57 encountered similarly poorly drained soils, with wet silty clay loam encountered at 40 and 50 centimeters below surface, respectively. The southeastern quadrant of the APE consisted of a partially wooded area and fallow field. Three shovel tests (STs 58-60) were excavated in this portion of the project area. ST 58 encountered 15 centimeters of dark grayish brown sandy loam over reddish brown loamy clay subsoil. ST 59 encountered 20 centimeters of dark brown sandy loam over a five centimeter thick layer of gravel. Subsoil was a dark yellowish brown silty clay loam (encountered at 25 centimeters below surface). ST 60, excavated near the western edge of the field, encountered 30 centimeters of disturbed mottled brown and dark brown sandy loam and gravel over a grayish brown and light brown mottled silty clay loam. Water was visible at 45 centimeters below surface. The southwestern quadrant of the APE was largely wooded, with a small, recently clearcut field along the north side of Second Creek. STs 61-63 were excavated in this portion of the project area. STs 61 and 62 encountered 25 centimeters of grayish brown sandy loam over dark yellowish brown silty clay loam. From 25 to 45 centimeters below surface, the silty clay loam transitioned to a compact loamy clay. The excavation of ST 63, located along the tree line of an adjacent iield, yielded a 15 centimeter layer of dark yellowish brown sandy loam over a yellow silty clay. The northwestern portion of the APE consisted of a relatively level residential lawn and driveway gently sloping toward Second Creek. Three transect shovel tests (STs 64-66) were excavated in this portion of the project area. As a result, one new archaeological site, 31RW262, was recorded and is described below. 31RW262 Site Size: Isolate Topo�raphv: Ridgetoe Elevation: 740 feet amsl Environmental Settin�: Maintained Lawn Soil Tvbe: MeB2, Mecklenburg clay loam, 2-8% slopes Nearest Water: Second Creek, 97 meters southeast Surface Visibility: None Field Procedure: Pedestrian inspection and shovel testing (n=6) Cultural Affiliation: Prehistoric, Lithic (Unknown Subperiod) Site Function: Isolated Find Recommendations: Not Eligible, No Further Work Site Description: ST 64 was excavated along a level area east of a residential driveway within an existing power line corridor at the edge of the APE. A single piece of inetavolcanic debitage was recovered from the uppermost portion of Stratum I(between 0 and 15 centimeters below surface). Soils in the shovel test consisted of 25 centimeters of brown loamy sand over 25 centimeters of light brown sandy loam. Subsoil was a light yellowish brown sandy clay. Delineation shovel tests dug at 15-meter intervals around ST 64 did not encounter any additional cultural materials. Recommendations: This prehistoric site consisted of one nan-diagnostic lithic artifact recovered from the uppermost disturbed soils of a single shovel test. This isolated artifact find does not have the potential to yield significant information pertaining to our knowledge of local and regional prehistory. This site is recommended not eligible for the National Register, and no further wark is recommended at this location. "NO NATIONAL REGISTER ELIGIBLE OR LISTED ARCHAEOLOGICAL SITES PRESENT OR AFFECTED" form for Minor Transportation Projects as Qualified in the 2007 Programmatic Agreement. 4of11 Project Tracking No.: 14-11-0018 In summary, based on the results of the background research and field investigations, no National Register eligible archaeological resources are located within the APE for Bridge No. 188 in Rowan County. It is recommended that this project be allowed to proceed without concern for impacts to significant cultural resources. Should the boundary of the proposed APE be expanded or moved, additional archaeological investigations may be necessary, as determined in consultation with the NCDOT and/or SHPO per the Programmatic Agreement. .�i�1��'�fl�u�� Terri Russ Seniar Archaeology Manager Environmental Services, Inc. "NO NATIONAL REGISTER ELIGIBLE OR LISTED ARCHAEOLOGICAL SITES PRESENT OR AFFECTED" form for Minor Transportation Projects as Qualified in the 2007 Programmatic Agreement. Sofll Project Tracking No.: 14-11-0018 f � �1 �1 �1 � �1►[�.Y�J_Y_-Y-�17 National Resources Conservation Service (NRCS) 2013 Rowan County Soil Survey. Natural Resources Conservation Service, United States Department of Agriculture Web Soil Survey. Tabular Data (2014); Spatial Data (2013). http://websoilsurvev.nres.usda.gov/ accessed January 26, 2015. North Carolina State Highway Commission 1938 North Carolina County Road Survey of Rowan County. On file, North Carolina State Archives, Raleigh. http://dc.lib.unc.edu/cdm/singleitem/collection/ncmaps/id/1699/rec/21 accessed 29 January 2015. 1953 North Carolina County Road Survey of Rowan County. On file, North Carolina State Archives, Raleigh. http://dclib.unc.edu/cdm/compoundobject/collection/ncmaps/id/8023/rec/24 accessed 29 January 2015. U.S. Bureau of Soils: North Carolina Department of Agriculture 1914 Soil Map, North Carolina, Rowan County Sheet. On file, North Carolina State Archives, Raleigh. http://dc.lib.unc.edu/cdm/singleitem/collection/ncmaps/id/284/rec/16 accessed 29 January 2015. U.S. Geological Survey (USGS) 1962 Rockwell, N.C., 7.5-minute topographic map, photorevised 1987 (1:24,000). U.S. Post Office Department 1910 Rural Delivery Routes, Rowan Counry, North Carolina (c.1910). On file, North Carolina State Archives, Raleigh. http://dclib.unc.edu/cdm/sin�leitem/collection/ncmaps/id/938/rec/13 accessed 29 January 2015. "NO NATIONAL REGISTER ELIGIBLE OR LISTED ARCHAEOLOGICAL SITES PRESENT OR AFFECTED" form for Minor Transportation Projects as Qualified in the 2007 Programmatic Agreement. 6of11 Pr•oject Trr�ckzng No.: i 14-11-0018 ,- - � - , d� � � ,� � �� . ,, ' . . _ _ : �!� ` � N . r- . � _ � `�� � , � ' '� . . • �� � _ , �:' ` ' . Q -� . . � _.!- � ";+.b-lakNrrs ' , � • ^ � +;� �', •_ � .,Y �r , :—, ; �� - �. _ — ' .n .�e.4T � 1 .� ' . ` 4 ,'ti.��l#4. ��' . ��1 . . • + �+ . • • � �� � . . � =�4 'r�}.,y� � � . ���' f � y .F' : . G � 5 �. �f �y�."�ui��sE7 � � '�� _ _ ��eo.+-�, , ' — 7�"'t �� L- , WeRt i'�.rk ' _ . ���; . � . I', �� ..� ' � � i . �i . . t `��Rly ,I� N y�; '� �� + . . ' � ^ '.•_�.;•r . "`r ^ � •� ` �k` � "� ��',�y�Q}�' • , ' � � ��� � � . T �. ' � � , ' � . . �tlP¢r�� I • • � � ��`` . , 5 � _ , . , - Brfdge , � _ swiw;+� ;_ No.188 - � � � �' - , � ,� - - ,` r1 � • - z_ �-- - ��- �` .j — ! . • i . a�n�. f � � �-;, ,� , . ,, ! � � _ � _ "�tas,-- _ •`"� �.'-� - � .,`� i � r . . s� � x `: A`. . . • r� ,.�" ��..._ f_��.g4'r ' � -��r�? � � � � . � . � . ` �,� _ 1 - . � . ' •�. _Y _, `, y l .� _ ' a � . � � � �� �- �{� �� . . ! � _' ,,� 4' �:I'-�, y � • � ` . _ ��� _� �.� . •,. � , , "� ' , � . _ � `:�.�� , -��� I ' � _ , ,� � - -• � � �. ' � � Q Prn�er.t Boundary (APE} _ ,.. - ' o ior,o z000 � � • � � _ � - '� _ feet f � 41 Source� 2�11 Nauonal Geographic SocieEylCSkl, i-cubed � �� '������ seartiless L1SGSyua�lranyle-, {I2oc�h �eBl. NC'��, f'rojecl � .� - � � � � Bnundery pr�W'idf�J �y NC..�DT, Fir,ldwork Vy ESI. I I ' , • o�scia;mc'f rnc 3mn�manon drp�nea on mis �g,i,c's,ror Q Figure 1. Project Location (Rockwell, NC USGS 7.5-Minute Topographic Quadrangle). NO NATIONAI. RF,GISTF,X F.l,IGIBLF. OR LISTFD ARCHAF,OLOCICAI, SITF,S PRF.SF.NT OR AFFF,CTF,D" forni Jor� Minor Transportation Projects as Qcealified in the �007 Progr�amrnatic Agreement. 7of11 Project Tracking No.: 14-11-0018 � . - �, _ _ M - _, � .:�. - � F. ` ' , � . �, . �. . "' y►'� T��, 1'� �'� �, �"� , ,5,� `` - i � ~ I�1T J�°" ��► � i ` _ ,' � � � � , �!' f� ST07q ' � �V . � �* ��7�" �-� `� � _ .��, .. � ST069 ST0�43;. � ��� -''b�, s',�i.l� � � ; �� _ - � _� s�y - - � _ � +� �- -� ,' j�� '� � � -t ' �"•, � �-� �' � � � s i a��a"'�iQc 3�1 RW262 �� ��;° 9���,." -� ��_ � • y , �.� � ' s ' �+�i' �� , � ' -t ��A, Y y STq��67��� r�^+. , ,;v h; �; :.� } � K'r, ` a� ' � , � �F_ .,�.. _ Tsro�s� � , ` � _ , ti._ yr �`t ��� � a' Y i A � � �� , ���r' � ��`.� �`,j� � � �� �. 1 - �} y� �� Lf .� ST063 �\ __ , ✓ �-� $, ,��'�A � •, �� *� ;f. ' 'ti. ��' .-�.��� T r Sl �fi6 ' iyL� � . �i _ ��'_�':.: �� _ � '� � SJ4fi2, s� �"�� a- • �� a . , �,<R .. �O" :� L� + - � � � i 7 "�. �3` �- , •T• �, - - �.#� 'r ,;i�1 � ` �• �Fal.� e 4'1„�c�T�61 • ~ '���� ST057, J� � r��, �` �„ � •.� • ��� � �� � `� 1 '� � �.,�`�'�� `' r ;� � ��" �� � � �*�, R�� � +•j 1 � �i ' � � �!. a��,,' ri . ,: 1 � � _ �'STO5G-. ' . . `. � �.: L '� � i� , . STOGO " . ' �- t. .,�' T�� �,,Fi . : . �� 1 ti`` / � ,' .• ,, ��R ��! S�T055 � � 1 ♦R• ST0��3 �r � ; 4�� � � � � � � s�` ��1 3 y < <� 1 � � � . ` � } ��. a,•r � .� � � - �;.'°�._3° .� . - �. _,+,��.' � . � ' �' � sro5e `� �'1�'i1 ".�w'` ���s r `, `,r- ' � h ��4 --�F- '�'�` � - . . .,� /� - .�� !R1 �: � "� �. `� f _ � — - �r �L!�'_1 .'}� i' �_ � z 2�'� 3' , �IP�.��` 'i�� � �l:�"_ - , � 1 .� �� ��j ��z�� . � ��'. � - •�1.�- .� ,}►� r. _ ' � � ����4 � - � - 1„�.�.. �a'�� '�?�y��,�� -_ � -;_`f: ,�� �, -t tl +, R. 1 * _ '� . �. `- ��',�`' S:� ,� - s;'^ �ti" �: � � �'- _ f� �• _ �� r 1 �t�� � . � I�G1���� , � �p „ _ _ :.+i� : . �.�'' ��'� - � • _ �^., �`� V F�� '°Ra� �. �. �A� � � „, ! � � � Pcoject Bound-ary (APE) � �r: ►� " y`�""�' "�•�y 'J Shavel Test, � i � . R � Positive Stravel Test (SubsurFacej ,�.� � �' .. � •: F'osftfve Strove! Test (5urface) �,��' - ` �' o sa �oo •1. � , � , �` r. ,� -'_�� ' , ���, �;� �'�. , y,. : � "� . t . F�F� �; � 1 �e � ~ �• S9�r��_ Flle�h 12es�Wilnn Ni Slatewitl� Onhnimayery, •�+_ - - � �� . 7i + c `� ��',i, �„ ..� �' `.. �' CGIA, 2010 Pra�ec[ Bauntlary provitletl by NC�OT, Z � ' �. � 1 � ���y � ' � �`.' :� �' FieltlwoM.6y E51. -,' 1 • 6- Is-me li�c�. f ti�6�p t.tl ill fg - fo y' �� `' ,? 3.��'�� �'���ilrM� ��� � r i- �ae w ao Ny � e i PmP � �, e-- �rn .��r ��,ro�i�a.i�x .�y��..myp,�,�,�,s.. Figure 2. Bridge No. 188 showing APE and Shovel Test Locations. "NO NATIONAL RF,GISTF,R ELIG[BLE OR L]STFD ARCHAEOLOGICAL SITF,S PRF.SF.NT OR AFFECTED" form Jor Minor Traraspor�talion Projects as Qual�ed in the 2007 Programmatic Agreement. 8of11 Pr•oject Tracking No.: 14-11-0018 � -. 4 -p i'�`c � � __....s-.....,p� ��. � _ . �. `. �� � + p � � ' � ��+ L�L' .; � �;`y r'A� '�_ r, - �. ��'� �> � Y �� 1 �' a , { � {� � • � ; �'4 .. �' � �� �.;`� � '�°".;.�.'�° � . ✓ A � Q'� ,�� . �1 ��"g� t'"ti e . �'���y ����' �". � . d j '' ? � � +' �' r�'� f � � �R � / �` : : k 1 1 � r � 9r �, � �� � 4�` ��` � � �� '.�Y i�' " � �� �pi M, _ t - ��' �T �r �, � � - � ���' ;1,, ��r p � ti ... . �. ,,� ' 1 . . Y �C. 7� - � ' �,�(�� X � ' V �� �. Ii ` � � -- +l _ . - SP �, � � �� •�� �f1� �; �fa b� �K�T S � � . ' ' 3 � �r r R f�_ I� rL�,� � _ �� ',� .- - _ - w ��'�h, �s � i_`�� J ry � � �'� � � � ; • � � ;� ' + � � • ��� �� it +j,� �a '� � • , 1 i �� ,/ � .� \ . � �.+1 �v �L."�� � Y1�7�.v � r . � � �' - . h '7�� . �-��,A�E.� �r f . f, r; .4 a.I . ,y.. � � v n`�9f �� Mip r> �r�, �+ 3 ^� Ydr:� . �� l (: }" 'd � ? I : � �, " Id�U �"�Y^t#f My�n.�G.'s'iS' eS.t,-h ''.I'4i � R !�s t.a �,.* Y L�,". �- � 75.� � �� f 4 �,K —�,p � r� q w� r�+'�,- 4 A' i ��'l} f R� i 1...1 t �. F.�•. - �.''�U*�'�� �� n . � �rX �'�. k . ,� . t - n�. ������a ` �C � {'� f� ,:��, �+. P � �-'� I� � �, �y�' �.� � ': � � Y!1 ' I �' J . �..'` F �, d � . �F�w'4��. ..i: � l3.� :�'<i�r dX^. n .. �,�+'�'.� � v w+, t x� n. . i �}f ` 4� ,°+E..; y ,. �,,� � �- a ' _ � ..is.n ,� . , : ^� �r f ,�.'..y . �:'+� }� �l b � a : � . � Yx :- r � A. ��� �y � ' -07 � f 1k �- � � r � " � ►+ �'�� i S � p :f� ' � � r . y � , � �t� �} .: +. � �',yn, ;� P a �a '`� .t` A �r " p �( � � r e v �'�k. `�.d� -i A ��,v �R�,�4Yy�� ,�,� ` y � E�i1il;�=� _�'_�.1[ ��S T�x's � +�...x'_r, h i,'� ��'�� � ��.��.x. ?���?u ����-,� � �'�_.'.'�'!.�'��r Figure 3. View of Northeastern Quadrant of APE, facing Northwest. Figure 4. View of Southeastern Quadrant of APE, facing Southeast. NO NATIONAL RF,GISTF,R F,LICIBLE OR LISTED ARCHAEOLOGICAL SITF,S PRESFNT OR AFFECTED" form Jor Minor Transportation Projects as Qualified an the 2007 Programmatic Agreement. 9of11 Pr•oject Tracking No.: 14-11-0018 ,�.:. , � � � ��,?j}ti � �,y� , � • � �_� � :� ��t�, � • r ���a \` �° � p1�:h �„,� r A�.`'�: �< Y �n.i ,. S C sT ,� �yi'� .�-, � . t �j A`ie ' (j _��r' �.�� �5�,�'` ^ �, .�`y ��'� 4 #AE� }�h�-' .. - . t! �y �' ��f�� �I ` a x ��,�y ` �i � �� . [p��{� i� { 3? °� ' . .ti. '�R. 1yS�' 4 ' Y k d � 'S _ ""' _ K.. . ��r- S .i V . P .. � r .L2, 2_ . a . -�; ��-� E. , 3 � � � i,:A �'�'��. ; . � '� m �� �' � . � f i� � �yy, ti� � .4ca �ti. '} . e "'+'S LL_` '`� �4 �'���r „�+��'��'fi�l�.,� � .��" , �r.�� �'T �. �:'`_� `"�s � ,� f � ` -.� � -> tij °'Y �. � � +'a � �k� �� yv���. �;�``d�+�"" ��&. "� j�+ � �,,�.- � . t e�a � ;� � rr'{�,;�{ .�� r s ,� � Y r �r,r � . , � c�a� s �. . � tr .r .. � _ . . . - _ �, �,_�'+ 4 � x„ �' 'Yir.' a � `�.,��r� � M '� ... � .. s`� R'�,a . , + " . _ r � ). � ��� . . . � �;� ' � 1 _ ` - �. � . �.,.. . ��� C�"' � ��` , ; , , y . � �' 4 �: . ' -..r � . .�� ' . . . �}}r s ° �� � . . . - .J1 � -_ ��, sy�F�' ftl - � � z'a . * � � f �*y . �, { �r *��" i ,� � N� � � � , �!` _- �` � �" { % �" � - � ' � -' � � .� yy � -.' ` es � �i� S � �� � v' �_ .� it L. ��y_ STj �i ./�r . �,' y -� - Figure 5. View of Southwestern Quadrant of APE, facing Northwest. ;� �n � � :�: �•�-•� r, r a s �p �t� �e � � r � � 1 ��,.�� w �' , '�` �,t .�- � '� � v� � i � �� � , ; � aw — �- ��* �� ,� � �^'i � .a? ��'.,�,:-� �F �� 7y.yy� �' .� � r� i � 4 d. '�a �^�. ��' � � `� � P � . . � � ���Fd �.� �. � w �1c',� ��. ' . - t ;"i , F M� _ . , W� � �a, I�k*i-. �' . a �1 :�e�y{, �,� � f�' r ' � ��a "��'i ' '.��' 4 4 � . r � . .^ �"' �� y . '. t d' � � � ! 4�i? }►` �c' 3, �.�,1 . �} � � ,��TM �I � � , , ,, � �r. �. ��'. i � � . , � � � , �` f � ��� z � l «r� � �� � � . ,� � � r� r,,, a, , Y_ � �' r =� f� � �_ � _ '�,��o. -�-�E A � R � � ,�`, > - - �- ' _ _ � � � � '. . �, _ ����- r�'�_* -� � ., �. � � ya �.. �` - z' �� �{� s��'�'• 'J - � y � '��,i`�i � +' iFir �'�� . f :: u' � . � � �. �1 . x v1�� .� � y, �t � , � � � a� a� y ' " � � 'a � _� , � A �;4Ck3_, .,. a � � � ;: " . � � s � y'�� rt ' ^ ���; � 0�i�'�3'tb, ...!'� �� ti='�i;v d4. � _s ' . k r `s' ��+�_'' ,, t �iFf .e;t�p.3�s► '�sa, 'S ��� '� . - , �... ��,1 y� . ' ;,} F� � . - r"`' +.k f y ;�`�t+� ' r �,y`"�' f . aM*�+i' "? � ��R - d . 'sa .. . y,�i;'� , �-.. �... �� .<:. �� { . F . . � a� ..._.,; ;.• '' r: E� -�cfi - � _ : � � �,: , ^" "� � "g '� ti s �. .,�`�, ` �r . �'_ . , ".�F�rr.� j��pr, rR s''S tX4 -��ji;e ��' ,V��Y �.. aedt� � v � Y`�„ x '�� ° g :_� y � �► �q�, � �Ii.,. ��? J '+ P A P � Y �''..sy' "1 n "Y'..,� �'�'Y `"�� �i" . a ++r+ ,w � t,�3�' , f,:l��i'�� �+s� �.. +w!!�► ki�. � w .� 7r,, fa vyy: Figure 6. View of Bridge No. 188 from Northeastern Quadrant of APE, facing Northwest. NO NATIONAL RF,GISTF,R F,LICIBLE OR LISTED ARCHAEOLOGICAL SITF,S PRESFNT OR AFFECTED" form Jor Minor Transportation Projects as Qualified an the 2007 Programmatic Agreement. l0 of 11 Pr•oject Tracking No.: 14-11-0018 Figure 7. View of Site 31RW262, facing Northwest. N ��i Cd �u_ .< —;, _� -� Y,*, �.. . . i �Cc-�,�� .-. i`+ ! � :! f � y� � � � . . 4}/ 111\. G � } - � Y � I � ���. �{ � q, '� �$ '&", 1 .\ � t � � �� ' � �� �" � � � !'��; . . � i � ��-'^�t.,� ry,�'" , � i , yC : �'�5' � z 4 � ;, � T � ?:� .I �� F '� ' �,1� � �l ► ��� .. � <� � �� � 1�� 1 7P } . - p � ,.,` �}7' � : . t_"S'� . ,. �I �t� c''��'''�' �. p , I � 5 :; I� �. , '. r i t 3� � DN-�. �� k � � 1 F: i �, _ ,k� r ;���'� A r � a r, "� •�� �s I ��' � �'° �� � 9 k2� � ! U �� yq�pN,`��r y,, �'yp ,� t �� lli'�iy�L��1;b'S�^��rl,h;�ik�.�'� `� � * � , �L'aYn��v�1�� ."y.r��a'y������ _ '�.. , - M .. . c! M" .. � � � '�;t1�. �. .,� _ �t ;aF.�;�.,�. ,. � ... . . .. a.Mti�i�YLN+�.��:c�a,f .,..,. Figure 8. View of Site 31RW262, facing Southwest. NO NATIONAL RF,GISTF,R F,LICIBLE OR LISTED ARCHAEOLOGICAL SITF,S PRESFNT OR AFFECTED" form Jor Minor Transportation Projects as Qualified an the 2007 Programmatic Agreement. ll ofll k li�;l 1'+t �tti' North Carolina Department of Transportation `7� L I 71't 1 ilv�idtf'f �I . .. Highway Stormwater Program ��-' STORMWATER MANAGEMENT PLAN - - (Version 2.05; Released April 2016) FOR NCDOT PROJECTS WBS Element: 17BP.9.R.62 TIP No.: SF-790188 County(ies): Rowan Page 1 of 2 General Project Information WBS Element: 17BP.9.R.62 TIP Number: SF-790188 Project Type: Bridge Replacement Date: 6/3/2016 NCDOT Contact: Galen Cail, PE Contractor I Designer: SEPI Engineering and Construction, Inc. Address: 1590 Mail Service Center Address: 1025 Wade Avenue Raleigh, NC 27699-1590 Raleigh, NC 27605 Phone: 919-707-6711 Phone: 919-573-9922 Email: cail ncdot. ov Email: bmazzochi se ien ineerin .com Cit ITown: Near Salisbu , NC Count ies): Rowan River Basin s: Yadkin-Pee Dee CAMA Count ? No Wetlands within Project Limits? No Pro'ect Description Pro'ect Len th fin. miles or feet : 311 ft. Surrounding Land Use: Light Residential/ Agricultural Proposed Pro'ect Existin Site Pro'ect Built-Upon Area ac. 0.1 ac. 0.1 ac. Typical Cross Section Description: 2@ 10'Travel Lanes w/ 4' Paved Shoulders - Normal Crown 2@ 9' Travel Lanes w/ no Paved Shoulders- Normal Crown Annual Avg Daily Traffic (veh/hr/day): Desi n/Future: 460 Year: 2025 Existin : 210 Year: 2012 General Project Narrative: Replace Bridge #188 in Rowan County with 3-Barrel Cast-In-Place Reinforced Concrete Box Culvert (RCBC). Minimal roadway improvements required at existing/proposed (Description of Minimization of Water crossing as described in the typical cross section descriptions above. Stream impacts due to culvet and channel improvements are 148 Linear Feet. Quality Impacts) Waterbody Information Surface Water Body (1): Second Creek NCDWR Stream Index No.: 12-117-2 NCDWR Surface Water Classification for Water Body Primary Classification: Class C Supplemental Classification: None Other Stream Classification: None Impairments: None Aquatic T&E Species? Yes Comments: N/A NRTR Stream ID: N/A Buffer Rules in Effect: N/A Project Includes Bridge Spanning Water Body? Yes Deck Drains Discharge Over Buffer? No Dissipator Pads Provided in Buffer? N/A Deck Drains Discharge Over Water Body? Yes (If yes, provide justification in the General Project Narrative) (If yes, describe in the General Project Narrative; if no, justify in the (If yes, provide justification in the General Project Narrative) General Project Narrative) See Si�et i-A Fo� Index of Sheets See Sheet 1-B Fo� Cor�ventionol symbols See Sheet i-C Fo� Survey Cont�ol Sheet TO SHUPING MILL RD. (SR 2559) � � '� � � �. ��) � � ��) ��� � �-� � '� ��� �� � , � � '� II�I��I�I(�>\ (�I�� I-II��I-I\�V� -�1�� ROWA1� COU1�lTY LOCATI0IV: BRIDGE NO. 790188 OVER SEC0111D CREEK 0111 S.R.2564 (SHIVE ROAD) TYPE OF WORK GRADING, DRAI11lAGE, PAVI11lG, £�' STRUCTURE WETLAND AND SURFACE WATER IMPACTS PERMIT 0 BEGIN CULVERT � THIS PROJECT IS NOT WITHIN MUNICIPAL BOUNDARIES CLEARING ON THIS PROJECT SHALL BE PERFORMED TO THE LIMITS ESTABLISHED BY METHOD III. GRAPHIC SCALES 20 10 0 20 40 PLANS 20 10 0 20 40 PROFILE (HORIZONTAL) 0 DESIGN DATA ADT 2012 = 210 DHV = 11 % D = % T = b % * V = 55 MPH * TTST = 3 DUAL 3 FUNC CLASS = LOCAL SUBREGIONAL TIER PROJECT LENGTH LENGTH OF ROADWAY PROJECT 17BP.9.R.62 = 0.043 MI LENGTH OF STRUCTURE PROJECT 17BP.9.R.62 = 0.007 MI TOTAL LENGTH OF PROJECT 176P.9.R.62 = 0.050 MI �S E P I R lei 9 N�C 296�5 C N o 1 N E E R N G e Fax 919-]89 959� LONSTftUCTION �cense:C-219� 20I2 STANDARD SPECIFICATIONS BEN CRAWFORD. PE RIGHT OF WAY DATE: YxolEcr' sh�crNEEH MAY 19, 2015 ROBBIE KIRK, PE PROJECT DES7GN ENGlNEER LETTING DATE: MAY 19, 2015 VIRGINIA MABRY PRlORlTY PROJECTS UNIT arsra wom�r nvna+a xn � 17BP.9.R.62 1 R�tf P{W.NQ R�.PROt.IA 17BP.9.R.62 rl/A 17BP.9.R.62 N/A 17BP.9.R.62 WA E�/� PE RNJ & UTILITIES CONSTRUCTION PERMIT DRAWING SHEET IOF 6 TO ORGAN CH. RD. (SR 1006) HYDRAULICS ENGINEER ROADWAY DESIGN ENGINEER P.E. INCOMPLETE PLANS DO NOT USB POR R/W ACaVIbIT10N PRELIMINARY PLANS OO NO'I' IJ� FOR CONSTRUCf10N NO. ENGINEER � ENGINEER [NCOMPLE E PLANS DO NOT USB FOR / W ACOUISITION 'RELIMIN RY PLANS DO NOT U36 PO CON3CRVCTION S�� I 1025 Wade Avenue Raleigh, NC 27605 Te1�.919-789-9977 E N G I N E E R I N G 8 Fax:919-789-9591 C 0 N 5 T R U C T I 0 N Llcense: G2197 PERMIT DRAWING SHEET 4 OF 6 20 10 0 20 40 GRAPHIC SCALE WETLAND PERMIT IMPACT SUMMARY WETLAND IMPACTS SURFACE WATER IMPACTS Hand Existing Existing Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural Site Station Structure Fillln Fillln in Clearing in SW SW Impacts Impacts Stream No. (From/To) Size / Type Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp. Design (ac) (ac) (ac) (ac) (ac) (ac) (ac) (ft) (ft) (ft) 1 13+90 TO 14+26 3@ 10'X8' RCBC 0.02 53 13+70 TO 14+40 BANK STABILIZATION 0.02 88 DRY WORK AREA/ DIKE 13+80 to 14+45 INSTALLATION 0.03 61 TOTALS*: 0.0 0.0 0.0 0.0 0.0 0.04 0.03 141 61 *Rounded totals are sum of actual impacts *Impacts due to installation of dikes overlaps with bank stabilization NOTES: Revised 2013 10 24 �`JNI�..L'dW 31�81� �IQa H1EM H��39 NEb'IdQOOId 3NIl ONb Si�3a1f109 dt1N dl� .II, 5Sb'l� HiIM �tl�99S ,L S3dOlS 3�JIl 'L�i Ol S3dOl5 �IiV`d8 363`v'`S Abl '1b3A7f1� �O HlatM FI�1MN Ol CI�� VV�2115 ��VE� ,� � 3A0�'d,�'L HJN�� Nlb'ld�dOi� 31`�fAb'aX3 ��1flN A"INO 131if10 flN'd l�lNl �N1 _. _ 1'd CI31'b'�O'I �9 Ol S'iIIS =31.OFJ ���u# ':;�' <`. ' _ _. ,. ; .�' � ��I � I Hl l�-Z} � d�a aia , � ,II, 55M� �T � I� 1� �•.: NOIl'dAb`�X� '1r,F.� : � �� � ;.a ,.� �E2��b"� �,� '� :. 3'111X�1O�t] �+'� ��fi �.� �� �� A .� .. .,�4.. �S � �� 1�€ J3 �A'S O�L = 1311N1 lt/ 3�l1X31039 �15� 1d1�.1 SN01. SL � L�IJ,NI 1`d dtl�l dliJ .II� la '1S3 ltllql "A'� OOz = 13"11NI 1'd N011b'Ad'�X� '1S3 lVlOi �t^u¢e• , ��J I�—�} � �'JX3 �- -�1- "� lldi3Q i311li0 ::��1��9 ,�:�.�n. � � s"9���.���<:`�4��-.9 {3lW'�S Q11�Nf we��rs�vr�oa �Ni�d� .�� os �.� N011�35 S50�l� Wb�I�i1S i 'JNf.LLtIW �1381� 2�IQ� H11M HaN38 NI'�1dQOOl� '�16� ,� -�- 1115 ,� __ r- ��9� ,� � _ 3h�Cl aN'''v' S�13a1f109 d'd2! dltl ,II. SS'dl� HllM �, � S3dOlS 3i�i�l 'l=Z Ql �3dOlS �INt/8 �l�'d8 Jl`v'l �� '1213A1f1a �O N1a1M 1-i�l'dW Ol t]�8 VYb9211S - �' - 3A09�a',0'l HJN39 I�Ih'�dC100�� 31bA�d�X� �31DN � (3i�1 Hl 1�-Z) �Ib 8'd� , x�n�o ���n� an�e �,��N� ��.� dt+a a� � � �; ��i�.x�lo�� � .L1�/ �139.'���3� �9 D.L SlI�S �3.LON ,IE, SSt�`l� � ; ���;��' � �, �� � 1�9�IN1 1�-Zl I_ ... _ ._ ._. �� . F. � a� � �;� a�a dia I�lQllt/A'G'�X3 ti � .:- r � �, �., `� � �Il, S5brf3 31�9'd� � � � � � �111X310��J ,�e ':� � P'JC}I117'A'S��X� ll � `w,��'� ` � � � 'A"S OSL = 1311f10 1'd 3111.X31.�3J'1.53 1b1Q1 � _ SNQI QOl 1311f1Q ld d't�l dl}1 ,II, la '1S3 l'dlOi I � _ - . •A'� OEi = 13��.f10 lb' NOI1dAt/�X3 '1S3 '1b'lOi .! `� -�a � l� J3 .F--- --�-- �BJ� 3�`v'ld - �lb'J.3q l�lhll '��9��9 ,�`,�,�9. C� i �� �fi.��2«�#z; Nl 1Sd� MW 3a"rlld - -� NI 1S'a'3 I� _ _.... . ,: _ . -,; I� --- ' I� __ I�IS �' a3� .� _� � .. ,.9 �8�21 3�br`Id � . 13A3� d4�L „9/M N) iSd'� , MH ��t/ld NI lSt/� 3i`d�S �.E 1aN �Nii��.�.N�a ��va�d ��e� s�n � 13�N1 �8��1 �O /N31A N01��3S �3l`d�S al lON) W�'3�11StdM0� J�Ik�b'� ��! Dl ll I�Oila�S SSQ�� Wb'3�15 i� � � �- �� ..?,� Ea.� r��ff r e' 3 y . ��� N�Il1/A`daX3 S314iV3a 5263Q�f1CJg li�/WS �S71�0?! Wf11C]3W Ol I�bWS '��It(5 �Sltl12131�JIN 438 � ze �p���]-�� �, � � �; S` ��;� . 1 � � I�_ � ��� I� �- 1 e�; �� � •'� -� I � V � �1 �� I �� � � i_�� � � 1���'a.1r��' , �t��_� r Cr � , � �i� ,r,���r . �J_`" �_f_J �1 U`���%` r, . { ��« _. . _�, . . . , � , �i � �-i-i- �--'- -'�� �_. � . _ . i_I i _I_i..._. li_ L_I_J �..� 1s� �C_ i �J_ I � � u _�„ _ _�I�'� J �_.I�I �I�'�,�,��'�I ? �I 1 _� ��I-1 ��ii —ri�i�f I�3 I��,J� I �_` � 'F�3�1 �IVt41�1 �I � f i43�C3dC121d�1 � �i _I�_� �`�`_- I I � �' i _ _i I , -� " _' I i_J .. �� ��� i—i I }/ ��� \ �[-�7,,.'�.0 1 �•�1"°'^ !i, r ��''�-���'� �,��� x_ �'a�„ a _ _ � - -- .��� \ ��_ ."� � I__— �� ------ -- --- _ __. _.. ...___.... ... i i i_ i�_u_ ia si_ .a i i�_.�_ ���r_� �_�_� ,�� -�I-I :-�-I I I I � II I a I I I I I � I G I� 1� s�aa�nos nvws's�3o� wniaaw o� ii�rrs'aNvs �s�via��.vw a�a •sr�oi��ar�n� �wa�a Q1133f9f15 �9 AWV aNb' a��r�i�r�� �Hi .te �vnoaddv a�. ta�rsns si ivra�lvw �niiar� ���r+ssvd 1VWINt/ T10� 3�Vjaf3S 1'd7d V 3tlinqad C1NV salOn lll� Oi dOt NQ �3J'e'ld 38 Olf10H5 l'�flii3lVW 3All�'N '13?1�tl8 iil3Ali�7 MO�I� H`JIM �Hi 3E�!'1 al t135f1 SI dV21 dRi il '13N21tl9 MJ�j H�IH 3Hl NI i'v'1N31VW 3N1VN 3Hl 1N3W3"Eddf1S O! a3Sfl 38 AVW d�ftl d121 'l3J�ltl9 ib3hlF1� MOi3 MOl 3Hi 3NI'1 (}l tl�Sfl 38 .IVYV a39 W'd3b15 3H1 WO?l� a31tfAV3k3 SI 3t+Hl '1t1Rt3itMf A1NQ "N911�[1b11SNU� J,313A1f13 �Nf�1f1C] 3115 1J3fD�3d 3HL Lb �ro�aaoo�� bo a�e wvaals a�l woa� aaldnb�x� s� 1Vk-Il 'itlla�lVW �O 51SI5hiC7� SiVR131WY 3Aflb'N =�.�oN. 33V�b�1S �f31VM lVWV2i�N Mfl139 lVIa31Wv' a3fl 3AliVN 3�V1d ava aia ,n, SSM� ava dia ,11, SStlI� ti.L ��'� �aNµvu� '�Ni151X3 � `�� �• ,z `J� �� .il �l .L ,Z! Ol ,l S�S31dA S�I�1bA (S1N) 4wa�a.isrvnnaa �r�i�oo�) �Ikfl3a H�N�B NI'd�d QQO�� =g=� 1J3Alf]J 3Q 3Jb'� sn w�a� •� ¢e _I_j __ OOZ98 NOIla35 --� l£'hZL d�SIA3b �s��zc �ni.t����� c��t��xao� �=I-I � t£'EZL 3A11�3�33 31'd�l�dfla _ � I I �J,tpOC _ I �! I�J �_'_� 3��'d13�N`�V�0�213d I_I__I. . �?J-i--�. 'dVV3� E'9Z1 b8"EZt i'£ZL L'ZZL Z'kZL a350d02ld L'BZL tiE'YZ! i'biL 8'£ZL Z'ZZL :]NI.LSIX3 L'ZZL LO'ZiL 9'l�L 6`iZL �'LZL lt�lfllt�'h3 ��dOS �ad00L •artQ�C •��SZ •ah�}l A�N3f1�7�b� ��a�.� ���vv�wao��3a iaa�r� �mll_ �] X i _!_ -!; _1= 4__ � � - :_ :_: _ .. ---_ ,__�.a- .:. _ - _. _ ._ . __�.�._.___��.�.���_ , , -, - .�__� _ -_ _ _ �_ _� _ _� _ �,�._ — _ �_ _;_v __� -._____ , � ` ! fJ�' L Od L �,� �} 4,�— QO L— U� L— � �-------�_ _ _ +_ _ _ a_ _ -- _ ---___ __. � --- _ _ � __—.___ �_� �_ _____ . __.�_.__ _._ .._,-- --- �_ ,__.., � _ -- ____ __.__. .__�____--- ADDITIONAL IN�ORMATI�N �4N� GONIPUTATfC�NS " SITE DATA ,�. ; ; Q, � �rainage Area ._-------2,85_SQ._Mf.---------------- Source ------ USGS_STR�AMSTATS _C�UA�_ MAP_R�CKWEL�..._. ' '' , � �U�VEf�T REPORT l�1GC , . , , �, . ; R�ver Basin .------- Y�4K1.1`:i?F'��.�4�� ................ Cd�aracter ------RU.RAI,..�hQQ�RATE..R�(�l-.�?9'_�1.vl�NT ------------ ' ..............�_._....____._.__o_____._.__._.._..---------_--------__-------___.__._____----------.._._---.__..._......_............- ' �; , . �, N. C. QEP.A,RTMENi f�F Ti�NSPORTATfON . . __ ' Strearr� Clt�ssifica�ivn (Such as Trout, High Gtuality Water, �tc.J ' DIVlSi{�N OF HiGHWAYS ________________________________________________________________________________________.-----.------_.�..._._.....___.__...._..____ : ----�._.__._.._..Q.1ND.�X..hIO•.12. i�7_=2------- ' �; � ; �, HYDRAULiCS UNIT DA 2.85 SQ. MI. ; Data on Existing Sfruct�re _ 1 c�_ 35'6 TIMBER DECK ON E--B�.AM5;_EIJl3__BNTS:_TIMBER,CAPS� POSTS �_SfLLS__ ; v, Rp,LE1GH, i�l. C. ............ ......... .. .... .. .... .. . . .. ... . . . ... ... . . .. _ _ .._.. _._........ .... ...._..- ----- . , . ; ---�--�-�--�-�-� RURAL RfDG� anci VA�.I.�Y-PIEDMONT ; T'otal Wa�erway Opensng ---_19U-------�.f. Waterv✓ay CJpening Below 1�Qyr. 4VS EL. �94 .s.f. : Z: ....----- _______________________ , _.._..� ............................................._..._. , ___ SIR 20D9--5158 ; Debris Potential: Low❑ Modercate� ��gh ❑ � 790189 �@ 25' 6 TIMB�R DECK ON ' �; I.D. No..-.--SF,.7_9.0188�_�� Prajecfi No, __.._._. .?7BP,, oR.62�--- , � ..._.. Pro�. Stption 14� �08 0 --�L -------------------------------.....-------........_.....----....._..----------------._..._...___......---..._------------------------ � , , - -----._-_.____.__._-------------- °�61 ' Data on Structur�s Up and Down 5tr�am I-BEAMS, TlMSER CAPS, POSTS, SILLS � � Q,p= 398 {DAJ 759 CFS {750 CFS) : - ._. _'" --" --" ; �; County A 790 88 ------ ---------- ------- ----- ------------------------------------- , -------_.._�4?'Y�!'__hl_.__..__ Stream _._.__S���h�l�?__�l����i ................. . Stru. No. ----^--^--'-----^'--- ^ -Q.6P6 ----'--'-------------------'-`--"----" ---'------'--'----'--------------------------------------------• . � _._...-'-.._...... ._......, ._, � Dv5 790176 3 @ 84" CMP ___- ---- -_._-- --------- � .....................a_._�...._.._.._.__-.___...---------------------------------------------------- ---- Q = 537-{DA) ___ iU13 CFS (iODU CFS] ; . _. ; �; �n Highway----SR_�564_SH11,!�.RR,---- �e#ween ------------------------ and ---------------------------------------- ...._._.��._.... ------------------------------------------------------------------------------------------------------ . . -�- 0.600 ` Ga�e Sta�ion Nc�.-----------'-------------------- P�r�od af Records ------------------�------------------------- Yrs. s",,: . Q= b61 �A 7239 CFS 120fl CFS ; " ; � Reeommended Structure 3. ���]0',��:�RC�C�,���,,ST_II�_,P��,� ��++�1�'.��OP,�GpE,B�VEL�, WIE��_ WA�4S_A�� ��.#,��.S_- -------54--------- {--- � ---------------�..-------- �----------•--...._._.._._-------------------------------------------------- �n. ------- � ' Max. Discharge-------------- G.f_s [?ate.----------- ----------------• Frequency .----------- _------- ; o. --------------- 4 776 �DA) _1445_,CFS (14(}0 CFSy ; . � ''�� ------------------------------------------------------------------------------------------------------------------------------------• o. -------�oo ---------------------- ----------------------------- �� --------------------------------------------------------------- Historecc�l �Ic�a�d Infarmatio�: osa3 � BRIDGE NO7 Ki'+10WhJ TU OVEfi70P «�; - i Oi2 DA 19i� CFS 2U(34 CFS ; P�riod af °,�-°: Recomrnendec! Widfh caf Rc�adwa 28' CLEAR ROAI]WAY �k�w _----- 12� _DEG:----_---- — , { } � ( 1 ; Y-------------------------------------------------------- -----��2°-------------- ---------------------------------------------------------------------------------------------------------- P05TAL CARRIER lOf o, -- ' , � ate------------- Elev.__..__....ft.Est. Freq. .._.._._yr. Source i�nawe ge..._____yrs. o.� ------------------------------------------ ' FEMA C� = 1517 CFS : • �''� Recommended Location is U At �own St�-�c�m from Existi�t Crps�in , Period of ; , � p � J J•--------------------------------------- -------------- ,00-----_......._.p._._____.___--_-_-------------------_---------__.---------_-.----------------______....______._._._. . pate------------ �lev.---------_ft. Est. �re r. Source Knowledge yrs. : �' � q• ------- Y , ------------------------------------------ -------- — S d �" ❑ R ; � �. tatewi e ier egional 7ier ❑ SuE�-Regional Tier �] ---------�-------------------------------------------------------------------------------------------------------------•-------_..___ � ` ' f�llowable HW Elev.._____ �INTAIN OR 1MPR�VE I.OS ____.�, [*�ormal Water Surface �lev. 715.6 _____ �} ; r.+_ , --------- -------------------- ------- ---- ' a, B�nch ll+lark is B1vk #� 61' LT QF -BL- STA. 14+i9 R�t SPIKE SET 24" QAK TREE � __ .. .......... ..... . ....... . .. .....a_ ... _.. _.._..__ . . __ .. ...W._.........�.. _.........._.. ------ � - - -- - - -- - -- - - - - -- -- - --------------------------------------------------------- _....__._._�._..------------._...----_�.....-------------------------- : Mannin s n: Left �.B. Chanrtel Ri ht +G7.B. 6�#�ta�ned From F�MA MOQ�I.: : � �` __4.�Q--9.J� Q,Q4. g QtQ9-Q.1 ' , - ---- -- ---- , hJon-En�rppchment : `�' -- El�v. -----727_.49-- , � vo: ------------------- -------- �F. t�tum: AV ------------------------------------------------------------------------------------------------------------------------------------ � ------------------------------------------ -------- -._Q_.$$_._ " Flood Stud /Status FEMA L4ME7ED D�iAIL�l7 �LOOD STUbY Established? Q�009 ; �; t , Y ------------------------------------------------------------------ • � Witi� Without � °; Temporary Grossing ----------------------------------------------------------------------------------------------------------- N/A ----------------------e.__._._.__._._..--------------•---------------------------------_..---------------...__...._..._._......_.._.. ' Flood Study lUl7 yr. Discharge 151 723.31 723 32 � m; ; _-------Z_�c.#.s.; 1NS E�ev.: Non-En�craachrnent---------�t.l�lon-encroachment----=._..ft. h; -----------------------------------------------------------------�..----•--------------------._._._.__.------------------------------ , @ iver 5tatipr, 852�0 I - - _ _ - - � , �. . , .-,, . . , ._, .. ...., . . ;�_., _. DE51GN DATA � � ' �� -----------------------------------------------__________.___.�._..__..__._____.____---------------____-_--------------------------- : . ` Hydrolagieal Methvd USGS REPORT S!R 20U9-5158 ; m - .i -�, , ------------------------------------------------------------------------------------------------------------------------------------- F ,_._._._..._...__._..._._.-----------------------------------------------_._._.....,__..._...--------------- .o � � � �., ���+� � HEGRAS V. 4.1.0 SF790188 Secand Creek SR25b4 ,. NOTES: � Hydraulic Design Method ------------------------------------- =---------------r--------------------------------....__.._._.. `�, � ' i i ------------------------------------------------------------------------------------------------------------------------------------- �� ' �t .�.�.�• i�.r�� '..,,��f � �, F _1 . � Desi n Tailwat�r � 5.6 b.b 6.8 7.2 8.2 «a; - , ►� ' 9 Q �t.; Q .ft., Q .ft.•Q -----------�•% � ----------------�. ; DESIG� FOLLOWS Sl1BRCGi�NAL TfER GUI�]Et1NE�. ------------- ---------- �� � , ' �a 2s sa.. " _----- � iuo soo . � �, - ----------------------------------_.._..___..____....._.._.__.__.._..__......_._._-----__..._.._._._....----___..._..____..._.__..._.. . . - ; � �.Yt � , o�; , ; TFiIS FROJEG�' COMPLIES WITM LOCAL FLQOD PLAIN MAN.�4GEMENT REGUI.AiIQNS. : Inlet Control 4utlet Contral � �� -' ` �,"'� � "� ---------------------------------------------------------...----------..._...._.:a-�--........._._.___....._.....---------------------- � � Remarks v�: � (� ,� N� STRUCTUi�ES WlLL BE ADVERSEEY !Mi'ACTED �BY THiS PROJECi. ; Yp C••� �.�+''. dc+C� �, H.W. ' ' L � - 5ize & T e c f s. K e HWrD (ft.) dc � o Fi l.So �� � � o � i ��- _ ------------------------------------------------------------------------------------------------------------------------------------• Z ' - " �"'I : ; - y � � DESIGN MAfIVTAINS /IMPROYES LEVEL �F SERVICE. Cai ' � _� � ------------------------------------------------------------------------------------------------------------------------------------ � °r-°; FC)`,+v' ---�~_"r.....,...,--�--�----�_,._....�..---� . � �. � I� -------------------------------------------------------------------------------------�----._._-------------------........---.._......_ f ------------------------------------------------------------------------------------------------------------------•------------------ � , � � .� , , o , � � ... _�C � ., _ :. *, � � ,���" L � � � �-r'� '� �� s�, ��� . , � yY� ' ; ,, � � � • ' � �� � %� ' � ��� . � � - a��{, � . • ` , ---------------------------------..._._.--------------------------------------------------------------------------------------__------ � � , , � Is a Floodway Revision Required? Md�, �P� 2A _------ Tofial Proposed Waterway C}p�ning.___,_1`�a-------s.f. � ` ;� �'~'� ---------------------------------------------------------------------------------------------------�--_.__.._._....__.__.._.....----- _..._..__ � � J�.�!�� .:� , ' Outlet Velocity (V�n] :�:��------------------------f.�.s. Natural Channel Velocity (V�Q) _----------- 5.9------------�.p.s. �� �4��,����lt�[r� ----------------•----------------------------------------------------------------------._...__.._._._._..._.------...._-------------- CiASS II RIP RAp ` a; a�'�����1 CA R0�1 ���t Required �utlet Prc�tection -------------------------------------------------------------------------------------------------- : a.=O '� . � . , .- . . . v� Designed by: .............................�.....__._......�___._ �'�' 'aF� �oy'.� ��: ------------------------------------------------------------------------------------------------------------------------------------- � 5�PI ENGIN�ERING & CQN5�'RUCI'{ON INC. INFC}RIVIATiON TC3 �� SHOWN QN PLANS ' �' Aate �/2220�6 :,'Q,`�' -�t`; ; , � � . ------------------------------------------------------------------------------------------------- � W ev. a �n @ River tation ��Zaa � �� Assisted 6y: ,._._.__._._._.__..._...._.._..__...__�.�._.___.__. ..------------------ � � ��A►� e � ------------------------�----------- � PALJL SI-�EPARD ' 1000 ' Design: Discharge 25 722•i ; U: ���s��� : : � __ c.f.s. Frequer,cy yr. Elev. ft, ^ , .._______�.__ ---------------------- ___-____.__...----------- --- , � �jv�iuu�, ----�-------------------------�- ' �r E ct � g eer -__ _.---- --- - - ---- ---- ------ - e .. ----------------------------------------------------------------------------- � ' o'e n� in . BfiIAN MAZ OCHI P.�. � ------------------------ ' Base Flaod: Diseharge 15�7--------- �.f.s. Fr�quen�y _ FENIAl00------ Yr. Elev. ----------724:31----------_fh. � r I� u r �� ����/�,+ �,',y �,�;°` ,.,: - - --- -- -------- ---------------------- ---------- ------------- - ---- - --------- ------------------- a Revi�:wed by: ..___... �.�'..,1.-- ---- - "�!:---?- -�� . SEPI Engineering & Consfrudion, Inc. � � �#;'��`�i. ' �`�.�0�► .................. ... . ..... .. . _ . _ ._ . • , �_ �verto in : Dischar e�a�� �re uenc 500 726.3 {}. v � � loz5 wada A��nue s^�, �' -�Q �+► ' pp � J--------------- c.f.�. q y.._..._...._....._....yr. Elev. .----------- ; � Raleigh,r�c 27605 �'�r � MAti tr ---------------- ; 914-789�9977 ��'��I�iI([i��� � f���ZQ1fr � ; Lie_ Na.: C-2197 Mrtigatiar� S�e��vices t+�ViR(yNMENfALGUAL�:r ;�Iavember 7, 2(�16 Ms. Amy �uliss I'�CDQT I3iuision 9 Enairann3ental Offcer Nor-th Carqlina De�amnent of �'ransportatian 375 Silas Creek Parkway Winstan-Salem, North Carr�lina �'7I27 L�ear Ms. E.uiiss: Subject: Mitigatiora Acceptan�e Letter: �Ar ���RaR�� �(�NALD R. VAIti' �]FR 4'A.�.I�-l' i�i�ision 9 Projecr, Reptace Bridee 188 on SR 2564 (S�ive Raad}, Rowan �oa�nty; WB� Num6za� 17BP,�.R,62 The purpose of this ietter i� to nQtify ytara r4��.t ��e D��3sion of 1VIiti�ation Services {i7MS} w'r�� pr•n��ide the cc�mpe�sa�ory streaan rnitigation fc�r ti�e s��ject garoject. �a��d fln il�� inf�rrrlatic�n supplied by y«u on No�•emher 4, 2015, the impacts are locate� iii CLl (]3(}4Q103 c�f the Yadkin �2iver 6asin in the Central Piedmant �CP] Lco-Region, ancfi are as follows; Yad �Cin 03D401Q3 C� Cnld I�npact,s � feek�acres) WetIancis Warm Riparian hT°n- Co�stal I�igarian Marsh 53.� � Buffer (Sy, i�t.} Iane 1 i 2.one 2 0 '�Sorne af the strearr� andJor ��etiand impact5 may be }�r�pased to �e n�iigated �t a 1:1 rrutigatig� ratio. See p�rmit applicatinn for �ietails. This impact and associated mitigatian need wez�e undcr projected by tl�e t�1GDOT irr tiie 2�11 fi unpact data. DM5 will cc�mrriit la inr�plement sufficient compensat�ry skreaaxa mitigatf�n �redits ta of€set the impacts assoeiated wit�i th�s project as r�eterrnin�d by the rebuIatory ae�ncie4 usi�-ig the delivery timel�axe listed tn Section Fa.c.iii of the an-Lieu I�ee 3nstntment datec� Juty 28. 2Q�0. Iit�e ab�ue referen�e� impact arncaunts are rev�iseci. ther� chis micigatican acce�atance 1et�er wiY� n� tanger he �aiid ar�d a new mitigation accept�rice ietter will be required Gosr� DMS, If'you �awe any questions or need additionai infarrnation, ,�i�ase contact Beth �anncan at 9]'�-7{17-842i}. 5iricerely, ,,. .)am s B StanfiZl Credi ana�enient 5u�er�vbsor cc: Mr. 74hsi Thomas, USAC,� - Ralei�h Regulatory Fielc3 �ffice Mr. Dave Wanucha, NCDWR - Wir�stor�-Salem Office Ms. �anda Fit�patrick, NCDC7T - P�EA File: SR 2564 - Bnd�;e 188 - t7ivisi�� 9 S[ate of Nprth Carolina I�virarurxent2! Quality I Mitigation Services ] 652 lyail Sen�icc Center � 2Y 7 W. lpnes StreeL Suite 3Q(]0 I italeigh. NC 27fip9-]b5? 9l9 7D7 $97fi T