HomeMy WebLinkAbout20161106 Ver 1_130164_Permit_Drawings_20161114SHEET 1
WETLAND PERMIT IMPACT SUMMARY
WETLANDIMPACTS SURFACE WATERIMPACTS
Hand Existing Existing
Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural
Site Station Structure Fillln Fillln in Clearing in SW SW Impacts Impacts Stream
No. (From/To) Size / Type Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp. Design
(ac) (ac) (ac) (ac) (ac) (ac) (ac) (ft) (ft) (ft)
-L- 11+94 to 12+02 Bridge End Bent Removal < 0.01 < 0.01 14 32
-L- 13+18 to 13+40 RT Bank Stabilization < 0.01 < 0.01 7.5 10
TOTALS*: < 0.01 < 0.01 22 42 0
*Rounded totals are sum of actual impacts
NOTES:
Timber crutch added to shore up the failing existing bridge will be removed, but no impacts are anticipated.
Existing footing to remain while end bent is removed.
�o za
6
�
�
-m
BEGIN PROJECT
—L — PC Stao l0 fll,4/
NOTE: BENCH EXCAVATION
AND PAVEMENT REMOVAL
HATCHING NOT SHOWN
FOR CLARITY
TEMPORARY
SURFACE
WATER
IMPACTS f
SURFACE
WATER
DaRr�E�� �, FAw DIV11B - BRIDGE 164 - CALDWELL COUNTY
� 64-2 DB 1752 PG 1216
—L — PT Sta, l0 f70e64
.�I�
STABBLIZATION BA� K
SEE DETAIL A.�vE S�ABILI 1
.€
� TUE
E TO __ _ :
�
_ � �x
�� ,_ ,
• o ;� `��� f
_
_ r_
_
_- c� - _ _ N 7°48'06.2^E
5' 46' 23.D' Q- F -- F �
� LI/ C
G
�
TEMPORARY
- SURFACE
4TER IMPAC
G
�
CIASS II RIP RAP
EST 50 TONS
EST 55 SY GEOiF
/ BANK �
STABI LIZA
SEE DET�
INSET A
�DENOTES IMPACTS IN
SURFACE WATER
DENOTES TEMPORARY
�
o � G
n �
� '''
�
�
-rP+i •0
m ; EX,
�' �
i. i
�TEMPORARY
SURFACE
a WATER
IMPACTS,
r�F
r�F �
,
B -ra�
. i st i
;i
;�
/
I
SCALE
1' - 30'
SURFACE
WATER
iMPACTS
SURFACE
WATER
IMPACTS
MATCH LINE INSET A
$
+s7.00 �, N G +2a.00
153.4' t� 155.8'
T�/
—L — PCC Sta, l2 f 99064
—L— PT Sta, 13+27,6/
END PROJECT
—L— PT STAa 14f0/o7`
-'
�POT Stae l4f12,45
200.9, " "''.""
793.9'
BEGIN BRIDGE
—L— POT STA, 11+72.0
GRAU 350 �
TL-2 TYPE III ^"'
� o �
N 7° 48' 06,2° E� N�°�
TYPE III �
� AT_, "'
IMPACTS \ EMPORARY IMPACTS IN SURFACE WATER �''° " BEGIN APPROACH SLAB
SURFACE � —L— POT STA,Il+6/,l3
SCALE WATER IMPACTS SI-1.4NNON WINBERG REYNOLDS
1"=30' DB 1344 PG 820
BM'l ELEV = 1357.7855'
. . N 859964. E /252097.
i i i 8" SPIKE SET lN ROOT -
-. II II I ...
- � �� � -
1370 - — ---'_ i -
OF l5"WALNUT � �� _
BEGIN BRID�E ___ � � �_
—L — ST Ao ll +72a00 Pl = l3 f68v00
END BRIDGE EL = 19354,16' -
_. —
,, —� — ST Ao l2 f44o25 VC = 50
_-- ---- _
K = 62
- , _ _ ;, - V = 39 mph =
--; _ � _ _----, ____ _ _
_� _ ,` : � �
�� —�2,608 °
1360 Js90 --�, :
�� /
f _.
I ��� �'' �_
�-4, 3 5'�. 3II'
I BE�IN PROJECT \ �� � - � — `— _ ( —J1a8000%
I I I �---- �
_— --- ____ __ � � =�2 — — — _
�.II.R.IIFJ PROJECT REFERENCE NO. SHEET NO.
DBlIB-l30/64 4
RNJ SHEET NO.
ROADWAY DESIGN HYDRAULICS
ENGINEER ENGINEER
PERMIT DRA WI11lG
SHEET 3 OF 4
NAD 83 (N RS S 2007)
END BRIDGE
—L — POT T Aa l2 +44.25
\ TYSC i I-1
TYPE III SC
END APPROACH SLAB � 9' 9'
AT-1
—L— POT STA,12+55,13
04
DETAIL A
BANK STABILIZATION
( Not To Scale)
NATURAL Max. EI.
GROUND 1355.9'
1.0'minJ
�, Z,
GEOTEXTILE
Type of Liner= 125 TONS,CL II Rip-Rap
Geotextile= 730 s
FROM STA. 11 + 72 TO STA. 11 + 87 LT
STA. 12 + 36 TO STA. 12 + 54 LT
DETAIL B
BANK STABILIZATION
( Not to Smle)
FLOODPLAIN Max. EI.
BENCH 1.0'min� 1353.0'
� z
—L — ST A, /O f//e4/ _ I o6080% - - _-
135o ELe = 1367e46 �� � ceore�i�e
f� Nws� �-,
DETAIL C i�.34���" � ' Type of Liner= 125 TONS,CL II Rip-Rap
BANK STABILIZATION 1-� � - Geotextile= 130 s
� Not to Scale) w. ROCK `'� ��� FROM $TA. 11 + 82 TO $TA. 11 + 94 LT
NAT��,� �344.0- RT END PROJECT
GROUND �� I 1341R0RT —L SI /1,�`Y'���o�5
1340 is� PIPE —� i.o�m�� 2, i - �
W. Ro�K ---- ELe = 1353055 � � -
i338.5' LT _
� _
GEOTEXTILE —� RETAIN -
CONCRETE �: I I I I
Type of Liner= 2 TONS,CL II RiP-Rap F��T�NG$ � � �
Geotextile= 6 s ' ' ' ' ' ' ' '
FROM STA. 13 + 26 TO STA. 13 + 33 RT
10+00 11+00 12+00 13+00 14+00 15+00
1370
1360
1350
PLANS PREPARED BY :
R�C �C
RUMMEL, KLEPPER 8 KAHL, LLP
900 RIDGEFIELD DRIVE SUITE 350
RALEIGH, NORTH CAROLINA 27609-3960
NC LICENSE NO. F-0112 •(919) 878-9560
6
�
�
-m
BEGIN PROJECT
—L — PC Stao l0 fll,4/
NOTE: BENCH EXCAVATION
AND PAVEMENT REMOVAL
HATCHING NOT SHOWN
FOR CLARITY
TEMPORARY
SURFACE �
WATER
IMPACTS
DaRr�E�� �, FAw DIV11B – BRIDGE 164 – CALDWELL COUNTY
� 64-2 DB 1752 PG 1216 ,�
-L - PT SfO, �O f7OvE4 i 1 I �� � TEMPORARY
BANK
STABILIZATION
SEE DETAIL A.
TUE
, E TO I
F q �
�E 5' 46` 23.
�
� �
�
TEMPORARY MATC
- SURFACE
4TER IMPACT
-- iv i' 48' 06.2^ E
F F �
�
CIASS II RIP RAP
EST 50 TONS
EST 55 SY GEO AB
/ BANK �
STABI LIZATI ON I
SEE DETAIL C
INSET A
��' � � DENOTES IMPACTS IN �
SURFACE WATER
SURFACE
WATER o�o DENOTES TEMPORARY
r�i,
� SURFACE
a WATER
IMPACTS,
r�F
r�F � /,
B a' I/ ,
� I St I�
;/
;�
/
SCALE
1' - 30'
SURFACE
WATER
iMPACTS
SURFACE
WATER
IMPACTS
MATCH LINE INSET A
$
�
+s7.00 �, G +2a.00
153.4' t� 155.8'
T�,/
—L — PCC Sta, l2 f 99064
—L— PT Sta, 13+27,6/
END PROJECT
—L— PT STAa 14f0/o7`
-'
— �POT Stae l4f12,45
200.9, " "''.""
793.9'
BEGIN BRIDGE
–L– POT STA, 11+72.0
GRAU 350 �
TL-2 TYPE III ^"'
� � �
N 7° 48' 06,2° E N�°�
TYPE III �
AT-1 r
BEGIN APPROACH SLAB
�.II.R.IIFJ PROJECT REFERENCE NO. SHEET NO.
DBlIB-l30/64 4
RNJ SHEET NO.
ROADWAY DESIGN HYDRAULICS
ENGINEER ENGINEER
PERMIT DRA WI11lG
SHEET 4 OF 4
NAD 83 (N RS S 2007)
END BRIDGE
–L – POT T Aa l2 +44.25
\ TYSC i I-1
TYPE III SC
IMPACTS EMPORARY IMPACTS IN SURFACE WATER "
SURFACE � ' I i –L– POT STA,Il+6/,l3 END APPROACH SLAB 9' 9'
SCALE WATER IMPACTS SI-1.4NNON WINBERG REYNOLDS
1' -30' DB 1344 PG 820
BM'l ELEV = 1357.7855' - -
N 859964. E /252097. .
i i i 8„ SPIKE SET lN ROOT _
-. II II I ...
- � �� � -
1370 - — ---'_ i -
OF l5"WALNUT � �� _
BEGIN BRID�E ___ � � �_
—L — ST Ao ll +72a00 Pl = l3 f68v00
END BRIDGE EL = 19354,16' -
___
,, —� — ST Ao l2 f44o25 VC = 50
_-- ---- _
K = 62
- , _ _ ;, - V = 39 mph =
--; _ � _ _----, ____ _ _
_� _ ,` : � �
�� —�2,608 °
1360 Js90 --�, :
�� /
f _.
� ��� `�'
I BEGIN PROJECT � �,'3°�°-�.30-� -__�
AT-1
–L– POT STA,12+55,13
---- DETAIL A
BANK STABILIZATION
_� � ( Not To Scale)
NATURAL Max. EI.
_ GROUND 1355.9'
1.0'minJ
� Z,
GEOTEXTILE
Type of Liner= 125 TONS,CL II Rip-Rap
Geotextile= 730 s
FROM STA. 11 + 72 TO STA. 11 + 87 LT
= STA. 12 + 36 TO STA. 12 + 54 LT
DETAIL B
1370
BANK STABILIZATION
( Not to Scale) 1360
FLOODPLAW Max. EI.
BENCH 1.0'min� 13z3.0'
I -- �/ i- - o-- �-)laU��O� �
�—. ! . —_ ___� .—: � —L— STA, lOflle4/ _ I ' �26080/
135o ELe = 1367e46 �� � ceore�i�e
f� Nws� �-,
DETAIL C i�.34���" � ' Type of Liner= 125 TONS,CL II Rip-Rap
BANK STABILIZATION 1-� � - Geotextile= 130 s
� Not to Scale) w ROCK `'� ��� FROM $TA. 11 + 82 TO $TA. 11 + 94 LT
NAT��,� �344.0- RT END PROJECT
GROUND �� I 1341R0RT -L SI /1,�`Y'���o�5
1340 is� PIPE -� i.o�m�� 2, i - �
W. Ro�K ---- ELe = 1353055 � � -
i338.5' LT _
� _
GEOTEXTILE —� RETAIN -
CONCRETE �: I I I I
Type of Liner= 2 TONS,CL II RiP-Rap F��T�NG$ � � �
Geotextile= 6 s ' ' ' ' ' ' ' '
FROM STA. 13 + 26 TO STA. 13 + 33 RT
10+00 11+00 12+00 13+00 14+00 15+00
1350
PLANS PREPARED BY :
R�C �C
RUMMEL, KLEPPER 8 KAHL, LLP
900 RIDGEFIELD DRIVE SUITE 350
RALEIGH, NORTH CAROLINA 27609-3960
NC LICENSE NO. F-0112 •(919) 878-9560