Loading...
HomeMy WebLinkAbout20061804 Ver 3_Triage Comments_20080613Use this form instead of writing inside the folder Triage Comment Sheet DWQ# -b O(=. 1 3 Triaged By: r Reviewer 1 !-?- Reviewer 2 l & Reviewer 3 Date: 0 % Date: Date: ? Issue Project (Reviewer 1) ? Issue Project (Reviewer 2) ? Issue with conditions (Reviewer 1) ? Issue with conditions (Reviewer 2) More Information (Reviewer 1) More Information (Reviewer 2) J ? Return Application (Reviewer 1) ? Return Application (Reviewer 2) ? Send to Regions (Reviewer 1) ? Send to Regions (Reviewer 2) SATriage Forms\Triage Issue Sheet.doc PLEASE PRINT CLEARLY Date: To: ? ARO ? FRO ? MRO 0_ RRO Triage Check List Project Name: 'p ujP-As c? . DWQ#: Z ao 12) 0' County: ?^s?'' Kevin Barnett Ken Averitte Alan Johnson Lauren Witherspoon From: ? WaRO Kyle Barnes ? WiRO Joanne Steenhuis/Chad Coburn ? WSRO Sue Homewood Telephone : (919) The file attached is being forwarded to your for your evaluation. Please call if you need assistance. ? Stream length impacted ? Stream determination ? Wetland determination and distance to blue-line surface waters on USFW topo maps ? Minimization/avoidance issues El Buffer Rules (Meuse, Tar-Pamlico, Catawba, Randleman) ? Pond fill ? Mitigation Ratios ? Ditching ? Are the stream and or wetland mitigation sites available and viable? ? Check drawings for accuracy Is the application consistent with pre-application meetings? ? Cumulative impact concern Comments: ? l r?_o S I rt" V V 1 1 , v V V_? - W')). .... 4 V C2-) ?ryr\gk od C_? t S (V %NJajZ\_ VS-Y-Lq VOV),tT i ,? ?' ?? v?.?1 Ica eas? -^YV ?t DWQ#: 2 Q? 80 Date: Who Reviewed: s Plan Detail Incomplete ? Please provide a location map/most recent NRCS soil survey map/ JSGS 1:24,000 topographic map for the project. ? Please re-submit your site plans on full plan sheets at a scale of no smaller than 1 "=50'. ? Please provide cross section details showing the provisions for aquatic life passage. ? Please provide the location of any proposed stormwater management practices as required by GC ? Please provide plans and profiles for all the stormwater management devices as required by GC ? Please indicate all stormwater inlets and outfalls on the site plan. ? Please provide an inventory of proposed project imperviousness area based on the estimated built-out conditions. Please include all proposed building footprints, roads, driveways, sidewalks, gravel-surfaced areas, amenity areas, etc. ? Please provide building envelopes for all lots with wetlands, streams or buffers (or lots ) on the site plans. ? Please indicate proposed lot layout as an overlay on the site plan. ? Please provide a signed and sealed geotechnical report of subsurface soils at the proposed bottomless culvert location. The report must comply with the Division of Highways - Guidelines for Drainage Studies and Hydraulic Design, prepared by A.L. Hankins, Jr., State Hydraulics Engineer - 1999. ? Please locate any planned sewer lines on the site plan. ? Please provide a detailed planting plan for (standard format includes: scientific name, common name, source of the plant material, plant spacing, wetland indicator status, etc., as well as planting specifications). ? Please indicate all proposed stream or wetland driveway crossings on your plan sheet (including future proposed). ? Please indicate all stream impacts including all fill slopes, dissipaters, and bank stabilization on the site plan. ? Please indicate all wetland impacts including fill slopes on the site plan. ? Please enumerate all riparian buffer impacts on the site plan and clearly label impacts (Buffer Impact 1, etc.). ? Please locate all isolated or non-isolated wetlands, streams, and other waters of the State as overlays on the site plan. ? Please locate all of the protected riparian buffers as overlays on the site plan, clearly showing Zone 1 and Zone 2. Avoidance and Minimization ? The labeled as on the plans does not appear to be necessary. Please eliminate the or provide additional information as to why it is necessary for this project. ? This Office believes that the labeled on the plans as can be moved or reconfigured to avoid the impacts to the . Please revise the plans to avoid the impacts. ? This Office believes that the labeled on the plans as can be moved or reconfigured to minimize the impacts to the . Please revise the plans to minimize the impacts. ? Your proposed stream crossing appears to be aligned at approximately ` ' . Please re-configure your proposed stream crossing to show it aligned approximately perpendicular (between 75° and 1051). Other ? The application fee is insufficient because over 150 feet of stream and/or over 1 acre of wetland impacts were requested. Please provide $ . This additional fee must be received before your application can be reviewed. ? Please complete Section(s) on the application. ? Please provide a signed copy of the application. ? Please provide an agent authorization letter for the application signature. ? Please indicate which 404 Permit the USACE has authorized for this project. ? Please provide copies of the application, copies of the site plans or other supporting documentation. ? Please resubmit copies of your information on the most current March 2005 Pre-Construction Notification form. You can download this format the following web address: bqp:;;%h2o.enr.state.nc.us,ncwetlauds/regcert.html ? Please submit electronic CAD files showing , via email to ian.memillaiiLvncmail.net and provide a CD (TIFF Group 4 format (black and white, not grayscale or color)) along with your response to the additional information requested. ? Please provide intermittent/perennial stream determination documentation on the site (upstream and downstream photos and DWQ stream identification forms). ? Please provide a qualitative indirect and cumulative impact analysis for the project. Please see DWQ's policy for guidance on our website at: http://h2o.enr.state.nc.us/ncwetlands/documents/InterimIntemalPolicyCumulativeImpact.doc ? For areas in nutrient sensitive waters or buffered river basins fertilizer specifications for stormwater BMPs should state that that only an initial minimal application of fertilizer to establish the plants shall be used. ? Please indicate whether or not the proposed impacts have already been conducted. ? Please provide proposed septic fields all (or) lots showing that additional impacts will not be required. Mitigation ? of compensatory mitigation is required for this project. Please provide a compensatory mitigation plan. The plan must conform to the requirements of 15A NCAC 2H .0500 and must be appropriate to the type of impacts proposed. Buffer mitigation is required for all road crossings that impact 150 linear feet of riparian buffer or more. Please submit a mitigation plan detailing the amount of buffer impact at crossing I qik=?3 and how the impact will be mitigated. Pl ase provide documentation from the NCEEP indicating their willingness to accept your request to purchase ?f uq?( (type of mitigation) credit to mitigate for the proposed 0. .i (type of mitigation) impacts listed in your PEPapplication , 2. Stormwater ? Please provide BMP Supplement for the proposed on the site plan. ? Please provide BMP Supplements for every proposed BMP on your site. The Supplement forms (including the Required Items Checklist) can be found at: http:hh2o.enr.state.nc.us/su.-bmp fornis.htni. ? Please use the most current version of the BMP Supplement available on the DWQ website at http:'/I12o.enr.state.nc.us/su-bmp forms.htm. The submitted version is outdated. ? Please redesign your BMP to comply with the 2007 DWQ Stormwater BMP manual (current revisions can be found at: http://h2o.enr.state.nc.us/su/bmp_forms.htm). ? Please complete all items in Part I of the BMP Supplement form: Project Information. ? Please include all information list in Part II of the BMP Supplement form: The Required Items Checklist was not included in your original submittal. ? Please indicate the diffuse flow provision measures on the site plan and submit diffuse flow provision measure supplement forms (Supplement forms available on the DWQ website at http:!!h2o.enr.state.nc.us/su'bmpFforms.htm). ? Please provide calculations to show the outlet velocity to ensure that a non-erosive velocity will be achieved for the 10-year storm. This should include the delineated drainage area, percent imperviousness, peak flow calculations for the 10- year storm, cross-section, and longitudinal slope. ? The slope from the proposed level spreader(s) lip ( ) to the top of bank of the stream exceeds the maximum allowable slopes for level spreaders (6% for wooded vegetation and 8% for thick ground cover and grass). If an appropriate area for level spreader(s) cannot be found then another BMP such as a bioretention area must me proposed. Notes: He?uz CM. 'r, /\A'VVw 7h r fM1 ?{ C 1?- ' 11? & -'k -NV S \Y - \??? V?k If asl'O - ?4 I Q 0 er?'_ 06-18040 The Village at Flowers Plantation AML comments June 13, 2008 Per the requirements of the Neuse Riparian Buffer Rule, all stormwater drainage from this site must meet the state's diffuse flow requirements as set forth in Chapter 8 of the North Carolina Stormwater BMP Manual, available at: http://h2o.enr.state.nc.us/su/bmp forms.htm Please provide one Level Spreader Supplement Form for each proposed level spreader, available at: http://h2o.enr.state.tic.us/su/bmp fonns.htm. Please include the Required Items checklist and all items listed therein. If the filter strip is too steep for a level spreader in any location, then you must provide a BMP that removes a minimum of 85 percent TSS and 30 percent TN from the stormwater generated by this project. For each proposed BMP, please provide a completed BMP Supplement Form, with all the required items. The BMP Supplement Forms are also available at the above web site. 2. Please provide a conceptual stormwater management plan for the project that includes the following: a. A depiction of the drainage areas on the site. b. An estimation of the percentage imperviousness associated with each of the drainage areas. c. A calculation of the water quality volume associated with each drainage area. d. A depiction of a proposed BMP (state the type of BMP you plan to use) on the site plan that is correctly sized based on the water quality volume. Please include the following language as a permit condition: Please provide documentation of Johnston County's approval of the stormwater management plan for this project by providing EITHER: • A valid approval letter from Johnston County indicating that the proposed activity has an approved SMP and one copy of the approved SMP, including plan details, calculations and other supporting information, OR A set of stormwater plan details and calculations stamped as "Approved" by Johnston County.