Loading...
HomeMy WebLinkAbout20071841 Ver 2_Staff Report_20080519Staff Report Project Num: 20071841 Version: 2 Name: Asheville Regional Airport Expansion County: Buncombe Location: UT to French Broad River FBR Fletcher Latitude: +35°26'46" SW Plan Location: Owner: Edwards, David Contact Person: Edwards, David Title: Status: Received Project Type: Airport/Aircraft Region: Asheville Longitude: -82°32'32" Phone: 828-684-2226 Inspection Date: 05/19/2008 Entry Time: 10:59 AM Exit Time: 11:01 AM Reason for Inspection: Routine Inspection Type: Staff Report On-Site Representative(s): Primary Inspector: Kevin H Barnett Phone: 828-296-4500 Ext.4657 Secondary Inspector(s): Question Areas: 0 Site Visit Page: 1 Project Num: 20071841 Owner: Edwards, David Inspection Date: 05/19/2008 Inspection Type: Staff Report Reason for Visit: Routine Inspection Summary: ARO believes that this project should be issued with the following conditions All Progress Energy sourced ash fill shall be encapsulated in a liner which complies with the issued Non-Discharge requirements (permeability of 1 `10 -7) All setbacks in the non-discharge requirements shall be adheared to. (ie no waste ash fill over waters) All stormwater generated on the airport property shall be collected and treated such that surface water standards are not contriveined. BMP's, as detailed in your application shall be in place no later than 30 days of receipt of this authorization. Compensatory Mitigation Using the Ecosystem Enhancement Program (EEP) Mitigation must be provided for the proposed impacts as specified in the table below. We understand that you wish to make a payment to the Wetlands Restoration Fund administered by the NC Ecosystem Enhancement Program (EEP) to meet this mitigation requirement. This has been determined by the DWQ to be a suitable method to meet the mitigation requirement. Until the EEP receives and clears your check (made payable to: DENR - Ecosystem Enhancement Program Office), no impacts specified in this Authorization Certificate shall occur. The EEP should be contacted at (919) 733-5208 if you have any questions concerning payment into a restoration fund. You have one month from the date of this approval to make this payment. For accounting purposes, this Authorization Certificate authorizes payment into the Wetlands Restoration Fund to meet the following compensatory mitigation requirement: Compensatory Mitigation Required Stream 2770 (feet) Wetlands 1 0 (acres) Turbidity Standard The turbidity standard of 50 NTUs (Nephelometric Turbidity Units) shall not be exceeded as described in 15 A NCAC 2B..0200 Appropriate sediment and erosion control practices must be used to meet this standard. No Impacts Beyond those in Application No waste, spoil, solids. or fill of any kind shall occur in wetlands, waters, or riparian areas beyond the footprint of the impacts depicted in the Pre-construction Notification. All construction activities, including the design, installation, operation, and maintenance of sediment and erosion control Best Management Practices, shall be performed so that no violations of state water quality standards, statutes, or rules occur. Construction Stormwater Permit NCGO10000 Upon the approval of an Erosion and Sedimentation Control Plan issued by the Division of Land Resources (DLR) or a DLR delegated local erosion and sedimentation control program, an NPDES General stormwater permit (NCG010000) administered by DWQ is automatically issued to the project. This General Permit allows stormwater to be discharged during land disturbing construction activities as stipulated by conditions in the permit. If your project is covered by this permit [applicable to construction projects that disturb one (1) or more acres], full compliance with permit conditions including the sedimentation control plan, self-monitoring, record keeping and reporting requirements are required. A copy of this permit and monitoring report forms may be found at http //h2o.enr.state nc.us/su/Forms_Documents htm. Page: 2 Project Num: 20071841 Owner: Edwards, David Inspection Date: 05/19/2008 Inspection Type: Staff Report Reason for Visit: Routine Site Visit Yes No NA NE Do impacts described in the application differ those seen in the field? ? ? ? ? If yes, please describe differences: Are the Intermittent/Perennial calls different in the application? ? ? ? ? If yes, please describe differences, and how mitigation ratios are affected: Are there additional impacts not described in the application? ? ? ? ? If yes, please describe and quantify: Were the impacts in place prior to the application for the 401 Certification? ? ? ? ? Additional conditions recommended for the Certification: Recommended project modifications: Is this a modification request to an existing Certification? ? ? ? ? Are there additional stromwater conditions that should be required due to the following classifications: ? ? ? ? # 303(d)list, Class WS, NSW, ORW, HQW Describe: Is this a subdivision or otherwise part of a larger project? ? ? ? ? # If yes, what phase is this? Are there prior impacts from prior phases? ? ? ? ? If yes, what are the cumulative imacts for this project? Possible secondary impacts noted: Comment: Page: 3