HomeMy WebLinkAbout20160597 Ver 1_CAMA Application_20160615h
N a
Coastal Management
ENVIRONMENTAL QUALITY
MEMORANDUM:
TO:
FROM:
SUBJECT:
Applicant:
RECEIVEI)MCDENR/M
JUN 15 2016
Water Quality Regional
Operations Section
Wilmington Rcaional Office
June 15, 2016
PAT MCCRORY
Governor
DONALD R. VAN DER VAART
Secrelaty
BRAXTON DAVIS
Director
Chad Coburn
b;4z; 01 Section, WiRO
V) W F",
Courtney Spears, Assistant Major Permits Coordinator
NCDEQ — Division of Coastal Management
400 Commerce Ave., Morehead City, NC 28557 courtneyspears(a)ncdenrgov
Fax: 252-247-3330 (Courier 11-12-09)
CAMA / D & F EMERGENCY Application Review
NC State Port Authority
Project Location: approx. 17 nautical miles south of the NC State Ports, within the
Horseshoe Shoals Section of the Cape Fear River shipping channel,
near Southport, Brunswick County
Proposed Project: to obtain an emergency permit for performing agitation dredging, to
maintain an existing shipping channel
Please indicate below your agency's position or viewpoint on the proposed project and
return this form by June 18, 2016 to Courtney Spears at the address above. If you
have any questions regarding the proposed project, contact Robb Mairs at (910) 796-7423
when appropriate, in-depth comments with supporting data is requested.
`jC) I Cti1GC tti -_-. C(; b3 li ( ( cC
REPLY: This agency has no objection to the project as proposed.
/This agency has no comment on the proposed project.
This agency approves of the project only if the recommended changes
are incorporated. See attached.
This agency objects to the project for reasons described in the attached
co me s.
SIGNED DATE
Nothing Compares_.
State of North Carolina I Environmental Quality I Coastal Management
127 Cardinal Drive Ext., Wilmington, NC 28405
910-796-7215
DIVISION OF COASTAL MANAGEMENT
FIELD INVESTIGATION REPORT
1. APPLICANT'S NAME: North Carolina State Ports Authority (Horseshoe Shoals Emergency
Maintenance Excavation)
2. LOCATION OF PROJECT SITE: The project is located approximately 17 nautical miles south of the
NCSPA, within the Horseshoe Shoals Section of the Cape Fear River shipping channel, near Southport,
Brunswick County.
Photo Index - 2006: 204-6656: A-E, 1-6 2000: 204-209: A -F, 1-6 1996: 14-150: A -G, 1-
6
State Plane Coordinates - X: 2315691 Y: 77567
Latitude: 34057'27.09"N Longitude: 77057'25.50"W
3. INVESTIGATION TYPE: CAMA/ D & F
4. INVESTIGATIVE PROCEDURE: Dates of Site Visit - N/A
Was Applicant Present - N/A
5. PROCESSING PROCEDURE: Application Received - 06/14/2016 (Completed)
Office - Wilmington
6. SITE DESCRIPTION:
(A) Local Land Use Plan -Brunswick County
Land Classification From LUP - Conservation/Developed
(B) AEC(s) Involved: EW, PTA
Water Dependent: Yes
(D) Intended Use: Commercial/Industrial
(E) Wastewater Treatment: Existing: N/A
Planned: None
(F) Type of Structures:
Existing - NA
Planned - Maintenance excavation of the shipping channel
(G) Estimated Annual Rate of Erosion: N/A
Source - N/A
7. HABITAT DESCRIPTION: [AREA]
DREDGED FILLED OTHER
(A) Vegetated Wetlands
(B) Non -Vegetated Wetlands (Open water)
1,140,000 sq. ft.
C Other - Hi h round
(D) Total Area Disturbed: - 1,140,000 sq. ft. (- 26 acres)
(E) Primary Nursery Area: No
(F) Water Classification: SC Open: No
8. PROJECT SUMMARY: The N.C. State Ports Authority proposes to allow emergency agitation dredging
to maintain an existing shipping channel within the Horseshoe Shoals Section in the Cape Fear River.
NCSPA- Horseshoe Shoal Emergency Maintenance Excavation
Page Two
9. PROJECT DESCRIPTION
The N.C. State Ports Authority (NCSPA) is located at 1 Shipyard Blvd., adjacent to the Cape Fear River, in
Wilmington, New Hanover County. The project site is located approximately 17 nautical miles downstream
of the NCSPA within the Horseshoe Shoals Segment of the Cape Fear River Shipping Channel, which is
northeast of the Town of Southport and the Duke Progress Energy Nuclear Power Plant in Brunswick
County. The project location is just east of two spoil islands, which are designated as DA -0003 to the south
and DA -0004 the north. DA -0003 is owned by the State of North Carolina and DA -0004 is currently owned
by Duke Progress Energy. The US Army Corps of Engineers (USACE) currently maintains this section of
the shipping channel to a final project depth of -44' @ mean lower low water (MLLW) (See Hydrographic
Surveys and Project Narrative).
The waters of the Cape Fear River (in the vicinity of the project) are classified SC, by the N.C. Division of
Water Resources. The area is NOT designated as a Primary Nursery Area (PNA), by the N.C. Division of
Marine Fisheries and these waters are CLOSED to the harvesting of shellfish.
PROPOSED PROJECT
The N.C. State Ports Authority proposes to allow emergency agitation dredging to maintain an existing
shipping channel within the Horseshoe Shoals Section in the Cape Fear River. Based on a recent
hydrographic survey, the application states that the existing depth within the Horseshoe Shoal Section of the
shipping channel ranges from approximately -39' to -40' @MLLW. The application states that this area has
not been dredged by the USACE in approximately 5 years and the Cape Fear River Pilots have indicated
that due to shoaling in this area, a draft restriction of -37' for the Cape Fear River is imminent. The
application states that in anticipation of the new locks at the Panama Canal, the NCSPA anticipates larger
vessels would soon call on their ports.
The applicant proposes to excavate "bed leveling" an area of approximately 3,800' in length by 300' in width
to a final project depth of -44'@ MLLW, which would result in the removal of approximately 100,000 cubic
yards (CY) of river bottom material within the federal limits of the Horseshoe Shoals Section of the Cape
Fear River. The application states that bed leveling would be performed using a beam to knock off the tops
of the finger shoals that have developed in Horseshoe Shoals. The beam would be attached to a cable and
wench system mounted on a barge being pushed by a tugboat until the final project depth of -42' + -2' @
MLLW is obtained. The application states the material in Horseshoe Shoals area is sandy and they do not
expect very much migration of disturbed material from this area of the river. Further, the application states
they anticipate that the material that is disturbed by this proposed process would be moved/disposed of in
the adjacent deeper areas with the Horseshoe Shoals Section of the river and remain in the shipping
channel. The application states that the proposed excavation would be done on a falling (ebb) tide and a
survey would be conducted by a third party (See Hydrographic Surveys and Project Narratives).
10. ANTICIPATED IMPACTS
The proposed maintenance excavation would disturb approximately 1,140,000 sq. ft. of river bottom area
and would result in the removal of approximately 100,000 CY of material, which would be re -suspended
back into the river system. Based on information on this type of agitation dredging in use in other facilities
within this segment of the river, it is anticipated that there would not be adverse impacts associated with the
operation of this system. The potential for short term sediment suspension impacts is certainly much more
acceptable than the possibility of product loss due to vessel damage resulting from grounding.
Submitted by: Robb L. Mairs Date: 06/14/2016 Office: Wilmington
IA e Z
. . A
June 14, 2016
Doug Huggett
Division of Coastal Management
400 Commerce Ave.
Morehead City, NC 28557
Re: North Carolina State Ports Authority
Port of Wilmington
Dredging of Cape Fear River — Horseshoe Shoal
Emergency Permit Request
Dear Mr Huggett:
The North Carolina State Ports Authority (NCSPA) is requesting an emergency CAMA
permit to perform bed leveling in the Horseshoe Shoal segment of the Cape Fear River.
The bed leveling will be performed by using a beam to knock off the tops of the finger
shoals that have developed in Horseshoe Shoals. The beam will be attached to a cable
and wench system as to perform the work to the precise depths in the area. Surveys of
the area will be performed upon completion of the work.
The Horseshoe Shoal segment of the Cape Fear River has not been dredged by the US
Army Corps of Engineers in approximately 5 years. The authorized project depth in this
area of the river with over depth is 42'+2', but recent surveys in this area show many
areas are currently at 39'-40'. The Cape Fear River Pilots have indicated that due to the
shoaling in this area, a draft restriction of 37' for the Cape Fear River is imminent. This
depth would prohibit the larger vessels to transit the Cape Fear River to the Port of
Wilmington.
The international shipping business is changing rapidly with companies migrating to
larger vessels in response to the June opening of the Panama Canal. The NCSPA is
expecting the arrival of the larger vessels starting on July 1 for one container service, and
August for another. It is very important for this area to maintain the authorized project
depth in order for vessels to arrive and depart in a safe manner. If the vessels are unable
to arrive and depart in a safe manner, the NCSPA is at risk to lose vital business
opportunities which not only affects the NCSPA, but is also detrimental to the State as a
whole due to the revenues generated from these customers who could potentially blosi ;
�..L
North Carolina State Ports Authority • 2202 Burnett Boulevard • PO Box 9002 • Wilmington, NC 28402 • www.ncports.com
: I Eel �4 dom-
• [.
Because of the noted conditions and circumstances above in the Cape Fear River, the
NCSPA is requesting an emergency permit to allow bed leveling in the Horseshoe Shoal
section of the Cape Fear River.
For your reference, I have attached the most recent USACE survey and a location map of
the area.
The North Carolina State Ports Authority appreciates the Division of Coastal
Managements attention and consideration regarding this effort. If additional information
is needed, please contact me at 910-251-5678 or via email at todd.waltongncports.com.
Sincerely,
North Carolina State Ports Authority
Todd C. Walton
Sr. Environmental Analyst
North Carolina State Ports Authority • 2202 Burnett Boulevard • PO Box 9002 • Wilmington, NC 28402 • www.ncports.com
Proiect Narrative
The North Carolina State Ports Authority is requesting a permit to perform bed leveling in the Horseshoe
Shoal segment of the Cape Fear River. The bed leveling will be performed by using a beam to knock off
the tops of the finger shoals that. have developed in Horseshoe Shoals. These shoals have a peak of 38-
40' throughout the area, with deep valleys in between that have depths in the 42'-46' range. The beam
will be attached to a cable and wench system mounted on a barge being pushed by a tugboat as obtain
results that will have precise 42' depths in the area upon completion of the work.
The beam is approximately 30' long. It will be tied by 4 separate cables and suspended from the barge
via a pulley and winch system. Because the areas that need to be leveled are fairly narrow, the beam
will be suspended to depths that will just push the material off of the tops of these peaks. The material
in the Horseshoe shoals area is sandy so we do not expect very much migration of disturbed material
from this area in the river. We anticipate that the material that is disturbed by the bed leveling process
will be moved/ disposed of in;fie adjacent deeper areas within the Horseshoe Shoals section of the river
and remain in the shipping channel. Calculations from recent surveys estimate that there is 100,000CY
of material in the area to be leveled.
The bed leveling will be done on the falling tide. We anticipate that the work will take approximately 7
days to complete. Throughout the bed leveling effort, the tugboat operator will be monitoring the
depth in the area he is working. If, after several passes; beneficial results are not observed, the bed
leveling work will discontinue. If after several passes the results show that the bed leveling is
successful, we anticipate 7-10 days of work to complete the entire process. After the work is complete,
the area will be surveyed by a third party.
:0.„^ mo .._ ..
ON Mr -1
APPLICATION for
Major Development Permit
(last revised 12/27/06)
North Carolina DIVISION OF COASTAL MANAGEMENT
1. Primary Applicant/ Landowner Information
Business Name
Project Name (if applicable)
North Carolina State Ports Authority
BED LEVELING OF HORSESHOE SHOALS
Applicant 1: First Name
MI
Last Name
JEFFREY
E
MILES
Last Name
Applicant 2: First Name
MI
Last Name
If additional applicants, please attach an additional page(s) with names listed.
Mailing Address
PO Box
City
Last Name
State
P.O. BOX 9002
9002
Wilmington
PO Box
NC
ZIP
Country
Phone No.
FAX No.
28402
USA
910 - 343 -
6430 ext.
910 - 343 - 6237
Street Address (if different from above)
City
State
28402
ZIP
2202 BURNETT BLVD
Wilmington
NC
ext.
28401 -
Email
jeff.miles@ncports.com
N/A
2. Agent/Contractor Information
Business Name
North Carolina State Ports Authority
Agent/ Contractor 1: First Name
MI
Last Name
TODD
C
WALTON
Agent/ Contractor 2: First Name
MI
Last Name
Mailing Address
PO Box
City
State
P.O. BOX 9002
9002
Wilmington
NC
ZIP
Phone No. 1
one No. 2
28402
910 - 251 -
5678 ext.
ext.
FAX No.
Contractor #
910 251 5686
N/A
Street Address (if different from above)
City
State
ZIP
2202 BURNETT BOULEVARD
Wilmington
NC
28401 -
Email
TODD.WALTON@NCPORTS.COM
<Form continues on back>
252-806-28€18 .. 1-888-4RCOAST :. www.nccoastaImanagement.net
Form DCM MP -1 (Page 2 of 4)
APPLICATION for
Major Development Permit
County (can be multiple) Street Address State Rd. #
BRUNSWICK HORSESHOE SHOAL
Subdivision Name City State Zip
N/A NEAR SOUTHPORT NC -
Phone No. Lot No.(s) (if many, attach additional page with list)
910 - 251- 5678 ext. , , ,
a. In which NC river basin is the project located? b. Name of body of water nearest to proposed project
CAPE FEAR CAPE FEAR RIVER
c. Is the water body identified in (b) above, natural or manmade? d. Name the closest major water body to the proposed project site.
®Natural []Manmade OUnknown CAPE FEAR RIVER
e. Is proposed work within city limits or planning jurisdiction? f. If applicable, list the planning jurisdiction or city limit the proposed
❑Yes NNo work falls within.
NA
4 S�t� Descripf�on
a. Total length of shoreline on the tract {ft.)
b. Size of entire tract (sq.ft.)
N/A
N/A
c. Size of individual lots)
d. Approximate elevation of tract above NHW (normal high water) or
N/A
NWL (normal water level)
(if many lot sizes, please attach additional page with a list)
N/A ❑NHW or ONWL
e. Vegetation on tract
CAPE FEAR RIVER
f. Man-made features and uses now on tract
PROJECT LOCATED WITHIN THE CONFINES OF THE CAPE FEAR RIVER SHIPPING CHANNEL, CURRENTLY
DREDGED ON AN AS NEEDED BASIS BY THE USACE
g. Identify and describe the existing land uses adlacent to the proposed project site.
Disposal Area #4, UPLAND DREDGE DISPOSAL SITE owned by Duke Energy
h.. How does local government zone the tract?
I. is the proposed project consistent with the applicable zoning?
NA
(Attach zoning compliance certificate, if applicable)
OYes []No NNA
j. is the proposed activity part of an urban waterfront redevelopment proposal? OYes NNo
k. Hasa professional archaeological assessment been done for the tract? If yes, attach a copy. []Yes NNo [INA
If yes, by whom?
I. Is the proposed project located in a National Registered Historic District or does it involve a []Yes NNo [INA
National Register listed or eligible property?
<Form continues on next page>
252-808-2808 :: 1-888-4RCOAST :: www. nccoastalmanagement.net
Form DCM MP -1 (Page 3 of 4)
APPLICATION for
Major Development Permit
m. (i) Are there wetlands on the site? ❑Yes ®No
(ii) Are there coastal wetlands on the site? ❑Yes ®No
(iii) If yes to either (i) or (ii) above, has a delineation been conducted? ❑Yes ®No
(Attach documentation, if available)
n. Describe existing wastewater treatment facilities.
NA
o. Describe existing drinking water supply source.
NA
p. Describe existing storm water management or treatment systems.
NA
5. Activities and Impacts
a. Will the project be for commercial, public, or private use?
®Commercial ®Public/Government
❑ Private/Community
b. Give a brief description of purpose, use, and daily operations of the project when complete.
THE AREA IS CURRENTLY USED AS A NAVIGATION CHANNEL FOR VESSELS COMING/GOING FROM THE OCEAN
TO TERMINALS ON THE CAPE FEAR RIVER.
c. Describe the proposed construction methodology, types of construction equipment to be used during construction, the number of each type
of equipment and where it is to be stored.
BED LEVELING OF MATERIAL IN EXISTING RIVER CHANNEL. A TUG WILL PUSH A BARGE WITH A BEAM
ATTACHED TO CABLES AND WENCHES TO ENSURE PRECISE DEPTHS
d. List all development activities you propose.
NA
e. Are the proposed activities maintenance of an existing project, new work, or both?
THIS IS MAINTENANCE OF THE
USACE AUTHORIZED DREDGE
AREA
f. What is the approximate total disturbed land area resulting from the proposed project?
N/A ❑Sq.Ft or ❑Acres
g. Will the proposed project encroach on any public easement, public accessway or other area
❑Yes ®No ❑NA
that the public has established use of?
h. Describe location and type of existing and proposed discharges to waters of the state.
na
i. Will wastewater or stormwater be discharged into a wetland?
❑Yes ®No [INA
If yes, will this discharged water be of the same salinity as the receiving water?
❑Yes .❑No ❑NA
J. Is there any mitigation proposed?
❑Yes ®No ❑NA
If yes, attach a mitigation proposal.
<Form continues on back>
252-808-2808 :. 9-888-4RC®AST :: www. nccosstalmanagement. not
Form DCM MP -1 (Page 4 of 4)
APPLICATION(' for
Major Development Permit
6. Additional Information
In addition to this completed application form, (MP -1) the following items below, if applicable, must be submitted in order for the application
package to be complete. Items (a) — (f) are always applicable to any major development application. Please consult the application
instruction booklet on how to properly prepare the required items below.
a. A project narrative.
b. An accurate, dated work plat (including plan view and cross-sectional drawings) drawn to scale. Please give the present status of the
proposed project. Is any portion already complete? If previously authorized work, clearly indicate on maps, plats, drawings to distinguish
between work completed and proposed.
c. A site or location map that is sufficiently detailed to guide agency personnel unfamiliar with the area to the site.
d. A copy of the deed (with state application only) or other instrument under which the applicant claims title to the affected properties.
e. The appropriate application fee. Check or money order made payable to DENR.
f. A list of the names and complete addresses of the adjacent waterfront (riparian) landowners and signed return receipts as proof that such
owners have received a copy of the application and plats by certified mail. Such landowners must be advised that they have 30 days in
which to submit comments on the proposed project to the Division of Coastal Management.
Name Phone No.
Address
Name Phone No.
Address
Name Phone No.
Address
g. A list of previous state or federal permits issued for work on the project tract. Include permit numbers, permittee, and issuing dates.
h. Signed consultant or agent authorization form, if applicable.
i. Wetland delineation, if necessary.
j. A signed AEC hazard notice for projects in oceanfront and inlet areas. (Must be signed by property owner)
k. A statement of compliance with the N.C. Environmental Policy Act (N.C.G.S. 113A 1-10), if necessary. If the project involves expenditure
of public funds or use of public lands, attach a statement documenting compliance with the North Carolina Environmental Policy Act.
7. Certification and Permission to Enter on Land
I understand that any permit issued in response to this application will allow only the development described in the application.
The project will be subject to the conditions and restrictions contained in the permit.
I certify that I am authorized to grant, and do in fact grant permission to representatives of state and federal review agencies to
enter on the aforementioned lands in connection with evaluating information related to this permit application and follow-up
monitoring of the project.
I further certify that the information provided in this application is truthful to the best of my knowledge.
Date _6/14201
Print Name JEFFREY E. MILES
Signature
Please indicate application attachments pertaining to your prop sed project.
®DCM MP -2 Excavation and Fill Information ❑DCM MP -5 Bridges and Culverts
❑DCM MP -3 Upland Development
❑DCM MP -4 Structures Information
252-808-2808 1-888-4RCOAST vvvvvv.nccoastalmanagement. net
Form DCM MIP -2
EXCAVATION and FILL
(Except for bridges and culverts)
Attach this form to Joint Application for CAMA Major Permit, Form DCM MP -1. Be sure to complete all other sections of the Joint
Application that relate to this proposed project. Please include all supplemental information.
Describe below the purpose of proposed excavation and/or fill activities. All values should be given in feet.
_ ON.........................:.......:.:_.:<....,.........:....:..,..._..._........_............::.:;...:.. I�Tfirs'section.:not.�....ica_.le�_
a. Amount of material to be excavated from below NHW or NWL in b. Type of material to be excavated,
cubic yards. SAND
100,000cy
c. (i) Does the area to be excavated include coastal wetlands/marsh
(CW), submerged aquatic vegetation (SAV), shell bottom (SB),
or other wetlands (WL)? If any boxes are checked, provide the
number of square feet affected.
❑CW ❑SAV ❑SB
OWL ®None
(li) Describe the purpose of the excavation in these areas:
TO RETURNT THE CURRENT DEPTH OF THIS PORTION OF
THE RIVER TO PROJECT DEPTHS
d. High -ground excavation in cubic yards.
2; ' Q(SP(�$AL °OF,FXCAVA.'ED MATER%AL CI This sect(on naf app(�cble
a. Location of disposal area. b. Dimensions of disposal area.
SEE ATTACHED NARRATIVE
c. (1) Do you claim title to disposal area?
❑Yes ❑No ❑NA
u If no, attach a letter granting permission from the owner.
e, (1) Does the disposal area include any coastal wetlands/marsh
(CW), submerged aquatic vegetation (SAV), shell bottom (SB),
or other wetlands (WL)? If any boxes are checked, provide the
number of square feet affected.
❑CW ❑SAV ❑SB
❑WL []None
(ii) Describe the purpose of disposal in these areas:
d. (i) Will a disposal area be available for future maintenance?
[]Yes []No [INA
(ii) If yes, where?
f. (1) Does the disposal include any area in the water?
❑Yes ®No [INA
(ii) If yes, how much water area is affected?
252-808-2808 :: 1-888-4RCOAST :: www.nccoastallmana-gernent.net revised: 12126/06
Access
Other
Channel
Rock
(excluding
(NLW or
Canal
Boat Basin
Boat Ramp
Rock Groin
Breakwater
shoreline
NWL)
stabilization
Length
3800'
Width
300'
'
n
Avg. Existing
g
39-40'
NA
(JA
Depth
Fina Project
I Pro1et
421+21
Depth
p t
_
_ ON.........................:.......:.:_.:<....,.........:....:..,..._..._........_............::.:;...:.. I�Tfirs'section.:not.�....ica_.le�_
a. Amount of material to be excavated from below NHW or NWL in b. Type of material to be excavated,
cubic yards. SAND
100,000cy
c. (i) Does the area to be excavated include coastal wetlands/marsh
(CW), submerged aquatic vegetation (SAV), shell bottom (SB),
or other wetlands (WL)? If any boxes are checked, provide the
number of square feet affected.
❑CW ❑SAV ❑SB
OWL ®None
(li) Describe the purpose of the excavation in these areas:
TO RETURNT THE CURRENT DEPTH OF THIS PORTION OF
THE RIVER TO PROJECT DEPTHS
d. High -ground excavation in cubic yards.
2; ' Q(SP(�$AL °OF,FXCAVA.'ED MATER%AL CI This sect(on naf app(�cble
a. Location of disposal area. b. Dimensions of disposal area.
SEE ATTACHED NARRATIVE
c. (1) Do you claim title to disposal area?
❑Yes ❑No ❑NA
u If no, attach a letter granting permission from the owner.
e, (1) Does the disposal area include any coastal wetlands/marsh
(CW), submerged aquatic vegetation (SAV), shell bottom (SB),
or other wetlands (WL)? If any boxes are checked, provide the
number of square feet affected.
❑CW ❑SAV ❑SB
❑WL []None
(ii) Describe the purpose of disposal in these areas:
d. (i) Will a disposal area be available for future maintenance?
[]Yes []No [INA
(ii) If yes, where?
f. (1) Does the disposal include any area in the water?
❑Yes ®No [INA
(ii) If yes, how much water area is affected?
252-808-2808 :: 1-888-4RCOAST :: www.nccoastallmana-gernent.net revised: 12126/06
F00 FRS 0 `M� Jilt' En F511, E-')IDj3 G CD :�)
3, SHORELINE STABILIZATION ®This section not applicable
(if development is a wood groin, use MP -4 — Structures)
a. Type of shoreline stabilization: lb. Length:
❑Bulkhead ❑Riprap ❑Breakwater/Sill ❑Other: Width:
c. Average distance waterward of NHW or NWL: d. Maximum distance waterward of NHW or NWL:
e. Type of stabilization material:
g. Number of square feet of fill to be placed below water level.
Bulkhead backfill Riprap
Breakwater/Sill Other
i. Source of fill material.
f. (i) Has there been shoreline erosion during preceding 12
months?
❑Yes ❑No ❑NA
(ii) If yes, state amount of erosion and source of erosion amount
information.
h. Type of fill material.
4.OTHER FILL ACTIVITIES ®This section not applicable
(Excluding Shoreline Stabilization)
a. (i) Will fill material be brought to the site? ❑Yes (JNo LANA
If yes,
(ii) Amount of material to be placed in the water
(iii) Dimensions of fill area
(iv) Purpose of fill
b. (i) Will fill material be placed in coastal wetlands/marsh (CW),
submerged aquatic vegetation (SAV), shell bottom (SB), or
other wetlands (WL)? If any boxes are checked, provide the
number of square feet affected.
E] CW ❑SAV RSB
❑WL ❑None
(ii) Describe the purpose of the fill in these areas:
5. GENERAL
a. How will excavated or fill material be kept on site and erosion b. What type of construction equipment will be used (e.g., dragline,
controlled? backhoe, or hydraulic dredge)?
Bed leveling will be performed on the falling tide. Tugboat, barge with cable and wench system to hold beam at
precise depths.
c. (i) Will navigational aids be required as a result of the project?
❑Yes ®No ❑NA
(ii) If yes, explain what type and how they will be implemented.
d. (i) Will wetlands be crossed in transporting equipment to project
site? ❑Yes ®No ❑NA
(ii) If yes, explain steps that will be taken to avoid or minimize
environmental impacts.
6/14/16
Date NORTH CAROLINA STATE PORTS AUTHORITY
MAINTENANCE BEDLEVELING OF CAPE FEAR RIVER/ Applicant Name
HOSRESHOE SHOAL
Project Name
252-808-2606 :: 1-888-4RCOAST :: vvww.nccoastalmanagernent-eget revised: 12/26/06
Ap icant Sj natu e
252-808-2808 :: 1-888-4RCOAST :: www.nccoastaimananement.net revised: 12/26/06
G OC !c //[\/