Loading...
HomeMy WebLinkAbout20080978 Ver 1_Application_20080616.i r1 MARZIANO & MCGOUGAN, P.A. consulting engineers Marziano & McGougan, P.A. 1300 Second Avenue Suite 211 Conway, SC 29526 Phone: 843-488-0124 Fax: 843-488-0129 June 12, 2008 Division of Water Quality 401/Wetlands Unit 1650 Mail Service Center Raleigh, NC, 27699-1650 08-0978 RE: PCN Application for NW-33 and NW-39 Permits 401 Water Quality Certification New Raw Water Intake on the Yadkin River in Davidson County, NC Davidson Water, Inc. WTP M&M Project No. 26023 To Whom It May Concern: Davidson Water, Inc. (DWI) has requested Marziano &z McGougan, P.A. to design a new raw water intake on the existing Water Treatment Plant (WTP) site to replace three existing intakes as the primary means for raw water supply. The existing WTP and intakes are located on the Yadkin River immediately south of US-64 on the Davidson- Davie County line. DWI will maintain the three existing intakes in working order to serve as a redundant backup system. The existing DWI WTP has a total water treatment capacity of 20.0 mgd. Since its original construction in 1969, it has been upgraded through several construction projects that have increased the capacity to serve the increasing customer base and service area expansions. DWI desires to construct the new intake with additional capacity to serve the future upgrades to this facility and potentially a new water treatment facility. On behalf of Davidson Water, Inc., please find enclosed seven (7) copies of the plans, permit application, and dewatering plan narrative. An application fee of $475.00 is included. We appreciate your review of the enclosed plans and look forward to working with you on the project. Please contact me at this office if you have any questions or need any additional information. Sincerely, Joseph W. McGougan, P.E. jig cc: Greg Stabler, Hiram Marziano ?9 (r-z' 9 k!27 D JUN 16' 2008 SAWS ANDSj?? BRANCH v - J f b Office Use Only: Form Version March 05 USACE Action ID No. DWQ No. (If any particular item is not applicable to this project, please enter "Not Apphcable" or "N/A".) 1. Processing 1. Check all of the approval(s) requested for this project: ® Section 404 Permit ? Riparian or Watershed Buffer Rules ? Section 10 Permit ? Isolated Wetland Permit from DWQ ® 401 Water Quality Certification ? Express 401 Water Quality Certification 2. Nationwide, Regional or General Permit Number(s) Requested: NW-33, NW-39 3. If this notification is solely a courtesy copy because written approval for the 401 Certification is not required, check here: ? 4. If payment into the North Carolina Ecosystem Enhancement Program (NCEEP) is proposed for mitigation of impacts, attach the acceptance letter from NCEEP, complete section VIII, and check here: ? 5. If your project is located in any of North Carolina's twenty coastal counties (listed on page 4), and the project is within a North Carolina Division of Coastal Management Area of Environmental Concern (see the top of page 2 for further details), check here: ? II. Applicant Information B?f ffi 1. Owner/Applicant Information JUN 1 6 2008 Name: Davidson Water Inc. (private water utility) Mailing Address: 7040 Old US Highway 52, PO Box 969 ,`.... ?, mn STORMWATER BRANCH Welcome NC 27374 Attn: Gregg Stabler Director Telephone Number: 336-731-2341 Fax Number: 336-731-3195 E-mail Address: gstabler@davidsonwater.com 2. Agent/Consultant Information (A signed and dated copy of the Agent Authorization letter must be attached if the Agent has signatory authority for the owner/applicant.) Name: Joseph W. McGougan P.E. Company Affiliation: Marziano & McGouganP.A. Mailing Address: 1300 Second Avenue Suite 211 Conway, SC 29526 Telephone Number: 843-488-0124 Fax Number: 843-488-0129 E-mail Address: jmcgoug_ankmarziano-mcg_ougan.com Updated 11/1/2005 Page 5 of 14 III. Project Information Attach a vicinity map clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads. Also provide a detailed site plan showing property boundaries and development plans in relation to surrounding properties. Both the vicinity map and site plan must include a scale and north arrow. The specific footprints of all buildings, impervious surfaces, or other facilities must be included. If possible, the maps and plans should include the appropriate USGS Topographic Quad Map and NRCS Soil Survey with the property boundaries outlined. Plan drawings, or other maps may be included at the applicant's discretion, so long as the property is clearly defined. For administrative and distribution purposes, the USACE requires information to be submitted on sheets no larger than 11 by 17-inch format; however, DWQ may accept paperwork of any size. DWQ prefers full-size construction drawings rather than a sequential sheet version of the full-size plans. If full-size plans are reduced to a small scale such that the final version is illegible, the applicant will be informed that the project has been placed on hold until decipherable maps are provided. 1. Name of project: Davidson Water Inc. Raw Water Structure and Intake 2. T.I.P. Project Number or State Project Number (NCDOT Only): N/A 3. Property Identification Number (Tax PIN): 5796-01-08-3943 (Davidson County GIS) 4. Location County: Davidson Nearest Town: Lexington Subdivision name (include phase/lot number): N/A Directions to site (include road numbers/names, landmarks, etc.): Project is located on site at the existing DWI Water Treatment Plant, approximately five miles west of Lexington at the US-64 Bridge over the Yadkin River. 5. Site coordinates (For linear projects, such as a road or utility line, attach a sheet that separately lists the coordinates for each crossing of a distinct waterbody.) Decimal Degrees (6 digits minimum): 35°51' 17" ON 80°22'53" °W 6. Property size (acres): Total parcel acreage of the DWI WTP site is approximately 36 acres. A new raw water intake (headwall and caisson) will be constructed on the eastern bank of the Yadkin River. The 30' diameter caisson will be constructed outside of the riverbed approximately 20 feet from the top of bank. The headwall structure will be constructed inside the floodway, approximately 10 feet inside from the edge of water (as observed to be 639 feet MSL, the day of field survey). Total disturbed acreage is approximately 0.297 acres (includes dewatering_area). 7. Name of nearest receiving body of water: Yadkin River 8. River Basin: Yadkin - Pee Dee River (Note - this must be one of North Carolina's seventeen designated major river basins. The River Basin map is available at http://h2o.eiu.state.nc.us/admin/maps/.) Updated 11/1/2005 Page 6 of 14 9. Describe the existing conditions on the site and general land use in the vicinity of the project at the time of this application: Property adjacent to the disturbed area is built upon by the DWI water treatment facility and raw water reservoirs. These areas were cleared over several phases since the WTP's initial construction in 1968. Adjoining land to the north and south have land cover that can generally be described as wooded with intermittent farmland areas that encroach upon the WTP site. 10. Describe the overall project in detail, including the type of equipment to be used: DWI desires to construct a new raw water intake with additional capacity to serve the future upgrades to the WTP facility and potentially a new water treatment facility. The river bottom has been surveyed at the proposed intake location and this information is included in the design plans included in this submittal. This information will be used to properly dewater the site for construction of the headwall structure via port-a-dam and coffer dam. It is anticipated that construction will proceed as follows: 1. Construct the caisson on the top of the river bank. 2. Dewater the Yadkin River and begin construction of the headwall structure. 3. Simultaneous with the headwall construction, directionally bore the raw water mains from inside the caisson to penetrate the headwall located within the riverbed. 4. Construct the pump station on top of the caisson structure. 5. Complete forming of the headwall structure and install the screens. 6. After final inspection and acceptance of the underwater work, flood the dewatered portions of the work area and remove the damming equipment. It should be noted that DWI intends to maintain their three existing intakes in working order to serve as a redundant backup system. The contractor will install the caisson with a portable crane, deep-excavation trackhoe, and smaller supporting equipment. Rock blasting/excavation is anticipated during construction of this project. 11. Explain the purpose of the proposed work: Davidson Water, Inc. (DWP has begun the design and permitting process for a new raw water intake on the existing WTP site to replace three existing intakes as the primary means for raw water supply. The existing DWI WTP has a total water treatment capacity of 20.0 mgd. Since its original construction in 1968, it has been upgraded through several construction projects that have increased the capacity to serve the increasing customer base and service area expansions. Planning for an additional upgrade to 30.0 mgd is underway and a new raw water intake will be necessary to supply this additional capacity and replace the aging infrastructure. Updated 11/1/2003 Page 7 of 14 IV. Prior Project History If jurisdictional determinations and/or permits have been requested and/or obtained for this project (including all prior phases of the same subdivision) in the past, please explain. Include the USACE Action ID Number, DWQ Project Number, application date, and date permits and certifications were issued or withdrawn. Provide photocopies of previously issued permits, certifications or other useful information. Describe previously approved wetland, stream and buffer impacts, along with associated mitigation (where applicable). If this is a NCDOT project, list and describe permits issued for prior segments of the same T.I.P. project, along with construction schedules. N/A V. Future Project Plans Are any future permit requests anticipated for this project? If so, describe the anticipated work, and provide justification for the exclusion of this work from the current application. No additional USACE permits are anticipated at this time. VI. Proposed Impacts to Waters of the United States/Waters of the State It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to wetlands, open water, and stream channels associated with the project. Each impact must be listed separately in the tables below (e.g., culvert installation should be listed separately from riprap dissipater pads). Be sure to indicate if an impact is temporary. All proposed impacts, permanent and temporary, must be listed, and must be labeled and clearly identifiable on an accompanying site plan. All wetlands and waters, and all streams (intermittent and perennial) should be shown on a delineation map, whether or not impacts are proposed to these systems. Wetland and stream evaluation and delineation forms should be included as appropriate. Photographs may be included at the applicant's discretion. If this proposed impact is strictly for wetland or stream mitigation, list and describe the impact in Section VIII below. If additional space is needed for listing or description, please attach a separate sheet. 1. Provide a written description of the proposed impacts: Proposed impacts consist of temporary impacts associated with the dewatering of the Yadkin River, and permanent impacts associated with the headwall and screen structures built in the riverbed. No wetlands are located within proximity of the caisson or dewatered areas, with exception to the river. 2. Individually list wetland impacts. Types of impacts include, but are not limited to mechanized clearing, grading, fill, excavation, flooding, ditching/drainage, etc. For dams, separately list impacts due to both structure and flooding. Wetland Impact Type of Wetland Located within Distance to Area of Number Type of Impact (e.g., forested, marsh, 100-year Flo a n Nearest Stream Impact (acres) (indicate on map) herbaceous, bog, etc.) (yes/no) ) ( (linear feet) Total Wetland Impact (acres) 0.00 Updated 11/1/2005 Page 8 of 14 3. List the total acreage (estimated) of all existing wetlands on the property: 0.00 4. Individually list all intermittent and perennial stream impacts. Be sure to identify temporary impacts. Stream impacts include, but are not limited to placement of fill or culverts, dam construction, flooding, relocation, stabilization activities (e.g., cement walls, rip-rap, crib walls, gabions, etc.), excavation, ditching/straightening, etc. If stream relocation is proposed, plans and profiles showing the linear footprint for both the original and relocated streams must be included. To calculate acreage, multiply length X width, then divide by 43,560. Stream Impact Number (indicate on ma) Stream Name Type of Impact Perennial Intermittent? ? Average Stream Width Before Impact Impact Length linear feet) Area of Impact (acres) 1 Yadkin River Temporary perennial 230 feet 200 0.230 2 Yadkin River Permanent perennial 230 feet 145 0.067 Total Stream Impact (by length and acreage)* 345 0.297 Temnorarv total footprint of the temporary' pact area (dewatering area) is approximatel 200' L x 50' W The permanent impact areaCheadwall/screen structures) is located within the temporary impact zone and is approximately 145' L x 20' W. For the impact calculation, the impact zones are calculated separately and summed together to reflect the more conservative impact estimate. 5. Individually list all open water impacts (including lakes, ponds, estuaries, sounds, Atlantic Ocean and any other water of the U.S.). Open water impacts include, but are not limited to fill. excavation, dredging, flooding, drainage, bulkheads, etc. Open Water Impact Name of Waterbody Type of Waterbody Area of Site Number (? applicable) Type of Impact (lake, pond, estuary, sound, bay, Impact (indicate on ma) ocean, etc.) (acres) Total Open Water Impact (acres) 0.00 6. List the cumulative impact to all Waters of the U.S. resulting from the project: Stream Impact (acres): 0.297 Wetland Impact (acres): 0.000 Open Water Impact (acres): 0.000 Total Impact to Waters of the U.S. (acres) 0.297 Total Stream hn act (linear feet): 345 7. Isolated Waters Do any isolated waters exist on the property? ? Yes ® No Describe all impacts to isolated waters, and include the type of water (wetland or stream) and the size of the proposed impact (acres or linear feet). Please note that this section only applies to waters that have specifically been determined to be isolated by the USACE. Updated 11/1/2005 Page 9 of 14 8. Pond Creation If construction of a pond is proposed, associated wetland and stream impacts should be included above in the wetland and stream impact sections. Also, the proposed pond should be described here and illustrated on any maps included with this application. Pond to be created in (check all that apply): ? uplands ? stream ? wetlands Describe the method of construction (e.g., dam/embankment, excavation, installation of draw-down valve or spillway, etc.): Proposed use or purpose of pond (e.g., local stormwater requirement, etc.): Current land use in the vicinity of the pc Size of watershed draining to pond: livestock watering, irrigation, aesthetic, trout pond, Expected pond surface area: VII. Impact Justification (Avoidance and Minimization) Specifically describe measures taken to avoid the proposed impacts. It may be useful to provide information related to site constraints such as topography, building ordinances, accessibility, and financial viability of the project. The applicant may attach drawings of alternative, lower-impact site layouts, and explain why these design options were not feasible. Also discuss how impacts were minimized once the desired site plan was developed. If applicable, discuss construction techniques to be followed during construction to reduce impacts. To construct a new intake with the desired capacity, temporary disturbance and permanent structure within the Yadkin River is unavoidable. However, the dewatering_plan and proposed construction methods will have a minimal disturbance width within the riverbed. The river bottom has been surveyed at the proposed intake location to minimize the dewatering area. Additionally, the raw water pump station will be mounted on top of the caisson, above the 100-year flood-plain and reducing the overall footprint of the structure on the top of the bank. As stated in the construction methodology, simultaneous with the headwall construction, the raw water mains will be directionally bored from inside the caisson to penetrate the headwall located within the riverbed. This will eliminate heM disturbance of the river bank and allow the headwall and pipeline to be constructed without excavation of the bank. VIII. Mitigation DWQ - In accordance with 15A NCAC 2H .0500, mitigation may be required by the NC Division of Water Quality for projects involving greater than or equal to one acre of impacts to freshwater wetlands or greater than or equal to 150 linear feet of total impacts to perennial streams. USACE - In accordance with the Final Notice of Issuance and Modification of Nationwide Permits, published in the Federal Register on January 15, 2002, mitigation will be required when necessary to ensure that adverse effects to the aquatic environment are minimal. Factors including size and type of proposed impact and function and relative value of the impacted aquatic resource will be considered in determining acceptability of appropriate and practicable mitigation as proposed. Examples of mitigation that may be appropriate and practicable include, Updated 11/1/2005 Page 10 of 14 but are not limited to: reducing the size of the project; establishing and maintaining wetland and/or upland vegetated buffers to protect open waters such as streams; and replacing losses of aquatic resource functions and values by creating, restoring, enhancing, or preserving similar functions and values, preferable in the same watershed. If mitigation is required for this project, a copy of the mitigation plan must be attached in order for USACE or DWQ to consider the application complete for processing. Any application lacking a required mitigation plan or NCEEP concurrence shall be placed on hold as incomplete. An applicant may also choose to review the current guidelines for stream restoration in DWQ's Draft Technical Guide for Stream Work in North Carolina (see DWQ website for most current version.). 1. Provide a brief description of the proposed mitigation plan. The description should provide as much information as possible, including, but not limited to: site location (attach directions and/or map, if offsite), affected stream and river basin, type and amount (acreage/linear feet) of mitigation proposed (restoration, enhancement, creation, or preservation), a plan view, preservation mechanism (e.g., deed restrictions, conservation easement, etc.), and a description of the current site conditions and proposed method of construction. Please attach a separate sheet if more space is needed. The river bank must be stabilized using geo-synthetic matting overlaid with Class I rip-rap. Additionally, sseeding/mulching and silt fence (and other stormwater BMPs as deemed appropriate by USACE) are included in the overall site plan. The Erosion Control system will be installed to prevent sediment runoff from reaching surface waters. This will minimize stormwater runoff from the iob site Overall land disturbance is less than one acre. 2. Mitigation may also be made by payment into the North Carolina Ecosystem Enhancement Program (NCEEP). Please note it is the applicant's responsibility to contact the NCEEP at (919) 715-0476 to determine availability, and written approval from the NCEEP indicating that they are will to accept payment for the mitigation must be attached to this form. For additional information regarding the application process for the NCEEP, check the NCEEP website at hqp://vAvNv.nceep.net/pages/inlieureplace.litm. If use of the NCEEP is proposed, please check the appropriate box on page five and provide the following information: Amount of stream mitigation requested (linear feet): N/A Amount of buffer mitigation requested (square feet): N/A Amount of Riparian wetland mitigation requested (acres): N/A Amount of Non-riparian wetland mitigation requested (acres): N/A Amount of Coastal wetland mitigation requested (acres): N/A Updated 11/1/2005 Page 11 of 14 IX. Environmental Documentation (required by DWQ) 1. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land? Yes ? No 2. If yes, does the project require preparation of an environmental document pursuant to the requirements of the National or North Carolina Environmental Policy Act (NEPA/SEPA)? Note: If you are not sure whether a NEPA/SEPA document is required, call the SEPA coordinator at (919) 733-5083 to review current thresholds for environmental documentation. Yes ? No 3. If yes, has the document review been finalized by the State Clearinghouse? If so, please attach a copy of the NEPA or SEPA final approval letter. Yes ? No ? X. Proposed Impacts on Riparian and Watershed Buffers (required by DWQ) It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to required state and local buffers associated with the project. The applicant must also provide justification for these impacts in Section VII above. All proposed impacts must be listed herein, and must be clearly identifiable on the accompanying site plan. All buffers must be shown on a map, whether or not impacts are proposed to the buffers. Correspondence from the DWQ Regional Office may be included as appropriate. Photographs may also be included at the applicant's discretion. 1. Will the project impact protected riparian buffers identified within 15A NCAC 213 .0233 (Meuse), 15A NCAC 213 .0259 (Tar-Pamlico), 15A NCAC 02B .0243 (Catawba) 15A NCAC 2B .0250 (Randleman Rules and Water Supply Buffer Requirements), or other (please identify V Yes ? No 2. If "yes", identify the square feet and acreage of impact to each zone of the riparian buffers. If buffer mitigation is required calculate the required amount of mitigation by applying the buffer multipliers. Required Zone* finpact (square feet) Multiplier Mitigation 1 3 (2 for Catawba) exempt 2 1.5 exempt Total p exempt * Zone 1 extends out 30 feet perpendicular from the top of the near bank of channel; Zone 2 extends an additional 20 feet from the edge of Zone 1. 3. If buffer mitigation is required, please discuss what type of mitigation is proposed (i.e., Donation of Property, Riparian Buffer Restoration / Enhancement, or Payment into the Riparian Buffer Restoration Fund). Please attach all appropriate information as identified within 15A NCAC 2B .0242 or .0244, or .0260. N/A Updated 11/1/2005 Page 12 of 14 XI. Stormwater (required by DWQ) Describe impervious acreage (existing and proposed) versus total acreage on the site. Discuss stormwater controls proposed in order to protect surface waters and wetlands downstream from the property. If percent impervious surface exceeds 20%, please provide calculations demonstrating total proposed impervious level. Minimal impervious surface area for a project of this scope and nature. The river bank must be stabilized using geo-synthetic matting_ overlaid with Class I rip-rap. Additionally, seeding//mulching and silt fence (and other stormwater BMPs as deemed appropriate by USACE) are included in the overall site plan. The Erosion Control system will be installed to prevent sediment runoff from reaching; surface waters. This will minimize stormwater runoff from the job site. XII. Sewage Disposal (required by DWQ) Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. The DWI WTP generates sludge that is removed from the sedimentation basin and treatment process filters The discharge from the sedimentation basin and the filters are currently combined into two ponds decanted and pumped out into vacuum assisted sludge dnyffig beds. The drying beds are excavated periodically and the waste sludge is land applied at an approved location. XM. Violations (required by DWQ) Is this site in violation of DWQ Wetland Rules (I 5A NCAC 2H .0500) or any Buffer Rules? Yes ? No Is this an after-the-fact permit application? Yes ? No XIV. Cumulative Impacts (required by DWQ) Will this project (based on past and reasonably anticipated future impacts) result in additional development, which could impact nearby downstream water quality? Yes ? No If yes, please submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent North Carolina Division of Water Quality policy posted on our website at http://h2o.enr.state.nc.us/ncwetlands. If no, please provide a short narrative description: This raw water intake is designed as a superior alternative to the continued operation of the existing intakes that supply the DWI WTP The cgpacity of the water plant to produce potable water will not increase as a result of this project Therefore cumulative impacts cannot be attributed to the construction of this intake. Subsequent upgrades to the WTP capacity will require an Environmental Assessment and FONSI as acknowledged by DWI. Updated 11/1/2005 Page 13 of 14 XV. Other Circumstances (Optional): It is the applicant's responsibility to submit the application sufficiently in advance of desired construction dates to allow processing time for these permits. However, an applicant may choose to list constraints associated with construction or sequencing that may impose limits on work schedules (e.g., draw-down schedules for lakes, dates associated with Endangered and Threatened Species, accessibility problems, or other issues outside of the applicant's control). The sensitivity and importance of this project is paramount to the efficient operation of the Davidson Water Inc. water treatment facility. This is the largest public utility in the U.S. with a customer base of approximately 52,000 and a service population of 160,000 persons. The condition of the three existing intakes should be noted as follows: 1. The pumps at each of these intakes are not capable of pumping from the river directly to the water treatment facility headworks. Therefore, bypassing the existing raw water reservoirs currently is not possible. 2. Flood events in the Yadkin River affect the operation of the DWI WTP. The middle and downstream intake pump stations, as well as the, two lower reservoirs, are low enough to be inundated during high flow events in the Yadkin River (less than the 100-year flood). 3. During the 2002 drought, extremely low water levels in the Yadkin River left two of the three intakes with insufficient suction head. The pumps at the downstream intake experienced an air lock and were rendered inoperable for several days. Also, the screw pumps at the upstream intake were inoperable, leaving the middle intake as the sole supply to the DWI water treatment facility. The proposed raw water intake will alleviate these problems because it will be constructed at a much lower elevation than the existing intake elevations, include a pump design that will be capable of pumping directly to the water treatment facility, and have a capacity to serve the future needs of the DWI service population. -49 - Applicant/Agent's Signature Date (Agent's signature is valid only if an authorization letter from the applicant is provided.) Updated 11/1/2005 Page 14 of 14 Davidson Water, Inc. - Raw Water Intake Construction Dewatering Plan June 2008 Dewatering Plan for the USACE NW-33 Permit New Raw Water Intake Construction Davidson Water, Inc. Davidson County, North Carolina Davidson Water, Inc. desires to construct a new raw water intake located on the eastern bank of the Yadkin River, approximately 1,000 feet downstream of the US-64 bridge. The river bottom has been surveyed at the proposed intake location and this information is included in the design plans as part of this submittal. The survey and design plan has been submitted to a specialty contractor for their review and comment. According to the information provided by the specialty contractor, the port-a-dam barrier will be installed as a three-sided barrier to retain the waters of the Yadkin River outside of the required working area. Sandbags shall be placed along the sealing nylon apron along the length of the dam to ensure adequate sealing of the port-a-dam to the river bottom and between the port-a-dam and the riverbank. It is anticipated that the dewatering of this section of the Yadkin River will encompass an area approximately 200 feet in length with an average width of approximately 50 feet. The bottom elevation of the port-a-dam will be approximately 632 feet-MSL, with a projected normal water elevation of 639 feet-MSL. This allows for an approximate 3 feet of rise in the river before overtopping could occur. The length of time that the river will be dewatered is projected to be 45 days. This should allow sufficient time to perform the following construction work in the riverbed: 1. Dewater the Yadkin River to expose the riverbed to the appropriate depth. 2. Excavate the riverbed to weathered bedrock, ensuring that the headwall footings will be poured at an elevation of 627 feet-MSL. 3. Construct the headwall footings, anchored to the river bottom. 4. Poor the headwall and rough in piping. 5. Directionally bore the raw water intake pipeline through the headwall. All boring equipment will be stationed inside the caisson installed on the riverbank. 6. Mount stainless steel intake screens to the footings and make all piping connections. 7. After final inspection and acceptance of the underwater work, flood the dewatered portions of the work area and remove the damming equipment. 8. Length/height of the northernmost wing wall section and final riverbed profile will be dependent upon the depth of sediment in this area. The wall can be cast in place underwater and anchored to'the river bottom without additional dewatering. Page 1 Marziano & McGougan, P.A. I I Asheboro, North Carolina DAVIDSON WATER, INC. RAW WATER STRUCTURE & INTAKE DAVIDSON COUNTY, NORTH CAROLINA D ...a. p@1m0wm p JUN 1 6 2008 DENR•WATER QUALITY WETLANDS AND STORMWATER BRANCH ® m ? 0 08-ceV T8 LOCATION MAP KTS. 4 i r Vemlan: 3 JUNE 2008 5 JOB NO. 26023 MARZIANO & MCGOUGAN, P.A. a consulting engineers 11x17 DWGS. ARE 1300 SECOND AVENUE SUITE211 • CONWAY,SC29526 TRUE HALF SCALE Phone: 843.488.0124 Fax: 843.488.0129 A ,. ,., FINAL DRAWINGS' NOT RELEASED FOR CONSTRUCTION r ........................ GENERAL CONSTRUCTI ON ABBREVIATIONS -N e NUMBER OR FOUND INFL INFLUENT N SE? b DIAMETER INS. INSIDE ?d AND INV. INVERT , < LESS THAN JT JOINT . <= LESS THAN OR EQUAL TO JTS JOINTS > GREATER THAN LLD. LONG LEG OUT ® AT LB POUND A.B. ANCHOR BOLT LG LONG AFF. ABOVE FINISHED FLOOR LP. LOW POINT ADDL ADDITIONAL mi. MECHANICAL JOINT ALUM ALUMINUM OR ALUM MATL. MATERIAL APPROX APPROXIMATE(LY) MA5 MASONRY ARCH ARCHITECTURAL MAX MAXIMUM BM BENCH MARK OR BEAM MECH MECHANICAL BOTT. BOTTOM MFR MANUFACTURER Z BIU. BLOCK WALL MH MANHOLE < C.I. CAST IRON MIN MINIMUM G/C CENTER TO CENTER MNTG MOUNTING 0 i CAP CAPACITY NP.W. NONPOTABLE WATER CIRCUM CIRCUMFERENCE N.TS. NOT TO SCALE U S.? GL CLAY NO. NUMBER ; CLR CLEARANCE O.C. ON CENTER rR CENTERLINE 0/0 OUTSIDE TO OUTSIDE c y'" GL2 CHLORINE OPNG OPENING CLARIF CLARIFIER OX OXIDATION ?= CHEM. CHEMICAL PE. PLAIN END OF SHEETS INDEX N COL COLUMN PED PEDESTAL - a a c ¢ CONC. CONCRETE PL PLATE `c GONST CONSTRUCTION PLCS. PLACES CONT CONTINUOUS PROJ PROJECTION CONTR CONTRACTOR P.S. PUMP STATION GU COPPER P.v.C. POLYVINYL CHLORIDE 1 COVER SHEET C.W. CONCRETE WALL R.C.P. REINFORCED CONCRETE PIPE S D DIAMETER RAD. RADIUS 2 GENERAL NOTES & INDEX DIA DIAMETER R+qS RETURN ACTIVATED SLUDGE IP DUCTILE IRON PIPE D 3 OVERALL SITE PLAN . . RED REDUCER X p15GH. DISGHAI?iE REF REFERIE'NC£ 4 GRADING/ DEWATERING PLAN W DP DEEP DWLS DOWELS REINF REIN FORCING OR REINFORCED ' 5 RAW WATER INTAKE PLAN & PROFILE . D REQUIRED REQ ? EF. EACH FACE Ss. STAINLESS STEEL 6 RAW WATER INTAKE & PUMP STATION LAYOUT E.J. EXPANSION JOINT SCH. SCHEDULE EA EACH SHT SHEET 7 RAW WATER INTAKE HEADWALL LAYOUT & SECTION z Ems. EFFLUENT 512 SIMILAR 8 RAW WATER PUMP STATION LAYOUT Q EL ELEVATION SOY SULFUR DIOXIDE ELEV ELEVATION SPA SPACES 9 RAW WATER PUMP STATION SECTIONS & DETAILS w EQ EQUAL SQ. SQUARE EQUIP EQUIPMENT STD. STANDARD 10 EROSION CONTROL DETAILS 0 EXIST. EXISTING 5TL STEEL 11 MISCELLANEOUS DETAILS z EXP. EXPANSION STN STAINLESS FEZ. FLARED END SECTION SID. SLAB WIDTH 12 MISCELLANEOUS DETAILS ? Q F.R.P. FIBERGLASS 5JJID. SIDE WALL DEPTH REINFORGED PLASTIC T/ TOP OF 13 ELECTRICAL DETAILS LlJ FIG FIGURE TCJ,CJ TYP. CONTROL JOINT, Z FIN FINISHED CONSTRICTION JOINT FL. FLANGE THRD THREAD(5XED) Ur FLR FLOOR TRICK TRICKLING FTG FOOTING TYP TYPICAL GALV GALVANIZED U.OTL UNLESS OTHERWISE NOTED HDWE HARDWARE VERT VERTICAL HK HOOK W.W.F. WELDED WIRE FABRIC C HORIZ. HORIZONTAL W/ WITH U W p N.P. HIGH POINT W/0 WITHOUT Z Q N HYD HYDRANT WAS WASTE ACTIVATED SLUDGE ID. INSIDE DIAMETER L WATER LEVEL W/ W W ? 0 O.D. OUTSIDE DIAMETER 0 Q Q 06 > W > ? SECTION/ )ETAIL LEC%END c o Q U 0 (j) C r -Z) o o _ DETAIL CALL-OUT A DETAIL IDENTIFICATION LETTER a AND DETAIL TITLE (IN SAME STRUCTURE) Q IDENTIFICATION 2 3 (n SYMBOL - SHEET NUMBER (IN SAME DISCIPLINE) WHERE DETAIL 15 DRAWN. SHEET NUMBER ON WHICH DETAIL CONDITION OCCURS. (DASH INDICATES CONDITION OCCURS ON MULTIPLE Scale: AS SHOWN SHEETS.) Date: 6.13-2008 Drown: ALG SECTION CUT SYMBOL - SECTION IDENTIFICATION NUMBER Checked: JWM IDE-ANTIIFCWATIIONiSYM50L 2 3 _ SHEET NUMBER (IN SAME STRICTURE) FINAL DRAWINGS Job No.: 26023 W,OARROW) WHERE SECTION IS PRAWN Sheet No.: SHEET NUMBER (IN SAME STRUCTURE) NOT RELEASED FOR 2 ON WHICH SECTION 15 INITIALLY CUT. CONSTRUCTION 3 1 t; 3 Version: I I APPROXIMATE TOP OF BANK I I WATER LEVEL DAY OF SURVEY 639: MSL I YADKIN RIVER I FLOW I, I II I f \ 04 I 1 I I i i 0 EXIST. PENCE TO BE FELOCATED 54" D.I. DISCHARGE, RAW WATER PUMP STATION i It 1 EXIST. CONC. O STRUCTURE i OVERALL SITE PLAN SCALE: P•20' r? I it • I I• I I,I I I I `hJ u ICI I r I .I jl 7SM T/ EXIST. CANC. WALL ELEV. 663.11' MSL RAW WATER LAGOON a Z Q Ci 4J a a Zan Z J W U) J J W 0 Z_ Y Q U ZL WW_tf Q Q Z 3 W c Z?p3 0 U)w00 0 D o w? F . Q U) > m Scale: As SHOWN Dale: 6-13-2008 Drown: ALG Checked: JVVM Job No.: 26023 Sheet No.: FINAL DRAWINGS NOT RELEASED FOR CONSTRUCTION 3 13 Version: 3 RETAINING WALL OR HEADWALL (I ( i P 11 11 I I I I 1 1 1 I I 1 I I I I I I I II ?` 1 1 1 1 I I YADKIN RIVER l s3 s 1 FLOW \ 1 1 I I I I \ 1 S 3 r I ' I I I ' I i I I I I / 1 I I 1 / I I r r I I II RAW W? INTAKE NEADW ! r ? TEMPORARY IMPACT PERMANENT IMPACT 11111111 Illh 1 1j1' ? / , 1 I 11 i ? / 1 1 1 1 __ 1 `, 1 1 ? ? / 1 1 1 `\ , 1 \ ?? ? , 1 1 1 1 \ `, 11 \ ` 1 \ II 1 , 11 Il A ? A 11 1 \` 1 / 1 ?\ 1 , 11\ I 1 1 i ? 1 1 1 1 ?` ` ? I , 1 1 1 I I V I I III 1/? J i I , I 1 l/ I / / \ ! \ 1 1 !, ? I I I ,.Irllllr?r, ? s 1 I 1?I IIIpllllo,/// 111 ,IIIIo11ti SILT FENCE ? ` ? ` ? , 1 11111 IIII II I (TYP-) , , , , I I I IIII III A % ' ?' Illlllllt111 1 ; I; ?' ?, II ?' \ , VIII 11 1 <? 1111111111, A 1 11 i RAW WATER 1 1 1 11111 IIII 1 v ?v 11111111111 \I ; 1 . PUMP STATION ? I I 1,,111111111 / ' IIII IIII I r / 111111111111 ? , ,, IIII IIII I I 1 -.? 1111 1 ` 1 ? I I 1 i 11111 I I 11 1111111 11111111 III I I II I I I I ,11111111111111111111' ? ? I 111111 IIII II I 1 I I I I I ? '1 I - 1III1111111, ; - 1dill, 1,11111111111111; ,/ 1 , 11 - - . II /% ' / I 1 1 1 f 1 1 1 I ' 11 1111 a 1 1 111 1 SILT FENCE 111111 1 1 1 i 11 1 11' I (TYP) 1 1 1 1 1 1 1 1 1 ?? 1 ( 1 111 11111 )111 11111 1 ?? 111 ? /// \ \ STABILIZE SLOPE CONSTRUCTION GRADING/ PEWATERING PLAN SCALE: 1".20' I I / I r r I ! I I l l ,l l r f? / I ?1 / r I I 1 / ?l 1 ? I ? I II , I N I I I f 1 I I m \ II 0 1 11 ?? I ? I I I, li i II I I ??11 1 1 ?' 1 1 1 ?J I I I I I I ff rf I I ? I r 1 I I I III ?1 I I I I I I I I I I III I I I I 1 I I 'III 1 I '1 'I 11 I 'I 11 I;1 ? r i rf rl I l . rr ,r I , I rr J i rf I f i f I? EXIST. CONC. f 5TRIUCTURE 1 I li r / I I f 1 f \ \ I/ ?v 1?1 TBM T/ EXIST. CONC. WALL ELEV. 663.II' MSL RAW WATER LAGOON d CL z d L G c. ?C d; z J n. (D ZZ UJ Q w Of ?- w 0 m C U W= ? Q Cu U ?WZL WW_? Q Q Z z?D? 0 0 D o ) Q H.2 0 Cu 0 Scale: AS SHOWN Date: 6-13-2008 Drawn: ALG Checked: JWM Job No.: 26023 FINAL DRAWINGS NOT RELEASED FOR CONSTRUCTION 4 13 RIP RAP DETAIL NTS a z d C }?Jz tTJ w "= 0 " do d= c? ilk 660 = 64U W.L. 639'! W.L. 639'! 635 / - I 635 630 R ELEV. 312' C ELEV. 1931.2": a ELEV. 312' 630 M 625 Nr _ ? .. _ 625 620... 1620 00+00 1+00 0+00 1+00 0+00 1+00 W YW Z u- 0 W 0- F- Q z ?g rr, Z_ Y 2 Q U ZL WW_tf Q Q o6 0 Z Lcu Z 3 Q O (A UA o j U) M Scale: AS SHOWN Date: 6-13-2008 Drawn: ALG Checked: JWM Job No.: 26023 Sheet No.: 5 )f: 13 Version: 3 \ \ 54"x36" MJ. 54"x36" MJ. TEE REDUCER 54" DISC LINE ARGE Hill Hill 11"ll, I ---- \ ?? IIII (IIII \ IIII IIII VIII VIII _ _ 54" M.J. 45' BEND J - 3,-0"x1-0" MAN DOOR 1 I 36 MJ. SO' BEND II ?? - II O ?I ? 11 O I - ? I II ? 11 J L H? PUMP CAN ITYPJ I I I; I JI L_____ 30' DIA CAISSON ------ , -----_J I -- - T I I IT I II I I I II II PUMP PARTITION III BELOWITYPJ 6" GONG. PAD 36" M.J. 90' BEND IO'-0"Wx91-0"H ROLL-UP DOOR IIII _?? /- I I ` 6'-04 AIR TANK I I 1 42" ISOLATION GATE ITYP. of 21 4-4" AIR I 1 BURST LINES I 4"' AU' UJATER NTAKE LINE TO PUMP I I ` 1STA7ON BORED 49 JACKED FROM I I 1 1 INTERIOR OF STRUCTURE TO DAYLIGHT (TYI1. OF 2 RAW WATER INTAKE t PUMP STATION LOWER LAYOUT SCALE: 1/4"-1'-0" o, z d iTlm?x Oct' Nay L-I ? a E F- D Y0 z z Of 0 F>- Q >> co a Q IL 06 m z Y QU Z t WW?tf 06 Z << > W T C z3>> 0 U) c) 0 0 D o Q U> to 0 Scale: Date: AS SHOWN 6-13-2008 Drown: ALG Checked: JWM FINAL DRAWINGS Job No. : 26023 NOT RELEASED FOR CONSTRUCTION Sheet N Of: 13 o.: 6 Version: 3 12" D.I. FLUSH LINE FROM 12'x12" M.J. TEE RETAINING WALL 12" WALL PIPE (TYP. OF 2) 77 45" WALL PIPE (TYP. OF 4) 12" 90' BEND (TYP. OF 4) 90' BEND i7 12" FLARE (TYP. OF 2) 10l'-2"s ROCK ANCHOR • 8'-0" O.C. (TYPJ CONC. HEADWALL 9 v 9 60" DIA STAINLESS STEEL TEE SCREENS WITH 1/8" SLOT OPENING. SCREEN A55EMBLY SHALL HAVE A 42" FLANGED CONNECTION (TYP.OF 4) RAW WATER INTAKE NEAMALL PLAN SCALE: 9 0 ro 0 n is 60" DIA STAINLE55 STEEL TEE SCREENS WITH 1/8" SLOT OPENING. SCREEN ASSEMBLY SHALL HAVE A 42" FLANGED CONNECTION EL. 621.00' 12" 0.1. SO' BEND 4" AIR BURST LINE ? 1? I II_ 0 11? I I I I I I I I I_ u ROCK ANCHOR (EPOXY COATED) 12" D.I. WALL PIPE nM1 ^ J12" MJ. ?I 190' BEND 42" D.I. WALL PIPE 12" D.I.90' BEND 12" FLARE 2n 1 3'-0" i SECTION l l SCALE: 3/8"=1'-0" 42"x42" MJ. TEE 42" MJ. 90' BEND 42" M.J. 22 1/1' BEND 42" RAW WATER INTAKE LINE TO PUMP STATION EL. 621.00' 6'-6" 2 SECTION SCALE 9 0 0 m Oa z d ? r U Z?z z Q W ? YV Q W U) z td De Z WJ Q a J J Q jr- 0 W N C Z_ Y aV Z WLu- Q< 06 0 Z ?3LLJ z 7 c U a U Scale: AS SHOWN Date: 6-13-2006 Drawn: ALG Checked: JWM FINAL DRAWINGS Job No.: 26023 NOT RELEASED FOR Sheet No.:7 CONSTRUCTION o,: 13 Version: 3 42" RAW WATER INTAKE LINE 42" RAW WATER INTAKE LINE TO PUMP STATION BORED t JTO JACKED STATION IBORED NTERIOR t JACKED FROM INTERIOR CF / JACKED FROM TO INTERIOR OF STRUCTURE TO DAYLIGHT I I ?1/ STRJCTURE TO DAYLIGHT / DIRECTIONAL BORE FROM III ` 1 DIRECTIONAL BORE FROM / THIS POINT TO CAISSON I I ` ` THIS POINT TO CAISSON 42" MJ. 22 1/2' BEND (TYP.OF 2) 4.4" AIR BURST LINES I I I 42"x42" MAJ. TEE III l1YP. OF 1) I I - 42" MJ. 90' BEND IIII 42" MJ. I (iTP. OF 4) /190' BEND '''I IIII '11'I ''I \(? IIII I III _ IIII Y/? " MJ. @ 14- ACCESS STEPS J-H Z--d ALUMINUM 0 V B 54" D.I. V LINE S HARGE 1111 IIII I Hill 1111 IIII IIII ELECTRICAL ELECTRICAL ROOM +2 ROOM +M /FUTURE PUMP\ 9 1? 111111 Q III 11 m FUTURE PUMP 02 Lit -? - El 36" STEEL PUMP rTP-)CAL PUMP 03 HEADER ql? _? tl All lillk`;? \ AIR / \\ I (TYI RESSOR I I / l1YP.) 1 ? I 0 s 4ILETWELL 14'-0" 28'-0" RAW WATER PUMP STATION LAYOUT UPPER PLAN SCALE: 114" - 1'-0" PRE-ENGINEERS METAL BUILDING 1 U7" ALUMNUI HANDRAIL ALUMINUM ACCESS PLATFORM I T SECTION VIEW S S SCALE: 1/4" - 1'-0" :EKED STEEL EAMS a z (?? a c> Nc- c _- N a,- a? 0 a? w QZ ?0 <F- w? m c z Y Q ID ?U WWZ QQ.5zo 3:3W z?: p 0 U) w C) 0 D o XD Q .2 O Scale: AS SHOWN Date: 6-13-2008 Drawn: ALG Checked: JWM FINAL DRAWINGS Job No.: 26023 Sheet No.: NOT RELEASED FOR 8 CONSTRUCTION 01: 13 Venlon: 3 48"X48" ACCESS HATCH (TYfl.) ELECTRICAL PANELS 1 112" ALUMINUM HANDRAIL FF. EL. 6T4.00' MSL FIRE -ENGINEERED STEEL SUPPORT BEAMS REINFORCED CONCRETE SUPPORT WALL 36" S0' BEND 3' MAN DOOR 36" BUTTERFLY VALVE - 6" CONC. PAD EL 662.00' MSL . -II --1N1_ -I I11 I II?III ?II?, I ki=i 1I0, -1r=-,, II_II ? 112" EXP. JT. MATL. J T REINFORCED CONCRETE FOOTING 36D.I. DISCHARSE LINE 36" MW. 90' BEND NOTE: STRUCTURAL DRAWINGS WILL BE PROVIDED BY THE CAISCN CONTRACTOR SIGNED 1 SEALED BY A PROFESSIONAL ENGINEER REGISTERED N THE STATE OF NORTH CAROLINA 30' DIA CAISSON 628.00' 36" STEEL HEADER 16" VERTICAL TURBINE PUMP (TYPJ FF. EL. 66233' MSL 10'WxS'H ROLL- PUMP UP DOOR COLUMN (TYP.) 30'-0" DIA. PUMP PARTITION (TYP.) T MIN. W/L 6352 I I I I 1 I I I I I I I I I I I I I I I I I I I I I I I I I 1 I I I I 1 I I I z SECTION YIl=-W \,8L9 SCALE: 1/4" . I'-0' PRE-ENGINEERED METAL 15UILDNG EXHAUST FAN -AIR COMPRESSOR AIR TANK NOTE: ACCESS STEPS NOT SHOWN FOR CLARITY. 42" D.I. WALL PIPE 42" D.I. INLET PIPE BORED 4JACKED TO DAYLIGHT NV. 629.43' M; 42" ISOLATION GATE d a z Q G Y V U- G Qc Z IL Q ?Z C'0cl) w F_ J Q U) W 3: Z? 3:0 of Q U) Y Z _ QU Z WW?1= QQ°6Z I LL T Z O coQU? O D c6 0 Scale: AS SHOWN Date: 6-13-2008 Drawn: ALG Checked: JWM FINAL DRAWINGS Job No.: 26023 NOT RELEASED FOR Sheet No.: 9 CONSTRUCTION Of: 13 Version: 3 I SEED AND MULCH OR ER051014 CONTROL MAT (TYP.) CLASS B RIPRAP S" THICK X WIDTH OF DISTURBED AREA WITH NON-WOVEN GEOSYNTHETIC UNDERLINER FLUSH W/ EXISTING CHAINEL BOTTOM RIP RAP SLOPE PROTECTION N.T.S. SEEDBED PREPARATION 1. CHISEL COMPACTED AREAS AND SPREAD TOPSOIL 3 INCHES DEEP OVER ADVERSE SOIL CONDITIONS. 2. RIP THE ENTIRE AREA TO 6" DEPTH. 3. REMOVE ALL LOOSE ROCK, ROOTS AND OTHER OBSTRUCTIONS LEAVING SURFACE REASONABLY SMOOTH AND UNIFORM. 4. APPLY AGRICULTURAL LIME, FERTILIZER AND SUPER PHOSPHATE UNIFORMLY AND MIX WITH SOIL. 5. CONTINUE TILLAGE UNTIL A WELL-PULVERSIZED, FIRM REASONABLY UNIFORM SEEDBED IS PREPARED 4 TO 6 INCHES DEEP. 6. COVER SEED LIGHTLY WITH SEEDING EQUIPMENT OR CULTIPACK AFTER SEEDING. 1. MULCH IMMEDIATELY AFTER SEEDING. 5. INSPECT ALL SEEDED AREAS AND MAKE NECESSARY REPAIRS OR RESEED WITHIN THE PLANTING SEASON IF STAND SHOULD BE OVER 6096 DAMAGED, REESTABLISH FOLLOWING ORIGINAL LIME, FERTILIZER AND SEEDING RATES 8. FERTILIZER SHALL BE APPLIED AT THE RATE OF 1000 POUNDS PER ACRE. 10. LIME SHALL BE APPLIED AT THE RATE OF 3000 POUNDS PER ACRE. IL PERMANENT VEGETATION. A SUMMER (MARCH I - AUGUST 14) COMMON BERMUDA 25 IbeJACRE (HULLED) GERMAN MILLET IC IbeJACRE B. WINTER (AUGUST 15 - FE15URARY 28) ANNUAL RYE 40 IbaJACRE COMMON BERMUDA 30 IbeJACRE (UNHULLED) 12. RYE GRAIN AND MILLET SHALL BE ADDED IN ORDER TO ESTABLISH QUICK GROUND COVER FOR EROSION CONTROL PURPOSES. 13. TEMPORARY VEGETATION: A (APRIL I - AUGUST 15) ANNUAL SUDAN GRASS 401beJACRE (SWEET OF TIFF) BROWN TOP MILLET 50 Ib6JACRE 5. (AUGUST 0 - MARCH U RYE GRAIN 55 1beJACRE 14. OAT GRAIN 15 TO BE ADDED IF SEEDING DATE IS BETWEEN MARCH I AND APRIL 16, AT THE RATE OF 10 POUNDS PER ACRE. 15. OTHER PLANTINGS OR SEEDING AS CONTAINED M THE CRITICAL AREA STABILIZATION SECTION OF SCS HANDBOOK "EROSION AND SEDIMENT CONTROL IN DEVELOPING AREAS" MAY BE USED PROVIDED THE WORK COMPLIES WITH ALL APPLICABLE SPECIFICATIONS CONTAINED IN 5C5 HANDBOOK 16. CONSULT CONSERVATION INSPECTOR ON MAINTENANCE AND FERTILIZATION AFTER PERMANENT COVER IS ESTABLISHED ??N?r? MAx I ??'? ? ?r"yyJU?r?"h ? r f~'1 NOTE: PREPARE, SEEDAND INSTALL AS REQUIRED GRASS (SEEDED) WALE d EROSION LINING CONTROL MA DEPTH OVERLAP 12" > AT SEAMS , !rr STAPLES , I' k BOTH DIRECTI NOTE: PREPARE, SEED,AND INSTALL EROSION CONTROL MAT ON DISTURBED AREA OF DITCH. EROSION CONTROL MAT SWALE AJ BURY THE TOP OF THE MAT IN A TRENCH 6" OR MORE IN DEPTH. BJ TAMP THE TRENCH PULL OF SOIL. SECURE WITH STAPLES EVERY 12" ACROSS THE TOP AND EVERY 3' AROUND THE EDGES AND BOTTOM. CJ OVERLAP BURY UPPER END OF LOWER STRIP AS IN 'A' AND 'B'. OVERLAP END OF TOP STRIP 18" AND E.) OVERFALL TYPICAL STAPLES 'y rB GAUGE WITS i " yyyy y y FJ PRESS ENDS OF MAT 4" INTO THE SOIL AROUND STRUCTURES AND STAPLE SECURELY. MAINTENANCE STAPLE EVERY 12" JUST BELOW THE ANCHOR SLOT. INSPECT ALL MULCHES PERIODICALLY, AND AFTER RAINSTORMS TO CHECK FOR RILL EROSION DJ EROSION STOP DISLOCATION, OR FAILURE. WHERE EROSION IS OBSERVED, APPLY ADDITIONAL MULCH. IF FOLD OF MAT BURIED WASHOUT OCCURS, REPAIR THE SLOPE GRADE, RESEED, AND REINSTALL MULCH. CONTINUE M SLIT TRENCH AND NSPECTION5 UNTIL VEGETATION IS FIRMLY ESTABLISHED. TAMPED. DOUBLE ROW OF STAPLES. DETAILS FOR STABILIZING SWALES SOIL EROSION CONTROL NOTES 1. ALL SEDIMENT CONTROL MEASURES SHALL BE INSPECTED ONCE EVERY SEVEN CALENDAR DAYS AND AFTER ANY STORM EVENT OF GRATER THAN 05 INCHES OF PRECIPITATION DURING A 24-HOUR PERIOD. ALL SEDIMENT CONTROL FEATURES SHALL BE MAINTAINED UNTIL FNAL STABILIZATION HAS BEEN OBTAINED. 2. STABILIZATION MEASURES SHALL BE INITIATED AS SOON AS PRACTICABLE IN PORTIONS OF THE SITE WHERE CONSTRUCTION ACTIVITIES HAVE TEMPORARY OR PERMANENTLY CEASED. BUT IN NO CASE MORE THAN 14 DAYS AFTER THE CONSTRUCTION ACTIVITY IN THAT PORTION OF THE SITE TEMPORARY OR PERMANENTLY CEASED, UNLESS ACTIVITY IN THE PORTION OF THE SITE WILL RESUME WITHIN 21 DAYS. 3. PROVIDE SILT FENCE AND/OR OTHER DEVICES. AS MAY BE REQUIRED TO CONTROL SOIL EROSION DURING UTILITY CONSTRUCTION ALL DISTURBED AREAS SHALL BE CLEANED, GRADED AND STABILIZED WITH GRASSING IMMEDIATELY AFTER THE CONSTRUCTION ACTIVITY. 4. ALL EROSION CONTROL DEVICES SHALL BE PROPERLY MAINTAINED DURING ALL PHASES OF CONSTRUCTION UNTIL THE COMPLETION OF ALL CONSTRUCTION ACTIVITIES AND ALL DISTURBED AREAS HAVE BEEN STABILIZED. ADDITIONAL CONTROL DEVICES MAY BE REQUIRED DURING CONSTRUCTION IN ORDER TO CONTROL EROSION AND/OR OFF SITE SEDIMENTATION. ALL TEMPORARY CONTROL DEVICES SHALL BE REMOVED ONCE CONSTRUCTION IS COMPLETE AND THE SITE IS STABILIZED. 5. TEMPORARY DIVERSION BERMS AND/OR DITCHES WILL BE PROVIDED AS NEEDED DURING CONSTRUCTION TO PROTECT WORK AREAS FROM UPSLOPE RUNOFF AND/OR TO DIVERT SEDIMENT LADEN WATER TO APPROPRIATE TRAPS OR STABLE OUTLETS. 6. IF NECESSARY, SLOPES WHICH EXCEED EIGHT (8) VERTICAL FEET SHOULD BE STABILIZED WITH SYNTHETIC OR VEGETATIVE MATS, IN ADDITION TO HYDROSEEDNG. IT MAY BE NECESSARY TO INSTALL TEMPORARY SLOPE DRAINS DURING CONSTRUCTION. TEMPORARY BERMS MAY BE NEEDED UNTIL SLOPE IS BROUGHT TO GRADE. 1. COMPLY WITH ALL REQUIREMENTS OF SPECIFICATIONS. FACE DAM WITH 051 WASHED STONE TO 12" THICKNESS SIDE BY SIDE, THE ADJACENT EDGES SHOULD BE OVERLAPPED 12" AND STAPLED TOGETHER EACH STRIP OF NETTIYi SHOULD ALSO BE STAPLED DOWN THE CENTER EVERY 2'. DO NOT STRETCH WHEN APPLYMG STAPLES ]All MIN CLASS "A" RIP-RAP CLASS "A" RIP-RAP VARIES C B" MIN EXISTING ROADSIDE DITCH RIP RAP CHECK DAM DETAIL N.T.S. NOTES: U CHECK DAMS SHALL BE REQUIRED ONLY IF TEMPORARY DITCH LINERS DO NOT CONTROL EROSION OR AS DIRECTED BY THE ENGINEER 2J CONTRACTOR SHALL REMOVE SEDIMENT ACCUMULATED BEHIND THE DAM TO PREVENT DAMAGE To CHANNEL VEGETATION. 3.) CONTRACTOR SHALL REMOVE ROCK CHECK DAMS AFTER PERMANENT VEGETATION HAS BEEN ESTABLISHED. 12" DMA. x 12' LENGTH EXIST. GRADE COMPOSITE FILLED SILT TUBE NOTE: STAKED ON DOWN STREAM SIDE. SILT TUBE DETAIL N.T.S. INSTALL FILTER FABRIC UNDER STONE TEMPORARY GRAVEL CONSTRUCTION ENTRANCE N.T.S. WIRE FENCING AND 33 L5/FT ' 4" DMA. FILTER FABRIC METAL TEE POSTS 6'-B O.C. WITH WIRE REINFORCEMENT (NN COMPACTED B4 M B4CKFILL EXTEND FABRIC AND WIRE INTO TRENCH SILT FENCE DETAIL N.TS. a 2 d c r??cIa mo?d, zz J Z (n J 0< ZW 00 C0 0 W W EROSION CONTROL SEQUENCE OF CONSTRUCTION 1. CLEARING AND GRUBBING THOSE AREAS NECESSARY FOR INSTALLATION OF PERIMETER CONTROLS. 2. INSTALLATION OF SEDIMENT BASINS AND TRAPS. 3. CONSTRUCTION OF PERIMETER CONTROLS. 4. REMAINING CLEARING AND GRUBBING. 5. ROAD GRADING. 6. GRADING FOR THE REMAINDER OF THE SITE. 1. CONSTRUCTION PROTECT STORM DRAINS UNTIL AFTER COMPLETION OF CONSTRIJCTION. 6. FINAL GRADING, LANDSCAPING AND STABILIZATION. S. REMOVABLE OF SEDIMT A?U[LLESDRAWINGS NOT RELEASED FOR CONSTRUCTION N c Z_ Y U.J QU ZL QQ°6Z Lij Z 0 F_ 3?3 O U) C) 0 F_ N Q -O j W O Scale: AS SHOWN Date: 6-13-2008 Drawn: ALG Checked: JWM Job 10 13 Version: 3 IS" X IB" X ro CONCRETE PAD w Z: , CAST IN PLACE 4 PLATE WiDIRECTIONAL - SQUARE BLANK BRASS MARKING D15C TO BE ARROW POINTED TO VALVE DISTANCE TO IIIIIIII IIIIIIII STAMPED WITH A DISTANCE AND NEAREST T FOOT IIIIIIII IIIIIIII 01111111 ? DIRECTION ARROW TO VALVE LOCATION. 4' 4' CAST IRON I VIII VALVE BOX I 2" BRASS MI MARKER PLATE SQUARE MARKER W/ANCHOR PAINTED BLUE I I I 3/4" CHAMPFER I AT EACH CORNER 0., III= IIIIIIII MECHANICAL JOINT I I 5" HIGH LETTERS CAST z BUTTfWLY VALVE W/ NN15W IN CONCRETE AND II RESTRAINTS PAINTED BLACK U FI I " I I G j NOTES: ? \ Id INSTALL MARKER POSTS ON EDGE OF \ \x v ; - THE PROPOSED WATER MAIN EASEMENT. c7 me O 2J PROVIDE MARKER POSTS AT ALL J G VALVES. Z ; t 4-N0.3 REINF. BAR W/ I' GONG COVER 3.1 ABBREVIATIONS STAMPED ON POST ° fl N ; (I EA CORNER) AS FOLLOWS: VALVES AND BLOWOFF ASSEMBLIES Gd d My • MAIN VALVE u ; I I BO • BLOW OFF VALVE 4J MAIN LINE VALVE MARKERS SHALL BE PAINTED BLUE. HYDRANT VALVE MARKERS BHALL BE PAINTED RED BUTTEFJ--LY VALVE ASSEMBLY _ N.TS. V ALVE MARCER POST DETAIL NT S. J 2'-0" V. DEWEY BROS. MANHOLE Q RING E COVER NO. MNRGR- 2001 OR EQUAL "SEWER" CAST IN LID _ Is" X is" X 6" CONCRETE PAD CAST IN PLACE OR C.P.W. APPROVED 0 n Q PRECA5T ADJUSTABLE ROADWAY W v E L VALVE BOX - z 9 EXISTING GRADE PAVEMENT v X 6x6 N0.6 SINGLE MAT ? ?. O Q REINF. IN CENTER THIRD W E OF WALL 4 IN TONGUE 4 GROOVE V 0 0 L) RAMNECK MASTIC (TYPJ IN UNPAVED AREAS TYPICALLY USE CLAS5 III BACKFILL COMPACTED IN 6" UNDER PAVED AREAS, USE G p LIFTS TO W% MAX DRY DENSITY AS PER = CLASS II BACKFILL TAPERED . h COMPACTED IN LIFTS TO _ m LIFTING NOTES: ASiM D155T. USE CLASS II BAGKFILL = - 95% MAX DRY DENSITY AS W HOLE I. CONCRETE (4,000 P51 MIND WHERE 50 DIRECTED BY THE ENG. PER ASTM DI5551 Q REINF IN ADJUSTABLE RINGS aII= . ' Q TO MEET ASTM. C-4T8-12 ? U W CAST-IN-PLACE WIRE MESH-ASTM. A-I 85-69. - _ I- - I I' Z Y 2 - 3 PLASTIC STEPS 2. FLAT-TOP MANHOLE TO BE USED WHERE REQUIRED BY Q F' U GRADE. D.I.P. OR P.vL. RISER -- SUPPORT VALVE BOX ON WELL COMPACTED BACKFILL DO NOT Z E 0 LENGTH AS REQUIRED FOR =T= ICI . 111 W - C DEEP VALVE INSTALLATION. L ALLOW VALVE BOX REST ON TO < < O C 5 AS SHOWN RUBBER BOOT ANY PORTION OF VALVE. ' Q a Z n W W/CLAMP - All II I - I W 3 li 1 1 1LI I? NOTE: . Z 0 0 THE CONTRACTOR SHALL = N T S O Q U ADJUST RIM OF MANHOLE O E : U 9 TO MATCH GRADE 0 c , . 1. CENTER VALVE BOX OVER OPERATING _ N GROUT NUT TO INSURE FREE VALVE OPERATION. p 2 USE 6" RISER PIPE ON 4' 4 VALVES Q . . " " 3. USE 8 RISER PIPE ON 8 Q 1=? - = VALVES AND LARGER NOTE: ICI ' ? " 04 a 12" EW " I SEE TYPICAL VALVE DETAIL F N 5 5 NO. 6 6xb OR OTES NOT SHOWN. MECHANICAL JOINT PLUG Seale: AS SHOWN WIU. MESH VALVE W/ RESTRAINTS Date: 6-13-2008 Drawn: ALG Checked: JWM PRECAST MANHOLE DETAIL TYPICAL VALVE BOX ASSEMBLY FINAL DRAWINGS Job No.: 26023 KTS. NTS NOT RELEASED FOR Sheet No.: ? CONSTRUCTION 3 13 Version: 10f:- w e NOTE: t d? CONTROL JOINTS e 5' W, EXPANSION JOINTS ® 25' SIDEWALK SHALL BE 5' WIDE UNLESS FORM JOINT BETWEEN SLABS WITH JOINTING TOOL TO PROVIDE CONC ? OTHERWISE NOTED . 1 21 s y FIBERGLASS RE INFORCED CONCRETE / NOM. 3" WIDE TOOLED SURFACE PROFILED AS SHOWN * II - I 4" WASHED STOKE ? GOMPACTED SUBGRADE SIDEWALK DETAIL Ntb. 1/2" PREMOLDED EXP. MAT'L PIPE (SIZE VARIES) EXPANSION JT DTL. D+ "Y' a 12, O.L NOTE: AROUND PERT "04TIES 41 4 ENCASE PIPES UNDER SHOWN 1 1/2"1 1/2" (J r ALL STRUCTURES 5'-0,! BEYOND OUTSIDE OF 0 u BUILDING. t PIPE DIA 'X" "Y" LESS THAN 6° "4 3" GLR e ° b U L e 6" GROVEL @" TO 24' e' "4 (TYP) SURFACE COURSE 30" TO 48" 12" 45 z x s 20'-0" SLOPE TO ROAD GREATER THAN 48" 1'_6 ' ? FORM JOINT BETWEEN SLABS WITH Q Nz 1/4" PER I'-0" DITCH AS REQUIRED CONC. JOINTING TOOL TO PROVIDE 3" WIDE TOOLED SUWACE NOM d e - `'..?;''"?''-?'r;e»?- `..F'?- „4'.` +'h=• - - TYPICAL PIPE . PROFILED AS SHOUdyyOL JOINT DTL. v `p 8' B-BASE - - - - ` - - - ENCASEMENT DETAIL III-ITi=III-I i I-ITi-I I _ITi=Iii-I LI I' 1-1 1 I l-1 I I= 1 N.T.S. CONTROL JOINT ANp - = - - COMPACTED SUBGRADE ? EXPANSION JOINT DETAIL (CL OR BETTER) NTS TYPICAL GRAVEL ROAD SECTION NOTE. T S PROVIDE CONTROL JOINTS IN ' " N. . . O.C, PROVIDE EXP. -0 WALKS 11 5 J JTS • MIN. 25'-0" O.C. 4 e ALL EDGES W/ OTHER MATERIALS Q l1J Z) 0 2" MESH FABRIC (TYPICAL) CHAIN LINK FABRI GR055 BRACING (TYPICAL) C BARBED WIRE 3 STRANDS, 4 POINT SUPPORTING APo'15 Q J J DOUBLE SWING GATE (TYPICAL) AT ENDS AND CORNERS, 3/8"0 TOP RAIL BARB WIRE (TYPICAL) Ljj MIN. (TYP) U lV / VJ -, I Li L WIRE TIES a 2" p 10"0 STEEL .. STRETCHE BAR TYP. R Or- TYP. N PIPE FILLED ' B Z Y W/ CONCRETE L o (PAINT) . ASPHALT PAVING Q N .o, OR CONCRETE LOCKING U ? - BAR HOG RINGS AT 2'-0"OL,TYP. W Z C Q f- az$ Z ? Q - B CONCRETE FOOTING -III III . D ?a 11? = D III I? III=ll -II?IL D D P TURdBUCKL TYP. a I a I III=11 11 DD P h? I I a ,.,l aNTi r - [ Z D 7 0 Q 0 I' I<D I la°I c 2"0 LINE 4" 4 GATE J ST (TYP) POST ITYP °I NO-1 GAGE E 5DI°I m TENSION WIR Cf) 0 C: ? D L_. a D J3000 P (TYP) . PO SI CONC. L a ° J -aJ L;_ J a j m ? o 2' 0" 2'_ p 6 4"b GORdER a }? AS SHOWN ON PLANS 10.0° 10'-0" POST (TYP.) BOLLARD DETAIL Scale: AS SHOWN N.T.S. Date: 6-13-2008 Drawn: ALG Checked: JWM CHAIN LINK FENCE W/ DOUBLE SWING GATE DETAIL FINAL DRAWINGS Job No.: 26023 N.T.S. Sheet No.: NOT RELEASED FOR 12 CONSTRUCTION 13 V i 3 : ers on: l" ROUCv H SURFACE a(d/3 ATERSTOP 0 /b d/b 3 " MAX) d/4 2" M d 1P_ 12" WATER5TOP I C 12" CENTERED WM4=? Lm NOTE: ALL WATERSTOPS b" PVC "DUMBELL" TYPE ION. SEE GENERAL NOTES. STANDARD CONSTRUCTION JOINT DETAILS NO SCALE 112' _ 2 (TYP) TYP) Il14LL5 }BIAS. JOISTS AND STRUCTURAL SLABS J--1 3" m v PILE COLLMS BASE SLABS. FIGS 4 GRADE BM5 z TYP REINF BAR CLEARANCES ?Iv (LUNLE55 OTHERWISE NOTED) NO SCALE BAR DEVELOPMENT LD*TH (TYP) SEE NOTE 3. NOTE: 1. $ DENOTES 'CLASS B' LAP SPLICE. 2. VERTICAL REINrFORCDNG NOT SHOWN FOR CLARITY. DOWER BAIR2 MAY BE USED IN LIEU OF HOOKS. 5ro HK 5ro He (iTP) (TYP) "L" INTERSECTION "T" INTERSECTION SKEWED 'T' 1'7'?TYP WALL INTERSECTION REINFORCING NO SCALE CONT KEYWAY - /-CONST JOINT COAT PVC EXTEND 50% OF REIN WATERSTOP T141RU JOINT SEE NOTE (EVERt'OTHER BAR EF) TERMINATE EVERYOT14ER CLASS B TENSION BAR 2" CLR OF JOINT LAB SPLICE NOTE: PROVIDE CONSTRUCTION JOINTS M ALL WALLS AND SLA55 AS NOTED ON THE PLANS AND AT 30'-0' MAX PROVIDE CONTINUOUS PVC WATERSTOPS AT SLAB JOINTS, AT ALL EXTERIOR WALL JOINTS AND ANY INTERIOR WALL JOINTS WHERE DIFFERENTIAL HEIGHTS OF FLUIDS EXIST ON EITHER SIDE OF WALL. PLACE CONCRETE IN ALTERNATE SECTIONS. TERMINATE WA1ER5TOP 3" FROM TOP OF WALL ('_r;,'NTYP WALL OR SLAB CONSTRUCTION JOINT NO SCALE SEE NOTE I. (TYP) i ADDL (2 EA EJ EACH SIDE OPNG OR PIPE PIPE OR OFENIN 33 J THRI WAIL OR SLAB NOTE: 1. PROVIDE ADDITIONAL HORIZONTAL AND VERTICAL BARS EQUAL TO THE NUMBER OF BARS TERMINATED AT OPENING, HALF EACH SIDE 2. AT SINGLE LAYER REINFORCED WALLS OR SLA85, PROVIDE ONLY SINGLE LAYER OF ADDITIONAL IREINORCM's AT OPNG. 3. TERMINATE REI F w/ STD HK WHERE OPNIG ADJACENT TO WALL OR SLAB EDGE. (*_4?TYP ADDITIONAL REINF AT WALL OR SLAB OPNG NO SCALE NUT 4 BEARING WASHER w/lE 3V x644xbV4 (WEDGE WASHER AS REQUIRED) -? 1111 ULI PARTIAL WEATHERED ROCK 1 I'/4"O DYWIDAG GRADE 120 THREADBAR ROCK ANCHOR (EPOXY COATED) NOTE: ROCK ANCHORS TO DEVELOP AN ULTIMATE III CAPACITY OF 200 kips AND III 1 A SAFE IUOpCMG CAPACITY III OF 100 kips, TO BE CONIRII 11 BY LOAD TESTS (SEE PLAN) I j IIII II I IIII III 44 MIN PILOT HOLE 1111 FILL w/4000 PSI GROUT 1111 ICI LJ 6 ROCK ANCHOR RETAIL NO SCALE GENERAL NOTES °""",,,,,°"v°Na A. FOUNDATIONS. 1. MAXIMUM ALLOWABLE SOIL BEARING PRESSURE = 3.000 PSF, 4.500 PSF TOE PRESSURE FOR RETAINING WALLS. ? rm a ?z(i E 2. FOOTING ELEVATIONS SHALL NOT BE RAISED OR LOWERED WITHOUT APPROVAL OF THE ENGINEER. e 3. FOOTINGS SHALL BE LOWERED WHEN DIRECTED BY THE ENGINEER TO REACH FIRM, UNDISTURBED SOIL '• yA 2 t 4. CONSTRUCTION J01NTS IN WALL FOOTINGS SHALL BE AT LEAST TWO FEET FROM THE INTERSECTION WITH ANOTHER WALL FOOTING. 5?y` drR 5. ALL FILL OR BACK FILL SHALL BE SELECT MATERIAL FREE FROM ROOTS, TRASH, WOOD SCRAPS AND OTHER EXTRANEOUS MATERIALS. PLACE IN LIFTS NOT EXCEEDING 8 INCHES AND COMPACT EACH LIFT TO 95% DENSITY AT OPTIMUM MOISTURE CONTENT AS MEASURED BY ASTM D698. 6. WHERE SOFT SOILS REQUIRE OVER EXCAVATION FOR BUILDING FOUNDATIONS, OVER EXCAVATED AREAS SHALL BE BACK FILLED WITH CONCRETE 7. EXCAVATIONS AND FORMS SHALL BE REVIEWED BY THE ENGINEER PRIOR TO PLACING CONCRETE. B. SEE "CONCRETE' BELOW FOR CONTROLLED LOW STRENGTH MATERIALS (CLSM). B. CONCRETE 1. CONCRETE SHALL. DEVELOP 4,000 PSI MINIMUM COMPRESSIVE STRENGTH AT 28 DAYS. 2. CONTROLLED LOW STRENGTH MATERIALS (CLSM) SHALL DEVELOP 300 PS MINIMUM STRENGTH AT 28 DAYS, (U.N.O.) 3. CONCRETE WORK SHALL CONFORM TO ACI 318-95 AND ACI 301-96. 4. CLSM WORK SHALL CONFORM TO ACI REPORT 'CONTROLLED LOW STRENGTH MATERIALS (CLSM); AG 229R-99. 5. PUCE 1/2 INCH EXPANSION JOINT MATERIAL BETWEEN EDGES OF SLABS AND VERTICAL SURFACES UNLESS OTHERWISE NOTED. 6. PROVIDE CONSTRICTION OR CONTROL JOINTS IN SLABS AND WALLS AT LOCATIONS SHOWN ON DRAWINGS, AT OFFSETS AND CHANGES IN DIRECTION, AND AT 30 FEET MAXIMUM. CONSTRUCTION JOINTS IN WALLS SMALL BE LOCATED A MINIMUM OF 10'-0' FROM WALL INTERSECTIONS. 7. CHAMFER EXPOSED EDGES OF CONCRETE 3/4 INCH, UNLESS OTHERWISE NOTED. B. CONCRETE SKULL BE CURED A MINIMUM OF 7 DAYS BY ONE OR MORE METHODS SPECIFIED IN ACI 301. (Q„ 9. CONTRACTOR SHALL REFER TO DRAWINGS OF OTHER TRADES AND VENDOR DRAWINGS FOR EMBEDDED ITEMS AND RECESSES NOT SHOWN ON THE STRUCTURAL DRAWINGS. Z 10. CONTRACTOR SHALL VERIFY ALL SIZES AND LOCATIONS OF MECHANICAL AND ELECTRICAL OPENINGS AND EQUIPMENT PADS WITH Q THE MECHANICAL, ELECTRICAL AND EQUIPMENT DRAWINGS. IT SHALL BE THE RESPONABIUTY OF THE CONTRACTOR TO PROVIDE ALL OPENINGS AND SLEEVES FOR PROPER DISTRIBUTION FOR All UTILITIES THROUGHOUT THE BUILDING. ] C. REINPoRCINC STEEL 1. ERE! c CONFORM TO ASTM A615, GRADE 60. V 2. WELDED WIRE FABRIC SHALL CONFORM TO ASTM A1B5 OR A497. (r},, , 3. DETAIL AND FABRICATE REINFORCING STEEL IN ACCORDANCE WITH THE ACI DETAILING MANUAL, SP-66(94). 4. REINFORCING STEEL IN PLACE SHALL BE REVIEWED BY THE ENGINEER PRIOR TO PLACING CONCRETE. 'u 5. PROVIDE BARS AT CORNERS AND INTERSECTIONS OF THE SAME NUMBER AND SIZE AN LONGITUDINAL BARS IN FOOTINGS, GRADE BEAMS AND WALLS. Wa "' 6. LAP LENGTHS SHALL BE 'CUSS B" TENSION LENGTHS AS SPECIFIED IN TABLE 5-5(B) ON THE CRSI HANDBOOK-1992 UNLESS OTHERWISE NOTED ON THE DRAWINGS. O u 7. STAGGER SPLICE IN REINFORCING SUCH THAT NOT MORE THAN ONE-HALF OF ALL BARS ARE SPLICED AT ANY ONE LOCATION, Z, ION. Qc3_, D. WATERSTOPS N J 1. PRDADE CONTINUOUS PVC WATERSTOPS WHERE SHOWN ON DRAWINGS. AT EXTERIOR WALL CONSTRUCTION JOINTS AND od a : WHERE DIFFERENTIAL HEIGHTS OF FLUIDS EXIST ON EITHER SIDE OF WALL 2. WATFRSTOPS SHAT BE MANUFACTURED OF VIRGIN MATERIAL COMPOSED OF AN ELASTOMERIC POLYVINYL CHLORIDE Q COMPOUND MEETING THE REQUIREMENTS OF CORPS OF ENGINEERS CRD-C572. SUBMIT MANUFACTURER'S LITERATURE SHOWING COMPLIANCE WITH THE JABOVE OINTS SPECIFICATION AND SHOWING WATERSIOP SHAPES FOR USE. 3. WATERSiOP5 AT CONSTRUCTION JOINTS SHALL ALL BE BE 6 6 INCH MINIMUM LENGTH 'DUMBBELL" TYPE UNLESS OTHERWISE INDICATED ON DRAWINGS. WATERSTOPS AT EXPANSION JOINTS SHALL BE 9 INCH MINIMUM LENGTH "DUMBBELL" TYPE WITH 3/4 INCH MINIMUM INSIDE DIAMETER CENTER BULB, UNLESS OTHERWISE INDICATED ON DRAWINGS. 4. ALL SPLICING OF WAERSTOPS SHALL BE SHOP FABRICATED EXCEPT THAT BUTT SPLICES MAY BE FIELD FABRICATED. 5. HYDROPHILIC WATERSTOPS SHALL BE A NON-BENTONITE, COEXTRUDED, STRIP APPLIED HYDROPHILIC RUBBER CONSISTING OF CHLOROPRENE RUBBER AND CHLOROPRENE RUBBER MODIFIED TO IMPART HYDROPHILIC PROPERTIES. 6. HYDROPHILIC WATERSTOP SHAT HAVE AN EXPANSION DELAY COATING TO INHIBIT INITIAL EXPANSION DUE TO MOISTURE PRESENT IN FRESH CONCRETE 7. HYDROPHILIC WATERSTOP VOLUMETRIC EXPANSION RATIO MUST BE A MINIMUM OF 3:1. E. DESIGN LIVE LOADS. STRUCTURAL MEMBERS SHALL BE DESIGNED FOR FULL DEAD LOADS AND THE FOLLOWING LIVE LOADS 1. FLOOR LIVE LOAD 300 PSF 2. SNOW 15 PSF (GROUND SNOW LOAD) 3. WIND 80 MPH (BASIC WIND VELOCITY) ASCE 7-93 EXPOSURE C (!7 WIND IMPORTANCE FACTOR = 1.07. INTERNAL PRESSURE GCpi = ±0.25 ,J CALCULATED WIND BASE SHEARS (MWFRS) BUILDING VP = 19 KIPS, Vy = 21 KIPS 4. LATERAL DESIGN CONTROL SEISMIC CONTROLS Q 5. SEISMIC SEISMIC PERFORMANCE CATEGORY C COMPLIANCE WITH SECTION 1607.3.6.1.1 TIES AND CONTINUITY? YES. W EFFECTIVE PEAK VELOCITY-RELATED ACCELERATION .................................. AV = 0.075 Q PEAK ACCELERATION COEFFICIENT ............................................................... A. = 0.075 SEISMIC HAZARD EXPOSURE GROUP ...................................................-....SHEG = II SEISMC PERFORMANCE GROUP........... ........................................................SPC = B SITE C ...........................-....................-................-.......................S = 1.0 Bvslc SRRUCTURA svs EM X BEARING WALL -DUAL r/SPECIAL MOMENT FRAME BUILDING FRAME -DUAL w/INIERMEIJUTE R/C OR SPECIAL STEEL -MOMENT FRAME -INVERTED PENDULUM F-. RESPONSE MODIFICATION FACTOR ..................................................................... R = 3.5 DEFLECTION AAPURCATION FACTOR .........................................._..................Cd = 3 U BUILDING HEIGHT LIMIT, FEET. .........................................................................H = NL D F. ABBREVIATIONS, BUILDING SEISMIC BASE SHEAR ................................................................_....V = 21 KIPS THE FOLLOWING THE FOLLOWING UST OF ABBREIMTONS 6 NOT INTENDED TO REPRESENT All THOSE USED ON THESE DRAWINGS, BUT TO SUPPLEMENT THE MORE COMMON ABBREVIATIONS USED: 1. TYP - TYPICAL 2. SIM - SIMILAR 3. UON - UNLESS OTHERWISE NOTED 4. CUR - CLEAR, CLEARANCE 5. TCJ - TYPKiIL CONTROL JOINT, TYPICAL CONSTRUCTION JOINT 6. FJ -EXPANSION JOINT C. CONSTRICTION SAFELY. 1. THESE STRUCTURAL DRAWINGS DO NOT CONTAIN NECESSARY COMPONENTS FOR SAFELY DURING CONSTRUCTION. 2. THE CONTRACTOR SHALL PROVIDE ADEQUATE TEMPORARY BRACING, SHORING AND GUYING OR FRAMING AGAINST WIND, O3 CONSTRUCTION LOADS AND OTHER TEMPORARY FORCES UNTIL SUCH PROTECTION IS NO LONGER REQUIRED FOR THE SAFE C SUPPORT OF THE FRAMING, U W = Z Q N U ZL WW_? QQ°6Z W Z 0 U) C) o Q U) 'j cc 0 Scale: ASSHOIA Date: 6-13-2006 Drawn: ALG Checked: JVVM FINAL DRAWINGS Job No.: 26023 Sheet No.: NOT RELEASED FOR 13 CONSTRUCTION 13 3 0f: Version;