Loading...
HomeMy WebLinkAbout20160986 Ver 1_More Info Requested_20161110November 10, 2016 PAT MCCRORY Governor DONALD R. VAN DER VAART Secretary JAY ZIMMERMAN DWR Director DWR # 16-0986 Craven County CERTIFIED MAIL: 7016 0750 000109017860 RETURN RECEIPT REQUESTED Jack and Stacey King 3004 Neuse River Drive New Bern, NC 28562 CERTIFIED MAIL: 7016 0750 000109017877 RETURN RECEIPT REQUESTED Richard and Gloria Gustafson 3006 Neuse River Drive New Bern, NC 28562 Subject: REQUEST FOR ADDITIONAL INFORMATION King and Gustafson Residences — Shoreline Stabilization Project Dear Mr. and Mrs. King and Mr. and Mrs. Gustafson: On October 14, 2016, the Division of Water Resources (Division) received your application dated October 10, 2016, requesting a 401 Water Quality and Buffer Authorization Certification from the Division for the subject project. The Division has determined that your application is incomplete and cannot be processed. The application is on -hold until all of the following information is received: 1. Diffuse Flow Requirements and Practical Alternatives Please provide more details regarding how diffuse flow shall be maintained in the riparian buffer by dispersing concentrated flow and reestablishing vegetation. [15A NCAC 02H .0502(b), 15A NCAC 02B.0233(5) and 15A NCAC 02B .0233(8)(b)(iv)] • This should include alternative designs with contour lines down slope and layouts of the project area to achieve diffuse flow through the riparian buffer. Pursuant to 15A NCAC 02H .0502 (b) and NCAC 02B .0233(5) and (8)(b)(iv)] the applicant shall furnish all of the above requested information for the proper consideration of the application. If all of the requested information is not received in writing within 30 calendar days of receipt of this letter, the Division will be unable to approve the application and it will be returned. The return of this project will necessitate reapplication to the Division for approval, including a complete application package and the appropriate fee. State of North Carolina I Environmental Quality I Water Resources -Water Quality Regional Operations Section -Washington Regional Office 943 Washington Square Mall, Washington, North Carolina 27889 252-946-6481 Please respond in writing within 30 calendar days of receipt of this letter by sending three copies of all of the above requested information to the 401 & Buffer Permitting Unit, 1617 Mail Service Center, Raleigh, NC 27699-1617. Please be aware that you have no authorization under the Section 401 of the Clean Water Act or Neuse River Riparian Buffer Rule for this activity and any work done within waters of the state and buffer may be a violation of North Carolina General Statutes and Administrative Code. Please contact Anthony Scarbraugh at 252-948-3924 or anthony.scarbraugh@ncdenr.gov if you have any questions or concerns. Sincerely, Robert Tankard, Assistant Regional Supervisor Water Quality Regional Operation Section Division of Water Resources, NCDEQ cc: Raleigh Bland, USACE Washington Regulatory Field Office (via email) Courtney Spears, DCM Morehead City Brad Connell, DCM Morehead City DWR WaRO 401 files Laserfiche