Loading...
HomeMy WebLinkAbout20110410 Ver 3_Bailey Draft Revisions_20161031Strickland, Bev From: Steve Morrison <smorrison@lmgroup.net> Sent: Monday, October 31, 2016 11:19 AM To: Higgins, Karen Cc: Gregson, Jim; Christopher W. Bailey (cwbailey@baileyandassociates.biz) Subject: Bailey draft revisons Karen, Chris Bailey has provided Jim Gregson with drawings depicting a draft revision to his proposed project near Wrightsville Beach. (Drawing 6A of 9 shows the latest proposed plan.) We understand that the revision is being reviewed by DWR for comment and input prior to our submittal of the requested response to DWR, due today. The revision removes the entire dredging area, eliminates the floating dock fingers which were closest to the shoreline, and relocates a proposed gazebo to a position offshore. The revision also includes a "detachment point" where the floating T' can be disconnected quickly to allow for any direct vertical access to the NEI in that location. To allow time for DWR input and formulating our response, we would like to request a two week extension of our response deadline. Please reply to this request as soon as possible. Thank you for your assistance. Steve Morrison on,,'Rlftant I )lreat�52 1001 a 1903 l I a910 52 0060 l Mob!Ie: 910 i /1.tt502 :::i,nalk smorrison(a)_lmgroup.net l Website: www.lmgroup.net Land Management Group, Inc l nvii-nrriniental Consultants 38105Wrightsville Avenue l Suite 15 l " :.r"ilirnington, N C 28,40 LMU LAND M. GM '' G O ' i (r„