Loading...
HomeMy WebLinkAbout20050091 Ver 1_Complete File_20050502O?o? W AT ?9QG > Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources March 2, 2005 Carl Morris 7209 Green Level Church Road Apex, NC 27523 And W. C. Mills, Jr. 7001 Green Level Church Road Apex, NC 27523 Subject Property: Beaver Creek Commons Shopping Center Ut to Beaver Creek, Class WSIV NSW, 16-41-10-1 Approval of 401 Water Quality Certification with Additional Conditions Dear Messrs. Morris and Mills: Alan W. Klimek, P.E. Director Division of Water Quality DWQ Project # 05-0091 Wake County You have our approval, in accordance with the attached conditions and those listed below, to place fill within or otherwise impact 0.44 acres of wetlands and 223 feet of streams (181 feet intermittent, 42 feet perennial) for the purpose of constructing a shopping center at the subject property, as described within your application dated January 18, 2005 and received by the N.C. Division of Water Quality (DWQ) on January 20, 2005, along with additional correspondence received February 16, 2005. After reviewing your application, we have decided that the impacts are covered by General Water Quality Certification Number(s) 3402 (GC3402). The Certification(s) allows you to use Nationwide Permit(s) 39 when issued by the US Army Corps of Engineers (USACE). In addition, you should obtain or otherwise comply with any other required federal, state or local permits before you go ahead with your project including (but not limited to) Erosion and Sediment Control, Non-discharge, and other regulations. Also, this approval to proceed with your proposed impacts or to conduct impacts to waters as depicted in your application shall expire upon expiration of the 404 or CAMA Permit. This approval is for the purpose and design that you described in your application. If you change your project, you must notify us and you may be required to send us a new application. If the property is sold, the new owner must be given a copy of this Certification and approval letter and is thereby responsible for complying with all conditions. If total fills for this project (now or in the future) exceed one acre of wetland or 150 linear feet of stream, compensatory mitigation may be required as described in 15A NCAC 2H .0506 (h). This approval requires you to follow the conditions listed in the attached certification and any additional conditions listed below. The Additional Conditions of the Certification are: 1. Impacts Approved 401 Oversight/Express Review Permits Unit 1650 Mail Service Center, Raleigh, North Carolina 27699-1650 2321 Crabtree Boulevard, Suite 250, Raleigh, North Carolina 27604 Phone: 919-733-1786 /FAX 919-733-68931 Internet http://h2o.enr.state.nc.us/ncwetlands Nose Carolina Nfirraib/ An Equal Opportunity/Affirmative Action Employer- 50% Recycled/10% Post Consumer Paper Beaver Creek Commons Shopping Center Page 2 of 4 March 2, 2005 The following impacts are hereby approved as long as all of the other specific and general conditions of this Certification (or Isolated Wetland Permit) are met. No other impacts are approved including incidental impacts: Amount Approved Units Plan Location or Reference Stream 223 (feet) PCN form 404/CAMA Wetlands 0.44 (acres) PCN form 2. Erosion & Sediment Control Practices Erosion and sediment control practices must be in full compliance with all specifications governing the proper design, installation and operation and maintenance of such Best Management Practices in order to protect surface waters standards: a. The erosion and sediment control measures for the project must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Sediment and Erosion Control Planning and Design Manual. b. The design, installation, operation, and maintenance of the sediment and erosion control measures must be such that they equal, or exceed, the requirements specified in the most recent version of the North Carolina Sediment and Erosion Control Manual. The devices shall be maintained on all construction sites, borrow sites, and waste pile (spoil) projects, including contractor-owned or leased borrow pits associated with the project: c. For borrow pit sites, the erosion and sediment control. measures must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Surface Mining Manual. d. The reclamation measures and implementation must comply with the reclamation in accordance with the requirements of the Sedimentation Pollution Control Act. 3. No Waste, Spoil, Solids, or Fill of Any Kind No waste, spoil, solids, or fill of any kind shall occur in wetlands, waters, or riparian areas beyond the footprint of the impacts depicted in the Pre-Construction Notification. All construction activities, including the design, installation, operation, and maintenance of sediment and erosion control Best Management Practices, shall be performed so that no violations of state water quality standards, statutes, or rules occur. 4. No Sediment & Erosion Control Measures w/n Wetlands or Waters Sediment and erosion control measures shall not be placed in wetlands or waters to the maximum extent practicable. If placement of sediment and erosion control devices in wetlands and waters is unavoidable, they shall be removed and the natural grade restored within six months of the date that the Division of Land Resources has released the project. 5. Certificate of Completion Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any subsequent modifications, the applicant is required to return the attached certificate of completion to the 401/Wetlands Unit, North Carolina Division of Water Quality, 1650 Mail Service Center, Raleigh, NC, 27699-1650. Beaver Creek Commons Shopping Center Page 3 of 4 March 2, 2005 6. Deed Notifications Deed notifications or similar mechanisms shall be placed on all retained jurisdictional wetlands, waters and protective buffers in order to assure compliance for future wetland, water and buffer impact. These mechanisms shall be put in place prior to impacting any wetlands, waters ,and/or buffers approved for impact under this Certification Approval and Authorization Certificate. A sample deed notification can be downloaded from the 401/Wetlands Unit web site at http://h2o.enr.state.ne.us/ncwetlands. The text of the sample deed notification may be modified as appropriate to suit to this project. 7. Written Stormwater Management Plan (No Further Approval Needed) The final, written stormwater management plans (including a signed and notarized Operation and Maintenance Agreement) dated January 17, 2005 and February 15, 2005, must be implemented and the stormwater management facilities shall be constructed and operational before any permanent building is occupied at the subject site. The structural stormwater practices as approved by this Office as well as drainage patterns must be maintained in perpetuity. No changes to the structural stormwater practices shall be made without written authorization from the Division of Water Quality. Violations of any condition herein set forth may result in revocation of this Certification and may result in criminal and/or civil penalties. The authorization to proceed with your proposed impacts or to conduct impacts to waters as depicted in your application and as authorized by this Certification shall expire upon expiration of the 404 or CAMA Permit. If you do not accept any of the conditions of this Certification (associated with the approved wetland or stream impacts), you may ask for an adjudicatory hearing. You must act within 60 days of the date that you receive this letter. To ask for a hearing, send a written petition, which conforms to Chapter 150B of the North Carolina General Statutes to the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, N.C. 27699-6714. This certification and its conditions are final and binding unless you ask for a hearing. This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water Act. If you have any questions, please telephone Cyndi Karoly in the Central Office in Raleigh at 919- 733-9721 or Mike Horan in the DWQ Raleigh Regional Office at 919-571-4700. Sing rely, dl--2 Alan W. Klimek, P.E. AWKIcbk Enclosures: GC 3402 Certificate of Completion Beaver Creek Conunons Shopping Center Page 4 of 4 March 2, 2005 cc: Kevin Martin, S&EC, 11010 Raven Ridge Road, Raleigh, NC, 27614 USACE Raleigh Regulatory Field Office DWQ Raleigh Regional Office DLR Raleigh Regional Office File Copy Central Files Filename: 050091 Beaver(Wake)401 W ATFRO Michael F. Easley, Governor `0 ?i William G. Ross Jr., Secretary r North Carolina Department of Environment and Natural Resources Alan W. Klimek, P.E. Director Division of Water Quality February 7, 2005 DWQ Project # 05-0091 Wake County CERTIFIED MAIL: RETURN RECEIPT REQUESTED Carl Morris 7209 Green Level Church Road Apex, NC 27523 And W. C. Mills, Jr. 7001 Green Level Church Road Apex, NC 27523 Subject Property: Beaver Creek Commons Shopping Center REQUEST FOR MORE INFORMATION Dear Mr. Morris and Mr. Mills: On January 20, 2005, the Division of Water Quality (DWQ) received your application dated January 18, 2005 to impact 0.44 acres of wetlands and 223 feet of streams to construct the proposed commercial construction. The DWQ has determined that your application was incomplete and/or provided inaccurate information as discussed below. The DWQ will require additional information in order to process your application to impact protected wetlands and/or streams on the subject property. Therefore, unless we receive the additional information requested below, we will have to move toward denial of your application as required by 15A NCAC 2H.0506 and will place this project on hold as incomplete until we receive this additional information. Please provide the following information so that we may continue to review your project. Additional Information Requested: 1. Plans Details a. Please provide the location of any proposed stormwater management practices as required by GC 3402. b. Since this watershed is Nutrient Sensitive Waters, your proposed wet detention ponds will need to be redesigned to be constructed wetlands. c. Please address the "Future Residential Area" and whether the proposed stormwater plan will treat this area. d. The topo and soils maps depict a pond in the NW corner of the property. However, no impacts are listed for the pond. Please address whether the pond still exists and whether any jurisdictional waters are still present. e. Please provide map of the location of the future 540 location, that should impact this property. 401 Oversight/Express Review Permitting Unit 1650 Mail Service Center, Raleigh, North Carolina 27699.1650 2321 Crabtree Boulevard, Suite 250, Raleigh, North Carolina 27604 Phone: 919.733-1786 / FAX 919.733-6893 / Internet: htto://h2o.enr.state.nc.us/ncwetlands NorthCarolma Alati!!'vIlif An Equal Opportunity/Affirmative Action Employer - 50% Recycled/10% Post Consumer Paper Carl Morris and W. C. Mills, Jr. Page 2 of 2 February 7, 2005 Please respond within three weeks of the date of this letter by sending this information to me in writing and Eric Kulz or Mike Horan of the DWQ Raleigh Regional Office. If we do not hear from you within three weeks, we will assume that you no longer want to pursue this project and we will consider the project as withdrawn. This letter only addresses the application review and does not authorize any impacts to wetlands, waters or protected buffers. Please be aware that any impacts requested within your application are not authorized (at this time) by the DWQ. Please call John Dorney or Ms. Cyndi Karoly at 919-733-1786 if you have any questions regarding or would like to set up a meeting to discuss this matter. Sincerely, Cyndi Karoly, Supervisor 401 Oversight Unit CBK/bs cc: Eric Kulz and Mike Horan, DWQ Raleigh Regional Office USACE Raleigh Regulatory Field Office File Copy Central Files Kevin Martin, Soil and Environmental Consultants, 11010 Raven Ridge Road, Raleigh, NC 27614 Filename: 05-0091 Beaver Creek Commons (Wake) On Hold ?MCIQM&CREED TO: NCDENR Division of Water Quality 401 Oversight Unit 2321 Crabtree Blvd. Ste 250 Raleigh, NC 27604 ATTENTION: Ms. Cyndl Karoly LETTER OF TRANSMITTAL DATE: February 15, 2005 PROJECT NO: 2655-0007 TASK NO: **** RE: Beaver Creek Commons Apex, NC TRANSMITTAL NO: PAGE 1 OF 1 WE ARE SENDING: ? Originals ® Prints ? Shop Drawings ? Samples ? Specifications ® Calculations ? Other - 11 Quantity Drawing No. Rev. Description Status 11 1 DWQ Comments and Responses 1 Level Spreader Worksheets 1 Revised Impact Maps and Detail Sheets Issue Status Code Remarks A. Preliminary B. Fabrication Only C. For Information D. Bid E. Construction F. For Review & Comments G. For Approval H. See Action Status Code: 1. No Exceptions Taken 2. Make Corrections Noted 3. Other 4. Amend & Resubmit 5. Rejected -See Remarks REMARKS: FEB 1 6 2005 WETW SANDSTORRriATER6RANCH 200 MacKenan Court, Suite 200, Cary, NC 27511 919/233-8091 Fax 919/ 233-8031 cc: McKIM & CREED, PA Signed Grant Livengood, PE hVT-T?M4&CREEr--1,D February 14, 2005 M&C 02655-0007 Ms. Cyndi Karoly, Supervisor 401 Oversight Unit 2321 Crabtree Blvd, Ste 250 Raleigh, NC 27604 RE: Beaver Creek Commons Apex, NC Dear Ms. Karoly: 92@1alumm FEB ! G 2005 l:-rU OSAND STOR AV TERIOWCH We have received your comments regarding our January 20, 2005 submittal to the Division of Water Quality for stream and wetland impact. We are providing the additional information requested in response to your comments dated February 7, 2005. 1. Plans Details a. Please provide the location of any proposed storinwater management practices as required by GC 3402. These devices were shown, but were not labeled on the impact map which was submitted to you. The stormwater management devices have now been properly labeled on the revised impact map. b. Since the watershed is Nutrient Seiisitive Waters, your proposed wet detention ponds will need to be redesigned to be constructed wetlands. According to GC #3402 (copy attached) wet detention ponds followed by forested filter strips are in accordance with WQC #3402 in watersheds that are classified as nutrient sensitive waters (NSW). Level spreaders are provided to diffuse flow for the first inch of runoff for the defined drainage areas. The wet detention ponds have been designed to remove 85% TSS and the level spreaders will be in stalled downstream to diffuse flow. Additional level spreader worksheet information has been provided to better clarify the design. C. Please address the "Future Residential Area" and whether the proposed storinwater plan will treat this area. This area will be mass graded during this project. The proposed residential site layout has not been established, but the stormwater pond followed by a forested filter strip was designed to handle an 85% impervious coverage in this area. d. The topo and soils maps depict a pond in the NW corner of the property. However, no impacts are listed for the pond. Please address whether the pond still exists and whether airy jurisdictional waters are still present. 200 MACKENAN COURT, CARY, NORTH CAROLINA 27511 TEL 919.233.8091 PAX 919.233.8031 www.mckimcreed.com AA0002667 Ms. Cyndi Karoly, Supervisor February 14, 2005 Page 2 The pond no longer exists and the Corps has confirmed that no jurisdictional waters are in that area. All jurisdictional waters and wetlands are shown on the impact map. There were no isolated waters or wetlands identified on the site. e. Please provide map of the location of the future 540 location, that should impact this property. A map of the proposed I-540 in the vicinity of this project has been provided. While this site borders 1540, 1540 does not impact our proposed site plan. It is our understanding that the 1-540 corridor in this area will be in a cut situation, therefore the drainage for this property will not be affected. Respectfully Submitted, McKIM & CREED, P.A. v Zee",L ??? Grant Livengood, PE cc: Kevin Martin, Soil and Environmental Consultants Jeff Byrd, 15, Carolina Properties File Attachments 1 ?o MCK &CREED DWQ Project DIVISION OF WATER QUALITY - LEVEL SPREADER WORKSHEET I. PROJECT INFORMATION (please complete the following information): Project Name : _ ' V ?_ C (tzr- r czex M &r Contact Person: 6)aAWT Lw iaoo?? Phone Number: (`(Ici 1 z3 3-H?".I Level Spreader ID: b,-vVjL S?'????to ?Z 1A 1 Level Spreader Length 3v ft. (perpendicular to flow) Drainage Area la 3 7 ac. (on-site and off-site drainage to the level spreader) Impervious Area 8':? I ac. (on-site and off-site drainage to the level spreader) Maximum Filter StriplBuffer Slope C? % (6% for forested, leaf littler cover, 8% for thick ground cover)' grass Max. Discharge from a 10 Year Storm r 1 2 3 cfs Max. Discharge to Level Spreader 2, I cfs i 5 ?,,1 Filter StriplBuffer Vegetation ?<,,; :: (? ,, r, (thick ground cover or grass, canopied forest with leaf litter °?j z i5 groundcover) Pre-treatment or Bypass Method %, ?? .? S II. REQUIRED ITEMS CHECKLIST Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached. If a requirement has not been met, attach an explanation of why. At a minimum, a complete stormwater management plan submittal includes a worksheet for each BMP, design calculations, plans and specifications showing all BMPs and outlet structure details, a detailed drainage plan and a fully executed operation and maintenance agreement. An incomplete submittal package will result in a request for additional information and will substantially delay final review and approval of the project. Applicants Initials C=+?L?- Level spreader is at least 13 ft. per cfs for thick ground cover or grass or 100 ft per cfs in canopied forest with leaf litter. j Pre-Form Scour Holes are on flat slopes only C-+'^ L No structures are located in protected buffers' If bypass method specified in the Draft Level Spreader Design Option Document: ?'t Bypass method is specified (if applicable) and plan details and calculations are provided C?,??i Discharge to level spreader and subsequent filter strip is hydraulically and spatially separate from the bypass discharge. C-.?, No structures are located in protected buffers. /'-M? Plan details for the bypass and outlets are provided. G-.n ? The operation and maintenance agreement includes annual erosion and vegetation repair. Cl?i- The operation and maintenance agreement signed and notarized by the responsible party is provided. ' Level spreaders in series can be used on slopes of up to 15% in forested areas with leaf littler cover or on slopes of up to 25% in areas with thick ground cover or grass if designed according to the Draft Level Spreader Design Option Document. This potentially requires a minor variance in protected buffer areas. In any event the second level spreader cannot be located in Zone 1 of a protected buffer area. Qd?D FE8 n???-?.? .c? pG ?Rw 0 S50R??yP?E?6? DWQ Project DIVISION OF WATER QUALITY - LEVEL SPREADER WORKSHEET 1. PROJECT INFORMATION (please complete the following information): Project Name: Contact Person: (,ct.?rr? L ,v wc?,?a) Phone Number: (4r ") s Level Spreader ID:. Lam" v L S FZ a71?-Dc r iA 2 Level Spreader Length S .V ft. Drainage Area `t.ac. Impervious Area 17, c:o ac. Maximum Filter Strip/Buffer Slope R) % grass (perpendicular to flow) (on-site and off-site drainage to the level spreader) (on-site and off-site drainage to the level spreader) (6% for forested, leaf littler cover, 8% for thick ground cover)' Max. Discharge from a 10 Year Storm Z4-. L. cfs Max. Discharge to Level Spreader 4.1 cfs ? Filter Strip/Buffer Vegetation TON,? yrc s Pre-treatment or Bypass Method ?3y ?? 4 s S II. REQUIRED ITEMS CHECKLIST Sit .= an (thick ground cover or grass, canopied forest with leaf litter groundcover) Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached. If a requirement has not been met, attach an explanation of why. At a minimum, a complete stormwater management plan submittal includes a worksheet for each BMP, design calculations, plans and specifications showing all BMPs and outlet structure details, a detailed drainage plan and a fully executed operation and maintenance agreement. An incomplete submittal package will result in a request for additional information and will substantially delay final review and approval of the project. Applicants Initials 6-11-L Level spreader is at least 13 ft. per cfs for thick ground cover or grass or 100 ft per cfs in canopied forest with leaf litter. N) A Pre-Form Scour Holes are on flat slopes only (_ )N%L- No structures are located in protected buffers' If bypass method specified in the Draft Level Spreader Design Option Document: t_ Bypass method is specified (if applicable) and plan details and calculations are provided ^? l Discharge to level spreader and subsequent filter strip is hydraulically and spatially separate from, the bypass discharge. EJ?t?L No structures are located in protected buffers. CTr?L Plan details for the bypass and outlets are provided. iT.a?L The operation and maintenance agreement includes annual erosion and vegetation repair. The operation and maintenance agreement signed and notarized by the responsible party is provided. ' Level spreaders in series can be used on slopes of up to 15% in forested areas with leaf littler cover or on slopes of up to 25% in areas with thick ground cover or grass if designed according to the Draft Level Spreader Design Option Document. This potentially requires a minor variance in protected buffer areas. In any event the second level spreader cannot be located in Zone 1 of a protected buffer area. ?O ? ? ? 005 F?8 v? c? v1P.???4 h ?R6?d+ DSO F3,QSjpF? vim" DWQ Project No DIVISION OF WATER QUALITY - LEVEL SPREADER WORKSHEET 1. PROJECT INFORMATION (please complete the following information): Project Name Contact Person: Phone Number: (`+? 5 1 2 3 a-tic "r r Level Spreader ID:. Lcvc sc'?ltf?c?: 3 Level Spreader Length 40 ft. (perpendicular to flow) Drainage Area (1131 ac. (on-site and off-site drainage to the level spreader) Impervious Area ;, 1 Z ac. (on-site and off-site drainage to the level spreader) Maximum Filter Strip/Buffer Slope % (6% for forested, leaf littler cover, 8% for thick ground cover)` grass Max. Discharge from a 10 Year Storm i2• cfs Max. Discharge to Level Spreader Z ri cfs Filter Strip/Buffer Vegetation ?•?? ?,ti __1 >•? ??t. iS (thick ground cover or grass, canopied forest with leaf litter groundcover) Pre-treatment or Bypass Method Pas S II. REQUIRED ITEMS CHECKLIST Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached. If a requirement has not been met, attach an explanation of why. At a minimum, a complete stormwater management plan submittal includes a worksheet for each BMP, design calculations, plans and specifications showing all BMPs and outlet structure details, a detailed drainage plan and a fully executed operation and maintenance agreement. An incomplete submittal package will result in a request for additional information and will substantially delay final review and approval of the project. Applicants Initials Asti ?`- Level spreader is at least 13 ft. per cfs for thick ground cover or grass or 100 ft per cfs in canopied forest with leaf litter. '(A Pre-Form Scour Holes are on flat slopes only No structures are located in protected buffers' If bypass method specified in the Draft Level Spreader Design Option Document: C? `tL Bypass method is specified (if applicable) and plan details and calculations are provided Discharge to level spreader and subsequent filter strip is hydraulically and spatially separate from the bypass discharge. k- No structures are located in protected buffers. (titiu- Plan details for the bypass and outlets are provided. c I The operation and maintenance agreement includes annual erosion and vegetation repair. C, u- The operation and maintenance agreement signed and notarized by the responsible party is provided. ' Level spreaders in series can be used on slopes of up to 15% in forested areas with leaf littler cover or on slopes of up to 25% in areas with thick ground cover or grass if designed according to the Draft Level Spreader Design Option Document. This potentially requires a minor variance in protected buffer areas. In any event the second level spreader cannot be located in Zone 1 of a protected buffer area. o ? 6 tip05 FE Ka?? R6?'cN ?`S w,OS?pn DWQ Project No DIVISION OF WATER QUALITY • LEVEL SPREADER WORKSHEET 1. PROJECT INFORMATION (please complete the following information): Project Name: Contact Person: Phone Number. (6 11 ) 2 33 l Level Spreader ID: L? ?L C-Pao3A')2 -04 Level Spreader Length '}O ft. (perpendicular to flow) Drainage Area r ft ac. (on-site and off-site drainage to the level spreader) Impervious Area 4 3?, ac. (on-site and off-site drainage to the level spreader) Maximum Filter Strip/Buffer Slope % (6% for forested, leaf littler cover, 8% for thick ground cover)' grass Max. Discharge from a 10 Year Storm cfs Max. Discharge to Level Spreader L cfs t" S??^M Filter Strip/Buffer Vegetation i,),?Y. arc s _I c >. v , I,kcs (thick ground cover or grass, canopied forest with leaf litter groundcover) Pre-treatment or Bypass Method her, 1 II. REQUIRED ITEMS CHECKLIST Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached. If a requirement has not been met, attach an explanation of why. At a minimum, a complete stormwater management plan submittal includes a worksheet for each BMP, design calculations, plans and specifications showing all BMPs and outlet structure details, a detailed drainage plan and a fully executed operation and maintenance agreement. An incomplete submittal package will result in a request for additional information and will substantially delay final review and approval of the project. Applicants Initials & VIA, Level spreader is at least 13 ft. per cfs for thick ground cover or grass or 100 ft per cfs in canopied forest with leaf litter. Nj t Pre-Form Scour Holes are on flat slopes only No structures are located in protected buffers' If bypass method specified in the Draft Level Spreader Design Option Document: G-0 L' Bypass method is specified (if applicable) and plan details and calculations are provided G?riy Discharge to level spreader and subsequent filter strip is hydraulically and spatially separate from the bypass discharge. No structures are located in protected buffers. L?vtt Plan details for the bypass and outlets are provided. The operation and maintenance agreement includes annual erosion and vegetation repair. The operation and maintenance agreement signed and notarized by the responsible party is provided. ' Level spreaders in series can be used on slopes of up to 15% in forested areas with leaf littler cover or on slopes of up to 25% in areas with thick ground cover or grass if designed according to the Draft Level Spreader Design Option Document. This potentially requires a minor variance in protected buffer areas. In any event the second level spreader cannot be located in Zone 1 of a protected buffer area. r ??Q o ? 6 ?pp5 1 05 ?,0 S.?Ow! c;,c vMCKUW&CREED TO: S&EC 1 1010 Raven's Ridge Road Raleigh, NC 27614 ATTENTION: Kevin Martin or Jessica Regan LETTER OF TRANSMITTAL DATE: January 17, 2005 PROJECT NO: 2655-0007 TASK NO' T-** RE: Beaver Creek Crossings Apex, NC TRANSMITTAL NO: PAGE 1 OF 1 WE ARE SENDING: ? Originals ® Prints ? Shop Drawings ? Samples ? Specifications ® Calculations ? Other - Quantity Drawing No. Rev. Description Status 1 Narrative and Calculations 2 Pond Details i ?JAIN 1 Issue Status Code: A. Preliminary B. Fabrication Only C. For Information D. Bid E. Construction F. For Review & Comments G. For Approval H. See Remarks Action Status Code: 1. No Exceptions Taken 2. Make Corrections Noted 3. Other 4. Amend & Resubmit 5. Rejected - See Remarks REMARKS: Thank you for your help. Please let Grant Livengood or myself know if you have any questions. Thanks! 200 MacKenon Court, Suite 200. Cary. NC 27511 919/2338091 Fax 919/ 233-8031 CC: McKIM & CREED, PA Signed Christoph . Se ster, RLA, ASLA SA2655\0007\10-Comm\tr01 1705.kevin martin S&EC.doc US Army Corps of Engineers Attn: Ms. Jennifer Burdette 6508 Falls of the Neuse Rd., Ste. 120 Raleigh, NC 27615 RE: Nationwide Permit 39 Beaver Creek Commons Shopping Center Apex, Wake County, North Carolina Dear Ms. Burdette and Ms. Karoly: <c^ ?i .y NC Division of Water Quality Attn: Cyndi Karoly 2321 Crabtree Blvd. Suite 250 Raleigh, NC 27604-2260 O Off` On behalf of Carl Morris and E.C. Mills, Jr. (property owners), we hereby request authorization from the US Army Corps of Engineers (USAGE) to use Nationwide Permit 39 for proposed permanent impacts to jurisdictional wetlands and a tributary of Reedy Branch Creek resulting from the construction of a shopping center. A Pre-construction Notification Application (PCN) is attached, which includes an Agent Authorization Form. The site is located north of U.S. Highway 64, west of the town of Apex, Wake County, North Carolina. The south side of the site is a mostly undeveloped, wooded area located in the Cape Fear River Basin. There are two single family residences on the south side. The northern side is mostly open area of past agricultural, commercial, and/or borrow pit activities. Please refer to the attached Figure 1 for the project's location on a USGS topographic quadrangle. The proposed project is a shopping center complex with access drives, parking areas, and typical utilities (sanitary sewer, water, electric, etc.) No previously issued permits are known to exist for the site. Nationwide Permit 39 It has been determined by the USACE that 42 feet of the proposed impact is classified as an important stream, while 181 feet of impact is to unimportant channel. There will also be 0.44 acres of wetland impacts. The applicant will employ appropriate erosion and siltation controls during construction. This project will comply with the general and regional conditions of NWP 39. Charlotte Office: Greensboro Office: 236 LePhillip Court, Suite C 3817-E Lawndale Drive Concord, NC 28025 Greensboro, NC 27455 Phone: (704) 720-9405 Phone: (336) 540-8234 Fax: (704) 720-9406 Fax: (336) 540-8235 January 18, 2005 S&EC Project #: 02-7262.W0 January 18, 2005 S&EC Project #: 02-7626.W0 Page 2 of 2 The USACE's current policy requires applicants to avoid and minimize wetland and stream channel impacts to the maximum extent practicable and may require compensatory mitigation to offset unavoidable losses of waters of the US when impacts exceed the thresholds for notification (0.10 acre) or if a discharge causes the loss of any open waters. S&EC does not believe stream mitigation should be required by the USACE for this project since impacts are less than 150 feet of important channel. Wetland mitigation will be achieved by payment to the WEEP at a 1:1 ratio. A discussion of avoidance and minimization is included in the attached PCN form. Sincerely, Kevin Martin Attachments: Pre-construction (PCN) notification forni Agent Authorization Fornis (2) Site Location Map-USGS (Figure 1) Site Location Map - County Soil Survey (Figure 2) Proposed Wetland Impact Map Buffer determination letter from Town of Apex Preliminary stormwater calculations and designs (DWQ only) $475.00 application fee (DWQ only) Office Use Only: Form Version May 2002 USACE Action ID No. DWQ No. (If any particular item is not applicable to this project, please enter "Not Applicable" or "N/A".) 1. Processing Check all of the approval(s) requested for this project: ® Section 404 Permit ? Riparian or Watershed Buffer Rules ? Section 10 Permit ? Isolated Wetland Permit from DWQ ® 401 Water Quality Certification 2. Nationwide, Regional or General Permit Number(s) Requested: 39 3. If this notification is solely a courtesy copy because written approval for the 401 Certification is not required, check here: ? 4. If payment into the North Carolina Wetlands Restoration Program (NCWRP) is proposed for mitigation of impacts (verify availability with NCWRP prior to submittal of PCN), complete section VIII and check here: If your project is located in any of North Carolina's twenty coastal counties (listed on page 4), and the project is within a North Carolina Division of Coastal Management Area of Environmental Concern (see the top of page 2 for further details), check here: ? II. Applicant Information 1. Owner/Applicant Information Name: Carl Morris W.C. Mills, Jr Mailing Address: 7208 Green Level Church Rd. 7001 Green Level Church Rd. Apex NC 27523 Apex NC 27523 Telephone Number: (919) 362-8722 Telephone Number:(919) 362-6694 E-mail Address: 2. Agent/Consultant Information (A signed and dated copy of the Agent Authorization letter must be attached if the Agent has signatory authority for the owner/applicant.) Name: Kevin Martin Company Affiliation: Soil & Environmental Consultants. PA Mailing Address: 11010 Raven Ridge Road Raleigh NC 27614 Telephone Number: (919) 846-5900 Fax Number: (919) 846-9467 E-mail Address: KMartin@SandEC.com Page 1 of 9 III. Project Information Attach a vicinity map clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads. Also provide a detailed site plan showing property boundaries and development plans in relation to surrounding properties. Both the vicinity map and site plan must include a scale and north arrow. The specific footprints of all buildings, impervious surfaces, or other facilities must be included. If possible, the maps and plans should include the appropriate USGS Topographic Quad Map and NRCS Soil Survey with the property boundaries outlined. Plan drawings, or other maps may be included at the applicant's discretion, so long as the property is clearly defined. For administrative and distribution purposes, the USACE requires information to be submitted on sheets no larger than 11 by 17-inch format; however, DWQ may accept paperwork of any size. DWQ prefers full-size construction drawings rather than a sequential sheet version of the full-size plans. If full-size plans are reduced to a small scale such that the final version is illegible, the applicant will be informed that the project has been placed on hold until decipherable maps are provided. 1. Name of project: Beaver Creek Crossings Shopping Center 2. T.I.P. Project Number or State Project Number (NCDOT Only): 3. Property Identification Number (Tax PIN): 4. Location County: Wake Nearest Town: Apex Subdivision name (include phase/lot number): Directions to site (include road numbers, landmarks, etc.): Traveling west on Hwy. 64 from Raleigh turn right on Green Level Church Road. The site is immediately on your left. (See attached USGS map) 5. Site coordinates, if available (UTM or Lat/Long): 035° 44'55.39" N . 078° 53' 14.78" W (Note - If project is linear, such as a road or utility line, attach a sheet that separately lists the coordinates for each crossing of a distinct waterbody.) 6. Property size (acres): 50.572 7. Nearest body of water (stream/river/sound/ocean/lake): Reedy Branch Creek 8. River Basin: Cape Fear (Note - this must be one of North Carolina's seventeen designated major river basins. The River Basin map is available at http://112o.enr.state.ne.us/admin/maps/.) 9. Describe the existing conditions on the site and general land use in the vicinity of the project at the time of this application: The south side of the property is mostly wooded with 2 existing residences The northern side has been significantly altered historically by agriculture commercial operations and/or borrow activities. Page 2 of 9 10. Describe the overall project in detail, including the type of equipment to be used: Construction of a shopping center utilizing typical heavy, grading equipment. 11. Explain the purpose of the proposed work: The purpose of the proposed work is to construct a commercial shopping center, office space and a residential area, along with parking and access routes to those facilities. IV. Prior Project History If jurisdictional determinations and/or permits have been requested and/or obtained for this project (including all prior phases of the same subdivision) in the past, please explain. Include the USACE Action ID Number, DWQ Project Number, application date, and date permits and certifications were issued or withdrawn. Provide photocopies of previously issued pennits, certifications or other useful information. Describe previously approved wetland, stream and buffer impacts, along with associated mitigation (where applicable). If this is a NCDOT project, list and describe permits issued for prior segments of the same T.I.P. project, along with construction schedules. Jennifer Burdette of the USACE has reviewed the delineation during a site visit with Kevin Martin We are currently awaiting return of the delineation survey after is has been signed. Ms Burdette also reviewed the original site plan and requested revisions to minimize impacts to one of the wetland areas. These changes have been made. V. Future Project Plans Are any future permit requests anticipated for this project? If so, describe the anticipated work, and provide justification for the exclusion of this work from the current application. No future impacts are anticipated VI. Proposed Impacts to Waters of the United States/Waters of the State It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to wetlands, open water, and stream channels associated with the project. The applicant must also provide justification for these impacts in Section VII below. All proposed impacts, pennanent and temporary, must be listed herein, and must be clearly identifiable on an accompanying site plan. All wetlands and waters, and all streams (intermittent and perennial) must be shown on a delineation map, whether or not impacts are proposed to these systems. Wetland and stream Page 3 of 9 evaluation and delineation forms should be included as appropriate. Photographs may be included at the applicant's discretion. If this proposed impact is strictly for wetland or stream mitigation, list and describe the impact in Section VIII below. If additional space is needed for listing or description, please attach a separate sheet. 1. Provide a written description of the proposed impacts: The proposed construction will impact 0.44 acres of wetlands 42 linear feet of important stream and 181 linear feet of unimportant stream 2. Individually list wetland impacts below: Wetland Impact Site Number indicate on ma) Type of Impact* Area of Impact acres Located within 100-year Floodplain** (es/no) Distance to Nearest Stream (linear feet) Type of Wetland*** 1 Fill 0.036 No -50' Headwater forest 2 Fill 0.022 No --300' Seep 3 Fill 0.056 No -200' Headwater forest/seep 4 Fill 0.050 No ~50' Wet depression 5 Fill 0.263 No <10' Seep 9 Fill 0.003 No <10, Seep 10 Fill 0.010 No <10' Seep * List each impact separately and identify temporary impacts. Impacts include, but are not limited to: mechanized clearing, grading, fill, excavation, flooding, ditching/drainage, etc. For dams, separately list impacts due to both structure and flooding. ** 100-Year floodplains are identified through the Federal Emergency Management Agency's (FEMA) Flood Insurance Rate Maps (FIRM), or FEMA-approved local floodplain maps. Maps are available through the FEMA Map Service Center at 1-800-358-9616, or online at http://www.fcma.go . *** List a wctland type that best describes wetland to be impacted (e.g., freshwater/saltwater marsh, forested wetland, beaver pond, Carolina Bay, bog, etc.) Indicate if wetland is isolated (determination of isolation to be made by USACE only). List the total acreage (estimated) of all existing wetlands on the property: 1.31 acres outside of Apex stream buffer (over 2.0 acres of wetland including those within Apex stream buffer) Total area of wetland impact proposed: 0.44 acres 3. Individually list all intermittent and perennial stream impacts below: Stream Impact Length of Average Width Perennial or Site Number Type of Impact* Impact Stream Name** of Stream Intermittent? indicate on ma (linear feet) Before Impact (please secif ) 6 Fill 26 ut Reedy Branch 21 Intermittent/ Creek Unimportant 7 Fill 58 ut Reedy Branch 2 Intermittent/ Creek Unimportant 8 Fill 97 ut Reedy Branch 3 Intermittent/ Creek Unimportant Page 4 of 9 ut Reedy Branch Perennial / 11 Fill 42 Creek 3 Important * List each impact separately and identity temporary impacts. impacts tnetuae, out are not iimitea to: curvcns and assoclawu up-iat,, dams (separately list impacts due to both structure and flooding), relocation (include linear feet before and after, and net loss/gain), stabilization activities (cement wall, rip-rap, crib wall, gabions, etc.), excavation, ditching/straightening, etc. If stream relocation is proposed, plans and profiles showing the linear footprint for both the original and relocated streams must be included. ** Stream names can be found on USGS topographic maps. If a stream has no name, list as UT (unnamed tributary) to the nearest downstream named stream into which it flows. USGS maps are available through the USGS at 1-800-358-9616, or online at www.u,s.gov. Several internct sites also allow direct download and printing of USGS maps (e.g., %aww.tapozono.cont, www.mal2(lucst.com, etc.). Cumulative impacts (linear distance in feet) to all streams on site: 42 feet of important channel (181 ft to unimportant channel) = 223 feet (total channel impacts 4. Individually list all open water impacts (including lakes, ponds, estuaries, sounds, Atlantic Ocean and any other water of the U.S.) below: Open Water Impact Site Number (indicate on ma Type of Impact* Area of Impact (acres) Name of Waterbody (if applicable) Type of Waterbody (lake, pond, estuary, sound, bay, ocean, etc.) * List each impact separately and identify temporary impacts. Impacts include, but are not limited to: till, excavation, dredging, flooding, drainage, bulkheads, etc. 5. Pond Creation If construction of a pond is proposed, associated wetland and stream impacts should be included above in the wetland and stream impact sections. Also, the proposed pond should be described here and illustrated on any maps included with this application. Pond to be created in (check all that apply): ? uplands ? stream ? wetlands Describe the method of construction (e.g., dam/embankment, excavation, installation of draw-down valve or spillway, etc.): Proposed use or purpose of pond (e.g., livestock watering, irrigation, aesthetic, trout pond, local stormwater requirement, etc.): Size of watershed draining to pond: Expected pond surface area: VII. Impact Justification (Avoidance and Minimization) Specifically describe measures taken to avoid the proposed impacts. It may be useful to provide information related to site constraints such as topography, building ordinances, accessibility, and financial viability of the project. The applicant may attach drawings of alternative, lower-impact site layouts, and explain why these design options were not feasible. Also discuss how impacts were minimized once the desired site plan was developed. If applicable, discuss construction techniques to be followed during construction to reduce impacts. Page 5 of 9 The site plan was altered in order to preserve the highest quality wetlands and minimize impacts A bridge crossing will be installed to span the main stream instead of creating additional impacts by culverting the stream. In addition the parking was redesigned after input from the USACE to reduce impacts at area 3. The wetland finger that comprises the maiority of the impacts (area 5) cannot be avoided since it dissects the northern half of the site and because of the commercial nature of the project Had it not been for the proposed 540 loop taking a portion of the tract it would have been easier to avoid some of the areas of impact VIII. Mitigation DWQ - In accordance with 15A NCAC 2H .0500, mitigation may be required by the NC Division of Water Quality for projects involving greater than or equal to one acre of impacts to freshwater wetlands or greater than or equal to 150 linear feet of total impacts to perennial streams. USACE - In accordance with the Final Notice of Issuance and Modification of Nationwide Permits, published in the Federal Register on March 9, 2000, mitigation will be required when necessary to ensure that adverse effects to the aquatic environment are minimal. Factors including size and type of proposed impact and function and relative value of the impacted aquatic resource will be considered in determining acceptability of appropriate and practicable mitigation as proposed. Examples of mitigation that may be appropriate and practicable include, but are not limited to: reducing the size of the project; establishing and maintaining wetland and/or upland vegetated buffers to protect open waters such as streams; and replacing losses of aquatic resource functions and values by creating, restoring, enhancing, or preserving similar functions and values, preferable in the same watershed. If mitigation is required for this project, a copy of the mitigation plan must be attached in order for USACE or DWQ to consider the application complete for processing. Any application lacking a required mitigation plan or NCWRP concurrence shall be placed on hold as incomplete. An applicant may also choose to review the current guidelines for stream restoration in DWQ's Draft Technical Guide for Stream Work in North Carolina, available at http://l12o.enr.state.nc.us/newetlands/stnngide.html. 1. Provide a brief description of the proposed mitigation plan. The description should provide as much information as possible, including, but not limited to: site location (attach directions and/or map, if offsite), affected stream and river basin, type and amount (acreage/linear feet) of mitigation proposed (restoration, enhancement, creation, or preservation), a plan view, preservation mechanism (e.g., deed restrictions, conservation easement, etc.), and a description of the current site conditions and proposed method of construction. Please attach a separate sheet if more space is needed. Only 0.44 acres of wetlands and 42 linear feet of important stream are being impacted, therefore stream mitigation should not be required The client proposes to mitigate for unavoidable wetland impacts by payment to the NCEEP at a 1:1 ratio. Page 6 of 9 2. Mitigation may also be made by payment into the North Carolina Wetlands Restoration Program (NCWRP). Please note it is the applicant's responsibility to contact the NCWRP at (919) 733-5208 to determine availability and to request written approval of mitigation prior to submittal of a PCN. For additional information regarding the application process for the NCWRP, check the NCWRP website at http://h2o.enr.state.nc.us/wrp/index.htm. If use of the NCWRP is proposed, please check the appropriate box on page three and provide the following information: Amount of stream mitigation requested (linear feet): 0 Amount of buffer mitigation requested (square feet): 0 Amount of Riparian wetland mitigation requested (acres): 0.44 ac Amount of Non-riparian wetland mitigation requested (acres): 0 Amount of Coastal wetland mitigation requested (acres): 0 IX. Environmental Documentation (required by DWQ) Does the project involve an expenditure of public (federal/state) funds or the use of public (federal/state) land? Yes ? No If yes, does the project require preparation of an environmental document pursuant to the requirements of the National or North Carolina Environmental Policy Act (NEPA/SEPA)? Note: If you are not sure whether a NEPA/SEPA document is required, call the SEPA coordinator at (919) 733-5083 to review current thresholds for environmental documentation. Yes ? No ? If yes, has the document review been finalized by the State Clearinghouse? If so, please attach a copy of the NEPA or SEPA final approval letter. Yes ? No ? X. Proposed Impacts on Riparian and Watershed Buffers (required by DWQ) It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to required state and local buffers associated with the project. The applicant must also provide justification for these impacts in Section VII above. All proposed impacts must be listed herein, and must be clearly identifiable on the accompanying site plan. All buffers must be shown on a map, whether or not impacts are proposed to the buffers. Correspondence from the DWQ Regional Office may be included as appropriate. Photographs may also be included at the applicant's discretion. Page 7 of 9 Will the project impact protected riparian buffers identified within 15A NCAC 2B .0233 (Meuse), 15A NCAC 2B .0259 (Tar-Pamlico), 15A NCAC 2B .0250 (Randleman Rules and Water Supply Buffer Requirements), or other (please identify )? Yes ? No ® If you answered "yes", provide the following information: Identify the square feet and acreage of impact to each zone of the riparian buffers. If buffer mitigation is required calculate the required amount of mitigation by applying the buffer multipliers. Zone* Impact (square feet) Multiplier Required Miti ation 1 3 2 1.5 Total * Zone 1 extends out 30 feet perpendicular from near bank of channel; Zone 2 extends an additional 20 feet from the edge of Zone 1. If buffer mitigation is required, please discuss what type of mitigation is proposed (i.e., Donation of Property, Conservation Easement, Riparian Buffer Restoration / Enhancement, Preservation or Payment into the Riparian Buffer Restoration Fund). Please attach all appropriate information as identified within 15A NCAC 2B .0242 or.0260. XI. Stormwater (required by DWQ) Describe impervious acreage (both existing and proposed) versus total acreage on the site. Discuss stormwater controls proposed in order to protect surface waters and wetlands downstream from the property. Please see attached stormwater plans by McKim & Creed XII. Sewage Disposal (required by DWQ) Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. Treatment will occur within the existing municipal waste water system XIII. Violations (required by DWQ) Is this site in violation of DWQ Wetland Rules (15A NCAC 2H.0500) or any Buffer Rules? Yes ? No Is this an after-the-fact permit application? Yes ? No Page 8 of 9 XIV. Other Circumstances (Optional): It is the applicant's responsibility to submit the application sufficiently in advance of desired construction dates to allow processing time for these permits. However, an applicant may choose to list constraints associated with construction or sequencing that may impose limits on work schedules (e.g., draw-down schedules for lakes, dates associated with Endangered and Threatened Species, accessibility problems, or other issues outside of the applicant's control). Please note that there are no DWQ required buffers on-site however the stream that divides the northern and southern parts of the project will have a 50' vegetated buffer (30' undisturbed) with the exception of one road crossing. c_ 0 Applicant/ cigeli'd nt' Signature Date (Agent's signature only if an authorization letter from the applicant is provided.) Page 9 of 9 - V1 -- -YV A-,. _,l ILI)-, Name: Orl,l 5 .Address: Phone: ) doh 7YI-13 Project Name/ Description: J,x Date: ;L0 . The Department of the Army U.S. Army Corps of Engineers, Wilmington District P.O. Box 1890 Wilmington, NC 28402 Attn: Field Office: Re: Wetlands Related Consulting and Permitting To Whom It May Concern: I, the current properly owner, hereby designate and authorize Soil & Environmental Consultants, PA to act in my behalf as my agent in the processing of permit applications, to furnish upon request supplement?inofrmation in support of applications, etc. from this day forward. The ;Ior' day of l ' This notification supersedes any previous correspondence concerning the agent for this project. NOTICE: This authorization, for liability and professional courtesy reasons, is valid only for government officials to enter the property when accompanied by S&EC staff. You should call S&EC to arrange a site meeting prior to visiting the site. Print Property Owner's Name Property Owner's Signature cc: Mr. John Domey cc: Mr. Kevin C. Martin NCDENR - DWQ Soil & Environmental Consultants, PA 2321 Crabtree Boulevard Raleigh, NC 27604 Chadotte Office: GCeensUoto Ofticc: Hicko Officc: 236 LLPhillip Court, Suitc C 3817-E Lawndale Drive 622 Coon Mountain Lane Concord. NC 28025 Greensboro, NC 27455 Taylorsville, NC 28681 Phone: (704) 720-9405 Phone: (336) 540-8234 Phone (828) 635-5820 l=ax: (704) 720-9406 Fax: (336)540-8235 Fax: (828) 635-5820 WJ V U'a uI o Soil & Environmental Consultants, PA 11010 Raven Ridge Road a Raleigh, North Carolina 27614 - Phone: (919) 846-5900 • Fax: (919) 846-9467 www.SandEC.com AGENT AUTHORIZATION FORM All Blanks To Be Filled In By The Current Landowner U1/U1/ZUU4 14:4U t•AA. 0 002 Environmental Consultants, PA Road @ Raleigh. North Camlinu 27614 • Phone: (919) 846-5900 • Fax: (919) 846.9467 AGENT AUTHORIZATION FORM All Blanks To Be Filled In By The Current Landowner Nance: r /I ?s L? .Address: (r) J'•Q Q,? \ -??? V (JA \t? Phone: C? Project Name/ Description: Date: ' _ 2 C The Department of the Army U.S. Army Corps of Engineers, Wilmington District P.O. Box 1890 Wilmington, NC 28402 Attn: Field Office: /.f Re: Wetlands Related Consulting and Permitting To Whom ft May Concern: I, the current property owner, hereby designate and authorize Soil & Environmental Consultants, PA to act in my behalf as my agent in the processing of permit applications, to furnish upon request s_pplemental information In support o app ca ons, a c. om is day ad-.-The ZIs-F day of This notification supersedes any previous correspondence concerning the agent for this project. NOTICE: This authorization, for liability and professional courtesy reasons, is valid only for government officials to enter the property when accompanied by S&EC staff. You should call S&EC to arrange a site meeting prior to visiting the site. o-o- P.rint Property Owner's Name Property Own &s signature cc: Mr. John Dorney cc; Mr. Kevin C. Martin NCDENR - DWQ Soil & Environmental Consultants, PA 2321 Crabtree Boulevard Raleigh, NC 27604 harlo,Ite Office: Gr?tnaUo o Ofticc HickorX Otiicc: 236 LcPhillip Court, Suitc C 3317-E Lawndale Drive 622 Coon Mountain Lane Concord. NC 23025 Grccnsboro, NC 27455 Taylorsville, NC 28681 Phone_ (704) 720-9405 Phone: (336)540-8234 Phone (828) 035-5820 Fax: (743)720-9406 Fax: (336)540-82.35 Fax: (828)635-5620 I't (r lift 700 /(?.' ?:. ? aV `?? ?,. J l- ? f153 ? /vn ?d y , . n. ' CP_ 14JO?) II n? NC u ? ?._ L1S ?*? r u C " f( ? ? 00 ?n q i? ? u ?1 II // n ou ll / S p O .is? !7 p 778 14 Project #: Scale: 02-7262 1"=2000` Figure 1 - USGS Quad Project Mgr.: KM Date: 7125102 Mills Tract First Cadina Properties Apex, Wake Co. NC I NEW HILL, N. C. . 35078-F8-TF-024 PHOTOINSPECTED 1983 1974 PHOTOREVISED 1981 DMA5255 111 NW-SERIES V842 Soil & Environmental Consultants, PA 11010 Raven Ridge Rd.- Raleigh, NC 27614 (919) 846-5900 • (919) 846-9467 Web Page: www.SandEC.com CrC2 2Jt'tUt j ' B2 ?CrE CrB2?/'` GrC'? GIG I CrC2 C (U2 ?/ Ott CrC2 r, GrC CrC21? GrD CrB2 C f CC2 J ?il ,+CrC2 L? . /. U CrC2 GIG Wy. GIB r? {{ .? CrG ?` UrC / GtF ?' II SV rB2 : Cs I. r Gtd GrC )/ CrC2 / ,%r 111 Y CrC2 GrD A JJJ -_ - CrE ? CrC2 C , <'' ?;._ CrB2 ?? r. ? o ctcz 1 ? ?? GrC 5 r1 yy:. / Cni-; GrD GrGh 14 ` GrD dlD2 \? U C \\!\ CtCI f r :r GIG i.. - N' T ? - ? ?.? 1L _? CrC2. n // . S,r> CtC2 " ?. = r ?j s ? CrC? ? u -1L / CrC • Y rM CrB2 z • YVv "I t P. h1[D !7? ?? " ! GrC ' CrP 1 ti GrD u a ? r E' CrC? j? Yo \ u Cry [ 'CrP^ Mf92 Tr. :f V Y GrC Cr6? 1 / f RE' AfA - t.C2 .. CrC2 > f '• Y - II -'.CrC3 ?j`l?r r ''"- ., 111 ,?': C / V4 cy .' I? 'SVo - "N GrD Cr8 i- ?. /:;I CrC2," M!C Crt. / l rC QM. ? :11 ?. CrE ?' . 1 c, L: Gv { f ! Crci /.. x tiVG/ „I IS ?? C fa - ' GrR ME62 CrE ?' ' 111 - _ r'I li CrC2 CrC2 1 M1StC2 f:- CrC t `CrC2 I ? Yt ` ! ('tB2 j ! N. r CrC2 ' ??. _ ` ? .` -. ? ? mow./ ? ?/ '? 2 c htfC CrC2 Sr t CrB ?? ? ? I '?Wpi CSC ' • ? CrC2 J i ` Ctu r f.1gB2 t i Au CrE rrE' ' GAG i Cr ?? . Mgr c ' ('t 1CrE ?? o r GrD Vtj CfC2 J / o a ?a S Ws t CrE tvCT?. c 5 . ?' f . 1(q - Cmt1 ' Project Scale: 02.7262 V =1320' Mgr.: KM 1 7125102 Figure 2 - Soil Survey Mills Tract First Carlina Properties Apex, Wake Co. NC Soil & Environmental Consultants, PA 11010 Raven Ridge Rd.- Raleigh, NC 27614 (919) 846-5900.(919) 846-9467 Web Page: www.SandEC.com i \''•, _J PROJECT DATA NAME P RROACT. QEAA(R PEEK CROS- 5 SOp NG CENTER WEI NPM CAROLINA a'ALOPER, DOR/15T CARMNA AREX MAY IN LLC 513 KEWS DR, S TE 202 CARY, NORM CAROLINA 22511 HONE. (919) 652-5005 FAX. (9:9) 652-5006 ZONRk DF RRORENTY WO-CU MEA OF TRACT.. 50572 AC TOTAL 19 742 80 440 LEGEND i - LIMNS OF WETLAND 1.1 ??? `4r v IMPACTED KnAND AREA wEnANO AREA -.-ZZ VICwm MAP NOT W s t FIOFiTH too' a 100' 200' SCALE: 1'-100' (Nori2.) Ir ? ' 4 1 1 l\ AREA11 % 6ryfE / I / , I• 37 BUFFER 11t b?`? AREA 12 97MCK r5 I. ? .......,. A 4 .i"- .1 11, ? I FUnJRE AREA I 5k1 •,I .? ,. ` .) a I • I RFSIIIEr'IFAL /?' // ?` •l F / 7 ' :'? ??? 1 •I AREA 8J f P i `''. I . I I ?IAQISCFN'EiL4SDi ' • , 1AA5 +? ?? i? Z. 11 I IS ?.' .?//3V -•"j t 41 1I ??. r ? - AREA 15 -"T7 1 1 , ,YC ` \\ ?•\, 1 - 't ?? 1 I I 1 'I\ ; II I; FXCELL 1 A I 11 J I' CELL _ I F FIII OFFFCF FUILME TONER FLrrLRE ?I OFFICE ji1 ;. .. • ` - ?.. FU LM ( 1 5 1R64M AREA t6 't I, AREA RBEAMAREA n j /ARE1 J F?1111 R111BCM1g.=TED5R ? _L - - ? - _ ?SIREAAfARFA fB l? '•`• ---- .`; FROM TOP OF BFREIM BANR) ARFA #10 MEAMAREA411 ?..? DATE o-__ 9, 2004 • BEAVER CREEK CROSSINGS RRDA I, 2655-0007 ??-t ?+ ???+? DRAW ERA <Vf N 1?llV1(f' t-•j?GP?1J DDR/1- CAROLINA APEX PHASE III, LLC APEX, NORTH CAROLINA DE&CIIEU ERA P? 200 ua'-h ".'i" 200 513 Keisler Drive, Suite 202 cNEPEo 6? W1-1 Cory, North Carolina 27511 ??,? NOF•th CdC011nd 27511 RRa MP O+5 Im 17- Phone (919) 233-8091, Fors (919) 233-8031 Cary, AA0002667 EB0006691 Phone: 919.6575005 WETLAND UPACT MAP SIAIUS FOR RENEW ONLY w %vw R•R mctmcreeecom IMPACTED WETLAND AREA SQUARE FOOTAGE ACRES AREA 1 158950 am AREA 12 955.16 022 AREA /3 2.A2818 D56 AREA i4 2,18171 050 AREA 5 1146611 763 AREA 9 161 55 003 AREA 10 46,10 .010 0 IMPACTED STREAM AREA CLASSIFICATION SQUARE FOOTAGE LF ACRES AREA 6 UNIMPORTANT 52 26 .001 AREA 7 UNIMPORTANT 116 58 003 AREA 8 UNIMPORTANT 194 97 004 AREA 11 IMPORTANT P/ 42 002 TOTAL '.PC*TANT STREAM ONLY 84 42 002 TOTAL AREA IMPACTED AREA SQUARE FOOTAGE AERES i07A1 19,32580 0442 TH e PEAK Of GOOD UVIPIO August 19, 2002 Ms. Laura Gadd Soil & Environmental Consultants, PA 11010 Raven Ridge Road Raleigh, NC 27614 Subject: Appeal of 50 foot Water Quality Buffer Requirement Dear Ms. Gadd, sloam of ogfac P. O. BOX 250 APEX. NORTH CAROLINA 27502 A U G 2 2 2002 D I have reviewed the USGS Topographic Map ( USGS Topo) and the USDA Soil Survey for the site located at the north west corner of the intersection of US Hwy. 64 and Green Level Church Road The Soil Survey indicates that there are two intermittent features on the property that would require buffers (Fig. 2), neither of which is indicated on the USGS Topo (Fig 1). Based on the site visit that we performed on 8/01/02, I have concluded that the two features are not buffered streams. As we discussed, the feature to the west of the site is an'intermittent stream and will require 50 foot buffers. I have included copies of the Soil Survey and the USGS Topo, with the subject property outlined, as attachments to this letter. If you have any questions, or if I may be of further assistance, please do not hesitate to contact me at 362-8166. Since , Dan LaMontagne, PE Environmental Programs Coordinator Attachments Cc: Tim Donnelly, PE = Public Works and Utilities Director T ?? O 'S' C A.? 5 00 ?Ls L-k 351- 8ri 5f \ u \ C LLA( a fl? O ?? fill %-- u /' ,?rfiAe Q li (/' N // _ _ U II ° X11 n O ? O 0 ` S 1 O 8 78 14 Project: Scale: 02.7262 2000, t Figure 1- USGS Quad Project e: Date: Mgr.: KM 7125102 Mills Tract First Carlina Properties Apex, Wake Co. NC r E t t? I? - M NEW HILL, N. C. 35078-F8-TF-024 PHOTOINSPECTED 1983 1974 PHOTOREVISED 1981 DMA 5255 111 NW-SERIES V842 Soil & Environmental Consultants, PA 11010 Raven Ridge Rd.- Raleigh, NC 27614 (919) 846-5900 • (919) 846-9467 Web Page: www.SandEC.com I \0 Q r Project C sale: 02.7262 V =1320' Project Date: Figure 2 - Soil Survey Mgr.: KM 1125102 Mills Tract First Carlina Properties Apex, Wake Co. NC Soil & Environmental Consultants, PA 11010 Raven Ridge Rd.- Raleigh, NC 27614 tiJ ?v. (919) 846-5900.(919) 846-9467 Web Page: www.SandEC.corn ,v?MCIQM&CREED To: S&EC 110 10 Raven's Ridge Road Raleigh, NC 27614 ATTENTION: Kevin Martin or Jessica Regan LETTER OF TRANSMITTAL DATE: January 17, 2005 PROJECT NO: 2655-0007 TASK NO: **** RE: Beaver Creek Crossings Apex, NC TRANSMITTAL NO: PAGE 1 OF 1 WE ARE SENDING: ? Originals ® Prints ? Shop Drawings ? Samples ? Specifications ® Calculations ? Other - Quantity Drawing No. Rev. Description Status 1 Narrative and Calculations 2 Pond Details I i ?JATI_7 200? Issue Status Code: A. Preliminary B. Fabrication Only C. For Information D. Bid E. Construction F. For Review & Comments G. For Approval H. See Remarks Action Status Code: 1. No Exceptions Taken 2. Make Corrections Noted 3. Other 4. Amend & Resubmit 5. Rejected -See Remarks REMARKS: Thank you for your help. Please let Grant Livengood or myself know if you have any questions. Thanks! 200 MacKenan Court, Suite 200, Cary, NC 27511 919/233-8091 Fax 919/ 2318031 cc: McKIM & CREED,- PA Signed Christoph . Se ster, RLA, ASLA S:\2655\0007\10-Comm\tr011705.kevin martin S&EC.doc Project No. DWQ (to be provided by DWQ) DIVISION OF WATER QUALITY - 401 WET DETENTION BASIN WORKSHEET DWQ Stormwater Management Plan Review: I. PROJECT INFORMATION (please complete the following information): Project Name : G fi-itzYZ. CRZEI! C20SS r Al C Contact Person: eAWTl.vervvoo? Pc Phone Number. ( OF ) Z33-8Cr,1 For projects with multiple basins, specify which basin this worksheet applies to: P." 0 44-1- Basin Bottom Elevation 33 5'- ft. (average elevation of the floor of the basin) Permanent Pool Elevation 3 ft. (elevation of the orifice invert out) Temporary Pool Elevation 'mss 1 ft. (elevation of the outlet structure invert in) Permanent Pool Surface Area 14)7 Ss' sq. ft. (water surface area at permanent pool elevation) Drainage Area 10 ,31 - ac. (on-site and off-site drainage to the basin) Impervious Area 9 .47 ac. (on-site and off-site drainage to the basin) Permanent Pool Volume fo4 cu. ft. (combined volume of main basin and forebay) Temporary Pool Volume '301 119 cu. ft. (volume detained on top of the permanent pool) Forebay Volume r3,vi cu. ft. SA/DA used (surface area to drainage area ratio) Diameter of Orifice ?- in. (draw down orifice diameter) II. REQUIRED ITEMS CHECKLIST The following checklist outlines design requirements per the Stormwater Best Management Practices Manual. Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached. If a requirement has not been met, attach an explanation of why. At a minimum, a complete stormwater management plan submittal includes a worksheet for each BMP, design calculations, plans and specifications showing all BMPs and outlet structure details, a detailed drainage plan and a fully executed operation and maintenance agreement An incomplete submittal package will result in a request for additional information and will substantially delay final review and approval of the project Aoolicants Initials C"t - The temporary pool controls runoff from the 1 inch storm event. Cs?tL The basin length to width ratio is greater than 3:1. G-M,L- The basin side slopes are no steeper than 3:1. Conf- A submerged and vegetated perimeter shelf at less than 6:1 is provided. C-y-y Vegetation to the permanent pool elevation is specified. CsvtIt.L An emergency drain is provided to drain the basin. C,,-AL The permanent pool depth is between 3 and 6 feet (required minimum of 3 feet). C-1 AA V The temporary pool draws down in 2 to 5 days. Cwt- The forebay volume is approximately equal to 20% of the total basin volume. CAM L" Sediment storage is provided in the permanent pool. L'i"L Access is provided for maintenance. C,144 L A notarized site specific operation and maintenance (0&M) plan is provided. C-1 MI- A vegetation management/mowing schedule is provided in the 0&M plan. C-kM L Semi-annual inspections are specified in the 0&M plan. AA L A debris check is specified in the 0&M plan to be performed after every storm event. C\Att: A specific sediment clean-out benchmark is listed (elevation or depth) in 0&M plan. CI1u L A responsible party is designated in the 0&M plan. Project No. DWO (to be provided by DWO) DIVISION OF WATER QUALITY - 401 WET DETENTION BASIN WORKSHEET DWO Stormwater Management Plan Review: 1. PROJECT INFORMATION (please complete the following information : Project Name : t fc AVEFV_ cye -Y_ r 20 S S I N -l Contact Person: C?4 s l.Xv Phone Numb?r. (Qt4) 7,33-60 For projects with multiple basins, specify which basin this worksheet applies to: t z ?%31%7- Basin Bottom Elevation Permanent Pool Elevation Temporary Pool Elevation Permanent Pool Surface Area Drainage Area Impervious Area Permanent Pool Volume Temporary Pool Volume Forebay Volume SAIDA used Diameter of Orifice -3+1 ft. '3,(6 ft. 3AI.9 ft. 12,'73 U sq. ft. 9.10 ac. -)'70 ac. 9"71 cu. ft. ,79toS cu. ft. to '358 cu. ft. 2•S 2 in. (average elevation of the floor of the basin) (elevation of the orifice invert out) (elevation of the outlet structure invert in) (water surface area at permanent pool elevation) (on-site and off-site drainage to the basin) (on-site and off-site drainage to the basin) (combined volume of main basin and forebay) (volume detained on top of the permanent pool) (surface area to drainage area ratio) (draw down orifice diameter) II. REQUIRED ITEMS CHECKLIST The following checklist outlines design requirements per the Stormwater Best Management Practices Manual. Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached. If a requirement has not been met, attach an explanation of why. At a minimum, a complete stormwater management plan submittal includes a worksheet for each BMP, design calculations, plans and specifications showing all BMPs and outlet structure details, a detailed drainage plan and a fully executed operation and maintenance agreement An incomplete submittal package will result in a request for additional information and will substantially delay final review and approval of the project Applicants Initials 67?'I7 The temporary pool controls runoff from the 1 inch storm event. &AA _ The basin length to width ratio is greater than 3:1. C-Ikt?_ The basin side slopes are no steeper than 3:1. CaMt- A submerged and vegetated perimeter shelf at less than 6:1 is provided. C,jA&L, Vegetation to the permanent pool elevation is specified. C?MI, An emergency drain is provided to. drain the basin. L The permanent pool depth is between 3 and 6 feet (required minimum of 3 feet). C.n.nnl, The temporary pool draws down in 2 to 5 days. C-1).&L- The forebay volume is approximately equal to 20% of the total basin volume. Ch m4- Sediment storage is provided in the permanent pool. r'KL Access is provided for maintenance. C'_-%W- A notarized site specific operation and maintenance (0&M) plan is provided. C-, Ak L_ A vegetation management/mowing schedule is provided in the O&M plan. &AAL- Semi-annual inspections are specified in the 0&M plan. JAG A debris check is specified in the 0&M plan to be performed after every storm event. C-1ML_ A specific sediment clean-out benchmark is listed (elevation or depth) in 0&M plan. -AML A responsible party is designated in the 0&M plan. Project No. (to be provided by DWQ) DIVISION OF WATER QUALITY - 401 WET DETENTION BASIN WORKSHEET DWO Stormwater Management Plan Review: 1. PROJECT INFORMATION (please complete the followinn information): Project Name : f3G'] ` cea K- 1,1 - S - S Contact Person: 6aArrr VG)'+L-X?y> i' a Phone Number. (4 r9) 233?dv For projects with multiple basins, specify which basin this worksheet applies to: RJo sl3 Basin Bottom Elevation `34Z ft. (average elevation of the floor of the basin) Permanent Pool Elevation ft. (elevation of the orifice invert out) Temporary Pool Elevation ft. (elevation of the outlet structure invert in) Permanent Pool Surface Area 1$ 3'3 sq. ft. (water surface area at permanent pool elevation) Drainage Area (0.3 ac. (on-site and off-site drainage to the basin) Impervious Area ac. (on-site and off-site drainage to the basin) Permanent Pool Volume cu. ft. (combined volume of main basin and forebay) Temporary Pool Volume l a 513 cu. ft. (volume detained on top of the permanent pool) Forebay Volume 7 cu. ft. SA/DA used 7_11 (surface area to drainage area ratio) Diameter of Orifice Z in. (draw down orifice diameter) II. REQUIRED ITEMS CHECKLIST The following checklist outlines design requirements per the Stormwater Best Management Practices Manual. Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached. If a requirement has not been met, allach an explanation of why. At a minimum, a complete stormwater management plan submittal includes a worksheet for each BMP, design calculations, plans and specifications showing all BMPs and outlet structure details, a detailed drainage plan and a fully executed operation and maintenance agreement An incomplete submittal package will result in a request for additional information and will substantially delay final review and approval of the project Applicants Initials -IML- The temporary pool controls runoff from the 1 inch storm event. C', AA _ The basin length to width ratio is greater than 3:1. M L The basin side slopes are no steeper than 3:1. _A^ - Mt- A submerged and vegetated perimeter shelf at less than 6:1 is provided. ermanent ool ele ation i s e if V t t d ti th 1 [AML p v p ie ege a on o e p s c . An emergency drain is provided to drain the basin. L The permanent pool depth is between 3 and 6 feet (required minimum of 3 feet). The temporary pool draws down in 2 to 5 days. C,-,,%,C The forebay volume is approximately equal to 20% of the total basin volume. L Sediment storage is provided in the permanent pool. C-A,kL Access is provided for maintenance. C3ML A notarized site specific operation and maintenance (0&M) plan is provided. GNAt, A vegetation management/mowing schedule is provided in the 0&M plan. CaML Semi-annual inspections are specified in the 0&M plan. C,,I`L A debris check is specified in the 0&M plan to be performed after every storm event. GIML A specific sediment clean-out benchmark is listed (elevation or depth) in 0&M plan. CIN1t?_ A responsible party is designated in the 0&M plan. Project No. (to be provided by DWQ) DIVISION OF WATER QUALITY • 401 WET DETENTION BASIN WORKSHEET DWO Stormwater Management Plan Review: 1. PROJECT INFORMATION (please com fete the following information)- Project Name : -1R.f C?oSSr N6 Contact Person: 6arw,,,F (At?" Phone Number. RR For projects with multiple basins, specify which basin this worksheet applies to: ?001)#4 Basin Bottom Elevation 3?0 ft. (average elevation of the floor of the basin) Permanent Pool Elevation 3 ft. (elevation of the orifice invert out) Temporary Pool Elevation ??S $ ft. (elevation of the outlet structure invert in) Permanent Pool Surface Area 02-1 sq. ft. (water surface area at permanent pool elevation) Drainage Area n -0 ac. (on-site and off-site drainage to the basin) Impervious Area 4 - S9 ac. (on-site and off-site drainage to the basin) Permanent Pool Volume ZO t' To cu. ft. (combined volume of main basin and forebay) Temporary Pool Volume I(, ZQS cu. ft. (volume detained on top of the permanent pool) Forebay Volume Sr 3? cu. ft. SA/DA used 2' 9 (surface area to drainage area ratio) Diameter of Orifice 1 • s in. (draw down orifice diameter) II. REQUIRED ITEMS CHECKLIST The following checklist outlines design requirements per the Stormwater Best Management Practices Manual. Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached. If a requirement has not been met, attach an explanation of why. At a minimum, a complete stormwater management plan submittal includes a worksheet for each BMP, design calculations, plans and specifications showing all BMPs and outlet structure details, a detailed drainage plan and a fully executed operation and maintenance agreement An incomplete submittal package will result in a request for additional information and will substantially delay final review and approval of the project Aoolicants Initials C-, e4 L The temporary pool controls runoff from the 1 inch storm event. (a ??'l & The basin length to width ratio is greater than 3:1. &ML The basin side slopes are no steeper than 3:1. r', M L A submerged and vegetated perimeter shelf at less than 6:1 is provided. aML Vegetation to the permanent pool elevation is specified. &JA4L An emergency drain is provided to drain the basin.- VA L, The permanent pool depth is between 3 and 6 feet (required minimum of 3 feet). &AAL The temporary pool draws down in 2 to 5 days. GIML The forebay volume is approximately equal to 20% of the total basin volume. ?hf. Sediment storage is provided in the permanent pool. &JAAL, Access is provided for maintenance. &J'"t. A notarized site specific operation and maintenance (0&M) plan is provided. 1?%nnL A vegetation managementlmowing schedule is provided in the 0&M plan. C_-)A4 Semi-annual inspections are specified in the 0&M plan. C, 1A A debris check is specified in the 0&M plan to be performed after every storm event. M? A specific sediment clean-out benchmark is listed (elevation or depth) in 0&M plan. C,'" L- A responsible party is designated in the 0&M plan. DESIGN NARRATIVE FOR STORMWATER MANAGEMENT, EROSION CONTROL PERMIT AND SUPPORTING CALCULATIONS BEAVER CREEK CROSSINGS Apex, North Carolina Prepared for: DDR / 1St Carolina Apex Phase III, LLC 523 Keisler Dr. Ste. 202 Cary, NC 27511 919-657-5005 Date: December 6, 2004 McKim & Creed Project: 02655-0007 Prepared by: McKim & Creed 200 MacKenan Court Cary, N.C. 27511 BEAVER CREEK COMMONS Design Narrative Developers Diversified Realty/ 15` Carolina Apex Phase III, LLC is proposing a mixed use development of a retail shopping center, office space and a residential two residential components. The site of the proposed development is comprised of approximately 130 acres of land. The project is separated by US Hwy 64. The parcel to the north of Hwy 64 will be classified as Phase 4 and is bound to the north and east by Green Level Church Rd. Phase 4 is bounded to the west by the future 1-540 corridor. The parcel to the south of Hwy 64 will be classified as Phase 3 and is bound to west by Beaver Creek, to the west by Reedy Creek Branch and to the south by the Chapel Ridge development. Both phases of this project are located in the Town of Apex, North Carolina. The existing site areas are primarily developed residential homes with gravel drives. The remainder of the site and the largest portion is areas of undisturbed woods and open areas. The proposed site improvements will consist of, the demolition of existing structures, roadway and utilities, the construction of new structures, Internal drives, parking, utilities, and a storm water management system. The project will also consist of a bridge that will connect the two phase across US Hwy 64. See Attached Exhibit. Apex US GS Map NCDENR stream classification indicates that Beaver Creek is within the Cape Fear basin, stream index number 16-41-(0.5), stream class WS-IV; NSW. .1 APEX AND NCDENR DWQ The detention ponds have been designed in accordance with NCDENR Best Management Practices (BMP). The pond's designed length to width ratio is approximately 3:1 and includes a fore-bay volume of 20% of the ponds overall volume. Pond side slopes are 3H to 1V, with 6H to 1V planted littoral shelf. The littoral shelf is provided just below the control water surface elevation. The permanent pool depths of the ponds are a minimum of 3' as designated by NCDENR Best Management Practices. The pond will detain the 1" rainfall volume from the contributing drainage basin. The 1" rainfall volume will draw down to the permanent pool elevation in a period of no less than 2 days and no greater than 5 days. Storm water in excess of the 1" rainfall volume will be contained in the pond and overflow the pond's riser structure, discharging to the natural outfall. Draw down orifice elevation is set at permanent pool water elevations. The pond's overflow riser structure has been set such that it will provide necessary site runoff storage in order too reduce the post-development peak discharge of runoff at or less than that of the pre-development rates. The emergency overflow elevation is set to safely pass the 24-hour, 100-year storm event. Apex and NCDENR DWQ - SA/ DA Ratios, 1" Volume and Draw Down Calculations are presented within this report, along with the 24-hour 10 and 100-year pond water elevations that were taken from the hydrograph summary. Beaver Creek Crossings December 2004 Page - 1 02655-0007 Stormwater Design Narrative .2 PRE / POST SITE DISCHARGE In addition to the DWQ requirements the Town of Apex requires that the Storm water detention ponds be designed such that the peak discharge from the proposed developed site does not exceed the peak discharge from the same site prior to proposed development for the 24 hour, 10-year storm event. .3 STORMWATER MANAGEMENT CONCLUSION Based on the provided data, the proposed storm water management system meets all the established NCDENR and Town of Apex requirements. The runoff discharge from the proposed ponds will not exceed the pre-developed rate of offsite discharge. The 1" runoff volume is detained within the ponds below the overflow riser elevations and draws down via a low flow orifice in the required 2-5 day time. The ponds permanent pool surface area and depth is more than that required to satisfy the TSS removal. The 24-hour 100-year storm event will safely discharge form the pond over the overflow and allow sufficient free board between the 24-hour 100-year water elevation and the top of the pond's berm. 4. EROSION CONTROL CONSIDERATIONS Runoff from the site will be directed to temporary sediment basins by temporary diversion ditches. Temporary silt fence will be constructed along the low areas of the site to hinder sediment from leaving the site. These devices will be constructed to cleanse stormwater before entering into the low point of the site in order to eliminate sediment build up in this area. Additional measures may be necessary during construction and will be approved by the Engineer and Town of Apex prior to installation. Riprap outlet protection will be placed at the end of each storm drain outlet to help eliminate erosion downstream and block and gravel inlet protection will be placed at each catch basin/curb inlet. Calculations for the design of the temporary sediment basins/trap and riprap dissipater are attached. All erosion control measures are documented on the erosion control plan and detail sheet. 5. MAINTENANCE CONSIDERATIONS Contractors shall be responsible for periodic inspection and maintenance of all indicated erosion control devices. In addition, inspection and any necessary maintenance will be required immediately following any significant storm event. Any measure that fails to function as intended shall be repaired immediately. Upon completion of construction, the property owner shall be responsible for site maintenance. 6. DRAINAGE CALCULATION A complete set of calculations for the stormwater drainage is attached. 0.00' Wl I I 1 P78' 54'0'00' WI I 1 1 p78' 53'0.00" W I I I I tt o a.; ?'• ar J I \ ?? . LJ , , ., _ [7 C III , ' , ? •? , ?, Z o ? LO ': 'if`\..?1(? , ?!' '-?.?, ? ??• 7r ? , ;r ? ti 0 , ? ? ` ;/i?r..• !, ~? 7, lra?l, y~ ??r' v oLOi O d i\'(`.h?il'.• ? IG \? ? \?IjUiir ate: /s1 7-1 > //.} .; l , I ?' ? + \? , ` / •i 1 _ ! .. , +. • .-: a? } I ! A? ?` I yi' `rll' J.'b ?l /.- y ,'? i I ? ' ? ,g ; ? .? J ?y? J_`.??? X0`, ) ' a"? t ?_ ( i :? _? ? ( l fir ? ?\ '. ! Ni r•. \,,.J?\`?,` n 1'?I ?` -? '- ?.. \I r,! `/ ? - :v\ / ?.\, -l ??\..yLl???'%i r` /;/?/SS ?? ' . '0/50 rr? (ay?? 1 " I l / l ' " 1 ? W- ;1 l ?`? ? , ,.'i , i ./ `??_ ? c Ste =*• ? •` B\ (? ).E ??t 77 ` ?p I ? / _J I r ?1 ,?,? •I ^ \1 ;' r 160 -??a llt?\' r ?' ,t• _ 1`` ?Q` ??' 1 _i J?.,'T//,•? 1?~?, -,.?f,?% :, ., _/ ? ?` j ' ..: X11 • ? _ , ! ?? ?'-?, _ .; - l Cl) C ) I ((?.1 ?;o ,j4?! = PI -."?\?f 4 -1 ,//i ) J 1! ? ?, ?? \ ? / 1?? ? ?J - ,rq" • f tt ?Q? ? __,,' } i„'? - 1\lil .l ?. r ? ? V\? ', ? ? ? ?//??1?,. (1(1Q?• ?-? - nor ;_ti(_}; j ,= 91 W 78. 55'10.00' W I I I b78. 54' 0.00' W I I I b78' 53' 0.00" VV I I I , Name: NEW HILL Location: 035° 44'41.55" N 078° 53'37.29" W Date: 1217/2004 Caption: Beaver Creek Crossings Scale: 1 inch equals 2000 feet Wake County Apex, NC WATER QUALITY POND CALCULATIONS Stormwater Pond #1 Project Name Beaver Creek Crossings Project Number 02655-0001 Date 24-Nov-04 3rd revision 2nd revision 1 st revision Water Quality Pond Drainage Area Data Project Beaver Creek Crossings Project No. 02655-0001 Date 24-Nov-04 Total site area 451,557 square feet = 10.37 acres Dra inage area to and Other Drai nage Area Impervious areas Existing s Proposed s Change s Existing s Proposed s On-site buildings 0 0 0 0 0 On-site streets 0 0 0 0 0 On-site parking 0 0 0 0 0 On-site sidewalks 0 0 0 0 0 Other on-site 14,727 383,823 369,096 0 0 Total off-site impervious 0 0 0 0 0 Total Impervious 14,727 383,823 369,096 0 0 Dra inage area to and Other Drai nage Area Non-impervious areas Existing s Proposed s Change s Existing s Proposed s On-site grass/landscape 0 0 0 0 0 On-site woods 0 0 0 0 0 Other undeveloped 436,830 67,734 -369,096 0 0 Total off-site non-impervious 0 0 0 0 0 Total non-impervious 436,830 67,734 -369,096 0 0 Total Drainage Area 451,557 451,557 0 0 0 Percent impervious 3.3 85.0 '81.7 0.0 n/a Notes: Prelim-Water Quality Pond-1 Calcs.xls Site Drainage Area Data Page 2 of 15 Printed 117/2005 3:41 PM Water Quality Pond Surface Area Calculations Project Project No Date Beaver Creek Crossings 02655-0001 24-Nov-04 Total on-site drainage area to pond 451,557 square feet Total impervious area in drainage area 383,823 square feet Average water depth of basin at normal pool 8.0 feet Location of site Apex Site region Piedmont % Impervious cover 85.0 percent If the site is in a coastal area, will a vegetative filter be used? n/a Surface Area/Drainage Area Ratios: For a site in the Piedmont 1.7 percent For a site in a Coastal County w/ Vegetative Filter 1.7 percent For a site in a Coastal County w/out Vegetative Filter 3.1 percent Required surface area of pond: For a site in the Piedmont 7,750.0 square feet For a site in a Coastal County w/ Vegetative Filter 7,460.0 square feet For a site in a Coastal County w/out Vegetative Filter 13,780.0 square feet Notes: Prelim _Water Quality Pond-1 Calcs.xls Pond Surface Area Calcs Page 3 of 15 Printed 117/2005 3:41 PM Water Quality Pond Stormwater Runoff Volume Calculations Project Beaver Creek Crossings Project No. 02655-0001 Date 24-Nov-04 Drainage area Impervious area Rainfall depth Percent Impervious 451,557 square feet 383,823 square feet 1.00 inches 85.0 percent R(v)=0.05+0.009*(Percent impervious) Runoff coefficient - R(v) 0.82 in/in Runoff volume=(Design rainfall)*(R(v))*(Drainage area) Runoff volume 4668.2 <cubic feet Notes: Prelim-Water Quality Pond-1 Calcs.xls Runoff Volume Calcs Page 4 of 15 Printed 117/2005 3:41 PM Water Quality Pond Volume Calculations Stage-Storage Data for Pond-#1 Project Beaver Creek Crossings Project No. 02655-0001 Date 24-Nov-04 Contour ID Stage Area [s q. ft. Area acres Incremental Area s . ft. Incremental Area acres Incremental volume cu. ft Incremental volume acre-ft Cumulative volume cu. ft Cumulative volume acre-ft 335 0 3,086.0 0.071 3,086.0 0.1 0.0 0.0 0.0 0.0 336 1 4,260.0 0.098 1,174.0 0.03 3,673.0 0.1 3,673.0 0.1 337 2 5,317.0 0.122 1,057.0 0.02 4,788.5 0.1 8,461.5 0.2 338 3 6,554.0 0.150 1,237.0 0.03 5,935.5 0.1 14,397.0 0.2 339 4 7,782.0 0.179 1,228.0 0.03 7,168.0 0.2 21,565.0 0.3 340 5 9100.0 0.209 1,318.0 0.03 8,441.0 0.2 30,006.0 0.4 341 6 10 380.0 0.238 1,280.0 0.03 9,740.0 0.2 39,746.0 0.4 342 7 11,741.0 0.270 1,361.0 0.03 11,060.5 0.3 50,806.5 0.5 343 8 14,755.0 0.339 3,014.0 0.07 13,248.0 0.3 64,054.5 0.6 Prelim-Water Quality Pond-1 Calcs.xls Pond Stage-Storage <Perm. Pool Page 5 of 15 Printed 1/7/2005 3:41 PM Water Quality Pond Volume Calculations Stage-Storage Data for Pond Project Beaver Creek Crossings Project No. 02655-0001 Date 24-Nov-04 Contour ID Stage Area (s q. ft. Area acres Incremental Area [s q. ft. Incremental Area acres Incremental volume cu. ft Incremental volume acre-ft Cumulative volume cu. ft Cumulative volume acre-ft 344 0 16,231.0 0.373 16,231.0 0.4 0.0 0.0 0.0 0.0 345 1 17,993.0 0.413 1,762.0 0.0 17,112.0 0.4 17,112.0 0.4 345.7 1.7 19,171.0 0.440 1,178.0 0.0 13,007.4 0.3 30,119.4 0.7 346 2 19,550.0 0.449 379.0 0.0 5,808.2 0.1 35,927.6 0.4 347 3 21,248.0 0.488 1,698.0 0.0 20,399.0 0.5 56,326.6 0.6 Prelim Water Quality Pond-1 Calcs.xls Stage-Storage>Perm. Pool Page 6 of 15 Printed 1/712005 3:41 PM Water Quality Basin Dewatering Time Calculations Project Project No Date Beaver Creek Crossings 02655-0001 24-Nov-04 Maximum surface area of basin 19,171.0 square feet Maximum head of water above dewatering hole 1.7 feet Orifice coefficient 0.90 Diameter of each hole 2.0 inches Number of holes 1 Cross sectional area of each hole = 0.022 square feet Cross sectional area of each hole = 3.1 square inches Cross sectional area of dewatering hole(s) = 0.022 square feet Cross sectional area of dewatering hole(s) = 3.1 square inches Dewatering time for basin = 88.1 hours Dewatering time for basin = 3.7 days Calculations based on NC Sediment and Erosion Control Manual Page 8.07.8 Notes: SAMA Ratio for Permanent Pool Sizing for 85% Removal in the Piedmont % Impervious Permanent Pool Depth Cover 3.0 4.0 5.0 6.0 7.0 8.0 9.0 10 0.59 0.49 0.43 0.35 0.31 0.29 0.26 20 0.97 0.79 0.70 0.59 0.51 0.46 0.44 30 1.34 1.08 0.97 0.83 0.70 0.64 0.62 40 1.73 1.43 1.25 1.05 0.90 0.82 0.77 50 2.06 1.73 1.50 1.30 1.09 1.00 0.92 60 2.40 2.03 1.71 1.51 1.29 1.18 1.10 70 2.88 2.40 2.07 1.79 1.54 1.35 1.26 80 3.36 2.78 2.38 2.10 1.86 1.60 1.42 90 3.74 3.10 2.66 2.34 2.11 1.83 1.67 SAIDA Ratio for Permanent Pool Sizino for 85% Removal in Coastal Counties (so' Venetatari Filtar Ranniraril % Impervious Permanent Pool Depth Cover 3.0 3.5 4.0 4.5 5.0 5.5 6.0 6.5 7.0 7.5 10 0.9 0.8 0.7 0.6 0.5 0.0 0.0 0.0 0.0 0.0 20 1.7 1.3 1.2 1.1 1.0 0.9 0.8 0.7 0.6 0.5 30 2.5 2.2 1.9 1.8 1.6 1.5 1.3 1.2 1.0 0.9 40 3.4 3.0 2.6 2.4 2.1 1.9 1.6 1.4 1.1 1.0 50 4.2 3.7 3.3 3.0 2.7 2.4 2.1 1.8 1.5 1.3 60 5.0 4.5 3.8 3.5 3.2 2.9 2.6 2.3 2.0 1.6 70 6.0 5.2 4.5 4.1 3.7 3.3 2.9 2.5 2.1 1.8 80 6.8 6.0 5.2 4.7 4.2 3.7 3.2 2.7 2.2 2.0 90 7.5 6.5 5.8 5.3 4.8 4.3 3.8 3.3 2.8 1.3 100 8.2 7.4 6.8 6.2 5.6 5.0 4.4 3.8 3.2 2.6 SAIDA Ratio for Permanent Pool Sizino for 9001 Removal in Cnastal Cnnntiac itJn Vanafafari i=iltar Ran??ireal % Impervious Permanent Pool Depth Cover 3.0 3.5 4.0 4.5 5.0 5.5 6.0 6.5 7.0 7.5 10 1.3 1.0 0.8 0.7 0.6 0.5 0.4 0.3 0.2 0.1 20 2.4 2.0 1.8 1.7 1.5 1.4 1.2 1.0 0.9 0.6 30 3.5 3.0 2.7 2.5 2.2 1.9 1.6 1.3 1.1 0.8 40 4.5 4.0 3.5 3.1 2.8 2.5 2.1 1.8 1.4 1.1 50 5.6 5.0 4.3 3.9 3.5 3.1 2.7 2.3 1.9 1.5 60 7.0 6.0 5.3 4.8 4.3 3.9 3.4 2.9 2.4 1.9 70 8.1 7.0 6.0 5.5 5.0 4.5 3.9 3.4 2.9 2.3 80 9.4 8.0 7.0 6.4 5.7 5.2 4.6 4.0 3.4 2.8 90 10.7 9.0 7.9 7.2 6.5 5.9 5.2 4.6 3.9 3.3 100 12.0 10.0 8.8 8.1 7.3 6.6 5.8 5.1 4.3 3.6 WET DETENTION BASIN #1 OPERATION AND MAINTENANCE AGREEMENT Beaver Creek Crossings The wet detention basin system is defined as the wet detention basin, pretreatment including forebays and the vegetated filter or level spreader if one is provided. Maintenance activities shall be performed as follows: After every significant runoff producing rainfall event and at least monthly: a. Inspect the wet detention basin system for sediment accumulation, erosion, trash accumulation, vegetated cover, and general condition. b. Check and clear the orifice of any obstructions such that drawdown of the temporary pool occurs within 2 to 5 days as designed. 2. Repair eroded areas immediately, re-seed as necessary to maintain good vegetative cover, mow vegetative cover to maintain a maximum height of six inches, and remove trash as needed. 3. Inspect and repair the collection system (i.e. catch basins, piping, swales, riprap, etc.) quarterly to maintain proper functioning. 4. Remove accumulated sediment from the wet detention basin system semi-annually or when depth is reduced to 75% of the original design depth (see diagram below). Removed sediment shall be disposed of in an appropriate manner and shall be handled in a manner that will not adversely impact water quality (i.e. stockpiling near a wet detention basin or stream, etc.). The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the permanent pool depth reads 337.00 feet in the main pond, the sediment shall be removed. [For stormwater wetlands: If the elevation of the marsh areas exceed the permanent pool elevation, the sediment should be removed to design levels. This shall be performed by removing the upper 6 inches of soil and stockpiling it. Then the marsh area shall be excavated six inches below design elevations. Afterwards the stockpiled soil should be spread over the marsh surface. The soil should not be stockpiled for more than two weeks.] When the permanent pool depth reads 337.00 feet in the forebay [and micro-pool], the sediment shall be removed. BASIN DIAGRAM (fill in the blanks) Permanent Pool Elevation 343.00 Sediment moval E1.337.0 75% --------------*-- ----Sediment _Removal _E_I_evation _337.00 Bottom'E vation 335.001 2610 FOREBAY MAIN POND --- Page 1 of 2 5. Remove cattails and other indigenous wetland plants when they cover 50% of the basin surface. These plants shall be encouraged to grow along the vegetated shelf and forebay berm. 6. If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain shall be minimized to the maximum extent practical. 7. All components of the wet detention basin system shall be maintained in good working order. 8. Level spreaders or other structures that provide diffuse flow shall be maintained every six months. All accumulated sediment and debris shall be removed from the structure, and a level elevation shall be maintained across the entire flow spreading structure. Any down gradient erosion must be repaired and/or replanted as necessary. I acknowledge and agree by my signature below that I am responsible for the performance of the seven maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Print name: 0,9A) OI.[. L RADal i F= Title: MAAJ A G6P-, Address: aZ.3 wE1.6Cc 2 !.?leIVa , Q'kP-Y? IN e a?? !/ ,Sri-ao2 Phone: 41 Q. ?a57, 500Signatu Date: 1-11a - Or Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. I, , a Notary Public for the State of'-4m;? dgAt&? County of WQ_ , do hereby certify that. -r-l, personally appeared before me this day of 07005 and acknowledge the due execution of the forgoing wet [wetland] detention basin maintenance requirements. Witness my hand and official seal, elf PEA A- IFG- ??' ?pTAq? ? r -46,00 1 SEAL My commission expires Page 2 of 2 SEDCAD 4 for Windows r "inhe IGOR P-i. 1 RZ'K-h Beaver Creek Crossings Pond #1 10-yr Pre Existing GML McKim & Creed, P.A. 200 MacKenan Ct. Cary, NC 27511 Filename: BeaverCreekX.sc4 Printed 01-13-2005 SEDCAD 4 for Windows !`-,,inhf 1OOR P.-I. I Crhwah 2 Genera/ Information Storm Information; Storm Type: NRCS Type II Design Storm: 10 yr - 24 hr Rainfall Depth: 5.380 inches Filename: BeaverCreekX.sc4 Printed 01-13-2005 SEDCAD 4 for Windows r-,,inhl 1QQA P-1. 1 '-,h-.h Structure Networking; Type Stru (flows Stru Musk. K Musk. X # into) # (hrs) Description Null #1 =_> End 1 0.000 0.000 Existing #1 Null Filename: BeaverCreekX.sc4 Printed 01-13-2005 SEDCAD 4 for Windows (`nnrcinh1100N Pamnl? I Crh-h Structure Summary; Immediate Total Peak Total Contributing Contributing Discharge Runoff Area Area Volume (ac) (ac) (ds) (ac-ft) #1 10.370 10.370 29.34 2.31 Filename: BeaverCreekX.sc4 Printed 01-13-2005 SEDCAD 4 for Windows (`-,,inh11OOA P-1a I Crhw.h 6 Subwatershed Hydrology Detail: Stru SWS SWS Area Time of Musk K Curve Peak Runoff Conc Musk X UHS Discharge Volume # (ac) (hrs) (hrs) Number (cfs) (ac-ft) #1 1 10.370 0.080 0.000 0.000 74.000 M 29.34 2.308 10.370 29.34 2.308 Filename: BeaverCreekX.sc4 Printed 01-13-2005 SEDCAD 4 for Windows r--inhf 1 ooR P-i. i z,h,..h Beaver Creek Crossings Pond #1 10-Yr Post Development GML Filename: Pond 1-10yrPost.sc4 Printed 01-14-2005 SEDCAD 4 for Windows r-,,inhf IGOR 0-1. 1 C,hw.h Genera/ Information Storm Information; Storm Type: NRCS Type I Design Storm: 10 yr - 24 hr Rainfall Depth: 5.380 inches Filename: Pond 1-10yrPost.sc4 Printed 01-14-2005 SEDCAD 4 for Windows +ooa P-m. i c„ti,..nK Structure Networking; Type Stru (Flows Stru Musk. K Musk. X Description # into) # (hrs) Pond #1 ==> End 0.000 0.0001 #1 Pond Filename: Pond 1-10yrPost.sc4 Printed 01-14-2005 SEDCAD 4 for Windows r'-, inhf IGOR P-1. 1 Rrh-.h 4 Structure Summary; Immediate Total Peak Total Contributing Contributing Discharge Runoff Area Area Volume (ac) (ac) (cfs) (ac-ft) In 22.29 3.86 #1 10.370 10.370 Out 17.23 3.14 Filename: Pond 1-10yrPost.sc4 Printed 01-14-2005 SEDCAD 4 for Windows r-...inhf 10QA P-1. I Ghunh 5 Structure Detail., Structure #1 (Pond) Pond Inputs: Initial Pool Elev: 343.00 Initial Pool: 1.47 ac-ft Perforated Riser Riser Riser Height Barrel Barrel Barrel Slope Number of ' Diameter (ft) Diameter Length (ft) (oho) s n Spillway Elev Holes per Manning (in) (in) Elev 36.00 10.70 18.00 90.00 0.50 0.0130 345.70 1 Pond Results: Peak Elevation: 346.39 Dewater Time: 5.03 days Dewatering time is calculated from peak stage to lowest spillway Elevation-Capacity-Discharge Table Elevation Area (ac) Capacity (ac-ft) Discharge (cfs) Dewater Time (hrs) 335.00 0.071 0.000 0.000 335.50 0.084 0.039 0.000 336.00 0.098 0.084 0.000 336.50 0.110 0.136 0.000 337.00 0.122 0.194 0.000 337.50 0.136 0.258 0.000 338.00 0.150 0.330 0.000 338.50 0.164 0.408 0.000 339.00 0.179 0.494 0.000 339.50 0.194 0.587 0.000 340.00 0.209 0.688 0.000 340.50 0.223 0.796 0.000 341.00 0.238 0.911 0.000 341.50 0.254 1.034 0.000 342.00 0.270 1.165 0.000 342.50 0.304 1.308 0.000 343.00 0.339 1.469 0.000 Low hole SPW #1 343.50 0.356 1.642 0.074 28.29* Filename: Pond 1-10yrPost.sc4 Printed 01-14-2005 SEDCAD 4 for Windows f'-,,inh/ loon 0-1. 1 Ghumh Elevation Area (ac) Capacity (ac-ft) Discharge (cfs) Dewater Time (hrs) 344.00 0.373 1.825 0.105 20.99* 344.50 0.393 2.016 0.129 18.00* 345.00 0.413 2.217 0.149 16.41* 345.50 0.431 2.428 0.166 16.25 345.70 0.438 2.515 0.173 6.20 Spillway #1 346.00 0.449 2.648 4.801 13.70 346.39 0.464 2.825 17.230 0.85 Peak Stage 346.50 0.468 2.878 20.905 346.75 0.478 2.996 24.343 347.00 0.488 3.117 24.591 *Designates time(s) to dewater ha ve been extrapolated beyond the 50 hour hydrograph limit. Detailed Discharge Table Elevation Perf. Riser (cfs) Combined Total Discharge (cfs) 335.00 0.000 0.000 335.50 0.000 0.000 336.00 0.000 0.000 336.50 0.000 0.000 337.00 0.000 0.000 337.50 0.000 0.000 338.00 0.000 0.000 338.50 0.000 0.000 339.00 0.000 0.000 339.50 0.000 0.000 340.00 0.000 0.000 340.50 0.000 0.000 341.00 0.000 0.000 341.50 0.000 0.000 342.00 0.000 0.000 342.50 0.000 0.000 343.00 2.00>0.000 0.000 343.50 0.074 0.074 344.00 0.105 0.105 344.50 0.129 0.129 345.00 0.149 0.149 345.50 0.166 0.166 345.70 0.173 0.173 Filename: Pond 1-10yrPost.sc4 Printed 01-14-2005 SEDCAD 4 for Windows r-...inht +ooa o.-I. i c,h,.,,h Combined Total Elevation Perf. Riser (cfs) Discharge (cfs) 346.00 4.801 4.801 346.50 20.905 20.905 346.75 24.343 24.343 347.00 24.591 24.591 Filename: Pond 1-10yrPost.sc4 Printed 01-14-2005 SEDCAD 4 for Windows Cnnvrinhf IQQA Domino I Srhwoh Subwatershed Hydrology Detail: Time of Peak Runoff Stru SWS SWS Area Musk K Curve Conc Musk X UHS Discharge Volume # # (ac) (hrs) (hrs) Number (cfs) (ac-ft) #1 1 10.370 0.080 0.000 0.000 92.000 M 22.29 3.855 10.370 22.29 3.855 Filename: Pond 1-10yrPost.sc4 Printed 01-14-2005 WATER QUALITY POND CALCULATIONS Stormwater Pond #2 Project Name Beaver Creek Crossings Project Number 02655-0001 Date 12-Nov-04 3rd revision 2nd revision 1 st revision Water Quality Pond Drainage Area Data Project Beaver Creek Crossings Project No. 02655-0001 Date 12-Nov-04 Total site area 405,105 square feet = 9.30 acres Dra inage area to and Other Drai nage Area Impervious areas Existing s Proposed s Change s Existing s Proposed s On-site buildings 0 0 0 0 0 On-site streets 0 0 0 0 0 On-site parking 0 0 0 0 0 On-site sidewalks 0 0 0 0 0 Other on-site 30,454 344,339 313,885 0 0 Total off-site impervious 0 0 0 0 0 Total Impervious 30,454 344,339 313,885 0 0 Dra inage area to and Other Drai nage Area Non-impervious areas Existing s Proposed s Change s Existing s Proposed s On-site grass/landscape 0 0 0 0 0 On-site woods 0 0 0 0 0 Other undeveloped 374,651 60,766 -313,885 0 0 Total off-site non-impervious 0 0 0 0 0 Total non-impervious 374,651 60,766 -313,885 0 0 Total Drainage Area 405,105 405,105 -1 0 0 Percent impervious 7.5 85.0 77.5 0.0 n/a Notes: Prelim-Water Quality Pond-2 Calcs.xls Site Drainage Area Data Page 2 of 15 Printed 1/7/2005 4:46 PM Water Quality Pond Surface Area Calculations Project Beaver Creek Crossings Project No. 02655-0001 Date 12-Nov-04 Total on-site drainage area to pond 405,105 square feet Total impervious area in drainage area 344,339 square feet Average water depth of basin at normal pool 7.0 feet Location of site Site region % Impervious cover Apex Piedmont 85.0 percent If the site is in a coastal area, will a vegetative filter be used? n/a Surface Area/Drainage Area Ratios: For a site in the Piedmont 2.0 percent For a site in a Coastal County w/ Vegetative Filter 2.5 percent For a site in a Coastal County w/out Vegetative Filter 3.7 percent Required surface area of pond: For a site in the Piedmont 8,050.0 square feet For a site in a Coastal County w/ Vegetative Filter 10,130.0 square feet For a site in a Coastal County w/out Vegetative Filter 14,790.0 square feet Notes: Prelim-Water Quality Pond-2 Calcs.xls Pond Surface Area Calcs Page 3 of 15 Printed 117/2005 4:46 PM Water Quality Pond Stormwater Runoff Volume Calculations Project Beaver Creek Crossings Project No. 02655-0001 Date 12-Nov-04 Drainage area Impervious area Rainfall depth Percent Impervious 405,105 square feet 344,339 square feet 1.00 inches 85.0 percent R(v)=0.05+0.009*(Percent impervious) Runoff coefficient - R(v) 0.82 in/in Runoff volume=(Design rainfall)*(R(v))*(Drainage area) Runoff volume 27,513.4 cubic feet Notes: Prelim _Water Quality Pond-2 Calcs.xls Runoff Volume Calcs Page 4 of 15 Printed 1/7/2005 4:46 PM Water Quality Pond Volume Calculations Stage-Storage Data for Pond Project Beaver Creek Crossings Project No. 02655-0001 Date 12-Nov-04 Contour ID Stage Area [s q. ft. Area acres Incremental Area [s q. ft. Incremental Area acres Incremental volume cu. ft Incremental volume acre-ft Cumulative volume cu. ft Cumulative volume acre-ft 341 0 2,695.0 0.062 2,695.0 0.1 0.0 0.0 0.0 0.0 342 1 3,633.0 0.083 938.0 0.0 3,164.0 0.1 3,164.0 0.1 343 2 4,687.0 0.108 1,054.0 0.0 4,160.0 0.1 7,324.0 0.2 344 3 5,824.0 0.134 1,137.0 0.0 5,255.5 0.1 12,579.5 0.2 345 4 7,042.0 0.162 1,218.0 0.0 6,433.0 0.1 19,012.5 0.3 346 5 8,343.0 0.192 1,301.0 0.0 7,692.5 0.2 26,705.0 0.3 347 6 9,726.0 0.223 1,383.0 0.0 9,034.5 0.2 35,739.5 0.4 348 7 12,736.0 0.292 3,010.0 0.1 11,231.0 0.3 46 970.5 0.5 Prelim Water Quality Pond-2 Calcs.xls Pond Stage-Storage<Perm. Pool Page 5 of 15 Printed 1/7/2005 4:46 PM Water Quality Pond Volume Calculations Stage-Storage Data for Pond Project Beaver Creek Crossings Project No. 02655-0001 Date 12-Nov-04 Contour ID Stage Area (s q. ft. Area acres Incremental Area [s q. ft. Incremental Area acres Incremental volume cu. ft Incremental volume acre-ft Cumulative volume cu. ft Cumulative volume acre-ft 348 0 12,736.0 0.292 12,736.0 0.3 0.0 0.0 0.0 0.0 349 1 14,363.0 0.330 1,627.0 0.0 13,549.5 0.3 13,549.5 0.3 349.95 1.95 15,985.0 0.367 1,622.0 0.0 14,415.3 0.3 27,964.8 0.6 350 2 16,073.0 0.369 88.0 0.0 801.5 0.0 28,766.3 0.3 351 3 17,864.0 0.410 1,791.0 0.0 16,968.5 0.4 45,734.8 0.4 352 4 20,205.0 0.464 2,341.0 0.1 19,034.5 0.4 64,769.3 0.8 Prelim Water Quality Pond-2 Calcs.xls Stage-Storage>Perm. Pool Page 6 of 15 Printed 117/2005 4:46 PM Water Quality Basin Dewatering Time Calculations Project Beaver Creek Crossings Project No. 02655-0001. Date 12-Nov-04 Maximum surface area of basin 15,985.0 square feet Maximum head of water above dewatering hole 2.0 feet Orifice coefficient 0.90 Diameter of each hole 2.0 inches Number of holes 1 Cross sectional area of each hole = 0.022 square feet Cross sectional area of each hole = 3.1 square inches Cross sectional area of dewatering hole(s) = 0.022 square feet Cross sectional area of dewatering hole(s) = 3.1 square inches Dewatering time for basin = 78.7 hours Dewatering time for basin = 3.3 days Calculations based on NC Sediment and Erosion Control Manual Page 8.07.8 Notes: SA/DA Ratio for Permanent Pool Sizinn for 85% Removal in the Piedmont % Impervious Permanent Pool Depth Cover 3.0 4.0 5.0 6.0 7.0 8.0 9.0 10 0.59 0.49 0.43 0.35 0.31 0.29 0.26 20 0.97 0.79 0.70 0.59 0.51 0.46 0.44 30 1.34 1.08 0.97 0.83 0.70 0.64 0.62 40 1.73 1.43 1.25 1.05 0.90 0.82 0.77 50 2.06 1.73 1.50 1.30 1.09 1.00 0.92 60 2.40 2.03 1.71 1.51 1.29 1.18 1.10 70 2.88 2.40 2.07 1.79 1.54 1.35 1.26 80 3.36 2.78 2.38 2.10 1.86 1.60 1.42 90 3.74 3.10 2.66 2.34 2.11 1.83 1.67 SAIDA Ratio for Permanent Pool Sizing for 85% Removal in Coastal Counties (30' Vegetated Filter Required) Impervious Permanent Pool Depth Cover 3.0 3.5 4.0 4.5 5.0 5.5 6.0 6.5 7.0 7.5 10 0.9 0.8 0.7 0.6 0.5 0.0 0.0 0.0 0.0 0.0 20 1.7 1.3 1.2 1.1 1.0 0.9 0.8 0.7 0.6 0.5 30 2.5 2.2 1.9 1.8 1.6 1.5 1.3 1.2 1.0 0.9 40 3.4 3.0 2.6 2.4 2.1 1.9 1.6 1.4 1.1 1.0 50 4.2 3.7 3.3 3.0 2.7 2.4 2.1 1.8 1.5 1.3 60 5.0 4.5 3.8 3.5 3.2 2.9 2.6 2.3 2.0 1.6 70 6.0 5.2 4.5 4.1 3.7 3.3 2.9 2.5 2.1 1.8 80 6.8 6.0 5.2 4.7 4.2 3.7 3.2 2.7 2.2 2.0 90 7.5 6.5 5.8 5.3 4.8 4.3 3.8 3.3 2.8 1.3 100 8.2 7.4 6.8 6.2 5.6 5.0 4.4 3.8 3.2 2.6 SAIDA Ratio for Permanent Pool Sizing for 90% Removal in Coastal Counties (No Vegetated Filter Required) % Impervious Permanent Pool Depth Cover 3.0 3.5 4.0 4.5 5.0 5.5 6.0 6.5 7.0 7.5 10 1.3 1.0 0.8 0.7 0.6 0.5 0.4 0.3 0.2 0.1 20 2.4 2.0 1.8 1.7 1.5 1.4 1.2 1.0 0.9 0.6 30 3.5 3.0 2.7 2.5 2.2 1.9 1.6 1.3 1.1 0.8 40 4.5 4.0 3.5 3.1 2.8 2.5 2.1 1.8 1.4 1.1 50 5.6 5.0 4.3 3.9 3.5 3.1 2.7 2.3 1.9 1.5 60 7.0 6.0 5.3 4.8 4.3 3.9 3.4 2.9 2.4 1.9 70 8.1 7.0 6.0 5.5 5.0 4.5 3.9 3.4 2.9 2.3 80 9.4 8.0 7.0 6.4 5.7 5.2 4.6 4.0 3.4 2.8 90 10.7 9.0 7.9 7.2 6.5 5.9 5.2 4.6 3.9 3.3 100 12.0 10.0 8.8 8.1 7.3 6.6 5.8 5.1 4.3 3.6 WET DETENTION BASIN #2 OPERATION AND MAINTENANCE AGREEMENT Beaver Creek Crossings The wet detention basin system is defined as the wet detention basin, pretreatment including forebays and the vegetated filter or level spreader if one is provided. Maintenance activities shall be performed as follows: After every significant runoff producing rainfall event and at least monthly: a. Inspect the wet detention basin system for sediment accumulation, erosion, trash accumulation, vegetated cover, and general condition. b. Check and clear the orifice of any obstructions such that drawdown of the temporary pool occurs within 2 to 5 days as designed. 2. Repair eroded areas immediately, re-seed as necessary to maintain good vegetative cover, mow vegetative cover to maintain a maximum height of six inches, and remove trash as needed. 3. Inspect and repair the collection system (i.e. catch basins, piping, swales, riprap, etc.) quarterly to maintain proper functioning. 4. Remove accumulated sediment from the wet detention basin system semi-annually or when depth is reduced to 75% of the original design depth (see diagram below). Removed sediment shall be disposed of in an appropriate manner and shall be handled in a manner that will not adversely impact water quality (i.e. stockpiling near a wet detention basin or stream, etc.). The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the permanent pool depth reads 342.75 feet in the main pond, the sediment shall be removed. [For stormwater wetlands: If the elevation of the marsh areas exceed the permanent pool elevation, the sediment should be removed to design levels. This shall be performed by removing the upper 6 inches of soil and stockpiling it. Then the marsh area shall be excavated six inches below design elevations. Afterwards the stockpiled soil should be spread over the marsh surface. The soil should not be stockpiled for more than two weeks.] When the permanent pool depth reads 342.75 feet in the forebay [and micro-pool], the sediment shall be removed. BASIN DIAGRAM (fill in the blanks) Permanent Pool Elevation 348.00 Sediment moval E1.342.7 75/o -------------- -- o Sediment Removal Elevation 342.75 7 ------------ -------- L.... :Z51110 0 ---------- E vation 341.0 -- -- -- - - FOREBAY MAIN POND Page 1 of 2 5. Remove cattails and other indigenous wetland plants when they cover 50% of the basin surface. These plants shall be encouraged to grow along the vegetated shelf and forebay berm. 6. If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain shall be minimized to the maximum extent practical. 7. All components of the wet detention basin system shall be maintained in good working order. 8. Level spreaders or other structures that provide diffuse flow shall be maintained every six months. All accumulated sediment and debris shall be removed from the structure, and a level elevation shall be maintained across the entire flow spreading structure. Any down gradient erosion must be repaired and/or replanted as necessary. I acknowledge and agree by my signature below that I am responsible for the performance of the seven maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Print name: C OMJQ-1-. L ?f?DCI.I JGF Title: A A) A 4 E IZ Address: JEA5 S?.2r?eIvc, C`A-P-y IBC' a75I l , s7r•AOA Phon Signe Date Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. 1, Q. , a Notary Public for the State of `n/F.Cfi County of Y.l A4A!G. , do hereby certify that dA? ae, personally appeared before me this 1 D-day of , j nS, and acknowledge the due 17 execution of the forgoing wet [wetland] detention ba n maintenance requirements. Witness my hand and official seal. ?UBL?G V. COU SEAL My commission expires 11,4 - /g 7 Page 2 of 2 SEDCAD 4 for Windows 1 Beaver Creek Crossings Pond #2 10-Yr Pre-Existing GML McKim & Creed, P.A. 200 MacKenan Ct. Cary, NC 27511 Phone: 233-8091 Filename: Printed 01-13-2005 SEDCAD 4 for Windows Cnrn.ri..hf I DOR D.-I. 1 Crh,uoh Genera/ Information Storm Information; Storm Type: NRCS Type II Design Storm: 10 yr - 24 hr Rainfall Depth: 5.380 inches Filename: Pond #2-10yr-Pre.sc4 Printed 01-13-2005 SEDCAD 4 for Windows rnrn,rinhr 1QQH D-I. I Srhunh Structure Networking; Type Stru (Flows Stru Musk. K Musk. X # into) # (hrs) Description Null #1 ==> End 0.000 0.000 Existing #1 Null Filename: Pond #2-10yr-Pre.sc4 Printed 01-13-2005 SEDCAD 4 for Windows r--inhl 100N 0-1. 1 Gh.uoh Structure Summary; Immediate Total Peak Total Contributing Contributing Discharge Runoff Area Area Volume (ac) (ac) (cfs) (ac-ft) #1 9.300 9.300 26.31 2.07 Filename: Pond #2-10yr-Pre.sc4 Printed 01-13-2005 SEDCAD 4 for Windows f -,,inhf 1aaR P-i. i Srh..nh Sub watershed Hydrology Detail: Time of Peak Runoff Stru SWS SWS Area Conc Musk K Curve Musk X UNS Discharge Volume # # (ac) (hrs) (hrs) Number (cfs) (ac-ft) # 1 1 9.300 0.080 0.000 0.000 74.000 M 26.31 2.070 E 9.300 26.31 2.070 Filename: Pond #2-10yr-Pre.sc4 Printed 01-13-2005 SEDCAD 4 for Windows r- inh} S OON P-1. 1 Ghunh Beaver Creek Crossings Pond #2 10-Yr Post Development GML Filename: Pond2-10yr-Post.sc4 Printed 01-14-2005 SEDCAD 4 for Windows Cnnvrinhl 1006 P-i. I z,h-.K Genera/ Information Storm Information; Storm Type: NRCS Type II Design Storm: 10 yr - 24 hr Rainfall Depth: 5.380 inches Filename: Pond2-10yr-Post.sc4 Printed 01-14-2005 SEDCAD 4 for Windows r--;A he ioOA a-i. i Structure Networking: Type Stru (Flows Stru Musk. K Musk. X Description # into) # (hrs) Pond #1 ==> End 0.000 0.000 I Pond 2 Pond Filename: Pond2-10yr-Post.sc4 Printed 01-14-2005 SEDCAD 4 for Windows (`nrn.rinhf 100A P.-J. I Gh.u.h 4 Structure Summary; Immediate Total Peak Total Contributing Contributing Discharge Runoff Area Area Volume (ac) (ac) (cfs) (ac-ft) In 36.65 3.46 #1 9.300 9.300 Out . 24.60 3.08 Filename: Pond2-10yr-Post.sc4 Printed 01-14-2005 SEDCAD 4 for Windows r-,,inhf IOOA P-1. I Crhu.ah Structure Detail., Structure #1 (Pond) Pond 2 Pond Inputs: Initial Pool Elev: 348.00 Initial Pool: 1.08 ac-ft Perforated Riser Riser Riser Height Barrel Barrel Barrel Slope Number of ' Diameter (?) Diameter Length (ft) (%) s n Spillway Elev -Holes per Manning (in) (in) Elev 36.00 8.95 18.00 60.00 0.50 0.0130 349.95 1 Pond Results: Peak Elevation: 351.51 Dewater Time: 3.59 days Dewatering time is calculated from peak stage to lowest spillway Elevation-Capacity-Discharge Table Elevation Area (ac) Capacity (ac-ft) Discharge (cfs) Dewater Time (hrs) 341.00 0.062 0.000 0.000 341.50 0.072 0.033 0.000 342.00 0.083 0.072 0.000 342.50 0.095 0.117 0.000 343.00 0.108 0.167 0.000 343.50 0.121 0.225 0.000 344.00 0.134 0.288 0.000 344.50 0.148 0.359 0.000 345.00 0.162 0.436 0.000 345.50 0.177 0.521 0.000 346.00 0.192 0.613 0.000 346.50 0.207 0.713 0.000 347.00 0.223 0.820 0.000 347.50 0.256 0.940 0.000 348.00 0.292 1.077 0.000 Low hole SPW #1 348.50 0.311 1.227 0.074 24.54* 349.00 0.330 1.388 0.105 18.45* Filename: Pond2-10yr-Post.sc4 Printed 01-14-2005 SEDCAD 4 for Windows r-,i,hf 700A D-i. 1 z,h-K Elevation Area (ac) Capacity (ac-ft) Discharge (cfs) Dewater Time (hm) 349.50 0.349 1.557 0.129 15.97* 349.95 0.367 1.719 0.147 14.20 Spillway #1 350.00 0.369 1.737 0.327 1.00 350.50 0.389 1.927 11.917 11.65 351.00 0.410 2.126 24.008 0.25 351.50 0.437 2.338 24.584 351.51 0.438 2.344 24.600 0.15 Peak Stage 352.00 0.464 2.563 25.147 Vesignates time(s) to dewater have been extrapolated beyond the 50 hour hydrograph limit. Detailed Discharge Table Elevation Perf. Riser (cfs) Combined Total Discharge (cfs) 341.00 0.000 0.000 341.50 0.000 0.000 342.00 0.000 0.000 342.50 0.000 0.000 343.00 0.000 0.000 343.50 0.000 0.000 344.00 0.000 0.000 344.50 0.000 0.000 345.00 0.000 0.000 345.50 0.000 0.000 346.00 0.000 0.000 346.50 0.000 0.000 347.00 0.000 0.000 347.50 0.000 0.000 348.00 2.00>0.000 0.000 348.50 0.074 0.074 349.00 0.105 0.105 349.50 0.129 0.129 349.95 0.147 0.147 350.00 0.327 0.327 350.50 11.917 11.917 351.00 24.008 24.008 351.50 24.584 24.584 352.00 25.147 25.147 Filename: Pond2-10yr-Post.sc4 Printed 01-14-2005 SEDCAD 4 for Windows r- ... inhf IQQA 93-1.1 Crhu.ah Subwatershed Hydrology Detail: Time of Peak Runoff Stru SWS SWS Area Musk K Curve Conc Musk X UHS Discharge Volume # # (ac) (hrs) Number (hrs) (cfs) (ac-ft) #1 1 9.300 0.080 0.000 0.000 92.000 M 36.65 3.457 9.300 36.65 3.457 Filename: Pond2-10yr-Post.sc4 Printed 01-14-2005 WATER QUALITY POND CALCULATIONS Stormwater Pond #3 Project Name Beaver Creek Crossings Project Number 02655-0001 Date 26-Nov-04 3rd revision 2nd revision 1st revision Water Quality Pond Drainage Area Data Project Beaver Creek Crossin Project No. 02655-0001 Date 26-Nov-04 Total site area 278,224 square feet = 6.39 acres Dra inage area to and Other Drai nage Area Impervious areas Existing s Proposed s Change s Existing s Proposed s On-site buildings 0 0 0 0 0 On-site streets 0 0 0 0 0 On-site parking 0 0 0 0 0 On-site sidewalks 0 0 0 0 0 Other on-site 13,451 236,490 223,039 0 0 Total off-site impervious 0 0 0 0 0 Total Impervious 13,451 236,490 223,039 0 0 Dra inage area to and Other Drai nage Area Non-impervious areas Existing s Proposed s Change s Existing s Proposed s On-site grass/landscape 0 0 0 0 0 On-site woods 0 0 0 0 0 Other undeveloped 264,773 41,734 -223,039 0 0 Total off-site non-impervious 0 0 0 0 0 Total non-impervious 264,773 41,734 -223,039 0 0 Total Drainage Area 278,224 278,224 0 0 0 Percent Impervious 4.8 85.0 80.2 0.0 n/a Notes: Prelim Water Quality Pond-3 Calcs.xls Site Drainage Area Data Page 2 of 15 Printed 1/7/2005 3:40 PM Water Quality Pond Surface Area Calculations Project Beaver Creek Crossings Project No. 02655-0001 Date 26-Nov-04 Total on-site drainage area to pond 278,224 square feet Total impervious area in drainage area 236,490 square feet Average water depth of basin at normal pool 4.0 feet Location of site Apex Site region Piedmont % Impervious cover 85.0 percent If the site is in a coastal area, will a vegetative filter be used? n/a Surface Area/Drainage Area Ratios: For a site in the Piedmont 2.9 percent For a site in a Coastal County w/ Vegetative Filter 5.5 percent For a site in a Coastal County w/out Vegetative Filter 7.5 percent Required surface area of pond: For a site in the Piedmont For a site in a Coastal County w/ Vegetative Filter For a site in a Coastal County w/out Vegetative Filter 8,180.0 ' square feet 15,310.0 square feet 20,730.0 square feet Notes: Prelim Water Quality Pond-3 Calcs.xls Pond Surface Area Calcs Page 3 of 15 Printed 1/7/2005 3:40 PM Water Quality Pond Stormwater Runoff Volume Calculations Project Beaver Creek Crossings Project No. 02655-0001 Date 26-Nov-04 Drainage area 278,224 square feet Impervious area 236,490 square feet Rainfall depth 1.00 inches Percent Impervious 85.0 percent R(v)=0.05+0.009*(Percent impervious) Runoff coefficient - R(v) 0.82 in/in Runoff volume=(Design rainfall)*(R(v))*(Drainage area) Runoff volume 18,896.0 cubic feet Notes: Prelim-Water Quality Pond-3 Calcs.xls Runoff Volume Calcs Page 4 of 15 Printed 117/2005 3:40 PM Water Quality Pond Volume Calculations Stage-Storage Data for Pond Project Beaver Creek Crossings Project No. 02655-0001 Date 26-Nov-04 Contour ID Stage Area s . ft. Area acres emental Area . ft. 7 Incremental Area acres Incremental volume cu. ft Incremental volume acre-ft Cumulative volume cu. ft Cumulative volume acre-ft 342 0 4,550.0 0.104 4, 550.0 0.1 0.0 0.0 0.0 0.0 343 1 5,595.0 0.128 045.0 0.0 5,072.5 0.1 5,072.5 0.1 344 2 6,695.0 0.154 1,100.0 0.0 6,145.0 0.1 11,217.5 0.3 345 3 7,851.0 0.180 1156.0 0.0 7,273.0 0.2 18,490.5 0.3 346 4 10,338.0 0.237 2,487.0 0.1 9,094.5 0.2 27,585.0 0.4 Prelim-Water Quality Pond-3 Calcs.xls Pond Stage-Storage<Perm. Pool Page 5 of 15 Printed 1/7/2005 3:40 PM Water Quality Pond Volume Calculations Stage-Storage Data for Pond Project Beaver Creek Crossings Project No. 02655-0001 Date 26-Nov-04 Contour ID Stage Area [s q. ft. Area acres Incremental Area [s q. ft. Incremental Area acres Incremental volume cu. ft Incremental volume acre-ft Cumulative volume cu. ft Cumulative volume acre-ft 346 0 10,338.0 0.237 10,338.0 0.2 0.0 0.0 0.0 0.0 347 1 11,661.0 0.268 1323.0 0.0 10,999.5 0.3 10,999.5 0.3 347.7 1.7 12,662.0 0.291 1,001.0 0.0 8,513.0 0.2 19,512.5 0.4 348 2 13,043.0 0.299 381.0 0.0 31855.8 0.1 23,368.3 0.3 349 3 14,467.0 0.332 1424.0 0.0 13,755.0 0.3 37,123.3 0.4 350 4 15,965.0 0.367 1,498.0 0.0 15,216.0 0.3 52,339.3 0.7 Prelim-Water Quality Pond-3 Calcs.xls Stage-Storage>Perm. Pool Page 6 of 15 Printed 1/7/2005 3:40 PM Water Quality Basin Dewatering Time Calculations Project Project No. Date Beaver Creek Crossings 02655-0001 26-Nov-04 Maximum surface area of basin Maximum head of water above dewatering hole Orifice coefficient Diameter of each hole Number of holes Cross sectional area of each hole = Cross sectional area of each hole = Cross sectional area of dewatering hole(s) _ Cross sectional area of dewatering hole(s) _ Dewatering time for basin = Dewatering time for basin = 12,662.0 square feet 1.7 feet U.Uu 2.0 inches 1 0.022 square feet 3.1 square inches 0.022 square feet 3.1 square inches 58.2 hours 2.4 days Calculations based on NC Sediment and Erosion Control Manual Page 8.07.8 Notes: SA/DA Ratio for Permanent Pool Sizinq for 85% Removal in the Piedmont % Impervious Permanent Pool Depth Cover 3.0 4.0 5.0 6.0 7.0 8.0 9.0 10 0.59 0.49 0.43 0.35 0.31 0.29 0.26 20 0.97 0.79 0.70 0.59 0.51 0.46 0.44 30 1.34 1.08 0.97 0.83 0.70 0.64 0.62 40 1.73 1.43 1.25 1.05 0.90 0.82 0.77 50 2.06 1.73 1.50 1.30 1.09 1.00 0.92 60 2.40 2.03 1.71 1.51 1.29 1.18 1.10 70 2.88 2.40 2.07 1.79 1.54 1.35 80 3.36 2.78 2.38 2.10 1.86 1.60 ?M 9o 3.74 3.10 2.66 2.34 2.11 1.83 , SAIDA Ratio for Permanent Pool Sizinq for 85% Removal in Coastal Counties (30' Vegetated Filter Required) % Impervious Permanent Pool Depth Cover 3.0 3.5 4.0 4.5 5.0 5.5 6.0 6.5 7.0 7.5 10 0.9 0.8 0.7 0.6 0.5 0.0 0.0 0.0 0.0 0.0 20 1.7 1.3 1.2 1.1 1.0 0.9 0.8 0.7 0.6 0.5 30 2.5 2.2 1.9 1.8 1.6 1.5 1.3 1.2 1.0 0.9 40 3.4 3.0 2.6 2.4 2.1 1.9 1.6 1.4 1.1 1.0 50 4.2 3.7 3.3 3.0 2.7 2.4 2.1 1.8 1.5 1.3 60 5.0 4.5 3.8 3.5 3.2 2.9 2.6 2.3 2.0 1.6 70 6.0 5.2 4.5 4.1 3.7 3.3 2.9 2.5 2.1 1.8 80 6.8 6.0 5.2 4.7 4.2 3.7 3.2 2.7 2.2 2.0 90 7.5 6.5 5.8 5.3 4.8 4.3 3.8 3.3 2.8 1.3 100 8.2 7.4 6.8 6.2 5.6 5.0 4.4 3.8 3.2 2.6 SAIDA Ratio for Permanent Pool Sizing for 90% Removal in Coastal Counties (No Vegetated Filter Required) % Impervious Permanent Pool Depth Cover 3.0 3.5 4.0 4.5 5.0 5.5 6.0 6.5 7.0 7.5 10 1.3 1.0 0.8 0.7 0.6 0.5 0.4 0.3 0.2 0.1 20 2.4 2.0 1.8 1.7 1.5 1.4 1.2 1.0 0.9 0.6 30 3.5 3.0 2.7 2.5 2.2 1.9 1.6 1.3 1.1 0.8 40 4.5 4.0 3.5 3.1 2.8 2.5 2.1 1.8 1.4 1.1 50 5.6 5.0 4.3 3.9 3.5 3.1 2.7 2.3 1.9 1.5 60 7.0 6.0 5.3 4.8 4.3 3.9 3.4 2.9 2.4 1.9 70 8.1 7.0 6.0 5.5 5.0 4.5 3.9 3.4 2.9 2.3 80 9.4 8.0 7.0 6.4 5.7 5.2 4.6 4.0 3.4 2.8 90 10.7 9.0 7.9 7.2 6.5 5.9 5.2 4.6 3.9 3.3 100 12.0 10.0 8.8 8.1 7.3 6.6 5.8 5.1 4.3 3.6 WET DETENTION BASIN #3 OPERATION AND MAINTENANCE AGREEMENT Beaver Creek Crossings The wet detention basin system is defined as the wet detention basin, pretreatment including forebays and the vegetated filter or level spreader if one is provided. Maintenance activities shall be performed as follows: 1. After every significant runoff producing rainfall event and at least monthly: a. Inspect the wet detention basin system for sediment accumulation, erosion, trash accumulation, vegetated cover, and general condition. b. Check and clear the orifice of any obstructions such that drawdown of the temporary pool occurs within 2 to 5 days as designed. 2. Repair eroded areas immediately, re-seed as necessary to maintain good vegetative cover, mow vegetative cover to maintain a maximum height of six inches, and remove trash as needed. 3. Inspect and repair the collection system (i.e. catch basins, piping, swales, riprap, etc.) quarterly to maintain proper functioning. 4. Remove accumulated sediment from the wet detention basin system semi-annually or when depth is reduced to 75% of the original design depth (see diagram below). Removed sediment shall be disposed of in an appropriate manner and shall be handled in a manner that will not adversely impact water quality (i.e. stockpiling near a wet detention basin or stream, etc.). The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the permanent pool depth reads 343.00 feet in the main pond, the sediment shall be removed. [For stormwater wetlands: If the elevation of the marsh areas exceed the permanent pool elevation, the sediment should be removed to design levels. This shall be performed by removing the upper 6 inches of soil and stockpiling it. Then the marsh area shall be excavated six inches below design elevations. Afterwards the stockpiled soil should be spread over the marsh surface. The soil should not be stockpiled for more than two weeks.] When the permanent pool depth reads 343.00 feet in the forebay [and micro-pool], the sediment shall be removed. BASIN DIAGRAM (till in the blanks) Permanent Pool Elevation 346.00 Sediment moval E1.343.0 75% ------------- -*-- - Sedimen__t_R_e__m_o_v_a__-_E_I_e_v_a_ti_o_n__3.4__----_ Bottom E vation 342.001 2561 FOREBAY MAIN POND -- 7. Page 1 of 2 5. Remove cattails and other indigenous wetland plants when they cover 50% of the basin surface. These plants shall be encouraged to grow along the vegetated shelf and forebay berm. 6. If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain shall be minimized to the maximum extent practical. 7. All components of the wet detention basin system shall be maintained in good working order. 8. Level spreaders or other structures that provide diffuse flow shall be maintained every six months. All accumulated sediment and debris shall be removed from the structure, and a level elevation shall be maintained across the entire flow spreading structure. Any down gradient erosion must be repaired and/or replanted as necessary. I acknowledge and agree by my signature below that I am responsible for the performance of the seven maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Print name: 6a Nti 6 &,c- L . /eA b C G t;=-r-- Title: "A A)A U e A Address: VC j 4 j2 A)(t 02 75' / /. STS= a a a? Phone Signati Date: Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. eV er44j?? , a Notary Public for the State of dv County of tll ?Q,k,4. , do hereby certify that 2"'99 Of . 44!ie? personally appeared before me this ZO day of ,.2005, and acknowledge the due C/ 01 execution of the forgoing wet [wetland] detention basin maintenance requirements. Witness my hand and official seal, GQ?PA. CF- ca`t' aO?A 9p ? 1i ? 5?t r ?0UIB V. ??FCOUer??.? SEAL My commission expires /01. I k- 0 7 Page 2 of 2 SEDCAD 4 for Windows r-...inhl iaaa P-i. 1 Ghumh Beaver Creek Crossings Pond #3 10-Yr Pre-Existing GML McKim & Creed, P.A. 200 MacKenan Ct. Cary, NC 27511 Filename: Printed 01-13-2005 SEDCAD 4 for Windows r-i. h# loom o.-t. i Genera/ Information Storm Information; Storm Type: NRCS Type II Design Storm: 10 yr - 24 hr Rainfall Depth: 5.380 inches Filename: Printed 01-13-2005 SEDCAD 4 for Windows ('-inhf iooa P-i- i q,h.uah Structure Networking; Type Stru (Flows Stru # into) # Musk. K Musk. X (hrs) Description Null #1 ==> End 0.000 0.000 Pond 3 Jf1 Null Filename: Printed 01-13-2005 SEDCAD 4 for Windows (`-inhf 1OOf1 P-1. 1 ',,h-.h Structure Summary; Immediate Total Peak Total Contributing Contributing Discharge Runoff Area Area Volume (ac) (ac) (cfs) (ac-ft) #1 6.390 6.390 18.08 1.42 Filename: Printed 01-13-2005 SEDCAD 4 for Windows r.-...inh} 1OOR P-1. I Gh-h Subwatershed Hydrology Detail: Time of Peak Runoff Stru SWS SWS Area Musk K Curve Conc Musk X UHS Discharge Volume # # (ac) (hrs) (hrs) Number (cfs) (ac-ft) #1 1 6.390 0.080 0.000 74.000 M 18.08 1.422 6.390 18.08 1.422 Filename: Printed 01-13-2005 SEDCAD 4 for Windows r-,rinhf IGOR P-1. 1 Srh.uoh Beaver Creek Crossings Pond #3 10-Yr Post Development GML Filename: Pond3-10yr-Post.sc4 Printed 01-14-2005 SEDCAD 4 for Windows (`nreninM IGOA P-1. I Rrh-.h Genera/ Information Storm Information; Storm Type: NRCS Type II Design Storm: 10 yr - 24 hr Rainfall Depth: 5.380 inches Filename: Pond3-10yr-Post.sc4 Printed 01-14-2005 SEDCAD 4 for Windows r`-.inht 1 OOR P-1. I C,h-h 3 Structure Networking; Type Stru (flows Stru # into) # Musk. K Musk. X (hrs) Description Pond #1 =_> End 0.000 0.000 Pond 3 #1 Pond Filename: Pond3-10yr-Post.sc4 Printed 01-14-2005 SEDCAD 4 for Windows r-,,inhf 10OA P-1. I Crh.uah 4 Structure Summary; Immediate Total Peak Total Contributing Contributing Discharge Runoff Area Area Volume (ac) (ac) (cfs) (ac-ft) In 25.18 2.38 #1 6.390 6.390 Out 12.99 2.17 Filename: Pond3-10yr-Post.sc4 Printed 01-14-2005 SEDCAD 4 for Windows r-...inhf I GOA P-1. I Crh.u?h Structure Detail., Structure #1 (Pond) Pond 3 Pond Inputs: Initial Pool Elev: 346.00 Initial Pool: 0.63 ac-ft Perforated Riser Riser Riser Height Diameter Barrel Barrel Barrel Slope Diameter Number of Manning's n Spillway Elev Holes per (ft) (in) Length (ft) (%) (in) Elev 36.00 5.70 15.00 85.00 0.50 0.0130 347.70 1 Pond Results: Peak Elevation: 349.36 Dewater Time: 2.78 days Dewatering time is calculated from peak stage to lowest spillway Elevation-Capacity-Discharge Table Elevation Area (ac) Capacity (ac-ft) Discharge (cfs) Dewater Time (hrs) 342.00 0.104 0.000 0.000 342.50 0.116 0.055 0.000 343.00 0.128 0.116 0.000 343.50 0.141 0.183 0.000 344.00 0.154 0.257 0.000 344.50 0.167 0.337 0.000 345.00 0.180 0.423 0.000 345.50 0.208 0.520 0.000 346.00 0.237 0.631 0.000 Low hole SPW #1 346.50 0.252 0.754 0.074 19.92* 347.00 0.268 0.884 0.105 14.98* 347.50 0.283 1.021 0.129 14.35 347.70 0.290 1.079 0.137 5.20 Spillway #1 348.00 0.299 1.167 4.801 11.35 348.50 0.315 1.321 12.250 0.40 349.00 0.332 1.482 12.684 0.25 349.36 0.345 1.606 12.989 0.15 Peak Stage 5 Filename: Pond3-10yr-Post.sc4 Printed 01-14-2005 SEDCAD 4 for Windows r,,.,.,.;,,tif looa 93-1. 1 Q,h,..K 6 Area Capacity Discharge Dewater Elevation Time (ac) (ac-ft) (cfs) (hrs) 349.50 0.349 1.653 13.104 350.00 0.367 1.832 13.512 Vesignates time(s) to dewater ha ve been extrapolated beyond the 50 hour hydrograph limit. Detailed Discharge Table Elevation Perf. Riser (cfs) Combined Total Discharge (cfs) 342.00 0.000 0.000 342.50 0.000 0.000 343.00 0.000 0.000 343.50 0.000 0.000 344.00 0.000 0.000 344.50 0.000 0.000 345.00 0.000 0.000 345.50 0.000 0.000 346.00 2.00>0.000 0.000 346.50 0.074 0.074 347.00 0.105 0.105 347.50 0.129 0.129 347.70 0.137 0.137 348.00 4.801 4.801 348.50 12.250 12.250 349.00 12.684 12.684 349.50 13.104 13.104 350.00 13.512 13.512 Filename: Pond3-10yr-Post.sc4 Printed 01-14-2005 SEDCAD 4 for Windows f -.inhf 1000 P-1. I Crhw.h Subwatershed Hydrology Detail., Time of Peak Runoff Stru SWS SWS Area Musk K Curve Conc Musk X UHS Discharge Volume # # (ac) (hrs) (hrs) Number (cfs) (ac-ft) #1 1 6.390 0.080 0.000 0.000 92.000 M 25.18 2.375 6.390 25.18 2.375 Filename: Pond3-10yr-Post. sc4 Printed 01-14-2005 WATER QUALITY POND CALCULATIONS Stormwater Pond #4 Project Name Beaver Creek Crossings Project Number 02655-0001 Date 30-Nov-04 3rd revision 2nd revision 1 st revision Water Quality Pond Drainage Area Data Project Beaver Creek Crossings Project No. 02655-0001 Date 30-Nov-04 Total site area 235,189 square feet = 5.40 acres Dra inage area to and Other Drai nage Area Impervious areas Existing s Proposed s Change s Existing s Proposed s On-site buildings 0 0 0 0 0 On-site streets 0 0 0 0 0 On-site parking 0 0 0 0 0 On-site sidewalks 0 0 0 0 0 Other on-site 8,565 199,910 191,345 0 0 Total off-site impervious 0 0 0 0 0 Total Impervious 8,565 199,910 191,345 0 0 Drai nage area to and Other Drai nage Area Non-impervious areas Existing s Proposed s Change s Existing s Proposed s On-site grass/landscape 0 0 0 0 0 On-site woods 0 0 0 0 0 Other undeveloped 226,624 35,279 -191,345 0 0 Total off-site non-impervious 0 0 0 0 0 Total non-impervious 226,624 35,279 -191,345 0 0 Total Drainage Area 235,189 235,189 0 0 0 Percent Impervious 3.6 85.0 81.4 0.0 n/a Notes: Prelim _Water Quality Pond-4 Calcs.xls Site Drainage Area Data Page 2 of 15 Printed 1/7/2005 3:41 PM Water Quality Pond Surface Area Calculations Project Beaver Creek Crossings Project No. 02655-0001 Date 30-Nov-04 Total on-site drainage area to pond 235,189 square feet Total impervious area in drainage area 199,910 square feet Average water depth of basin at normal pool 4.0 feet Location of site Apex Site region Piedmont % Impervious cover 85.0 percent If the site is in a coastal area, will a vegetative filter be used? n/a Surface Area/Drainage Area Ratios: For a site in the Piedmont 2.9 percent For a site in a Coastal County w/ Vegetative Filter 5.5 percent For a site in a Coastal County w/out Vegetative Filter 7.4 percent Required surface area of pond: For a site in the Piedmont 6,920.0 square feet For a site in a Coastal County w/ Vegetative Filter 12,940.0 square feet For a site in a Coastal County w/out Vegetative Filter 17,530.0 square feet Notes: Prelim-Water Quality Pond-4 Calcs.xls Pond Surface Area Calcs Page 3 of 15 Printed 1/7/2005 3:41 PM Water Quality Pond Stormwater Runoff Volume Calculations Project Beaver Creek Crossings Project No. 02655-0001 Date 30-Nov-04 Drainage area Impervious area Rainfall depth Percent Impervious 235,189 square feet 199,910 square feet 1.00 inches 85.0 percent R(v)=0.05+0.009*(Percent impervious) Runoff coefficient - R(v) 0.81 in/in Runoff volume=(Design rainfall)*(R(v))*(Drainage area) Runoff volume 15,973.2 cubic feet Notes: Prelim-Water Quality Pond-4 Calcs.xls Runoff Volume Calcs Page 4 of 15 Printed 1/7/2005 3:41 PM Water Quality Pond Volume Calculations Stage-Storage Data for Pond Project Beaver Creek Crossings Project No. 02655-0001 Date 30-Nov-04 Contour ID Stage Area [s q. ft. Area acres Incremental Area [s q. ft. Incremental Area acres Incremental volume cu. ft Incremental volume acre-ft Cumulative volume cu. ft Cumulative volume acre-ft 340 0 3,240.0 0.074 3,240.0 0.1 0.0 0.0 0.0 0.0 341 1 4,085.0 0.094 845.0 0.0 3,662.5 0.1 3,662.5 0.1 342 2 4,986.0 0.114 901.0 0.0 4,535.5 0.1 8,198.0 0.2 343 3 5,944.0 0.136 958.0 0.0 5,465.0 0.1 13,663.0 0.2 344 4 8,029.0 0.184 2,085.0 0.0 6,986.5 0.2 20,649.5 0.3 Prelim-Water Quality Pond-4 Calcs.xls Pond Stage-Storage<Perm. Pool Page 5 of 15 Printed 1/7/2005 3:41 PM Water Quality Pond Volume Calculations Stage-Storage Data for Pond Project Beaver Creek Crossings Project No. 02655-0001 Date 30-Nov-04 Contour ID Stage Area [s q. ft. Area acres Incremental Area [s q. ft. Incremental Area acres Incremental volume cu. ft Incremental volume acre-ft Cumulative volume cu. ft Cumulative volume acre-ft 344 0 8,029.0 0.184 8,029.0 0.2 0.0 0.0 0.0 0.0 345 1 9,156.0 0.210 1,127.0 0.0 8,592.5 0.2 8,592.5 0.2 345.8 1.8 10,099.0 0.232 943.0 0.0 7,702.0 0.2 16,294.5 0.4 346 2 10,340.0 0.237 241.0 0.0 2,043.9 0.0 18,338.4 0.2 347 3 11,581.0 0.266 1,241.0 0.0 10,960.5 0.3 29,298.9 0.3 348 4 12,873.0 0.296 1292.0 0.0 12,227.0 0.3 41525.9 0.5 Prelim _Water Quality Pond4 Calcs.xls Stage-Storage>Perm. Pool Page 6 of 15 Printed 117/2005 3:41 PM Water Quality Basin Dewatering Time Calculations Project Beaver Creek Crossings Project No. 02655-0001 Date 30-Nov-04 Maximum surface area of basin 10,099.0 square feet Maximum head of water above dewatering hole 1.8 feet Orifice coefficient 0.90 Diameter of each hole 1.5 inches Number of holes 1 Cross sectional area of each hole = Cross sectional area of each hole = Cross sectional area of dewatering hole(s) _ Cross sectional area of dewatering hole(s) _ Dewatering time for basin = Dewatering time for basin = 0.012 square feet 1.8 square inches 0.012 square feet 1.8 square inches 84.9 hours 3.5 days Calculations based on NC Sediment and Erosion Control Manual Page 8.07.8 Notes: SA/DA Ratio for Permanent Pool Sizing for 85% Removal in the Piedmont OY6 Impervious Permanent Pool Depth Cover 3.0 4.0 5.0 6.0 7.0 8.0 9.0 10 0.59 0.49 0.43 0.35 0.31 0.29 0.26 20 0.97 0.79 0.70 0.59 0.51 0.46 0.44 30 1.34 1.08 0.97 0.83 0.70 0.64 0.62 40 1.73 1.43 1.25 1.05 0.90 0.82 0.77 50 2.06 1.73 1.50 1.30 1.09 1.00 0.92 60 2.40 2.03 1.71 1.51 1.29 1.18 1.10 70 2.88 2.40 2.07 1.79 1.54 1.35 1.26 80 3.36 2.78 2.38 2.10 1.86 1.60 1.42 90 3.74 3.10 2.66 2.34 2.11 1.83 1.67 SAIDA Ratio for Permanent Pool Sizing for 85% Removal in Coastal Counties (30' Vegetated Filter Required) % Impervious Permanent Pool Depth Cover 3.0 3.5 4.0 4.5 5.0 5.5 6.0 6.5 7.0 7.5 10 0.9 0.8 0.7 0.6 0.5 0.0 0.0 0.0 0.0 0.0 20 1.7 1.3 1.2 1.1 1.0 0.9 0.8 0.7 0.6 0.5 30 2.5 2.2 1.9 1.8 1.6 1.5 1.3 1.2 1.0 0.9 40 3.4 3.0 2.6 2.4 2.1 1.9 1.6 1.4 1.1 1.0 50 4.2 3.7 3.3 3.0 2.7 2.4 2.1 1.8 1.5 1.3 60 5.0 4.5 3.8 3.5 3.2 2.9 2.6 2.3 2.0 1.6 70 6.0 5.2 4.5 4.1 3.7 3.3 2.9 2.5 2.1 1.8 80 6.8 6.0 5.2 4.7 4.2 3.7 3.2 2.7 2.2 2.0 90 7.5 6.5 5.8 5.3 4.8 4.3 3.8 3.3 2.8 1.3 100 8.2 7.4 6.8 6.2 5.6 5.0 4.4 3.8 3.2 2.6 SAIDA Ratio for Permanent Pool Sizinq for 90% Removal in Coastal Counties (No Vegetated Filter Reauired) % Impervious Permanent Pool Depth Cover 3.0 3.5 4.0 4.5 5.0 5.5 6.0 6.5 7.0 7.5- 10 1.3 1.0 0.8 0.7 0.6 0.5 0.4 0.3 0.2 0.1 20 2.4 2.0 1.8 1.7 1.5 1.4 1.2 1.0 0.9 0.6 30 3.5 3.0 2.7 2.5 2.2 1.9 1.6 1.3 1.1 0.8 40 4.5 4.0 3.5 3.1 2.8 2.5 2.1 1.8 1.4 1.1 50 5.6 5.0 4.3 3.9 3.5 3.1 2.7 2.3 1.9 1.5 60 7.0 6.0 5.3 4.8 4.3 3.9 3.4 2.9 2.4 1.9 70 8.1 7.0 6.0 5.5 5.0 4.5 3.9 3.4 2.9 2.3 80 9.4 8.0 7.0 6.4 5.7 5.2 4.6 4.0 3.4 2.8 90 10.7 9.0 7.9 7.2 6.5 5.9 5.2 4.6 3.9 3.3 100 12.0 10.0 8.8 8.1 7.3 6.6 5.8 5.1 4.3 3.6 WET DETENTION BASIN #4 OPERATION AND MAINTENANCE AGREEMENT Beaver Creek Crossings The wet detention basin system is defined as the wet detention basin, pretreatment including forebays and the vegetated filter or level spreader if one is provided. Maintenance activities shall be performed as follows: After every significant runoff producing rainfall event and at least monthly: a. Inspect the wet detention basin system for sediment accumulation, erosion, trash accumulation, vegetated cover, and general condition. b. Check and clear the orifice of any obstructions such that drawdown of the temporary pool occurs within 2 to 5 days as designed. 2. Repair eroded areas immediately, re-seed as necessary to maintain good vegetative cover, mow vegetative cover to maintain a maximum height of six inches, and remove trash as needed. 3. Inspect and repair the collection system (i.e. catch basins, piping, swales, riprap, etc.) quarterly to maintain proper functioning. 4. Remove accumulated sediment from the wet detention basin system semi-annually or when depth is reduced to 75% of the original design depth (see diagram below). Removed sediment shall be disposed of in an appropriate manner and shall be handled in a manner that will not adversely impact water quality (i.e. stockpiling near a wet detention basin or stream, etc.). The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the permanent pool depth reads 341.00 feet in the main pond, the sediment shall be removed. [For stormwater wetlands: If the elevation of the marsh areas exceed the permanent pool elevation, the sediment should be removed to design levels. This shall be performed by removing the upper 6 inches of soil and stockpiling it. Then the marsh area shall be excavated six inches below design elevations. Afterwards the stockpiled soil should be spread over the marsh surface. The soil should not be stockpiled for more than two weeks.] When the permanent pool depth reads 341.00 feet in the forebay [and micro-pool], the sediment shall be removed. BASIN DIAGRAM (fill in the blanks) Permanent Pool Elevation 344.00 Sediment moval E1.341.0 75% / -------------- -- 7 --------- Sedimen__t_R_e__m_o_v_al _E_I_evation _341.00 Bottom E vation 340.0 1 0 2561 FOREBAY MAIN POND Page 1 of 2 5. Remove cattails and other indigenous wetland plants when they cover 50% of the basin surface. These plants shall be encouraged to grow along the vegetated shelf and forebay berm. 6. If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain shall be minimized to the maximum extent practical. 7. All components of the wet detention basin system shall be maintained in good working order. 8. Level spreaders or other structures that provide diffuse flow shall be maintained every six months. All accumulated sediment and debris shall be removed from the structure, and a level elevation shall be maintained across the entire flow spreading structure. Any down gradient erosion must be repaired and/or replanted as necessary. I acknowledge and agree by my signature below that I am responsible for the performance of the seven maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Print name: OeA)1YE u- L- . Rog D a- 41•r Title: &_A AJA 6 6 A Address: Phone: Sig Date: l -/D -D S Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. I, Q • , a Notary Public for the State of County of do hereby certify that personally appeared before me this /01?1 day of and acknowledge the due execution of the forgoing wet [wetland] detention ba in maintenance requirements. Witness my hand and official seal, D)UO: SEAL My commission expires /a -a-'0 7 Page 2 of 2 SEDCAD 4 for Windows (`-inhf 1008 V-1. 1 Crhmoh Beaver Creek Crossinus Pond #4 10-Yr Pre-Existing GML McKim & Creed, P.A. 200 MacKenan Ct. Cary, NC 27511 Filename: Printed 01-13-2005 SEDCAD 4 for Windows r-inhf iOOA Domino i Srhwah Genera/ Information Storm Information; Storm Type: NRCS Type II Design Storm: 10 yr - 24 hr Rainfall Depth: 5.380 inches Filename: Printed 01-13-2005 SEDCAD 4 for Windows r-inhf +ooa a-i. i c r -.K Structure Networking; Type Stru (flows Stru # into) # Musk. K Musk. X (hrs) Description Null #1 =_> End 0.000 0.000 Pond 4 #1 Null Filename: Printed 01-13-2005 SEDCAD 4 for Windows r-inh} 1000. P-1. 1 Cnhmah Structure summary; Immediate Total Peak Total Contributing Contributing Discharge Runoff Area Area Volume (ac) (ac) (cfs) (ac-ft) #1 5.400 5.400 15.28 1.20 4 Filename: Printed 01-13-2005 SEDCAD 4 for Windows Cnn?minhf 1OOA P.-I. 1 S,hw.h Subwatershed Hydrology Detail: Time of Peak Runoff Stru SWS SWS Area Musk K Conc Curve Musk X UHS Discharge Volume # # (ac) (hrs) (hrs) Number (cfs) (ac-ft) #1 1 5.400 0.080 0.000 74.000 M 15.28 1.202 5.400 15.28 1.202 Filename: Printed 01-13-2005 SEDCAD 4 for Windows f --inh} iaoA P-i. i z,h,..h Beaver Creek Crossinus Pond #4 10-Yr Post Development GML 1 Filename: Pond4-10W-Post.sc4 Printed 01-14-2005 SEDCAD 4 for Windows r-,,inhf iaaA P-i. i Crh-.h Genera/ Information Storm Information; Storm Type: NRCS Type II Design Storm: 10 yr - 24 hr Rainfall Depth: 5.380 inches Filename: Pcnd4-10Yr-Post.sc4 Printed 01-14-2005 SEDCAD 4 for Windows f`nn..rinhf iaaR P-1- 1 Crh--h Structure Networking; Type Stru (flows Stru # into) # Musk. K Musk. X (hrs) Description Pond #1 ==> End 0.000 0.000 Pond 4 #1 Pond 3 Filename: Pond4-10W-Post.sc4 Printed 01-14-2005 SEDCAD 4 for Windows (`-iv hf 1000 P-12 1 C,h-h 4 Structure Summary; Immediate Total Total Contributing Contributing Peak Runoff Area Area Discharge Volume (ac) (ac) (cfs) (ac-ft) In 21.28 2.01 #1 5.400 5.400 Out 13.20 1.78 Filename: Pond4-10Yr-Post.sc4 Printed 01-14-2005 SEDCAD 4 for Windows r-,inh/ IQQR P-1o I Crh-h Structure Detail., Structure #1 (Pond Pond 4 Pond Inputs: Initial Pool Elev: 344.00 Initial Pool: 0.47 ac-ft Perforated Riser Riser Riser Height Barrel Barrel Barrel Slope Number of ' Diameter (ft) Diameter Length (ft) (%) s n Spillway Elev Holes per Manning (in) (in) Elev 36.00 5.80 15.00 75.00 0.50 0.0130 345.80 1 Pond Results: Peak Elevation: 347.25 Dewater Time: 3.74 days Dewatering time is calculated from peak stage to lowest spillway Elevation-Capacity-Discharge Table Elevation Area (ac) Capacity (ac-ft) Discharge (cfs) Dewater Time (hrs) 340.00 0.074 0.000 0.000 340.50 0.084 0.039 0.000 341.00 0.094 0.084 0.000 341.50 0.104 0.133 0.000 342.00 0.114 0.188 0.000 342.50 0.125 0.247 0.000 343.00 0.136 0.312 0.000 343.50 0.159 0.386 0.000 344.00 0.184 0.472 0.000 Low hole SPW #1 344.50 0.197 0.567 0.042 27.56* 345.00 0.210 0.669 0.059 20.82* 345.50 0.223 0.777 0.072 18.11* 345.80 0.232 0.845 0.079 10.85 Spillway #1 346.00 0.237 0.892 2.613 11.50 346.50 0.251 1.014 12.535 0.50 347.00 0.266 1.143 12.983 0.20 347.25 0.274 1.213 13.204 0.10 Peak Stage Filename: Pond4-10W-Post.sc4 Printed 01-14-2005 SEDCAD 4 for Windows r-inhf iaQR P-j- I Srh,...h Area Capacity Discharge Dewater Elevation Time (ac) (ac-ft) (cfs) (hrs) 347.50 0.281 1.280 13.416 348.00 0.296 1.424 13.835 *Designates time(s) to dewater have been extrapolated beyond the 50 hour hydrograph limit. Detailed Discharge Table Elevation Perf. Riser (cfs) Combined Total Discharge (cfs) 340.00 0.000 0.000 340.50 0.000 0.000 341.00 0.000 0.000 341.50 0.000 0.000 342.00 0.000 0.000 342.50 0.000 0.000 343.00 0.000 0.000 343.50 0.000 0.000 344.00 1.50>0.000 0.000 344.50 0.042 0.042 345.00 0.059 0.059 345.50 0.072 0.072 345.80 0.079 0.079 346.00 2.613 2.613 346.50 12.535 12.535 347.00 12.983 12.983 347.50 13.416 13.416 348.00 13.835 13.835 6 Filename: Pond4-10Yr-Post.sc4 Printed 01-14-2005 SEDCAD 4 for Windows (:nrn.rinhl 100A Damela 1 Crhw?h Subwatershed Hydrology Details Time of Peak Runoff Stru SWS SWS Area Musk K Curve Conc Musk X UHS Discharge Volume # # (ac) (hrs) (hrs) Number (cfs) (ac-ft) #1 1 5.400 0.080 0.000 0.000 92.000 M 21.28 2.007 5.400 21.28 2.007 Filename: Pond4-10Yr-Post.sc4 Printed 01-14-2005 DWQ# 7 ' Date / Who Reviewed: L? 1 Plan Detail Incomplete ? Please provide a location map for the project. ? Please show all stream impacts including all fill slopes, dissipaters, and bank stabilization on the site plan. ? Please show all wetland impacts including fill slopes.on the site plan. ? Please indicate all buffer impacts on the site plan. ? Please indicate proposed lot layout as overlays on the site plan. ? Please indicate the location of the protected buffers as overlays on the site plan. ? Please locate all isolated or non-isolated wetlands, streams and other waters of the State as overlays on the site plan. ? Please provide cross section details showing the provisions for aquatic life passage. - - -- ? Please locate any planned sewer lines on the site plan. [, Please provide the location of any proposed stormwater management practices as required by GC ? Please provide detail for the stormwater management practices as required by GC ? Please specify the percent of project imperviousness area based on the estimated built-out conditions. ? Please indicate all stormwater outfalls on the site plan. ? Please indicate the diffuse flow provision measures on the site plan. ? Please indicate whether or not the proposed impacts already been conducted. l Avoidance and/or M almi .ation Not Provided - ? The labeled as on the plans does not appear to be necessary. Please eliminate the or provide adslitiodal information as to why it is necessary for this project. ? This Office believes that the labeled on the plans as can be moved or reconfigured to avoid the impacts to the . . Please revise the plans to avoid the impacts. ? This Office believes that the labeled on the plans as can be moved or reconfigured to minimize the impacts to the Please revise the plans to minimize the impacts. ? The stormwater discharges at the location on the plans labeled will not provide diffuse flow through the buffer because Please revise the plans and provide calculations to show that diffuse flow will be achieved through the entire buffer. If it is not possible to achieve diffuse flow through the entire buffer then it may be necessary to provide stormwater management practices that remove nutrients before the stormwater can be discharged through the buffer. Other ? The application fee was insufficient because over 150 feet of stream and/or over 1 acre of wetland impacts were requested. Please provide $ . This additional fee must be received before your application can be reviewed. ? Please complete Section(s) on the application. ? Please provide a signed copy of the application. ? Please provide Mitigation copies of the application, copies of the site plans and other supporting information. ? of compensatory mitigation is required for this project. -Please provide a compensatory mitigation plan. The plan must conform to the requirements in 15 A NCAC 211.0500 and must be appropriate to the type of impacts proposed. ? Please indicate which 404 Permit the USACE would use to authorize this project. V re 7?u tAA yeg-7 4j u.? 604LAt-^`Il?'JD JZQ ea? 0 you ?JG) Pm/?°^ ? ?? -s Q^C M4 S-411 9111515 GW ?+"-' C(AA-? SOIL & ENVIRONMENTAL CONSULTANTS, PA NC Division of Plater Quality Tran # Invoice Type Date Reference 5678 011905 Invoice 01/19/05 7262.P10 Check Number: 17329 Dat e: 01/19/05 Check Aunt: o $475.00 Balance Discount t- Y Amount ?' $475.00 /.$0.00 475.00 s? V 7 n yam C , O ?? y - .r-- _ _ 4' 3' 1.25' 1.25' , 8" -OUTFLOW STRUCTURAL NOTES: t25 - INFLOW MATERIAL STAPLED 1. CONCRETE DESIGN IS BASED ON THE FOLLOWING STANDARDS: TBD GALVANIZED 2'x2'x3/i6" COVER WITH AN 8" DIAMETER OPENING POURE[ IN PLACE 6 6 FILTER FABRIC PouRED IN PLACE BUILDING CODE REQUIREMENTS FOR .REINFORCED CONCRETE (ACI 318-89) AND IN COVER 8" GATE VALVE CONCRE CONCRETE COLLAR in FLOW SPLITTER ALL SUBSEQUENT SUPPLEMENTS. FOR EMER, DRAIN LOW FLOW ORIFICE Wi INV.=343.00 N Mi WATERPROOF a UNDISTURBED MASTIC (TYP.) NATURAL 2. CAST IN PLACE CONCRETE DESIGN IS BASED ON THE FOLLOWING MATERIAL CONCRETE BOX a.,~ MATERIAL _ _ _ _ _ _ _ _ _ _ GROUND STRENGTH: TOP'EL. =345.7 3:1 MIN, 6;1 MIN, A. CONCRETE (AT 28 DAYS): 4000 PSI (,46 MAX WATER CEMENT RATIO) REBAR TRASH ~ 1~ WATERPROOF i I RACK OVER ORIFICE ~y°' ~ B, REINFORCING STEEL, ASTM A615, GRADE 60: FY = 60,000 PSI ~ . MASTIC (TYP.) I r i r - 1° 0 EXPANSION ANCHORS ~ I N 3, MINIMUM CONCRETE PROTECTION FOR REINFORCEMENT SHALL BE AS FOLLOWS: TYPICAL EACH SIDE i I 8" DIP FOR BURIED 6" MIN, A. CAST AGAINST AND PERMANENTLY EXPOSED TO EARTH = 3" " ANGLE IRON I I EMERGENCY DRAIN = ~ 2 4"X4"X5/8"X3'LONG I N N B. EXPOSED TO EARTH, WATER OR WEATHER, WHERE FORMS ARE USED = 2" N 12" WIRE STAPLES o TYPICAL EACH SIDE I ~ I ~ 6" INTERVALS 4 SPA, ®8"=32" t ~ m • r- INV.= 340.0 LEVEL LIP OF SPREADER 4. CHAMFER ALL EXPOSED CORNERS OF CONCRETE WITH 3/4" X 45 DEG CHAMFER, 2" BASE EL.=339.50 n CONSTRUCTION SPECIFICATIONS UNLESS OTHERWISE NOTED, 6" 1" 0 XPAN I ;y5 REBAR (Tl E SON ANCHORS ~;y5 REBAR (TYPICAL EACH FACE) 2"ORIFICE g' G.V. ®8" O.C. TYPICAL EACH SIDE m FILL WITH GROUT 1. THE MATTING SHOULD BE A MINIMUM OF 4 FT WIDE EXTENDING 6 INCHES 7, ALL CONCRETE WORK SHALL BE DONE IN ACCORDANCE WITH "SPECIFICATIONS FOR ANTI-SEEPAGE COLLAR . • y ANGLE IRONS „OLLAR-POND #1 OVER THE LIP AND BURIED 6 INCHES DEEP IN A VERTICAL TRENCH ON THE STRUCTURAL CONCRETE IN BUILDINGS ACI 301 AND ACI PUBLICATION ACI-350R-89 LOWER EDGE. THE UPPER EDGE SHOULD BUTT AGAINST SMOOTHLY CUT "ENVIRONMENTAL ENGINEERING CONCRETE STRUCTURES", 4"X4"X58"X3' ONG 8" D.I.P TYPICAL EACH SIDE L SOD AND BE SECURELY HELD IN PLACE WITH CLOSELY SPACED HEAVY DUTY WIRE STAPLES AT LEAST 12 INCHES LONG, e, UNLESS NOTED OTHERWISE, ALL SPLICES, BENDS, STANDARD HOOKS AND OTHER DETAILING OF REINFORCEMENT SHALL BE ACCOMPLISHED AS RECOMMENDED IN THE CLASS B RIP RAP ,PLACED 24" DEEP TBD 2. ENSURE THAT THE SPREADER LIP IS LEVEL FOR UNIFORM SPREADING OF "MANUAL OF STANDARD PRACTICE FOR DETAILING REINFORCED CONCRETE STRUCTURES" 3' STORM RUNOFF. ACI 315 AND ACI 318-89. TOP OF SPILLWAY .WAY 9. FORM FINISH S ACCEPTABLE FOR WALLS, FLOAT FINISH SLABS, RUB EXPOSED SECTION 6 ~ PLAN -11 3. CONSTRUCT THE LEVEL SPREADER ON UNDISTURBED SOIL NOT ON FILL . SURFACES, ( ) 4. CONSTRUCT A 20-FT TRANSITION SECTION FROM THE DIVERSION CHANNEL 10. CONTINUOUS RUBBER WATERSTOPS SHALL BE PROVIDED AT ALL CONSTRUCTION JOINTS - RISER BARREL STRUCTURE-POND #1 RE POND #1 L STRUCTU ISER BARRE R TO BLEND SMOOTHLY TO THE WIDTH AND DEPTH OF THE SPREADER. IN RISER. 11. PRECAST MANUFACTURER TO PROVIDE ~5 DIAGONALS AROUND PIPE OPENING IN RISER I- , 0' -I 5. DISPERSE RUNOFF FROM THE SPREADER ACROSS A PROPERLY STABILIZED BOX IN EACH FACE. SLOPE NOT TO EXCEED 10~. MAKE SURE THE SLOPE IS SUFFICIENTLY INCLUDE SUBIAYER OF FILTER FABRIC OR FS-2 FILTEF 1RIC OR FS-2 FILTER STONE WITH SMOOTH TO KEEP FLOW FROM CONCENTRATING. A BEDDING THICKNESS OF 6". 6. IMMEDIATELY AFTER ITS CONSTRUCTION, APPROPRIATELY SEED AND MULCH SOIL EROSION AND SEDIMENTATION C NTROL THE ENTIRE DISTURBED AREA OF THE SPREADER. O EMERGENCY SPILLWAY DET~ AY DETAIL-POND #1 CERTIFICATION BY THE TOWN OF APEX MBANKMENT TO BE DESIGNED/ LEVEL SPREADER DESIGN FLOW MIN. ENTRANCE DEPTH END WIDTH LENGTH This drawing has been reviewed by the Town of Apex, and to the best of my knowledge NUMBER (CFS) WIDTH (FT) (Fr) (FT) (FT) and belief, conforms to the requirements established in the Soil Erosion and Sedimentation INSTALLED PER GEOIECHNICAL RECOMMENDATIONS 1 2.to tD o.s 5 3o Control Ordinance of the Town of Apex. However, this signature does not constitute a EMERGENCY variance from ony requirements contained in any federal, stole, or Iocol code, low, TOP OF DAM= 347.00 SPILLWAY = 346.50 s RIP RAP SSIPATOR 17•~ specification, rule or ordinance. the developer/engineer/contractor is solely responsible . ~ GALVANIZED 2x2 x3/16 COVER ::::.:::...::::::r:r;;;•:;:;:::ADUATIC;;•::::tt::;::::::t;::::ii;;rii;iia;:;~i;r;:~?:}"'~;~. EMBANKM R MA WITH AN 18 DIAMETER OPENING eENCN ?s€;: TO BE DESIGNED LEVEL SPREADER #1 fa meeting all applicoble requirements, ,NKMENT CORE MATERIAL MIN. 6:1 AQUATIC / •i'ri::: ~ iiii: i~ier'r }'riii: is i'ri iFiiii;: ? ...6:1,,„:.,5: PERMANENT IN COVER INLET ; POOL RISER BARt>Fl SEDIMENT FOREBAY BENCH (10' WIDE) INSTALLED PER GEOTECI E DESIGNED/ THIS SIGNATURE DOES NOT CONSTITUTE PLAN APPROVAL, ONLY PLAN REQUIREMENTS. A SEPARATE ILLED PER GEOTECHNICAL CLASS 8 RIP RAP MM N A I TOP RISER = 345.70 INLET FLOW )MMENOATIONS BYPASS CHANNEL LETTER OF PLAN APPROVAL WILL BE MAILED TO THE FINANCIALLY RESPONSIBLE PERSON AT A LATER ANTI-S A A 2" ORIFICE INVERT = 343.0 -SEEPAGE COLLARS DATEACCORDINGTOTHECONSTRUCTIONSEOUENCE, 20" TOP OF PERMANENT POOL FLOW SPLITTER By, Dote: EMERGENCY CONCRETE BOX (ELEVATION TO BE SAME AS UP OF SPILLWAY WITH EXTENDED BASE INV, TOP VIEW BOTTOM OF FOREBAY ~ 18 INV, OUT=339,55 LEVEL SPREADER ELEV=335.00 EMBANKMENT WITH MARSH ~ BARREI ®0,509,' BARREI ®0,509,' LEVEL SPREADER REVIEW CERTIFICATION BY THE TOWN OF APEX a.s PLANTS AND SPILLWAY TO MAIN POOL BOTTOM OF POND = 335.00 RISER EMBANKMENT TO BE DESIGNED/ 5, This drawing has been reviewed by the Town of Apex, and to the best of INSTALLED PER GEOTECHNICAL TRENOCHF c STORMWATER STORAGE RECOMMENDATIONS RIP RAP DIS. RIP RAP DISSIPATER my knowledge and belief, conforms to the requirements established in the . NHMENT _ _ ' META E Imo, I mI - 11n PERMANENT PDOL~ ~ IPAT CONCRETE 18"BARREL ;vr,+~l,~a Standard Specifications of the Town of Apex. However, this signature '~T- -Ilj-j1f I I- - __~~1L I -";,°•»iiiii?r'ri'r'rii:°.::ererii'r 'r _ ANTI-SEEP RIP RAP DISS OR ANTI-FLOTATION BLOCK INVERT=340.00 ,~~~~at does not constitute a varionce from any requirements contained in any federal, state, or local code, law, specification, rule or ordinance. The DLLARS r EDIMENT FOREBAY" I~_ I I I _ SIZE TBD) PLANTED AS MARSH) I - developer/engineer/contractor is solely responsible for meeting all ~a,_I POND SECTION opplicable requirements. - m NTS SIDE wEW ET TIO POND OUTLET STRUCTURE DETAIL POND #1 D EN N By. Date: 3' TBD GALVANIZED 2'x2'x3/16" COVER 4' ~ OUTFLOW ~ INFLOW WITH AN 8" DIAMETER OPENING IN COVER 8" GATE VALUE 1.25' 1.25' ~ ~ MATERIAL STAPLED , FOR EMER, DRAIN ~ F~ DRIfiCE INV, =34E.00 R~ IN PLACE 6 6 FILTER FABRIC 1 PouRED IN PUCE FLOW SPLITTER CONCRETE BOX TOf TOP EL. =349,95 CONCRETE .n UNDISTURBED NATURAL REBAR TRASH • , WATERPROOF I I RACK OVER ORIFICE ;ASH WATERPROOF N MATERIAL [R ORIFICE N MASTIC (rrn.) ~ _ _ _ _ _ _ _ _ _ _ GROUND ~ . ~ ~ ; : MASTIC (TYP.) 4'° 3:1 MIN, 6:1 MIN. i" 0 EXPANSION ANCHORS I r- I r TYPICAL EACH SIDE ~ I " "ANGLE IRON I I 8 DIP FOR 2 4" X 4" X 5/8" X 3' LONG I I EMERGENCY GRAIN , ~ a 1~ a o0 TYPICAL EACH SIDE I GRAIN ° 4 SPA, ®8"=32" ~ m I ~ I ~ BURIED 6" MIN. 2. INV.= 342.0 12" WIRE STAPLES t' BAS 6' BASE EL. =341,50 ~ s ~ „ N N ®6 INTERVALS 2"ORIFICE 1" ,EXPANSION ANCHORS B" G.V, 'ANSION ANCHORS ~ LEVEL LIP OF SPREADER TYPICAL EACH SIDE CONSTRUCTION SPECIFICATIONS 0 B" O.C. TYPICAL EACH 51 o FILL WITH GROUT i., • 1• ANGLE IRONS tONS i5 REBAR (TYPICAL EACH FACE) 1. THE MATTING SHOULD BE A MINIMUM OF 4 FT WIDE EXTENDING 6 INCHES 8" D.I.P 4" X 4" X 5/8" X 3' LONG X 5/B" X 3' LONG OVER THE LIP AND BURIED 6 INCHES DEEP IN A VERTICAL TRENCH ON THE TYPICAL EACH SIDE EACH SIDE LOWER EDGE, THE UPPER EDGE SHOULD BUTT AGAINST SMOOTHLY CUT 3. TBO ANTI-SEEPAGE COLLAR-POND #2 SOD AND BE SECURELY HELD IN PLACE WITH CLOSELY SPACED HEAVY cuss a RIP RAP , PLACEO 24• DEEP DUTY WIRE STAPLES AT LEAST 12 INCHES LONG. 2, ENSURE THAT THE SPREADER LIP IS LEVEL FOR UNIFORM SPREADING OF PLAN SECTION STORM RUNOFF. B TOP OF SPILLWAY RISER B REL STRUCTURE-POND #2 - AR RISER BARREL STRUCTURE POND #2 #Z 3, CONSTRUCT THE LEVEL SPREADER ON UNDISTURBED SOIL (NOT ON FILL). 4, CONSTRUCT A 20-FT TRANSITION SECTION FROM THE DIVERSION CHANNEL TO BLEND SMOOTHLY TO THE WIDTH AND DEPTH OF THE SPREADER. MBANKMENT TO 8E DESIGNED/ ' ~ INSTALLED PER GEOTECHNICAL 110' . RECOMMENDATIONS 5, DISPERSE RUNOFF FROM THE SPREADER ACROSS A PROPERLY STABILIZED EMERGENCY TOP OF DAM= 352.00 INCLUDE SuBLAYER OF FILTER FABRIC OR FS-2 FlLTER STONE 4NTH SLOPE NOT TO EXCEED 10%. MAKE SURE THE SLOPE IS SUFFICIENTLY 2,0o A BEDDING THICKNESS OF 6". SMOOTH TO KEEP FLOW FROM CONCENTRATING. • ~ SPILLWAY = 1.5 - ::•.~:::.RIP RAP DISSIPATOR GALVANIZED 2'x2'x3 16' COVER .....:....:.::::°::::..:::::::::;>:a AOUATIC:==::.::::r.2-: ,,,:,:::r:~>:•:~ ~•:»>:~::;•:i;>iFii&iirisrit§:ii:4'r 5 ' EMBANKMENT CORE MATT • ?r~°"::: ~;;i::=iii:;: i:::;;:;;: eencN `is:;;- ~':~;:`.:€;:i WITH AN 18' DIAME ER OPENING PERMANENT ~ A IN COVER TO BE DESIGNED •;:;•;;;:::;a:::;;:r:•::;::r>;:;::;;::;r: 4:l.......;ii;:r> MIN. 6:1 A UATI VKMENT CORE MATERIAL EMERGENCY SPILLWAY DETAIL-POND #2 6. IMM IATE Y AFT R IT N TR TIN APPR PRIAT Y S ED AND MULCH :OESIGNED ED L E S CO S UC 0 0 EL E INLET p~L RISER ~ IM NT F R AY BENCH (10 W1DE~ INSTALLED PER GEOTECF :;;;::.:':;:r:rr::;::::::rra;•:>::s:;::;a SED E 0 EB RECOMMENDATIONS / TECHNI A THE ENTIRE DISTURBED AREA OF THE SPREADER. LLEO PER GEO C L MMENDATIONS CLASS B RIP RAP INLET FLOW TOP RISER = 349.95 ANTI-SEEPAGE C LLA . BYPASS CHANNEL -SEEPAGE COLLARS LEVEL SPREADER DESIGN FLOW MIN. ENTRANCE DEPTH END WIDTH LENGTH - 2" ORIFICE INVERT = 348.0 NUMBER (CFS) W10TH (FT) (FT) (FT) (FT) 20" TP FPRMNNTP FLOW SPLITTER • MERGENCY CONCRETE BOX SPILLWAY WITH EXTENDED BASE INV. (ELEVATION TO BE SAME AS LIP OF 2 4.10 t0 0.5 5 55 INV, OUT=341,70 LEVEL SPREADER TOP VIEW BOTTOM Of FOREBAY 60 LF 18 EZEV-341' EMBANKMENT WITH MARSH OQSOX LEVEL SPREADER - PLANTS AND SPILLWAY TO •:•r,"A~{~• LEVEL SPREADER #2 MAIN POOL RISER EMBANKMENT TO BE DESIGNED BOTTOM OF POND = 341,00 ~ IN T PER GEOTECHNICAL/ CUT OFF 5' RIP RAP OIS~PATER S TRENCH ~ RAP OIS~PATER STORMWATER STORAGE RECOIAMENOATK)r1S . ~ ~T ~ 1WY6JL94~YIY. f i_ _ - - ':~;;';t;:~PERMANENT POOL: EMEIAN BARREL r4 il4il~6d~4~~ ~ ~ I I I I I- ~ pAT CONCRETE _ _ _ ANrh RIP RAP DISSI OR ANTI-FLOTATION BLOCK INVERT-342.00 '°°t EDIMENT FOREBAY - - (SIZE TBD) PLANTED AS MARSH) GAB 1 - ~_„rl _ PON SECTION NTS SIDE VIEW ON OUTLET STRUCTURE DETAIL-POND #2 ION P D DETENT SEAL SEAL GATE: January 14, 2005 SCALE M&C FILE NUMBER D-3B MCE PROJ, # 2655-0007 DRAWN LRA HORIZONTAL: onAwlNC NUM6ER A DCV A1/1DTLJ n A D~11 IAI A A. V i i \i.& 1 i V I%r/i \L.JLIL UL P lSLU11 tM0 MF 1-.Al IVVII I F-1 V/11lVL11,AM DESIGNED GML 200 MacKenan Court, Suite 200 DOVERSME® CHECKED GML VERTICAL: Cory, North Carolina 27511 REALTY • Phone: (919) 233-8091, Fax: (919) 233-8031 3300 Enterprise Parkway Beachwood, OH 44122 PROD, MGR. CHS N/A Tel: Tel: 216-755-5500 o Fax: 216-733-1500 o wwaddccom STATUS; REV1510N I RENSED PER TOA AND DWO 2-14-06 AA0002667 EB0006691 c REVAO. DESCRIPTIONS DATE 1STLCAROLINA aopmm STORMWATER POND DETAILS FOR REVIEW ONLY NOT RELEASED FOR CONSTRUCTION R ~ www.mckimcreed.com p - 3.75' 3' 1,25 1.25 B" ~ OUTFLOW STRUCTURAL NOTES: - INFLOW MATERIAL STAPLED 1, CONCRETE DESIGN IS BASED ON THE FOLLOWING STANDARDS; TBD GALVANIZED 2'x2'x3/16" COVER WITH AN 8" DIAMETER OPENING POURED IN IN PLACE 6 6 FILTER FABRIC POURED IN PLACE BUILDING CODE REQUIREMENTS FOR REINFORCED CONCRETE (ACI 318-89) AND IN COVER g" GATE VALVE CONCRETE ~ CONCRETE COLLAR FLOW SPLITTER ALL SUBSEQUENT SUPPLEMENTS, ~n FOR EMER, DRAIN LOW FLOW ORIFICE N WATER INV. 346.00 N MASTI( WATERPROOF N UNDISTURBED MASTIC (TYP,) NATURAL 2. CAST IN PLACE CONCRETE DESIGN IS BASED ON THE FOLLOWING MATERIAL CONCRETE BOX ay MATERIAL _ _ _ _ _ _ GROUND STRENGTH• TOP EL. =347.70 _ 3:1 MIN, REBAR TRASH n 5~ WATERPROOF I I RACK OVER ORIFICE M ~ 6:1 MIN, A, CONCRETE (AT 28 DAYS: 4000 PSI .46 MAX WATER CEMENT RATIO ) ( ) ' ~ . ` ~ • MASTIC (TYP.) ~ B, REINFORCING STEEL ASTM A61 RA - , 5, G DE 60; FY - 60,000 PSI I r - 1" 0 EXPANSION ANCHORS 3. MINIMUM CONCRETE PROTECTION FOR REINFORCEMENT SHALL BE AS FOLLOWS: I iV • ~ TYPICAL EACH SIDE I I 8" DIP FOR ~ BURIED 6" MIN. A. CAST AGAINST AND PERMANENTLY EXPOSED TO EARTH = 3" 2" ANGLE IRON I I EMERGENCY DRAIN 4"X4"X5/8"X3'LONG I N ~ B. EXPOSED TO EARTH, WATER OR WEATHER, WHERE FORMS ARE USED = 2" TYPICAL EACH SIDE o I ~ I • N 12 WIRE STAPLES @ 6" INTERVALS 4 SPA. ®8°=32" ; : ~ m INV.= 342.0 LEVEL LIP OF SPREADER 4. CHAMFER ALL EXPOSED CORNERS OF CONCRETE WITH 3/4" X 45 DEG CHAMFER, 2° BASE EL. =341,50 CONSTRUCTION SPECIFICATIONS UNLESS OTHERWISE NOTED, 6 1° 0 EXPANSION ANCHORS N5 REBAR (TYPIC? N5 REBAR (TYPICAL EACH FACE) 2"ORIFICE 8" G.V, ®8" O.C. TYPICAL EACH SIDE o FILL WITH GROUT m - - I 1. THE MATTING SHOULD BE A MINIMUM OF 4 FT WIDE EXTENDING 6 INCHES 7. ALL CONCRETE WORK SHALL BE DONE IN ACCORDANCE WITH "SPECIFICATIONS FOR ANTI SEEPAGE COLLAR P . )LLAR-POND #3 OVER THE LIP AND BURIED 6 INCHES DEEP IN A VERTICAL TRENCH ON THE STRUCTURAL CONCRETE IN BUILDINGS" ACI 301 AND ACI PUBLICATION ACI-350R-89 , ~ ' ` ` ANGLE IRONS LOWER EDGE. THE UPPER EDGE SHOULD BUTT AGAINST SMOOTHLY CUT "ENVIRONMENTAL ENGINEERING CONCRETE STRUCTURES". 8"D.I.P 4"X4"X5/8"X3'LONG TYPICAL EACH SIDE CLASS B RIP RAP ,PLACED 24" DEEP EP SOD AND BE SECURELY HELD IN PLACE WITH CLOSELY SPACED HEAVY DUTY WIRE STAPLES AT LEAST 12 INCHES LONG. 8. UNLESS NOTED OTHERWISE, ALL SPLICES, BENDS, STANDARD HOOKS AND OTHER DETAILING OF REINFORCEMENT SHALL BE ACCOMPLISHED AS RECOMMENDED IN THE TBD 3' TOP OF SPILLWAY 6 2. ENSURE THAT THE SPREADER LIP IS LEVEL FOR UNIFORM SPREADING OF "MANUAL OF STANDARD PRACTICE FOR DETAILING REINFORCED CONCRETE STRUCTURES" SPILLWAY STORM RUNOFF. ACI 315 AND ACI 318-89. ~1 9, FORM FINISH IS ACCEPTABLE FOR WALLS, FLOAT FINISH SLABS, RUB EXPOSED SECTION PLAN 3. CONSTRUCT THE LEVEL SPREADER ON UNDISTURBED SOIL (NOT ON FILL). SURFACES. - RISER BARREL STRUCTURE-POND #3 L STRUCTURE POND #3 RISER BARRE 4. CONSTRUCT A ZO-FT TRANSITION SECTION FROM THE DIVERSION CHANNEL 10. CONTINUOUS RUBBER WATERSTOPS SHALL BE PROVIDED AT ALL CONSTRUCTION JOINTS TO BLEND SMOOTHLY TO THE WIDTH AND DEPTH OF THE SPREADER. IN RISER. lo' Io' 11. PRECAST MANUFACTURER TO PROVIDE #5 DIAGONALS AROUND PIPE OPENING IN RISER INCLUDE SUBLAYER OF FlLTER FABRIC OR FS-2 f ! FABRIC OR FS-2 FILTER STONE WITH 5. DISPERSE RUNOFF FROM THE SPREADER ACROSS A PROPERLY STABILIZED BOX IN EACH FACE. A BEDDING THICKNESS OF 6". SLOPE NOT TO EXCEED 10~, MAKE SURE THE SLOPE IS SUFFICIENTLY SMOOTH TO KEEP FLOW FROM CONCENTRATING. EMERGENCY SPILLWAY DE" WAY DETAIL-POND #3 6. IMMEDIATELY AFTER ITS CONSTRUCTION, APPROPRIATELY SEED AND MULCH SOIL EROSI N AN THE ENTIRE DISTURBED AREA OF THE SPREADER. 0 D SEDIMENTATION CONTROL CERTIFICATION BY THE TOWN OF APEX MBANKMENT TO BE DESIGNED/ INSTALLED PER GEOTECHNICAL . ~ RECOMMENDATIONS LEVEL SPREADER DESIGN FLOW MIN. ENTRANCE DEPTH END WIDTH LENGTH This drowing hos been reviewed by the Town of Apex, and to the best of my knowledge EMERGENCY TOP OF DAM= 350.00 NUMBER (cFS) WIDTH (FT) (FT) (Fr) (FT) and belief, conforms to the requirements estoblished in the Soil Erosion and Sedimentation = 350.00 3 2.80 1a a.s 5 ao Control Ordinance of the Tawn of Apex, However, this signature does not constitute a SPILLWAY = 349.50 ~ RIP RAP DISSIPATOR ::::::::...:::::..:.-:::.-::a:riii; AQUnnCiss?~;isiiiii;:•:::::;;:::;:;::;;::;;:•;:::;::;;;::;:;.:`s??::??:i::::: GALVANIZED 2'x2'x3/16" COVER variance from any requirements contained in any federal, state, or local code, law, • :;'::.;;;'i::'riiii~iii:3?:':::; BENCH WITH AN 18" DIAMETER OPENING EMBANKM NT CORE T I NED 0 BE OESG 6: t : PERMANENT MIN. 6:1 AQUATI :MBANKMENT CORE MATERIAL s ecificotion, rule or ordinance. The develo er en ineer contractor is salel res onsibe TO BE DESIGNED/ P P 19 / Y P INLET 'r POOL ~ RISER BARREL BENCH 10 WIDE IN COVER INSTALLED PER GE( SEDIMENT FOREBAY ( RECOMMENDATIONS T RI R - 4710 NSTALLED PER GEOTECHNICAL LEVEL SPREADER for meeting all applicable requirements, RECOMMENDATIONS CLASS B RIP RAP OP SE - 3 ....::::..:::.:::.:::::"">ia;;i iii;iii:'i:iii;:Siii;;;:::::>:::::::::,-:::.:-::,-s;r INLET FLOW BYPASS CHANNEL THIS SIGNATURE DOES NOT CONSTITUTE PLAN APPROVAL, ONLY PLAN REQUIREMENTS. A SEPARATE • ANTI-SEEPAGE COI • • • 2 ORIFICE INVERT = 346.0 20" TOP F P RMA T P ANTI-SEEPAGE COLLARS LETTER OF PLANAPPROVALWILLBEMWLEDTOTHEFINANCIAILYRESPONSIBLEPERSONATAIATER DATE ACCORDING TO THE CONSTRUCTION SEQUENCE, FLOW SPLITTER EMERGENCY CONCRETE BOX SPILLWAY WITH EXTENDED BASE (ELEVATION TO BE SAME AS LIP OF INV, OUT 341.58 LEVEL SPREADER By. Date: TOP VIEW BOTTOM OF FOREBAY ELEV=342.00 EMBANKMENT WITH MARSH 85 LF IS 00.50% F IS pp,50~ LEVEL SPREADER _ PLANTS AND SPILLWAY TO .:gR~'{., MAIN POOL BOTTOM OF POND = 342.00 RISER EMBANKMENT TO BE DESIGNED/ 5, INSTALLED PER GEOTECHNICAL CUT OFF RIP R, REVIEW CERTIFICATION BY THE TOWN OF APEX ~;~~~a~ RIP RAP DISSIPATOR 1 STORMWATER STORAGE RECOMMENDATIONS TRENCH .r elndvi~ll~Jl, ' Ir - 1~- =11i `r'%~`:';:i ;i;i;: PERMANENT P00L ;:;i~` EMBPNRMEM ,.r- I- -r- - y..::_;;;;...,:::::.,:::":::::::::"::::"...: ~ ANII-SEEP RIP RAP DISSIPATOR CONCRETE BARREL r~~a~am This drawing has been reviewed by the Town of Apex, and to the best of my knowledge and belief, conforms to the requirements established in the _ W~~ uRS ANTI FLOTATION BLOCK NVERT 342.00 i. ~ Standard Specifications of the Town of Apex. However, this signature PANTED ASRMARSH) - ~ (SIZE TBD) "'-III-I POND SECTION does not constitute a variance from any requirements contained in any „ . federal, state, or local code, law, specification, rule or ordinance. The - Nrs SIDE VIEW developer/engineer/contractor is solely responsible for meeting all DETENTION POND OUTLET STRUCTURE DETAIL-POND 3 Opplicoble requirements. By. Date: 3' 3.75' - OUTFLOW INFLOW TBD GALVANIZED 2'x2'x3/16" COVER WITH AN 8" DIAMETER OPENING IN COVER B" GATE VALVE MATERIAL STAPLED , IN PLACE 6 6 FILTER FABRIC FOR EMER, DRAIN LOW FLOW ORIFICE INV, =344,00 Iw ORIFICE FLOW SPLITTER x4,00 POURED IN PLACE CONCRETE COLLAR N UNDISTURBED NATURAL CONCRETE BOX TOP EL.=345.80 N WATERPROOF , N MATERIAL REBAR TRASH WATERPROOF I I RACK OVER ORIFICE R TRASH N MASTIC (TYP,) _ _ _ _ _ _ _ _ _ _ _ GROUND • < MASTIC (TYP,) I r OVER ORIFICE <; 3:1 MIN, 6:1 MIN. I r M M 15 ~."a :f 1" A EXPANSION ANCHORS ~ ~ I I M TYPICAL EACH SIDE I I B" DIP FOR m FOR rp I I EMERGENCY DRAIN 2" ANGLE IRON VCY DRAIN ~ BURIED 6" MIN. 4 X 4 X 5/8" X 3' LONG I I L I TYPICAL EACH SIDE ; 12" WIRE STAPLES 4 SP0. 0 8"=32" M m INV.= 342.0 N ~ ~ @ 6" INTERVALS 2„ BASE EL.=341.50 N LEVEL LIP OF SPREADER 6" 1" f EXPANSION ANCHC EIfPANS10N ANCHORS CONSTRUCTION SPECIFICATIONS ® B„ O.C. TYPICAL EAC 1.5"ORIFICE g" G.V.. o FlLL WITH GROUT ' O.C. TYPICAL EACH SIDE ~5 REBAR (TYPICAL EACH FACE) 1. THE MATTING SHOULD BE A MINIMUM OF 4 FT WIDE EXTENDING 6 INCHES ~ ~ ' ~ i : ANGLE IRONS ~ .j 4"X4"X5/8"X3'L F IRONS OVER THE LIP AND BURIED 6 INCHES DEEP IN A VERTICAL TRENCH ON THE a' z 5/8' z 3' LONG LOWER EDGE. THE UPPER EDGE SHOULD BUTT AGAINST SMOOTHLY CUT 8" D.I,P TYPICAL EACH SIDE ;AL EACH SIDE ANTI-SEEPAGE COLLAR-POND #4 SOD AND BE SECURELY HELD IN PLACE WITH CLOSELY SPACED HEAVY TBD DUTY WIRE STAPLES AT LEAST 12 INCHES LONG, 3' 2. ENSURE THAT THE SPREADER LIP IS LEVEL FOR UNIFORM SPREADING OF CLASS B RIP RAP ,PLACED 24" DEEP STORM RUNOFF. SECTION PLAN 3. CONSTRUCT THE LEVEL SPREADER ON UNDISTURBED SOIL (NOT ON FILL), RISER BARREL STRUCTURE-POND #4 RISER BARREL STRUCTURE-PON D #4 IND #4 TOP OF SPILLWAY s ~ 4. CONSTRUCT A 20-FT TRANSITION SECTION FROM THE DIVERSION CHANNEL TO BLEND SMOOTHLY TO THE WIDTH AND DEPTH OF THE SPREADER, MBANKMENT TO 8E DESIGNED/ INSTALLED PER GEOTECHNICAL . RECOMMENDATIONS 5. DISPERSE RUNOFF FROM THE SPREADER ACROSS A PROPERLY STABILIZED SLOPE NOT TO EXCEED 10~. MAKE SURE THE SLOPE IS SUFFICIENTLY 1a' SMOOTH TO KEEP FLOW FROM CONCENTRATING, EMERGENCY TOP OF DAM= 348.00 SPILLWAY = 347.25 z1 RIP RAP OISSIPATOR ApUATIC'iii::is:;i:=:;'ti;:'t€;;;i;;;::iii:;=; ~>:~t:°ii~:;'s'i; ;:i;:: GALVANIZED 2'x2'x3/16" COVER IMTH AN 18" DIAMETER OPENING EMBANKMENT CORE MATER BENCH INCLUDE SUBLAYER OF FILTER FABRIC OR FS-2 FILTER STONE WITH 6. IMMEDIATELY AFTER ITS CONSTRUCTION, APPROPRIATELY SEED AND MULCH MENT CORE MATERIAL A BEDDING THICKNESS OF 6". THE ENTIRE DISTURBED AREA OF THE SPREADER, IN COVER TO BE DESIGNED ....4,'.I.:.,.,.Siii:~> PERMANENT MIN. 6:1 AQUATIC / INLET RISER BARREL H INSTA H I POOL BENC 10 WIDE LLED PER GEOTEC N IESIGNEO/ ED PER GEOTECHNICAL SEDMENT fOREBAY ( ) RECOMMENDATIONS • I TOP RISER = 345.80 ~ENDATIDNS CLASS B RIP RAP EMERGENCY SPILLWAY DETAIL-POND #4 • NLEi FLOW ANTI-SEEPAGE COLLARS :...:..:-:.:;s::::s;~:;.;:;:>::::::::;::::: 1.5 ORIFICE INVERT = 344. 0 EEPAGE COLLARS BYPASS CHANNEL LEVEL SPREADER DESIGN FLOW MIN. ENTRANCE DEPTH END WIDTH LENGTH 20" T P OF PERMAN NT P OL NUMBER (CFS) WIDTH (fT) (FT) (FT) (FT) EMERGENCY CONCRETE BOX FLOW SPLITTER 4 2,40 10 0.5 5 40 (ELEVATION TO BE SAME AS UP OF SPILLWAY WITH EXTENDED BASE OUT=341.63 LEVEL SPREADER TOP VIEW BOTTOM OF FOREBAY C ELEV=340.00 EMBANKMENT WITH MARSH 15 LF 15 p p arm p o a~ LEVEL SPREADER LEVEL SPREADER #4 PLANTS AND SPILLWAY TO MAIN POOL BOTTOM OF POND = 340.00 RISER EMBANKMENT TO BE DESIGNED/ 5' RIP RAP r-~ x' INSTALLED PER GEOTECHNICAL CUT OFF STORMWATER STORAGE RECOMMENDATIONS TRENCH q$gpAT~ RIP RAP ~~~'i~i 'rv1' iilrrt~lrr~t ~l > ~ ~ I DISSIPATER L..., 11,>rl,d$IY~f - •ix.::`':;e:='r ~~;:f:[::PERMANENT••POOL~ ~''r'~ ENRANKAIENT ' ~ ::.,'i rRIP RAP DISSIPA70R CONCRETE BARREL ~W~~~dud I ANTI-FLOTATION BLOCK INVERT-342.00 SEDIMENT FOREBAY I (SIZE TBD) (PLANTED AS MARSH) I - _ - I PON SECTION OENR.W~' NTS ~WETIAtaDSANR`~~' ..~•~~J'tCH ' SIDE VIEW DETENTION POND OUTLET STRUCTURE DETAIL-PO 4 ND # SEAL SEAL DATE; January 14, 2005 SCALE MdcC FILE NUMBER MCE PROJ. U-3C # 2655-0007 v. ~ ~ DRAWN LRA HORIZONTAL oRAw1NG NuMSER DEVELOPERS Art=, K I N UAKULINA N/A NZOIF, 1 V 1 1\i1 / 1 V %...L %L.JLJLJ f DESIGNED GML ®OVERSME® - 200 MacKenon Court, Suite 200 Cary, North Carolina 27511 L7Y0 CHECKED GML VERTICAL; REI@ Phone: (919) 233-8091, Fax: (919) 233-8031 3300 Enterprise Parkway Beachwood, OH 44122 PROJ. MGR. CHS N/A Ib1; 216-755-5500 o Fax: 216-755-1500 o wwwA&coffi I REMSED PER TOA AND DWO 2-I4-05 AA0002667 EB0006691 REVAO, DESCRIPTIONS DATE www.mckimcreed.com ER I ST LCAaouNA PROpmm STORMWATER POND DETAILS STATUS; RENSION FOR REVIEW ONLY R N NOT RELEASED FOR CONSTRUCTION 3' ' iBD GALVANIZED 2'x2'x3 16" COVER WITH AN 8" DIAMET~R OP I STRU CTURA L NOTES. IN COVER EN NG 8" GATE VALVE 1, CONCRETE DESIGN IS BASED ON THE FOLLOWING STANDARDS: FOR EMER. DRAIN LOW FLOW ORIFICE INV.=343.00 CONCRETE BOX BUILDING CODE REQUIREMENTS FOR REINFORCED CONCRETE (ACI 318-89) AND ALL SUBSEQUENT SUPPLEMENTS. TOP El, =345.7 . WATERPROOF REBAR TRASH 2. CAST IN PLACE CONCRETE DESIGN IS BASED ON THE FOLLOWING MATERIAL STRENGTH; ,7;; :,•'i.,i..~;•',r'.; i~.,::. "~t:,;••..'', I RACK OVER ORIFICE • ' MASTIC TYP. I 4 ( ) I ~ .r. 1" 0 EXPANSION ANCHORS ~ - i 25' TYPICAL EACH SIDE 1.25' r A. CONCRETE (AT 28 DAYS): 4000 PSI(,46 MAX WATER CEMENT RA110) , a 2" ANGLE IRON I 8" DIP F N !5' e" B, REINFORCING STEEL, ASTM A615 GRADE 60' F = Y 60,000 PSI I OR 4" X 4" X 5/8" X 3' LONG I I EMERGENCY DRAIN TYPICAL EACH SIDE ~ L POURED I~ 3. MINIMUM CONCRETE PROTECTION FOR REINFORCEMENT SHALL BE AS FOLLOWS: 4 SPA, ~ 8"=32" ~ a•:'~ M ~ I I CONCRETE POURED IN PLACE ' ' ' • CONCRETE COLLAR A, CAST AGAINST AND PERMANENTLY EXPOSED TO EARTH = 3" INV,= 335.0 ~ WATE! 2" N MAST - WATERPROOF ~ ~ cnv B. EXPOSED TO EARTH, WATER OR WEATHER, WHERE FORMS ARE USED = " 6" BASE EL,=334,50 2 Masnc (TYP.) • • ~ 2"ORIFICE 8" G.V. ~ 1" 0 EXPANSION ANCHORS CLASS B RIP RAP ,PLACED 24" DEEP 4. CHAMFER ALL EXPOSED CORNERS OF CONCRETE WITH 3/4" X 45 DEG CHAMFER, ~ ~ UNLESS OTHERWISE NOTED, ~ FI ®8" O.C. TYPICAL EACH SIDE ~ 8" '•r.... ~ LL WITH GROUT 1 oo s TOP aF sPluwar • 8" D.I,P ANGLE IR N OS ~ ~t 7, ALL CONCRETE WORK SHALL BE DONE IN ACCORDANCE WITH "SPECIFI A 1 4"X4"X5/8"X3'LONG TYPICAL EACH SID STRUCTURAL CON R " C TONS FOR • C ETE IN BUILDINGS ACI 301 AND ACI PUBLICATION ACI-350R- E in N "ENVIRONMENTAL ENGINEERING CONCRETE STRUCTURES". 89 3' TBO - "5 N 8, UNLESS NOTED OTHERWISE, ALL SPLICES BENDS T S ANDARD HOOKS AND OTHER ID' DETAILING OF REINFORCEMENT SHALL BE ACCOMPLISH "MANUAL OF STANDARD PRA ED AS RECOMMENDED IN THE PLAN SE T C ION C11CE FOR DETAILING REINFORCED CONCRETE STRUCTURES" INCLUDE SUBLAYER OF FLTER FABRIC OR FS-2 FILTER STONE WITH ACI 315 AND ACI 318-89. A BEDDMC THICKNESS OF 8". •/5 REBAR (TYPICAL EACH FACE) 9. FORM FINISH IS ACCEPTABLE FOR WALLS, FLOAT FINISH SLABS, RUB EXPOSED RISER B - /5 REBAR (TYPICI ARREL STRUC TUBE POND #1 RISE RB ARR EL S TRUC TU SURFACES. RE PO ND # - 1 ANTI SEEP AGE C OLL AR F EM ERG _ ENC Y SP ~ IL LW LL AY ARP D 0 ET N AI D LP #1 OND #1 0. CONTINUOUS RUBBER WATERSTOPS SHALL BE PROVIDED AT ALL CONSTRUCTION JOINTS IN RISER. 11, PRECAST MANUFACTURER TO PROVIDE I BOX IN EACH FA ;~5 D AGONALS AROUND PIPE OPENING IN RISER CE. MBANKMENT TO BE DESIGNED/ INSTALLED PER GEOTECHNICAL RECOMMENDATIONS SOIL EROSION AND SEDIMENTATION CONTROL CERTIFICATION BY THE TOWN OF APEX EMERGENCY • ........:::::.:::a:, AouAT~c>.;a`~~;:;i°:~_~:=::~i:~i`sii:rs:;:;::-:=~:•;::;:ctt::;::::::::, RIP RAP DISSIPATOR NCH ~;'t;~;:° ..;,;•;:st::•r:::=• SPILLWAY = 346.50 TOP OF DAM= 347.00 .a This drowing has been reviewed by the Town of Apex, and to the best of m knowled e t~s:;:•t::s>-.:t:r.;••~-tt=:::::::>: • GALVANIZED 2'x ' / LNLEr PERUANENT 2 z3 16 COVER _ ppOl : RISER L1~RREL and belief, conforms to the requirements established in the Soil Erosion ondy im 9 Sed entotion MI / Wl TH AN 1 " 8 I DAM N. :1 ETER OP NIN 6 A E E AN A G MB K TI MENT R COEM Ai RIA E I SEDIMENT FOREBAY BENCH (10 WIDE IN COVER TO BE DESIGN --:::;•:::-:::::::::•::::.:-:::-:::•:•;;s•::<:.:::.;•::- NSTALLED PER GEOTECHNICA :NT CORE MATERIAL Control Ordin~ce of the Town of Apex, However, this signature does nol constitute o 51GNED/ ~ vari0nce from any requirements conloined in any federal, stole, or Iocd code I w INLET FLOW o, PER GEOTECHNICAL specification, rule or ardinonce. The develops/en ineer contractor is sdel r - TOP RISER = 345.70 RECOMMENDATIONS ~ " 2" ORIFICE INVERT = 343.0 ANTI-SEEPAGE C A VDATIONS t 9 / y esponsible a meeting dl applicable requirements, ' OLL RS " 20 P RMAN P PAGE COLLARS TENS SIGNATURE DOES NOT CONSTITUTE PLAN APPROVAL, ONLY PLAN REQUIREMENTS, A SEPARATE MERGENCY SPILLWAY TOP VIEW BOTTOM OF FOREBAY CONCRETE BOX 30' vEGETATED FILLER LETTER OF PLANAPPROVALVYILLBEMA~EDTOTHEFINANCI ALLY RESPONSIBLE PERSON AT A LATER WITH EXTENDED BASE ELEV=335.00 DATE ACCORDNVG TO THE CONSTRUCTION SEQUENCE. EMBANKMENT WITH MARSH 90 ~ 1d BARREL w.> PLANTS AND SPILLWAY TO 00.50% RISE MAIN POOL MV EMBANKMENT TO BE DESIGNED/ BOTTOM OF POND = 335.00 '~L BY Date: INV, PUT=334,55 STORMWATER STORAGE INSTALLED PER GE0IECHNICAL ~ri/1ir 1klt RECOMMENDATIONS 5' RIP T _ _ EMeaNIC CU OFF RIP RAP DISSIPATOR PERM/NENf POOL' - MENt TRENCH _ ~_gEEp RIP RAP DISSIPATOR REVIEW CERTIFICATION BY THE TOWN OF AP EX EDIMENT FOREBAY' 1M15 CONCRETE 18"BARREL PLANTED AS MARSH q _ NTI FLOTATION BLDCK INVERT=J35.00 (SIZE TBD) This drawing has been reviewed by the Town of Apex, and to the be my knowled a and belief of st of 9 , co arms to the requirements established in the Standard Specifications of the Town of Apex. However, this si natur PQ SIDE VIEW N TS does not constitute a variance from on r g e D E TE NTI ON PO N _ DO ET S TRU y equirements contained in any federal, state, or local code, law, specification, rule or ordinance, T CTU RE D ET AIL PO N D #1 Bevel ITe oper/engineer/contracior is solely responsible for meetin all applicable requirements. g BY Oute: _ ~ vr......_ 4 ` 1,25' 1,25' 8" CLASS B ~ ~ ,PLACED 24" DEEP POURED IN PLACE 6 TOP OF SPILLwAr CONCRETE COLLAR ~T ' N WATERPROOF r ' MASTIC (TYP,) a F---~_ a IO' ~i '."t ~ INCLUDE SUBLAYER OF FM.TER FABRI - • A BEDDING THICKNESS OF 8", C OR FS 2 FILTER S10NE WITH MBANKMENT TO BE DESIGNED/ ' • ~ • : • ~ • INSTALLED PER GEOTECHNICAL RECOMMENDATIONS i0 N • .s ~ EM ERG _ ENC Y SP EMERGENCY ILLW AY D ETAI N L PO ND #2 :•r:r:•tr`; AOU~nc::»:>:~:;i~~;i.'•;:;'t;s?;~`.~>;=:`•;;i';•::•;;:;:~r~f=•:::": RIP RAP I I • • • D SS PATOR SPILLWAY = 351.55 TOP OF DAM= J52 . .ii~^:iiizi''?iiir~.'?'ii!?.=i:~ie'r'r~^;i BENCH ':'ii':° .............._-.:.:':::::::::::.m•.~: .._4i;:;ire})w:• •OO RiLEf 4%.I•••-~'"%~'•>: PERMANENT GALVANIZED" 2'x2'x3 16" COVER - - R R BARREL. LSE POOL Wl TH E/R AN 1 8 I DAM MI TE OP NIN :°••a.-;..;:.~:~::•~~~:~~-+:::::;: ~ts:;;:;':~i:i;:;:=:: N. 6:1 ApUATI E G MATERIAL TMBANKMENT CORE • SEDIMENT FOREBAY BENCH (10 WIDE IN COVER 0 BE DESIGNED/ CORE MATERIAL ~5 REBAR (TYPICAL EACH FACE VED/ ) -::.::~-.~:ss::;•;;s;:••;;:::;-::;:-t-;;;::;;:-•;;-~ INLET ROW STALLED PER GEOTECHNICAL • • • • • TOP RISER ~ 349.95 RECOMMENDATIONS :R GEOTECHNICAL ~ 2" ORIFICE INVERT .348.0 .ANTI-SEEPAGE C A n A oNS S P A GE C OL L A RP ON D# 2 OLL RS 20" T P M P ~ COLLARS I EMERGENCY SPILLWAY CONC i 30 VEGETATED FILTER J' TOP VIEW BOTTOM OF FOREBAY WITH EXTENDED A B SE ELEV=341,00 TBO EMBANKMENT WITH MARSH 60 LF 18 0p GALVANIZED 2'x2'x3/16" COVER WITH AN B" DIAMETER aPENIN w.x PLANTS AND SPILLWAY TO ~ RISE MAIN POOL '.'fit' INV. OL IN COVER G MV. OUT=340.70 8" GATE VALVE EMBANKMENT TO BE DESIGNED/ BOTTOM OF POND = 341.00 1 STORMWATER STORAGE INSTALLED PER GEOTECHNICAL FOR EMER. DRAIN LOW FLOW ORIFICE ~tlr~ ~t INV. =348,00 _ RECOMMENDATIONS 5' ...,::=a;:•i:;:;&>;;•;;:;a.:;•;;:•:;:;;;.:;-;z,-.;;;;t> CUT OFF RIP RAI RIP RAP DISSIPATOR CONCRETE BOX PERMANENT PO01. is"• E?IBANKMENi TRENCH TOP EL. =349.95 µO_~Ep RIP RAP DISSIPATOR EDIMENT FOREBAY TARS r CONCRETE BARREL t~PLANTEO AS MARSH ANTI- REBAR TRASH ~ ~ ~i",'•. ~•~i.:j•, ~;I'., WATERPROOF ) ROTA110N BLOCK INVERT=341.00 (SIZE TBO) ' • ` MASTIC TYP, ( 1 RACK OVER ORIFCE ~ TYPICAL EACH ANCHORS I ' sloE r ; P SIDE VIEW J I ~ 2" ANGLE IRON I I 8' DIP FOR ° 4 X 4 X 5/8" X 3' LONG i I EMERGENCY DRAIN ~ N TS D NTIO NP OND _ 0 ET TYPICAL EACH SIDE I STR UC TU R E D ET AI LP OND #2 4 SPA, 0 B"=32" ` o . , 1 ~ I L INV.= 341,00 2" • ,50 8" BASE EL, =340 2"ORIFICE " 6" G.V. 1 d EXPANSION ANCHORS o F 0 8" O.C. TYPICAL EACH SIDE ' : ~ ILL WITH GROUT ' 4~. i ~ B" O.I.P ANGLE IRON S 4"X4"X5/8"X3'LONG TYPICAL EACH 51DE 3' TBD P AN S CTION RIS ER _ BA RR EL STRU CTUR EP OND # 2 RIS _ ER B AR R E LS TRU CTUR E PO ND # 2 SEAL SEAL ~ ~ - - 44 DATE; January 14, 2005 SCALE M&C FILE NUMBER BEAVER CREEK CROSSINGS MCE PROJ. 2655-0007 D"3B w'~NFM&CREED DIEVEIOPERS DRAWN HORIZONTAL: 200 MacKenan Court, Suite 200 LRA ORAIMNG NUMBER ®IVERSi~il:® APEX, mTy• NORTH CAROLINA DESIGNED GML N/A Cary, North Carolina 27511 lt Phone: (919) 233-8091, Fax; - 3~B°5- (919) 233 8031 3300 BntaVdse Pui~ Bewhaood, OH 44122 CHECKED CHGmL D3B S /A VERTICAL; - 1b1: 216-735- REv,ND. DESCRIP71ONS DATE AA0002667 E80006691 1b1: 21735-5500 a Fea; 216-755-15W o ~v~rnddccom PROJ. MGR. N c;f11s REVIS[ONS www.mckimcreed.com IFIsT C I =ST NOPffalF~ I STATUS: REN~oN I ST CAROUNA STORMWATER POND DETAILS NOT RELEASED FOR CONSTRUCTION FOR REVIEW ONLY ~ 4 3' TBD GALVANIZED 2'x2'x3 I6" COVER WITH AN 8 DIAMET~R OPENIN STRUCTUR AL NOTES. IN COVER G 1. CONCRETE DESIGN IS BASED ON THE FOLLOWING STANDARDS: 8" GATE VALVE FOR EMER. DRAIN LOW FLOW ORIFICE BUILDING CODE REQUIREMENTS FOR REINFORCED CONCRETE (ACI 318-89) AND INV. 346.00 ALL SUBSEQUENT SUPPLEMENTS. CONCRETE BOX 2. CAST IN PLACE CONCRETE DESIGN IS BASED ON THE FOLLOWNG MATERIA TOP EL. =347.70 ; ; ; . WATERPROOF REBAR TRASH L STRENGTH: ° . • •"r ~ • ~ MASTIC TYP. I I RACK OVER ORIFICE 3.75' „ ( J I r .r. i" 0 EXPANSION ANCHORS I 1.25 1.25 TYPICAL EACH SIDE A. CONCRETE (AT 28 DAYS): 4000 PSI(.46 MAX WATER CEMENT RATIO) 1.25 8" B. REINFORCING STEEL, ASTM A615, GRADE 60: FY = 60,000 PSI J I iv 2" ANGLE IRON ~ ti I I 8" DIP FOR ~ 4 X 4 X 5/8" X 3' LONG I I EMERGENCY DRAIN TYPICAL EACH SIDE I POURS 3. MINIMUM CONCRETE PROTECTION FOR REINFORCEMENT SHALL BE AS FOLLOWS: 4 SPA, 0 8"=32" ~ o CON F i 1`~ I L I C • . POURED IN PLACE corlcRETE caLaR A. CAST AGAINST AND PERMANENTLY EXPOSED TO EARTH = 3" " INV. 342,0 ~ V 2" N b n B. EXPOSED TO EARTH, WATER OR WEATHER WHERE FORMS ARE U = " WATERPROOF N ~ SEO 2 6" BASE EL. =341.50 MASTIC (TYP.) 4j CLASS B RIP RAP ,PLACED 24" DEEP ~ 2"ORIFICE 8" G.V. ~ 1" A EXPANSION ANCHORS r " 4. CHAMFER ALL EXPOSED CORNERS OF CONCRETE WITH 3/4" X 45 DEG CHAMFER, UNLESS OTHERWISE NOTED. m Flll WITH GROUT ®8" O.C. TYPICAL EACH SIDE M ~5 '.,r in TOP OF SPILLWAY • 8 8" D.I,P ANGLE IRONS I 7. ALL CONCRETE WORK SHALL BE DONE IN ACCORDANCE WITH "SPE IFI AT " ~ ~ " C C IONS FOR STRUCTURAL CONCRETE IN BUILDINGS ACI 301 AND AG PUBLICATION ACI-350R-89 4" X 4" X 5/8" X 3' LONG TYPICAL EACH SIDE "ENVIRONMENTAL ENGINEERING CONCRETE STRUCTURES". N ••i n 8. UNLESS NOTED OTHERIM 3' TBD N SE, ALL SPLICES, BENDS, STANDARD HOOKS AND OTHER DETAILING OF REINFORCEMENT SHALL BE ACCOMPLISHED AS RE MM N to CO E DED IN THE "MANUAL OF STANDARD PRACTICE FOR DETAILING REINFORCED CONCRETE STRUCTURES" PLAN SECTION ACI 315 AND ACI 318-89. INCLUDE SUBLAYER OF FILTER FABRIC OR F5-2 FILTER STONE MATH A BEDDING THICKNESS aF 8". 9. FORM FINISH IS ACCEPTABLE FOR WALLS F AT ~5 REBAR (T' ~5 REBAR (TYPICAL EACH FACE) LO FINISH SLABS, RUB EXPOSED RISE - RB ARR EL S TRUC TUR E PO ND _ #3 RISE RB AR REL STRUC TU _ RE PO ND SURFACES. _ EM - #3 ANTI SE EP AG C E 0 LL AR ERG ENC Y SP ILL WA YD ET 0 AIL LL PO ND AR PO #3 0. G N ND O T1NU #3 OUS RUB BER WATERSTOPS SHALL BE PROVIDED AT ALL CONSTRUCTION JOINTS ~ IN RISER. 11. PRECAST MANUFACTURER TO PROVIDE ~5 DIAGONALS AROUND PIPE OPENING IN RISER BOX IN EACH FACE. MBANKMENT TO BE DESIGNED/ ' " ,INSTALLED PER GEOTECHNICAI SOIL EROSION AND SEDIMENTATION CONTROL "RECOMMENDATIONS CERTIFICATION BY THE TOWN OF APEX ~ EMERGENCY I AP DISSIPATOR = r = ........:::::::::::~:;::::_::.;AIXl~ncti-:~::~:~i;;:€:'=i::~;;'i;;TITS;i~l3ris;:•a°>ai:~;:-~';:~x:=ii: SPILLWAY OP OF DAM . 349.50 350.00 This drawing has been re>riewed by the Town of Apex, and to the best of my knowledge A.00 and belief, conforms fo the requirements established in the 5dl Erosion and Sedimentation tr::::;:: ~ t: . ~ ':;;_~$;1„_,,,,:,:::::: GALVANIZED 2~z2'x3 16" CO R NLET _ PNENi RISER BARREL WITH AN 18" DIAME1R ~ EMBANKM NT :::::...:::::::•::•::.-.:.:•:::::::.:.::.,:~~;•!c•::;:_::;:: MIN. 6:1 A(~UATI 0 E NG E CORE MAl Control Ordinance of the Town of Apex. However, this signature does not constitute o TE P NI ::•:::.s:,":':.:.::..',:.;~:"`'::;:::~~~`i:;t:ii: IN COVER TO BE DESIGNED , SEDIMENT FOREBAY BENCH (10 WIDE / EC NKMENT CORE MATERIAL variance from any requirements contained in an federal stole, or local code I w E DESIGNED/ Y ~ a , INLET FLOW INSTALLED PER GEOT I ~uED PER cEOTECHNICAL specificolion, rule or ordinance. The developer/engineer/contractor is sdel res onsble Y P MMENDATIONS fa meeting dl applicable requirements. TOP RISER = 347.70 ECOMMENDATIONS - ~ • 2" ORIFICE INVERT = J46.0 ANTI-SEEPAGE COLLAR! ' 20" • TP fPRM NTP ' -SEEPAGE COLLARS THIS SIGNATURE DOES NOT CONSTITUTE PLAN APPROV AL, ONLY PLAN T~QUIREh~NTS. A SEPARATE EMERGENCY SPILLWAY CONCRETE BOX 30' VEGETATED FILTER LETTER OF PLAN APPROVAL WILL SE MALED TO THE FINANCIALLY RESPONSIBLE PERSON AT A LATER TOP wEw BOTTOM OF FOREBAY WITH EXTENDED BASE DATE ACCOR~NG TO THE CONSTRUCTION SEQUENCE, ELEV=342.00 EMBANKMENT WITH MARSH 851E 15 005 aosox BY Date:' .r•,;,> PLANTS AND SPILLWAY TO :,.~R::::. RISE MAIN POOL : INV. OUT 341,5 EMBANKMENT TO BE DESIGNED/ BOTTOM OF POND = 342.00 . S10RMWATER STORAGE INSTALLED PER GEOTECHNICAI 1 - _ RECOMMENDATIONS CUT OFF 5' RIP RAP DISSIPATOR REVIEW CERTIFICATION BY THE T W TR NH EC - j: pER1AANEM:.p00L EMBAIMNENT 0 N OF APEX ANn-SEEP RIP RAP DIS5IPATOR EDIMENT FOREBAY IAIiS r CONCRETE BARREL This drawing has been reviewed by the Town of Apex, and to the best of ~PIANTED AS MARSH) ANTI-FLOTATION BLOCK INVERT=342.00 (SIZE TBD) my knowledge and belief, conforms to the requirements established in the Standard Specifications of the Town of Apex. However, this signature - P SIDE VIEW NTS does not constitute a varlonce from any requirements contained in any D NTIO _ N Po ND 0 UTL ET S TRUC federal, state, or local code, low, specification, rule or ordinance. The TURE DETAt L PO ND #3 developer/engineer/contractor is solely responsible for meetin all 9 applicable requirements. BY Dote: 3.75` 8• CLASS B RIP RAP ,PLACED 24" PEEP 1.25' 1,25' POURED IN PLACE ' • 6 ~ ~ SPILLWAY CONCRETE COLLAR N WATERPROOF n MASTIC (TYP,) ' n I---- I 0' M 15 . • e , ~ i INCLUDE SUBLAYER OF FILTER FABRIC OR FS-2 FILLER STONE MATH . A BEDDING THICKNESS OF B", , MBANKMENT TO BE DESIGNED/ INSTALLED PER GEOTECHNICAL ~ i RECOMMENDATIONS N EME - RGE C NY ~ SPILLW AY DETAIL PO ND #4 N I . EMERGENCY •:::•::;t: AOVATICr~;~::it>:`~=::~~`::~>~~%:~%::;;=::';i~;%: is ..:RIP RAP DISSIPATOR SPILLWAY = 347. TOP OF DAM= 348.00 00 •":.::iri;.i;~:~;`:=i:~i; iiii BENCH : ~ ;;;;;::s:;_:a~;:~:::~:tas•s ~ GALVANIZED"2'x2'x3 16" COVER INLET iii:±.....kyl„•,~,;;;;i•;: PERMANENT Ri BARREL WITH AN 18 DIAME R EMBANKMENT Pool SER MIN. 6:1 A ATI OPENING CORE MATEF IN CO R BE DESIGNED/ ENT AY BENCH (10 WIDE :.....:...:::.:::.-;r>::.:>:;:=•-;-:~.::•::~•:::.:;::.....:~~~E~:.=:;r:+ i:~ LIED PER GEOTECHN OdENT CORE MATERIAL ~5 REBAR (TYPICAL EACH FACE) DESIGNED/ •-::.,..•-.•:::;;;::::;r>:~;;::~rt•-::•:~:;;::=•s•-.t&r~ INLET FLOW 3 5.80 .ED PER GEOTECHNICAL ANTI- - SEE ENOATK)NS PAGE TOP RISER - 4 RECOMMENOATN)NS 1.5" ORIFICE INVERT = 344. ANTI-SEEPAGE COLLARS COLL AR PO , ND #4 F P RMAN NT 'EEPAGE COLLARS EMERGENCY SPILLWAY CONCRETE BOX 30' VEGETATED FILTER 3' TOP VIEW BOTTOM ~ FOREBAY WITH EXTENDED BASE TBD GALVANIZED 2'x2'x3/16" COVER ELEV=340.00 EMBANKMENT WITH MARSH ~ lF 15 0 0.50X WITH AN 8" DIAMETEER OPENING 0 0.50X IN COVER .~,;s PLANTS AND SPILLWAY TO ' II MAIN P RISE OOL 8" GATE VALVE INV. OUT-339. FOR EMER. DRAIN LOW FLOW ORIFICE EMBANKMENT TO BE DESIGNED/ BOTTOM OF POND = 340.00 ~tfL INV, e344,00 STORMWATER STORAG INSTALLED PER GEOTECHNICAL 1 ~ ~ ' E 'RECOMMENDATIONS _ _ _ - CUT OFF 5' R _ TRENCH RIP RAP DISSIPATOR CONCRETE BOX ~~~~PERMANEM ~POOL~ ~ EMBANKMENT TOP EL.=345.80 • REBAR TRASH _ µp_~Ep RIP RAP DIS5IPATOR C AR EDIMENT FOREBAY IARS r ONCRETE B REL , 4..; • , WATERPROOF I I RAp( OVER ORIFCE •`r.. MASTIC (TYP,) I r ANTI FLOTATION BLOCK INVERT=340.00 PLANTED AS MARSH) I (SIZE TBD) .r 1" 1s EXPANSION ANCHORS I C - POND SECT TYPICAL EACH SIDE J I ~ SIDE vlEw N rS 2" ANGLE IRON I I 6" DIP FOR 4 X 4" X 5/8" X 3' LONG I I EMERGENCY DRAIN D _ ETE NTION PON D OU TLET STRUC TYPICAL EACH SIDE I a•• 4 SPA, ®8"=32" ~ I ~ I i~ m TORE DET AIL P OND # 4 2" INV.= 340• _ BASE EL=339.50 8" 1.5"ORRICE 8" C.V. 1" 0 EXPANSION ANCHORS 0 0 8" O.C. TYPICAL EACH SIDE ~ FILL WITH GROUT ~•i.. .j. ;y. :1; i l• 8" D.I.P ANGLE IRONS 4" X 4" X 5/8" X 3' LONG TYPICAL EACH SIDE 3' TBD PLAN SECTION RISER - BARRE L STRU CTURE _ POND #4 RISER BARRE L STRUC TURF PO ND #4 SEAL SEAL - • 4 IVICM&CMED IF BEAVER CREEK CROSSINGS DATE: Jonuory 14, 2005 SCALE Mac nU NUMaER MCE PROJ. 2655-0007 D- 3C DEVELOPS DRAWN LRA HORIZONTAL: DRAWING NUMBER 200 MacKenan Court, Suite 200 ®OVERSIFIE® APEX, NORTH CAROLINA DESIGNED GML N/A Cary, North Carolina 27511 REALTY 3300 Enterprise Parkway Beachwood, OH 44122 CHECKED GML VERTICAL: - Phone; 233-8091 Fax: 3301 (919) (919) 233-8031 1h1: 211 1h1: 216.755.5500 o Pax: 216.755-1500 o www.cidr.com PROJ. MGR. CHS N/A REV,NO, DESCRIPTIONS DAZE AA0002667 EB0006691 i REVISIONS www•mckimcreed.com STATUS: REhsoN B 7ST GAROLWA PROPEMESJI STORMWATER POND DETAILS FOR REVIEW ONLY NOT RELEASED FOR CONSTRUCTION N/F i00D YANOERS ~ENKINS R0, Bu 1860, PG J9/ OB 8112 vG 115 PwA m)l.a-1D-2958 AREA SQUARE FOOTAGE ACRES AREA NAME OF PROJECT: AREA CLASSIFICATION SQUARE FOOTAGE LF ACRES cRfe WALDEN BEAVER CREEK CROSSINGS SHOPPING CENTER N(F CREEK DR, ~ AREA 1 1,589,50 .036 AREA 6 APEX, NORTH CAROLINA ~F( AREA 6 UNIMPORTANT 52 26 ,001 CyGR ~ \ DEVELOPER; Cy \ F`,~ R NYNRRx.WRXS,mdr6P. AREA #2 955.16 .022 AREA 7 mnx s. YoNms Pn ~ De Boer, ac. s 116 58 .003 Ra R. AREA 7 UNIMPORTANT o PROJECT ~g N D DDR/1ST CAROLINA APEX PHASE III, LLC ~ SITE \~V `V ~ RHA msz Dl-to-Be}e ~ ~ AREA #3 2,428.18 .056 AREA 8 AREA 8 UNIMPORTANT 194 97 ,004 523 KEISLER DR„ SUITE 202 ~ ~ f \ ~ CARP, NORTH CAROLINA 27511 w US 64 AREA #4 2,181.71 .050 AREA 11 \ AREA 11 IMPORTANT 64 42 ,002 PHONE: (919) 657-5005 Y us s4 ~ - ~ \ ~ AREA 5 11,466.11 .263 TOTAL IMPORTANT FAX: (919) 657-5006 TOTAL STREAM ONLY 64 42 ,002 ZONING OF PROPERTY: PUD-CU \ ~ ~ J AREA 9 161.55 ,003 ~ ~ ~ AREA OF TRACT; 50,572 AC ~ ~ AREA 10 460.70 .010 1 1 NLMER x. Pnd rRN TOTAL 19,242.80 0.440 AR A AREA SQUARE FOOTAGE ACRES i Ealll ~ ~K E I ~ ` Plx~ of zo•-:as-~BSe] / y ~ ; ~ TOTAL TOTAL 19,326,80 0,442 ~ r ~ ~ LIMITS OF WETLAND _r ~ \ ~ VICINITY MAP ~ / \ '0G N/i ' ANDREW J. GREGORY, and dlP. ~ \ e \ IMPACTED WETLAND AREA NOT TO SCALE HENNIE A dKGOBY ' T eN INO, PG J0/ ~ BN 1900, PC. 1112 OB S/et, PC. e+e I PNA D73301-29-1175 WETLAND AREA 1 / 1 ~ \ ~ N/P XUNIEA H YOANI$, o+d r11P, \ ~ m11N s wortws A wNA mlxaae-9e]e ~ ~ S NY! • ~ NOfl1H WROLINA DEPARMENi I \ ~ OF 1RANBPDRIAl10N FOR MURC I-SID AIGH7-OF-WAY f \ ~ ~ 1 \ ~ ~ \ ~ NORTH i i - ~ ~ 100' 0 100' 200' ~ ~ 0 ~ o \ ~ N~ ~ ~ towx or APEY SCALE: 1'1=100' (Horiz.} S eu live; Pca l uAi Pw m32D1- AUS LNIt[O PARRiUBxP r ~ ~ BY 199s, Pc. mo ' \ DB 6117, PG BSA \ Pwl 0732.01-Je-1131 r ~ - \ ~ pFT r \v~ ~ r / 4 \ JAYCB PEAR end rNe, DETENTION : ~ / \ BNERRY PEAAO[ ~ , . i / i ~ Leo: zSo ~ Y., 1 I 1 POND ~ ; ~ / ~ PINA ml1.01-JB-ally ;J/ T 1 = . Qa ~ ggg \ / ~ \ / / ~ ~ ~y / RONgp N, 1NENCR and wfr, / N/i RON4D N, 91d1C9 and •114 I CA90.1N 6 MGNEe DB a ss, vG zos r ' - ~ \4 / ~ / / ~ PINA 0}32.a-3e-Aa] LA90.YN B NIGNE9 BN 190.5. PC 1)10 Nit 0R S155, v6 1109 R.WOAIL 5 BCRNARD, ~ ~y PIN/ 013201-JE-9017 0nd M14 TANYY 9EIINIAD ' eM IN9 vG ?ID os ew0. Pa 19te '~v ~ ~ ,v , i I ~ v vMA O73LDI-A7-OOIS ~ CC,/ , ~ I v N I JUNN P. 0'L NON nd NIh MARINA D'LONNOR ~ 14 BY 1905, PG 1110 ~ y 1 fi i\ \ ~ I I ~O'-\ 61.1 1999 PC. 692 (r Q' z DB 10994 PO. 7019 PING O7JLD7./7-0999 ' ~V r~ - I ~ ,,v LEVEL I P ~ ~ ~v I ~ , - ~ SPREADS 2 ~ i ~ - ~ ~ `Y ~ A ~ LEVEL X~~O ~Yv / v ~ I I~ ~v ~ I P SPREADER #4 .v ~ ~ i ~ . ~ ~'e N/I ~ 1 ~ i I ~ ~`a ~ i ~ ~ P I 1 i , ~ WET b~ SLO1T K ttOD, 0na vlle, DOININC E. TODD e4 1995, N. 1710 oe 1095x vG x>ea ~ I / ~ ' P DETENTION ~1V HXd DnzDl-u-tees 1Y x~ BRCNaN x aulNxnn, .Na .la, = . , POND #4 aa9u mu+AanN ew 1999 PG mo oe aot va n7J ~ vN19 mum-n-lea 1 / • I C AREA #1 \ \ I ~ ~~-.I. ~j v ~ ~ ~ A 0 0 ~ ~~C \ r A~ v r I Por1u x e'i~agr r ~ ~ ~ ~ - ~ ~ M Ul eC AO ¦O1,K ele i - << I 'P I I' 20'B A UFFER NII mC01-O-I77~ 16~ M oD99wY c weax.r.Y4 ~ r A /1 SETBACK LINE p 1 9AXeN1A a ~ 1 ~ M 711E IC t9p s teq Na m 1 J ~ *f Y ~ V P t 1 1'Y ~'^-am x~ '°2~ i~ r ` Y' • , - W P /c R Xma'i icon v1°n iww / / ~ ~ 09 ewe PG TIw ~ ~ pxA OAI.m-w-eM P ~ ~ I I D z:~~~ UTURE , ~ . v \ P 1. i ` \ A ~ . , I RESIDENTIAL [DENTIAL ~i ~ FEB ~ ki 700 ~ ~.P ,,''r\ P P Q, I ~ AREA . AREA \ ~ b+ ~Ar \ ~:~ii: A ~ r ~ ~ / ~ DENR-WA'=~K;,~UAiii"v ~ / WEIU~NDSANO ~ ~ r I P i i 1 P ! I ~ oQ' ~ Sg Q~ ~ y ~ 1 ! ' ! AREA #3 ~ c 0~ °,P & ~ I. l I J9. ~ I • 1_ % A / ~ ~ \ , I I I,IlVII'I5 OF WETLANDS 1 ~ I 1 .gl ~ H NIP , ~ - -f i - I ' I,.J OMC DEPO USA, LNG ` BM 1987, PG 11TT BM 2000, PG 1J9A OB a198, PG. TI19 ' , PIN/ 07JT.11-57-ABJS 4 ,i , - ~ r .-_.-,'----i ~ I ~ ~ r ' \ i ~ / ~1 fm 1 I ( ; f ~ ~ NYNRR k AnJeIAS aA M I ~ Earns s Ape}$ ` ~ % . WET ~ ~ 1' i EJQSTING i BY 1916, PG 1]16 ~ / ! ! ! Naa,N ~ARa ; DEPAR>uEm ~ ne ~,6 i"• ~ ~ ~ ~ DETE1,~}EPPII~I 1 1 I I CELL - ~ m 1RAN~OR]AilaN - ' AIBA•Ata6 AU[I 1 ~ ; / ! `•ON I , Ppl rUNRE I-ND RN:Nf ar WAY te1,13A SD A7 ~ i ( /r ! I J I , 1 I I ~ TOWER _ ~ F \ , 1 U'TURE I ~ 2aNAN~ ~ ~ - r ~ I I ! POND #3 1 r" . ~ /WET ~ ~ ~I 1 LEVEL ! DETENTIO I I . I ~ ~ I 1 1 I I FUTURE OFFICE I ~ ~6/Y0 TURF 1 \i R,X ~ STREAM AREA #6 , SPREADER #1 / POND #1 / , FUTURE 1, , r ! ~ I ~ ~ i OFFICE I 11 ~ ~ ~ ~FICE i 1 , I \ I-540 m AREA 9~ ~ ~ 1 I ~ ~ i 1 ~ \5 AREA ~ . - ~ ~h-LEVEL STREAM AREA #7 ~ ~ ~ ~ I 1 - q I SPREADER #3 i ~ 1 1 -~--r i I l STREAM AREA #8 ~ AREA # ~ ~ ~ WATERSHED BUFFER (LOCATED 50 Am ] a ro N Ysx/ rot runA¢ i- / ~ a A~ _ / ~ i ~ FROM TOP OF STREAM BANK) I E ASPHALT P - - - EP ~ ~ AREA#10 / ,,i ~ EP C Ipr 6110161 VINIUCNI / . ~1~ wNE STREAM AREA #11 ' RM 11111[ A•1610pAr-OG-wAp ~ . _ .PANT / pANT _ - _ - r r PANT-' ~ ~ . V.S. I-e ~ ~ ~ . • _ ~ VNBABI.E WDTH PU8t1C RAW - ^ " ~f~ • ~ ~ CP~ vM13' R/W - SEAL SEAL DATE; December 9, 2D04 MkC FILE Nl1M8ER SCALE MCE PR ,r'~~ OJ. # 2655-0007 DDR 1~' ST DRAWN LRA HORIZONTAL: oRavrtNC NuMSea DDR 1 CAROLINA APEX PHASE III LLC , APEX_ NORTH CAROLINA _ , =,oo r 7 • • • • UtSIGNLU LHA 200 MacKenan Court, Suite 200 523 Keisler Drive Suite 202 VERTICAL: CHECKED GML Cary, North Carolina 27511 Cary, North Carolina 27511 [PROJ. MGR. CHS N/A Phone; (919) 233-8091 Fax; (919) 233-8031 1 REVISED PER DWQ COMMENTS p-ry-QS AA0002667 EB0006691 Phone: 919.657.5005 WETLAND IMPACT MAP STATUS: REV1510N [REvm] DESCRIPTIONS DALE www,mckimcreed. com FOR REVIEW ONLY i ~ \ \ . t ~eNK~N3 RD t I t ~ N \ NUNiCR H. NOAPIG and Mle, CDIiN L. MpRRlS C,pF~ WALDEN OB N90. Pt. 559 % ~ ~ PIxY m3am-2a-9597 ~ (F CREEK DR. ~F~ I / ~ / ~ cyGR t I ~~f ~ R ~ ~ cy Rp I \ ao \ PRaJECT N NOR. xlr I `1 '~(/e( AxoArw d cAECOAV, om .Ne, ~ ~ ~ x[Nx¢ w, taECOev I % ~ } SITE W US 64 BN 1999, PC. 594 \ ~ \ R ~ BN 1990. PG 1112 \ DB 5497 Pt. 649 I PINY 0732DI-19-4415 Y US 64 I ~ \ I ; ~ \ 1 `o L ~ N/T I - I \ ~ ~ NUNICR N. NOARS. Pnd xib, ` EDNN G NORMS ' OB 609; PO. 9 I - - o ~ l j x~ ~ \ , ~ flN/ 0132.01-28-9078 x aINA ocoAAINEN7 ( .xsvox74nax ~V DR -940 AICHi-Of-WAY I I / \ I \ ~ \ VICINITY MAP I , ~ ~ I I ;0 NOT TO SCALE I \ NNNNOF APE% BN 1996, P0. 1203 \ ` BN 1996, PG 797 I - 0B 7001, PG 102 \ \ PINA 0772.01-JB-7570 N/f ALPS LMIIEO DARINIR9NV i i i~ qe eili vc, e~i / \ RN/ WR.014R-018Z R~ _ t 1 ~ LIFT ~j/ ~ $iATION / 7 \ N~ JAMES PC0.RCE, and x110. / @11998 PGA 1~T0 ~ ~ ~ ( ~ / ,r; ~ i \ ,Q~r / NORTH ~ - ) ~*~i` l~ ~ 1 I ~ /RONALD N. WaC$, and x11P, 1 001 0 I OQI 0001 \ ~ / ~ cARam B McxEs ~ ~ ~ I \ ~I / &.11994 PG f71D N/T j~ \ / I - `.Q / / / / PIN OIJI~OIG35-9017 AANOALL~S A~RNARO. ,Q \ / / I 1ANNY BERNARD If I I ~ ~ ~ ' /~i ~ I 6ad~o `;~;;a SCALE; 1 =100 (Horiz,) , / ~ ~ ~ / r qN/ m32m-n-Dols / I I 1 ~ / I I ~ N ~ / I JOIN P. O'CONNOA, and x111, Y~'~ ~ ~ ~ ~ - NAgNA O'CONNOR (U y~ '~~i' ~ / , , I I BN 1997, PG 1710 'I• \ F / ~ I OBN10B94 PG 1x29 ~W ~ A ~ ~J + 1 I I . ' PIMA D732.01-17-0980 ~ V / ~ I, I I ~ ~ ~ % , . ~ i i. ~ \ ~ \ I I I I ~ \ ~ i Y \ ~ I / 'i ~ ~ \ I ~ ~ NAr ~ ~ I : ~ scon u. ,aoo, one ,Nq I 1 ~ RozuaE E. rood r~~~ ~ i 1 ~ ~ ~ % ~ _ ~ j J I .J 1994 PO. ,718 ~ ~ \ 08 10951. PG 1306 I PNA 07]2.01-A7-2896 ~ ) ' ~ 1~~ ~ - i ~ i~r ~ I / NAF I BPENOM! L gINAIIIIN, and x110. \ ) U~~ I ' I ~ . / \ aOPoA gLNARRN ..R: y \ % ~i BN 1R97, PG 1110 ~ I I OB BB07, PC. 7116 I;.. ' I I I ~+p \ qN/ 0137.01-11-dB7A ,y i r o `'i \ " \ I I I r \ I I I Ir o ~ i' ~ ' ~ / ~ N/F t 1 I / RALDDLL 7. NLN(Cl, and tlle, 9P NCLLY C. NUNIRL 1 \ ~ ~ \ 1 ~ ~ I , GRFn BN 1995, PO. 1710 'r.,;ul;~ I I l ~ / DB 0063, PG 2lfi ~ ~ ~ 4 ~ ,l/`/~ DNA 0772.DI-/7-1776 _ 1 I n N/f I I I 1 6A~ tREtORr 4 NAi7CRN. end .IN, r/ ~ I ~ I 4 "V 6.C~ W.1M A MAn[RN ~ \ ~ I 8~ ~ PN/ W3L01-/7-5771 X/Y \ \ ~ t j 1 is HR NDAE 5EP0, N91. 91D. i ~ • , \ / R Q 9A 19n, va u22 / I Y , ~ / ~Y Bu 2oao, Pc. 1JeA 1 ~3 \ b~. ~ ~ ~ ~3\ ~ i1 \ i ~ -i/ ` I W ~ ~ ~ nN~ oie6um~~n e71e i1 ~ ~ I 1 ~ • % / ii 0 ~ r U I I I , 11 $ ' / ` i U I r I Z , ~ I I • Q I r / A~~~ 'k a1g6w ~ ~ ~ ~ ~~"g~. ; ' G I , m P I I r I / I r ~ ~ / {6 + ~rA~ 1 ~`1~~ ~ a ' F !c \ ~ I I W I ~ / ! 'w ~ r I I / y~ I 1 , r ~ \ y~Q 1 1 ~ ~ 3q ~ 1 • ,II 1 I 1 i ~ ~ ~ ~ I ~ ~ ~ i i~ I I ~ i/ ~ ~ / . ~ ~ 1 1 i = ~ ~ 1 1 - ~ I ~ 6 ~ - 1 ~ ; - - % r 7 I II ~ ! I ~ coA r 1 I x x. and we, I 5 A 9u PG w D9 G rqd WIOlY4A DPMIYpf 1 PINY 0137. 7- 1 V 11190~A110N wREw.A199 C9 1 ra rvu~ .9ro rwrt-v-+P'Y 1 +eu34 P7 taxnaG Pw 1 r i/ 1 1' i ~ I I 1 \ r ~ I I ll I 1 / I I! I I . i ~ 1 1 1 1 - I I I - - I I l I i I ~ , r ' 1 ~ 1 ~I l /l 1 ~ ~ I - - 1 ~ ; ~ I ~ 1 t } . _1... I 111/ ~ ~ FUTURE I I I I i = 1 / 1 _ ~i Eor 7IS 7o er usco Pw runat \ ~ - ( R-o-w roR I-s4o Axo Wu ~ ~ PURCNASEp BY ME NC4A1H CAA(UXA 1 oEPA a< mANSPCwunox I J ~ ~ _r ~ -~rlr1.~ P9pPas[o 9DX7-or-wXV 1NE / xoRm tAMLINA oEPeRruExr 1 a 7nu4sPDRU7aN / trot runnc 1-54o mtw-tY-wAr) _ -vxxr 1 1 ~ _ - - _ C 1 F AsPHUt _ _ V,~Y84 ~ .,m~ _ _ - U.S. H _ _ _ vnPL Q _~__-SPAT f t 1 f _ rr _ _ .-PAMi ~~'fr'1~1.J r~. o t ~ EP -i a r NAME OF PROJECT; LIMITS OF WETLAND ~ BEAVER CREEK CROSSINGS SHOPPING CENTER APEX, NORTH CAROLINA IMPACTED WETLAND AREA DEVELOPER: DDR/1ST CAROLINA APEX PHASE III, LLC I WETLAND AREA 523 KEISLER DR., SUITE 202 CARY, NORTH CAROLINA 27511 PHONE: (919) 657-5005 FAX: (919) 657-5006 ZONING OF PROPERTY: PUD-CU AREA OF TRACT; 50,572 AC SEAL SEAL DATE: February 141 2005 MdLC FILE NUMBER SCALE M CE PROD. # 2655-0007 ST DRAWN LRA HORIZONTAL: oaAVnNC NuMeeR DDR DDR 1 CAROLINA APEX PHASE III LLC 1. , ~ 1 =100 _ _ _ f DESIGNED LRA 200 MacKenan Court, Suite 200 523 Keisler Drive, Suite 202 CHECKED GML LN'/A ICAL: Cary, North Carolina 27511 Phone: (919) 233-8091, Fax: (919) 233-8031 Cary, North Carolina 27511 PROJ. MGR, CHS Phon AA0002667 ®0006691 e: 919.657.5005 AREA MAP STATUS: REMsiom REV,NO. D ESCRIPTIONS DATE www.mckimcreed.com REVISIONS I%% -i FOR REVIEW ONLY