Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
NCG140086 DMR SW (3)
STORMWATER DISCHARGE OUTFALL (SDO) - Semi-Annual MONITORING FOR GENERAL PERMIT NO. NCG140000 Orig-State 0 Copy-State 0 Copy-Plant CERTIFICATE OF COVERAGE NO. NCU4"Qj__ SAMPLE COLLECTION YEAR:2016 0 Copy-File FACILITY NAME: Chandler Concrete Co.-Pittsboro#111 _ SAMPLING PERIOD: ❑July-December ®January-June PERSON COLLECTING SAMPLES: - D COUNTY ChathamPHONE NO. (919) 542 -4242 CERTIFIED LABORATORY:Pace Analytical Lab#633 i OPTIONAL INFO: --VG--VG 0 i. 1_0'G ADD TO LISTSERVE? DYES NO EMAIL: _ Cti i*i RAL ALES DISCHARGING TO CLASS: ESA ❑HQW ❑PNA ['Trout ®Other: WS-V, ©\ IR SECTION NSW Part A:Stormwater Monitoring Requirements Date Sample In Tier 2 pH Event Total Collected TSSa Monthly #of Months in Tier Outfall No. (Standard Duration Rainfall4 (mo/dd/yr OR (mg/L) Monitoring? 2 Sampling NO FLOW)1 Units) (minutes) (in) (Yin) - - 6-92 1002'3 - - - - 1 NO FLOW - - - - N N/A No Qualifying Discharge this Period 1 If"NO FLOW"or"NO DISCHARGE, Enter"NO FLOW"or"NO DISCHARGE"for each outfall here. Please make sure to mark the sample period above. 2 If a value is in excess of the benchmark,or outside the benchmark range(for pH),you must implement the Tier 1 or Tier 2 responses in the General Permit.Tier 2 Monthly sampling shall be done until 3 consecutive samples are below the benchmark or within the benchmark range. 3 TSS benchmark values are 100 mg/I,except when discharging to ORW, HQW,Trout,and PNA waters where they are 50 mg/I. 4For each sampled measurable storm event the total precipitation must be recorded using data from an on-site rain gauge. Permit Date:7/1/2011-60/30/2015 Last Revised 7/13/11 Page 1 of 2 Part B: Vehicle Maintenance Activity Monitoring Requirements for facilities using>55 gal of new motor oil/month—averaged over a calendar year. In Tier 2 pH TPH using method Total Suspended Event Total New Motor Oil #of Months Outfall Date Samplea Monthly (Standard 1664A SGT-HEM Solids Duration Rainfall Usage in Tier 2 No. Collected Monitoring? 2 (mo/dd/yr)1 Units) (mg/L) (mg/L) (minutes) (in) (gal/month) (yin) Sampling 6-92 152 1002'3 - - - - - - - - N / A - - - No vehicle maintenance performed at facility - - - HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES AT ANY ONE OUTFALL(INCLUDING VEHICLE MAINTENANCE)? YES ❑ NO HAVE YOU CONTACTED THE REGION? YES ❑ NO❑ REGIONAL OFFICE CONTACT NAME: Mail Original and one copy of this DMR (including all "No Flow" &"No Discharge" reports)within 30 days of receipt of sample (or at end of monitoring period in case of"No Flow")to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law,that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system,or those persons directly responsible for gathering the information,the information submitted is,to the best of my knowledge and belief,true,accurate, and complete. I am awarethata inificant penalties for submitting false information, including the possibility of fines a d imprisonment for knowing violations." /a 7 /7 � , (Signature of Permittee) (Date) Permit Date:7/1/2011-60/30/2015 Last Revised 7/13/11 Page 2 of 2