Loading...
HomeMy WebLinkAbout20080231 Ver 3_Approval Letter_20080609OF W A TFi9 Michael F. Easley, Governor O? : qG William G. Ross Jr., Secretary r North Carolina Department of Environment and Natural Resources > ia) -1l 4." < Coleen H. Sullins, Director Division of Water Quality Chuck Wakild, P.E., Deputy Director Division of Water Quality June 9, 2008 DWQ Project # 08-0231 Ver. 3 Beaufort County Charis Properties Mr. Johnny Corbett Post Office Box 1549 Winterville, NC 28590 Subject Property: Cypress Corner Subdivision Section 4, Boat Ramp on Sydney Creek Sydney Creek, Tar-Pamlico River Basin Approval of 401 Water Quality Certification (GC3641) and Authorization Certificate per the Tar-Pamlico River Buffer Protection Rules (15A NCAC 2B.0259) with Additional Conditions Dear Mr. Corbett: You have our approval, in accordance with the attached conditions, to place fill material within or otherwise impact 212 square feet of waters to construct a boat ramp and pier as described in your application received by the Division of Water Quality (DWQ) 401 Oversight/Express Review Permitting Unit on May 14, 2008. After reviewing your application, we have determined that the Division of Water Quality (DWQ) General Water Quality Certification Number 3641 covers these water impacts. This Certification allows you to General Permit No. 198000291 when issued by the US Army Corps of Engineers (USACE). This letter shall also act as your approved Authorization Certificate for impacts to the protected riparian buffers per 15A NCAC 2B .0259. In addition, you should get or otherwise comply with any other federal, state and local requirements before you go ahead with your project including (but not limited to) erosion and sediment control regulations and CAMA. Also, this approval to proceed with your proposed impacts or to conduct impacts to waters as depicted in your application shall expire upon expiration of the 404 or CAMA Permit. This approval is for the purpose and design that you described in your application. If you change your project, you must notify us and you may be required to send us a new application. If the property is sold, the new owner must be given a copy of this Certification and approval letter and is thereby responsible for complying with all conditions. If total fills for this project (now or in the future) exceed one acre of wetland or 150 linear feet of stream, compensatory mitigation may be required as described in 15A NCAC 2H .0506 (h). This approval requires you to follow the conditions listed in the attached certification and any additional conditions listed below. The Additional Conditions of the Certification are: 1. Impacts Approved The following impacts are hereby approved as long as all of the other specific and general conditions of this Certification (or Isolated Wetland Permit) are met. No other impacts are approved including incidental impacts: Amount Approved (Units) Plan Location or Reference Stream (feet) 404/CAMA Wetlands (acres) Waters 212 (square ft.) Boat Ram on Sydney Creek Buffers 1,500 (square ft.) Boat Ram on Sydney Creek North Carolina Division of Water Quality Internet: h2o.enr.state.nc.us 943 Washington Square Mall Phone: 252-946-6481 Washington, NC 27889 FAX 252-946-9215 An Equal Opportunity/Affirmative Action Employer - 50% Recycled/10% Post Consumer Paper NorthCarohna Naturally 2. Certificate of Completion Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any subsequent modifications, the applicant is required to return the attached certificate of completion to the 401 Oversight/Express Review Permitting Unit, North Carolina Division of Water Quality, 1650 Mail Service Center, Raleigh, NC, 27699-1650. 3. Water Quality Certification The proposed project must comply with all of the conditions of General Water Quality Certification (GC) 3641. Violations of any condition herein set forth may result in revocation of this Certification and may result in criminal and/or civil penalties. The authorization to proceed with your proposed impacts or to conduct impacts to waters as depicted in your application and as authorized by this Certification, shall expire upon expiration of the 404 or CAMA Permit. If you do not accept any of the conditions of this Certification (associated with the approved water impacts), you may ask for an adjudicatory hearing. You must act within 60 days of the date that you receive this letter. To ask for a hearing, send a written petition, which conforms to Chapter 150B of the North Carolina General Statutes to the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, N.C. 27699-6714. This certification and its conditions are final and binding unless you ask for a hearing. Any disputes over determinations regarding this Authorization Certificate (associated with the approved buffer impacts) shall be referred in writing to the Director for a decision. The Director's decision is subject to review as provided in Articles 3 and 4 of G.S. 150B. This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water Act and the Tar-Pamlico riparian buffer protection rule as described within 15A NCAC 2B .0259. If you have any questions, please telephone Roberto Scheller of the Washington Regional Office at 252-948-3940 or Ian McMillan of the 401 Oversight/Express Unit at 919-715-4631. Sincerel , A odge/Supervisor Division of Water Quality Surface Water Protection Washington Regional Office Enclosures: Certificate of Completion GC 3641 cc: Corps of Engineers Washington Field Office DWQ 401 Oversight/Express Unit CAMA, Doug Hugget, Morehead Office CAMA, Mike Thomas, WaRO File copy Central Files File:08-0231 Ver.3