Loading...
HomeMy WebLinkAbout20080921 Ver 1_More Info Received_20080616t JF-Ac2l 12 June 2oo8 to Cyndi Karoly, Supervisor 401 Oversight/Express Review Permitting Unit North Carolina Division of Water Quality 165o Mail Service Center Raleigh, NC 27699-i65o re signed page of application Pre-Construction Notification (PCN) Application Form for 4335 Galax Drive; Raleigh, NC, 27612 Dear Ms Karoly, Please find attached our signed Pre-Construction Notification (PCN) Application Form page 12 for the above project and four copies. Thank you for catching the omission. Please phone me with any questions or comments. Thank you for your help w' h this project, Charles Holden, AIA date 1 ®1% 10 N16 ?p_OIJOO?R e?kN pNDEN??gtOR 21 7 DEXTER PLACE RALEIGH, NC 27605 T919.832.2207 I F919.633.2474 WWW. OX I DEAR C H ITECTU RE. 00 M ObO? W AT ?9QG v_? r7 . ? -1 0 I,< Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Coleen H. Sullins, Director Division of Water Quality June 6, 2008 CERTIFIED MAIL: RETURN RECEIPT REQUESTED Oxide Architecture Attn: Charles Holden 217 Dexter Place Raleigh, North Carolina 27605 Subject Property: Anderson: 4335 Galax Drive Unsigned Application - - - ® REQUEST FOR MORE INFORMATION Dear Mr. Holden: DWQ Project # 08-0921 Wake County JUN 1 6 2008 DENR - WATER QUAUTY WETLANDS AND STORMWATER BRANCH On June 5, 2008 the Division of Water Quality (DWQ) received your application for the above referenced project. The DWQ has determined that your application was incomplete and/or provided inaccurate information as discussed below. The DWQ will require additional information in order to process your application to impact protected wetlands and/or streams on the subject property. Therefore, unless we receive five copies of the additional information requested below, we will have to move toward denial of your application as required by 15A NCAC 2H.0506 and will place this project on hold as incomplete until we receive this additional information. Please provide the following information so that we may continue to review your project. Additional Information Requested: ® The PCN Application failed to contain the Applicant/Agent's Signature and Date. See last page of application. (Agent's signature is valid only if an authorization letter from applicant is provided). Please sign/date the enclosed application page and one (1) original and four (4) copies to begin the review and approval process. Please contact the DWQ within three weeks of the date of this letter to verify that you have received this letter and that you remain interested in continuing to pursue permitting of your project and will be providing the DWQ the requested information at a later date. Please contact this office in writing. If we do not hear from you within three weeks, we will assume that you no longer want to pursue this project and we will consider the project as returned. This letter only addresses the application review and does not authorize any impacts to wetlands, waters or protected buffers. Please be aware that any impacts requested within your application are not authorized (at this time) by the DWQ. Please call Mr. Ian McMillan or me at 919-733-1786 if you have any questions regarding or would like to set up a meeting to discuss this matter. 401 Oversight/Express Review Permitting Unit 1650 Mail Service Center, Raleigh, North Carolina 27699-1650 2321 Crabtree Boulevard, Suite 250, Raleigh, North Carolina 27604 Phone: 919-733-1786 / FAX 919-733-6893 / Internet: hap://h2o.enr.state.nc.us/ncwetlands .one 6f Carolina AlaturdlY An Equal Opportunity/Affirmative Action Employer - 50% Recycled/ 101Y* Post Consumer Paper Sincerely, Cyndi Karoly, Supervisor ?O I Oversight/Express Review Permitting Unit CBK/1jd ` Enclosures: Application signature/date page cc: Lauren Witherspoon, DWQ Raleigh Regional Office File Copy Central Files Filename: 080921Andemon4335GalaxDr(Wake) SignaturePage XI. Stormwater (required by DWQ) Describe impervious acreage (existing and proposed) versus total acreage on the site. Discuss stormwater controls proposed in order to protect surface waters and wetlands downstream from the property. If percent impervious surface exceeds 20%, please provide calculations demonstrating total proposed impervious level. Impervious acreage related to the three new homes and driveways is less than 20% of the property area. In addition, cisterns are proposed to harvest rainwater that falls on the roofs. "Rain gardens" are also proposed to mitigate, retain run-off from the driveway and other impervious pathways. XII. Sewage Disposal (required by DWQ) Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. N/A, City sewerage. XIII. Violations (required by DWQ) Is this site in violation of DWQ Wetland Rules (15A NCAC 2H.0500) or any Buffer Rules? Yes ? No X Is this an after-the-fact permit application? Yes ? No X XIV. Cumulative Impacts (required by DWQ) Will this project (based on past and reasonably anticipated future impacts) result in additional development, which could impact nearby downstream water quality? Yes ? No X If yes, please submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent North Carolina Division of Water Quality policy posted on our website at http://h2o.enr.state.nc.us/ncwetlands. If no, please provide a short narrative description: XV. Other Circumstances (Optional): It is the applicant's responsibility to submit the application sufficiently in advance of desired construction dates to allow processing time for these permits. However, an applicant may choose to list constraints associated with construction or sequencing that may impose limits on work schedules (e.g., draw-down schedules for lakes, dates associated with Endangered and Threatened Species, accessibility problems, or other issues outside of the applicant's control). The owner has muscular dvstrophv which has proven to deteriorate his mobilitv araduallv over time. He would like to be in his new, ADA accessible home before his 40`" birthday. This will require construction of the bride etc. to begin in late 2008, earl 2009. /,_0 i;, /Z/o y pplicant/,lfnt's Signature D ' Date • (Ag is signature is valid only if an authorization letter from the applicant is provided.) Page 12 of 12