HomeMy WebLinkAbout20140285 Ver 3_USACE Permit_20161108�
Regulatory Division
DEPARTMENT OF THE ARMY
WILMINGTON DISTRICT, CORPS OF ENGINEERS
69 DARLINGTON AVENUE
WILMINGTON, NORTH CAROLINA 28403-1343 �
ve /'
� �� �
November 4, 2016 l/ j /� �
� � �
Action ID No. SAW-2004-01203
I� � �
, �� �'��
� �����'�r� ,
�} 1'�,�l
I�iUV � r`) LU�b
DENR -bJATER ii�SOURCES
Mr. Philip S. HaTP1S, P.E. TRANSPORTA7YON -cRMITTING UNIT
Project Development and Environmental Analysis Unit
North Carolina Department of Transportation
1598 Mail Service Center
Raleigh, North Carolina 27699-1548
Dear Mr. Harris:
Reference the Department of the Army (DA) permit issued on October 3, 2014, to
Mr. Philip S. Harris of the North Carolina Department of Transportation, for impacts
associated with the project identified as R-0623. The widening project begins along
existing NC 24/27 west of SR 113 8(Dairy Road) and continues east for approximately
1.3 miles, turns south for a 4.5 mile new location section (south of downtown Troy), and
then ties back into NC 24/27 for an approximate 0.9 mile widening to just east of the
Little River. The proposed project is a partial control of access, four lane, shoulder
section facility, with a divided grassed 46-foot median and totals 6.65 miles in length, in
Troy, Montgomery County, North Carolina. Coordinates (in decimal degrees) for the site
are: 35.334610° North, -79.903305° West. Waters identified within the project corridor
include the Little River, Warner Creek, Turkey Creek, their unnamed tributaries, and one
unnamed tributary to Rocky Creek. These waters are located in the in the Yadkin-Pee
Dee River Basin (Hydrologic Unit Code 03040104).
Impacts authorized by the permit include: 1) The permanent placement of fill
material into 4,916 linear feet of jurisdictional stream channel, 1.23 acres of adjacent
riparian wetlands, and 1.37 acres of jurisdictional open waters and, 2) the temporary
placement of fill material into 700 lineax feet of jurisdictional stream channel. Impacts
were associated with roadway fill, bank stabilization, pipe placement, excavation, utility
line installation, and hand clearing of vegetation for overhead power line clearing.
Mitigation was implemented for the unavoidable impacts by payment into the North
Carolina Ecosystem Enhancement Program as well as permittee responsible mitigation
referenced in the permit special conditions.
��
,
-2-
Also reference your letter to the Corps, received via electronic mail on May 20,
2016, requesting modification of the permit for.additional impacts to R-0623, including
the permanent discharge of fill material into 3821inear feet of stream channel, associated
with:
1) an additiona138 feet of permanent streaxn impacts for bank stabilization at Site
15;
2) an additiona12701inear feet of permanent stream impacts and 281inear feet of
temporary stream impacts at new permit site 25 for the proposed Ramp D;
3) an additiona1661inear feet of permanent stream impacts for fill, 7linear feet of
temporary stream impacts and 8linear feet of permanent impacts associated with
bank stabilization at new permit site 26 due to the proposed grade raising on
Troy-Candor Road to accommodate the new interchange;
Note that a public notice regarding your modification request, dated May 20, 2016,
was published on August 31, 2016, for a 15 day comment period. Following evalua.tion
of the information submitted in your modification request, and comments made during
the agency Public Notice period, the U.S. Army Corps of Erigineers, Wilmington District
has determined that the requested impacts are appropriate and reasonable and not
contrary to the public interest. Therefore, the permit is modified to include the requested
additional stream impacts. This work must be constructed for Permit Sites 15, 25 and 26
as shown on drawings included in your modification request dated May 20, 2016 (revised
5/13/2016 Permit Drawing Sheets 1, 55, 56, 90, 91 and Permit Drawing Sheets 1-4,
added 5/13/2016) copy attached. In addition, the following special condition regarding
additional compensatory mitigation has been incorporated:
y) In order to compensate for impacts associated with this permit modification,
additional mitigation shall be provided in accordance with the provisions outlined on the
most recent version of the attached Compensatory Mitigation Responsibility Transfer
Form. The requirements of this form, including any special conditions listed on this form,
are hereby incorporated as special conditions of this permit authorization.
All other conditions of the permit, including the permit expiration date of December
31, 2019, remain in effect as written. The R-0623 project now totals permanent impacts
to 5,2981inear feet of jurisdictional stream channel, 1.23 acres of adjacent riparian
wetlands, and 1.37 acres of jurisdictional open waters and, 2) the temporary placement of
-3-
fill material into 7351inear feet of jurisdictional stream channel for road
construction/improvement activities. Should you have questions„contact Mr. Andrew
Williams, Raleigh Regulatory Field Office at telephone (919) 554-4884, Extension 26 or
Andrew.E. Williams2@usace.army.mil. ;
Sincerely,
i
c �
�vin P. Landers �
Colonel, U.S. Army ;
District Commander �
Attachments
Copy Furnished with Attachments
Mr. Rob Ridings
North Carolina Department of Environmental Quality
1617 Mail Service Center
Raleigh, North Carolina 27699
Mr. Art King
DEO Highway Division 8
902 North Sandhills Blvd.
Aberdeen, North Carolina 28315
Mr. Chris Rivenbark
North Carolina Department of Transportation
Division of Highways
1598 Mail Service Center
Raleigh, North Carolina 27699-1598
Copy Furnished without Attachments
Mr. Pete Benjamin
U.S. Fish and Wildlife Services
Fish and Wildlife Enhancement
Post Office Box 33726
Raleigh, North Carolina 28516
�
Ms. Cynthia Van Der Wiele
U.S. Environmental Protection Agency
Region 4 NEPA Program Office
C/o USEPA-RTP
109 T.W. Alexander Drive
Mail Code: E143-08
Research Triangle Paxk, North Carolina 27709
Ms. Renee Gledhill-Eaxly
North Carolina Division of Cultural Resources
NC State Historical Preservation Office
4617 Mail Service Center
Raleigh, North Carolina 27699-4617
Ms. Amy Chapman
Transportation Permitting Unit
Division of Water Resources
North Caxolina Department of
Environment and Natural Resources
1617 NTail Service Center
Raleigh, North Carolina 27699-1617
Mr. Travis Wilson
North Carolina Wildlife Resources Commission
1142 I-85 Service Road
Creedmoor, North Carolina 27522
. U.S. ARMY CORPS OF EIVGIIVEEFtS
� Wilmington Distrlct
Compensatorv Miti�ation Responsibilitv Transfer Form
Permittee: NCDOT
Project Name: NCDOT TIP: R-0623 Troy Bypass
Action ID: SAW-2004-01203
County: Montgomery
Instructions to Permittee: The Permittee must provide a copy of this form to the Mitigation Sponsor, either an approved
Mitigation Bank or the North Carolina Division of Mitigation Services (NCDMS), who will then sign the form to verify the
transfer of the mitigation responsibility. Once the Sponsor has signed this form, it is the Permittee's responsibility to ensure
that to the U.S. Army Corps of Engineers (USACE) Project Manager identified on page two is in receipt of a signed copy of this
form before conducting authorized impacts, unless otherwise specified below. If more than one mitigation Sponsor will be
used to provide the mitigation associated with the permit, or if the impacts and/or the mitigation will occur in more than one
8-digit Hydrologic Unit Code (HUC), multiple forms will be attached to the permit, and the separate forms for each Sponsor
and/or HUC must be provided to the appropriate mitigation Sponsors.
Instructions to Sponsor: The Sponsor must verify that the mitigation requirements (credits) shown below are available at the
identified site. By signing below, the Sponsor is accepting full responsibility for the identified mitigation, regardless of
whether or not they have received payment from the Permittee. Once the form is signed, the Sponsor must update the bank
ledger and provide a copy of the signed form and the updated bank ledger to the Permittee, the USACE Project Manager, and
the Wilmington District Mitigation Office (see contact information on page 2). The Sponsor must also comply with all
reporting requirements established in their authorizing instrument.
Permitted Impacts and Compensatory Mitigation Requirements:
Permitted Impacts Requirin� Miti�ation* 8-di�it HUC and Basin: 03040104, Yadkin River Basin
Stream Impacts (linear
Warm Cool
336
Wetland Im
Cold I Riparian Riverine I Riparian Non-Riverine I Non-Riparian I Coastal
*If more than one mitigation sponsor will be used for the permit, only include impacts to be mitigated by this sponsor.
ipensatory Mitigation I
Stream Mitigation
Warm Cool
606
uirements:
Cold
HUC and Basin: 03040104, Yadkin River Basin
Wetland Miti�ation (credits)
Riparian Riverine I Riparian Non-Riverine I Non-Riparian I Coastal
Mitigation Site Debited: NCDMS
(List the name of the bank to be debited. For umbrella banks, also list the specific site. For NCDMS, list NCDMS. If the NCDMS
acceptance letter identifies a specific site, also list the specific site to be debited).
Section to be completed by the Mitigation Sponsor
Statement of Mitigation Liability Acceptance: I, the undersigned, verify that I am authorized to approve mitigation
transactions for the Mitigation Sponsor shown below, and I certify that the Sponsor agrees to accept full responsibility for
providing the mitigation identified in this document (see the table above), associated with the USACE Permittee and Action
ID number shown. I also verify that rel'eased credits (and/or advance credits for NCDMS), as approved by the USACE, are
currently available at the mitigation site identified above. Further, I understand that if the Sponsor fails to provide the
required compensatory mitigation, the USACE Wilmington District Engineer may pursue measures against the Sponsor to
ensure compliance associated with the mitigation requirements.
Mitigation Sponsor
Name of Sponsor's Authorized Representative:,
Signature of Sponsor's Authorized Representative
Page 1 of 2
Date of Signature
Form Updated 23 November, 2015
�, � USACE VUilmington District
Compensatory Mitigation Responsibility Transfer Form, Page 2
Conditions for Transfer of Compensatory Mitigation Credit:
• Once this document has been signed by the Mitigation Sponsor and the USACE is in receipt of the signed form, the
Permittee is no longer responsible for providing the mitigation identified in this form, though the Permittee remains
responsible for any other mitigation requirements stated in the permit conditions.
• Construction within jurisdictional areas authorized by the permit identified on page one of this form can begin only after
the USACE is in receipt of a copy of this document signed by the Sponsor, confirming that the Sponsor has accepted
responsibility for providing the mitigation requirements listed herein. For authorized impacts conducted by the North
Carolina Department of Transportation (NCDOT), construction within jurisdictional areas may proceed upon permit
issuance; however, a copy of this form signed by the Sponsor must be provided to the USACE within 30 days of permit
issuance. NCDOT remains fully responsible for the mitigation until the USACE has received this form, confirming that the
Sponsor has accepted responsibility for providing the mitigation requirements listed herein.
� Signed copies of this document must be retained by the Permittee, Mitigation Sponsor, and in the USACE administrative
records for both the permit and the Bank/ILF Instrument. It is the Permittee's responsibility to ensure that the USACE
Project Manager (address below) is provided with a signed copy of this form.
� If changes are proposed to the type, amount, or location of mitigation after this form has been signed and returned to
the USACE, the Sponsor must obtain case-by-case approval from the USACE Project Manager and/or North Carolina
Interagency Review Team (NCfRT). If approved, higher'mitigation ratios may be applied, as per current District guidance
and a new version of this form must be completed and included in the USACE administrative records for both the permit
and the Bank/ILF Instrument.
Comments/Additional Conditions:_USACE impact ratios for the project are as follows: 270 linear feet of stream channel at a
2:1 ratio; 66 linear feet of stream channel at a 1:1 ratio.
This form is not valid unless signed below by the USACE Project Manager and by the Mitigation Sponsor on Page 1. Once
signed, the Sponsorshould provide copies of this form along with an updated bank ledger to:1) the Permittee, 2J the USACE
Project Manager at the address below, and 3J the Wilmington District Mitigation Office, Attn: Todd Tugwell,11405 Falls
of Neuse Road, Wake Forest, NC27587 (email: todd.tugwell@usace.army.milJ. Questions regarding this form or any of the
permit conditions may be directed to the USACE Project Manager below.
USACE Project Manager: Andy Williams
USACE Field Office: Raleigh Regulatory Field Office
US Army Corps of Engineers
3331 Heritage Trade Drive, Suite 105
Wake Forest, North Carolina 27587
Email:Andrew.e.williams2@usace.army.mil
USACE Project Manager Signature
November 4. 2016
Date of Signature
Current Wilmington District mitigation guidance, including information on mitigation ratios, functional assessments, and
mitigation bank location and availability, and credit classifications (including stream temperature and wetland groupings) is
available at http://ribits.usace.armv.mil.
Page 2 of 2
The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so, please complete the
Customer Satisfaction Survey located at our website at httq://resulatorv.usacesurvev.com/ to complete the survey online.
DEPARTMENT OF THE ARMY
WILMINGTON DISTRICT, CORPS OF ENGINEERS
69 DARLINGTON AVENUE
WILMINGTON, NORTH CAROLINA 28403-1343
November 4, 2016
Regulatory Division
Action ID No. SAW-2004-01203
Mr. Philip S. Harris, P.E.
Project Development and Environmental Analysis Unit
North Carolina Department of Transportation
1598 Mail Service Center
Raleigh, North Carolina 27699-1548
Dear Mr. Harris:
C � c, �� � '��% � �
i�'�V 0 �4 �uib �
�'J
DENR • 4;'ATER iic^G;.)r•;�'cS
rRANSPOFT;,1;U� ;'�; ;i�;� n-ING UNIT
Reference the Department of the Army (DA) permit issued on October 3, 2014, to
Mr. Philip S. Harris of the North Carolina Department of Transportation, for impacts
associated with the project identified as R-0623. The widening project begins along
existing NC 24/27 west of SR 113 8(Dairy Road) and continues east for approximately
1.3 miles, turns south for a 4.5 mile new location section (south of downtown Troy), and
then ties back into NC 24/27 for an approximate 0.9 mile widening to just east of the
Little River. The proposed project is a partial control of access, four lane, shoulder
section facility, with a divided grassed 46-foot median and totals 6.65 miles in length, in
Troy, Montgomery County, North Caxolina. Coordinates (in decimal degrees) for the site
are: 35.334610° North, -79.903305° West. Waters identified within the project corridor
include the Little River, Warner Creek, Turkey Creek, their unnamed tributaries, and one
unnamed tributary to Rocky Creek. These waters are located in the in the Yadkin-Pee
Dee River Basin (Hydrologic Unit Code 03040104).
Impacts authorized by the permit include: 1) The permanent placement of fill
material into 4,9161inear feet of jurisdictional stream channel, 1.23 acres of adjacent
riparian wetlands, and 1.37 acres of jurisdictional open waters and, 2) the temporary
placement of fill material into 7001inear feet of jurisdictional stream channel. Impacts
were associated with roadway fill, bank stabilization, pipe placement, excavation, utility
line installation, and hand clearing of vegetation for overhead power line clearing.
Mitigation was implemented for the unavoidable impacts by payment into the North
Carolina Ecosystem Enhancement Program as well as permittee responsible mitigation
referenced in the permit special conditions.
-2-
Also reference your letter to the Corps, received via electronic mail on May 20,
2016, requesting modification of the permit for additional impacts to R-0623, including
the permanent discharge of fill material into 3821inear feet of stream channel, associated
with:
1) an additiona138 feet of permanent stream impacts for bank stabilization at Site
15;
2) an additiona12701inear feet of permanent stream impacts and 281inear feet of
temporary stream impacts at new permit site 25 for the proposed Ramp D;
3) an additiona1661inear feet of permanent stream impacts for fill, 7linear feet of
temporary stream impacts and 8linear feet of permanent impacts associated with
bank stabilization at new permit site 26 due to the proposed grade raising on
Troy-Candor Road to accommodate the new interchange;
Note that a�public notice regarding your modification request, dated May 20, 2016,
was published on August 31, 2016, for a 15 day comment period. Following evaluation
of the information submitted in your modification request, and comments made during
the agency Public Notice period, the U.S. Army Corps of Engineers, Wilmington District
has determined that the requested impacts are appropriate and reasonable and not
contrary to the public interest. Therefore, the permit is modified to include the requested
additional stream impacts. This work must be constructed for Permit Sites 15, 25 and 26
as shown on drawings included in your modification request dated May 20, 2016 (revised
5/13/2016 Permit Drawing Sheets 1, 55, 56, 90, 91 and Permit Drawing Sheets 1-4,
added 5/13/2016) copy attached. In addition, the following special condition regarding
additional compensatory mitigation has been incorporated:
y) In order to compensate for impacts associated with this permit modification,
additional mitigation shall be provided in accordance with the provisions outlined on the
most recent version of the attached Compensatory Mitigation Responsibility Transfer
Form. The requirements of this form, including any special conditions listed on this form,
are hereby incorporated as special conditions of this permit authorization.
All other conditions of the permit, including the permii expiration date of December
31, 2019, remain in effect as written. The R-0623 project now totals permanent impacts
to 5,2981inear feet of jurisdictional stream channel, 1.23 acres of adjacent riparian
wetlands, and 1.37 acres of jurisdictional open waters and, 2) the temporary placement of
-3-
fill material into 7351inear feet of jurisdictional stream channel for road
construction/improvement activities. Should you have questions, contact Mr. Andrew
Williams, Raleigh Regulatory Field Office at telephone (919) 554-4884, Extension 26 or
Andrew.E. Williams2@usace. army.mil.
Sincerely,
s ��
�vin P. Landers
Colonel, U.S. Army
District Commander
Attachments
Copy Furnished with Attachments
Mr. Rob Ridings
North Carolina Deparhnent of Environmental Quality
1617 Mail Service Center
Raleigh, North Carolina 27699
Mr. Art King
DEO Highway Division 8
902 North Sandhills Blvd.
Aberdeen, North Carolina 28315
Mr. Chris Rivenbark
North Carolina Department of Transportation
Division of Highways
1598 Mail Service Center
Raleigh, North Carolina 27699-1598
Copy Furnished without Attachments
Mr. Pete B enj amin
U.S. Fish and Wildlife Services
Fish and Wildlife Enhancement
Post Office Box 33726
Raleigh, North Carolina 28516
�
Ms. Cynthia Van Der Wiele
U.S. Environmental Protection Agency
Region 4 NEPA Program Office
C/o USEPA-RTP
109 T.W. Alexander Drive .
Mail Code: E143-08
Research Triangle Paxk, North Carolina 27709
Ms. Renee Gledhill-Early
North Carolina Division of Cultural Resources
NC State Historical Preservation Office
4617 Mail Service Center
Raleigh, North Carolina 27699-4617
Ms. Amy Chapman
Transportation Permitting Unit
Division of Water Resources
North Carolina Department of
Environment and Natural Resources
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
Mr. Travis Wilson
North Carolina Wildlife Resources Commission
1142 I-85 Service Road
Creedmoor, North Carolina 27522
0
. ; 5 �d � � ����y ���� « ��-
��
y
�
�
w
�
�
�
�
�
w
�
z
��
0
���
��w
r�a
v��nz
���
���
rnw�
wwm
wwYr
N
�O
O
�
�
�
V
W
O
�
�
I �
�
See Sheet 1-A For Index of Sheets
THIS PROJECT IS N7THIN THE MUINICIPAL BOUriDARY OF TROY
SITE SA
-7,2- .STA.2R+91.05 L.R_= SI7E 5B
-n-
DAlRY RD J
(SR 1138)
SITE 7
/AV" 5 5
�0
�
�
i
SITE 3 �
fo9P
?ND l�CBC
'Z'�'�
G
q � y ��
� �
���e �4�
��� � `
� 0
Ir STA.122+33.46 +/-
� l,t- �[tt.tnt�xrso =
-LI- STA.I8+49.86
BEGI11i TIP PRO EC
—LI— STA.17+00.00
-Ll- STA.15+50.00
BEGIIK C011�STRUCTION
* TRAFFIC SIGNAL
� �L � 1L 1L:J �ll' AW �����L `l.i�����AW �
�������A� �� ��������
M01�TGOMER Y CO U1�TY
Action ID: SAW-2004-01203 Applicant: NCDOT Project
Name: NC 24/27 Troy Bypass Mod. TIP R-0623
Page 1 of 9
LOCATl0111: 111C 2�27 TROY BYPASS FROM WEST OF SR 1138
(DAIRY ROAD) TO JUST EAST OF LITTLE RIVER
TYPE OF WORI�: GRADI11iG, DRAINAGE, PAVIII�G, STRUCTURES
SIGNALS A11iD SIG11iI11iG
WETLAND AND SURFACE WATER IMPACTS PERMIT .
p / SRE 19C
rox
SITE 19B
SRE 79
SITE 19A
. -L- POC 983+50B4
� BEG/N RCBC
� SITE 17 ,�
� SITE 16
� �S . � SITE 15
2 � �a���
��
SITE 24A L -�
CAPELSIE RD
x�ocnrrox
SITE 24 (SR 1519) ,
NOTE: THIS PROJECT IS A PARTIAL CONTROLLED ACCESS PROIECT WITH ACCESS BEING LIMITED i0 POINTS AS SHOWN ON THE PLANS
CLfiARII�'G ON THIS PROJECT SHALL B& PERFORMED TO THE LIMITS ESTABLISAED BY METHOD III
-Y9-
PAGE ST
N (SR I332)
C �
Z�1 � A
te ��--- _Yra
HOLLY HlLLS DR
(SR ISB6)
� ST.4 338+09.13 +/-
BEGIIK BRIDGE
E11iD TIP
Permit Drawing
Sheet 1 of 91
Revised 5/13/2016
-YIO-
:E71i RD
2 7324)
��
i � fO
4�' `� � � �l�'C
+� �� \ ��
R-0623
PRELIMINARY PLANS
00 NOC V56 POR Wq511tUCilOIi
Prep7red !n the Offhg oh ��ULICS ENGINEER DIVISI011i OF IiIGHWAYS
GRAPHIC SCALES DESIG11i DATA PROJECT LE11iGTH
ADT 2014 = 6610 - 12,641 DIVISI011i OF HIGHWAYS DE NORTy �
i � � � Q ADT 2040 = 9300 - 18,200 � o
50 25 0 50 l000 Birch Ridge Dr., Ra[eigb NC, 276I0 4� �p
DHV = 10 % zorz srnrmAxn srscrFrcarroxs tiQ' y
PLANS D= 55 % LENGTti ROADWAY TIP PROJECT R-0623 = 6.576 MILES P� � 9
sicxnrur� �
50 25 0 50 l00 T— 77 %• RIGHT OF WAY DATE: G. E. BREW, P.E. .'"c o
LENGTH STRUCTURES TIP PROJECT R-0623 = 0.131 MILES PROJEClFXGfNEER ROADWAY DESIGN r ,�
V= 60 MPH JANUARY 30.2013 EIYGINEHR �'� Q
PROFILE (HORIZONTAL) • TTST =12% DUAL 5% TOTAL LENGTH OF TIP PROJECT R-0623 = 6.649 MILES �F.y Qo�
7�� Q 10 20 FUNC710NAL CLASSIFICATION LHTTII�'G DATE: PRo�sc �nYF.s�rc,Uv �r�cr�ex T oF TRpNS
RURAL ARTERIAL NOVEMBER 18. 2014
PROFILE (VERTICAL) REGIONAL TIER PROJECT sr�N� P� STAT6 OF NORTH CAROLINA
z
0
�
�
� k��
� S� P 22
gR�� � 2P
�` -YSREV-+00
�`NE SN��� Z �F 60
M�'�GN S�� \ \�\ , ` F
EE CEfAII'2
��
`•••• � �
\�:�ij�
���,..�' ,\
�1���
�����1�,
h�1���1� '�
i� +ip�i \
�1�1�
:�1•��� '
:•:•�. 1i
,...♦, '
., � '. .♦♦♦ '
n� � 1� : �
♦
�`_"ai� `� �1���i
� �1�����
_ „1 1�
.` .\ ���F•
— _ . . _' ��L��
� � � . _\� —
� � . �\��,
■ �n1!'�
� '_ :.
` �• � �'� �'�.:�.
�..
� , �t�� �.:i.n :
�� _ -�� �,� �
. /� � _
� � - r� ���`1
.....�
����1
s � � 1���Q��, 1
PLANTE� PMES
U- - , „ �o �
� � y gy1Q ��i W /11 �`` /7 ♦_i {"� + q��S�OC� �\ \
n,� •w
��" �'' � , "' l�Y+ GZ F s \ \\
� 9 00 �
7
� � � o
� ISBKD � � � � i
� � ' Q� \ �,� \
� � � � ��
{:� / �o `\
y %� \ \
�� ���� �y L4T 6ASE DIiCH
'°.n. � SEE DETAIL'22-5'
49 50 �oy i
JOYCE HOWELL MCCALL\ MINNIE WOOD Waoos {;3 �ioy -}
REVOCABLE TRUST �8 161PC 419 9
DB 691 PG 386 � oy
m.
PB F 6K 137-A /i',�/ `��' g
\ 16� 0 � .fJ .
po��30 � CL B P.IP
—YBREV— � �6.
PI Sto 32+7724 es
�= IZ' 3B' OS� (LT) � BENSON MORRIS -YeRtv- +
� D= 3' 49' 11.0' / 4 DB 283 PG 265 76.01'
� L = 330.78'
� T = I66A7'
� ,� R = �500.00'
; � e = SEE PLAN �
� �
�
� � /
�
�
; �
� � /
� �
� �
� �
i �
i Z �
i u
i �^o
i ���
i
' �w
i �
i ��
� �
� NM
� T19
N�LL
� ��- 5" MONOLITHIC CONC. ISLAND _
� ��
i �n*»w
i a(n w
FOR DRAINAGE DITCH DETAILS
SEE SHEEfS 2D-1 THRU 2D-3
5/
.�Q� RICKY HARRIS
DB 489 PG SW
`�,Q PC D SLI�E 124D
.
DETAIL C
FALSE SUh1P
( Nol lo Smle)
. Median Di1ch _
y, I Z,
�,
.. a,n xlo.l ----.�— �o� ----{ GI
-- 5 — em.
5-Ditch Slope 4 P.oposed Di�ch
FROM STA. 252 t 75 Cl
FP.OM -fOFEV- ST4. 30 t 60 ..i
't}L- �jy P.I^P.F,P AT EM 1{(A8ILIZATION
�� SEE DE'AIL -6
L4T BASE DRCH
SEE DETAIL 'G'
DDE�176 C.Y.
��" E5T.97 SY � ' O
C TREES
.� '''' / .
. /.'
TREES __,-- _ -'_""""_
"sa�_---- --' -------- _'_
F
�— HW 11i
�--
F�—�
� TREES
IAU�50
CrJ
z�i
i� C1A55 'B' RIP RAP u
E5T.1 TONS
E5T.5 SY GF
O N
\ TOE PROTECTIO �
\ SEE DETAIL F
W/CL 'B' RIP RAP
E5T.5� TONS
� � .
�
\F ClASS 'B' RIP RAP
\ .f6T�5AFF �%.
ESf P'
\ L4T &4SE DI7C11
� SEE DETAIL 22-7'
\F E5T.16 CY DDE
\
�
�
�\
PLANTEO \� ��
PINES
\ p �
\\
\
\.
�
�
.']IJ)
TOE PFOT=CTION Tn� 7FOTECTIG`J
rSEE DETnIL'f' ��E DETAIL �F'
W Cl 'B' RIP PJ.7 �v/CL '8' RIP RP.P
EST. 71 TONS 'ST. 7 NS
E5T.52 SY GF E5T.16 GF
E%iSIWG N/N
_ 50/L __ "'_____'�_ �.
'------' �
FOR PROFILE OF LINE -L- SEE SHEETS 45
AND 46
�\ FOR PROFILE OF LINE -YBREV- SEE SHEET 57
FOR PROFILE OF LINE -RBD- SEE SHETT 58
�/ \f\
�
\ �c� \
�f °���; \
\ oA+i
3 � � �'�
� PLANTE� PWES ��
� -�
, �
----------{�----- -------- ---
� � 4
� 4 �
i10 /���
�v F \ � �t /
&4CKFILL E�ISTIh'G�CHAN4EL � �
r� F
TREES - I �j O
_ ExiSiv+� niv /c � 0
`1 J 2 �
FI IF
If � a I ,,,,
STANDARD eA�E DITCH 15�
SEE DETlJL T _o� �� I
E5T.12 CY D�E I f
E5T.15 TON CL'1' RIP P
, EST.40 SY ¢F �
\ RIPRP.P AT E�NKMENT I
\'; SEE DETAIL
l I
fl �F
CL455 'B' RIP RAP � �
EST.1 TONS
EST.S SY GF SITE ZS F I
� I
F/ I
// �F
„ __�� /
7LANTEO �
, PINES
��\����, :,����;
—L—
�
�
PLANTE�
PINES
PROJECT REFERENCE NO. SHEET NO.
R-0623 22
RNJ SHEET NO.
:OADwAY DESIGN HYDRAULICS
ENGINEER ENGINEER
PRELIMIN RY PLANS
DO NOT U58 F CONSTAUCTION
INCOMPL TE F'LANS
DO NOT USE FOR R/W ACpU15IT10N
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
\ �
�
�`
�
i l a �B ` �\
t \�. /%��V� F
�--- 1�_--�/ �\�4(��
�
:�a� �—�� --
� _� � � STANDARD BASE DITCH \ O
SEE DETAII'Hti' \ Q
EST.30 CY DDE �
ESi.44 SY PSRA1
� \ �
_ �ri
�' N
M
,• a r-N iG� 3P 55' 12.9' E � N
� �z:: o � ,--
� �W
.r �3 � 2
N
o w
w
o Q Z w
--- c --_ J N
//F C --- C _—_ C _—�_—_
/�QQ ` _
F
z� U
C1A55 'B' RI7 R4P Q �
ES . 11 5Y G cx�siwc ni� _ �
TOE PROTKTION
SEE DE7AIL'F' �
w/CL '8' R1P RAP
EST.15 TO^15
EST.]7 SY GF
CL4S5 'B' P.IP fJ.P
EST. 1 TONS
ESi.S SY GF 5�
-RPD-�79_49 RICKY HARRIS
OB 489 PG 509
PL D SLI�E 129D
—RPD—
Pl Sta /2+76.78
� = 68' l5' 522' (LTJ
D = 28' 38' S2.4'
L = 238.29'
T = 135.57'
R = 200A0'
� -tSL'
Permit Drawing
Sheet 55 of 91
Revised 5/13/2016
Action ID: SAW-2004-01203 Applicant: NCDOT
Project Name: NC 24/27 Troy Bypass Mod. TIP R-0623
Page 2 of 9
%P'
DENOTES IMPACTS IN
� SURFACE WATER
\ ��� � M ACTSSINE SURFACE WATER
100' 0' 100' 200' 300'
GRAPHIC SCALE
i PROJECT REFERENCE NO. SHEET NO.
i m FOR PROFILE OF LINE -L- SEE SHEETS 45
�
i � � FOR DRAINAGE DITCH DEfqILS AND 46 R-0623 22
i• � Zk DETAIL C � e FOR PROFILE OF LINE -YBREV- SEE SHEET 57
� � �� 2 . SEE SHEETS 2D-1 THRU 2D-3 \ w.v stieEr No.
i � Fn�se sur.�r FOR PROFILE OF LINE -RBD- SEE SHETT 58
(Nolla Smle) ROADWAY DESIGN HYDRAU4C5
i �`I i Med'an Difch _ ENGINEER ENGINEER
.�
,�$� ZP 9- �I=��- �/ �
-YBREV-+00
' \N� a��� Z ��F °o � 5! `s- ' --I rc \ f\ PRELoMIN RYsrP�ANS
i � �` ' � � r�q RICKY HARRIS •• aone.b- �- zo• GI
i �`GN �G� \\ � S.Dilch Siope 4 ProposedeDiich
� v \ INCOMI�L TE PLANS
� \ '\ % \� . ! P C D$IIDE 24D Dilch Gra • L Dikh Grad• L ��'ps uo vOT U56 FOR R/ W ACOmslnov
i O
. , �-. � F� c ;- � �P p.09L To 2.0'i 20' O.ar 4 OX To 6 Oi 40' .e�,s \
; . . .. `.�\..% ` �•.\ ` ' ,. o F M S�TA.252.7OSVC�6.0`Y �c�.
50'
zo �
� '. %,. � � � FROA1 -YBP�EV-ST4.30+60 RT �``r"s�.o` \
i , v' DR �
SEE DFiA;I �2 -Y R?�y{ EX. � � .�, � � e\ '+ DOCUMENT NOT GONSIDERED FINAL
i � � l \ . ��,, PLANTED PINES
i I , `�� � ' �..' F�, -BL- 559 UNLESS ALL SIGN4TURE5 COMPLETED
i / y. \; :- �� . -BL- 558 f:�7W+P AT EM KfABIUZATION
.. I ._ ..d • C• � .� � � � SEE DETAIL -6 _ '
� � � � ��. '� - . ,/' L4T BASE CITCM
� � �
' �. . � : 7 Y , , .' , .. , � ; .. -' �'- , : � . . . .. ' .. .
� � \ : � � ( �. \ SEE;DE7AIL G . .. . ., . � � , .
-�..�. .;.\. , \ 4c ' ` � �. i `���� DDE:�136��C.Y. � . , - , . _ . . t
_ I � $�FCIAL CUT \ ��� - F .- EST.�D7.SYy PSRM .. - +/ / � '� \ , � .. � � ' � � .,
`` \ -. fl�$E bfTCH � 9 �. \ . � � � I . � , : {� � O ._ .__ . / - . ' .
r ' I SEE ��TAIC . � . �. .; TOE PROTEC7iE>N � , / ``� \� :�
� ti .\. '� . � � I '.. I �' � TPEES TOE�PROTECTION
(V 'g2-2: � • `.� �i .. SEE D�TAIL'F,� , / " � .
\� � , \� � -+���.1 �1, . SEEDEi.A,l.l'F' ���/ .
I . � � � � � `` � . _...,wlGL-`B' RIP,RAP , \��
i
i �
i i
i
� \ �' 140' � �.. �/' W�CL'B'RIFRAP �- EST.7� NS.. � �e
i �
i `
�
�
/
i •
i I"� I . �i ` • 'U17 �'V' RC ' � � �. � '� ' � � � � � ; � �. . � . � �/ -...ES7. 21 70N5 EST. 1 GF � �TD ; / �
� W . , '�: + '. 5 �`.D�TAIL' :-] ,,,�� • �\ � f . '. . TREES�.: : ' / � � . ' � � � _ EST:5R..�Y GE- ._ _ ." � � i .�` \ .
W I' \ �CUITIVA `\� \ \ x T I - � 1 "' Ewslwc aill
�
I ` '. ' � � .'� �A/N r ♦ . .� ..
I " � � �_ �� '.
I T . I �. ., r . FIELO \ , �.. �. \ lP ' , ._i � . � ; i . „ . ' SOIL_'__ _ _' , "' __� � .
I y ze�. ��. c.� �� mc we 49 � �` �..�' .s� � ; � -�:�. , ; . :. , ',� - _ saf_ _ ; ''� �\�/Cv�.
� N � O , \ � i - ' --' �+ . � � ., �_ � \f ,
I W ' Y � \ v f ` � � F,". I .\ _ . ` c _'__�---� "���.
_. . \ , \ � ---
�
;�
L1� . �` _ _-�. - � �. ` . � F ��/ h�t/ ���__�_j ... / . z3]7 + -�'��� � / t
� � �..' ._ , � . -!
, , � F _ �c:3 � , q 1 _ ' us , \
N �' ,r� _ �
- � \.• LlTChSEDI�CH. 1,•"� , , .� F ' �
I � -c r..c ..:, _.. \ e_ F 7J�P �.,; ..:.� m." ' ,� ...• . : _�-� : �,�,-';,'. ��. . , , ���\ t.� _ � OF � STdNDARD•.BASF�DITCM O
_ `.
% ` �
:
, � -BL- 557 � �c___...,..i��z i -- - � - . . . ���� - � �
i . � ' P,IP R44 � ' V '� ��._.- � .. � 4 •�TYPE.��J_-�%� i�' 7REEA � . . . � ' .,� - � � $EE�DEiRII :�H. . A . . O
i � � . � \• �,,�; . , �.'Gl �4i .,,. ... , fST.30.G`! DDE � � .. . . "
'� ` � / � PLANTED PINES
; � ;"' '� JOYCE. HOWELL McCALL -� ti.. . / / � �� ' �� iSi.�aa'sr 7sR�. \ \. �'
. � . � .� : � . . ', '�_
�- -- _---- —� . . . - ', , _ .
, ' ,
i (� i ' EV CA L � - ..- .- . � , y , i �� -� -
. . �: ;� . ..., . ... �
i � ` � 9w�aec . ' SITE 15 . , , ' , � ., �.�, � '. N
I � ` _ _ , � \ -, .
�, _ � � �
; CV � �� '� Q �'� � �� ,�. � ���.��, �e•R� � �cr � � rvre � �n � uuaso � .�2 0 �� � zci � . i ' 'rs ���. ` L=; . 2 5z"ci � a i R�e � ' 7'6� 3l' 5'l2.9'E'�. ' `. �. , Q N
� ,
O � - �• Y 2 I A -, ,`—' REMOV \ . �I< 5 TYPE �77 i1 °.. .� �\ 2xie , . . � / � .{/ � .� 1Pi . 1�: .` , �G� ` \ .\' � \ _ - O N w
i . ' �, . � - . `�_ . �.
i '�. � , •. ' •
I `
,
.'..
� � N � � , , ; l � , - , �► , �-► , � �� � I W
� - , ,
> , _:_ T=�— ` . �
, � : % �� ,
, � � - ; .q . � m� , �. ,� � - - ---- ------- --- --- -- �-r � � �
� J ; z i-n c� a � �`, . . ' . 'nP �i� zo> ` �, , :ci� � � N
� � 2G1 , � ���. 2GI . .705 CP�V� � � � �� _ .. Q�. .. � 7 IW
W �.''' _ F ___�`S6 . � , O\`�c/ � F\�� '. � "O_ �iyr) , ix�.�.� , C1A55 B;'RIPI.RAF -. � PLnNTED = \ __. ` . �
I T�� � �.'., ' • �.. \
.� 3•-/ '� ,i (
; F 623-3` (GP ) +�,0 �. 6 � �' �� � \. 4 �,• EST 1TON5, ; • � i PINES �� C • �� J V�
� Z �� . . oa 9�.., � ,�' c..� . . �'` EST 5 SY 6F � i ' : _ � . ` ��l�F — .. — _
, , \ �\ � 16 " GR .' \ �. . ;:- � �ai e� I � _ � �' �� `c.. "e — ---
J ` . , � ��.•" ' � . �� . . � t,, �. i r,; ��� i � ., ji� �� = c� .. . T
; . . . � ��. '�. z�i '. �` � `, ` ' .��.. ��`
� , `.
� \
' W,MH ' : , � ' .. C
i ' .` . '. .. �. '. �, _ 90'i : ; � �': . \ .. _ ' i
� \
i � ' '. �. , ' �- '' O � GfiASS . � .'. '.. . ''., TOE PROTECSIQ � .. , �. F \\; � `V' I/ \`� \ \ \� . \ -' .... . ( 1
�
t .
� - �
� � _ � - i ; � ' �._ � �' ' � ::SEE D61'AIL F .�^BhCKF�lII E%ISTIN�CI-ItiHNeI p . �F . ' ��o . �. � V � ' � .. � �` V
�•� . .. ��'CL B RIP RAP � '. CLASi `8'�RIP ^e/CP' �� {^�
� ���. �'�. . \ 1 �', � .i � Zp � . ` ` . : � � SY.57 TaNS '�TREES I - , I � -�. ��. . � � ,. W '� �
, � ti,� o -, � � .... �` � ._,. _ � sa2s�� \ `' \ � , . . t / E.�:.� ��. 15 � ' � _ ez7 n�� w� �•.e,sra�c w � \. �
� ' SQe� .�� � \ . . � � 'a �� � �; � �.�� � � �: 2 � ...�_` \ . '.,\. \ �'�.
i �� . . . . ..., r ..n .� - , , .
. . . � . ....�,.
_ .
� , �3. . �� �. 0 . � � . c cyr�+�,, �. \ ;�., �� ,�� � -� � F Cu55 a kiPi� � � „ �
_
.
%
:
� �� � . �. . � .- , oo �' \ � � � " .� . T�Tjj/� ��% � _ { : �.� F L-+260 TbEf'RQ�KHpt� \ �, _
� ! �
� � �` '� �_.. � - . � . : � " P"Y.F : _ � J ; ' I f . . 140 SEE DEi�f 'E' \ � . { � .
� `. \t ti . � . � . _ � S \.i � �n ' % � \ : �s �7 S z ' i ; i . i �'•., Q � � ��B' wP,q�' `
, �''3 . . .. - s� �� :' P ,.� -1 � ! � �\ ao,` � ' N _
i \', .. . �� � F' � � '�..,��'�_, ISBkO.. . � �:':-'i ' �4.. � , : W. ` , ! �\ . IAY � `E DITCH � � } i i.�''' 1 ' Q . _ E5T..37�. $UV GF.' �� \ � � � �' . - . �' .
' .' ,. �. �.�('�
i � � . . . - . . �_ . . . � . . � . �,�.� :, �� ST'ANd D'�E�`DIjCM� � ' ,
i . ��. . '. . '�. , w i. �'.'�. � � ' � - p\ \ . \ � � � : � � � � : $E�e. QEIAII 22 7 .:.�SE�,P �.'. . . . .. _ . . . . _ _ .
. . ... - ... \ \ .-,�.�.•.'� .,-_ .:.. . �._ i' �- � ' � � j l � f5T:idGYDDE . /��' .m I�` : I �'� .. . - ��� � .. � .
i �•. . �, . � i.. � . ��. _ � � / � / t �EST.I4:CY�D
��_ . ._ � . : . _
_ . ._ . __. . , , -� ;� E
. . , ,: . �.! _ .
, '
c i. oi BL 560
a
i '�_ .� `\ . •. _ . � � ��i, '� � '19 � ��� �i � f � _��ESb.75 70N�G4'1'RIP'.
4 � � �F� �
i - - - .,: � � ., % ; � � �` � ESi, a0�5Y �E . �... ....\ I;
� � \'�- " � Q � � � '' � CL455 'B' F. P F.AP
��� � � \ � '.qItRA7 AT� NKl=_NT I EST.1 TORS
i , � /.� Q \�.. \ � �' \t � ;' � � �. \ "�� SEEDiTA1L � f EST.S SY GF 5�
� � � �
� ... • . ' �� - \ � l � � � \ . I -RPD- +79 49
i e' .. � a� \ i �-. -I RICKY HARRIS
i c,9sa._- - . - _ _ . •, \ �/ ��/- . . ; . p iF 100' DB 489 PC 509
� y � , L4T BASE DITCH . \ • ( ` � ' 'l ..
i �" SEEDETAIL'-22-5' � ` '� PLANTE4\ �E : � � �� PC D SLIDE 1240
i c^ ���. � PINE$ �. .;.�F � � ; CfA6S '8' I�Ip w1P . � � �' � \ � �
i - \ \ 1 " �SY 1 T NS,
�� 49 50 , . �oy �, .�. � A�sr s s�i cF SITE 25 f� � , � -RPD-
O � �� �' w. � Pl Sto 12+76.78
i \ �� MINNIE WOOD � WOODs _.. �; +. ... -(-..�. ' * � .
� JOYCE HOWEIL McCALL ` ' .. � °2' \ �\ � .- p ` � '. ; : . � �,, � �''..� ��. . �'` I 0 = 68'!5� SZZ" (LT)
' �B� 161 PG 419 . .... y yv y. � 4 \ : I 1, 3„ _� � f. .\ .� F D= 28' 38' 52.4�
� REVOCABLE TRUST ` � -� '� �
� DB 691 PC 386 . -� , " �- .. /' ... m '\\�� �. / � � /
� PB F BK 13T-A -. -...'. . . � . + Rp�� ., a .. y, j � . ,: :' �-'� Hw -' � L = 238.23'
� . .e,�o s ,• � , � . �� i ; ,\� � P�pNTEo T = 135.5I'
� y� r „ \� 'f " � � ' z�e ' T Pwes . � � / R = 200A0'
� s� \
'�A6�� S �' ? �C �
�0 5 3 � s� a�xie � ,� ,; � r; _" � � �� � � � � `,� p2T'llll� �T1W111g
-YBREV- � � "
� Pi sto 32+nza ss ' �� i� � '` � ;- i 4 � Sheet 56 of 91
' � _ /2' 38' 05.9' (LTJ e�son MORRis -��> ,. ' � ` � ' / .
� � ,,.�
.
.
' D = 3' 45 /l.0' � Y'R _ .'� \ � � ' � � � Revised 5/ 13/2016
i q �. �8 283 PC 265 , "� 76.01 . .,- . /- .
L = 330.78' / ' Q � ' ` � �
� � � \. ' �
� T = 166.07' � �' �
I » R = I�OO.DO� ... PASTIIRE._� \ �� \��_ '.. \ " \`..� •t\ �', Q"', PDi / DI �.. F .. �
� � � : � {:') . \ ` ':... ♦
\
I � e = SEE PLANS < �., , � _ �w , � , , ; ' ., 'Y ! • , , .�� Action ID: SAW-2004-01203 Applicant: NCDOT
' A / � .\ .,, , ., ,
� , '\
; � �. ':, � � � � f� `� � ' , m° ��`--q� Project Name: NC 24/27 Troy Bypass Mod. TIP R-0623
� � / _ . "p_ � � . � ; P:�o�E so,� e �R�'� - ,� - � . k Pa e 3 of 9
t
�
\ • �
; � \ � ` , � _- � 3`L g
� /
� � � � � ` � ;" `7 �p,'
� � �
i y� PoND �. \ `- S � DENOTE$ IMPACTS IN
� v � \ - \ ', \ , � " ��� Q SURFACE WATER
i �o " '
�� \� � .o�y ' y `.( �.�-� DENOTES TEMPORARY
�� \ �'� � TO� �\ TFCTIOY -`� yF�,Fo � � / �GY \ � IMPACTS IN SURFACE WATER
�» � SE[ D l2Z�t \\ � `v
�� W/E�,'B' AAP �
,��� �...� EST. J0.J0 ,5 fp9� �`��C � 100' 0' IQO' 20�� 3�0�
i N� \ .. ' E5T.�4 SY �F ��. �♦� C V
' �� 5" MONOLITHIC CONC. ISLAND _ � �,,p�'�G`` �
� w�«� Cl" GRAPHIC SCALE
�
, ���
�
=----------------------------------------------------------------------- ------------------------------------------------------------------------------------------------------------------------------------------------------
Action Ii�: SE1W-2004-01203_
A.pplicant: 1�CD0'T
Project IiTaane: NC 24/27.'I'xoy �ypass 10�[od. TIP R-0623
Pa�e 4 of
SITE 25
Permit Drawing
Sheet 1 of 4
Added 5/13/2016
0
�
�
m
d
r
i
:�
z
U
Wp
CV�;S B'
GIP o�..P
esr. t ror�s
EST. 5 Si GF
/� SiANDARD BASE DITCH
3 SEE DEiAIL 22�2'
E5T.17 CY D�E STANDARD 8lSE DI'CH
EST.15 TONS Cl'I' RIP RAP SEE DETAIL'32�2'
cST.20 SY GF EST.7 CY DDE
�EST.10 TONS Cl'I'?.I� �A7
EST. 14 SY GF
PLANiEO
PINES �
i �
�
��� ^
RRD ...%��,, `"
��� :.�,�•s: � ... �
�'a��` ��
— —'— —
�
� �
-GE i'rJItC110N
'�F �F�tIL 2:�1
.�, �.:L'3' RIP RAP F��
- � ;L 5 SY GF ' ��
� \ ~��
�\ ��
��i
�IRECTIONAL ONLY '�
ENO OF PIPE N/G
PQNO
. c � �_ ��
T'V'DIiCH iC
`.[E DEiAIL'2i�-3' �
END C/A
R0623-4 (GPS)
-BYB- POT 15+96.14 PASTURE
C
-5" MONOLITHIC CONC. ISLAND
�DENOTES IMPACTS IN
SURFACE WA7ER
�DENOTES TEMPORARY
IMPACTS IN SURFACE wATER
100' 0' IOD' 200' 300'
� � � � 1 �
GRAPHIC SCALE
51
RICKY HARRIS
PLanrEo DB 489 PG 509
aiNES PC D SLIDE 124D
tii
j' CL4SS 'B' RIP F.AP
EST.3 TONS
' RAP EST.71 SY GF SPECIAL CUT
�5 BASE DRCH
GF � SEE DETAII '228-5'
� �
0
��f�i�wl'tTT�-
�� SR ISSi Tf�/�µ — — � 4"�i.✓Z: - _ —
q�R RO ��r�'
�� -YBREV - 1 �
rcw � �.�,�
JITCH 48' ND IL _
_ � — �—. — ���-
_---- R {�—� � _ _-- - '=
`R a a a
�
86
BENSON MORRIS
D8 297 PG 265
-i urrtv -
Pl Sta 32f7724 Pl Sto 37+05.21 Pl Sta 39+/5.44
�_ l2' 38' 05.9' (LTl 0= 3' 29' 37.0' (RTl p= l2' S8' 93S (RT)
o=.� aq ii.a o= 2� oa oo.a o= r oa oo.o�
L= 330.78' L= 174.68' L= 185.41'
T= 166.07' T= 87.3/' T= 93J0'
R= 1,500.00' R= 2.864.79' R= 8/8Sl'
e= SEE PLANS e= SEE PLtWS e= EXIST/NG
SPECU.L CUT f\
flASE DITCH tJ
$EE DETAIL '2:3-5'
PaSTURE
FOR DRAINAGE DITCH DETAILS SEE
SHEETS 2D-1 THRU 2D-3
�
o�
�
�
a
z
Tp ���R
�s5B,9p e
PROIECT REFERENCE NO. SHEE7 NO.
R-0623 22g
fLW SHEET NO.
,OADwAY DESIGN HYDR4ULIC5
ENGINEER ENGINEER
INCOMPLE E PLANS
DO !�OT U56 F00. /W wC0l:I5IT�OV
PRELIMIN RY PLANS
DO �'OT ti5E FO CO�'STRUGT]ON
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
FOR PROFILE OF -YBREV- SEE SHEET 57
FOR PROFILE OF -DR22B- SEE SHEET 58
Perniit Drawing
Sheet 2 of 4
Added 5/13/2016
DETAIL 228-1 DETAIL 22�2
TOE PROTECTION STANDARO BASE DITCH
{Naa SmW IN���e S.d.J
e�`
i��d d � D 1` �wnd
��owd D 1`f�
�� d f»aur4 S Min. 0.1 F.
Mw d-I H.
�-1 FI. Cwo��nd� l-7-5 H.
'rve dlinar-R � Rip-RaP T ollln��-CL 1RI Ra
r.�:�_:M -YBREV- STA 31 r80 70 STA.77+30 RT -YBREV- STA 34+04+/- LT
-RP0. STA 11+16+/- RT
DETAIL 226-3 DETAIL 22B-4 DETAIL 226-5
UTERAL'Y DRCH SPKIAL CUT BASE �ITCH SPECIAL CUi B.45E DITCN
��.y� p y�y�� � Nq lo kole) � Nei �e Swlr�
_ 1 � " .� , ,, ,�� � b , d ,.�.
c.or � �•.F. �w 1�� D �Fw� Sbq u D fw,•' �`%
o� D
Min ��1 H. 8 Min. D�1 F. u Wn.O-1 H.
6-3 R. Maa. d�l Ft. !.7 H.
B-Y F.
FnC�M -YBRE�'-STA.33t37 TO STA.34t75 RT FROM -YBREv-STA76+50 TO S�A78-`�7 ��
-.,! �',�er- !'SRM FP.OM -YB°E'/- STA_ 76 � 00 TO STA. �5 r_] _(
_—__.. . —.— _.. . _ _ _
i� � :;FE�/- �. ��r:J iJ TA.3.,+;0 ii
Action ID: SAW-2004-01203 Applicant: NCDOT
Project Name: NC 24/27 Troy Bypass Mod. TIP R-0623
Page 5 of 9
Z
O
�
w
�
�
Z
�
O�
�
N
M
Q �
F�—
� N
I N
1
� W
i-
i N
W
ZN
J
CL455 B'
PJP FGP
EST 1 �ONS
EST.S SY GF
sran:o�.00 ense oircn
;�SEE CETAIL'22�2'
��. E5T.12 CY DDE STANDARD BASE DIiC!i
" ��_E.iTJS.-ZQN�..CL'1' RIP RAP SEE DETAII'2]9-]'
�� -.._EST,-20`SW6F.-._.__._._ . EST.7 CY DDE
__
_; �_-.«___.:..._ ..._...._..._.._._.� _EST.lO70NSCl'I'>ip;��
., -..' F5T.�1� SYGi - 2
PLANTED " �
PINES �� ���
._ - .. � � ' ./
� _
,
TREE$
° � ' SITE 26 . ��'
��
C,.� �� ' ��(�' \+ 1�fJ�
� ' �i-\ iftEES l�, : I � .n. ��'�-✓ "1 \ L'/
� ,,,�� ���
/ ��,�
� �- ��� s
_ — —�— — . � —,
� � aEMove = oo � " � oc
� _ AL
/ � < OCK
LUM
� ��� r�-�,-11"��� .
' � . � � ��.
� a
t E°P.UTtC77611 � � �� � LcTl.l V( I Ci1. � F' � opi �\ �9
� CE7a1L 2�8-{ . . . �V�( m
�' LL �3 RIP RA} .,�. g�� '� I
.- E� lI_ SY �F �%% . � ..
.. %� \�.. ENO C/A �
�// R0623-4 fGPS1 ' P
ar+¢eTar+��.on[t�� _gY8- POT 15+96.14 P^sruae ,
.-.. END OF P4E X/� . �.... -.. .
, ,
.. _`..\ �':\ _' ,. �..:.
_ - _ . . . . _ . _.._PCN'0 �. �I /� � �DR22B- +46 00
lq'
- 5" MONOLITHIC CONC. ISLAND
�DENOTES IMPACTS IN
SURfACE wATER
�DENOTES TEMPORP,RY
IMPACTS IN SURFACE wATER
100' 0' 100' 200' 300'
GRAPHIC SCALE
�
5/
RICKY HARRIS
OB 989 PG 509
rc o suoE izao
FOR DRAINAGE DITCH DETAILS SEE
SHEETS 2D-1 THRU 2D-3
��� �
// . �� J 5�3'FI�Fr.? .. .��. � �
EST 3 TG� 5
P P.}P, . ESi il $Y GF �CIAL CUT ' �
i 1� NS' 'g�SE DITCM . � . .
�. . � SY GF ; .�SEE DETAIf� 239-5` � .. . , . ,- �
. / / ;% .:.-- ' .. _ .. - . . .
> ` i � �
....Y. ' ' _ .. // . _ _ ! � i - .
END C/A . � � ' ,
� � .� ��r �
� �� _�� �� � �. . � i
__ ..,
,
.. . . — � � � .
.
�`��� I SH /551� TFNN-r� a.. —' — � ,��
�
o,
�
�
a
z
'' i " �� � � -YBREV - � � � ���
.
� - . enac-crrr — — � �� ,qg ��M��
�.��. --. an*FnixH�.� �- .. �e xo a �. �� � __ \
— — _' - '
� � �.
HH� ' 3 — ._ � - � � .
\�.ze . , c� c� -- R.� � .� C _ c R....� .- �\TS %J^'C��R`
\
° ° , S���F
F , '� . � �
� �
YBREV-��+ 0
� � W SO' . �, .�' �.,.� \• ,
/�. a �,� � � i69 '\ � % SPECfAL CC�T '. !\ � -
// � �'/.SE Dlicy W
�. � �\ ` \ � � �``S:.' ( SEE DETAIL�'228i5' � \ �
' � � � � � � ;� ' .
� > �
-DR22B- 41 n! '" ... . � \
78 . � % ' _ P�STURE . _ ���.� �
� \ \ -. ' - � .
.-
. � - � - , ,
' �
I � -�
; �. -., � :.. .- _. �_ .
� � _ . _ � - - - ..- � ' _ .ro � � ;
25'tD - f .
... - _ ' . . .
86 DETAIL 22�7
TOE PROTECTION
BENSON MORRIS ��b�
DB 283 PG 265 d�°��,
.,�o� d b 1�F'l��
d
C .1 F.
`_ - 2 FI. C»o�.ei�
e o� i:,«-a � uo-noe
i Y.l'�M -YBREV- STA. 31+80 TO STA 31+30 Ri
—YBREV —
PI Sta 32+7724 Pl Sta 37f05.2/ Pl Sta 39fl5.44
�_/2' 38' 05.9' ILTI �= 3' 29' 37.(7 (RT) �_/2' 58' 43.5 IRTJ
D= 3' 49' 11.0' o= 2� oa oo.o� o= T oa oa.a�
L= 330.78' L= 174.68' L= 185.4/'
T= 166.07' T= 87.37' T= 93J0'
R= 1,500.00' R= 2.864.79' R= 8/85/'
e= SEE PLANS e= SEE PIANS e= EXISTING
DETAIL 22�2
STANDARD eASE DITCH
� Hw �e 5<oW
� p 1� �o�M
Wa�.��� S AVn.O-i Ff.
Mw.d�l F.
B-7-S H.
T or u�..-ct i u Ra
-YBRE`�- S7A 3a�0�+/- LT
-RPD- STAll+lb+/- RT
PP,OIECT REFERENCE NO. SHEET NO.
R-0623 226
RN! SHEET NO.
OADWAY DESIGN HYDRAULICS
ENGINEER ENGWEER
INCOMPLE E PLANS
]l0 }�OT U58 FOR /W ACOtiISITION
PRELIMIN RY PLANS
uo vor �se t'o rn�srtt�cno�
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES GOMPLETED
FOR PROFILE OF -YBREV- SEE SHEET 57
FOR PROFILE OF -DR22B- SEE SHEET 56
Permit Drawing
Sheet 3 of 4
Added 5/13/2016
DETAIL 22�3 DETAIL 226-4 DETAIL 22B-5
UTERPl'v' ORCH SPECIAL CUT BASE DITCH SPECWL C11� BASE OITCH
,w�asmw �Ho�m kob, ,No��, ud.�
1 — " :;, ' .o�, ,.,..
?/ � d°� oncn Noti�d � d
c,o�� p r,F. �w � Fw sep. o fw��� u�c.
Min. D-1 H. B �n. D-1 F. S AYn. D-1 F1.
6-S R. MoA. d�l fl. !.I FI.
8�3 H.
FFGM -YBftF�-STA.37r77 TO STA.34r75 RT FROM -YBREv-STA.J6+50 TO STA38-50 ���:7
T;-e ofti�e�- PSc1.1 FRO!.1 -vBPEV- STA. 36+00 TO StA.36+�0 LT
F�G/.1 -Y8F['!-S7A_35�7D TO STA'_6�i0 F�
Action ID: SAW-2004-01203 Applicant: NCDOT
Project Name: NC 24/27 Troy Bypass Mod. TIP R-0623
Page 6 of 9
SITE 26
Aetion ID: SAi�ii-2004-01203 Applieant: NCDOT
Project Name: 1VC 24/27'Troy Bypass Mod. TIP IZ-0623
Page 7 of 9
Permit Drawing
Sheet 4 of 4
Added 5/13/2016
Action ID: SAW-2004-01203 Applicant: NCDOT
Project Name: 1VC 24/27 Troy Sypass Mod. TIP R-0623
Page 8 of 9
WETLAND PERMIT IMPACT SUMMARY
WETLAND IMPACTS SURFACE WATER IMPACTS
an Existing Existing
Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural
Site Station Structure Fillln Fillln in Clearing in SW SW Impacts Impacts Stream
No. (From/To) Size / Type Wetlands Wetlands Wetlands iri Wetlands Wetlands impacts impacts Permanent Temp. Design
(ac) (ac) (ac) (ac) (ac) (ac) (ac) (ft) (ft) (ft)
1 L2 26+14 to 28+48 Roadway Fill 0.13 0.02 0.01 <0.01 136 16
Bank Stabilization <0.01 11
2 L 30+39 to 30+81 Rt 15" <0.01 <0.01 <0.01 <0.01 39 34
3 L 53+20 to 55+42 2@8'x6' RCBC 0.02 0.02 0.03 <0.01 294 24
4 L 70+83 to 73+70 60" RCP IV 0.02 0.06 0.02 <0.01 271 73
5 L 75+30 to 84+50 2@10'x7' RCBC � 0.05 <0.01 295 17
Bank Stabilization 0.01 62
5A Roadwa Fill 0.04 0.02 500
5B Roadwa Fill 0.01
5C Pond 0.02 0.02 0.34
6 L 120+g5 to 121+g0 Lt Roadwa Fill 0.08
7 L 122+87 to 123+78 Bank Stabilization <0.01 43
7A L 124+42 Lt Bank Stabilization <0.01 16
76 L 124+91 to 128+04 Roadway Fill 0.16 O.D2 <0.01 355 72
8 L 131+38 to 132+�0 Lt Roadwa Fill <0.01 <0.01 <0.01 10
9 L 137+g7 to 138+55 Roadwa Fill 0.03
10 L 150+48 to Y6 11+00 Rt Roadway Fill 0.14 <0.01 0.13
11 L 187+35 to 188+66 1 10'x6' RCBC 0.03 0.01 319 56
Bank Stabilization <0.01 47
11A L 187+80 to 187+gg Roadway Fill 0.01 0.01 105 21
Bank Stabilization <0.01 6
12 L 203+49 to 206+55 2@12'x8' RCBC 0.10 0.01 499 38
13 L 228+85 to 229+g8 Roadway Fill 0.05 0.04
14 L 241+68 to 242+88 54" RCP IV 0.02 0.01 229 60
Bank Stabilization <0.01 12
15 L 250+61 to 251+7� 66" RCP-IV 0.02 <0.01 370 31
Bank Stabilization <0.01 51
TOTALS: 0.68 0.04 0.27 0.68 0.08 3660 452
Stream Bank Stablization Sites 1-15 = 248 feet
Revised 3/31/05
Permit Drawing
Sheet 90 of 91
Revised 5/13/2016
Action ID: SAW-2004-01203 Applicant: NCDOT
Project Name: NC 24/27 Troy Bypass Mod. TIP R-0623
Page 9 of 9
WETLAND PERMIT IMPACT SUMMARY
WETLANDIMPACTS SURFACE WATERIMPACTS
Hand Existing Existing
Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural
Site Station Structure Fillln Fillln in Clearing in SW SW Impacts Impacts Stream
No. (From/To) Size / Type Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp. Design
(ac) (ac (ac) (ac) ac) (ac (ac) (ft) (ft) (ft)
16 L 262+36 to 264+32 30" RCP-III 0.14 0.09
17 L 264+70 to 265+86 54" RCP-III 0.10 0.01 0.03 0.01 <0.01 280 57
Bank Stabilization <0.01 21
18 L269+62 to 272+04 42" RCP-III 0.11 <0.01 0.02 0.01 <0.01 297 44
Bank Stabilization <0.01 22
19 L 282+75 to 283+36 Roadway Fill 0.04
19A L 282+68 to 283+49 Roadway Fill 0.01 0.02
19B L 283+33 to 283+47 2@11'x7' RCBC <0.01 17
19C L 283+47 to 284+20 2@11'x7' RCBC 0.05 340
Bank Stabilization <0.01 9
20 L 316+gg to 317+88 Roadway Fill 0.05
21 L 338+46 to 340+55 Bank Stabilization 0.01 75
Causeways 0.08 112
22 L 350+09 to 352+49 Lt Pond 0.55
23 L 362+75 to 364+14 Rt Pond 0.48
24 Y7 15+26 to 15+49 Lt Roadway Fill <0.01 <0.01
24A Y7 15+63 to 16+31 48" RCP 0.04 0.02 0.01 <0.01 240 18
Bank Stabilization <0.01 10
25 RPD 11+14 to 11+73 72�� RCP-IV 0.02 <0.01 270 28
26 YBREV 33+36 to 34+�3 54" RCP-IV 0.01 <0.01 66 7
Bank Stabilization <0.01 8
SHEET TOTALS (SITES 16-24A): 0.49 0.02 0.11 1.14 0.10 1638 283
SHEET TOTALS (SITES 1-15): 0.68 0.04 0.27 0.68 0.08 3660 452
TOTALS: 1.17 0.06 0.39 1.82 0.17 5298 735
Stream Bank Stablization Sites 16-26 = 145 feet
Permit Drawing
Sheet 91 of 91
Revised 5/13/2016