Thanks Jerry. The temporary crossing removal looks good based on the photos. Has the side the photos were taken from
been seeded/strawed above the rip rap?
The bank stabilization monitoring photos looks good as well, with the small exception of the black plastic in the stream
channel. Is that from NCDOT construction activity? If so, please have them remove it.
Thanks again, Jerry. I appreciate the follow-up.
-Dave Bailey
David E. Bailey, PWS
Regulatory Project Manager
US Army Corps of Engineers
CE-SAW-RG-R
3331 Heritage Trade Drive, Suite 105
Wake Forest, North Carolina 27587
Phone: (919) 554-4884, Ext. 30.
Fax: (919) 562-0421
Email: David.E.Bailey2@usace.army.mil
The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we
continue to do so, please complete the Customer Satisfaction Survey located at
http://corpsmapu.usace.army.mil/cm_apex/f?p=136:4:0.
-----Original Message-----
From: Parker, Jerry A [mailto:jparker@ncdot.gov]
Sent: Thursday, November 03, 2016 10:43 AM
To: Wanucha, Dave <dave.wanucha@ncdenr.gov>; Bailey, David E SAW <David.E.Bailey2@usace.army.mil>
Subject: [EXTERNAL] Pictures from temporary crossing on U-2525
Dave and Dave,
The contractors have completed the removal of the temporary crossing on U-2525 at Rankin Mill Rd. Attached are
pictures showing the restoration and bank stabilization. Dave Bailey, the second attachment shows the pictures of the
bank stabilization at Rankin Mill Rd that we have been monitoring. Let me know if you have any comments or questions.
Jerry Parker