HomeMy WebLinkAbout20130918 Ver 8_Pictures from temporary crossing on U-2525_20161107Strickland, Bev From: Bailey, David E SAW <David.E.Bailey2@usace.army.mil> Sent: Monday, November 07, 2016 11:07 AM To: Parker, Jerry A Cc: Wanucha, Dave Subject: RE: Pictures from temporary crossing on U-2525 Thanks Jerry. The temporary crossing removal looks good based on the photos. Has the side the photos were taken from been seeded/strawed above the rip rap? The bank stabilization monitoring photos looks good as well, with the small exception of the black plastic in the stream channel. Is that from NCDOT construction activity? If so, please have them remove it. Thanks again, Jerry. I appreciate the follow-up. -Dave Bailey David E. Bailey, PWS Regulatory Project Manager US Army Corps of Engineers CE-SAW-RG-R 3331 Heritage Trade Drive, Suite 105 Wake Forest, North Carolina 27587 Phone: (919) 554-4884, Ext. 30. Fax: (919) 562-0421 Email: David.E.Bailey2@usace.army.mil The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so, please complete the Customer Satisfaction Survey located at http://corpsmapu.usace.army.mil/cm_apex/f?p=136:4:0. -----Original Message----- From: Parker, Jerry A [mailto:jparker@ncdot.gov] Sent: Thursday, November 03, 2016 10:43 AM To: Wanucha, Dave <dave.wanucha@ncdenr.gov>; Bailey, David E SAW <David.E.Bailey2@usace.army.mil> Subject: [EXTERNAL] Pictures from temporary crossing on U-2525 Dave and Dave, The contractors have completed the removal of the temporary crossing on U-2525 at Rankin Mill Rd. Attached are pictures showing the restoration and bank stabilization. Dave Bailey, the second attachment shows the pictures of the bank stabilization at Rankin Mill Rd that we have been monitoring. Let me know if you have any comments or questions. Jerry Parker Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties.