Loading...
HomeMy WebLinkAbout20131200 Ver 4_DEMLR Inspection Reports_20161107Burdette, Jennifer a From: Clement Riddle <clement@cwenv.com> Sent: Monday, November 07, 2016 2:27 PM To: Burdette, Jennifer a Subject: Fwd: Tryon Inspection Reports Attachments: image001.png; ATT00001.htm; 11072016125652-DOC110716.pdf, ATT00002.htm Jennifer, I am forwarding you the compliance reports from Shawna riddle regarding tryon equestrian center. Hopefully, we are on track for 401 now. Please let me know if you have any questions or need any additional information. Clement Sent from my iPhone Begin forwarded message: From: "David Odom" <davidodom@odomengineering.com> Date: November 7, 2016 at 1:45:10 PM EST To: "Clement Riddle" <dement@cwenv.com> Subject: Fwd: Tryon Inspection Reports From: Riddle, Shawna <shawnaAddle@ncdenr.gov> Sent: Monday, November 7, 2016 1:11:54 PM To: Wayne Watkins; David Odom; Jeff Brown Cc: Aiken, Stan E Subject: Tryon Inspection Reports Wayne - Here are the inspection reports from 10/25. If you have questions — call me. Thanks Shawna Shawna Riddle Environmental Senior Specialist Land Quality Section N. C. Dept of Environmental Quality 828 296-4500 Phone 828 299-7043 Fax Shawn a.Riddle(a)ncdenr.gov 2090 US Hwy 70 Swannanoa, NC 28778 1 North Carolina Department of Environmental Quality Land Quality Section: 2090 U.S. HIGHWAY 70 SWANNANOA, NC 28778, Phone: 828-296-4500 COUNTY: Polk PROJECT: TRYON INTERNATIONAL EQUESTRIAN CENTIRIVER BASIN: BROAD PERSON FINANCIALLY RESPONSIBLE: Jeff Brown, Tryon Equestrian Properties No 2 PROJECT # POLK-2015-401 ADDRESS: 4066 Pea Ridge Road Mill Spring NC 28756 CASE # 1. PROJECT LOCATION: CRNR Pea Ridge/J Shehon Rd. Green Creek NC 28782 Pictures: Video: Digital: 2. Weather and Soil Conditions: DRY PC First Inspection:NO 3. Is site currently under Notice of Violation? NO 4. Is the site in compliance with S.P.C.A. and rules? YES 5. Violations: 6. Is the site in compliance with NPDES Permit NCG 010000?: YES 7. Has Sedimentation Damage occurred since last in ections? NO Lake/natural watercourse on the tract: Lakelnatural watercourse off the tract: Other Property: Description: Degree of Damage: Stormwater Discharge Outfall with high turbidity or sedimentation loss: 8. Contact Made with (name): WAYNE WATKINS Title: ODOM ENGINEERING Inspection Report: SENT TO PERSON FINANCIALLY RESPONSIBLE Date Given/Sent: NOV 04, 2016 9. Corrective Actions Needed: 10. COMMENTS: West slope of the proiect has been re -seeded. Continue efforts of establishing a permanent groundcover, Continue to maintain the sediment basin as needed. Report By: Shawna Riddle 4 Others Present: R. BROOKS Date of Inspection: OCT 25, 2016 Time Arriving on Site: 10:15 cc; Time Leaving Site: 12:15 Revision Date 1011612015 Page 1 of 1 North Carolina Department of Environmental Quality Land Qualify Section: 2090 U.S. HIGHWAY 70 SWANNANOA, NC 28778, Phone: 828-296-4500 COUNTY: Polk PROJECT: Tryon International E uestrian Center Phase 3RIVER BASIN: BROAD PERSON FINANCIALLY RESPONSIBLE: Jeff Brown, Tryon Equestrian Properties PROJECT # POLK-2014-009 ADDRESS: 4066 Pea Ridge Road Mill Spring, NC 28756 CASE # 1. PROJECT LOCATION: 4066 Pea Ridge Rd. Mill Spring NC 28756 Pictures: YES Video: Digital: X 2. Weather and Soil Conditions: DRY PC First Inspection: 3. Is site currently under Notice of Violation? YES 4. Is the site in compliance with S.P.C.A. and rules? NO 5. Violations: b. Failure to follow approved plan - G.S. 113A-57(5)and Failure to implement the erosion and sedimentation control plan, NCG 010000 Section III. 3) (a) d. Failure to provide adequate groundcover - Failure to provide adequate groundcover, G.S. 113A-57(3) and 15A N.C. A.C. 4B.0107(b) or 15A N.C.A.C. 4B.0124(e) 6. Is the site in compliance with NPDES Permit NCG 010000?: NO 7. Has Sedimentation Damage occurred since last inoections? NO Lake/natural watercourse on the tract: Lake/natural watercourse off the tract: Other Property: Description: Degree of Damage: Stormwater Discharge Outfall with high turbidity or sedimentation loss: 8. Contact Made with (name): WAYNE WATKINS Title: ODOM ENGINEERING Inspection Report: SENT TO PERSON FINANCIALLY RESPONSIBLE 9. Corrective Actions Needed: Date Given/Sent: NOV 04, 2016 10. COMMENTS: Groundcover has not been established as required in the July 26 2016 NOV. As discussed onsite - the NOV for this proiect will not be released until a permanent groundcover has been established on all bare areas of the north slope. Gullies and ruts are still present in the slope. Some areas have been repaired. Report By: Shawna Riddle`" Others Present: R. BROOKS Date of Inspection: OCT 25, 2016 Time Arriving on Site: 10:15 cc; Revision Date 10/16/2015 Time Leaving Site: 12:15 Page 1 of 1 North Carolina Department of Environmental Quality Land Quality Section: 2090 U.S. HIGHWAY 70 SWANNANOA, NC 28778, Phone: 828-296-4500 COUNTY: Polk PROJECT: TRYON EQUESTRIAN TREE REMOVAL ECP RIVER BASIN: BROAD PERSON FINANCIALLY RESPONSIBLE: Jeff Brown, Tryon Equestrian Properties, LLC PROJECT # POLK-2016-001 ADDRESS: 4066 Pea Ridge Road Mill Spring, NC 28756 CASE # 1. PROJECT LOCATION: 4066 Pea Ride Rd. Mill Spring NC 28756 Pictures: YES Video: Digital: X 2. Weather and Soil Conditions: DRY PC First Inspection: 3. Is site currently under Notice of Violation? YES 4. Is the site in compliance with S.P.C.A, and rules? YES 5. Violations: 6. Is the site in compliance with NPDES Permit NCG 0100007: YES 7. Has Sedimentation Damage occurred since last inpections? NO Lakeinatural watercourse on the tract: Lake/natural watercourse off the tract: Description: Degree of Damage: Stormwater Discharge Outfall with high turbidity or sedimentation loss: 8. Contact Made with (name): WAYNE WATKINS Inspection Report: SENT TO PERSON FINANCIALLY RESPONSIBLE 9. Corrective Actions Needed: Other Property: Title: ODOM ENGINEERING Date Given/Sent: NOV 04, 2016 10. COMMENTS: Compliance inspection for the NOCAV. The south east corner slope has been re -graded, seeded/matted. Groundcover is becoming established on the slope and surrounding areas. Matting needs to be repaired as discussed onsite. Areas with sparse vegetation will need to be re -seeded. Report By: Shawna Riddle 4 Others Present: R. BROOKS Date of Inspection: OCT 25, 2016 Time Arriving on Site: 10:15 cc; Time Leaving Site: 12:15 Revision Date 10/16/2015 Page 1 of 1 North Carolina Department of Environmental Quality Land Quality Section: 2090 U.S. HIGHWAY 70 SWANNANOA, NC 28778, Phone: 828-296-4500 COUNTY: Polk PROJECT: TRYON EQUESTRIAN CROSS COUNTRY HOR,RIVER BASIN: BROAD PERSON FINANCIALLY RESPONSIBLE: Jeff Brown, Tryon Equestrian Properties No 2 PROJECT # POLK-2015-011 ADDRESS: 4066 Pea Ridge Road Mill Spring NC 28756 CASE # 1. PROJECT LOCATION: 2659 Sandy Plains Rd. Tryon NC 28782 Pictures: Video: Digital: 2. Weather and Soil Conditions: DRY PC First Inspection: NO 3. Is site currently under Notice of Violation? NO 4. Is the site in compliance with S.P.C.A. and rules? YES S. Violations: 6. Is the site in compliance with NPDES Permit NCG 010000?: YES 7. Has Sedimentation Damage occurred since last inpections? NO Lake/natural watercourse on the tract: Lake/natural watercourse off the tract: Description: Degree of Damage: Stormwater Discharge Outfall with high turbidity or sedimentation loss: Other Property: 8. Contact Made with (name): WAYNE WATKINS Title: ODOM ENGINEERING Inspection Report: SENT TO PERSON FINANCIALLY RESPONSIBLE Date GivenlSent: NOV 04, 2016 9. Corrective Actions Needed: 10. COMMENTS: As discussed onsite - add washed stone at the inlet protection device structures where needed and repair damaged devices. Continue to maintain all measures on the site. Continue efforts of establishinq a permanent groundcover where needed. Report By: Shawna Riddle yY Others Present: R. BROOKS Date of Inspection: OCT 25, 2016 Time Arriving on Site: 10:15 cc; Time Leaving Site: 12:15 Revision Date 1011612015 Page 1 of 1 North Carolina Department of Environmental Quality Land Qualify Section: 2090 U.S. HIGHWAY 70 SWANNANOA, NC 28778, Phone: 828-295-4500 COUNTY: Polk PROJECT: TRYON INTERNATIONAL EQUESTRIAN HOTEIRIVER BASIN: BROAD PERSON FINANCIALLY RESPONSIBLE: Jeff Brown, Tryon Equestrian Properties No 2 PROJECT # POLK-2016-011 ADDRESS: 4066 Pea Ridge Road Mill Spring NC 28756 CASE # 1. PROJECT LOCATION: Sandy Plains Rd. Tryon NC Pictures: Video: Digital: 2. Weather and Soil Conditions: DRY PC First Inspection:NO 3. Is site currently under Notice of Violation? NO 4. Is the site in compliance with S.P.C.A. and rules? YES 5. Violations: 6. Is the site in compliance with NPDES Permit NCG 0100007: YES 7. Has Sedimentation Damage occurred since last inpections? NO Lake/natural watercourse on the tract: Lakelnatural watercourse off the tract: Other Property: Description: Degree of Damage: Stormwater Discharge Outfall with high turbidity or sedimentation loss: 8. Contact Made with (name): WAYNE WATKINS Title: ODOM ENGINEERING Inspection Report: SENT TO PERSON FINANCIALLY RESPONSIBLE Date Given/Sent: NOV 04, 2016 9. Corrective Actions Needed: 10. COMMENTS: Continue to establish a permanent groundcover on all bare areas. Report By: Shawna Riddle Others Present: R. BROOKS Date of Inspection: OCT 25, 2016 Time Arriving on Site: 10:15 cc; Time Leaving Site: 12:15 Revision Date 10/16/2015 Page 1 of 1 North Carolina Department of Environmental Quality Land Qualify Section: 2090 U. S. HIGHWAY 70 SWANNANOA, NC 28778, Phone: 828-296-4500 COUNTY: Polk PROJECT: TRYON EQUESTRIAN FARMETTE EROSION CRIVER BASIN: BROAD PERSON FINANCIALLY RESPONSIBLE: Jeff Brown, Tryon Equestrian Properties No 2 PROJECT # POLK-2015.005 ADDRESS: 4066 Pea Ridge Road Mill Sprung NC 28756 CASE # 1. PROJECT LOCATION: John Shehan Rd. T on NC 28782 Pictures: Video: Digital: 2. Weather and Soil Conditions: DRY PC First Inspection:NO 3. Is site currently under Notice of Violation? NO 4. Is the site in compliance with S.P.C.A. and rules? YES 5. Violations: 6. Is the site in compliance with NPDES Permit NCG 010000?: YES 7. Has Sedimentation Damage occurred since last inpections? NO Lake/natural watercourse on the tract: Lakeinatural watercourse off the tract: Description: Degree of Damage: Stormwater Discharge Outfall with high turbidity or sedimentation loss: 8. Contact Made with (name): WAYNE WATKINS Inspection Report: SENT TO PERSON FINANCIALLY RESPONSIBLE 9. Corrective Actions Needed: Other Property: Title: ODOM ENGINEERING Date Given/Sent: NOV 04, 2016 10. COMMENTS: The RV park center section is permitted within the Farmette area. Areas have been re -seeded adjacent to John Shahan Road. The catch basin at the entrance has been repaired. continue to establish permanent groundcover in this area. Report By: Shawna Riddle �;y Others Present: R. BROOKS Date of Inspection: OCT 25, 2016 Time Arriving on Site: 10:15 Time Leaving Site: 12:15 cc; Revision Date 10/16/2015 Page 1 of 1 North Carolina Department of Environmental Quality Land Quality Section: 2090 U.S. HIGHWAY 70 SWANNANOA, NC 28778, Phone: 828-296-4500 COUNTY: Polk PROJECT: TRYON INTERNATIONAL EQUESTRIAN CENTERIVER BASIN: BROAD PERSON FINANCIALLY RESPONSIBLE: Jeff Brown, Tryon Equestrian Properties, LLC PROJECT # POLK-2015-008 ADDRESS: 4066 Pea Ridge Road Mill Spring, NC 28756 CASE # 1. PROJECT LOCATION: Off Sandy Plains Rd. Tryon NC 28782 Pictures: Video: Digital: 2. Weather and Soil Conditions: DRY PC First Inspection: NO 3. Is site currently under Notice of Violation? NO 4. Is the site in compliance with S.P.C.A. and rules? YES 5. Violations: 6. Is the site in compliance with NPDES Permit NCG 010000?: YES 7. Has Sedimentation Damage occurred since last inpections? NO Lake/natural watercourse on the tract: Lakelnatural watercourse off the tract: Other Property: Description: Degree of Damage: Stormwater Discharge Outfall with high turbidity or sedimentation loss: 8. Contact Made with (name): WAYNE WATKINS Title: ODOM ENGINEERING Inspection Report: SENT TO PERSON FINANCIALLY RESPONSIBLE Date GivenlSent: NOV 04, 2016 9. Corrective Actions Needed: 10. COMMENTS: Areas have been re -seeded and some groundcover is becoming established. Continue efforts of establishing permanent groundcover on bare areas. Report By: Shawna Riddle 4 Others Present: R. BROOKS Date of Inspection: OCT 25, 2016 Time Arriving on Site: 10:15 Time Leaving Site: 12:15 cc; Revision Date 10/1612015 Page 1 of 1 North Carolina Department of Environmental Quality Land Quality Section: 2090 U. S. HIGHWAY 70 SWANNANOA, NC 28778, Phone: 828-296-4500 COUNTY: Palk PROJECT: TRYON INTL EQUESTRIAN EASTERN FARMEIRIVER BASIN: BROAD PERSON FINANCIALLY RESPONSIBLE: Jeff Brown, Tryon Equestrian Properties No 2 PROJECT # POLK-2016-010 ADDRESS: 4066 Pea Ridge Road Mill Spring NC 28756 CASE # 1. PROJECT LOCATION: 4066 Pea Ridae Rd. Mill Sorina NC 28756 Pictures: Video: Digital: 2. Weather and Soil Conditions: DRY PC First Inspection:NO 3. Is site currently under Notice of Violation? NO 4. Is the site in compliance with S.P.C.A. and rules? YES 5. Violations: 6. Is the site in compliance with NPDES Permit NCG 010000?: YES 7. Has Sedimentation Damaae occurred since last inoections? NO Lake/natural watercourse on the tract: Lake/natural watercourse off the tract: Other Property: Description: Degree of Damage: Stormwater Discharge Outfall with high turbidity or sedimentation loss: 8. Contact Made with (name): WAYNE WATKINS Title: ODOM ENGINEERING Inspection Report: SENT TO PERSON FINANCIALLY RESPONSIBLE Date GivenlSent: NOV 04, 2016 9. Corrective Actions Needed: 10. COMMENTS: Continue efforts of establishing a groundcover on all areas to grade. Continue to maintain all measures as needed. Report By: Shawna Riddle Others Present: R. BROOKS Date of Inspection: OCT 25 2016 Time Arriving on Site: 10:15 cc; Time Leaving Site: 12:15 Revision Date 10/16/2015 Page 1 of 1 SEDIMENTATIONICONSTRUCTION . ! INSPECTION REPORT ■. North Carolina Department of Environmental Quality Land Qualify Section: 2090 U.S. HIGHWAY 70 SWANNANOA, NC 28778, Phone: 828-296-4500 COUNTY: Polk PROJECT: Tryon Equestrian Covered Arena Erosion ContRIVER BASIN: BROAD PERSON FINANCIALLY RESPONSIBLE: Jeff Brown, Tryon Equestrian Properties PROJECT # POLK-2014-011 ADDRESS: 4066 Pea Ridge Road Mill Spring, NC 28756 CASE # 1. PROJECT LOCATION. John Sheehan Tryon NC Pictures: Video: Digital: 2. Weather and Soil Conditions: DRY PC 3. Is site currently under Notice of Violation? NO 4. Is the site in compliance with S.P.C.A. and rules? YES 5. Violations: 6. Is the site in compliance with NPDES Permit NCG 010000?: YES 7. Has Sedimentation Damaae occurred since last inoections? NO First Inspection: NO Lakelnatural watercourse on the tract: Lake/natural watercourse off the tract: Other Property: Description: Degree of Damage: Stormwater Discharge Outfall with high turbidity or sedimentation loss: 8. Contact Made with (name): WAYNE WATKINS Title: ODOM ENGINEERING Inspection Report: SENT TO PERSON FINANCIALLY RESPONSIBLE Date Given/Sent: NOV 04, 2016 9. Corrective Actions Needed: 10. COMMENTS: Inlet protection devices have been repaired and areas have been seeded and groundcover is becoming established. Continue efforts of establishing a groundcover where needed. Report By: Shawna Riddle a Date of Inspection: OCT 25, 2016 Others Present: R. BROOKS Time Arriving on Site: 10:15 Time Leaving Site: 12:15 cc; Revision Date 10/16/2015 Page 1 of 1 North Carolina Department of Environmental Quality Land Quality Section: 2090 U.S. HIGHWAY 70 SWANNANOA, NC 28778, Phone: 828-296-4500 COUNTY: Polk PROJECT: TRYON INTL EQUESTRIAN CTR CABIN RD ECRIVER BASIN: BROAD PERSON FINANCIALLY RESPONSIBLE: , Tryon Equestrian Properties LLC PROJECT # POLK-2016-007 ADDRESS: 4066 Pea Ridge Road Mill Spring, NC 28756 CASE # 1. PROJECT LOCATION: 4066 Pea Ridge Rd. Tryon NC 28756 Pictures: Video: Digital: 2. Weather and Soil Conditions: DRY PC First Inspection:NO 3. Is site currently under Notice of Violation? NO 4. Is the site in compliance with S.P.C.A. and rules? YES 5. Violations: 6. Is the site in compliance with NPDES Permit NCG 010000?: YES 7. Has Sedimentation Damage occurred since last inpections? NO Lakeinatural watercourse on the tract: Lake/natural watercourse off the tract: Other Property: Description: Degree of Damage: Stormwater Discharge Outfall with high turbidity or sedimentation loss: 8. Contact Made with (name): WAYNE WATKINS Title: ODOM ENGINEERING Inspection Report: SENT TO PERSON FINANCIALLY RESPONSIBLE 9. Corrective Actions Needed: Date Given/Sent: NOV 04, 2016 10. COMMENTS: The west upper level slope has been re -worked re -seeded and matted. Continue efforts of establishin a per anent groCndcover on this area and any additional areas to rade. Report By: Shawna Riddle Others Present: R. BROOKS Date of Inspection: OCT 25 2016 Time Arriving on Site: 10:15 cc; Revision Date 10116/2015 Time Leaving Site: 12:15 Page 1 of 1