Loading...
HomeMy WebLinkAboutWQ0029233_Monitoring - 09-2016_20161101 (2)'FORM: NDAR-1 08-11 NON -DISCHARGE APPLICATION REPORT (NDAR-1) Page ( of Permit No.: W00029233 Facility Name: Bear Lake Reserve County: Jackson Month: September Year: 2016 Did irrigation occur at this facility? DYES [21NO �� Field Name: A Field Name: B Field Name: C Field Name: D Area (acres): 0.67 Area (acres): 0.84 Area (acres): 0.82 Area (acres): 1.26 Cover Crop: Mature Forest P� Cover Mature Forest P� Cover Mature Forest P'• Cover Mature Forest P� Hourly Rate (in): 0.05 Hourly Rate (in): 0.05 Hourly Rate (in):: 0.05 Hourly Rate (in): 0.05 1` V Annual Rate (in): 70.5/7.0 Annual Rate (in): 85.7/8.6 Annual Rate (in): 72.5 ( 7.2 Annual Rate (in): 69.6/7.0 Wea her itbU Field Irrigated? DYES EINo Field Irrigated? [:]YES EINO Field Irrigated? DYES [jNO Field Irrigated? DYES ONO a O C� 41 w d� `y'1 F- '�''G o. ,F •.+ T.a fA t0 p, _ 3 O a 41 y Q G7 m E� `'.!-" 9 C >, C a G C J 3 T'G E 3, -m =°°.0 g J O W �'- O d > Q d d E� F- O' �. C v � O J 7 �' C E �'v •X 0 rL J O N �� ° a > Q O Q� E W 1` �. 7, C a 00 ;C ; J 3 C Ewa °.x i J O N _3'- ° G > Q d y E� �,- '°' A C 'v O J 7 a C E =-5 _° O J °F in ft ft gal min in in gal min in in gal min in in gal min in in 1 C 72 0 9 19 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 2 CL 67 0.1 9 19 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0:00 0 0 0.00 0.00 3 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 4 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 5 a 0 0.00 4.00 0 0 0.00 0.00 0 0 0.00 0:00 0 0 0.00 0.00 61 C 69 0 9 19 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0100 0.00 0 1 0 0.00 0.00 7 C 71 0 9 18.5 0 0 0,00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 8 C 68 0 9 18.5 0 0 0:00 0:00 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 9 C 72 0 9 18.5 0 0 0.00 0.00 0 0 0.00 0.00 .0 0 0.00 0.00 0 0 0.00 0.00 10 0 0 0,00 0.00 0 0 0.00 0.00 0 0 0,.00 0,00 0 0 0.00 0.00 11 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0;00 0 0 0.00 0.00 12 C 67 0 9 18 0 0 0,00 0.00 0 0 0.00 0.00 0 0 0.00 0,00 0 0 0.00 0.00 13 C 70 0 9 18 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 14 C 68 0 9 18 0 0 0.00 0.00 0 0 0.00 0.00 0, 0 0.00 0;00,_,; 0 0 0.00 0.00 15 C 60 0 9 18 0 0 0,00 0.00 0 0 0.00 0.00 0 0 0,00 ! 0,00 0 Q 0.00 0.00 16 C 71 0 9 18 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0;00 0 0 0.00 0.00 17 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 U0 0 0 0.00 0.00 18 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 19 C 68 0.3 9 17.5 0. 0 0.00 0,00 0 0 0.00 0.00 0 0 0.00 0.00 0 1 0 0.00 0.00 20 C 66 0 9 17.5 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0:00 0.00 0 0 0.00 0.00 21 C 60 0 9 17.5 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 221 C 68 0 9 17 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 23 C 66 0 9 16 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0,00 0.00 0 0 0.00 0.00 24 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 25 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0,00 0 0 0.00 0.00 26 C 68 0 9 15 0 0 0.00 0,00 0 0 0.00 1 0.00 0 0 0.00 0.00 0 0 0.00 0.00 27 R 65 0.9 9 14.5 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0,00 0 0 0.00 0.00 281 CL60 0 9 14 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 C 0 9 13 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0A0 0 0 0.00 0.00 129 30 C 0 9 12 0 0 0.00 0.00 1 0 0 0.00 0.00 0 0 0,00 OAO 0 0 0.00 0.00 311 0 0 0.00 0.00 1 0 0 0.00 0.00 0 0 OAO 0.00 0 0 0.00 0.00 Monthly Loading: 0 0.00 2.57 0 0.00 2.54 0 0.00 2.49 0 0.00 2.39 '. 12 Month Floating Total (in)- FORM: NDAR-1 08-11 NON -DISCHARGE APPLICATION REPORT (NDAR-1) Page I of—A, Did the application rates exceed the limits in Attachment B of your permit? Were adequate measures taken to prevent effluent ponding in or runoff from the sites? Was a suitable vegetative cover maintained on all sites as specified in your permit? Were all setbacks listed in your permit maintained for every application to each permitted site? Were all freeboards maintained in accordance with the specified freeboard heights in your permit? ❑� Compliant ❑Non -Compliant ❑� Compliant ❑Non -Compliant EZCompliant ❑Non -Compliant ❑✓ Compliant ❑Non -Compliant ❑� Compliant `' ❑Non -Compliant If the facility is non-compliant, please explain in the space below the reason(s) the facility was not in compliance. Provide in your explanation the date(s) of the non-compliance and describe the corrective action(s) taken. Attach additional sheets if necessary. Operator in Responsible Charge (ORC) Certification Permittee Certification ORC: Michael Beck Permittee: Bear Lake Reserve Certification No.: SI -991669 WWIV-7930 Signing Official: Robert Barr Grade: SI WWIV Phone Number: (828) 251-1900 Signing Official's Title: Signatory Has the ORC changed since the previous NDAR-1? ❑Yes FYINo Phone Number: (828) 251-1900 Permit Exp.: 9/30/14 LVV2 Signature Date Signature Date By this signature, I certify that this report is accurrate and complete to the best of my knowledge. I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that all qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations. Mail Original and Two Copies to: Division of Water Quality Information Processing Unit 1617 Mail Service Center Raleigh, North Carolina 27699-1617 FORM: NDAR-1 08-11 NON -DISCHARGE APPLICATION REPORT (NDAR-1) Page Z of Permit No.: WQ0029233 Facility Name: Bear Lake Reserve County: Jackson Month: September Year: 2016 Did irrigation occur at this facility? Field Name: E Field Name: F Field Name: G Field Name: H Area (acres): 0.74 Area (acres): 0.95 Area (acres): 0:71 Area (acres): 0.53 Cover Crop: Mature Forest Cover Crop: Mature Forest Cover Crop: Mature Forest Cover Crop: Mature Forest ❑YES PINO Hourly Rate (in): 0.05 Hourly Rate (in): 0.05 Hourly Rate (in): 0.05 Hourly Rate (in): _ 0.05 Annual Rate (in): 70.217-0 Annual Rate (in): 73.9/7.4 Annual Rate (in): 63.5.:/ 6.3 Annual Rate (in): 77.3/7.7 Weather Freeboard Field Irrigated? DYES ❑✓ NO Field Irrigated? DYES ONO Field Irrigated? DYES pN0 Field Irrigated? DYES ❑✓ NO V ° d w m Q• E 0 ° " •v ` a m or :° 0 rA m °' H� CL M T O. a7 a m d o Em 3 4 O cL > Q. Ts dr E a� a= •- t a� >,c ism ❑ p J E m ��c E a m ', �= p � J a, v Em a O d > Q o mw; Ern H •C � rn >c �a � O J E ar � c x c a f6 x � � J 0 •o Em a o O. � d a 04) E iA 1= •r a� ?•� ,� ,, D p J E o� ��c .X a E t9 x� � J m y Ew ' a o a � Q v a)� E H •� rn _'_'o `° G O E oa E�'v x l0 2 C °F in ft ft gal min in in gal min in in gal, mita in in gal min in in 1 C 72 0 9 19 0 0 0.00 0:00 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 1 0.00 2 CL 67 0.1 9 19 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 1 0.00 3 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 4 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 5 0 0 1 0.00' ' 0.00 0 0 0.00 0.00 0 0 0.00 1, 0.00 0 0 0.00 0.00 6 C 69 0 9 19 0. 0 0.00 0100 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 7 C 71 0 9 18.51 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 8 C 68 0 9 18.5 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0:00 0 0 0.00 0.00 9 C 72 0 9 18.5 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 101 0 0 0.00 0.00 0 0 0.00 0.00 0'' 0 0.00 0.00 0 0 0.00 0.00 11 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 12 C 67 0 9 18 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00. 0.00 0 0 0.00 0.00 13 C 70 0 9 18 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 14 C 68 0 9 18 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0:00 0 0 0.00 0.00 15 C 60 0 9 18 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 .1 0.00 0 0 0.00 0.00 16 C 1 71 0 j 9 18 0 0 0.00 0.00 0 0 0.00 0.00 0. 0 0.00 0.00 0 0 0.00 0.00 17 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0400 0 0 0.00 0.00 18 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0:00 0 0 0.00 0.00 19 C 68 0.3 9 17.51 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 0 1 0 0.00 0.00 20 C 66 0 9 17.5 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0,.00 0.00 0 0 0.00 0.00 21 C 60 0 9 17.5 0 0 0.00 0.00 0 0 0.00 0.00 0, 0 0.00 1 0.00 0 0 0.00 0.00 22 C 68 0 9 17 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0:00 0 0 0.00 0.00 231 C 1 66 0 9 16 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 24 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 25 0 0 0:00 0.00 0 0 0.00 0.00 0 0 0.00 .0.00 0 0 0.00 0.00 26 C 68 0 9 15 0 0 0.00 0,00 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 27 R 65 0.9 9 14.5 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 28 C 67 0 9 140 0 0.00 0.00 0 1 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 29 C 60 0 9 13 0 0 0.00 0.00 0 0 0.00 0.00 0. 0 0.00 0.00 0 0 0.00 0.00 30 C 60 0 9 12 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 31 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0 0.00 0.00 2.51 0.00 0 0 0.00 Monthly Loading: 12 Month Floating Total (in): 0 0.00 2.52 0 0.00 1.53 0 0.00 2.44 iw FORM: NDAR-1 08-11 NON -DISCHARGE APPLICATION REPORT (NDAR-1) Page 2- of Did the application rates exceed the limits in Attachment B of your permit? Were adequate measures taken to prevent effluent ponding in or runoff from the sites? Was a suitable vegetative cover maintained on all sites as specified in your permit? Were all setbacks listed in your permit maintained for every application to each permitted site? Were all freeboards maintained in accordance with the specified freeboard heights in your permit? ❑� Compliant ❑Non -Compliant . (]Compliant ❑Non -Compliant ❑� Compliant ❑Non -Compliant ❑� Compliant ❑Non -Compliant ❑✓ Compliant ❑Non -Compliant If the facility is non-compliant, please explain in the space below the reason(s) the facility was not in compliance. Provide in your explanation the date(s) of the non-compliance and describe the corrective action(s) taken. Attach additional sheets if necessary. Operator in Responsible Charge (ORC) Certification Permittee Certification ORC: Michael Beck Permittee: Bear Lake Reserve Certification No.: SI -991669 WWIV-7930 Signing Official: Robert Barr Grade: SI WWIV Phone Number: (828) 251-1900 Signing Official's Title: Signatory Has the ORC changed since the previous NDAR-1? ❑Yes ONo Phone Number: (828) 251-1900 Permit Exp.: 9/30/14 %k4 I e, (0 -,R7-16 P ) o ft i// Signature Date Signature Date By this signature, I certify that this report is accurrate and complete to the best of my knowledge. I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that all qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations. Mail Original and Two Copies to: Division of Water Quality Information Processing Unit 1617 Mail Service Center Raleigh, North Carolina 27699-1617 FORM: NDAR-1 08-11 NON -DISCHARGE APPLICATION REPORT (NDAR-1) Page __� of Permit No.: W00029233 Facility Name: Bear Lake Reserve County: Jackson Month: September Year: 2016 Did irrigation occur at this facility? Field Name: I Field Name: K Field Name: M Field Name: N Area (acres): 0.85 Area (acres): 0.99 Area (acres): 0.52 Area (acres): 0.58 Cover Crop:Mature Forest Cover Crop: Mature Forest P� Cover Crop: Mature Forest P� Cover Cro Mature Forest P' ❑YES ONO Hourly Rate (in): 0.05 Hourly Rate (in): 0.05 Hourly Rate (in): 0.05 Hourly Rate (in): 0.05 Annual Rate (in): 80.0/8.0 Annual Rate (in): 71.0/7.1 Annual Rate (in): 66.8/6.7 Annual Rate (in): 60.2/6.0 Weather Freeboard Field Irrigated? DYES [ENO Field Irrigated? DYES ENO Field Irrigated? DYES ONO Field Irrigated? DYES ENO >, CD O c` y r m }' cv a E d ~ c 2 io a y a m m L° o N m °' fA .0 � � M a y a E R 3 � p a ! Q a @ m.. E � 1= C rn C a �a p m J E rn 7 �" C Ewa x o R = J c, ' E. 01 � Q o a i Q v y 47 r E � 1= M CM a C � o D f6 J E m 7 Z` C E �'v x° �° g= J m a E :3- 'o a Q z� m 41 E �+ P of i a� C a.� E� 0 m J E rn 7 C Ego 'x p m g J am v E. y � o o Q, Q o O d.. E � 1- � = rn T C E'v � l0 J E m 7 �` C z E g o x o so = J OF in ft ft gal min in in gal min in in gal min in in gal min in in 1 C 72 0 9 19 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 2 CL 67 0.1 9 19 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 3 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 4 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 5 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 6 C 69 0 9 19 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 7 C 71 0 9 18.5 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 8 C 68 0 9 18.5 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 9 C 72 0 9 18.5 0 0 0.00 0.00 0 0 0.00 0.00 1 0 0 0.00 0.00 0 0 0.00 0.00 10 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 11 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0,00 0.00 0 0 0.00 0.00 12 C 67 0 9 18 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 13 C 70 0 9 18 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0,00 0.00 0 0 0.00 0.00 14 C 68 0 9 18 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 15 C 60 0 9 18 0 0 0.00 0.00 0 0 0.00 0.00 0 0 1 0.00 0:00 0 0 0.00 0.00 16 C 71 0 9 18 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 17 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0:00 0 0 0.00 0.00 18 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0,00 0 0 0.00 0.00 19 C 68 0.3 9 17.5 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 20 C 66 0 9 17.5 0 0 0.00 0,00 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 21 C 60 0 9 17.5 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 22 C 68 0 9 17 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 23 C 66 0 9 16 0 0 0,00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 24 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 251 j 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 1 0 0 0.00 0.00 261 C 1 68 0 9 15 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0;00 0 0 0.00 0.00 27 R 65 0.9 9 14.5 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 28 C 67 0 9 14 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 29 C 60 0 9 13 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0,00 0.00 0 0 0.00 0.00 30 C 60 0 9 12 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 1 0.00 0 0 0.00 0.00 31 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0 = = = 0.00 0.00 0.00 _ 2.37 ''. Monthly Loading: 12 Month Floating Total (in): 0 0.00 2.53 0.; � �- � 0.00 2.60 :: ' 0 0.00 2.47 FORM: NDAR-1 08-11 NON -DISCHARGE APPLICATION REPORT (NDAR-1) Page 3 of Did the application rates exceed the limits in Attachment B of your permit? ❑� Compliant ❑Non -Compliant Were adequate measures taken to prevent effluent ponding in or runoff from the sites? ECompliant ❑Non -Compliant Was a suitable vegetative cover maintained on all sites as specified in your permit? ❑� Compliant ❑Non -Compliant Were all setbacks listed in your permit maintained for every application to each permitted site? ❑✓ Compliant ❑Non -Compliant Were all freeboards maintained in accordance with the specified freeboard heights in your permit? (]Compliant ❑Non -Compliant If the facility is non-compliant, please explain in the space below the reason(s) the facility was not in compliance. Provide in your explanation the date(s) of the non-compliance and describe the corrective action(s) taken. Attach additional sheets if necessary. I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance Operator in Responsible Charge (ORC) Certification Permittee Certification ORC: Michael Beck Permittee: Bear Lake Reserve Certification No.: SI -991669 WWIV-7930 Signing Official: Robert Barr Grade: SI WWIV Phone Number: (828) 251-1900 Signing Official's Title: Signatory Has the ORC changed since the previous NDAR-1? Elves ENo Phone Number: (828) 251-1900 Permit Exp.: 9/30/14 Signature Date Signature Date By this signature, I certify that this report is accurrate and complete to the best of my knowledge. I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that all qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations. Mail Original and Two Copies to: Division of Water Quality Information Processing Unit 1617 Mail Service Center Raleigh, North Carolina 27699-1617 •FORM: NDAR-1 08-11 NON -DISCHARGE APPLICATION REPORT (NDAR-1) Page -1--- of Permit No.: W00029233 Facility Name: Bear Lake Reserve County: Jackson Month: September Year: 2016 Field Name: O Field Name: P Field Name: Q Field Name: R Did irrigation at this facility? occur Area (acres): 0.5 Area (acres): 1.1 Area (acres): 0.43 Area (acres): 0.7 Cover Crop: Mature Forest P� Cover Cro Mature Forest P� Cover Cro Mature Forest P� Cover Cro Mature Forest P' ❑YES ONO Hourly Rate (in): 0.05 Hourly Rate (in): 0.05 Hourly Rate (in): 0.05 Hourly Rate (in): 0.05 Annual Rate (in): 78.6/7.9 Annual Rate (in): 80.7/8.1 Annual Rate (in): 87.318.7 Annual Rate (in): 77.6/7.8 Weather Freeboard Field Irrigated? DYES ❑✓ NO Field Irrigated? DYES ❑✓ NO Field Irrigated? DYES ❑a NO Field Irrigated? DYES ❑� NO ° U .L-. r m a E I— w Y ` a d rn m 0 (n G1 w� am �.a t0 p• LO m y •O y E•- o c > Q "6 a; 1- C W ' c a o e J 'E A o c. c ��`a XS o J d E °' �- o a i Q N m„ E� �•°� - ?, E v o o J 7 a C E°'o m2 0 J E d' �- o a > Q a d ° .. Em i'. rn C � .s a o o J E rn 7 C � ._ Ewa cxoz Q J m -° E. d °- ° c i o d 47 y E� F'°� rn T �o o o E rn E5'v ms° o OF in ft ft gal min in in gal min in in gal min in in gal min in in 1C 72 0 9 19 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 2 CL 67 0.1 9 19 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 3 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 4 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 5 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 6 C 69 0 9 19 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0;00 0 0 0.00 0.00 7 C 71 0 9 18.5 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 8 C 68 0 9 18.5 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 9 C 72 0 9 18.5 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 10 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 11 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 12 C 67 0 9 18 0 0 0.00 0,00 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 13 C 70 0 9 18 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 14 C 68 0 9 18 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0,00 0 0 0.00 0.00 15 C 60 0 9 18 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0,00 0.00 0 0 0.00 0.00 16 C 71 0 9 18 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 17 0 0 0.00 0.00 0 1 0 0.00 0.00 0 0 0:00 0.00 0 0 0.00 0.00 18 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 191 C 68 0.3 9 17.5 0 0 0.00 0:00 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 , 0.00 20 C 66 0 9 17.5 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 0 0 'c . ;0.00 ,• , . Q-.00 21 C 60 0 9 17.5 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 22 C 68 0 9 17 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0,00 0 0 0.00 0.00 23 C 66 0 9 16 0 0 0.00 0,00 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 24 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 25 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 26 C 68 0 9 15 0 0 0,00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 27 R 65 0.9 9 14.5 0 0 0.00 0,00 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 28 C 67 0 9 14 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 29 C 60 0 9 13 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 30 C 60 0 9 12 0 0 0.00 0.00 0 0 0.00 0.00 1 0 0 0.00 0.00 0 0 0.00 0.00 311 1 1 1 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 10 0 0.00 0.00 Monthly Loading: 0 0.00 2.57 0 -�* Y -_- - - 0.00- 2.35k� 0 0.00 0 0.00 _ qL;-:, 12 Month Floating Total (in): FORM: NDAR-1 08-11 NON -DISCHARGE APPLICATION REPORT (NDAR-1) Page 4— of& - Did the application rates exceed the limits in Attachment B of your permit? Were adequate measures taken to prevent effluent ponding in or runoff from the sites? Was a suitable vegetative cover maintained on all sites as specified in your permit? Were all setbacks listed in your permit maintained for every application to each permitted site? Were all freeboards maintained in accordance with the specified freeboard heights in your permit? (]Compliant ❑Non -Compliant (]Compliant ❑Non -Compliant ElCompliant []Non -Compliant ❑✓ Compliant ❑Non -Compliant OCompliant ❑Non -Compliant If the facility is non-compliant, please explain in the space below the reason(s) the facility was not in compliance. Provide in your explanation the date(s) of the non-compliance and describe the corrective action(s) taken. Attach additional sheets if necessary. Operator in Responsible Charge (ORC) Certification Permittee Certification ORC: Michael Beck Permittee: Bear Lake Reserve Certification No.: SI -991669 WWIV-1930 Signing Official: Robert Barr Grade: SI WWIV Phone Number: (828) 251-1900 Signing Official's Title: Signatory Has the ORC changed since the previous NDAR-1? ❑Yes ONO Phone Number: (828) 251-1900 Permit Exp.: 9/30/14 . - 10-27-16. Signature Date Signature Date By this signature, I certify that this report is accurrate and complete to the best of my knowledge. I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that all qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations. Mail Original and Two Copies to: Division of Water Quality Information Processing Unit 1617 Mail Service Center Raleigh, North Carolina 27699-1617 FORM: NDAR-1 08-11 NON -DISCHARGE APPLICATION REPORT (NDAR-1) Page of Permit No.: W00029233 Facility Name: Bear Lake Reserve County: Jackson Month: September Year: 2016 Did irrigation occur at this facility? DYES ONO Field Name: S Field Name: T Field Name: U Field Name: Area (acres): 0.92 Area (acres): 0.61 Area (acres): 0.58 Area (acres): Cover Crop:Mature Forest Cover Crop: Mature Forest P' Cover Crop: Mature Forest p' Cover Crop: P' Hourly Rate (in): 0.05 Hourly Rate (in): 0.05 Hourly Rate (in): 0,05 Hourly Rate (in): Annual Rate (in): 67.416.7 Annual Rate (in): 73.517.3 Annual Rate (in): S5.449.5 Annual Rate (in): Weather Freeboard Field Irrigated? DYES QNO Field Irrigated? DYES ONO Field Irrigated? DYES ONO Field Irrigated? DYES ❑NO C3 o v a) o E ~ ° " a E o. m rn c .. ;c m 01 ya CL cc Ta Ln 010 V Em d� aQ ; o, oa :t -E cc �c ;� ❑o E 0 o=c Ko' mxo m y Em °a oa o m;; Ern �c rn >,c 'm:5 ❑° E rn �c x'o� oxo 0,0 Em �a oa V m;; �a� i-,.� 0 >.� ro° ❑ E. w arc xc� Wi° m y 'o Em m5; °° E� pO ~'_ oM E 0 �.c °c `°� x'om ❑° ,�_° °F in ft ft gal min In in gal min in in gal min in in gal min in in 1 C 72 0 9 19 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 2 CL 67 0.1 9 19 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 3 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 4 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 5 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 6 C 69 0 9 19 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 7 C 71 0 9 18.5 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 8 C 68 0 9 18.5 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0,00 9 C 72 0 9 18.5 0 0 0.00 0,00 0 1 0 0.00 0.00 1 0 0 0.00 0.00 10 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 11 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 12 C 67 0 9 18 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 13 C 70 0 9 18 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 14 C 68 0 9 18 0 0 0.00 0.00 0 0 0.00 0.00 0: 0 0.00 0:00 15 C 60 0 9 18 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0100 16 C 71 0 9 18 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0:00 171 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 18 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0:00 19 C 68 0.3 9 17.5 0 1 0 0.00 0,00 0 0 0.00 0.00 0 0 0.00 0.00 20 C 66 0 9 17.5 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0;00 21IC60 0 9 17.5 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 2268 0 9 17 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 2366 0 9 16 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 24 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 25 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 2668 0 1 9 15 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0::00 27 R 65 0.9 9 14.5 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 28 C 67 0 9 14 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 29 C 60 0 9 13 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 DAO 30 C 60 0 9 12 0 0 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 31 0 1 0 1 0.00 0.00 0 0 0.00 0.00 0 0 0.00 0.00 Monthly Loading: 12 Month Floating Total (in): 0 0.00 2.53 0 0.00 2.51 0 0.00 2.37 0 0.00 FORM: NDAR-1 08-11 NON -DISCHARGE APPLICATION REPORT (NDAR-1) Page S of Did the application rates exceed the limits in Attachment B of your permit? Were adequate measures taken to prevent effluent ponding in or runoff from the sites? Was a suitable vegetative cover maintained on all sites as specified in your permit? Were all setbacks listed in your permit maintained for every application to each permitted site? Were all freeboards maintained in accordance with the specified freeboard heights in your permit? ❑✓ Compliant ❑Non -Compliant ❑✓ Compliant ❑Non -Compliant ❑✓ Compliant ❑Non -Compliant ❑� Compliant ❑Non -Compliant []Compliant ❑Non -Compliant If the facility is non-compliant, please explain in the space below the reason(s) the facility was not in compliance. Provide in your explanation the date(s) of the non-compliance and describe the corrective action(s) taken. Attach additional sheets if necessarv. Operator in Responsible Charge (ORC) Certification Permittee Certification ORC: Michael Beck Permittee: Bear Lake Reserve Certification No.: SI -991669 WWIV-7930 Signing Official: Robert Barr Grade: SI WWIV Phone Number: (828) 251-1900 Signing Official's Title: Signatory Has the ORC changed since the previous NDAR-1? ❑Yes [2]No Phone Number: (828) 251-1900 Permit Exp.: 9/30/14 %�L_ Q - V�/� / .012-qlt � 10_9�7_1& Signature Date Signature Date By this signature, I certify that this report is accurrate and complete to the best of my knowledge. I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that all qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations. Mail Original and Two Copies to: Division of Water Quality Information Processing Unit 1617 Mail Service Center Raleigh, North Carolina 27699-1617