HomeMy WebLinkAboutWQ0005681_Monitoring - 09-2016_20161101 (2)FORM: NDAR-1 08-11
Permit No.: W00005681
Did irrigation occur
at this facility?
Q YES ❑ NO
NON-DISCHARGE APPLICATION REPORT (NDAR-1)
Facility Name: Pilgrim's Corporation - Staley County: Randolph
Field Naive: .' 1 Field Name: Field Name: , " '°''
Area (acres): ; 6.27 Area (acres): Area (acres):
Cover Crop: Cover Crop: Cover, Crop:
Hourly Rate.(in): 0.3. Hourly Rate (in):Hourly Rate (In):
Annual Rate (in): 35.88 Annual Rate (in):Annual Rate On):
Month:
'"
Page-1 of
September Year: 2016
Field Name:
Area (acres):
Cover Crop:
Hourly Rate On):
Annual Rate (in):
Weather Freeboard
Field irrigated?
[) YES❑ NO
Field Irrigated?
❑ YES
[] N0
Field irrigated? ,❑ YES
( No
Field Irrigated? ❑YES
(] NO
a
o c
a
3
w
4) "0 a rn
E c
E
cE
a
C
=
iE
�
a
ac
c E
w
E
is o
=J
ay
_t
E-
Z,
E
Ei15
(L
.J
.::
.
>
J
9 Q
=
00
�0
Z j
LO
-7F7in
,.rnU
ft ft
- gal min
; in
inx
gal min
in
in
gal' min In
in`
gal min In
in
1
C
80 0.4 1.9
11,200 120
0.07
0.03
2
R
72 0 1.9
_.
3
q
--
5
R
79 0 1.9
-
6
R
76 0.5 1.9
7
C
83 0.25 1.9
8
C
85 0.25 1.9
9
C
79 0 1.9
_-16,800 150
0.10
0.04 °
r11 Nil
10
11
12
C
89 0 1.9
17,400 _ 150
0.10 _
, 0.04
_ hh
�m
13
C
80 0
11,500 120
0.07_0
`
_ 0 `1
14
C
80 0
10,900. 120',
0.06
0:03
15
C
86 0
12,900 120
0.08
0.04
������ r,
16
C
83 0
17
19
CL
78 0.6
20
R
69 0.1
-.
21
R
71 0.1 1.8
1
22
PC
86 0.4 1.8
23
PC
67 0
24
25
26
CL
740.1
27
R
66 0.25
28
R
69 0.25 1.8
29
R
72 0.4 1.8
30
CI_
78 p
Monthly Loading
80,700
0.47
0
0.00
;mss.
0 0.00
0% 0.00
12 Month Floatin Total m
9 ( )
9.72
.� � . �F r �:•r :
� �� - ` �.;
FORM: NDAR-1 o8-11 NON -DISCHARGE APPLICATION REPORT (NDAR-1) Page �2 of
Did the application rates exceed the limits in Attachment B of your permit?
[] Compliant ❑ Non -Compliant
Were adequate measures taken to prevent effluent ponding in or runoff from the sites?
❑✓ Compliant ❑ Non -Compliant
Was a suitable vegetative cover maintained on all sites as specified in your permit?
E] Compliant ❑ Non -Compliant
Were all setbacks listed in your permit maintained for every application to each permitted site?
p Compliant ❑ Non -Compliant
Were all freeboards maintained in accordance with the specified freeboard heights in your permit?
❑✓ Compliant ❑ Non -Compliant
If the facility is non-compliant, please explain in the space below the reason(s) the facility was not in compliance. Provide in your explanation the date(s) of
action(s) taken. Attach additional sheets if necessary.
the non-compliance and describe the corrective
Operator in Responsible Charge (ORC) Certification Permittee Certification
ORC: Melissa Harshman Permittee:
Dan Moreno
Certification No.: 1001745/1991779 Signing Official: Dan Moreno
Grade: SI/WW2 Phone Dumber: 919-599-1295 Signing Officials Title: Complex Manager
Has the ORC changed since the previous NDAR-1? yes No Phone Number: 919-895-5347 Permit Exp.:
�I
Signature Dat Signature Date
By this signature, I certify that this report is accurrate and complete to the best of my knowledge. I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance
with a system designed to assure that all qualified personnel property gathered and evaluated the information submitted. Based on my
inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the
information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant
penalties for submitting false information, including the possibility of fines and Imprisonment for knowing violations.
Mail Original and Two Copies to:
Division of Water Quality
Information Processing Unit
1617 Mail Service Center