HomeMy WebLinkAbout20100536 Ver 2_Design Plans_20161028DocuSign Envelope ID: ED3B886B-OD93-43C3-964B-01 E781 DE8D84
�
�
-L - Sto 11+67.00
BEGIN T lP PROJECT U-49
BEGIN PROJECT PHASE 2
RAY GRI FFI N
C ITY I��IANAG E R
—
B EC KFO RD D RIVE �S R 1165� F ROM HARRI SO N STRE ET TO N O RTH PARK D RIVE
-L - Sto 2/+00.00
T lP PROJECT U -49/6
END PROJECT PHASE 2
BEGIN PROJECT PHASE l
PREI'AhED IN ���HE OFFICE OFe
/
>
PoOo BOX 33008 — RA�EIGHg NORTH CARO�INA 2763C-3068
PHONE° (9 19) 677-2000 FAXo (9 19) 6�7-2050
SURVEYS PROVIDED BY:
Bobbitt Surveying, P.A.
GEOTECHNICAL INVESTIGATIONS BY:
Falcon Engineering, Inc.
PROJECT REFERENCE NO. SHEET NO.
U -49/6 /
GRAPHIC SCALE
20 0 40
PLANS
20 0 40
PROFILE (HORIZONTAL)
2 0 4
PROFILE (VERTICAL)
DESIGI� DATA
ADT 2011
ADT 2035
DHV
9,550 VPD
15,400 VPD
10%
55%
3% *
40 mph
* (TTST 1 % + D UAL 2 %)
-L - Sto 38 �65.00
END PROJECT PHASE l
END T lP PROJECT U-49/6
��.�`��, CA Rp�.
�
,o�.,, ..,., i
� ���.S��.a.�;�:�-
� ���EALwov� • �
� �
� �
�c�'��ocass. -
- : �
� ,� ': 8/4/2016 :� :
.,�,,��.. FNG I NE��: ��,,��•
,,,� � � ���ii►i �0�,,�
JAMES D. O'GEARY
N�IAYO R
�
�
Note: 1 �ot to Scale
*S. U.E. = Subsurface Utility Engineering
BOUNDARIES AND 1'ROI'ERTY.•
St t L' ----- -----
a e ine
County Line ---
Township Line ---
City Line --
Reservation Line -
Property Line
Existing Iron Pin
Property Corner
Property Monument
Parcel/Sequence Number
Existing Fence Line -X
Proposed Woven Wire Fence
0
EIP
-�
a
EcM
�23
-X X-
Proposed Chain Link Fence �
Proposed Barbed Wire Fence '�
Existin Wetland Bounda - - - -��8- - - -
J rY
Proposed Wetland Boundary
Existing Endangered Animal Boundary
Existing Endangered Plant Boundary
BUILDINGS AND OTHER CULTURE:
�yLB
EAB
EP8
Gas Pump Vent or U/G Tank Cap o
Sign �
w@�� �
Small Mine �
Foundation �
Area Outline
Cemetery fi
Building
School �
Church �
Dam
HYDROLOGY.•
Stream or Body of Water
Hydro, Pool or Reservoir
Jurisdictional Stream
Buffer Zone 1
Buffer Zone 2
Flow Arrow
Disappearing Stream
Spring
Swa m p Ma rs h
Proposed Lateral, Tail, Head Ditch
False Sump
���
���
�►
�'���� � ������ � -�J�������� ,,
�� ����� �� ���� ���
RAILROADS:
Standard Gauge -
RR Signal Milepost
Switch
RR Abandoned -
RR Dismantled -
RIGHT OF WAY.•
Baseline Control Point
Existing Right of Way Marker
Existing Right of Way Line
Proposed Right of Way Line
Proposed Right of Way Line with
Iron Pin and Cap Marker
Proposed Right of Way Line with
Concrete or Granite Marker
Existing Control of Access
Proposed Control of Access
Existing Easement Line
Proposed Temporary Construction Easement -
Proposed Temporary Drainage Easement
Proposed Permanent Drainage Easement
Proposed Permanent Utility Easement
CSX TRAIySPORTATION
0
MILEPOST 35
0
swircH
� � ��
0
�
.
W�
W
i� /ca7
� W
�c�
�� A;
E
—E—
TDE
PDE
PUE
ROADS AND RELATED FEATURES:
Existing Edge of Pavement
Existing Curb -
Proposed Slope Stakes Cut --- G---
Proposed Slope Stakes Fill --- F---
Proposed Wheel Chair Ramp cR
Curb Cut for Future Wheel Chair Ramp CCFR
Existing Metal Guardrail T T T
Proposed Guardrail T T T T
Existing Cable Guiderail n n �
Proposed Cable Guiderail n n n n
Equality Symbol �
Pavement Removal
I�EGETATION.•
Single Tree
Single Shrub
Hedge
Woods Line
Orchard
Vi neya rd
� REV. No.e REVISIONe DATEe DRAWN BYe Ct;ECKED BYe
NThis document, toqether with the concepts and designs presented herein, as an instrument of service, is
� intended only for the speciflc purpose and cllent for which lt was prepared, Reuse of and improper
� reliance on this document without writTen authorization and adoption by Kimley-Horn and Associates, Ince
Op shall be without liability to Kimley-Horn and Associatesv !nc,
Copyright Kimley-Norn aod Ass�ciates, Incos 20 10
�
�
�.�.�-.�.�.�
� � � �
Vineyard
'R�PARCD IN TI�IC O�F'CC OFo
■
�
PoOo BOX 33068 — RQ�EIGH� NCRTH CQRO�INQ 27636-30�8
PHONE° (9 19) 677-20C�0 F/�Xo (9 19) 677-2050
EXISTING STRUCTURES:
MAJ O R:
Bridge, Tunnel or Box Culvert
Bridge Wing Wall, Head Wall and End Wall -
MINOR:
Head and End Wall
Pipe Culvert
Footbridge
Drainage Box: Catch Basin, DI or JB
Paved Ditch Gutter
Storm Sewer Manhole
Storm Sewer
UTILITIES:
POWER:
Existing Power Pole
Proposed Power Pole
Existing Joint Use Pole
Proposed Joint Use Pole
Power Manhole
Power Line Tower
Power Transformer
U/G Power Cable Hand Hole
H-Frame Pole
Recorded U/G Power Line
Designated U/G Power Line (S.U.E.*)
CONC
� coNc y�V� �
CONC HW
�---
� CB
O
s
��
P
WATER:
Water Manhole O
Water Meter o
Water Valve 3�
Water Hydrant �
Recorded U/G Water Line �
Designated U/G Water Line (S.U.E.* - - - -�- - - -
Above Ground Water Line A�c �vater
TV:
_� TV Satellite Dish C�
TV Pedestal �❑
TV Towe r �
U/G TV Cable Hand Hole HH
Recorded U/G TV Cable T�
Designated U/G TV Cable (S.U.E.*) - - - -T�- - - -
Recorded U/G Fiber Optic Cable TV FO
Designated U/G Fiber Optic Cable (S.U.E.*� ----T� Fo- --
GAS:
Gas Valve 0
Gas Meter �
Recorded U/G Gas Line �
Designated U/G Gas Line (S.U.E.*) - - - -�- - - -
Above Ground Gas Line A�c �°S
— — — —P— — — —
TELEPHONE:
Existing Telephone Pole -♦
Proposed Telephone Pole �
Telephone Manhole O
Telephone Booth ❑�
Telephone Pedestal ❑T
Telephone Cell Tower �
U/G Telephone Cable Hand Hole HH
Recorded U/G Telephone Cable T
Designated U/G Telephone Cable (S.U.E.*) - - - - -T- - - -
Recorded U/G Telephone Conduit T�
Designated U/G Telephone Conduit (S.U.E.*)- - - - -T�- - - -
Recorded U/G Fiber Optics Cable T FO
Designated U/G Fiber Optics Cable (S.U.E.*)- ----T Fo- --
�E No, F-o io2
CONVENTIONAL SYMBOLS
SANITARY SEWER:
Sanitary Sewer Manhole OO
Sanitary Sewer Cleanout 0
U/G Sanita r y Sewer Line 55
Above Ground Sanitary Sewer A/G Sanitary Sewer
Recorded SS Forced Main Line FSS
Designated SS Forced Main Line (S.U.E.*) - - - - -FSS- - - -
MISCELLANEOUS:
Utility Pole
Utility Pole with Base
Utility Located Object
Utility TrafFic Signal Box
Utility Unknown U/G Line
U/G Tank; Water, Gas, Oil
A�G Tank; Water, Gas, Oil
U/G Test Hole (S.U.E.*)
Abandoned According to Utility Records
End of Information
PKO�-CT�
•
0
0
a
— ?UTL —
0
0
m
AATU R
E.O.I.
U-4916
�����T T� `� Q�E BECKFORD DR I VE WI DEN I NG
JOL� NUMQER:
0 � 1065000
SH�ET NUMQERe
I-B
�
�
P TING DETAILS REFORESTATION
� TREE REFORESTATION SHALL BE PLANTED 6 FT. TO 10 FT. ON CENTER, RANDOM SPACING,
AVERAGING 8 FT. ON CENTER, APPROXIMATELY 680 PLANTS PER ACRE.
BAREROOT PLANTING DETAIL
DIBBLE PLANTING METHOD �� �,��
USING THE KBC PLANTING BAR
/ -+06.42'
401.50'
T 406.50' RETENiION POND �
, , '��`,i_ 400.90' .-•�
ii /
�ii
�� 'E INV. 4 .0' +/- MARY ANNE DAVIS
i i � s D.B. 804, PAGE 381
�� Zin ! P.B. "U", PAGE 665
i i a GRAPHIC SCALE
,� ( VACANT PROPERTY )
ii �
11 9 20 70 0 20 40
— — � — — — — — — — — s
���—���— � ��—���—��� ���—���— ��—���—��� ��� ���— ��—���—���
=111—III � III—III—II =111=111 111=111—II =11=111 111=111=11 � �
I I 1=1 I I—I I� I I I—I I I—I I I I I I—I I I—I I I 1=1 I 1=1 I I I I I I I 1=1 I I I—I I 1=1 I I ��
—III—III— —III—III—II —III—III_ —III—III—II —I 1=111— —III—III—II
111=111=111_I11=111=111 111=111=111-111=111=111 III_III—III-111=111=111 � � � �
-111-111-111-111-111-11 -111-111-111-111-111-11 -111-111-111-111-111-11
I I I-1 I I-1 I I-1 I I-1 I I-1 I I I I I-1 I I-1 I I-1 I I-1 I I-1 I I I I I-1 I I-1 I I-1 I I-1 I I-1 I I
i �
1. Insert planting bar 2. Remove planting bar 3, Insert planting bar 2in � � �
as shown and pull handle and place seedling at toward planter from seedling. °
toward planter. correct depth. _ �` �
I � � r '- � •� �
/ \ ��- �� �ti � � � �
V� � � �
_, � �
�
`—'_.___�.-.__— �
'__—.—_. —
�___'�--�,_� � �
\
\
\
�
� —
\
\ � �
�
/ \
� � — _ _ �- _ � � — — _ � � � � \ � \
` � \ �
— �
� _ � _
�
�
�
— - \
��� �— ��—���—��� �� ���—� ���—��� � ��—��� ��—���—�� _ �� �
—�� ��� ���—���—�� �� ��—��� ��—���—��� �� ���—� ���—��� �
��� —�� ��—���—��� �� ���—�� ���—��� �� ��—��� ��—���—��
—�� ��— —���—���—�� �� ��—��� ��—���—��� �� —���—�� ���—��� �
���—_ ���—���—���—��� ��— �—���—��—���—��� ��—���—���_��—���—�� �
—���—���—���—���—���—�� ���—���—���—���—���—��� ��—���—���—���—���—��� ��
i i i-i i i-i i i-i i i-i i i-i i i i i-i i i-i i i-i i i-i i i-i i i i i i-i i i-i i i-i i i-i i i-i i AREAS TO BE PLANTED �'.__..._��
4. Pull handle of bar 5. Push handle forward 6. Leave compaction �(DISTURBED AREA WITHIN 50' FROM TOP OF BANK) '�`"`�..,
toward planter, firming firming soil at top. hole open. Water
soil at bottom. thoroughly.
STREAMBANK REFORESTATION
MIXTURE, TYPE, SIZE, AND FURNISH SHALL CONFORM TO THE FOLLOWING:
PLANTING NOTES:
20% LIRIODENDRON TULIPIFERA TULIP POPLAR 12in - 18in BAREROOTS
PLANTING ��G 4
During planting, seedlings ° 20% PLATANUS OCCIDENTALIS SYCAMORE 12in - 18in BAREROOTS
sha11 be kept in a moist �, I
canvas bag or similar
container to prevent the ' 20% FR�NUS PENNSYLVANICA GREEN ASH 12in - 18in BAREROOTS
root systems from drying.
� 20% QUERCUS PHELLOS WILLOW OAK 12in - 18in BAREROOTS
�c P�vTING B� 20% BETULA NIGRA RIVER BIRCH 12in - 18in BAREROOTS
Planting bar shall have a
blade with a triangular
cross section, and shall
be 12-in long, 4-in wide and
1-in thick at center.
'�I ��i��
ROOT PRUNING
All seedlings shall be root
pruned, if necessary, so that
no roots extend more than
10-in below the
root collar.
'R�PARCD IN TI�IC O�F'CC O�o ���������►
�������� �qR������� P�o�-CT�
■ ,.- �,�oF�ss';oti.�"9 "'�: U - 4916
� REFORESTATION :�� SEAL !: : BECKFORD DRIVE WIDENING
REV. No.e REVISIONe DATEe DRAWN BYe Ct;ECKED BYe D C� n T� � 024436 �
This document, toqether with the concepts and designs presented herein, as an instrument of service, is C l'11 ���� J �
intended only for the speciflc purpose and cllent for which lt was prepared, Reuse of and improper ��F �'.F G �' � ��
reliance on this document without writTen authorization and adoption by Kimley-Horn and Associates, Ince � Q �ii�i�� �. �N�.�•' ��'���
�hallbe without liability to Kimley-Horn and Associatesv!nc, ���� g�X 53��� - R,q�EIG�I� ��IV�'TH l- q���l�Q > i�3��3��� �i��,FY"W �04���� �o� NUMQE�: h sH�ET NUMQERe ,
co�yr�gnt K�miey-Norn a�,d As����ates9 in�os 2o io PHONE° (9 I�) 677—�OC�O F/�Xo (9 I_,) o��-20�0 �E No, F-o io2 �•�,u�u►►�� 0� �06�u00 1-�
0
ti
�
N
�
�
0
� 1 : � 1 � ' I . . • � �
1 : 1 � ' I • • � • • � , • � • • • � • • • � •
, • • �
- , • • :. 1�
� 1.
I � � , � I � � � , , � , ,
•
I u • �
• •
• • �
� • � �.
�� � I �1 � :�
s �
�. • 1 •�1 � �..� �.�.
• � � � �'�� • ' -
' • _ ' :.
• • � s - _
• • '1 I � - � �.�■
� I - - � �� � ����
•
• � 1 � "• •
� � � _ � � � • � • G•
• •
� 1 � 1 • 1 • 1 • I ' 1 �� • , • ' •
• •
• • _ • . � . - •• �� � , � � • � � � •
_ . � • .. �.�.
• - • •
_ � _ .. � ..
_ • - • � � � • C•
• • ; _ _ � _ .
•' • • � � � •
• • _ _ _ _ _ _ � •
� � • � � .
� � " •
• '
_ _ ..eee: ._....____..-_... : . . .
...���� .........................................�����■.....■■■■■■■■■■■■:■■� ��
- : m�. . , , ,. ��■......■■..■■......■■......■■......■■...■��o��o■.o..■■■■■■■■■■■■■■■� ��
m��� - , . .,. : , , . ■.......■..■■......■.......■■m.....■■...■�����■..■..■■■■■■■■■■■■■■■� ��
m�. - , -,� : ��■......■■..■■......■■......■■......■■...■��o��o■.o..■■■■■■■■■■■■■■■� , ,. ��
m� �. � -,� : -,� , , ■......■■..■■......■■......■■m.....■■...■�����■■.■..■■■■■■■■■■■■■■■� ��
m ,.. - , -,� ��■......■■..■■......■■......■■......■■...■��o��o■o■..■■■■■■■■■■■■■■■� ��
- : m�. . , , ,. ��.......■............■...... ..............��o��o■.o..■■■■■■■■■■■■■■■� ��
m� ,. , , . ,,. � , , .............................m...........�����■.....■■■■■■■■■■■■■■■� ��
m ,. �� -,. ., , , , . ■.......■..■■......■.......■■.m....■■...■�����■..■..■■■■■■■■■■■■■■■� ��
- m�. - : -, - ��■.......■..■■......■.......■■......■■...■��o��■..■..■■oo■■■■■■■■■■■� ��
- m�. - � -, � ��■.......■..■■......■.......■■......■■...■��o��■..■..■o■■o■■■■■■■■■■� ��
m��� -, . ., - , , ■......■■..■■......■■......■■m.....■■...■�����■■.■..■■■■■■■■■■■■■■■� ��
m��� ,, , ., , , , : ■......■■..■■......■■......■■. .:....■■...■�����■■.■..■■■■■■■■■■■■■■■� ��
m�. .,. , ,, , ��■......■■..■■......■■......■■......■■...■��o��o■o■..■■■■■■■■■■■■■■■� ��
m��� ,, , .. , ,. .......■............■.m ..................�����■■....■■■■■■■■■■■■■■■� ��
m�. -� �: �� .........................................��o��■.....o■■■■■■■■■■■■■■� ��
m��� �: .: , , , , ■.......■..■■......■.. -: ....■■......■■...■�����■..■..■■■■■■■■■■■■■■■� ��
: m ,:. .,, .:: ��■.......■..■■......■.......■■......■■...■��o��o.o■..■■■■■■■■■■■■■■■� ��
m ,: �� .: : .: , ,,. ■.......■..■■......■..m....■■......■■...■�����■..■..■■■■■■■■■■■■■■■� ��
: . m ,�. .,. , ,, , ��■......■■..■■......■■......■■......■■...■��o��oo.■..■■■■■■■■■■■■■■■� ��
m ,. ,: � -, , .,, , , : ■......■■..■■......■■......■■m.....■■...■�����■■.■..■■■■■■■■■■■■■■■� ��
: :, m�. .,. , ,, ��■......■■..■■......■■......■■......■■...■��o��o■.o..■■■■■■■■■■■■■■■� ��
m� ,. � -, ., , , , ■......■■..■■......■■......■■m.....■■...■�����■■.■..■■■■■■■■■■■■■■■� ��
m�.���� .........................................�����■.....■■■■■■■■■■■■■■■� �� . .
: :, m��� �. .. , , , - ■.......■..■■......■...o...■■......■■...■�����■..■..■■■■■■■■■■■■■■■� � . �
. . m��� .: , . . , „ ■.......■..■■......■...o...■■......■■...■�����■..■..■■■■■■■■■■■■■■■� � . �
. m�. ., , ,,, - ��■.......■..■■......■.......■■......■■...■��o��o..o..■■■■■■■■■■■■■■■� ��
m��� ,,, , .: , ,. ■......■■..■■......■■m.....■■......■■...■�����■■.■..■■■■■■■■■■■■o■■� ��
m�. -� -,- ��■......■■..■■......■■......■■......■■...■��o��■■.■..■■o■■■■■■o■■■■■� ��
m� . . � ,,, .,. , , , ■......■■..■■......■■.o....■■......■■...■�����■■.■..■■■■■■■■■■■■■■■� ��
, m�. ., , ,,, - ��■......■■..■■......■■......■■......■■...■��o��o■o■..■■■■■■■■■■■■■■■� ��
m� . : � -„ - .. , , - .......■............■m ...................�����■■....■■■■■■■■■■■■■■■� ��
. m . :. -� . �� ��■......■■..■■......■■......■■......■■...■�����■■.■..■■■■■■■■■■■■■■o� ��
, m ., . -� �. ��.......■ .................................��o��o■o...■■■■■■■■■■■■■■■� ��
m ., ., � .. . . , , - ■......■■..■■......■■m.....■■......■■...■�����■■.■..■■■■■■■■■■■■■■■� ��
- � m . - .���� .........................................�����.....�■■■■■■■■■■■■■■■� � �- �m
. � ..................... .- �m..... .: ............��mo�m000.�00000■■■■o■■o■o� o�
...���� .........................................�����.....�■■■■■■■■■■■■■■■� ��
...����■......■■..■■......■■......■■......■■...■�����■■.■..■■■■■■■■■■■■■■■� ��
:, m ,, . ... „ . ��.......■............■...... ..............��o��.■....■■o■■■■■■o■■■■■� ��
m ,, ,, � „ . .. , , , , ■......■■..■■......■■.m....■■......■■...■�����■■.■..■■■■■■■■■■■■■■■� ��
m ,,, . .. , . �� .........................................��o��o..o.�■■■■■■■■■■■■■■■� ��
: m -, . --. � - � �� .........................................��o - � �o.o...■■■■■■■■■■■■■■■� ��
: m ,,.. .. , , .. ��■......■■..■■......■■......■■......■■...■�����■■.■..■■■■■■■■■■■■■o■� ��
. , m ,,.. .. : , : ��■......■■..■■......■■......■■......■■...■��o��o■.o..■■■■■■■■■■■■■■■� ��
. ,. m , , . .. . , , ��■.......■..■■......■■......■■......■■...■��o��o.o■..■■■■■■■■■■■■■■■� ��
. , m�. .. , : �� .........................................�����......■■■■■■■■■■■■■o■� ��
,: m , , . - � � - - �� .........................................��o �. �......■■o■■■■■■o■■■■■� ��
m� - - � - . . . , , , : .......■............■o ...................�����.■....■■■■■■■■■■■■■■■� ��
m , , �� , , . . , ,. ■......■■..■■......■■......■■.m....■■...■�����■■.■..■■■■■■■■■■■■■■■� � ..
. . m�. - . - � ��.......■............■...... ..............��o��o■.o..■■■■■■■■■■■■■■■� ��
m��� - , . . , � . ......................m..................�����......■■■■■■■■■■■■■■■� �m
� - m�.� - : �� .........................................��o��o.o...■■■■■■■■■■■■■■■� ��
. . m�.� - � ��■......■■..■■......■■......■■......■■...■��� .. �■■.■..■■■■■■■■■■■■■o■� ��
...���� .........................................�����......■■■■■■■■■■■■■■■� ��
. � .....................om.......m..........��o��o.00.�■■o■■■■■■o■■■o■� �m
. . , . . . : .....................���..... � � �.......... �� � ��m 000.� v0000■■■■o■■000 � o „
�
�
c
o,
�
�
�
Q
i
�
rn
�
�
�
c
0
�
�
i
�
�
0
�
�
U
Q�
m
O
0
O
�
0
0
�
0
�
0
0
�
i
�
Q
�
�
�
W
W
�
O
O
+
01
Q
�—
(/�
i
J
i
W
Z
�
-L - POT Sto 2/+00.00
T /P PROJECT U -49/6
END PROJECT PHASE 2
BEGIN PROJECT PHASE
TIE PROP BERI� SLOPE TO OFFSITE
PROPERTY EXISTING BACK OF CURB
19+20 TO 20+80 LT
. . ��... , . .... �.�,...
MARKETPLACE ASSOCIATES, LTD.
( MARKET PLACE SHOPPING CENTER )
D_B. 661, PAGE 36
REV. No.e I REVISIONe DATEe I DRAWN BYe I C�ECKED BYe
This document, toqether with the concepts and designs presented herein, as an instrument of service, is
intended only for the speciflc purpose and cllent for which lt was prepared, Reuse of and improper
reliance on this document without writTen authorization and adoption by Kimley-Horn and Associates, Ince
shall be without liability to Kimley-Horn and Associatesv !nc,
Copyright Kimley-Norn aod Ass�ciates, Incos 20 10
I Vr ' ' `�'UJ.`�' I
�NV.IN— 400.75'
/.IN— 400.36'
JOROMI
PROPERTIES, LLC.
(OLD SONIC STORE)
P.B. "X", PAGE 126
'R�PARCD IN TI�IC O�F'CC OFo
■
�
._r ._ ._� .V�f - � .JV i.lr __�.._�
INV.IN— 399.88' INV.IN— 401.60' INV.IN-402.34�
INV.IN— 399.48' INV.OUT— 401.60' INV.OUT-402.34
ini�.� n� ir znn ^ �
PoOo BOX 33068 — RQ�EIGH� NCRTH CQRO�INQ 27636-30�8
PHONE° (9 19) 677-20C�0 F/�Xo (9 19) 677-2050
�E No, F-o io2
HERMAN DAVIS
30' SEWER
EASEMENT
D.B.F25 PG.541
P.B.' X" PG.758
t;�,n�� �ts' rtir rtAr
EST 2 TONS
EST 7 SY GEO
SEE NOTE 2
MARKETPLACE ASSOCIATES, II, LTD.
D.B. 817, PAGE 641
P/ Sto 3/+43.6/
�= 52' 5/' 37.1" fRT 1
D = 6° 00' 00.0'
L = 88/.0/'
T = 474.66'
R = 954.93'
SE = 0.035
RO = 9/'
ROADWAY PLAN SHEET
Sto. 26 f68.95
JAMES W. CRAWFORD &
HARRIETT C. CRAWFORD
P.B. "X", PAGE 758
D.B. 457, PAGE 673
INLET CHANNEL
IMPROVEMENTS
CLASS 'I' RIP RAP
EST 100 TONS
EST 205 SY GEO
SEE DETAIL 6
SHEET 2-A
OUTLET CHANNEL
IMPROVEMENTS
CLASS 'I' RIP RAP
EST 45 TONS
EST 95 SY GEO
SEE DETA�L 6
SHEET 2-A
OUTLET PROTECTION
CLASS 'B' RIP RAP
EST 2 TONS
EST 7 SY GEO
SEE NOTE 2
OUTLET PROTECTIONJ
CLASS 'B' RIP RAP
BANKS ONLY
EST 4 TONS
EST 5 SY GEO
SEE DETAIL 8
SHEET 2-A
NOTESo
I� DRIVEWAY CUT ON PARCEL 5 WILL SLOPE
AT I% AS SHOyVN ON PLANa
2o CONTRACTOR TO ROTATE RIP-RAP PAD
TO ENSURE THAT THE PIPE OUTFALLS
TO THE ARMORED CHANNEL BANKa
ro o ao
MARY ANNE DAVIS
D.B. 804, PAGE 381
PREFORMED SCOUR HOLE
OUTLET PROTECTION
CLASS 'B' RIP RAP
EST 8 TONS
EST 16 SY GEO
EST 30 SY PSRM
SEE DETAIL 9
SHEET 2-A
PKO�-CT�
JOL� NUMQER:
TOE PROTECTION
EST 135 SY PSRI�
SEE DETAIL 4
SHEET 2-A
�
MILLING/RESURFACING LIMITS
SEE SHEET N0. 7 FOR -L- PROFILE
SEE SHEETS NOS.C-I THRU C-4 FOR CULVERT PLANS
U-4916
BECKFORD DRIVE WIDENING
0 f 1065000
SH�ET NUMQERe
5
�
�
c
�
�
�
Q
�
�
�
'c
0
,
�
�
a
�
L
0
�
�
U
Q�
m
0
0
0
�
�
0
0
�
0
�
0
0
�
�
�
Q
�
i
�
Pl = 12+64.00
456 � � ; EL = 449.97' � � � _ � � �_ � � �- ; � _ i ;_ i _ _ i i , 456
� � � � � �-- � � r i- � � � � � � � : -1- C- _ �_ _ _ �-_ -1- - -- I
K= 44 � � � �
- _ _ _
__
454 VC = 80' � � � � � -___ - - -- --- -- - - -- -- 45
_ _ _ _ _ _ _ _ _ _ ._ _ _ _ _ _ .__ _._ _ _ _
: i i i i_ 4
� DS = 40 �IPH i �
��_ i I I I I_ �
i � i i
i_ _ _ _ _I _ _ I _I _ � _ _ I _. I i_ _ __ _ I
452 � _ _ _ � _ _ _ � _ _ � � _ _ i_ _ _ _ _.i _ __ ___i__ _ - �-- _ _ _ -�- -- -- -- - - --� 452
_� . i N. i �,- . Ji __ i _ . I __ � . , . � _ � - . �i � _ i _ , _ i - - � - - i- - . - -i � � - -- - �i
, , � � _� ' : _
' ' � _I _ _ _ _I
_ �_�. , i - - - -_ _
450 �---'-- 5025% � � , ,
�_���� � i i ��i . . i i i i � i � i � i � � � i i i � 450
� p/ i i i i i i i i i i i i � i � i � i i � i i i
448 - , � ' � � � -1i _ l_ _. _ _1i _ 1_ _ _ � � �-- _ li l_ _ i -- .- _ - -�- - - - -�- - - �- - - - J- - - -- - -- - -I' 448
� � �'
_ _ _ � I � � ` , � -� �- . _ - _ _ 1 � _ _ - - - - - -�- - - - I - - �- - - - -1- - - - -- -I
� I i �` � i i , i
446 �. i � . �. i � ---- I �- - - - - - - - - -- - - -- - - -- -- -- - - -- - 446
_ , _ , __ _ _ . � ! �
� _ _ `
�` I i i i i i
444 � _ � -+ -i- _�_ 1_ � - � J_ _� _ _� i�_ _ - - - - -- - - �- - - - -- - - -- -j 444
� �
� �. , - _l� _ _ _ �i _ . � ` -- - _ � _ _ - � _ _ _ I _ _ _
� I - . ��� , __ _ _._ � . I � _ __ -�- - _.i . _ _ EL /435.05 _i � � i - -- �,
I I I I , _ � ' 2 � ` ` I I I � I — I _ _ _ -I— - __ _ _I,__ . -- --- — _ __ _ _
442 •�92/, ! ! -� � � K= 589 �� � i i i i i i �� �, 442
I� i i , i �. I � I i�;
� i BEG/ SPECI�QL ' _ i i i i : ��` i i i � � �i i i li �/C = 760' i i i i i i i i i
� -� F_ � �i DITCH GRADE LT _ � ;- __. __ _� � _ �_ � � � , �- � . ii_ � _ DS � 40 �PH - _.}_. _ �_ � _ _ i- -�---- i�
440 _ ; -L - ST /2+90 �_ END SPEC/AL I I� . . � � __ _ � � � � _ _ _ _ _ . _ _ 440
�. ' ELEV = 443.40 ; ' ' DITCH GRADE LT � � �. . � — _ � � ` '- - _ _ I �._ � _ � - - - - � - �- - - ! -- - - - - - - 438
438 �-�- L- ST /3f50 � � - --_
� -� � � Gi GRADE _ _�_ �_ ELEV = 44i.65 �_ _ _ _� _ ��- _ � � �- _ i� ��_ ' � , ` ` �, _ _�_ _ _ _ �- - �-
� _ _ � -. _ -- - -- - -i
436 � � � . . _ lLL OTCH T0 KEY / S9.5B �_ __ _ , � -- I , _ � , � _ � � _ _ . � � , _ _ _ � �2�/O • -�- - - �- - - - �- - - -- - � 436
O/, i i i i i i � �
-L - STA 11+67.00 ELEV 450.56' � � �, �� i � � �, �� _ - � � � �3 _ - - - i _ � _ �i
_ �
ii : __ __ . __ i _ - - -- -
_ I : i
434 � � ���` � �6pO • � � i , 434
I , I __ ; _._ _._ : , __ II __ � ` � ` $/
�_ , • I
,
I I I � ; I I i i i � i i i i � I I I I I ` � �J2.� `� � : -I— — - I-- I —I —— —-- —�II
432 _ _ _ _ � - -_ _ _ . __ _ -- _ _ _ � - , 8/ -- - - -- 432
�- .. r
-r r� � i � � � � : � r . � � -r r� � i BEGII y SPEC/AL
�_ _ _�� _+ _�- , . --�- +- _�� __ � , ____ _� __ _�_. �- _� _ _�, D/TCH GRADE LT -; � � , � � � � � ` - - - � -- - - -- -i
430 _ � : . ; _� : �_ ; . __ � : . � __ : _ . � -� - ST 17+83 , _ � � ' - � � i � � � � _ . _ 430
_� __ E V 3390 _
i i i i i i I i _ __ i i - , i i ���` I�
LE 4 � ��
_ _
� � � _ _� ; �_ _ � � _ �_ � � � _ _ _ _ � �_ _ _ _� _ END SPEC/AL - � ' I I
42 8 � - - -- - 42 8
�. _� _il I� _.� _�_ _�_ �._ � _�_ _ if_ _ _ : _� _ if- : _ �. � I �_ _ - - - _ - � � � ` � -- - -I
_ i i �__ i_ _i_ DITCH GRADE LT �_ � ;
� � �. ; �_ �_ , � � . � . � � _ _�_ _ �_ - T � � _ � � i
426 �- _ _ . , _ _ . , . , , � � .. � —� � � { --- . � = 430.50 � � � _ , 426
� _ � L S
: : : � -
_ _ , , , , , - - -- __ � _
, � �
� � ' � _.� � � i � � i
-� - � i � __ __ ! i _� _ i � - _ i _ _ i _ _ _i i '� � � i
424 _ _ �-L - BECKFORD DR � ;- ,-,, 424
�. �� �� � � � � � � � �
� i- �i �
422 SEE SHEET NOS.4 AND 5 FOR -L- PLAN 422
11 12 13 14 15 16 17 18 19 20 21 22
424 � P/PE HYDRAUL/C DAT A 424
� i _�_ � � ` _II ' I ' I � _�_ � - � ___ __ I
� �. _ _ � _ _ � ` � _ � � � � _ - � l�9' x 6 RCBC fBUR/ED l 1 � -r- i - -- - �
2 ' '
422 i _ _ � PIPE HYDRAULIC DATA , � - - - - _I 422
f i �� . i i � 1i_ _� _ __.i_ � i I
i _i _
_ �
` �- DRAINAGE AREA = 0.23 SQ l. - - - - - -
I �� � � _ _ �2 5/l 2� RCP I
420 _ _� _ : � _ , : � , __ DES/GN FREC?UENCY = 50 YRS � - -- - - 420
DES/GN D/SCHARGE = 470 CFS . ; _ _ DRAINAGE AREA = 6.0 AC
', 1 l , � ` : . .- - - --
418 � � �- _i� . _ _� _�_ �_ � � � - � ` _ �i- DES/GN Hy� ELEVATIOIy _ 403.1 FT �- ii- -� _ _ _i- � DES/GN FREQUENCY = 50 YRS -�- _._ _.__ -_ i 418
_ __�
� � �. . _ � , _ _ _ _�. , . �_ _. _ . � _ � , - 550 CFS _�_ _ - �- I DES/GN D/SCHARGE
l00 YEAR D/SCHARGE _ l5 CFS � _ i
i i � . � _ � i i i i � � i_ _ _ __ �
i _ � � l00 YEAR Hy� ELEVAT/ON - 404.7 FT _il � � _i � DES/GN Hy� ELEVAT/ON = 400J3 FT i-- -_i
416 I -- -._ � � - F -- --- 416
i � �
I OVERTOPPII yG FREQUENCY = �100 YRS
, , , , , �� i l00 YEAR D/SCHARGE = 28 C S ; i
_ ' i_ i' _ �` OVERTOPPIIyG D/SCHARGE = 6/7 CFS - I l00 YEAR Hy� ELEVAT/ON = 40%85 FT - - -- - �
�_ � i _ � --r _�- _ -�_ �__ �' : i i - � � OVERTOPPING ELEVAT/ON = 406.34 FT - i Pl = 7+ l 0 RT PP� FR Y = �I00 YRS __ _ _ �, 414
414 � �i i�, �i- i _ � 2 9.0 OVE 0 HG EQUENC
� � _ � _ . __� � : � �__ , _ � r -- ! � � ` `
EL = 403.33' �, OVERTOPPING D/SCHARGE = 44 CFS � - -- i
412 __. _ � � - - �- K = 65 - OVERTOPPING ELEVAT/ON = 406.34 FT -- -- -- - - -- -- 412
� L _ � _�_ _ ; _ � , . �_ _ ; _ � _ � , . � _ � � � , � _ _ ; _ _ VC = 330' - - - - -- --
_i _ i � � DS = 40 �IPH _ _ ,
410 �- _� _� I -+ -�- _�_ +_ I �_ _ �_ __ __ _� �- �- � ` _ _ i- -- -- - - -- -'� 410
� I�� ' J _�. : J_ : J_ __ i _ . I __ � . ' . � � � _ _, � - _ _- - - - - -- - �
� � � I
I f � I I I f.�_ �` I I I I i � � I II
408 _ _ ' , , ; ; , � _.� _ _ - - - - - - - - - - - , 408
�
� � i � �
� �. . � _ _ _ _i�. . , .�_ , �_ i _ _ , _ i !� . , _ � � . � _ �_ I_ _ _ � - - -- - I
, _ , J_ _ l _. _ _J _ _l_ _ _ I
406 � � _I� i � -f i � � I I : I I _ �. � . _ � � ' ' � � . . _ _ �- -._ _._. _ __ _._�, 406
_ � _ _
_ ` — � �
_ _ � _ � _ i � � � 1 �--- ���-�� j -- - -1- - - - -- -I
i I i i i i i i i i i i i I i I i �� ��_ _____ —� � i i
404 -- � _ � � � �� �� �� �� � � �� � . � J3,6��Si 5�• _ i I i - I 404
� � � � � � • +)1.438 �
, , , , ( -
� �
402 i i i i i i i i i i i i i i i i i i i i i i i i � i � i i i i � � i i i i i i i i i ' 402
i
I I I I I I I I I I I I I I I I I I I I I I I I I
I I I I I I I I �' �' I� I I I ' I I I
400 i , ; ; ; ; ; , ; ; , ; ; i i � i i i 400
1 i I i i i i I i � i i � i i 1 f I I I I � I f I I I I I
i i i i i i i i i i i i i i i I EXIST NG i � i i
398 � � � 72' C�P � 398
� � � � � � � � � _ I � i _ I� i �
�
�
, I I i i I I i i I I i I I I I „ � I I I i
396 i i i i i i i i i, i i i
IVORti1AL W.S.EL. = 394.4' � 24 RCP i 396
-- - - � � ELEV = 393.55'
_ _ @ EXISTING CULVERT � ' _ — i
i i i i i � i'i i i � i i i � � i i � � i i � � i i i i � i i � i �
394 (JANUARY 20, 20/Ol -- 394
i
� � ; . ; ; ; -� - BECKFORD DR �@9- X 6- RCBC �BURIED l-� � � � � � � � � �. �__ �� .'�� 39�
392 , �� i i � � � i i � i i i i i
� � � �
. _ _
1 I i i 1 I I I I f i i 1 I f i i 1 I f , l I I I � I
39� SEE SHEET N0.5 FOR -�- PLAN 39O
22 23 24 25 26 27 28 29 30
�R��A��� iN Ti�i� or���c� o�o ���`���`�ARO���i,
HORIZ P�o�-cT�
�. o� ,. .....,. ��. � o o a o
■ .`�� �. : O� � S S�O� ti9 i��I
�� U-4916
.
ROADWAY PROFILE SHEET "'_.� 0244369�' - BECKFORD DRIVE WIDENING
REV. No.e REVISIONe DATEe DRAWN BYe Ct;ECKED BYe � �
This document, toqether with the concepts and designs presented herein, as an instrument of service, is i,� '• % � VERT
fntended c�nly for the speciflc purpose and cllent -For which lt was prepared, Reuse of and improper ���F�'•Fi�G �,�,r ��� �
reliance on this document without writTen authorization and ado tion b Kimle Horn and Associates, Ince �� � • �N�••• ���� 0 �
��o�yb ghttKimle IiNbliln a dl AKimoc atorn and O IOoclatesv i���, P y Y- ���� g�x 53��� -(R��EIG�I� ��V�THF�X� g�l �Q� I i�2����O�U pE N0, F-0102 ,,,,��III 111►►oO,,,, �o� NUMQE�: � I ICE'�000 sH�ET NUMQERe 7
f Y- P��NE° �g I �) �077-�
�
c
Q,
�
�
a
�
�
�
�
�
c
0
�
�
�
--,
�
a
�
i
0
�
�
U
Q�
�
�.
0
0
O
�
�
0
O
i
O
3
�
0
0
�
I
J
Q
�
�
�
424 � � ' 1 __� � � ��-- � � � -I- � � �� � _ � � � - 1 � _ i _ � � _ i 1_ - �_ ; � _ __ , 424
�
� � �
i i _ _ i
__
i i ____ _ _ _ _ _ _ _ _ _ _ _ ._ _ _ _ _ _ ._
_ _._ _ _ _ __ ___ __ _ _ __ __
422 : : : i i i i i_ i i i_ 422
� _ �- ---- -i - !- i_ - ___i__ - - -!
420 _ ;� _- _ � __ _ � _� _ � - � _ _ � � _ � � _ _ _.i - __ - ��-- _ _ _ -�- -1_ __ __ - - � 420
_i_ __ _ �
� _ � , _ _ _�. , �_ . _ J_ _ _ _ � , � _ _ _ . � � , _ _ - - - - - - �- - - - - -- - �
i � � i i � i � � i � � i i � i � � i i i � �
� � P/ 32 �79 00 � � � �
- , , _
,
_ _ _ _
. _ _ - - - _ i _ _ _ _i i
418 � i � ! ! � i ! � � ! � � � � EL = 4/0.35' � i i � i i � � � i i � � � � � � i � � i � � � � � � i i i � 418
i il i i i i i i -� K= lOO _ l_ . _ I I �_ _ I l_ � i i � i � i � i � � i_ J- --I
_._ _._. _ __
�. _� � _.i � _.� _�_ . . _�_ �._ �I i _ , i � � �- i I - � - I- _ - -�- - _ _ _I_. _ _ i _ _ � i
416 VC 3/0 416
_ i _ � _ , _ _I I _ � _ -, os � 4o MPH �- _ _ � r _ _ _ _ _ - -r - - - � - - �- - - - -�- - - - -- -�
414 �. i � _ _ i i : �. i � �_ _ _ _ - , - - - _ - - - - - - - -�- _ _ ! -�- -- - - - - -- - 414
i- --I-- _� __ i _ _ _i � _ -- Pl = 36+5600 '- - -'
412 � _� � _i -� -�- _�- + _�_ __ _ �- �- � f- , � - - -- - - � - - -- - - -- �
_ _ _ _ � __� �. : . �_ � _ � _ _ _ - ! ' � _ � � � - _ . � � _ _ � _ _ EL = 404.08 - - - � - - - � - i 412
� � �� , � � � � , � � � � � , � �, � � i K= l35 i � � � ii �i
ii_ - -- -- - -- -- - - - -! - - - -- - -- - -�-- -- --- - - -- - -
i i _ i
i _
i_ � �
410 I i i i � � � � � i i -F)1.4385� (-���6 , I i i i II i II I. II �/C = l5�' �i i �� � i I i I i i II �i 410
� � � � - l 3/� � � � � � � � � �. DS � 40 �IPH i i i � � � � � � �
� -�F_ %� � � - , � ______----__�,_ � _ �� _ �_ �. ii_ � - - -�- - �- -� - - i- -}---- --- -��
408 _ _ _ _ , 408
_ _ — � � � — — — � � � _ _ — � ; _ _ _. _ _ _ . — ._ .
�
�. _ _ i— I - — �— - - -- — — — — - -
� � �I �I � ^ ► -.— _ _ _ . _ — _ _ _.
— � . , i
406 ___��� - - _ _ _ _ _ _ �--�__ i i i 406
-
.., � —
, , �
I _I i II I I �— I— � .
_�i � � � _ " -J/„663//. - - -�i- - - - i- - -� _ _ -�- - - - - - -- - -i
404 � ��-- � _� �.: . �_ �_: J_ __ I __ I _ ��: � ��_ � � , ��___ �, - -�- - - �- - -- - - -- -� 404
i � i � � i � � i � � � � � i i i , � �2. � i i i i � �
II : I I I ! I : __ , , __ . , __ ' II_ I � ' ' - - - � �5 • - - - - I - - - -- - II
. � ' �� _ _I_
_ I I -.
/ I_ I I
�
402 ; _ r . _ : ' , 402
�_ , i , II i , i , __ II �_ ' ' -Z"'?5/ _ � � ` -�- - - �-- � -�I - - - -- - II
BEGIN SPEC/AL ' �
D/TCH GRADE LT � ••,. � i
I i i � , i i � � � � � � � � � I i i
L - ST 35 +32 �
400 -T 1- �- _ I _ _ _ _� �. _ �_ � _ _ � __ r . _ � __ �. --r _ 1- �- - - � � - . , , _ � � � �_ i - -- j 400
., ` _ _
�- _ _�� _� _E_ , _�_ + _�� __ E ____ _� __ _�_.
�- -� - ELEV = 4 .00 �- _ _ _ _ -I- -- - - -- -i�
398 _ � : . ; _� �_ , . . __ � . . � __ ; _ . 1 ! - � _ - - 398
i __ _ _ - - - - -_— � � _ i i -
�. . �. �
� � � � � � � � � i _� , _ . _ , END SPEC/AL
_ � � _ �_ � � � _ _ _ _ � � _ - - - - _� _ D/TCH GRADE LT _ - -L - - - -- -I
396 _ � _ � _ � : _ _� , . �_ ; _ 396
i, ' _ _ _ i _i _ i _ _ _i _ i _ _ ii i _ i- - i- _ _i_ -L - ST 37+38 i - -�
� _� � � i� �_ �_ �- �_ � �- � � �- - - - - - -�- - - - - - -- i
394 �- _ _ , _ _ , � , � . � � �. . � � _ _�_ _ �- � LEV = 399.37 _ I - - -- - I 394
, _ E
�_
_ _ � , , � � , � -� - _. - --_ _--- � _ - - -
, � R
i : � � � � i-� -. i_ i i__ . __ �: i / pc c p p �' , I � i lLL NOTCH T0 KEY-lN S9.5B I i - -- - �
392 . � � � , � � � � �-L UL C�l 0/1 ��l� � -L- STA 38+65.00 ELEV 398.28' . i 392
� � �� _ i i � � I I � ' ;
390 SEE SHEET N0.6 FOR -L- PLAN 390
30 31 32 33 34 35 36 37 38 39
i i i �_ _ i _i ._ � i_ _� �__ � ----- � _ � i i i- i � _ _ i _� � i_ !- � i - -� __ i _ � i i i � �
� � �. _ � _ � i_ i i i � � � � � r r- �r- r- �- - - - r- - - -- - �
�_ � _ _ __ �i i __ _ � � �_ _ �_ � � __ . _ �_ �_ _� _ _ _._ _� -- !�- - -- �- - -�_ � �_. � --- - -- - - - _i
� _� _ � _ _� _ � � _ _ - � � -� -- � �- ! -�- ! -� - --- �
; � �_ � _ ; _ � �� � � _ � � _ _ _ _� i_
i , , i ; � i � i
_ _ _ , _ -- _ _ _ _ _ _ - - - - - - - - - - - -- - -
.
i � � � � i i i
_ _ , , _� , �_ , J_ , � � , � . _ _ _ _ _ , _ _ � _ _ _ �_ I
� i i_ _i_ __ ' _i _ � _ _ : i _ i_ � _ i i i- 1- -1- --1- !-- �- -1___._ _._i
_ _ _ _ __. _ _ ____ _ _ _ _ - - - - - _ _ _ _ _ _ -- - --
__J �. , J_ l__ _ J _ -- _ _ �. , _ _l � �. _ _ . J L , _ _ _ __l _1_ -1- I- - -1-� _L_ _I 1 _ I
� � � i _ I i i I i ' ' i I I I i i I I j � _ i— j i I __ � � -� i— ' I i i --�-- — -- -- i
I I I I I I I
II_ I ! , I I I I ! __ . , __ . , __ I II_ I _ I _ _ _I . . - - -- — -- — — -- - - — -- — _ -- -- — — -- -
!
I I I
I I I � I I I I I I I I I I I � � I I I I I I I I I I
� � � : . _ ;__r _�. . . . .�- �--; . . �_ __ _ r . . � __ � � _ � - . � r - ; - - - _ _ _ -�- - - - -- i
, � ; _ _ _ i - - - - - - - i Ii
_ �i . i I� _� -i_ �� i . . _ _ . _ ' _ i �
i i i i i i i i i_ i i_ i i i i i. � i i i i i _i
_ _ _ _ _ _ _ _ _ _ _
_ _ _ _ _ _ _ -- -- _ _
� � _ �- � _ � � � � � � � I I I I I f_ I I
i i i
_. _ _ _. ---- - -- - - -- - - - - - - - - - -- - -- -- - - - - -- --- -- - - -- --
i .i . . i i
_ J _ _ I� . �_ _ . _ � � __ J � . _ _ _ _ J __ _ _ _ _L _ _I �_ _� _I
_ _ _ _ _ _ _ _ _ _ - - _ ---
_ I i __ 1_ I __ I J __ I i J I i f I _ I _ i _--_ I . _ _. 1_ I_ I_. I_ !__I_ I __ 1 I_. 1__ ! I_ 1 !_- -1---- __i
_ _ _ _ _ - --- _ __ _ _
� _ J , _ _ _ _�. , J_ . _ J_ __ , _ __ � , � l _ _ _ . J � , _ _ - - - --1- - - �- - - - - -- - �
I � I I i I I I I I � I i I I I I I I I I I I
�
- , , , , , , _.�
_ , , _ � � - - - - - _ I _ _ _ _I _ I
� � � i � i i � � � i i i � � I I I
_i i I i � I i � I I I I I I i I I �
� ��.. � i �._ . �_ _ _ �_ __ � _ � __ �_ � ��__ .� � _ _ _ _ -- - _ �- - __ - -- -I
i _ _ _ _ _l_ _1_ _ _ , _i_ _ i_ _. _ _i _ i__ _ _ i i i- _ . �- - _i
� � � � � � � � � � � - - � _ ._ _ _ __ _ _.._ _ __ __-i � _ _ � _.____ __ _ __
� � � ,, , � � � � � � � � � � � � � � � � � � � � � � � � � �
� � _ _ ; _ - ; _ _ - _ _ ---- _ _ - i - - - - --- - - -- - - - - - - -- -- - - - -
i � i
i i �, � i i i � � i i i �, � i i i � � i i i , � i , i i , i i I i I I
i i i i i i i i i i I
- - � - i
i i _ _ i i i i I
I I ' I I ' I I I I I I I I I I ' I I I I I I I I I ' I I I ' I I I ' I I i I I i I I I I I I I i I I i I i
i i i i i i i i i i i i i i i i i i i I i i i i I �i
I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I
I
� � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � I
�
I I I I I I I I ' ' I I I ' ' I I I ' ' I I I ' ' I I I I I I I I ' I I I I ' I I I I I I I I I I I I I I I I I I I
i i i i i i i i i i i i i i i i i i i i i i i i i i i
I I I I I I I � i I I I I i i I I I I i � I I I I � � I I I I I i I I I I I I I I I I I I I I I I I I I I I I i
I I I I I I I I I I I I I I I I I I I I I I I I I I I I i I I i I I I I i I I I li
i I i I I i I i I I i I i I i I
� I� I I� I � I I � I i I '� I
I I I i i I I I I I I i i I I I i i I I I I I I ' I I I I I I I I I I I I I I I I I I I I
I I I I I I I I I I I I I I I I I I I I I li
� � � � � � � � � � � � � � � I
�
I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I
�R��A��� iN Ti�i� or���c� o�o ���`���`�ARO���i,
HORIZ P�o�-cT�
�. o� ,. .....,. ��. � o o a o
■ .`�� �. : O� � S S�O� ti9 i��I
�� U-4916
.
ROADWAY PROFILE SHEET "'_.� 0244369�' - BECKFORD DRIVE WIDENING
REV. No.e REVISIONe DATEe DRAWN BYe Ct;ECKED BYe � �
This document, toqether with the concepts and designs presented herein, as an instrument of service, is i,� '• % � VERT
fntended c�nly for the speciflc purpose and cllent -For which lt was prepared, Reuse of and improper ���F�'•Fi�G �,�,r ��� �
reliance on this document without writTen authorization and ado tion b Kimle Horn and Associates, Ince �� � • �N�••• ���� 0 �
��o�yb ghttKimle IiNbliln a dl AKimoc atorn and O IOoclatesv i���, P y Y- ���� g�x 53��� -(R��EIG�I� ��V�THF�X� g�l �Q� I i�2����O�U pE N0, F-0102 ,,,,��III 111►►oO,,,, �o� NUMQE�: � I ICE'�000 sH�ET NUMQERe 8
f Y- P��NE° �g I �) �077-�
�" I' .,�\ " I' I�:' C�) I��'' \� C�)J I'� " I' I I' ��' .,��. I'� C�) I., I.\\' .,��,
II)' I�� I� I C�) \� C�) I"� I I I( I� I I`� �.,'�, �'�
SCALE: 1" = 2000'
"� � � 11t.C.D.O.T. WORK ZO1VE TRAFFIC C011tTROL N oF
— 1561 MAIL SERVICE CENTER (MSC) RALEIGH, NC 2 76 9 9-1561 �� NORr �h•
� 750 N. GREENFIELD PARKWAY, GARNER, NC 27529 (DELIVERY) ���oF �-q\�
��„ �_ PHONE: (919) 773-2800 FAX: (919) 771-2745 � �� �o `��
��.�� 1 I I o�_�� — O�- �. s
-��v������� J . S . BOURNE , P . E . � ��
� . S T A T E T R A F F I C M A N A G E M E 1 1 l T E 1 1 t G I 1 V E E R �� � ��ti
m Z �
��� ���� � ������� ������ ��u � JEFF M00RE P. E. � � �
� � TRAFFIC CONTROL PROJECT E11tGI11tEER o� � o
� ; - �° �� ,�� �
\ � �
� J. JASON PACE , P. E. TRAFFIC CONTROL PROJECT DESIGIV ENGI11tEER ���Fti� sQ°� o
WORK ZO1VE SAFETY F� MOBILITY o�F _ ; �'
TRP
"from the MOUNTAINS to the COAST" JASON JOHNSON TRAFFIC C011lTROL DESIG1V E1VGI1VEER rRAFF G
I1�DEX OF SHEE TS
SHEET N0.
TMP-1
TMP-1A
TMP-2 & 3
TMP-4,6-9
TMP-5
TMP-10 TO TMP-13
TITLE
TITLE SHEET, AND INDEX OF SHEETS
LIST OF APPLICABLE ROADWAY STANDARD DRAWINGS,
LEGEND, AND TEMPORARY PAVEMENT MARKING
PROJ ECT NOTES
PROJECT PHASE 1, CONSTRUCTION PHASING DETAILS
PROJECT PHASE 1, DETOUR ROUTE
PROJECT PHASE 2, CONSTRUCTION PHASING DETAILS
■
�)
APPR O VED:
DA TE:
�������, C A R p���i�
�� 4Q` •'' ' '•• � �ti'i.
�.`�; ��ESS�/p�.:9''.
. :: �� ;
� SEAL 9!•' �
� .
SEAL ' "
� 024436 �
� �
. : �
: �
: ,� �. .� �
�•,���,,c. FN� � NE`��; ��,��.
,,,, � ����i i►► �0�,,�
�
����� ��e
TMP-1
• �
R OAD WA Y S TA1�lDARD DRA WI1�GS
THE FOLLOWING ROADWAY STANDARDS AS SHOWN IN "ROADWAY STANDARD DRAWINGS►► _
PROJECT SERVICES UNIT - N.C. DEPARTMENT OF TRANSPORTATION - RALEIGH, N.C.,
DATED JANUARY 2012 ARE APPLICABLE TO THIS PROJECT AND BY REFERENCE HEREBY
ARE CONSIDERED A PART OF THESE PLANS:
STD. N0.
1 101 . 01
1101.02
1101 .03
1101 .05
1101 .11
1110.01
1110.02
1130.01
1135.01
1145.01
1150.01
1180.01
1205.01
1205.02
1205.04
1261 .01
1261 . 02
1262.01
1264.01
1264.02
TITLE
WORK ZONE WARNING SIGNS
TEMPORARY LANE CLOSURES
TEMPORARY ROAD CLOSURES
WORK ZONE VEHICLE ACCESSES
TRAFFIC CONTROL DESIGN TABLES
STATIONARY WORK ZONE SIGNS
PORTABLE WORK ZONE SIGNS
DRUMS
CONES
BARRICADES
FLAGGING DEVICES
SKINNY - DRUM
PAVEMENT MARKINGS - LINE TYPES AND OFFSETS
PAVEMENT MARKINGS - TWO LANE AND MULTILANE
PAVEMENT MARKINGS - INTERSECTIONS
ROADWAYS
GUARDRAIL AND BARRIER DELINEATORS - INSTALLATION SPACING
GUARDRAIL AND BARRIER DELINEATORS - TYPES AND MOUNTING
GUARDRAIL END DELINEATION
OBJECT MARKERS - TYPES
OBJECT MARKERS - INSTALLATION
GENERAL
� DIRECTION OF TRAFFIC FLOW
���
DIRECTION OF PEDESTRIAN TRAFFIC FLOW
EXIST. PVMT.
- '- NORTH ARROW
PROPOSED PVMT.
WORK AREA
� �>;;�>',��
�� ��� REMOVAL
,
TRAFFIC CONTROL DEVICES
BARRICADE (TYPE III)
CONE
DRUM � SKINNY DRUM O TUBULAR MARKER
TEMPORARY CRASH CUSHION
FLASHING ARROW BOARD
FLAGGER
LAW ENFORCEMENT
TRUCK MOUNTED ATTENUATOR (TMA)
CHANGEABLE MESSAGE SIGN
TEMPORARY SIGNING
IQ PORTABLE SIGN
I- STATIONARY SIGN
p STATIONARY OR PORTABLE SIGN
SIGNALS
.,
F- -y
� ;EXISTING
F- -i
�----
❑
�--��� �
�
PAVEMENT MARKINGS
-EXISTING LINES
- TEMPORARY LINES
PAVEMENT MARKERS
�T
� M TEMPORARY
�P
� CRYSTAL/CRYSTAL
� CRYSTAL/RED
. YELLOW/YELLOW
PAVEMENT MARKING SYMBOLS
� � PAVEMENT MARKING SYMBOLS
LE GE1�lD
TEMPORARY PAVEMENT MARKING
PA
PD
PE
PI
PV
P4
PAINT
PAINT
PAINT
PAINT
PAINT
PAINT
(4" WHITE,
(4" WHITE,
(4" WHITE,
(4" YELLOW,
(8" YELLOW,
(24" WHITE,
2X)
2X)
2X)
2X)
2X)
2X)
EDGELINE
4" x 2' MINISKIP
SOLID LANE LINE
DOUBLE CENTER LINE
DIAGONAL
STOP BAR
.
�>
APPROVED: DATE: oN � F H/G
,`�� oF NORTH y�
`���\11111►�� c'9 �
���� � �,q R 0 ��ii � �`� °c �'�
�� �� ,,.. . .., � / �i o ,��- . J+
'� ° '' � � �' � �'� � 2 ROADWAY STANDARD
�� � � F $$ � . 9 �
: :' �� ti9 � � � � � �
�� DRAWINGS & LEGEND
� SEAL ! ' � � � o O
SEAL � 024436 = p � �
� . �
: 9° ��. ,�Q' /�
';F,�, �• FN� �,�: � � .�' � ��F oe- /�
i���� ��.,,. I NE.. ������� l��a �� R��se �O
,�������iii�i►���, �F T R A F F� G
GEN ER:AL NOTES
CHANGES MAY BE REQUIRED WHEN PHYSICAL DIMENSIONS IN THE DETAIL
DRAWINGS, STANDARD DETAILS, AND ROADWAY DETAILS ARE NOT ATTAINABLE
TO MEET FIELD CONDITIONS OR RESULT IN DUPLICATE OR UNDESIRED
OVERLAPPING OF DEVICES. MODIFICATION MAY INCLUDE: MOVING,
SUPPLEMENTING, COVERING, OR REMOVAL OF DEVICES AS DIRECTED BY THE
ENGINEER.
THE FOLLOWING GENERAL NOTES APPLY AT ALL TIMES FOR THE DURATION OF
THE CONSTRUCTION PROJECT EXCEPT WHEN OTHERWISE NOTED IN THE PLAN
OR DIRECTED BY THE ENGINEER.
TIME RESTRICTIONS
A) DO NOT CLOSE OR NARROW TRAVEL LANES AS FOLLOWS:
ROAD NAME
DAY AND TIME RESTRICTIONS
BECKFORD DRIVE MON-FRI (6:00 AM TO 9:OOAM AND 4:OOPM TO 6:OOPM)
BECKFORD DRIVE SAT-SUN (WITH APPROVAL OF THE ENGINEER)
B) DO NOT CLOSE OR NARROW TRAVEL LANES DURING HOLIDAYS AND SPECIAL
EVENTS AS FOLLOWS:
ROAD NAME
BECKFORD DRIVE
HOLIDAY
1. FOR ANY UNEXPECTED OCCURRENCE THAT CREATES UNUSUALLY HIGH TRAFFIC
VOLUMES, AS DIRECTED BY THE ENGINEER.
2. FOR NEW YEAR'S, BETWEEN THE HOURS OF 4:00 P.M. DECEMBER 31st
TO 9:00 A.M. JANUARY 2ND. IF NEW YEAR'S DAY IS ON A FRIDAY,
SATURDAY, SUNDAY, OR MONDAY THEN UNTIL 9:00 A.M. THE FOLLOWING
TUESDAY.
3. FOR EASTER, BETWEEN THE HOURS OF 4:00 P.M. THURSDAY AND
9:00 A.M. MONDAY.
4. FOR MEMORIAL DAY, BETWEEN THE HOURS OF 4:00 P.M. FRIDAY TO
9:00 A.M. TUESDAY.
5. FOR INDEPENDENCE DAY, BETWEEN THE HOURS OF 4:00 P.M. THE
DAY BEFORE INDEPENDENCE DAY AND 9:00 A.M. THE DAY AFTER
INDEPENDENCE DAY.
IF INDEPENDENCE DAY IS ON A FRIDAY, SATURDAY, SUNDAY OR MONDAY
THEN BETWEEN THE HOURS OF 4:00 P.M. THE THURSDAY BEFORE
INDEPENDENCE DAY AND 9:00 A.M. THE TUESDAY AFTER
INDEPENDENCE DAY.
6. FOR LABOR DAY, BETWEEN THE HOURS OF 4:00 P.M. FRIDAY AND
9:00 A.M. TUESDAY.
7. FOR THANKSGIVING DAY, BETWEEN THE HOURS OF 4:00 P.M. TUESDAY TO
9:00 A.M. MONDAY.
8. FOR CHRISTMAS, BETWEEN THE HOURS OF 4:00 P.M. THE FRIDAY
BEFORE THE WEEK OF CHRISTMAS DAY AND 9:00 A.M. THE FOLLOWING
TUESDAY AFTER THE WEEK OF CHRISTMAS.
9. FOR SPECIAL EVENTS , BETWEEN THE HOURS OF 4:00 P.M. THE (DAY)
OF THE WEEK OF THE SPECIAL EVENTS AND 9:00 A.M.THE
FOLLOWING (DAY) AFTER THE WEEK OF THE SPECIAL EVENTS.
C) DO NOT CONDUCT ANY HAULING OPERATIONS AGAINST THE FLOW OF TRAFFIC
OF AN OPEN TRAVELWAY UNLESS THE HAULING OPERATION IS PROTECTED BY
BARRIER OR GUARDRAIL OR AS DIRECTED BY THE ENGINEER.
LANE AND SHOULDER CLOSURE REQUIREMENTS
D) REMOVE LANE CLOSURE DEVICES FROM THE LANE WHEN WORK IS NOT BEING
PERFORMED BEHIND THE LANE CLOSURE OR WHEN A LANE CLOSURE IS NO
LONGER NEEDED OR AS DIRECTED BY THE ENGINEER.
P ROJ E CT N OT E S
E) WHEN PERSONNEL AND/OR EQUIPMENT ARE WORKING WITHIN 15 FT OF AN
OPEN TRAVEL LANE, CLOSE THE NEAREST OPEN SHOULDER USING ROADWAY
STANDARD DRAWING N0. 1101.04 UNLESS THE WORK AREA IS PROTECTED BY
BARRIER OR GUARDRAIL OR A LANE CLOSURE IS INSTALLED.
F) WHEN PERSONNEL AND/OR EQUIPMENT ARE WORKING ON THE SHOULDER
ADJACENT TO AN UNDIVIDED FACILITY AND WITHIN 5 FT OF AN
OPEN TRAVEL LANE, CLOSE THE NEAREST OPEN TRAVEL LANE USING ROADWAY
STANDARD DRAWING N0. 1101.02 UNLESS THE WORK AREA IS PROTECTED BY
BARRIER OR GUARDRAIL.
WHEN PERSONNEL AND/OR EQUIPMENT ARE WORKING ON THE SHOULDER
ADJACENT TO A DIVIDED FACILITY AND WITHIN 10 FT OF AN OPEN
TRAVEL LANE, CLOSE THE NEAREST OPEN TRAVEL LANE USING ROADWAY
STANDARD DRAWING N0. 1101.02 UNLESS THE WORK AREA IS PROTECTED BY
BARRIER OR GUARDRAIL.
G) WHEN PERSONNEL AND/OR EQUIPMENT ARE WORKING WITHIN A LANE OF TRAVEL
OF AN UNDIVIDED OR DIVIDED FACILITY, CLOSE THE LANE ACCORDING TO
THE TRAFFIC CONTROL PLANS, ROADWAY STANDARD DRAWINGS, OR AS DIRECTED
BY THE ENGINEER. CONDUCT THE WORK SO THAT ALL PERSONNEL AND/OR
EQUIPMENT REMAIN WITHIN THE CLOSED TRAVEL LANE.
H) DO NOT WORK SIMULTANEOUSLY WITHIN 15 FT ON BOTH SIDES OF AN OPEN
TRAVELWAY, RAMP, OR LOOP WITHIN THE SAME LOCATION UNLESS PROTECTED
WITH GUARDRAIL OR BARRIER.
PAVEMENT EDGE DROP OFF REQUIREMENTS
I) BACKFILL AT A 6:1 SLOPE UP TO THE EDGE AND ELEVATION OF EXISTING
PAVEMENT IN AREAS ADJACENT TO AN OPENED TRAVEL LANE THAT HAS AN
EDGE OF PAVEMENT DROP-OFF AS FOLLOWS:
J)
BACKFILL DROP-OFFS THAT EXCEED 2 INCHES ON ROADWAYS WITH
POSTED SPEED LIMITS OF 45 MPH OR GREATER.
BACKFILL DROP-OFFS THAT EXCEED 3 INCHES ON ROADWAYS WITH
POSTED SPEED LIMITS LESS THAN 45 MPH.
BACKFILL WITH SUITABLE COMPACTED MATERIAL, AS APPROVED BY THE
ENGINEER, AT NO EXPENSE TO THE DEPARTMENT.
DO NOT EXCEED A DIFFERENCE OF 2 INCHES IN ELEVATION BETWEEN OPEN LANES
OF TRAFFIC FOR NOMINAL LIFTS OF 1.5 INCHES. INSTALL ADVANCE WARNING
"UNEVEN LANES" SIGNS (W8-11) 350' IN ADVANCE AND A MINIMUM
OF EVERY HALF MILE THROUGHOUT THE UNEVEN AREA.
TRAFFIC PATTERN ALTERATIONS
K) NOTIFY THE ENGINEER TWENTY ONE (21) CALENDAR DAYS PRIOR TO ANY
TRAFFIC PATTERN ALTERATION.
SIGNING
L)
M)
N)
0)
P)
INSTALL ADVANCE WORK ZONE WARNING SIGNS WHEN WORK IS WITHIN
40 FT FROM THE EDGE OF TRAVEL LANE AND NO MORE THAN THREE
(3) DAYS PRIOR TO THE BEGINNING OF CONSTRUCTION.
PROVIDE PERMANENT SIGNING.
PROVIDE SIGNING AND DEVICES REQUIRED TO CLOSE THE ROAD ACCORDING
TO THE ROADWAY STANDARD DRAWINGS AND TRAFFIC CONTROL PLANS.
PROVIDE SIGNING REQUIRED FOR THE OFF-SITE DETOUR ROUTE AS SHOWN IN
THE TRAFFIC CONTROL PLANS.
COVER OR REMOVE ALL SIGNS AND DEVICES REQUIRED
TO CLOSE THE ROAD WHEN ROAD CLOSURE IS NOT IN OPERATION.
COVER OR REMOVE ALL SIGNS REQUIRED FOR THE OFF-SITE
DETOUR WHEN THE DETOUR IS NOT IN OPERATION.
ENSURE ALL NECESSARY SIGNING IS IN PLACE PRIOR TO ALTERING ANY
TRAFFIC PATTERN.
Q) INSTALL BLACK ON ORANGE "DIP" SIGNS (W8-2) AND/OR "BUMP" SIGNS
(W8-1) IN ADVANCE OF THE UNEVEN AREA, OR AS DIRECTED BY THE
ENGINEER.
PROJ. REFERENCE NO. SHEET NO.
U-4916
TM P-2
Kimle >>> Horn
v
�C 2��5 PostOffice Box 33068
Raleigh, North Corolina 27636
PE N0. F0102
TRAFFIC CONTROL DEVICES
R) SPACE CHANNELIZING DEVICES IN WORK AREAS NO GREATER IN FEET THAN TWICE
THE POSTED SPEED LIMIT (MPH), EXCEPT 10 FT ON-CENTER IN RADII, AND 3 FT
OFF THE EDGE OF AN OPEN TRAVELWAY WHEN LANE CLOSURES ARE NOT
IN EFFECT. WHEN SKINNY DRUMS ARE ALLOWED REFER TO SECTION 1180
OF STANDARD SPECIFICATIONS FOR ROADS AND STRUCTURES OR AS SHOWN
IN THE PLANS.
S) PLACE TYPE III BARRICADES, WITH "ROAD CLOSED" SIGN R11-2
ATTACHED, OF SUFFICIENT LENGTH TO CLOSE ENTIRE ROADWAY.
PAVEMENT MARKINGS AND MARKERS
T)
U)
V)
W)
INSTALL PAVEMENT MARKINGS AND PAVEMENT MARKERS ON THE FINAL SURFACE
AS SHOWN IN THE PAVEMENT MARKING PLAN.
INSTALL TEMPORARY PAVEMENT MARKINGS AND TEMPORARY PAVEMENT MARKERS
ON INTERIM LAYERS OF PAVEMENT AS FOLLOWS:
ROAD NAME:
BECKFORD DRIVE
MARKING:
PAINT
MARKER:
NONE
TIE PROPOSED PAVEMENT MARKING LINES TO EXISTING PAVEMENT MARKING
LINES.
REMOVE/REPLACE ANY CONFLICTING/DAMAGED PAVEMENT MARKINGS AND
MARKERS BY THE END OF EACH DAY'S OPERATION.
MISCELLANEOUS
X) POLICE (PROVIDED BY CITY) MAY BE USED TO MAINTAIN TRAFFIC THROUGH
THE WORK AREA AND/OR INTERSECTIONS AS DIRECTED BY THE ENGINEER.
Y) IN THE EVENT A TIE-IN CANNOT BE MADE IN ONE DAY'S TIME, BRING THE
TIE-IN AREA TO AN APPROPRIATE ROADWAY ELEVATION AS DETERMINED BY
THE ENGINEER. PLACE BLACK ON ORANGE "LOOSE GRAVEL" SIGNS (W8-7)
AND BLACK ON ORANGE "PAVEMENT ENDS" SIGNS (W8-3) AND
RESPECTIVELY IN ADVANCE OF THE UNEVEN AREAS. USE DRUMS
TO DELINEATE THE EDGE OF ROADWAY ALONG UNPAVED AREAS.
Z) ALL WHEELCHAIR RAMP LOCATIONS SHALL BE DERIVED FROM STATIONING
SHOWN ON PAVEMENT MARKING PLANS OR AS DIRECTED BY THE ENGINEER.
APPROVED: DATE:
,,•,,��'�ARo�,.., PROJECT NOTES
��•��� ,,,... .,,.1 � �i�
:.��; ��E$$/��;y9��,�
� :' �� .
� SEAL 9!•� ' scA`E: REVISIONS
_ �
SEAL ' "
' 024436 �
� � DATE:
� � �
,��F'c���`.c�l'� I NE`�� .'�,,�� DWG. BY: .J.I
,�I� �� },�� ����Q�,��, DESIGN BY: JJP
����������, REVIEWED BY: ��I�/M F LDD
PHASI NG NOTES
PROJ ECT PHAS E 1
CONSTRUCTION PHASE I
(SEE SHEETS TMP-4 AND TMP-5)
IF WORK IS NOT PURSUED WITHIN 3 DAYS OF SIGN INSTALLATION, THE
WORK ZONE ADVANCE WARNING SIGNS SHALL BE COVERED OR REMOVED
IN A METHOD APPROVED BY ENGINEER. THESE COVERINGS SHALL BE MADE
IN ACCORDANCE WITH SECTION 1110 OF THE NCDOT STANDARD SPECIFICATIONS.
STEP 1) PRIOR TO BEGINNING ANY CONSTRUCTION ACTIVITY, THE CONTRACTOR
SHALL INSTALL WORK ZONE ADVANCE WARNING SIGNS AS SHOWN ON
NCDOT ROADWAY STANDARD DRAWING N0. 1101.01.
STEP 2) WHILE MAINTAINING EXISTING TRAFFIC ON BECKFORD DRIVE, AND ACCESS
TO ALL INTERSECTING ROADWAYS AND DRIVEWAYS, THE CONTRACTOR SHALL
USE NCDOT ROADWAY STANDARD DRAWING N0. 1101.02 (SHEET 1 OF 9) AND
PERFORM:
- CLEARING AND GRUBBING
- POWER LINE RELOCATION
- TEMPORARY RELOCATION OF WATER AND SEWER UTILITIES IN THE PROPOSED
BOX CULVERT LOCATION.
STEP 3) PLACE OFF-SITE DETOUR SIGNING ON BECKFORD DRIVE, DABNEY DRIVE AND
ROANOKE AVENUE.
WORK IN A CONTINUOUS MANNER TO COMPLETE THE FOLLOWING WORK OF
PHASE I STEPS 4& 5 WITHIN 42 CONSECUTIVE CALENDAR DAYS (SEE
INTERMEDIATE CONTRACT TIME).
STEP 4) CLOSE BECKFORD DRIVE TO THRU TRAFFIC BETWEEN DABNEY DRIVE AND
ROANOKE AVENUE AND DETOUR TRAFFIC TO DABNEY DRIVE AND ROANOKE AVENUE.
SEE SHEET TMP-5 FOR DETOUR PLAN. THE CONTRACTOR SHALL USE NCDOT
STANDARD DRAWING N0. 1101.03 (SHEET 1 OF 9)FOR ROAD CLOSURE DETAILS.
STEP 5) WHILE MAINTAINING ACCESS TO THE BUSINESSES ON BECKFORD DRIVE FOR
LOCAL TRAFFIC, THE CONTRACTOR SHALL:
- CONSTRUCT PRECAST BOX CULVERT AND REPAIR EXISTING ROADWAY DAMAGED
DURING BOX CULVERT CONSTRUCTION.
- BEGIN BECKFORD DRIVE'S PROPOSED SOUTH SIDE WIDENING.
CONSTRUCTION PHASE II
(SEE SHEETS TMP-6 AND TMP-7)
STEP 1) OPEN BECKFORD DRIVE BACK TO THRU TRAFFIC. REMOVE OFFSITE DETOUR SIGNS AND
RESTORE ROANOKE AVENUE THREE-WAY STOP TRAFFIC PATTERN.
STEP 2) USING NCDOT ROADWAY STANDARD DRAWING N0. 1101.02 (SHEET 1& 2 OF 9) THE
CONTRACTOR SHALL COMPLETE BECKFORD DRIVE'S PROPOSED SOUTH SIDE WIDENING UP
TO BUT NOT INCLUDING THE FINAL LAYER OF SURFACE COURSE.
CONSTRUCTION PHASE III
(SEE SHEETS TMP-8 AND TMP-9)
USING NCDOT ROADWAY STANDARD DRAWING N0. 1101.02 (SHEET 1& 2 OF 9) THE CONTRACTOR
SHALL:
STEP 1) PLACE TEMPORARY PAVEMENT MARKINGS ON BECKFORD DRIVE THAT INCLUDE NEWLY
WIDENED AREA AND SHIFT TRAFFIC ACCORDINGLY.
STEP 2) USING NCDOT ROADWAY STANDARD DRAWING N0. 1101.02 (SHEET 1& 2 OF 9) THE
CONTRACTOR SHALL CONSTRUCT BECKFORD DRIVE'S PROPOSED NORTH SIDE WIDENING UP
TO BUT NOT INCLUDING THE FINAL LAYER OF SURFACE COURSE.
STEP 3) PLACE FINAL LAYER OF SURFACE COURSE ON BECKFORD DRIVE AND PLACE
PERMANENT SIGNING.
STEP 4) PLACE PERMANENT PAVEMENT MARKINGS AND MARKERS ON BECKFORD DRIVE AS
SHOWN IN THE PAVEMENT MARKING PLANS.
STEP 5) OPEN ALL LANES OF BECKFORD DRIVE TO TRAFFIC.
STEP 6) REMOVE ALL WORK ZONE SIGNS AND DEVICES.
PROJ ECT PHAS E 2
CONSTRUCTION PHASE I
(SEE SHEETS TMP-10 AND TMP-11)
IF WORK IS NOT PURSUED WITHIN 3 DAYS OF SIGN INSTALLATION, THE
WORK ZONE ADVANCE WARNING SIGNS SHALL BE COVERED OR REMOVED
IN A METHOD APPROVED BY ENGINEER. THESE COVERINGS SHALL BE MADE
IN ACCORDANCE WITH SECTION 1110 OF THE NCDOT STANDARD SPECIFICATIONS.
STEP 1) PRIOR TO BEGINNING ANY CONSTRUCTION ACTIVITY, THE CONTRACTOR
SHALL INSTALL WORK ZONE ADVANCE WARNING SIGNS AS SHOWN ON
NCDOT ROADWAY STANDARD DRAWING N0. 1101.01.
STEP 2) WHILE MAINTAINING EXISTING TRAFFIC ON BECKFORD DRIVE, AND ACCESS
TO ALL INTERSECTING ROADWAYS AND DRIVEWAYS, THE CONTRACTOR SHALL
USE NCDOT ROADWAY STANDARD DRAWING N0. 1101.02 (SHEET 1 OF 9) AND
PERFORM:
- CLEARING AND GRUBBING
- POWER LINE RELOCATION
STEP 3) USING NCDOT ROADWAY STANDARD DRAWING N0. 1101.02 (SHEET 1& 2 OF 9) THE
CONTRACTOR SHALL COMPLETE BECKFORD DRIVE'S PROPOSED SOUTH SIDE WIDENING UP
TO BUT NOT INCLUDING THE FINAL LAYER OF SURFACE COURSE.
CONSTRUCTION PHASE II
(SEE SHEETS TMP-12 AND TMP-13)
USING NCDOT ROADWAY STANDARD DRAWING N0. 1101.02 (SHEET 1& 2 OF 9) THE CONTRACTOR
SHALL:
STEP 1) PLACE TEMPORARY PAVEMENT MARKINGS ON BECKFORD DRIVE THAT INCLUDE NEWLY
WIDENED AREA AND SHIFT TRAFFIC ACCORDINGLY.
STEP 2) USING NCDOT ROADWAY STANDARD DRAWING N0. 1101.02 (SHEET 1& 2 OF 9) THE
CONTRACTOR SHALL CONSTRUCT BECKFORD DRIVE'S PROPOSED NORTH SIDE WIDENING UP
TO BUT NOT INCLUDING THE FINAL LAYER OF SURFACE COURSE.
STEP 3) PLACE FINAL LAYER OF SURFACE COURSE ON BECKFORD DRIVE AND PLACE
PERMANENT SIGNING.
STEP 4) PLACE PERMANENT PAVEMENT MARKINGS AND MARKERS ON BECKFORD DRIVE.
STEP 5) OPEN ALL LANES OF BECKFORD DRIVE TO TRAFFIC.
STEP 6) REMOVE ALL WORK ZONE SIGNS AND DEVICES.
PROJ. REFERENCE NO. SHEET NO.
U-4916
TM P-3
Kimle >>> Horn
v
�C 2��5 PostOffice Box 33068
Raleigh, North Corolina 27636
PE N0. F0102
APPROVED: DATE:
,,,,.���'�ARo��,,, PROJECT NOTES
:.����: O� E $ $ /�� ; y9����.
� :' �� .
� SEAL 9!•� ' scA`E: REVISIONS
_ �
SEAL ' "
' 024436 �
� � DATE:
� � �
,��F'c���`.c�l'� I NE`�� .'�,,�� DWG. BY: .J.I
,�I� �� },�� ����Q�,��, DESIGN BY: JJP
����������, REVIEWED BY: ��I�/M F LDD
�
�
�CKFORD DRIVE (SR 116� _
50' BST
CLOSED
�0 FT VV20-3D
48" X 48"
�
r�
—L— BECKFORD DRIVE (SR 1165)
TYPE III BARRICADE
—L — ST A 26 �40 +/ —
R11 -2
48"X30„
TYPE III BARRICADE
FULL CLOSURE
PROJ. REFERENCE NO. SHEET NO.
U-4 916 TM P-4
Kimle >>> Horn
v
�C 20�5 Post Office Box 33068
Raleigh, Narth Caralina 27636
PE N0. FO 102
NOTE:
SEE TCP-5 FOR INFORMATION
ON PROPOSED DETOUR ROUTE
TEMPORARY
PAVEMENT
MARKINGS (TYP)
—L— STA 28+20 +/—
NEW CONSTRUCTION
WEDGING AND RESURFACING
PAVEMENT REMOVAL
APPROVED: DATE:
PROJECT PHASE 1
,,,.,o�����AR��;-.,, CONST. PHASE I
�. �. �E$$/� ;yq�•�
: :��� � �' !
: : Q q�'; � sca�e: REVISIONS
SEAL � SEAL -
: -
� 024436 � DATE:
. �, : .
�� �•.F ��' �� DWG. BY: JJ
�'.;�',� • :y� I NE�:••'���.`
,,,, ��111111►\ oo,,,, DESIGN eY: JJ P
REVIEWED BY: �N/M ILDD
DocuSign Envelope ID: 2906071 E-F7C0-4E6F-8595-B641266A516F
0
�
O
DETOUR
AHEAD
W2 0-2
48" X 48"
:
TYPE III BARRICADE
R11-2
48" X 30"
TYPE III BARRICADE(S)
FULL CLOSURE
BECKFORD
M4-9
DRIVE 30" x 24��
DETOUR M4-s
24 X 12
� M5-1 L
21" X 15"
�
BECKFORD
M4-9
DRIVE 30�� x 2a��
D ETO U R M4-s
24 X 12
<� M6-1
21" X 15"
O
u
�
R11-4
60"X30„
ROAD CLOSED
TO
THRU TRAFFIC
TYPE III BARRICADE
CLOSED
EAST
BECKFORD M4-9
DRIVE as�� x sb��
DETOUR ^^4; a
24 X 12
�, Mb-1
21" X 15"
W20-3D
48" X 48"
�
M4-10R O
48"X18„
�
TYPE III BARRICADE
�ROAD
CLOSED
1\0 F
W20-3C
48" X 48"
EAST
BECKFORD M4-9
DRIVE 48" x 36"
DETOUR I M4-8
24" X 12"
�M5-1 R
21" X 15"
0
/ROAD�
CLOSED
.1500 F�
R11 -4
60"X30„
ROAD CLOSED
TO
THRU TRAFFIC
TYPE III BARRICADE
BECKFORD
M4-9
DRIVE 30" x 24��
OH I DETOUR I M4-8
24" X 12"
W2 0-3 B
48" X 48" � M5-1 R
21" X 15"
i� ��
i� ��
�' STOP'� RETAIN
O�t >j
♦ � ♦
TO INSTALL PLAQUE Rl-2A (TEMPORARY)
NCOMIN 24�� x �s��
TRAFFIC
M4-10L
48"X18„
EAST
BECKFORD M4-9
DRIVE 4s" x 36"
�/ D ETO U R M4-8
24 X 12
� M6-3
21" X 15"
OFF-SITE DETOUR ROUTE
PROJ. REFERENCE NO. SHEET NO.
U-4916 TCP-5
Kimle >>> Horn
v
�C 20�5 Post Office Box 33068
Raleigh, Narth Caralina 27636
PE N0. FO 102
� CONVERT THREE-WAY STOP TO ONE-WAY STOP INTERSECTION
DURING TRAFFIC DIVERSION OF EAST BECKFORD DRIVE.
STOP AHEAD SIGNS AND STOP SIGNS TO BE COVERED AND
STOP BARS TO BE REMOVED ON ROANOKE AVENUE TO ALLOW
CONTINUOUS AND SMOOTH FLOW OF DETOURED TRAFFIC ON
ROANOKE AVENUE. REPLACE STOP BARS AND REMOVE COVERS
UPON CULVERT COMPLETION.
DocuSi ned b :
APPROVED: .� �b�''�- DATE:
PROJECT PHASE 1
�,o���'cA',e'o��.,, DETOUR ROUTE
�� o� ....... ...... i �.
�.��.. �E$$/� .y9���
: : �� ti �' i
: : Q qr'; � sca�e: REVISIONS
SEAL � SEAL -
: -
� 024436 � DATE:
. �, : .
'�IF'c�•�F'1'� I NE`���•� ���� DWG. BY: JJ
,,,, ��111111►\ oo,,,, DESIGN eY: JJ P
REVIEWED BY: �N/M ILDD
�
�
�CKFORD DR
50'
PROJ. REFERENCE NO. SHEET NO.
U-4916 TMP-6
Kimle >>> Horn
v
�C 20�5 Post Office Box 33068
Raleigh, Narth Caralina 27636
PE N0. FO 102
NEW CONSTRUCTION
WEDGING AND RESURFACING
PAVEMENT REMOVAL
APPROVED: DATE:
P ROJ E CT P HAS E 1
,,,.,o�����AR��;-.,, CONST. PHASE II
�. �. �E$$/� ;yq�•�
: :��� � �' !
: : Q q�'; � sca�e: REVISIONS
SEAL � SEAL -
: -
� 024436 � DATE:
. �, : .
�� �•.F ��' �� DWG. BY: JJ
�'.;�',� • :y� I NE�:••'���.`
,,,, ��111 11►\ oo,,,, DESIGN eY: JJ P
REVIEWED BY: �N/M ILDD
—L— STA 38+00 +/—
I � ~
�IVE (SR 1165) ~
PROJ. REFERENCE NO. SHEET NO.
U-4916 TMP-7
Kimle >>> Horn
v
�C 20�5 Post Office Box 33068
Raleigh, Narth Caralina 27636
PE N0. FO 102
O1
T
�
NEW CONSTRUCTION
WEDGING AND RESURFACING
PAVEMENT REMOVAL
APPROVED: DATE:
P ROJ E CT P HAS E 1
,,,.,o�����AR��;-.,, CONST. PHASE II
�. �. �E$$/� ;yq�•�
: :��� � �' !
: : Q q�'; � sca�e: REVISIONS
SEAL � SEAL -
: -
� 024436 � DATE:
. �, : .
�� �•.F ��' �� DWG. BY: JJ
�'.;�',� • :y� I NE�:••'���.`
,,,, ��111 11►\ oo,,,, DESIGN eY: JJ P
REVIEWED BY: �N/M ILDD
PROJ. REFERENCE NO. SHEET NO.
U-4916 TMP-8
Kimle >>> Horn
v
�C 20�5 Post Office Box 33068
Raleigh, Narth Caralina 27636
PE N0. FO 102
NEW CONSTRUCTION
WEDGING AND RESURFACING
PAVEMENT REMOVAL
APPROVED: DATE:
PROJECT PHASE 1
,,,.,o�����ARo�;-.,, CONST. PHASE III
�. �. �E$$/� ;yq�•�
: :��� � �' !
: : Q q�'; � sca�e: REVISIONS
SEAL � SEAL -
: -
� 024436 � DATE:
. �, : .
�� �•.F ��' �� DWG. BY: JJ
�'.;�',� • :y� I NE�:••'���.`
,,,, ��111 11►\ oo,,,, DESIGN eY: JJ P
REVIEWED BY: �N/M ILDD
�
�
—L — ST A 38 f 00 +/ —
u
PROJ. REFERENCE NO. SHEET NO.
U-4916 TMP-9
Kimle >>> Horn
v
�C 20�5 Post Office Box 33068
Raleigh, Narth Caralina 27636
PE N0. FO 102
-L- BECKFORD DRIVE (SR 1165)
NEW CONSTRUCTION
WEDGING AND RESURFACING
PAVEMENT REMOVAL
APPROVED: DATE:
PROJECT PHASE 1
,,,.,o�����AR��;-.,, CONST. PHASE III
�. �. �E$$/� ;yq�•�
: :��� � �' !
: : Q q�'; � sca�e: REVISIONS
SEAL � SEAL -
: -
� 024436 � DATE:
. �, : .
�� �•.F ��' �� DWG. BY: JJ
�'.;�',� • :y� I NE�:••'���.`
,,,, ��111 11►\ oo,,,, DESIGN eY: JJ P
REVIEWED BY: �N/M ILDD
N
�
�
r
�
�
.�
w
>
�
0
�
W
m
0
,��
i��
�i �
EXIST TRAFFIC SIGNAL
O
�
O
-�- srA iif�o +i-
PROJ. REFERENCE NO. SHEET NO.
U-4 916 TM P-1 O
Kimle >>> Horn
v
�C 20�5 Post Office Box 33068
Raleigh, Narth Caralina 27636
PE N0. FO 102
O
�
�
�
Q
_
NEW CONSTRUCTION
WEDGING AND RESURFACING
PAVEMENT REMOVAL
�
�
�
I
�'
W
W
_
(/�
w
w
�
0
0
+
rn
Q
�
�
i
J
i
W
Z
�
_
U
�—
Q
�
APPROVED: DATE:
PROJECT PHASE 2
,,,..���'�AR��;,,, CONST. PHASE I
.��,��'��FESS.�Q �'9,��.
: :��� � �' !
: : Q q�'; � sca�e: REVISIONS
SEAL � SEAL -
: -
� 024436 � DATE:
. �, : .
�� �•.F ��' �� DWG. BY: JJ
�'.;�',� • :y� I NE�:••'���.`
,,,, ��111 11►\ oo,,,, DESIGN eY: JJ P
REVIEWED BY: �N/M ILDD
O
O1
T
O
N
-L - POT Sto 2/+00.00
�
w
w
�
w
�
0
O
+
O�
Q
f --
�
I
J
z
J
_
U
�
Q
�
\/ �
I «
�
—L— BECKFORD DRIVE (SR 1165)
I
—.
�
�
�J
�}
i� ��
--� � %
■
PROJ. REFERENCE NO. SHEET NO.
U-4 916 TM P-11
Kimle >>> Horn
v
�C 20�5 Post Office Box 33068
Raleigh, Narth Caralina 27636
PE N0. FO 102
- - _ =�__,.
�-�--
I �����
�
I �'��
�
� `!
—�� - � �
��
���� ��_ � �
� � - �
_��`�\ �
\
� `� ! _�
\
��,
��\��
\ ,
�
NEW CONSTRUCTION
��
WEDGING AND RESURFACING
PAVEMENT REMOVAL
APPROVED: DATE:
PROJECT PHASE 2
,,,..���'�AR��;,,, CONST. PHASE I
.��,��'��FESS.�Q �'9,��.
: :��� � �' !
: : Q q�'; � sca�e: REVISIONS
SEAL � SEAL -
: -
� 024436 � DATE:
. �, : .
�� �•.F ��' �� DWG. BY: JJ
�'.;�',� • :y� I NE�:••'���.`
,,,, ��111 11►\ oo,,,, DESIGN eY: JJ P
REVIEWED BY: �N/M ILDD
��
N
�
�
r
�
�
.�
w
>
�
0
�
w
m
�
I r��' �■
I��
�I �
EXIST TRAFFIC SIGNAL
—L — ST A ll +70 +/ —
�
PROJ. REFERENCE NO. SHEET NO.
U -4 916 TM P-12
Kimle >>> Horn
v
�C 20�5 Post Office Box 33068
Raleigh, Narth Caralina 27636
PE N0. FO 102
0
�
�
�
a
_
NEW CONSTRUCTION
WEDGING AND RESURFACING
PAVEMENT REMOVAL
�
�
1__I�
L
�
�
W
W
_
(/�
W
W
�
O
O
+
�
Q
�
�
�
J
�
W
Z
J
_
U
I--
a
�
APPROVED: DATE:
PROJECT PHASE 2
�0����' CA R p���i�
,,. ��... ... �, .,, const. PHASE I I
�.���.''�E$$/� .y9���
: :��� � �' !
: : Q q�'; � sca�e: REVISIONS
SEAL � SEAL -
: -
� 024436 � DATE:
. �, : .
�� �•.F ��' �� DWG. BY: JJ
�'.;�',� • :y� I NE�:••'���.`
,,,, ��111 11►\ oo,,,, DESIGN eY: JJ P
REVIEWED BY: �N/M ILDD
-L - POT Sto 2/+00.00
�
w
w
�
W
�
0
0
�
a
�
�
�
�
Z
J
_
U
�-
a
�
�� -
//�
\/�
..
�
�
�
�
-L- BECKFORD DRIVE (SR 1165)
.fJ
�}
PROJ. REFERENCE NO. SHEET NO.
U-4 916 TM P-13
Kimle >>> Horn
v
�C 20�5 Post Office Box 33068
Raleigh, Narth Caralina 27636
PE N0. FO 102
-_= _
=___�
�__��
-_�
���--
-- - _ �
—��� �
��--�� �\�
�
��-�_�-_
_�=`�\ �
\
�`\�! �
�
�_
�� �,
�
�
�
����
►-�-�
NEW CONSTRUCTION
WEDGING AND RESURFACING
PAVEMENT REMOVAL
APPROVED: DATE:
PROJECT PHASE 2
,,,.,o�����AR��;-.,, CONST. PHASE II
�. �. �E$$/� ;yq�•�
: :��� � �' !
: : Q q�'; � sca�e: REVISIONS
SEAL � SEAL -
: -
� 024436 � DATE:
. �, : .
�� �•.F ��' �� DWG. BY: JJ
�'.;�',� • :y� I NE�:••'���.`
,,,, ��111 11►\ oo,,,, DESIGN eY: JJ P
REVIEWED BY: �N/M ILDD
�
c
�
�
N
�
Q
�
Q
�
�
�
�
�
�
c
0
�
�
�
�
0
�
�
U
Q�
�
�.
�
0
0
�
�
�
�
i
O
�
�
O
O
�
I
J
Q
�
�
�
c
�
�
0
�
�
Q
�
0
L
a�
i
�
�
�
�
�
0
L
�
c
0
v
c
0
,�
0
i
W
�
c
0
�
�
�
�
0
�
�
U
Q�
�
�.
�
0
0
�
�
�
�
i
O
�
�
O
O
�
I
J
Q
�
�
�
C
�
�
N
O
�
�
Q
�
0
L
a�
i
�
�
�
�
�
0
L
�
c
0
v
c
0
,�
0
i
W
�
c
0
�
�
�
�
0
�
�
U
Q�
�
�.
�
0
0
�
�
�
�
i
O
�
�
O
O
�
I
J
Q
�
�
�
c
�
�
�
0
�
�
Q
�
0
L
a�
i
�
�
�
�
�
0
L
�
c
0
v
c
0
,�
0
i
W
�
c
0
�
�
�
�
0
�
�
U
Q�
�
�.
�
0
0
�
�
�
�
i
O
�
�
O
O
�
I
J
Q
�
�
�
c
�
�
�
O
�
�
Q
�
0
L
a�
i
�
�
�
�
�
0
L
�
c
0
v
c
0
,�
0
i
W
�
c
0
�
�
�
�
0
�
�
U
Q�
�
�.
�
0
0
�
�
�
�
i
O
�
�
O
O
�
I
J
Q
�
�
�
C
o,
�
�
0
�
�
Q
�
0
L
a�
i
�
�
�
�
�
0
L
�
c
0
v
c
0
,�
0
i
W
�
c
0
�
�
�
�
0
�
�
U
Q�
�
�.
�
0
0
�
�
�
�
i
O
�
�
O
O
�
I
J
Q
�
�
�
c
�
�
�
O
�
�
Q
�
0
L
a�
i
�
�
�
�
�
0
L
�
c
0
v
c
0
,�
0
i
W
�
c
0
�
�
�
�
0
�
�
U
Q�
�
�.
�
0
0
�
�
�
�
i
O
�
�
O
O
�
I
J
Q
�
�
�
�
T OPSOI�ING (6004�
��0/US7�f�UC7 /0/� SPL- Cl��ICA�T-l0/VS
MAT ERIALS
Determi r�e whether the quali ty and quanti ty of a�ailable topsoi l J usti f i es selecti �e
har�dli ngo Quali ty topsoi l has the f ollowing choracteristi cso
T exture — loam9 sandy loamg and si lt loam are best9 sandy clay loam9 si lty clay
loam9 clay loam9 and loamy sand are fairo Do not use hea�y clay and organic
soi ls such as peat or muck as fopsoi lo
Organic ma��er �onlen� (somefimes re�erred lo as "humic ma�ler") should be
greater than l05% by wei ghto
Acidity pH should be qreater than 306 before liminq9 and liming is required if
i t� i s less l-han 6000
Soluble sal�s should be less ���ha� 500 ppmo
Sodi um sodi um adsorpti on rati o should be less than l20
T he depth of materi al meeti ng the above quali f i cati ons should be at leasC� 2 i ncheso
Soil facTors such as roc% fragmenTs9 slope9 depth to water Table9 and laye�
thickness affect the ease of excavation and spreading of topsoil�.
Generally9 the upper part of the soi l9 whi ch i s ri chest i n organi c ma� t�er9 i s most
desirable9 howe�er9 material exca�ated from deeper layers may be worth storing
i f i t meets the other cri teri a li sted aboveo
Orqanic soils such as mucks and peats do not mal�e qood topsoila They can be
i denti f i ed by thei r extremely li ght wei ght when dryo
S�T ���'lr��ll`✓� �
Strip topsoi l only f rom thosc arcas that wi ll be di sturbed by exca�ati on9 t i lli ngy
roadbuildinq9 or compoction by equipmento A 4 to 6 inch strippinq depth is common9
but depth �ari es dependi ng on the si teo Determi ne depth of strippi nq by tal�i ng
soil cores at several locations within each area to be strippedo Topsoil depth
generally vari es along a grodi ent f rom hi lltop to toe of the slopeo Put sedi ment
basins9 di �ersi ons9 and other controls into place bef or� strippinga
ST OCKPIUI�G
Select stoc%pi le locati on to a�oi d slopes and natural drai nageways9 avoidi nq
traf f i c routeso On large si tes9 respreadi ng i s easi er and more economi cal wher�
topsoi l i s stockpi led i n small pi les located near areas where they will be used�
All stockpi le areas used shall be stabi li zed wi th si lt fcnc� and seeded p�r thc
latest I�PDES ruleso
Sediment barriers� Use sedi�ment fences or other barriers where necessary to
rctai r sed� n�ento
T Emporary ,sc�di ng Prot�ct topso�l stoc%pi l�s by tc�mporari ly s��di ng p�r
the latest I�PDES ruleso
Permanent �eqetati on lf stockpi les wi ll not be used wi thi n l2 months they
must be stobi li zed wi th permanent vegetati on to control erosi on and weed
growtho
SITE PREPARATlOIV
Bef ore spreadi nq topsoi l9 establi sh e�osi on and sedi mentaTi on control practi ces
siach as di �ersi ons9 berms9 di kes, waterways9 and sedi rnent basi nso
Gradi ng Mai ntai n grad es on the areos to be topsoi led accordi nq i o the
appro�ed plan and do not alter them by addi ng topsoi la
Li mi ng of subsoi l W here the pH of fhe exi sti nq subsoi l i s 600 or less9 cr the
soi l i s composed �f heavy clays9 i ncorporate aqri cultural li mestone i n amounts
recommended by soi l tests or speci f i ed f or the seedi ng mi xture to be useda
lncorporate li me to a depth of at least 2 i nches by di sl�i nqo
f�ouqheninq lmmedi ately pri or to spreodi nq the topsc�i lo loos�n the subqrad�
by di ski ng or scari fyi ng to a depth of at least 4 i nches9 to ensure bondi ng of
the topsoil and subsoi lo lf no amendments ha�e been i ncorporated9 /oosen
the soi l to a depth of at least 6 i nches bef ore spreadi ng topsoi lo
� REV. No.e REVISIONe DATEe DRAWN BYe Ct;ECKED BYe
NThis document, toqether with the concepts and designs presented herein, as an instrument of service, is
� intended only for the speciflc purpose and cllent for which lt was prepared, Reuse of and improper
� reliance on this document without writTen authorization and adoption by Kimley-Horn and Associates, Ince
Op shall be without liability to Kimley-Horn and Associatesv !nc,
Copyright Kimley-Norn aod Ass�ciates, Incos 20 10
S�l-� ��ADIIVG ��O�SOIL
Do not spread topsoi l whi le i t i s f rozen or muddy or when subgrade i s
wet or f rozeno Cor�ect any i rregulari ti es i n the surf ace that result from
topsoi li ng or other operati ons to pre�er�t The f ormati on of depressi ons or
water pockets�
Compoct the topsoi l enough to ensure good contact wi th the underlyi ng soi l,
but a�oi d excessi �e compacti on9 as it i ncreases runof f and i nhi bi ts seed
germi nati ono Li ght pac%i nq wi th a roller i s recommended where
hiqh maintenance turf is to be establishedo
On slopes and areas that will not be mowed9 the surface may be left rouqh
after spreadi r�g topsoi lo A di sl� may be used to promote bondi ng a� �-he i rterFace
between topsoil and sub� oilo
After topsoi l appli cati on9 follow prucedure t�or seedbed preparati on4 tal�i ng care
to avoi d excessi ve rni xi ng of topsoi l i nto the subsoi lo
�AND GRADING (6002)
CDIV ST RUC l l0/U Sl='CCIFICAT l0/US��
la Construct and mai ntai n all erosi on and sedi meni��afi on control practi ces and
measures i n accordance wi th the appro�ed sedi mentati on cc�ntrol plan and
construction scheduleo
2o Remo�e qood topsoi l t rr�m areas to be qraded and fi lledy and preser�e
i t f or use i r� f i ni shi ng the gradi nq of all cri ti cal areasa
, �� �
�`� �� CO�''i' l� 0/"PO ; l 0 bF l 0��� 0/ l�Cl �0 0"�l nl r�lU�"� C��;��tCI 0� ; l liCl��� r�f Di"�
placi nq topsoi lo
4o Clear and qrub areas to be f i lled to remo�e trees�9 �eqetati on9 roots9 cr
other ob� ecti onable materi al that would aff ect the planned stabi li 1y oi- fhe f i llo
5o Ensure that fill material is free of brush9 rubbish9 roc%s9 /ogs9 stumps9
bui ldi ng debri s9 and other materi als i nappropri ote f or constructing stable f i//so
6o Place all f i ll i n layers nat to exceed 9 i nches i n thi ckness9 and compact
the layers as required to reduce erosion9 slippaqe9 settlement9 or other
related problemsa
i o Do not incorporate fro��n material or soft or l�ighly �ompressible
materials into fill slopesa
8a Do nof place fill on a frozen f�undation9 due to possible subsidence and
slippaqeo
9� Keep di��er �i�or,�s and other water „o�?��ey�nce ��easures T�ee �,f se�;i,n�ent
during all phas�s of developmer��o
lOo Handle seeps or spri ngs encountered duri nq construcl�i on i n accordance
with appro�ed methodso
lla �ermanently stabi li ze all qraded areas i mmedi ately af ter f i nal qradi nq i s
completed on each area i n the gradi ng plan per NPDES Soi l Stabi li zati on
7��i mef rameso
l2o Show topsoi l stockpi les9 borrow areas9 and spoil areas on The plans9 and
make sure they ore adequately protected f rom erosi ono lnclude f i nol
stabi li zati on of these areas i n the plana
MAlI�TEIUAIUCE�
Peri odi cally chec% all graded areas and the supporting erosi on and
sedi mentati on control practi ces9 especi ally af ter heavy rai nf allso Prompl-ly
remove all sedi ment f rom di �ersi on and other water —di sposal practi ceso lf
washouts or breaks occur9 repair them immediately� Prompt
mai ntenonce of small eroded areas before they became si gni f i cant gulli es
is an esser�tial part of an effecti�e erosion and sedimentation control plana
'R�PARCD IN TI�IC O�F'CC OFo
■
�
PoOo BOX 33068 — RQ�EIGH� NCRTH CQRO�INQ 27636-30�8
PHONE° (9 19) 677-20C�0 F/�Xo (9 19) 677-2050
�E No, F—o io2
EROSION CONTROL DETAILS
V EGET AT lV E PLAN (NCDENR 60/l�
SEEDIIVG SCHEDU�E
Sr�oulJcrs9 Sid� Ditchcs9 Slope�� � 3oi;
Date Type Planti r�g Rate
Auga l5 No�o l Tall Fescue 250 /bso/acre
l�ovo l Mara l Tall Fescue 250 /bsa/acre
& Abruzzi Rye 25 /bso/acre
Maro l Apro l5 T all Fescue 250 /bso/acr�
Apro l5 Juno l5 Hulled Common Bermudagrass l2 /bso/acre
Jui�o l5 qugo l5 Tall Fescue 250 /bso/acre
& Browntop Mi llet ��� 35 /bso/acr�;
or �orghum Sudan Hybri ds ��� 30 /bso/acre
Slopes �39 / to 2a l)
Maro l—Juno l Seri cea Lespedeza (scari f i ed) 50 /bsa/oc�e
and
(Maro l Apro /5) Add T all Fescue 250 /bso/acr�
�Mara l Juno 30) or Add Weeping Lo�eqrass� 5/bso/acre
�Mara l Juno 30) or Add Hulled Common Bermudagrass 8/bso/acre
Juno /—Sepo / l all Fescue ��� 250 /bso/acre
& Browntop Mi llet ��� 35 /bso/acr�e
or Sorqhum Sudan Hybri ds ��� 30 /bs,/acre
S�p� l—Maro l Seri cea Le�spedeza
�unhulled unscarified) �0 /bs�/acre
& T all Fescue 250 /bso/acre
(lVo�� l Mara l) Add Abruzzi Rye 25 /bso/acr�
Consult Conservati on Enqi neer or Soi l Conser�ati on Ser�i ce
l��r addi ti onal i nformati on co�cerni ng other alternati �es for
�eqetati on of denuded areaso T he abo�e vegetati on rates are
those which do well under local conditionso other seeding rate
combi nati ons are possi bleo
��� T emporary Reseed accordi nq to opti mum season f or
desi red permanent �egetati ono Do not allow temporary co�er to
qrow o�er l2 i r�ches i n hei qht b�f or� mowi nq9 oth�rwi sc9 f�scu�
may be shaded outo
/)
2)
�)
4)
5)
6�
7)
SEEDIIVG SPECIFICATlOIVS
After rough grading is completed9 till soil in areas to be
seeded and planted to a dept�h of si x i ncheso
Apply ogri cultural li me9 ferti li zer9 and superphosphaf�e f�o
di sturbed areas to be �egetatedo
1.35 /bs� li mestone/1000 sqo fta (.3 tons/acre) or based on soi ls
tesi
35 /bso l0 /0 /0 f ertili zer/1000 sqo f to (1500 /bs/acre)
40 /bso 50% superphosphate/1000 sqo fto �1750 /bs/acre)
Di sk nutri ents i nto soi l to a depth of si x i nches un1 i l
surf ace i s uni f orm and f ree of large di rt clods�
Seeding permanent grasso
300 /bso KY 3/ tall fescue/1000 sqo fto �1�30 /bso/acre) during
February l5 through May l5 or August l5 through
lUo�ember l50
—OR —
300 /bs� KY 3/ tall fescue and 200 /bs� annual ryeqrass/1000
sqa fto durinq November l5 through February l50
Mulch seeded area wi th small qrai n straw at 90 /bs/1000
sqa f to �2 tor�s/acre)o Spread uni f ormlyo Approxi mately'�2
of qround surf ace should be �i si ble to a�oi d blocki ng
sunliqhf to seedlingso On areas where the ground
surf ace equals or exceeds o 3a l slope9 ond in the i n�erts
of all drainage �swales9 tack mulch with as,�halt emulsion
ot a rate of 450 qallons emulsion per acre of strawo
Mulch around shubbery and trees with pine straw t� depth
of 3 incheso
Temporary co�er
la0 /bsa brown top mi llet/1000 sqo f to May throuqh August 2`� o
—OR —
l00 /bsa annual ryegrass �1000 sqo f��o /�ugusl� 25 th�ough ,�pril�
PKO�-CT�
U-4916
NJ�T T� ���h�- BECKFORD DRIVE WIDENING
JOL� NUMQER:
0 � 1065000
SH�ET NUMQERe
EC-7
O
�
P�ASTIC
PIF
NOTES
1.
2.
3.
4.
5.
6.
TEMPO
PERMA
UNC�A
MATER
c'i� T�����r� rc'T�� �i n r> >
V L/� .J .J U .J I LJ I V� I /� LJ \ I /\ I /\ 1 I V I � I V o�
SEED AND PLACE MATTING FOR EROSION CONTROL ON INTERIOR AND EXTERIOR SIDESLOPES.
LIMIT EARTH DIKE HEIGHT TO 5 FT.
FOR BASIN DEPTH OF 3 FT., THE MINIMUM BASIN WIDTH SHALL BE 9 FT.
DETERMINE PRIMARY SPILLWAY WEIR LENGTH (FT.) USING Q/0.8, WHERE Q IS FLOW RATE (CFS)
PLASTIC SLOPE DRAIN PIPE AT INLET OF BASIN MAY BE REPLACED BY FILTRATION GEOTEXTILE
SOIL STABILIZATION GEOTEXTILE FOR PRIMARY SPILLWAY SHALL BE ONE CONTINUOUS PIECE OF
� REV. No.e REVISIONe DATEe DRAWN BYe Ct;ECKED BYe
NThis document, toqether with the concepts and designs presented herein, as an instrument of service, is
� intended only for the speciflc purpose and cllent for which lt was prepared, Reuse of and improper
� reliance on this document without writTen authorization and adoption by Kimley-Horn and Associates, Ince
Op shall be without liability to Kimley-Horn and Associatesv !nc,
Copyright Kimley-Norn aod Ass�ciates, Incos 20 10
'R�PARCD IN TI�IC O�F'CC OFo
■
�
PoOo BOX 33068 — RQ�EIGH� NCRTH CQRO�INQ 27636-30�8
PHONE° (9 19) 677-20C�0 F/�Xo (9 19) 677-2050
�E No, F-o io2
�TION
E
DIKE
'OUND
E� PIPE
INo
2" x 2" (nominal)
WOODEN STAKE
1"
1 _ 2 ►►
1-2
12-24"
#10 STEEL
REINFORCEMENT BAR
4 ►►
DIAMETER BEND
4 ►►
24"
1" (nominal)
STAPLE
_ 1►► _
12 ►►
COIR FIBER MAT
ANCHOR OPTIONS
INTO BASIN.
OR TARP AS DIRECTED.
MATER IAL OR OVERLAPPED 18 I N. ( MI N.). NoT To SCA�E
EROSION CONTROL DETAILS
PKO�-CT�
U-4916
NJ�T T� ���h�- BECKFORD DRIVE WIDENING
JOL� NUMQER:
0 � 1065000
SH�ET NUMQERe
EC-8
O
�
orn
H �
C �
H z
D���
�o���
Hz-�=D
=��nrn
V
�z�
i � O O
zHor�
� � H
n=�z
' ��D
D�
� H
� O
z
m
z
�
r
H
�
_
�'I
rn
Z
n
rn
SHEET 1 OF 1
1605.01
TOP AND BOTTOM S�
SHALL BE 10 GAUGI
8' MAX. WITH WIRE
i' MAX. WITHOUT WIRE
VV1RC i i� i �n i r�univ
NOTES
USE WIRE A MINIMUM OF 32"
IN WIDTH AND WITH A MINIMUM
OF 6 LINE WIRES WITH 12" STAY
SPACING.
USE FILTER FABRIC A MINIMUM
OF 36" IN WIDTH AND FASTEN
ADEQUATELY TO THE WIRE AS
DIRECTED BY THE ENGINEER.
PROVIDE 5'-0" STEEL POST OF THE
SELF-FASTENER ANGLE STEEL TYPE.
� REV. No.e REVISIONe DATEe DRAWN BYe Ct;ECKED BYe
NThis document, toqether with the concepts and designs presented herein, as an instrument of service, is
� intended only for the speciflc purpose and cllent for which lt was prepared, Reuse of and improper
� reliance on this document without writTen authorization and adoption by Kimley-Horn and Associates, Ince
Op shall be without liability to Kimley-Horn and Associatesv !nc,
Copyright Kimley-Norn aod Ass�ciates, Incos 20 10
'R�PARCD IN TI�IC O�F'CC OFo
■
�
PoOo BOX 33068 - RQ�EIGH� NCRTH CQRO�INQ 27636-30�8
PHONE° (9 19) 677-20C�0 F/�Xo (9 19) 677-2050
FI LTER
FABRIC
COMPACTED
�E No, F-o io2
EXTENSION
WIRE INTO
EROSION CONTROL DETAILS
—
—
—
STEEL
OF FABRIC
TRENCH
� , ,
2' - 0" DEPTH
PKO�-CT�
z
o�
H �
� Q
Q�� .
H p� � U
���Hz
oo�=
o� .,
wQQ�=
QU�O�
�=~zw
���o�
� � � �
z ,H
oC
��
� ~
L1J �
0
�
0
�
W
c�
Z
W
�
�
J
H
C1�
_
�
H
J
�
z
w
SHEET 1 OF 1
1605.01
U-4916
NJ�T T� ���h�- BECKFORD DRIVE WIDENING
JOL� NUMQER:
0 � 1065000
SH�ET NUMQERe
EC-9
O
0
orn
H �
C �
�H' z
�HO�
r����
Hz-�=D
���nm
=�z�
�
=�O�
z,�o��
� � H
n=�z
. �D�
D�
� H
� O
z
N
�
rn
n
H rn
� z
r �'
r
H
� �
rn =
v �,
��
� �
m z
Z �
�
� �v
0
C� o
O �o
Z D
��
� H
O z
�
r
�
� o
rn �°
Z
C7
rn
�HEET 1 OF 1
1606.01
GENERAL NOTES:
USE N0. 5 OR N0. 57 STONE FOR SEDIMENT
CONTROL STONE.
USE HARDWARE CLOTH 24 GAUGE WIRE MESH
WITH 1/4 INCH MESH OPENINGS.
INSTALL 5 FT. SELF FASTENER ANGLE STEEL
POST 2 FT. DEEP MINIMUM.
SPACE POST A MAXIMUM OF 3 FT.
� REV. No.e REVISIONe DATEe DRAWN BYe Ct;ECKED BYe
NThis document, toqether with the concepts and designs presented herein, as an instrument of service, is
� intended only for the speciflc purpose and cllent for which lt was prepared, Reuse of and improper
� reliance on this document without writTen authorization and adoption by Kimley-Horn and Associates, Ince
Op shall be without liability to Kimley-Horn and Associatesv !nc,
Copyright Kimley-Norn aod Ass�ciates, Incos 20 10
VARIABLE 7
�
DIMENSION �
�
1/
3 ft
WIRE MESH
SEDIMENT CONTROL STONE
WATER FLOW
'R�PARCD IN TI�IC O�F'CC OFo
■
�
PoOo BOX 33068 — RQ�EIGH� NCRTH CQRO�INQ 27636-30�8
PHONE° (9 19) 677-20C�0 F/�Xo (9 19) 677-2050
1/
WIRE MESH
�E No, F-o io2
EROSION CONTROL DETAILS
STEEL
�
SEDIMENT CONTROL STONE
2 ft DEPTH
PKO�-CT�
z
o�
H �
� Q
Q�� .
H��V
���Hz
oo�=
� �
wQQ�=
QU�O�
�=~zw
���o�
0 � � �
z , �-+
�
��
� ~
w�
0
W
v
z
W
� �
0
� J
� O
z pC
H �
�z
Q
�o
� V
�
� �
Q Z
� W
z �
Q
� H
cn p
= W
� �
H
� J
c� Q
z �
w
V
W
0.
�
SHEET 1 OF 1
1606.01
U-4916
NJ�T T� ���h�- BECKFORD DRIVE WIDENING
JOL� NUMQER:
0 � 1065000
SH�ET NUMQERe
O
�
�
�
C
rn
r
�
�
Z
�
�
�
C
C7
�
H
O
Z
rn
Z
�
�
�
Z
C'�
rn
rn
z
�
r
H
�
_
�
0
�
SHEET 1 OF 1
1607.01
�
� REV. No.e REVISIONe DATEe DRAWN BYe Ct;ECKED BYe
NThis document, toqether with the concepts and designs presented herein, as an instrument of service, is
� intended only for the speciflc purpose and cllent for which lt was prepared, Reuse of and improper
� reliance on this document without writTen authorization and adoption by Kimley-Horn and Associates, Ince
Op shall be without liability to Kimley-Horn and Associatesv !nc,
Copyright Kimley-Norn aod Ass�ciates, Incos 20 10
'R�PARCD IN TI�IC O�F'CC OFo
■
�
NOTES:
1. PROVIDE TURNING RADIUS SUFFICIENT TO ACCOMMODATE LARGE
TRUCKS.
2. LOCATE ENTRANCE(S) TO PROVIDE FOR UTILIZATION
BY ALL CONSTRUCTION VEHICLES.
3. MUST BE MAINTAINED IN A CONDITION WHICH WILL PREVENT
TRACKING OR DIRECT FLOW OF MUD ONTO STREETS.
PERIODIC TOPDRESSING WITH STONE WILL BE NECESSARY.
4. ANY MATERIAL TRACKED ONTO THE ROADWAY MUST BE
CLEANED UP IMMEDIATELY.
5. LOCATE GRAVEL CONSTRUCTION ENTRANCE AT
ALL POINTS OF INGRESS AND EGRESS UNTIL SITE IS STABILIZED.
PROVIDE FREQUENT CHECKS OF THE DEVICE AND TIMELY
MAINTENANCE.
6. NUMBER AND LOCATION OF CONSTRUCTION ENTRANCES TO
BE DETERMINED BY THE ENGINEER.
7. USE CLASS 'A' STONE OR OTHER COARSE AGGREGATE APPROVED
BY THE ENGINEER.
PoOo BOX 33068 - RQ�EIGH� NCRTH CQRO�INQ 27636-30�8
PHONE° (9 19) 677-20C�0 F/�Xo (9 19) 677-2050
NOTE:
�E No, F-o io2
PLACE FILTER FABRIC BENEATH STONE
EROSION CONTROL DETAILS
PKO�-CT�
z
o�
H �
� Q
Q�� .
H pC � U
�J�Hz
oo�=
� �
wQQ�-'-=
QU�O�
�=~zw
���o�
� � � a
z ,H
�
� ~ H
� w �
� o
�
W
v
Z
� Q
o �
��
c� Z
z W
H
� Z
Q
� O
0 �..�
o �
� v
Q �
o �
z �
Q
� N
� Z
= O
�, c�
H
� J
� W
w >
Q
OC
c�
SHEET 1 O�F 1
1607.01
U-4916
NJ�T T� ���h�- BECKFORD DRIVE WIDENING
JOL� NUMQER:
0 � 1065000
SH�ET NUMQERe
F C- I I
�
c
o,
�
�
,o
�
a�
�
i
0
L
a�
i
�
�
�
�
�
0
L
�
c
0
v
c
0
,�
0
i
W
�
c
0
�
�
�
�
0
�
�
U
Q�
�
�.
�
0
0
�
�
�
�
i
O
�
�
O
O
�
I
J
Q
�
�
O
O
�
orn
H �
C �
H z
D���
�o���
Hz-�=D
=��nrn
�z�V
i � O O
zHor�
- � i--i
n=�z
' ��D
D�
� H
� O
z
�..� m
Z z
r �'
r
rn H
��
_
� (�
rn�
v�
H z
� �
D
rn�
Z �
� p
�
� �
� �
H
� z
� �
SHEET 1 OF 1
1632.03
A
1/4 " WI RE MESH
...v.. ... �.. ...v.. ...
�. . �. �c;���� � �� , �c;����� � ��.�o. �c:��� � �.�
,� . o.� � . o.� .� . �.� .
��.� o '.��.��,
. O. : � • ' �.
. �.
.��..
� '.
•�',.
Q' � `. �.
�.�G.
. ' O. �•
Q'��
. � ' .` G.
. : •• . O..
..� Q-.,
. �.�. � � � � .. �.�. � � �� � .. �.�. " � ��. G..
. : ••a J. 'Q . : ••c�� �. 'Q . : ••c� �. O .
�'.��•�: Q � �'.r'�•�.' Q � .'.r'�•�: Q '�.,
MAXIMUM POST SPACING 4 FT.
2 , �k
2'
���8��8��8��8�� ��C� � °
SEDIMENT �' '
�e
CONTROL STONE
1►_6►►
------�-�------ . �
�� -� �
6 "�
FILTERED
WATER
SECTION A-A
2'
A
12"
0
NOTE
USE N0. 5 OR N0. 57 STONE
FOR SEDIMENT CONTROL STONE.
-�����" USE 24 GAUGE MINIMUM WIRE ""—""����►►lell II� � :�
;;
1/ " MESH HARDWARE CLOTH WITH SEDIMENT ',
WIRE MESH 1/4 INCH MESH OPENINGS. CONTROL STONE
PLACE TOP OF WIRE MESH 1'-6"
AVERAGE BOX
DIMENSION VARIABLE
MULTI-DIRECTIONAL FLOW
� REV. No.e REVISIONe DATEe DRAWN BYe Ct;ECKED BYe
NThis document, toqether with the concepts and designs presented herein, as an instrument of service, is
� intended only for the speciflc purpose and cllent for which lt was prepared, Reuse of and improper
� reliance on this document without writTen authorization and adoption by Kimley-Horn and Associates, Ince
Op shall be without liability to Kimley-Horn and Associatesv !nc,
Copyright Kimley-Norn aod Ass�ciates, Incos 20 10
A MINIMUM OF ONE FOOT BELOW
THE SHOULDER OR ANY
DIVERSION POINT.
INSTALL WIRE MESH UNDER
SEDIMENT CONTROL STONE.
USE 5' STEEL POST, INSTALLED
1.5' DEEP MINIMUM, AND
OF THE SELF-FASTENER
ANGLE STEEL TYPE.
SPACE POST A MAXIMUM
0 F 4' .
'R�PARCD IN TI�IC O�F'CC OFo
■
�
PoOo BOX 33068 — RQ�EIGH� NCRTH CQRO�INQ 27636-30�8
PHONE° (9 19) 677-20C�0 F/�Xo (9 19) 677-2050
�E No, F—o io2
1/4" WIRE MESH
Y
SEE NOTE FOR POST DESCRIPTION
�______________�
FL OW —�
AVERAGE BOX
DIMENSION VARIABLE
FILTERED
WATER
SECTION Y-Y
SINGLE-DIRECTIONAL FLOW
EROSION CONTROL DETAILS
PKO�-CT�
z
o�
H �
�Q
Q�� .
H p� � U
���Hz
oo�=
o� .,
wQQ�=
QU�O�
�=~zw
���o�
O�C/��
z ,H
�
��
� H
w �
0
►
V
►
_ �
C�
H W
J J
� Z
z �
w
SHEET 1 OF 1
1632.03
U-4916
NJ�T T� ���h�- BECKFORD DRIVE WIDENING
JOL� NUMQER:
0 � 1065000
SH�ET NUMQERe
EC- 13
�
� REV. No.e REVISIONe DATEe DRAWN BYe Ct;ECKED BYe
NThis document, toqether with the concepts and designs presented herein, as an instrument of service, is
� intended only for the speciflc purpose and cllent for which lt was prepared, Reuse of and improper
� reliance on this document without writTen authorization and adoption by Kimley-Horn and Associates, Ince
Op shall be without liability to Kimley-Horn and Associatesv !nc,
Copyright Kimley-Norn aod Ass�ciates, Incos 20 10
'R�PARCD IN TI�IC O�F'CC OFo
■
�
PoOo BOX 33068 — RQ�EIGH� NCRTH CQRO�INQ 27636-30�8
PHONE° (9 19) 677-20C�0 F/�Xo (9 19) 677-2050
�E No, F—o io2
EROSION CONTROL DETAILS
PKO�-CT�
U-4916
NJ�T T� ���h�- BECKFORD DRIVE WIDENING
JOL� NUMQER:
0 � 1065000
SH�ET NUMQERe
�_C- I �
u
�
c
o,
�
�
,o
�
a�
�
i
0
L
a�
i
�
�
�
�
�
0
L
�
c
0
v
c
0
,�
0
i
W
�
c
0
�
�
�
�
0
�
�
U
Q�
�
�.
�
0
0
�
�
�
�
i
O
�
�
O
O
�
I
J
Q
�
�
O
O
�
orn
H �
C �
�H' z
� H O �
m����-�i
Hz�=D
=��nrn
V
�z�
= u' o 0
z ,� o i- -n
� � H
n=�z
� �D�
D�
� H
� O
z
�
0
�
�
'�
I"I
�rn
I'11 z
�
�..� r
Z ~
�
r =
rn�
� �
D
C� z
rn�
v�
��
0
�
rn�
z �°
�
� �
H
� z
� �
� �
-o 0
�
�
�
�
rn
-
�
-
>HEET 1 OF 1
1635.01
NOTE:
USE CLASS '6' EROSION CONTROL STONE
FOR STRUCTURAL STONE.
USE N0. 5 OR N0. 57 STONE FOR
SEDIMENT CONTROL STONE.
CONSTRUCT TOP OF BERM A MINIMUM OF
ONE FOOT BELOW THE SHOULDER OR
DIVERSION POINT.
PROVIDE A TOTAL SEDIMENT TRAP
VOLUME OF 1800± CUBIC FEET PER ACRE
OF DISTURBED AREA. SOME OF THE
REQUIRED VOLUME MAY BE PROVIDED
BY UP OR DOWNSTREAM CONTROLS.
DIVERSION POINT
A
�v�,`,��� •
�,.�• �� •
�(��N � . ,
i t1 �
►• � �
�. �e � � �,.'
SEDIMENT CONTROL STONE
� REV. No.e REVISIONe DATEe DRAWN BYe Ct;ECKED BYe
NThis document, toqether with the concepts and designs presented herein, as an instrument of service, is
� intended only for the speciflc purpose and cllent for which lt was prepared, Reuse of and improper
� reliance on this document without writTen authorization and adoption by Kimley-Horn and Associates, Ince
Op shall be without liability to Kimley-Horn and Associatesv !nc,
Copyright Kimley-Norn aod Ass�ciates, Incos 20 10
12" MIN
SEDIMENT CONTROL STONE
,s�����o� �s,,
�� �� �'+: ;,Q i�
�•�. ; � � ��,� �
_��,� •�. ��
�. ��. �--- �
��r, •
i •• • ��
I..�,��
��.
�'•�'I•'
/•� •/
�� �•�•�
•�
r��� �
.�• •
i •�•
• � , �, • •
�•� •�
►�� � �, � � I
•�
� ►•. •, �
�, � ► ,.� �� �
1•�,•�•�
�.
� �• � .
��'.a1'��._ �� �
P LAN
STRUCTURAL STONE
12►►
'R�PARCD IN TI�IC O�F'CC OFo
■
�
PoOo BOX 33068 - RQ�EIGH� NCRTH CQRO�INQ 27636-30�8
PHONE° (9 19) 677-20C�0 F/�Xo (9 19) 677-2050
/ �j�'
• �' •,
►•�••1,
1 • • � •� •
�
0
12►►
�..
�❑
PIPE
MIN
�
A
STRUCTURAL STONE
„ �-- ROADWAY SHOULDER
18
________________________________
MIN.,_r'; p ,A:,
,_.� , , FLOW
i � � .
--------------------------------------"
��
8' M I N .
36" PIPE MAX.
SECTION A-A
�E No, F-o io2
EROSION CONTROL DETAILS
PKO�-CT�
z
o�
H �
� Q
Q�� .
H��V
L.L J � H z
oo�=
wQz� �
�U�O�
�=�z�'
cn �- ,_,_ o J
� � � a
�
z .H
�>
� H
L.LJ �
0
-
Q
►
oc a
0
L.L Q
� �
z �
H
��
az
°C W
0
�
o�
�o
a W
0
z N
Q
� �
� W
= J
� Z
H �
J
�
z W
w a
F-I
a
�
�
O
�C
SHEET 1 OF 1
1635.01
U-4916
NJ�T T� ���h�- BECKFORD DRIVE WIDENING
JOL� NUMQER:
0 � 1065000
SH�ET NUMQERe
LC- 16
u
O
O
�D
O
C'�
�
�
H
� m
rn z
�
�..� r
Z H
�
r =
rn�
� �
D
tl� z
rn�
v�
H�
0
�
rn�
z �°
�
� �
H
� z
� �
� �
� o
�
�
�
�
rn
SHEET 1 OF 1
1635.02
NOTE:
USE CLASS 'A' EROSION
CONTROL STON FOR
STRUCTURAL STONE.
USE N0. 5 OR N0. 57 STONE
FOR SEDIMENT CONTROL.
CONSTRUCT TOP OF BERM
A MINIMUM OF ONE FOOT
BELOW THE SHOULDER OR
DIVERSION POINT.
PROVIDE A TOTAL SEDIMENT
TRAP VOLUME OF 1800± CUBIC
FEET PER ACRE OF DISTURBED
AREA. SOME OF THE REQUIRED
VOLUME MAY BE PROVIDED BY
OTHER UP OR DOWNSTREAM
CONTROLS.
DIVERSION POINT
SEDIMENT
� REV. No.e REVISIONe DATEe DRAWN BYe Ct;ECKED BYe
NThis document, toqether with the concepts and designs presented herein, as an instrument of service, is
� intended only for the speciflc purpose and cllent for which lt was prepared, Reuse of and improper
� reliance on this document without writTen authorization and adoption by Kimley-Horn and Associates, Ince
Op shall be without liability to Kimley-Horn and Associatesv !nc,
Copyright Kimley-Norn aod Ass�ciates, Incos 20 10
A
CONTROL
12" MIN
SEDIMENT CONTROL STONE
S�����
PLAN
STRUCTURAL STONE
12"
18 ►►
MIN.
,I���,�j�•�
� �i %�� �� � � • �
�: �''1�� ��, •♦ ,
'' �' �I � � � � �I: �
. _•�S — � . � —
'R�PARCD IN TI�IC O�F'CC OFo
■
�
PoOo BOX 33068 — RQ�EIGH� NCRTH CQRO�INQ 27636-30�8
PHONE° (9 19) 677-20C�0 F/�Xo (9 19) 677-2050
7►_6►► MIN .
SECTION A-A
�E No, F-o io2
12" MIN
�
PIPE
�
A
FLOW
STRUCTURAL STONE
18►►
-------------------------------_
MIN.,_;r'; p �:.
,
�_� � .
i � � .
--------------------------------------"
_�
18" PIPE
EROSION CONTROL DETAILS
ROADWAY SHOULDER
FLOW
►t-�l_f:�
PKO�-CT�
z
o�
H �
� Q
Q�� .
H p� � U
���Hz
oo�=
o� .,
wQQ�=
QU�O�
�=~zw
���o�
o�cnQ
oC
z ,H
� ~ H
O w �
� o
ti
W
�
�
H
�a
0
� Q
� �
z �
H
��
Qz
°C W
0
�
o�
�o
a W
0
z N
Q
� �
� W
= J
� Z
H �
J
�
z W
w a
H
�
�
�
O
�
SHEET 1 OF 1
1635.02
U-4916
NJ�T T� ���h�- BECKFORD DRIVE WIDENING
JOL� NUMQER:
0 � 1065000
SH�ET NUMQERe
�_C- 17
�
c
�
�
O
W
�
O
�
O
�
�
I
O
d
�
I
�
�
c1'
�
�
c
0
�
�
�
�
0
�
�
U
Q�
�
�.
�
0
0
�
�
�
�
i
O
�
�
O
O
�
I
J
Q
�
�
O
�
c
�
�
a
w
�
O
O
�
i
N
0
a
�
i
�
�
�
'c
0
�
�
i
a
�
i
0
�
�
U
a�
m
O
0
0
�
�
0
0
�
0
3
�
0
0
�
i
�
Q
�
I
�
�
F—
W
W
_
�
W
V /
�
�
+
�
Q
�
(/�
I
�
�
Z
J
_
U
�--
a
�
, ; � PROJECT U-49/6
�ND PROJECT PHASE 2
CONTRACTOR TO
RELOCATE 30 LF
l0" Dl VyATERLINE UNDER
DRAINAGE STRUCTURE
CONFLICT lF REQUIRED
�SEE DETAIL l
T HlS SHEET 1
EXISTING 4"
MAIN T lC GAS �
_ EXIST
80' R/W
X ; X X
�
EXIST 8-0 R
X X X X - X X
w
-° -
�
e�
/
PROPOSED GRADE
ALI�NG EX Tll�
y�ATERLINE..
EXfSTfI�T� G ALJ�
ALQIyG EXl Q(G
y�ATERLINE
PROP ED
STOR�ORAIN
20 LF (�llN.1 /0' C /g���,
35� Dl y�ATE`�Ll
c�Mr��D oN --- _----
CONFLICT EXIST l0' l LINE
PRQPOSED-1Q'- ' PRQPIIS� lf�45'
VERTICAL BEIyD VERTICAL EIyD
�ROP_QSEQ_1�4 ' Q�QSEQ Q' 45'
VERTICAL BEIyD VERTICAL ElyO
DETAIL 1
(NTS)
SEE DETAILS P-1 AND W-12 ON SHEET 2—D
FOR THRUST RESTRAINT REQUIREMENTS
l20' BORE
�_
E
EMBARQ TO EXPOSE
AND REWORK EXIST
CABLE TO NEW PEDESTAL
— EMBARQ TO
PLACE PEDESTAL
REMOVE PEDESTAL
ADJUST EXIST
WATER VALVE
X
X X X X
X
.\
x
EMBARQ TO
PLACE PEDESTAL
N- 400.5q.,
Ivr �� �t�UO.`t�l �-� �- ._� .vt - .. -.�v �.1� __�.._�
�nJV.IN- 400.75' INV.IN- 399.88' INV.IN- 401.60' INV.IN-402.34�
%.IN- 400.36' INV.IN- 399.48' INV.OUT- 401.60' INV.OUT-402.34
. ini�.� n� ir znn ^ �
X X X X
�
x x � x X
X T= X
I
�i ��Y v�� �
(NTS)
SEE DETAILS P-1 AND W-9 ON SHEET 2—D
FOR THRUST RESTRAINT REQUIREMENTS
'R�PARCD IN TI�IC O�F'CC OFo
� REV. No.e REVISIONe DATEe DRAWN BYe Ct;ECKED BYe
NThis document, toqether with the concepts and designs presented herein, as an instrument of service, is
� intended only for the speciflc purpose and cllent for which lt was prepared, Reuse of and improper
� reliance on this document without writTen authorization and adoption by Kimley-Horn and Associates, Ince
Op shall be without liability to Kimley-Horn and Associatesv !nc,
Copyright Kimley-Norn aod Ass�ciates, Incos 20 10
x x
PSNC TO A ANDON
4" PLASTIC �AIN
CONTRACTOR TO RELOCATE
75 LF 8" Dl VyATERLINE AROUND
DRAINAGE STRUCTURES
(SEE DETAIL 2 THIS SHEETJ
PSNC TO INSTALL
PLASTIC � S MAIN�
X � X
e�
)R:
X � x
�
'�
�,
RETAIN PEDES AL - ��rE r
ADJUST EXl
WATER VAL E /
��
�}���
P\
��
X
�
/
—CONTRACTOR TO PROVIDE
CLEARIN� FOR TEMPORARY
POLE RELOCATION
PSNC TO INSTALL
PROPOSED 2"STEEL
GAS MAIN
`� RELOCATE VyATER AND SEVyER
: � (TEMPORARYJ BEFORE CULVERT
E � CONSTRUCTION.
SEE NOTES 5 THRU 7
' � `
� �
p E
pppF
�� �
� �
W� �——�
/
/ �
�
X X X X X Xx x X X
X
� � �
EM�Ro ro �
RE OVE PEDESTAL
EMeaRa ro
PLACE PEDESTAL
EMBARQ TO
EXPOSE AND REVyORK
EXIST CABLE INTO NEW PEDESTAL
DEPTH AS R QUIRED TO
CLEAR STOR� SEWER AND CB
■
�
PoOo BOX 33068 — RQ�EIGH� NCRTH CQRO�INQ 27636-30�8
PHONE° (9 19) 677-20C�0 F/�Xo (9 19) 677-2050
�E No, F-o io2
INSTALL CLASS B CONCRETE �
ENCASEMENT BETVyEEN WATEf?/SEINER
PIPES AND PROPOSED CULVERT PER
DETAIL P-1 FOR FULL CROSSING VyIDTH
�
X
EXISTING 4„
P AST lC GAS
— ao�usr Exisr �AiN
MANHOLE
X �_
�- X
x �( � _
x
� � X � x
RELOCATE
HYORaNr
k
x
—
4" PLAST/C 270' QORE
�
x
��— —�
�
'0O � � VA's � ��
��%— PDE ``
--��1�`;....
ETAIN PEDESTAL
�
ADJUST EXIST
MANHOLE
M
�
O
J
�
�
�
��-�,�,,`\\ �
\ �
�_ �
X O
k �
x 0
xx x M
�Q
�
/
� �
/
�
�
�
V
�
�Q
NOTES: '�
I. ALL UTILITY �IORK SHO�IN ON THIS SHEET BY OTHERS �'�
EXCEPT �yHERE NOTED. �,`
2. PROGRESS ENERGY TO COORDINATE �yITH CONTRACTOR AT THE �'�•�,.
PRE-CONSTRUCTION MEETING TO SCHEDULE TIME FOR TEMPORARY ., -�y
RELOCATION OF AERIAL POy�ER. PROGRESS ENERGY �yILL BE ��
SETTING TEMPORARY POLE TO RELOCATE PO�ER AROUND CULVERT 0.�.
AREA DURING CULVERT CONSTRUCTION.
3. TIME �yARNER CABLE �yILL FOLLOy�ING PROGRESS ENERGY'S
RELOCATION PLAN DURING CULVERT CONSTRUCTION. THERE ARE
NO OTHER CONFLICTS THAT TIME �yARNER CABLE IS A�yARE OF
THROUGHOUT THE PROJECT LIMITS. CONTRACTOR TO CONTACT
TIME �IARNER CABLE IF ANY CONFLICTS ARE FOUND. 6.IN THE EVENT OF A SPILL OR LEAK PERTAINING TO THE �JATER OR
4. CITY OF HENDERSON TO COORDINATE �ITH CONTRACTOR ON SEy�ER LINES, THE CONTRACTOR SHALL IMMEDIATELY NOTIFY ToMMY CURRIN
SE�yER AND �yATER RELOCATIONS BEFORE CULVERT CONSTRUCTION. �yITH THE CITY AT (252)-430-5731.
5. CONTRACTOR SHALL MAiNTAiN FL0�1 AND/OR SER�ICE OF AFFECTED
�yATER AND SE�ER LINES DURING ALL PHASES OF CONSTUCTION �ITH 7. ALL �yORK ASSOCIATED yyiTH PHAsiN� coNsTRucrioN AN� MAiNTAiNiN�
ONLY LIMITED AND APPROVED SHORT DURATION �ATER SYSTEM �yATER AND SE�yER SER�ICE SHALL BE CONSIDERED INCIDENTAL TO THE
SHUTDO�yN AND NO LEAKS ALLO�yED. BYPASS PUMP�NG AND/OR TEMPORARY TO THE CULVERT IMPROVEMENTS. NO ADDITIONAL OR SPECIFIC PAYMENTS
PIPING PLANS FOR �yATER AND SE�yER SHALL BE REV�Ey�ED AND APPROVED �yILL BE CONSIDERED FOR THIS PORTION OF THE PROJECT.
BY THE CITY OF HENDERSON PRIOR TO BEGINN�NG CONSTRUCTION. CONTACT
TOMMY CURRIN AT THE CITY AT (252)-430-573 I FOR REVIE�I. ALL
UTILITIES SHALL BE EITHER MAINTAINED IN OR RESTORED TO THEIR
PRE-CONSTRUCTION CONFIGURATIONS IN THE AREA OF THE PROPOSED BOX
CULVERT CONSTRUCTION.
��0����CARp��i�� PROJ-CT�
� ♦
;,-���:oF�ss';oti ••9 ;: - U - 4916
, :.
UTILITY PLANS =�`� SEAL 9�': :'0 ° ���' BECKFORD DRIVE WIDENING
� 024436 �
: ,� �: :� :
.��, •.��` ��: �•
������� �G � N ����� ���
J013 NUMQER� SH�ET NUMQERe
i�������������� 0 f 1065000 U 2
�
0
c
a
�
i
�
i
�
rn
j
i
C
0
�
c
�
b.
�
�
O
v
'c
a�
�
�
�
�
.,
�
�
�
�
�
U
a�
m
0
0
0
=
0
z
�
�
�
v
i
�
�
�
j
-�
�
�
0
�
;
' �� ' �
�. ' .
�
�
�
BENCH MARK SURVEY -L- CURVE DATA �
�0 D NAIL PI STA 31+43e61 a� `�
;TA 25+O1o54 D = 52°51'3701° (RT) .��
IFFSET 83083' LT D= 6°00'OOoO" �� ~
:LEVa 420e71' L = 8810001` � �
T = 474066' � `� , t
R = 954093' � ��
� z..�; .
:� ��
� ✓� . ' ,
�.:' �-
. �,'. -j ,i/
� ,,. , ; ,
��,.._,��.
r
. � i %�
� � ,�
��� � � `'2. ��a. �
,
�
, � ,� ; . e� �`
,�.�..,
2
�
75,_g��
� r. f
�. � r.
� `r'
��� �� �O
� �
�
, � ��,� .�
�� ,��'
/�
�` � �' °` �°�
' / �`�� ;�
� f' .�" �r
� �' f
. �� /� : / / �<F`6� 9� �� j�,
� i'/ �'� .� ��� , ��
70,_3"
' ; / / � 9�," /, i � , � �� `. , ' � ,.
,
�' � � :� ;, , � � PRECAST CULVERT ,,r . ���� 44� �` � ��� ���f l � �,% � jr._.. ��N .
V� �= ��` STA 27+23�00 -L ; I �� TO TANGENT ��°y ��°� � i =, ,
� � , E
+ , i ��. ,aC% � �rf � . � .A p� ��! / .
a
; r 6 / �
. � f i- . :� R/ /� �.. ' �
i', i � /�� lt . / �� �a` j I ... � ; � % � �
.
:.
� � � �r-- �-�- — — — — — — — = — — — — — — — — — — — —� — -� — — — — — — — — — — — —
; — — -� /— — —
�' r-
� �`-
� :
� ,
� � ' � w.a�a+�.mm
� � : . r' •' / ......... � ......... .......... .. ... ......... ..... .... ....... ..... .
. . .: � . . _ ... .. ...... . . .... ...... ... .
'' .. : , -::, . .......... ....... ",.�.�......... ... ..;r`. ..... .. ... .........�.. ........ ... . ........ .... ......... ... � �i"
_ . _ /�
_ j o , ,..
I
. ,�_..
s_ � %
,,.. r , ,: �� � ; ' _'',
�
;
, ;' ,
----------- - - ----- ��
� `� � '� � ' =
. _ � —�-----=----------- � - -- -- — --- — --- ---- ----- �
� �
,-�_. � � ��� — - — - �a ,- — — - — — — -
� � ,
:
�
7
,
�
� , E
, , _, ,�
� _,_,, �� ; � i' _ _ �
,� � - �, .
� __. .. J� _._ _ ,,. _ _ j, � _ _ _ _ __ i , i
....... . ...- — . ,c� .. /— _ _ _ _ — _ — _ _ _ _ _ ��� _ _ _ � T
� ' �
_.... ��- � % ,
�
, �— — — — — — a-- — — �— �'— — — — ,.. ,� — — — — — — — — — — ��
;
. � J . / A9' / � � ,
�... �. / / ",`'✓ /:i . �y �`9m / � � /��' � �� / % � �.,.—' � �.. .awmr.
� .__�` �' � �„ " ' � � : ,
� __ _,.� .�.,.� ,
� � � � �`� *� .✓`' / �� �,� � � � �� � /' � � �=�� ,
� � 3 ��w. f .. _ , � . �. .�;'� .,� �' Y�c`� �� f,'' � j � � i' ,,�' W �
� _�%
, , t
Si� �,L t�.. � f% � � " � ,' S�,;� I ,r � f,'` ; F /
�x
�. ,��� ; �
�� �"' � % � ��$� �° l/' � ��� �� / ,�-�6 �,�`�� `� ; ��� P R E CfA S T �,� a.� µ�
9�� � �` ,� � �� � �� � � ;% CULVEI��.T - �..
i � �' � � � % � ,
� � ,�� �;:, � `� / _� r
B A C K 0 F C U R B ��� � � s�- ,� ��� ;� � e��� � y , , i � � � ,��" � �- ,�.d.,,�
,� � \ , � i �' � , ��, :
/ � c�- Oj ' � �� � %."""'� �
�6,, � � �" � �'� % BACK OF� � � �°
.� � il`c ��� ; �Ff ��� .�` � C U R B ' �� ��
� �° � ,� �^ � 3,,�` / ; %� '� a� �� ���
� /" � �,ll.. ��� t,> � i� � / i �
�� ,-�',,�'
,
��'
�; ,
�'
r
410 RIP RAP
405
400
..�
395 � — _ _ INV EL 394%38
— �----�d
390
EXISTING GROUND
� � �`� ��
� ; ��,��� ° � y j' '/ � ' � \' / � �
�: � � ;� �,��.. .
O" 6, � � ' �� �°�,Y i� ` '� ' ' , ��:�� �
,
, ,,. �,�
,
r �
,
, �, � � / � __ ��
�
� O,, , y,i �� � % , _ -� � / �� �,�� �
• � ; '' � � ��� � ��� � �
� � �
6� ���, � �� /% , / y k
� �� � � � r a- �
�, � c ��� �. ; ,,...
�.� . �0., \,�� m ` .� �,, , � �� � °
�
75,_9"
,
� `/ , , ,; � �< ,
i � , �,�� � ` _.-_�
;, ; � Z �� v�a
,
<� , , ��.� �.,a, ��
;` �.,� ; �, �
;' � ¢
�°' l ��- � 9 �.�..;� .. r,..,.
r,�' °�� �,�•_�� N
�a� _. ;' �__�.
� ;` ,z � ..,�..
s���/,,•� �����T � � � r .;°h ..
�!� Oo � � i. . . N' �--
; q� �� .� � �:
�
LAYOUT PLAN
SCALEo 3�32 �� - �,_0��
70'-3"
�
,�, m
'-r' cC r- m
—� ��
o� c.� �
o �
� L� lf') U
i? � SURVEY -L- — � � o
J O , >
�
wf— � Jo
, ,,� �-
_ _,_,. _.-- , — — — — _ � _ _
--- -" — l � — — — � _
9' X 6' PRECAST CONCRETE BOX CULVERT � EL 393055 �? �
INV EL 392077—�
�
I
� SECTION ALONG� PRECAST CULVERT STA 27+23
SCALEa 3�32 �� _ �,_p��
PREPARED IN THE OFFICE OFe
■
Kiml -H rn
e o
0
� REV. No.: REVISION: DATE: DRAWN BY: CHECKED BY: �
N This document, to ether with the conce ts and desi ns � � I I�r
g p g presented herein, as an instrument of service, is a, ssoe ates V
� intended only for the specific purpose and client for which it was prepared, Reuse of and improper ' ■
Nreliance on this document without written authorization and adoption by Kimley-Horn and Associates, Ince PaOa BOX 33068 - RALEIGH9 NORTH CAROLINA 27636-3068
-� shall be without liability to Kimley-Horn and Associateso Inc.
Copyright Kimley-Horn and associateso �nc,, zo �o PHONEe (9 19) 677-2000 FAXo (9 19) 677-2050
,� ..� �
�,,
.�
A P
�
� �f� �
W2) �
� � �.
� - �
�
� '+vo-zH ..��.`Y+r .�rv.'xivu � �,.»m.
aw�m ..., d�.. ? ' �
,
.�
� �
�
� � ���,
_�
.. .64°I0,4��� �p � ��,;� ,..�.
(TYP
� ��9; ��,,�, � �
�.�
�'_ ��...�. � � /}. / ke.:
� � . �
. ! ��..._.,c... y� . ' ... �... . ;. .. .. .. l
410
405
400
395
390
FLOW
NOTE:
SEE ROADWAY PLANS FOR RIP RAP REQUiREMENTS AT CULVERT ENDSa
FOR ADDITIONAL INFORMATION REGARDING DRAINAGE, GRADING AND
ROADWAY9 SEE ROADWAY PLANSo
CONTRACTOR SHALL INCLUDE DETAILS FOR 3"� WEEP HOLES AT
10 FT MAX SPACING IN SHOP DRAWINGSo THE WEEP HOLES SHALL BE
APPROXIMATELY 6" ABOVE NORMAL STREAM FLOWo # 78 STONE FILLED
POROUS BAGS SHALL BE PLACED IN FRONT OF EACH WEEP HOLEo
CONTRACTOR MUST VERIFY INFORMATION PROVIDEDo
CONCRETE SHALL BE POURED IN THE FOLLOWING ORDERe
IoSET PRECAST BOX CULVERTo
2o WING FOOTING AND WING AND BOX CUTOFF WALLSo
3o WWGWALLS AND HEADWALLSo
THE CONTRACTOR SHALL STAKE OUT THE LENGTH OF CLJLVERT FOR
ENGINEER REVIEW PRIOR TO ORDERING PRECASTa
DESIGN PARAMETERSo
MAXIMUM ALLOWABLE SOIL BEARING PRESSURE = 3000 PSF
SOIL DENSITY = 120 PCF
PHI ANGLE = 30 DEGREES
COEFFICIENT OF FRICTION = Oe35
ASSUMED LIVE LOAD = HS20 OR ALTERNATE LOADINGo
DESIGN FILL = 8025'
PRECAST BOX SHALL BE DESIGNED TO ACCOMMODATE %2" DIFFERENTIAL
SETTLEMENT AT JOINTSo
FOR BORING INFORMATION9 SEE GEOTECHNICAL REPORT AND ADDENDUMo
OVER-EXCAVATE EXISTING SOILS DOWN T�0 THE TOP OF PWRo
SEE SPECIAL PROVISIONS FOR PRECAST REINFORCED CONCRETE BOX
CULVERT AT STA 27+23000 -L-o
CAST-IN-PLACE WINGS. F04TING. AND HEADWALL INFORMATION:
MINIMUM CONCRETE COMPRESSIVE STRENGTH = 3000 PSI
ALL REINFORCING STEEL SHALL BE GRADE 600
ESTIMATED QUANTITIES
ITEM UNIT QUANTITIY
BOX CULVERT EXCAVATION CY 1071
SELECT MATERIAL CLASS VI- CY 270
#57 STONE BACKFILL
PRECAST CULVERT AT STA 27+23000 LS I
ENGINEERING FABRIC - TYPE 4 SY 775
� REINFORCING STEEL LBS 2745
� CLASS A CONCRETE CY 4600
� SHOWN FOR WINGS9 FOOTINGS AND HEADWALL ONLYo
ENGINEERING FABRIC - TYPE 4
(WRAP ALL AROUND WITH A I'-6"
MIN LAP AT JOINTS) G
��y111111!(/��
\\�.�`;�N Cq/��%,,�
SINGLE 9'x6' PRECAST � °�••'F�ss;°..��2--'
; _; ee"° "y�•: y ;
CULVERT AT STA 27+23.00 -= SEAL i- SCALE AS NOTED
- i 2186 i -
� �
�i/ �'•�� Ci I N� �d��Q��
� ••.....• .
///���� ��i i iN+�`�fl�l��l
PROJECTo
JOB NUMBER:
PRECAST
CULVERT
18° (TYP
ALL AROUND)
. . o . .a o . . o , .a o . . o . .o o z
o , vo< . ,�, , ea , eo, ` �_ so , aoa ` .. � .� ee . �o w �
°oo °`o. `oo °`o, � `ao °�oe Q �
oo� ae oa' oe eo oe � �
SELECT MATERIAL CLASS VI
- #57 STONE BACKFILL
BEDDING DETAIL
NTS
U-4916
BECKF4RD DRIVE WIDENING
C���Z.���Z�Z�7
SHEET NUMBER:
C-I
0
0
o,
�
N
v
�
rn
j
�
O
�
C
�
�
�
v
'c
�
�
j
�
0
a
�
�
U
�
0
�
0
a
?
�
�
v
i
�
�
-�
�
�
�
i
0
�
�
WING STEI
I-'LHIV VI— I—ICHUVVHLL / VVIIVI�VVHLLS ( VV"I ) Z'Sc ( VV� I
DETAIL A
SCALEo I" = I'-0"
SCALEe %2" = I'-0" �—
INLET END SHOWNq OULET END SIMILAR
'RECAST BOX
�ND HEADWALL
LE
�
� PRECAST CULVERT
_ = 400088 (INLET)
_ = 399028 (OUTLET)
O
� REV. No.: REVISION: DATE: DRAWN BY: CHECKED BY:
N This document, to ether with the conce ts and desi ns
g p g presented herein, as an instrument of service, is
ti intended only for the specific purpose and client for which it was prepared, Reuse of and improper
\ reliance on this document without written authorization and adoption by Kimley-Horn and Associates, Inc<
N shall be without liability to Kimley-Horn and Associates, inc.
Copyright Kimley-Horn and Associates, Inco, 20 10
DETAIL B
SCALEo I" = i'-0"
,
PRECAST BOX
AND HEADWALL
SELECT MATERIAL
CLASS VI — #57
STONE BACKFILL —
ENGINEERING FABRIC — TYPE 4
(WRAP ALL AROUND WI" A
I'-6" MIN LAP AT JOINTS)
PREPARED IN THE OFFICE OFe
■
Iml -
e orn
.
nA
a o i In
ss c ates c.
PoOo BOX 33068 — RALEIGH9 NORTH CARO�INA 27636-3068 �
PHONEa (9 19) 677-2000 FAXo (9 19) 677-2050
�❑
�
�
�
�
�
� PRECAST CULVERT
TYPICAL END OF CULVERT ELEVATION
SCALEo %2" = I'-0"
DIMENSION ASSUMES THE TOP AND BOTTOM SLAB, AND WALL
THICKNESS OF THE PRECAST CULVERT TO BE 9"oIF THE
DESIGN INDICATES THICKNESSES OTHER THAN 9"q THE CONTRACTOR
SHALL MAKE ALL REQUIRED MODIFICATIONS TO ADJUST FOR THE
ACTUAL DIMENSIONSo
/-- RIP RAP INLET END
ONLY (SEE ROADWAY
PLANS)
I'-3"
HEADWALL
�
ELo 402a13 (INLET)
O�O O o. o ELo 400e53 (OUTLET)
O o �
— TOP OF PRECAST
���� ' CULVERT
� �w.. . � r a�E�_ ���� �
PRECAST CULVERT
INV IN
INV OUT
%//—%//_--
�. �� ���_ � a � ^. . ; � h � i: � y �_ � l�a��� o .
��. y x`° ,�, �;�`�-.._,. .
0
a � �� o . a �
0 0 �. a, o• o' a. �o , a o
o . a o
�a a o .. a . .
o . o 0 0
0 0 �, o, o• o o. 'o . a
o . a o
° �� ° . oo . ° �� �. ° � � ° o
�� ��/��� ���—���—��� o ��� � _
//�—//�—//�—// O zo-
% %//—%/ %//—%//—%//—%// ° ' �
� ����� ����������� = �.�
i, ,,, ,,, ,,, ,,, ,,, ,,, �
TOP OF F'WR
�,_0��
SECTION A-A
SCALEo %2" = I'-0"
�
�
�
SELECT MATERIAL
CLASS VI - #57
STONE BACKFILL -
ENGINEERING FABRIC
TYPE 4 (WRAP ALL
AROUND WI" A I'-6"
MIN LAP AT JOINTS)
\\��\11{IIIII/���
\��� ,�N Cq/�p �,,��
SI NGLE 9' x 6' PRECAST '� °�'��FESS'°�'�%%
� � �: Q-� �q'� '� �
= S � �' '
CULVERT WING WALL LAYOUT = ' _
— i � 12 18 � �,
. L - �,
�� •.; G I N B�;'� Q?�
, � •......• ,
,, �� F�Q �%
/���''�� �i i iN�P`��'! Z'� l
�
)�
O
RIP RAP INLET END
ONLY (SEE ROADWAY
PLANS)
�� �
= iii= iii —�Z
%//—///—//r
—'%//%///--
'� -///—%/
CONST JOINT
° 0 3" Diaa
� WEEP NOLE
o � —►
,__c � tn
� W
�
o Q
o RIP RAP �
/� (SEE ROADWAY
O PLANS)
o �
� �
%
� \� 0
° �\�ii
° ��� — OPTIONAL
I��_° —
4 0 0
�� . . p� . . � . �
p - 0 d . � ' p . �
0 0 0
. .a .�a � . . . o
o � a . . a . o
�� a . o �
o• a' o• a' o. 'o . o 0
. . a . a —
a •o ' •o • ' � (p
o . a ... � o . O o . ° I
• . . . . o o • . . N
- o 0 0�
° n
_/ j�� j� �����/���/���/���// � .
�// ///— /—%//—%//—%//—%//
— //—/ —///_//�//�//
TOP OF PWR
�,_��� 6,_��� �,_���
MIN
SEGTION B-B
SCALEo %2�� _ �,_���
PROJECTo
CONSTRUCTION
JOINT
�
�
�
1J-4916
SCALE AS NOTED BECKFORD DR I VE WI DEN I NG
JOB NUMBER:
0 I 1065000
SHEET NUMBER:
C-2
�
�
�
��
c
�
�
v
�
�
�
�
c
b
�
c
�
a
�
�
�
0
v
'c
a�
a
�
�
a�
�
.�
a
�
0
�
�
U
�
�
0
0
0
�
�
0
_ .. _ Q� -��,
6�� ZI
� � PRECAST CULVERT
i�-
,
PLAN OF WINGS AND F04TINGS eP „-��
� � S � .o
SCALEo 3�R�� _ �,_���
;
�
��N�� RAR� 3" II �P� ra Q" - R'—��� F��
PREPARED IN THE OFFICE OFe
.
Kimle -Horn
y
O REV. No.: REVISION: �ATE: DRAWN BY: CHECKED BY: �
N This document, to ether with the conce ts and desi ns � � n
g p g presented herein, as an instrument of service, is a ssoc�ates 1 1�
� intended only for the specific purpose and client -For which it was prepared, Reuse of and improper ' �
Nreliance on this document without written authorization and adoption by Kimley-Horn and Associates9lnca Pa�o B�X 33068 - RALEIGH, NORTH CAROLINA 27636-3068
� shall be without liability to Kimley-Horn and Associates, Inca
Copyright Kimley-Horn and Associates, �nc,9 zo �o PHONEo (9 19) 677-2000 FAXa (9 19) 677-2050
ELEVATION VIEW A-A
BAR TYPE
ZI 6'-8"
Z2 I`-6°
�.-- .
,—
o �
L FACE)
THER FACE
-1LL FACE)
)THER FACI
. .
.. .. ..
N M ct' Lf)
� I-- f-- F-- I-
4"
—•
2-N5
5"
2-V4
REINFORCING BAR SCHEDULE
BAR N0. SIZE TYPE LENGTH WEIGHT.
,�
n
20 SPA @ 9" = t5,_0"
5-N4 5-N3 5-N2
10 SPA C� 18" = 15'-0"
3-V3 . 3-V2
STR
STR
STR
STR
STR
2
2
2
2
2
STR
STR
STR
STR
STR
STR
STR
STR
STR
STR
STR
I
i
�
�
\ :!:
3" "V" BARS
\`\�N, �CARp''%
.
��\\ � ������p��� �� �/// .
SINGLE 9' x 6' PRECAST �z°••Q�.°F�SS'°ti9,:?�=
CULVERT WI NG WALL DETAI L-= SEAL i-
( SHEET 1 OF 2) =:, 12186 ;�
.
: � . �
� .� G I N � ;.•'�O ���
, � •....... ,.
���� �� �p�2 l�
��''���iiiN�P` �
ELEVATION VI EW B-�
PROJECTa
U-4916
SCALE AS NOTED BECKFORD DR I VE WI DEN I NG
JOB NUMBER:
0 I 1065000
SHEET NUMBER:
C-3
•
.
O
�
a
�
�
�
v
�
�
rn
�
�
C
�
�
C
O�
�
b
�
�
v
'c
a�
a
�
s
a�
>
.�
Q
�
L
O
�
�
U
N
m
I
O
O
O
�
�
O
O
U
Z
�
� �
>
�
U
�
I
i
�
N
L
-�
U
�
L
�
�
I
�
4
�
�
O
O
N
\
ti
\
N
c
�
�
J
I
Q
k
I
�
�
c1'
�
i
C
O
�
i
�
�
O
�
�
U
Q)
m
�
O
O
O
�
�
O
O
�
0
�
�
0
0
�
i
J
Q
�
�
lC� � lf� � l(� � lC� l[� � lf� O l[� � � � lfl � lf� 0 lf� � C� lf� � ln 0 lf� � n l(� � lf� � lC� 0 l(� 0 lf� � l(� � l(�
^'f�Cf ARC� IN TIJC OF�ICE O�o
■
REV. No.e REVISIONe DATEe DRAWN BYe CHECKED BY: �
�
� This document, together with the concepts and designs presented herein, as an instrument of service, is
nJ intended only for the speciffc purpose and cllent for whlch lt was prepared, Reuse o-F and imprc�per
\ reliance on this document without written authorizat°:on and adoption by Kimley-Horn and Associates, Inc, �� , , � ,�
� sna��ee without �iaei�ity to Kim�ey-Horn and �ssociates4�.i�c, PoOo C30X 33068 — R,q�E �I-�9 NGRTH � GF�U�INq 2765C-�-3068
� copyr�gnt K�miey-Horn and Asso��ates9 �n�o9 2o io FHONEo (9 I a) E77-2000 �/�X� (9 19) 077-2050 �E �io, F-o ioz
ROADWAY CROSS SECTIONS
� � n
PROJ= � T�
U-4916
BECKFORD DRIVE WIDENING
JOE3 NUMBER: SH�ET NUMBERe
0��065000 x-I
c
�
�
J
I
Q
k
I
�
�
c1'
�
i
C
O
�
i
�
�
O
�
�
U
Q)
m
�
O
O
O
�
�
O
O
�
0
�
�
0
0
�
i
J
Q
�
�
� o �n o �n O �n o �n O �n o �n O o �n O �n o � O o tf� o �n o �n � o �n o �n o �n O o �n o � o �n O
^'f�Cf ARC� IN TIJC OF�ICE O�o
■
REV. No.e REVISIONe DATEe DRAWN BYe CHECKED BY: �
�
� This document, together with the concepts and designs presented herein, as an instrument of service, is
nJ intended only for the speciffc purpose and cllent for whlch lt was prepared, Reuse o-F and imprc�per
\ reliance on this document without written authorizat°:on and adoption by Kimley-Horn and Associates, Inc, �� , , � ,�
� sna��ee without �iaei�ity to Kim�ey-Horn and �ssociates4�.i�c, PoOo C30X 33068 - R,q�E �I-�9 NGRTH � GF�U�INq 2765C-�-3068
� copyr�gnt K�miey-Horn and Asso��ates9 �n�o9 2o io FHONEo (9 I a) E77-2000 �/�X� (9 19) 077-2050 �E �io, F-o ioz
ROADWAY CROSS SECTIONS
� � n
PROJ= � T�
U-4916
BECKFORD DRIVE WIDENING
JOE3 NUMBER: SH�ET NUMBERe
0 � �0��!=,000 u--2
c
�
�
J
I
Q
k
I
�
�
c1'
�
i
C
O
�
i
�
�
O
�
�
U
Q)
m
�
O
O
O
�
�
O
O
�
0
�
�
0
0
�
i
J
Q
�
�
o �n o �n O �n O o �n o �n O �n O �n O �n o �n O �n �n o �n o � O � �n o �n o �n O �n �n o �n o �n O �n
^'f�Cf ARC� IN TIJC OF�ICE O�o
■
RE�. No.e RE��S�oNe oATEe oRAWN BYe ��E�KEo BY: � R OADWAY C R 0 S S S E CT I 0 N S
�
� This document, together with the concepts and designs presented herein, as an instrument of service, is
nJ intended only for the speciffc purpose and cllent for whlch lt was prepared, Reuse o-F and imprc�per
\ reliance on this document without written authorizat°:on and adoption by Kimley-Horn and Associates, Inc, �� , , � ,�
� sna��ee without �iaei�ity to Kim�ey-Horn and �ssociates4�.i�c, PoOo C30X 33068 - R,q�E �I-�9 NGRTH � GF�U�INq 2765C-�-3068
� copyr�gnt K�miey-Horn and Asso��ates9 �n�o9 2o io FHONEo (9 I a) E77-2000 �/�X� (9 19) 077-2050 �E �io, F-o ioz
� � �
PROJ= � T�
U-4916
BECKFORD DRIVE WIDENING
JOE3 NUMBER: SH�ET NUMBERe
0 � �0��!=,000 u-3
c
�
�
J
I
Q
k
I
�
�
c1'
�
i
C
O
�
i
�
�
O
�
�
U
Q)
m
�
O
O
O
�
�
O
O
�
0
�
�
0
0
�
i
J
Q
�
�
lC� � l(� O � O ir� lC� � � O lC� O i n � lCl � � O lC� O � li� 0 � O � O � lC� � lC� � l(� O 0 li� 0 � O � O
^'f�Cf ARC� IN TIJC OF�ICE O�o
■
REV. No.e REVISIONe DATEe DRAWN BYe CHECKED BY: �
�
� This document, together with the concepts and designs presented herein, as an instrument of service, is
nJ intended only for the speciffc purpose and cllent for whlch lt was prepared, Reuse o-F and imprc�per
\ reliance on this document without written authorizat°:on and adoption by Kimley-Horn and Associates, Inc, �� , , � ,�
� sna��ee without �iaei�ity to Kim�ey-Horn and �ssociates4�.i�c, PoOo C30X 33068 — R,q�E �I-�9 NGRTH � GF�U�INq 2765C-�-3068
� copyr�gnt K�miey-Horn and Asso��ates9 �n�o9 2o io FHONEo (9 I a) E77-2000 �/�X� (9 19) 077-2050 �E �io, F-o ioz
ROADWAY CROSS SECTIONS
� � n
PROJ= � T�
U-4916
BECKFORD DRIVE WIDENING
JOE3 NUMBER: SH�ET NUMBERe
0 � �065000 X -4
c
�
�
J
I
Q
k
I
�
�
c1'
�
i
C
O
�
i
�
�
O
�
�
U
Q)
m
�
O
O
O
�
�
O
O
�
0
�
�
0
0
�
i
J
Q
�
�
lfi O lCl O i n [1 lfl lf� O lC� O i n [1 l(� lf� O lC� O � n [1 lf� 0 � O lC� O i n [1 � lf� � lC� O i n [1 lCl 0 l(� O lC� O i r�
^'f�Cf ARC� IN TIJC OF�ICE O�o
■
REV. No.e REVISIONe DATEe DRAWN BYe CHECKED BY: �
�
� This document, together with the concepts and designs presented herein, as an instrument of service, is
nJ intended only for the speciffc purpose and cllent for whlch lt was prepared, Reuse o-F and imprc�per
\ reliance on this document without written authorizat°:on and adoption by Kimley-Horn and Associates, Inc, �� , , � ,�
� sna��ee without �iaei�ity to Kim�ey-Horn and �ssociates4�.i�c, PoOo C30X 33068 — R,q�E �I-�9 NGRTH � GF�U�INq 2765C-�-3068
� copyr�gnt K�miey-Horn and Asso��ates9 �n�o9 2o io FHONEo (9 I a) E77-2000 �/�X� (9 19) 077-2050 �E �io, F-o ioz
ROADWAY CROSS SECTIONS
� � n
PROJ= � T�
U-4916
BECKFORD DRIVE WIDENING
JOE3 NUMBER: SH�ET NUMBERe
0 � �0��!=,000 u-5
c
�
�
J
I
Q
k
I
�
�
c1'
�
i
C
O
�
i
�
�
O
�
�
U
Q)
m
�
O
O
O
�
�
O
O
�
0
�
�
0
0
�
i
J
Q
�
�
O i n n l(� 0 lC� O i n n �Cl 0 l(� O � � O � n n lC� � lC� O � O � n n � � O � O i n n �fl � O � O i n n � 0
^'f�Cf ARC� IN TIJC OF�ICE O�o
■
REV. No.e REVISIONe DATEe DRAWN BYe CHECKED BY: �
�
� This document, together with the concepts and designs presented herein, as an instrument of service, is
nJ intended only for the speciffc purpose and cllent for whlch lt was prepared, Reuse o-F and imprc�per
\ reliance on this document without written authorizat°:on and adoption by Kimley-Horn and Associates, Inc, �� , , � ,�
� sna��ee without �iaei�ity to Kim�ey-Horn and �ssociates4�.i�c, PoOo C30X 33068 — R,q�E �I-�9 NGRTH � GF�U�INq 2765C-�-3068
� copyr�gnt K�miey-Horn and Asso��ates9 �n�o9 2o io FHONEo (9 I a) E77-2000 �/�X� (9 19) 077-2050 �E �io, F-o ioz
ROADWAY CROSS SECTIONS
� � n
PROJ= � T�
U-4916
BECKFORD DRIVE WIDENING
JOE3 NUMBER: SH�ET NUMBERe
0 � � 0��!=,000 X- 6
c
�
�
J
I
Q
k
I
�
�
c1'
�
i
C
O
�
i
�
�
O
�
�
U
Q)
m
�
O
O
O
�
�
O
O
�
0
�
�
0
0
�
i
J
Q
�
�
i n n lfl � � O � i n n �Cl 0 l(� O � � n n lC� � lC� O � � n n li� � � O � O i n n �fl � � O
O i r, n lC� � lf� O
^'f�Cf ARC� IN TIJC OF�ICE O�o
■
RE�. No.e RE��S�oNe oATEe oRAWN BYe ��E�KEo BY: � R OADWAY C R 0 S S S E CT I 0 N S
�
� This document, together with the concepts and designs presented herein, as an instrument of service, is
nJ intended only for the speciffc purpose and cllent for whlch lt was prepared, Reuse o-F and imprc�per
\ reliance on this document without written authorizat°:on and adoption by Kimley-Horn and Associates, Inc, �� , , � ,�
� sna��ee without �iaei�ity to Kim�ey-Horn and �ssociates4�.i�c, PoOo C30X 33068 — R,q�E �I-�9 NGRTH � GF�U�INq 2765C-�-3068
� copyr�gnt K�miey-Horn and Asso��ates9 �n�o9 2o io FHONEo (9 I a) E77-2000 �/�X� (9 19) 077-2050 �E �io, F-o ioz
� � �
50'9
1
1
\
1
1
�
�
�
PROJ= � T�
U-4916
BECKFORD DRIVE WIDENING
JOE3 NUMBER: SH�ET NUMBERe
0��065000 x-���
c
�
�
J
I
Q
k
I
�
�
c1'
�
i
C
O
�
i
�
�
O
�
�
U
Q)
m
�
O
O
O
�
�
O
O
�
0
�
�
0
0
�
i
J
Q
�
�
�ii O i n [1 lCl O lCi lC� O i n [1 l(� � lf� O � n [1 l(� 0 lf� O � n [1 lf� � l(� � lii i n [1 lf� � lC� O � i n [1 lC� 0 lf� O �ii
^'f�Cf ARC� IN TIJC OF�ICE O�o
■
REV. No.e REVISIONe DATEe DRAWN BYe CHECKED BY: �
�
� This document, together with the concepts and designs presented herein, as an instrument of service, is
nJ intended only for the speciffc purpose and cllent for whlch lt was prepared, Reuse o-F and imprc�per
\ reliance on this document without written authorizat°:on and adoption by Kimley-Horn and Associates, Inc, �� , , � ,�
� sna��ee without �iaei�ity to Kim�ey-Horn and �ssociates4�.i�c, PoOo C30X 33068 — R,q�E �I-�9 NGRTH � GF�U�INq 2765C-�-3068
� copyr�gnt K�miey-Horn and Asso��ates9 �n�o9 2o io FHONEo (9 I a) E77-2000 �/�X� (9 19) 077-2050 �E �io, F-o ioz
ROADWAY CROSS SECTIONS
� � n
PROJ= � T�
U-4916
BECKFORD DRIVE WIDENING
JOE3 NUMBER: SH�ET NUMBERe
0 � �0��!=,000 u--8
c
�
�
J
I
Q
k
I
�
�
c1'
�
i
C
O
�
i
�
�
O
�
�
U
Q)
m
�
O
O
O
�
�
O
O
�
0
�
�
0
0
�
i
J
Q
�
�
� O i n n lCl O lC� lC� O i n n li� � � lC� O � n n � � � O � O � n n � � O � O i n n �fl � � O i r� n � � �
^'f�Cf ARC� IN TIJC OF�ICE O�o
■
�
REV. No.e REVISIONe DATEe DRAWN BYe CHErKED BY:
�
� This document, together with the concepts and designs presented herein, as an instrument of service, is
nJ intended only for the speciffc purpose and cllent for whlch lt was prepared, Reuse o-F and imprc�per
\ reliance on this document without written authorizat°:on and adoption by Kimley-Horn and Associates, Inc, �� , , � ,�
� sna��ee without �iaei�ity to Kim�ey-Horn and �ssociates4�.i�c, PoOo C30X 33068 — R,q�E �I-�9 NGRTH � GF�U�INq 2765C-�-3068
� copyr�gnt K�miey-Horn and Asso��ates9 �n�o9 2o io FHONEo (9 I a) E77-2000 �/�X� (9 19) 077-2050 �E �io, F-o ioz
ROADWAY CROSS SECTIONS
� � �
PROJ= � T�
U-4916
BECKFORD DRIVE WIDENING
JOE3 NUMBER: SH�ET NUMBERe
0 � �0��!=,000 u-9
c
�
�
J
I
Q
k
I
�
�
c1'
�
i
C
O
�
i
�
�
O
�
�
U
Q)
m
�
O
O
O
�
�
O
O
�
0
�
�
0
0
�
i
J
Q
�
�
O i n [1 lfl 0 lC� O � O i n [1 lCl 0 l(i � O � n [1 lC� � lC� tC� O � n [1 li� � � � O i n [1 lf� � � �ii O ir� [1 lC� � l(�
^'f�Cf ARC� IN TIJC OF�ICE O�o
■
REV. No.e REVISIONe DATEe DRAWN BYe CHECKED BY: �
�
� This document, together with the concepts and designs presented herein, as an instrument of service, is
nJ intended only for the speciffc purpose and cllent for whlch lt was prepared, Reuse o-F and imprc�per
\ reliance on this document without written authorizat°:on and adoption by Kimley-Horn and Associates, Inc, �� , , � ,�
� sna��ee without �iaei�ity to Kim�ey-Horn and �ssociates4�.i�c, PoOo C30X 33068 — R,q�E �I-�9 NGRTH � GF�U�INq 2765C-�-3068
� copyr�gnt K�miey-Horn and Asso��ates9 �n�o9 2o io FHONEo (9 I a) E77-2000 �/�X� (9 19) 077-2050 �E �io, F-o ioz
ROADWAY CROSS SECTIONS
� � n
PROJ= � T�
U-4916
BECKFORD DRIVE WIDENING
JOE3 NUMBER: SH�ET NUMBERe
0 � �065000 x�- 0
c
�
�
J
I
Q
k
I
�
�
c1'
�
i
C
O
�
i
�
�
O
�
�
U
Q)
m
�
O
O
O
�
�
O
O
�
0
�
�
0
0
�
i
J
Q
�
�
O � n n lC� � lC� O O � n n li� � � O O i n n � � � O O i r� n � � � O
^'f�Cf ARC� IN TIJC OF�ICE O�o
■
REV. No.e REVISIONe DATEe DRAWN BYe CHECKED BY: �
�
� This document, together with the concepts and designs presented herein, as an instrument of service, is
nJ intended only for the speciffc purpose and cllent for whlch lt was prepared, Reuse o-F and imprc�per
\ reliance on this document without written authorizat°:on and adoption by Kimley-Horn and Associates, Inc, �� , , � ,�
� sna��ee without �iaei�ity to Kim�ey-Horn and �ssociates4�.i�c, PoOo C30X 33068 — R,q�E �I-�9 NGRTH � GF�U�INq 2765C-�-3068
� copyr�gnt K�miey-Horn and Asso��ates9 �n�o9 2o io FHONEo (9 I a) E77-2000 �/�X� (9 19) 077-2050 �E �io, F-o ioz
ROADWAY CROSS SECTIONS
� � n
PROJ= � T�
U-4916
BECKFORD DRIVE WIDENING
JOE3 NUMBER: SH�ET NUMBERe
0��065000 X-II