Loading...
HomeMy WebLinkAboutNCG140423 DMR SW (7) i STORMCATER DISCHARGE OUTFALL ((SDI) e Secr amAnnuail MO II u t ,[ EIG FOAM G d GENERAL PERMIT NO. NCG1400©0 "��`p5�"Ir;.t� _` ,P,�p-- SAMPLE COLLECTION YEAR: ��(�� `'� FACILITYCERTI t=1CATE OF COVERAGE— NO.�1 � `'�- SAMPLING PERIOD: July-December ; ]January-io�ne NAME: t^l Sl ,.1 +� ! - l COUNTY •_G fix- I---) PERSON COLLECTING SAM"LES A •1� ` �' , PHONE OUNT NO. E�' ) �� J-/..L . /�4 , CERTIFIED LAt30RATORV Lab# ADD TO LISTSERVE?OYES ONO EMAIL: I Lab# DISCHARGING TO CLASS: OSA ❑HQW ❑PNA []Trout: Other OPTIONAL INFO: Part A:Stormwater Monitoring Requirements In Tier Date Sample H Event Total o TierMonthly #of Months iroz ler Collected P TSS Duration Rainfall v 2 Sampling Outfall No. (Standard (mg/L) Monitoring. (mo/dd/yr OR Units) (minutes) (in) NMNO FLOW)1 11 2 - - - - r )1/ 6-9 1002. 16 CEI T' ' el e sure to mark e le od ove. 1 If"NO FLOW"or"NO DISCHARGE,Enter"NO FLOW"or"NO DISCHARGE" t '(for pH)for , mil ust impre.lement thelease cTier 1 or Tier 2 reisponsesin thelGenebal Permit.Tier 2 2 If a value is In excess of the benchmark,or outside the benchmarkrange Monthly sampling shall b 100 mg/I,ne l 3 consecutive e except when discharies are ging to below ORW,HQW,Trout,andrk rwithin the PNA waters bwhere they are 50 rng/I. 3 Tor benchmarkpvaluesmare 4 For each sampled measurable storm event the total precipitation must be recorded using data from an on-site rain gauge. Last Revised 7/13/11 permit Date:7/1/2011-60/30/2015 Page 1 of 2 ( Monitoring Requirements for facilities using>55 gal of new motor oil/month—averaged over a calendar year. Part R: Vehicle IUleintenance Activity In Tier 2 it of Months Event Total New Motor Oil Monthly in Tior pH TpH using method Total Suspended Duration Rainfall4 Usage ilAoreitoring? Sampling2 Outfall ®ate Sample a 5ol'eds m (gal/month) (von) 2 Collected (Standard Z669�SGT-HEM (mg/L) (minutes) (� ) No. Units) (on®/dd/yr)1 �r� 6-92 1002'3 - MIN NIIININIMIIIIIIIIIIIIIIII- NIIIIIIMIIIIIIIMIIIMINNIIIIIIIIIIMIIIIIIIIIIMINIIHINIIIMNIIIIIIIINIIIIIIIII MIIIIMIIIIIIMIIIIIIIIINIIIIIIIIIIMIIIIIINIOINIIIIIIIMIIIIMNIIIIIIIIOIIIIIIIII OIIIIIMINIIIINIIIIIIIMIIIIIIIIMIIIIIIIIMNIINIIII 11111111111111111111111.111111111 IIIIIIIIMINIIIIIMIIIMMIIIINIIIIMIIIIIIIIIMIIIIIIIOIIIIIIIIIMIIIIIINIIIIIIIHIMIII IOIIIIIIOININMINIIMIIIIIIIIIIIIIIMIIIIIIIIIIUNIIIIIIOIIIIIIIIIOIIIIIINIIIIIIIIIIIIMIIIIIIIIII IMIINIIIIIIIHNIIINIINIIIIININIIIIIIIIIIIIIIIMIIIIIIIIMIIIIMINIIINMIIINIIIIMIIIIIII 11111111111.1111111111.11.111111.11111111111111111111111111111111111111111111111111111111111111111 MIIIMIIIIIIINIIIIIIIIIMIIIIIIIIMIIIIIIIIIMIIIIIIIMIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIMIIIIIIIII 1.1111.11111111111111111111111111111111111111111111111111111.111111111.111111111101111111111111111111111111.1111111111 RK EXCEEDS ES AT ANY ONE OUTFALL(INCLUDING VEHICLE MAINTENANCE)? YES 0 NOV HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK ES 0 N 0 HAVE YOU CONTACTED THE REGION? REGIONAL OFFICE CONTACT NAME: d Mail Ori:inal and one cos of this DMR includin: all"No Flow" &"No Dischar:e"retorts within 30 da s of recei•t of sam.le or at end of monitorin: ,erio In case of"No Fl(mw")to: Division of Water Quality Attn:DWQ Central Files 1617 Mail Service Center Raleigh,North Carolina 27699-1617 that this documentANY and all attachments were prepared under my direction or supervision in accordance with a system designed to YOU MUST under penalty y of law, iINFORMATIONandall REPORTED: we of the personni persons who manage the system,or "I certify,equalified e law, assure that personnel properly gather and evaluate the Information submitted. Based on my inquiry e nd ,true, those persons directly responsible for gg atherin the information,the information submitted is,to the best of my wledge and belieffor knowing ccatte,and complete. I am aw- - hat they rz significant penalties for submitting false information,including the possibility®� of�fines���J`P (Date) gnature of P- mittee) Last Revised 7/13/11 Page 2 of 2 Permit Date:7/1/2011-60/30/2015