HomeMy WebLinkAboutNCG130050 DMR SW Semi-annual Stormwater Discharge Monitoring Report
for North Carolina Division of Water Quality General Permit No. NCG
Date submitted_____.,345.42!-V to
CERTIFICATE OF COVERAGE NO.NeC a _ 0_5 ! SAMPLE COLLECTION YEAR 2U/(4,
FACILITY NAME Waste Industries C&D High Point Landfill SAMPLE PERIODen-June r 'Juiy-Dec
COUNTY Guilford or 0 Monthly1 (month)
PERSON COLLECTING SAMPLES Clyde Herrin DISCHARGING TO CLASS DORW OHQW ®Trout DPNA
LABORATORY Research & Anavlsis Lab Cert.# RECEIVED ['Zero-flow ['Water Supply OSA
Comments on sample collection or analysis: J U L 1 1 20)b DOther
CENTRAL FILES PLEASE REMEMBER TO SIGN ON THE REVERSE -
Did this facility perform Vehicle Maintenance Activities using more than 5Pea lginq 4Q6otor oil per month? yes _no
(if yes, report your analytical results in the table immediately below)
Part A:Vehicle Maintenance Areas Monitoring Requirements(If applicable) )5-sNo discharge this period1
Outfall Date 00530 00400
00556
No. Sample Collected, Total Suspended pH, Non-Polar OR and Grease/IPM EPA New Motor Oil Usage,
mo/dd/yr Solids,mg/L Standard units - Method 1664(SGT-HEM).mg/L Annual average gal/mo
Benchmark - 50 or 100 see permit Within 6.0—9.0 15 -
1 —
_2
3 —
Part B: Oil/water Separators and Secondary Containment Areas at Petroleum Bulk Stations and Terminals(If applicable)
Outfall Date 00556 00530 _ 00400
No. Sample Collected, Nen-Polar Oil and Grease/TPH EPA Method Total Suspended Solids, pH,
mo/dd/yr 1664(SGT-HEM),mg/L mg/L standard units
—
Permit Umit - 15 50 or 100 see permit 6.0—9.0
: For sampling periods with no discharge at any single outfall,you must still submit this discharge monitoring report with a checkmark here.
SWU-250 last revised April 11,2013 ..iiiiii
Page 1 of 2
\.
STORM EVENT CHARACTERISTICS:
Date (first event sampled)
Total Event Precipitation(inches):
Date (list each additional event sampled this reporting period,and rainfall amount)
Total Event Predpitation(inches):
Note: If you report a sample value in excess of the benchmark,you must implement Tier 1,Tier 2,or Tier 3 responses. See General Permit text.
FOR PART A AND PART B MONITORING RESULTS:
• A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B.
• 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B.
• TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ❑NO
29
IF YES,HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ❑NO 0
REGIONAL OFFICE CONTACT NAME:
Mail an original and one coag of this DMR.including all"No Discharae"reports,within 30 days of receipt of the lab results for at end of monitoring period in
the case of"No Discharge"reports)to:
Division of Water Quality
Attn:DWQ Central Files
1617 Mail Service Center
Raleigh,North Carolina 27699-1617
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
"I certify,under penalty of law,that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure
that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system,or those persons
directly responsible for gath ring the information,the information submitted is,to the best of my knowledge and belief,true,accurate,and complete. I am aware that
there are significant pena es for miffing false information,including the possibility of fines and imprisonment for knowing violations."
Jr/
(Signature of Permittee) )
Additional copies of this form may be downloaded at:http://portal.ncdenr.ors/web/wcl/ws/su/npdessw#tab-4
last revised April 11,2013
-250 Page 2 of 2